Multilevel rail transit interconnection and interworking train operation scheme compilation method

By determining the number of trains suspended by direct, large stations and stations in multi-level rail transit, optimizing the train operation plan, solving the optimization problem of train operation plan under multi-level rail transit interconnection, and improving passenger travel efficiency and operational benefits .

CN118877047APending Publication Date: 2024-11-01ZHEJIANG RAIL TRANSIT OPERATION MANAGEMENT GROUP CO LTD +1

Patent Information

Application Number
CN202410900868.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The existing technology is difficult to optimize train operation plans under the conditions of multi-level rail transit interconnection, fails to effectively coordinate the supply and demand relationships in collinear operations in different standards, and lacks scientific and reasonable transportation organization plans.

Method used

By determining the number of direct trains, trains suspended at large stations and trains suspended at stations, the passenger flow model and stop plan selection model are adopted to optimize the train operation plan to meet passenger travel needs and ensure the efficiency of train operation and the benefits of operating companies.

Benefits of technology

It has realized a transportation organization plan that is more in line with supply and demand relationships, improved passenger travel efficiency and comfort, made full use of railway network transportation capacity, and provided a scientific and reasonable train operation plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118877047A_ABST
    Figure CN118877047A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-level rail transit interconnection train operation scheme compilation method, and particularly relates to the field of multi-level rail transit transportation organizations, and the method comprises the following specific compilation steps: S1, determining the operation number of non-stop trains; s2, determining a stop scheme of the large stop train; s3, the running number of the large station parking trains is determined; and S4, determining the running number of the train stopping at the station. According to the method, interconnection and intercommunication of multi-level rail transit are taken as an object, the optimization problem of the train operation scheme under the interconnection and intercommunication condition is researched, a basis is provided for formulating a transportation organization scheme more conforming to the supply and demand relation, the scientific and reasonable passenger train operation scheme can make full use of the transportation capacity of a railway network, and the transportation efficiency of the railway network is improved. The travel efficiency of passengers is effectively improved, and meanwhile, a more convenient and comfortable travel environment can be created for the passengers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of multi-level rail transit transportation organization, and more specifically, to a method for compiling a multi-level rail transit interconnected train operation plan. Background Art

[0002] The train operation plan is the main part of the operation organization work, the basis for the preparation of train operation diagram and vehicle operation plan, and the core issue of transportation organization. The passenger train operation plan is a strategic technical plan that plays a connecting role in the operation organization.

[0003] With the rapid development of my country's urban agglomerations, the travel needs of residents have increased, and a network will gradually be formed between multi-level rail transit. The development trend of rail transit interconnection is obvious. Realizing the interconnection of rail transit systems is conducive to improving the accessibility of the line network, meeting the needs of passengers for convenient travel, and improving the overall operating efficiency and competitiveness of the rail transit system. Although my country has accumulated relatively rich theoretical methods and practical experience in the research on the transportation organization of urban rail transit and passenger dedicated lines, the research on multi-level rail transit transportation organization is still insufficient and has not yet formed a theoretical system. Moreover, the exploration of co-line operation of different systems is in its initial stage. How to coordinate the contradictions among multiple subjects in co-line operation when formulating transportation organization plans remains to be studied. Summary of the invention

[0004] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a method for compiling a multi-level rail transit interconnection train operation plan. The technical problem to be solved by the present invention is: how to solve the problem of optimizing the train operation plan under the existing interconnection conditions to carry out research, in order to provide a basis for formulating a transportation organization plan that is more in line with the supply and demand relationship.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solution: a method for compiling a multi-level rail transit interconnection train operation plan, comprising the following specific compilation steps:

[0006] Step S1: Determine the number of direct trains to be run:

[0007] Assume that the passenger flow between stations a and b is P ab , when P ab Satisfy P ab >W×θ 直达 , run direct trains; where W is the train capacity, θ 直达 The minimum full load rate for direct trains, that is, to operate one-stop direct trains while ensuring the profits of the urban rail operating companies;

[0008] Then the number of direct trains from station a to station h is N 直达 Satisfy the following formula:

[0009]

[0010] Step S2, determining a stop plan for trains stopping at major stations;

[0011] The model is constructed as follows:

[0012]

[0013] Where, formula (3) indicates that the train that stops at a major station needs to stop at both the departure and arrival stations; formula (4) indicates that the train that stops at a major station must stop at a selected station, P i is the passenger flow OD volume from the upstream station of station i to the downstream station of station i / person; is the travel time difference between the train stopping at the big station and the train stopping at every station caused by the big station train passing the station i / s; Q i is the number of passengers boarding at station i; is the maximum waiting time / s for passengers boarding at station i due to the train stopping at a large station; x i Indicates whether the large station stop train stops at station i, x i =0 means the long-distance train stops at station i, x i =1 means no stop; n is the total number of stations along the rail transit line;

[0014] Step S3, determining the number of trains stopping at major stations;

[0015] Remember U ij is the passenger flow density between station i and station j, then the passenger flow density of each running section of the train stopping at a major station is:

[0016] U ac =P ac p1+P af p2+P ah p3

[0017] U cf =P cf p1+P ch p2+P af p2+P ah p3

[0018] U fh =P fh p1+P ch p2+P ah p3.

[0020] Therefore, the number of trains stopping at the big station from station a to station h is N. 大站 Satisfy the following formula:

[0021]

[0022] In the formula, θ 大站 The minimum full load factor for trains stopping at major stations;

[0023] Step S4, determining the number of trains that stop at every station;

[0024]

[0025] Where U ij is the passenger flow density between station i and station j.

[0026] In a preferred embodiment, after determining the number of direct trains in step S1, the passenger flow between stations a and b needs to be corrected:

[0027] P ab =max(0,P ab -N 直达 ×W×θ 直达 )

[0028] In the formula, C a is the capacity of trains that originate and arrive at station a / trains; C b is the capacity / train of trains originating and terminating at station b; the corrected passenger flow data and line and station throughput capacity are used to calculate the number of subsequent trains stopping at major stations and trains stopping at every station.

[0029] In a preferred embodiment, before constructing the model in step S2, since different stop plans of trains stopping at major stations have a great impact on the number of train runs, it is necessary to determine the stop plan of trains stopping at major stations through a stop plan selection model before calculating the number of train runs; after determining the number of one-station direct train runs, the corrected OD passenger flow data is used to construct a stop selection model for trains stopping at major stations based on maximizing the passenger travel time benefit as follows:

[0030] ①Objective function

[0031] In order to maximize the travel time benefits of passengers on the urban rail line, on the one hand, it is necessary to maximize the travel time saved by passengers on trains that stop at major stations, and on the other hand, it is necessary to minimize the additional travel time for passengers on trains that stop at every station. Therefore, the model objective function is defined as:

[0032]

[0033] Formula (1) shows that the travel time saved by passengers who choose trains that stop at major stations is maximized, and formula (2) shows that the travel time added by passengers who choose trains that stop at every station is minimized;

[0034] Convert two objective functions into a single objective function:

[0035] In a preferred embodiment, in step S3, after determining the train stop plan for major stations on the line, the number of trains stopping at major stations is determined using the following formula:

[0036] Assume that the train stops at the origin and destination stations a and b, and also stops at the large stations c and f. The train stops at the large stations to attract the OD passenger flow of a→c, a→f, a→b, c→f, c→b, and f→b. Assume that the passenger flow between ac stations P ac , cf station-to-station passenger flow P cf 、fb station passenger flow P fb The probability of choosing a train to stop at a large station (i.e., OD passenger flow between adjacent large stations) is p1; the passenger flow between af ​​stations is P af Passenger flow between cb station P cb The probability of choosing a large station to stop the train is p2; the passenger flow between stations a and b is P ab The probability of choosing a train that stops at a major station is p3. Since passengers with longer travel distances tend to choose trains with faster travel speeds, p3>p2>p1.

[0037] After determining the number of trains stopping at major stations, it is necessary to correct the OD passenger flow between related stations:

[0038] P ac =max(0,P ac -N 大站 ×W×θ 大站 )

[0039] P cf =max(0,P cf -N 大站 ×W×θ 大站 )

[0040] P fb =max(0,P fb -N 大站 ×W×θ 大站 )

[0041] P af =max(0,P af -N 大站 ×W×θ 大站 )

[0042] P cb =max(0,P cb -N 大站 ×W×θ 大站 )

[0043] P ab =max(0,P ab -N 大站 ×W×θ 大站 )

[0044] The corrected passenger flow data and line and station capacities are used to calculate the number of trains that stop at every station.

[0045] In a preferred embodiment, in step S4, the passenger flow density of each section of the train that stops at every station can be calculated based on the remaining passenger flow of the direct trains and the trains that stop at major stations:

[0046] U ab =P ab +P ac +P ad +P ae +P af +P ag +P ah

[0047] U bc =P ac +P ad +P ae +P af +P ag +P ah +P bc +P bd +P be +P bf +P bg +P bh

[0048] …

[0049] U gh =P ah +P bh +P ch +P dh +P eh +P fh +P gh

[0050] Therefore, the number of trains that stop at every station from station a to station h is N. 站站 Satisfy the following formula:

[0051]

[0052] After determining the number of trains that stop at every station, the passenger flow in each section, the line capacity and the station capacity are verified. If the OD passenger flow demands are basically met when the point-line capacity conditions permit, then this plan will be the plan for the number of trains of each type on the line.

[0053] Technical effects and advantages of the present invention:

[0054] The present invention takes the interconnection of multi-level rail transit as the object, and conducts research on the optimization of train operation plans under interconnection conditions, in order to provide a basis for formulating transportation organization plans that are more in line with supply and demand. A scientific and reasonable passenger train operation plan can make full use of the transportation capacity of the railway network, effectively improve the travel efficiency of passengers, and also create a more convenient and comfortable travel environment for passengers. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 Schematic diagram of an example circuit of the present invention. DETAILED DESCRIPTION

[0056] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0057] The present invention provides a method for compiling a multi-level rail transit interconnection train operation plan, and the specific compilation steps are as follows:

[0058] S1. Determine the number of direct trains to be operated:

[0059] Assume that the passenger flow between stations a and b is P ab , when P ab Satisfy P ab >W×θ 直达 , direct trains can be operated; where W is the train capacity, θ 直达 The minimum full load rate for direct trains, that is, one-stop direct trains can be operated under the condition of ensuring the profits of the urban rail operating companies;

[0060] Then the number of direct trains from station a to station h is N 直达 Satisfy the following formula:

[0061]

[0062] After determining the number of direct trains to be operated, the passenger flow between stations a and b needs to be corrected:

[0063] P ab =max(0,P ab -N 直达 ×W×θ 直达 )

[0064] In the formula, C a is the capacity of trains that originate and arrive at station a / trains; C bis the capacity / train of trains originating and terminating at station b; the revised passenger flow data and line and station throughput capacity are used to calculate the number of subsequent trains stopping at major stations and trains stopping at every station;

[0065] S2. Determine the stopping plan for trains at major stations:

[0066] Since different stop plans of trains stopping at major stations have a great impact on the number of trains running, before calculating the number of trains stopping at major stations, it is necessary to determine the stop plan of trains stopping at major stations through the stop plan selection model; after determining the number of direct trains running at one station, the corrected OD passenger flow data is used to maximize the passenger travel time benefit to construct the stop selection model for trains stopping at major stations as follows:

[0067] ①Objective function

[0068] In order to maximize the travel time benefits of passengers on the urban rail line, on the one hand, it is necessary to maximize the travel time saved by passengers on trains that stop at major stations, and on the other hand, it is necessary to minimize the additional travel time for passengers on trains that stop at every station. Therefore, the model objective function is defined as:

[0069]

[0070] Formula (1) shows that the travel time saved by passengers who choose trains that stop at major stations is maximized, and formula (2) shows that the travel time added by passengers who choose trains that stop at every station is minimized;

[0071] The two objective functions can be converted into a single objective function;

[0072]

[0073] ②Model construction

[0074] The stop selection model for trains stopping at major stations is as follows:

[0075]

[0076] Formula (3) indicates that the train that stops at a major station needs to stop at both the departure and arrival stations; Formula (4) indicates that the train that stops at a major station must stop at selected stations;

[0077] S3. Determine the stopping plan for trains at major stations:

[0078] After determining the train stop plan for major stations on the line, the number of trains stopping at major stations can be determined using the following formula:

[0079] Assume that the train stops at the origin and destination stations a and b, and also stops at the large stations c and f. The train stops at the large stations mainly attracts the OD passenger flow between a→c, a→f, a→b, c→f, c→b, and f→b. Assume that the passenger flow between ac stations P ac , cf station-to-station passenger flow Pcf 、fb station passenger flow P fb The probability of choosing a train to stop at a large station (i.e., OD passenger flow between adjacent large stations) is p1; the passenger flow between af ​​stations is P af Passenger flow between cb station P cb The probability of choosing a large station to stop the train is p2; the passenger flow between stations a and b is P ab The probability of choosing a train that stops at a major station is p3. Since passengers with longer travel distances tend to choose trains with faster travel speeds, p3>p2>p1.

[0080] Remember U ij is the passenger flow density between station i and station j, then the passenger flow density of each running section of the train stopping at a major station is:

[0081] U ac =P ac p1+P af p2+P ab p3

[0082] U cf =P cf p1+P cb p2+P af p2+P ab p3

[0083] U fb =P fb p1+P cb p2+P ab p3.

[0084] Therefore, the number of trains stopping at the big station from station a to station h is N. 大站 Satisfy the following formula:

[0085]

[0086] In the formula, θ 大站 ——The minimum load factor for trains stopping at major stations.

[0087] After determining the number of trains stopping at major stations, it is necessary to correct the OD passenger flow between related stations:

[0088] P ac =max(0,P ac -N 大站 ×W×θ 大站 )

[0089] P cf =max(0,P cf -N 大站 ×W×θ 大站 )

[0090] P fb=max(0,P fb -N 大站 ×W×θ 大站 )

[0091] P af =max(0,P af -N 大站 ×W×θ 大站 )

[0092] P cb =max(0,P cb -N 大站 ×W×θ 大站 )

[0093] P ab =max(0,P ab -N 大站 ×W×θ 大站 )

[0094] The corrected passenger flow data and line and station throughput capacity are used to calculate the number of trains that stop at every station;

[0095] S4. Determine the number of trains that stop at every station:

[0096] The passenger flow density of each section of the train that stops at every station can be calculated based on the remaining passenger flow of direct trains and trains that stop at major stations:

[0097] U ab =P ab +P ac +P ad +P ae +P af +P ag +P ah

[0098] U bc =P ac +P ad +P ae +P af +P ag +P ah +P bc +P bd +P be +P bf +P bg +P bh

[0099] …

[0100] U gh =P ah +P bh +P ch +P dh +Peh +P fh +P gh

[0101] Therefore, the number of trains that stop at each station from station a to station h is N. 站站 Satisfy the following formula:

[0102]

[0103] After determining the number of trains that stop at every station, the passenger flow in each section, the line capacity and the station capacity are verified. If the OD passenger flow demands are basically met when the point-line capacity conditions permit, then this plan will be the plan for the number of trains of each type on the line.

[0104] The specific implementation method is as follows: an example is used to verify the implementation method:

[0105] 1. If Figure 1 As shown in the figure, two rail transit lines of different levels can cross the track at G station, where line 1 runs from C1 station to C6 station, with 7 stations (including the crossing station), and line 2 is derived from G station and connected to S3 station; urban trains and national railways, intercity trains and other rail transits of different levels can realize the co-operation of rail transits of different levels through the crossing station G; the basic transportation organization conditions of the line are set as follows: the train formation adopts 4-carriage CRH6F EMU, with a capacity of 740 people and a full load rate of 0.75;

[0106] 2. This example is based on the recent peak hour passenger flow demand data to study the corresponding train operation plan; the example line is a "Y"-shaped structure, with the following routes: ①C1-G-C6, ②C1-G-S3;

[0107] The recent peak hour OD passenger flow distribution between stations on the example line is shown in the following table:

[0108] Table 1: Distribution of OD passenger flow between stations during recent peak hours on the example line (unit: person-times)

[0109] C1 C2 C3 G S1 S2 S3 C4 C5 C6 C1 0 252 148 129 702 442 201 344 562 122 C2 448 0 58 51 610 187 408 407 328 87 C3 203 530 0 443 224 147 809 302 936 849 G 460 776 493 0 271 260 118 390 879 246 S1 111 279 185 156 0 191 424 0 0 0 S2 156 227 211 316 783 0 533 0 0 0 S3 646 674 188 111 713 534 0 0 0 0 C4 874 464 627 507 0 0 0 0 205 751 C5 531 266 148 519 0 0 0 985 0 20 C6 642 534 274 56 0 0 0 757 908 0

[0110] Determine the number of direct trains to run

[0111] ① Determine the number of direct trains from C1 to G to C6

[0112] From Table 1 above, the OD between stations C1 and C6 is: C1→C6=122, C6→C1=642.

[0113]

[0114] It can be obtained that the number of direct trains from C1 to G to C6 is 1, which means that one direct train needs to be operated during the recent peak hours at the first and last stations;

[0115] ② Determine the number of direct trains from C1 to G to S3

[0116] From the table above, the OD between stations C1 and S3 is: C1→S3=201, S3→C1=646.

[0117]

[0118] It can be obtained that the number of direct trains from C1 to G to S3 is 1, which means that one direct train needs to be operated during the recent peak hours at the first and last stations;

[0119] Determine the stopping plan for trains at major stations

[0120] After determining the number of direct trains to be operated, the OD passenger flow and interval passenger flow density between related stations need to be corrected, see Table 2 below;

[0121] Table 2 The remaining passenger flow OD of each station after correction in each section of the peak period of the example line (unit: person-time)

[0122] C1 C2 C3 G S1 S2 S3 C4 C5 C6 C1 0 252 148 129 702 442 0 344 562 0 C2 448 0 58 51 610 187 408 407 328 87 C3 203 530 0 443 224 147 809 302 936 849 G 460 776 493 0 271 260 118 390 879 246 S1 111 279 185 156 0 191 424 0 0 0 S2 156 227 211 316 783 0 533 0 0 0 S3 91 674 188 111 713 534 0 0 0 0 C4 874 464 627 507 0 0 0 0 205 751 C5 531 266 148 519 0 0 0 985 0 20 C6 87 534 274 56 0 0 0 757 908 0

[0123] Calculate the OD volume P of upstream passengers arriving at downstream stations at each station (excluding the first and last stations) in the upstream direction during the recent peak period of the example line i and the number of people boarding at the station Q i , as shown in Table 3 below:

[0124] Table 3 Passenger flow data of recent peak stop plan model (unit: person-time)

[0125] C6 → C1 C5 C4 G C3 C2 <![CDATA[P i ]]> 1708 2415 3805 3992 2155 <![CDATA[Q i ]]> 2449 2472 1729 733 448 S3→C1 S2 S1 G C3 C2 <![CDATA[P i ]]> 1777 1974 2122 2774 1021 <![CDATA[Q i ]]> 1693 731 1729 733 448

[0126] The train's stop time at each intermediate station is shown in Table 4 below. Set the maximum waiting time for passengers boarding at each station due to the train stopping at a major station. The travel time difference between trains stopping at major stations and trains stopping at every station due to overtaking is 600s. See Table 4 below:

[0127] Table 4 Peak-time train stop time table (unit: s)

[0128]

[0129] According to the above data, the stop model for the peak period in the upward direction of the example line is:

[0130]

[0131] Among them, x1-x7 represent stations C5, C4, G, C3, C3, S2, S1 respectively, and the solution is x *=[0,0,0,1,0,0,0], f(x) = 33820(s), so the example line can run trains that stop at C3 during the recent peak hours;

[0132] Determine the number of trains that stop at major stations

[0133] Since the train that stops at major stations only passes through C3 station, for passengers whose destination is the station below C3 station, the probability of choosing the train that stops at major stations and the train that stops at all stations is 0.5. For passengers whose destination is the station above C3 station, that is, passengers whose destination is C1 station, they are more inclined to choose the train that stops at major stations, and the probability of choosing the train that stops at major stations is 0.7. The passenger flow density of each section of the train that stops at major stations is calculated as shown in Table 5 below:

[0134] Table 5 Passenger flow density in each section of the example line during peak hours when trains stop at major stations (unit: person-times)

[0135]

[0136] Assuming the minimum full load rate of trains stopping at major stations is 0.75, calculate the number of trains stopping at major stations;

[0137] ① Number of trains stopping at major stations between C6 and C1:

[0138]

[0139] ① Number of trains stopping at major stations from S3 to C1:

[0140]

[0141] Therefore, during the recent peak hours on the example line, a total of 11 trains stopping at major stations were operated, of which 6 started from C6 station and 5 started from S3 station;

[0142] Determine the number of trains that stop at every station

[0143] After determining the number of trains stopping at major stations, it is necessary to correct the OD passenger flow and interval passenger flow density between related stations, as shown in Table 6 below:

[0144] Table 6 Corrected residual passenger flow density of each section during peak hours of the example line (unit: person-times)

[0145]

[0146]

[0147] Assuming the minimum full load rate of trains that stop at every station is 0.75, calculate the number of trains that stop at every station:

[0148] ① Number of trains stopping at every station between C6 and C1:

[0149]

[0150] ② Number of trains stopping at every station from S3 to C1:

[0151]

[0152] Therefore, it is found that during the recent peak period, a total of 8 trains stop at every station will be operated on the example line, of which 5 start from C6 station and 3 start from S3 station;

[0153] The recent peak-hour train quantity plan for the example line is shown in Table 7 below:

[0154] Table 6: Plan for the number of trains running during peak hours on the example line in the near future

[0155] Direct train Trains stop at major stations Trains stop at every station total C6-C1 1 6 5 12 S3-C1 1 5 3 9 total 1 12 8 21

[0156] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0157] Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other;

[0158] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for compiling a multi-level rail transit interconnection train operation plan, characterized in that: The specific preparation steps are as follows: Step S1: Determine the number of direct trains to be run: Assume that the passenger flow between stations a and b is P ab , when P ab Satisfy P ab >W×θ 直达 , run direct trains; where W is the train capacity, θ 直达 The minimum full load rate for direct trains, that is, to operate one-stop direct trains while ensuring the profits of the urban rail operating companies; Then the number of direct trains from station a to station h is N 直达 Satisfy the following formula: Step S2, determining a stop plan for trains stopping at major stations; The model is constructed as follows: stx1=x n =0 x i ∈{0,1}; Where P i is the passenger flow OD volume from the upstream station of station i to the downstream station of station i / person; is the travel time difference between the train stopping at the big station and the train stopping at every station caused by the big station train passing the station i / s; Q i is the number of passengers boarding at station i; is the maximum waiting time / s for passengers boarding at station i due to the train stopping at a large station; x i Indicates whether the large station stop train stops at station i, x i =0 means the long-distance train stops at station i, x i =1 means no stop; n is the total number of stations along the rail transit line; Step S3, determining the number of trains stopping at major stations; Remember U ij is the passenger flow density between station i and station j, then the passenger flow density of each running section of the train stopping at a major station is: U ac =P ac ·p1+P af ·p2+P ah ·p3 U cf =P cf ·p1+P ch ·p2+P af ·p2+P ah ·p3 U fh =P fh ·p1+P ch ·p2+P ah ·p3. Therefore, the number of trains stopping at the big station from station a to station h is N. 大站 Satisfy the following formula: In the formula, θ 大站 The minimum full load factor for trains stopping at major stations; Step S4, determining the number of trains that stop at every station; Where U ij is the passenger flow density between station i and station j.

2. A method for compiling a multi-level rail transit interconnection train operation plan according to claim 1, characterized in that: After determining the number of direct trains in step S1, the passenger flow between stations a and b needs to be corrected: P ab =max(0,P ab -N 直达 ×W×θ 直达 ) In the formula, C a is the capacity of trains that originate and arrive at station a / trains; C b The capacity / trains of trains originating and terminating at station b; The corrected passenger flow data and line and station capacity are used to calculate the number of subsequent trains stopping at major stations and trains stopping at every station.

3. The method for compiling a multi-level rail transit interconnection train operation plan according to claim 1, characterized in that: In step S2, before constructing the model, the corrected OD passenger flow data is used to construct a stop selection model for large-station trains based on the maximization of passenger travel time benefits as follows: The model objective function is: Formula (1) shows that the travel time saved by passengers who choose trains that stop at major stations is maximized, and formula (2) shows that the travel time added by passengers who choose trains that stop at every station is minimized; Convert two objective functions into a single objective function:

4. The method for compiling a multi-level rail transit interconnection train operation plan according to claim 1, characterized in that: In step S3, after determining the train stop plan for major stations on the line, the number of trains stopping at major stations is determined using the following formula: Assume that the train stops at the origin and destination stations a and b, and also stops at the large stations c and f. The train stops at the large stations to attract the OD passenger flow of a→c, a→f, a→b, c→f, c→b, and f→b. Assume that the passenger flow between ac stations P ac , cf station-to-station passenger flow P cf 、fb station passenger flow P fb The probability of choosing a train to stop at a large station is p1; the passenger flow between stations is P af Passenger flow between cb station P cb The probability of choosing a large station to stop the train is p2; the passenger flow between stations a and b is P ab The probability of choosing a train that stops at a major station is p3. Since passengers with longer travel distances tend to choose trains with faster travel speeds, p3>p2>p1. After determining the number of trains stopping at major stations, it is necessary to correct the OD passenger flow between related stations: P ac =max(0,P ac -N 大站 ×W×θ 大站 ) P cf =max(0,P cf -N 大站 ×W×θ 大站 ) P fb =max(0,P fb -N 大站 ×W×θ 大站 ) P af =max(0,P af -N 大站 ×W×θ 大站 ) P cb =max(0,P cb -N 大站 ×W×θ 大站 ) P ab =max(0,P ab -N 大站 ×W×θ 大站 ) The corrected passenger flow data and line and station capacities are used to calculate the number of trains that stop at every station.

5. The method for compiling a multi-level rail transit interconnection train operation plan according to claim 1, characterized in that: In step S4, the passenger flow density of each section of the train that stops at every station can be calculated based on the remaining passenger flow of the direct train and the train that stops at major stations: U ab =P ab +P ac +P ad +P ae +P af +P ag +P ah U bc =P ac +P ad +P ae +P af +P ag +P ah +P bc +P bd +P be +P bf +P bg +P bh …… U gh =P ah +P bh +P ch +P dh +P eh +P fh +P gh Therefore, the number of trains that stop at every station from station a to station h is N. 站站 Satisfy the following formula: After determining the number of trains that stop at every station, the passenger flow in each section, the line capacity and the station capacity are verified.

Citation Information

Patent Citations

  • Urban rail transit cross-station parking and starting scheme optimization method based on direct passenger flow

    CN113988371A

  • Urban rail transit train timetable optimization method and system considering passenger flow distribution

    CN117022398A

  • Method and system for establishing station passenger flow real-time deduction model based on reinforcement learning

    CN117150907A

  • Method of circulating a set of trains, with all possible stops but with few intermediate stops for each train.

    FR3106803A1

Cited By

  • Flexible train marshalling working diagram compiling method considering subway supply and demand matching

    CN119872654A