PCB (Printed Circuit Board) transfer device
By designing a semi-automated PCB board transfer device, the automatic handling and replacement of test fixtures are achieved using traction accessories and drive devices, which solves the problems of manual operation and time-consuming and labor-intensive operation in traditional equipment and improves the transportation efficiency.
Patent Information
- Application Number
- CN202411056622.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional PCB board transfer equipment requires manual placing the PCB board to be tested onto the test fixture of the transfer truck or removing the tested PCB board from the test fixture, resulting in inconvenient manual operation and time-consuming and laborious. .
A PCB board transfer device is designed, including a transfer vehicle, a transit part and a material changer. The semi-automated PCB board transfer is realized through the traction accessories and the driving device. The first track, the second track and the driving device are used to cooperate with the traction part and the The traction accessories docking realizes the automated handling and replacement of test fixtures.
The semi-automated PCB board transport is realized, which reduces the time and energy of manual operation, improves the transportation efficiency, and can complete the PCB board replacement on all test fixtures faster and easier.
Smart Images

Figure CN118877580A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of PCB board transportation, and in particular to a PCB board transportation device. Background Art
[0002] PCB, or Printed Circuit Board, is a substrate used to support and connect electronic components. It is a flat board made of insulating material, on which electronic components are laid out and connected through structures such as conductive tracks, holes and pads. PCB is one of the most common components in electronic devices, used to build and support electronic circuits. Aging tests usually include simulations of high temperature, low temperature, high and low temperature changes, and comprehensive effects such as electrical power. For example, the PCBA board is placed in a thermal aging device, the temperature in the device is reduced to a specified temperature value at a specified rate, then raised to a high temperature condition for a certain period of time, and finally reduced to room temperature. This process is repeated continuously until the specified aging time. After the PCB board is produced, an aging test is required. Usually, a transfer device is used to transfer the PCB board to be tested to the aging test equipment to complete the test, and then the PCB board that has completed the aging test needs to be transferred to other workstations for unloading and waiting for processing.
[0003] Traditional PCB board transfer equipment realizes transfer through a transfer cart with multiple fixtures. The PCB board to be tested is placed on the test fixture manually, and then the cart is pushed into the aging test equipment. The electrical connectors in the aging test equipment are connected to the test fixture, and the aging test equipment is turned on to finally complete the test of the PCB board on the fixture. After the PCB board test is completed, the transfer cart is manually pushed out, and then pushed to the work station for processing the aging-completed PCB board, and the PCB board is manually removed from the fixture and placed on the work station.
[0004] Traditional PCB board transfer equipment requires manual work to place the PCB boards to be tested onto the test fixture of the transfer vehicle or to remove the tested PCB boards from the test fixture layer by layer. The height of each layer is inconsistent, manual operation is inconvenient, and repeated transportation in and out is time-consuming and laborious. Summary of the invention
[0005] In order to overcome the disadvantages of the prior art that the traditional PCB board transfer equipment requires manual placement of the PCB boards to be tested on the test fixture of the transfer vehicle layer by layer or unloading the tested PCB boards from the test fixture, the height of each layer is inconsistent, the manual operation is inconvenient, and the repeated transport in and out is time-consuming and laborious, the present invention provides a PCB board transfer device, which is characterized by comprising:
[0006] The transfer vehicle is equipped with multiple test fixtures, each of which is equipped with a traction accessory;
[0007] The transfer part is connected to the transfer vehicle and is provided with a first track and a first driving device, wherein the first driving device is connected to the first track in a driving manner; a traction member, a second driving device and a third driving device are provided on the first track, wherein the traction member is connected to the traction accessory in a docking manner, the second driving device is connected to the traction member, and the third driving device is also connected to the traction member;
[0008] The material changing part is connected with the transfer part, and a second track is arranged on the material changing part, and the second track is connected with the first track.
[0009] Optionally, a moving seat is provided on the second driving device, the traction member includes a front hook rod and a rear hook rod, and the front hook rod and the rear hook rod are respectively arranged on the front and rear sides of the moving seat, the traction accessory includes a front hook ring and a rear hook ring, and the front hook ring and the rear hook ring are respectively arranged on the front and rear sides of the test fixture, and the third driving device includes a front cylinder and a rear cylinder, the front cylinder is installed on the front side of the moving seat and connected to the front hook rod, and the rear cylinder is installed on the rear side of the moving seat and connected to the rear hook rod.
[0010] Optionally, a stop position is provided on the first track, a positioning piece and a clamping assembly are provided on the stop position, and a positioning accessory is provided on the fixture, and the positioning accessory is docked with the positioning piece.
[0011] Optionally, the clamping assembly comprises a left clamping cylinder and a right clamping cylinder, and the left clamping cylinder and the right clamping cylinder are respectively arranged on both sides of the first track.
[0012] Optionally, the second driving device includes a screw seat, a second motor, and a second screw, the second motor and the second screw are mounted on the screw seat, the second motor is connected to the second screw, the second screw is provided with a screw nut, and the second screw nut is connected to the moving seat.
[0013] Optionally, the first track includes a crossbeam and two vertical plates, the two vertical plates are arranged on the crossbeam in parallel and at intervals, each vertical plate is provided with a plurality of rolling bearings arranged at intervals, the first driving device includes a first motor and a first screw, the output end of the first motor is connected to the first screw, the first screw is provided with a screw nut, and the crossbeam is connected to the screw nut on the first screw.
[0014] Optionally, the transfer part is provided with a locking piece, the locking piece includes a rotating clamp cylinder, the transfer vehicle is provided with a locking accessory, and the locking accessory is docked with the rotating clamp cylinder.
[0015] Optionally, the test fixture is provided with a limit assembly, the limit assembly includes a limit piece, a spring, and a mounting seat, the mounting seat is installed on the test fixture, the spring is installed in the mounting seat, and the thumb knob is connected to the spring.
[0016] Optionally, a feeding platform and a pushing cylinder are provided on the material changing part, and the pushing cylinder is transmission-connected to the feeding platform.
[0017] Optionally, a positioning column and a positioning cylinder are provided on the material changing part, the positioning column is drivingly connected to the positioning cylinder, a positioning ring is provided at the bottom of the test fixture, and the positioning column is docked with the positioning ring.
[0018] The beneficial effect of the present invention is that the test fixture equipped with the PCB board on the transfer vehicle is extracted through the transfer part, and then the tested PCB board is manually removed from the test fixture and the PCB board to be tested is placed on the test fixture in the material replacement part, and the PCB boards on all the test fixtures on the transfer vehicle can be replaced in such a reciprocating cycle, thereby realizing semi-automatic PCB board transfer and replacement, thereby realizing more time-saving and labor-saving PCB board transfer. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0020] Figure 1 is a schematic diagram of the structure of some embodiments;
[0021] Figure 2 is a partial structural schematic diagram of some embodiments;
[0022] Figure 3 is a schematic diagram of the structure of a transfer vehicle in some embodiments;
[0023] Figure 4 yes Figure 3 A partial enlarged view of the middle A part;
[0024] Figure 5 is a schematic diagram of a test fixture structure with a PCB board placed thereon in some embodiments;
[0025] Figure 6 is a schematic structural diagram of a test fixture with a PCB board placed at another angle in some embodiments;
[0026] Figure 7 is a schematic diagram of the structure of the limit assembly in some embodiments;
[0027] Figure 8 is a schematic diagram of the structure of the transfer part in some embodiments;
[0028] Fig. 9 is a schematic diagram of the assembly structure of the first track, the traction member, the second driving device, and the third driving device in some embodiments;
[0029] Fig.10 yes Fig. 9 A partial enlarged view of the middle B part;
[0030] Fig.11 is a partial structural schematic diagram of a material changing unit in some embodiments;
[0031] Fig.12 It is a structural schematic diagram of a partial structure of a material changing portion from another angle in some embodiments.
[0032] Description of reference numerals:
[0033] 1. Transfer vehicle; 101. Test fixture; 2. Transfer unit; 201. First track; 3. Material changing unit; 301. Second track; 202. Moving seat; 203. Front hook rod; 204. Rear hook rod; 102. Front hook ring; 103. Rear hook ring; 205. Front cylinder; 206. Rear cylinder; 207. Left clamping cylinder; 208. Right clamping cylinder; 209. Base; 210. Moving block; 211. Positioning roller; 104. Positioning block; 105. Positioning slot; 212. Screw seat; 213. Second motor; 214. The second screw rod; 215, the cross beam; 216, the vertical plate; 217, the rolling bearing; 218, the first motor; 219, the first screw rod; 220, the machine compartment; 221, the guide column; 222, the rotating clamp cylinder; 106, the frame; 107, the wheel; 108, the support rod; 109, the positioning block; 110, the limiting piece; 111, the mounting seat; 112, the screw seat; 113, the locking block; 302, the feeding platform; 303, the pushing cylinder; 304, the positioning column; 305, the positioning cylinder; 114, the positioning ring; 4, the PCB board. DETAILED DESCRIPTION
[0034] The following will clearly and completely describe the concept, specific structure and technical effects of the present invention in combination with the embodiments and drawings, so as to fully understand the purpose, characteristics and effects of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, other embodiments obtained by technicians in this field without creative work are all within the scope of protection of the present invention. In addition, all the connection / connection relationships involved in the patent do not refer to the direct connection of components, but refer to the formation of a better connection structure by adding or reducing connection accessories according to the specific implementation situation. The various technical features in the invention can be combined interchangeably without conflicting with each other.
[0035] The present invention provides a PCB board 4 transfer device, which is used to transfer the PCB board 4 in the aging test process, including: a transfer vehicle 1, which is provided with a plurality of test fixtures 101, and each test fixture 101 is provided with a traction accessory; a transfer part 2, which is docked with the transfer vehicle 1, and is provided with a first track 201 and a first drive device, the first drive device is connected to the first track 201 by transmission, and the first track 201 is provided with a traction member, a second drive device, and a third drive device, the traction member is docked with the traction accessory, the second drive device is connected to the traction member, and the third drive device is also connected to the traction member; a material replacement part 3, which is docked with the transfer part 2, and the material replacement part 3 is provided with a second track 301, and the second track 301 is docked with the third track. Among them, the transfer vehicle 1 is used to transfer the PCB board 4 to be tested to the aging test equipment and to transfer the PCB board 4 after the test is completed from the aging test equipment, the transfer part 2 is used to transfer and extract the PCB board 4 in the transfer vehicle 1 or to send the PCB board 4 to be tested to the transfer vehicle 1, and the material replacement part 3 is used to replace the PCB board 4 transferred by the transfer part 2.
[0036] During implementation, the transfer vehicle 1 equipped with the PCB board 4 to be tested is pushed into the aging test equipment, the electrical connector in the aging test equipment is connected to the test fixture 101 on the transfer vehicle 1, the aging test equipment is turned on for testing, and the transfer vehicle 1 is pushed out after the test is completed. Then, the transfer vehicle 1 is docked to the transfer part 2, and the first track 201 on the transfer part 2 can move in the first direction under the drive of the first driving device. The movement of the first track 201 in the first direction is used to align the fixtures at different positions. The traction member can move in the second direction under the action of the second driving device. The movement of the traction member in the second direction is used to remove or send the fixture in. The traction member moves in the third direction. The driving device can move in the third direction, and the traction member moves in the third direction to dock with the traction accessory. When the transfer vehicle 1 docks with the transfer part 2, the first track 201 can move in the first direction to approach the test fixtures 101 at different positions. After approaching a test fixture 101, the second driving device drives the traction member to a position close to the test fixture 101, and then the third driving device drives the traction member to move in the third direction, so that the traction member docks with the traction accessory on the test fixture 101, and then the second driving device drives the traction member to move in the second direction, and the test fixture 101 is detached from the traction member, and the test fixture 101 is on the first track 201. The traction member drives the test fixture 101 to move from the first track 201 to the second track 301 of the material replacement part 3, and then the PCB board 4 on the fixture that has been tested is manually removed on the second track 301, and then placed on the processing and testing station, and then the PCB board 4 to be tested is manually placed on the test fixture 101, and the traction member drags the test fixture 101 back and sends it into the transfer vehicle 1, and the third driving device drives the traction member to move in the opposite direction of the third direction, and the traction member is disconnected from the traction accessory, and the first driving device drives the first track 201 to the position of other test fixtures 101, and the third driving device here pulls the traction member to the first track 201. The traction device is driven in three directions, and the traction device cooperates with the traction accessories on the test fixture 101 at other positions of the transfer vehicle 1. The traction device then sends the test fixture 101 to the material changing section 3 for material changing. The test fixture 101 equipped with the PCB board 4 on the transfer vehicle 1 is pulled out through the transfer section 2, and then the tested PCB board 4 is manually removed from the test fixture 101 and the PCB board 4 to be tested is placed on the test fixture 101 in the material changing section 3. This reciprocating cycle can complete the replacement of all PCB boards 4 on the test fixtures 101 on the transfer vehicle 1, realizing semi-automatic PCB board 4 transfer and replacement, thereby realizing more time-saving and labor-saving transfer of PCB boards 4.
[0037] Specifically, the traction part is a component of the traction test fixture 101, the traction accessory is a component that docks and cooperates with the traction part, the first driving device is one of a cylinder, an electric push rod, a motor and a screw connection driving device, the second driving device is also one of a cylinder, an electric push rod, a motor and a screw connection driving device, and the third driving device is one of a cylinder and an electric push rod.
[0038] In some embodiments, a moving seat 202 is provided on the second driving device, and the traction member includes a front hook rod 203 and a rear hook rod 204, and the front hook rod 203 and the rear hook rod 204 are respectively arranged on the front and rear sides of the moving seat 202, and the traction accessories include a front hook ring 102 and a rear hook ring 103, and the front hook ring 102 and the rear hook ring 103 are respectively arranged on the front and rear sides of the test fixture 101, and the third driving device includes a front cylinder 205 and a rear cylinder 206, and the front cylinder 205 is installed on the front side of the moving seat 202 and connected to the front hook rod 203, and the rear cylinder 206 is installed on the rear side of the moving seat 202 and connected to the rear hook rod 204.
[0039] During implementation, after the second driving device drives the moving seat 202 to approach a test fixture 101, the rear hook rod 204 on the moving seat 202 is located at the bottom of the front hook ring 102 of the test fixture 101, and at this time, the rear cylinder 206 drives the rear hook rod 204 to move upward, and the rear hook rod 204 hooks the front hook ring 102 of the test fixture 101, and then the second driving device drives the moving seat 202 to move and drag the test fixture 101 out of the transfer vehicle 1, and the test fixture 101 enters the first track 201. When the test fixture 101 is pulled to a predetermined position, the moving seat 202 stops moving, and the rear cylinder 206 drives the rear hook rod 204 to withdraw from the front hook ring 102 of the test fixture 101. The second driving device drives the moving seat 202 to move, so that the front hook rod 203 on the moving seat 202 is located under the front hook ring 102 of the test fixture 101, and the front cylinder 205 drives the front hook rod 203 to move upward so that the front hook rod 203 hooks the front hook ring 102, and then the second driving device drives the moving seat 202 to move to the next predetermined position, and the front cylinder 205 drives the front hook rod 203 to withdraw from the front hook ring 102, and the second driving device drives the moving seat 202 again so that the front hook rod 203 of the moving seat 202 is located under the rear hook rod 204 of the test fixture 101, and the front cylinder 205 drives the front hook rod 203 to move upward so that the front hook rod 203 hooks the rear hook ring 103, and the second driving device The movable seat 202 is then driven to move, and the movable seat 202 drives the test fixture 101 to move forward, and finally pushes the test fixture 101 onto the second track 301 of the material replacement part 3, and then the front cylinder 205 drives the front hook rod 203 to descend so that the front hook rod 203 exits the rear hook ring 103, and then the PCB board 4 on the test fixture 101 that has been tested is manually removed and replaced with the PCB board 4 to be tested, and the front cylinder 205 drives the front hook rod 203 to hook the rear hook ring 103 upward, and the second driving device drives the movable seat 202 to move backward, and after reaching a predetermined position, the front cylinder 205 drives the front hook rod 203 to exit the rear hook ring 103, and the second driving device drives the movable seat 202 to move forward The front hook rod 203 is located below the front hook ring 102, and the front cylinder 205 drives the front hook rod 203 upward to hook the front hook ring 102. The second driving device drives the movable seat 202 to move backward. When it reaches a predetermined position, the front cylinder 205 drives the front hook rod 203 to withdraw from the front hook ring 102, and then the second driving device drives the movable seat 202 to move forward, so that the rear hook rod 204 on the movable seat 202 is located below the front hook ring 102, and the rear cylinder 206 drives the rear hook rod 204 to move upward to hook the front hook ring 102. Finally, the second driving device drives the movable seat 202 to move backward until the test fixture 101 is released, and the rear cylinder 206 drives the rear hook rod 204 to withdraw from the front hook rod 203.
[0040] Specifically, two front hook rods 203 are provided on the front side of the moving seat 202, and each front hook rod 203 is connected to a corresponding front cylinder 205. Two rear hook rods 204 are provided on the rear seat of the moving seat 202. There are four guide rails on the moving seat 202, and each guide rail is provided with a slider. The two front hook rods 203 and the two rear hook rods 204 are respectively installed on the sliders of the four guide rails. Two front hook rings 102 are provided on the front side of the test fixture 101, and two rear hook rings 103 are provided on the rear side of the test fixture 101. In this embodiment, the front hook rod 203 and the rear hook rod 204 are below the front hook ring 102 and the rear hook ring 103, so the third direction driven by the third driving device is the vertical direction.
[0041] In some cases, the front hook rod 203 and the rear hook rod 204 are on the left or right side of the front hook ring 102 and the rear hook ring 103. At this time, the third direction driven by the third driving device can be horizontal. The traction member can include a hook ring, and the traction accessory can include a hook column. The traction pulling test fixture 101 is achieved by putting the hook ring on the hook.
[0042] In some embodiments, a stop position is provided on the first track 201, and a positioning piece and a clamping assembly are provided on the stop position. A positioning accessory is provided on the fixture, and the positioning accessory is docked with the positioning piece.
[0043] During implementation, a positioning member and a clamping assembly are installed on the stop position of the first track 201. When the test fixture 101 reaches the stop position, the positioning member docks with the positioning accessory on the test fixture 101, so that the test fixture 101 is positioned at the stop position. Then the clamping assembly clamps the fixture at the stop position, the positioning member is pre-positioned, and the clamping assembly is finally fixed, so that the fixture can be accurately and stably stopped at the stop position.
[0044] Specifically, when the test fixture 101 is being pulled, the test fixture 101 is pulled and advanced by switching the front hook rod 203, the rear hook rod 204 and the front hook ring 102, the rear hook ring 103. The specific switching coordination method has been described in detail in the above embodiment and will not be repeated here. In the above embodiment, the test fixture 101 will stop twice on the first track 201, so the first track 201 is provided with two stop positions, each stop position is provided with a positioning member and a clamping assembly, the first track 201 includes two parallel and spaced vertical plates 216, each vertical plate 216 is provided with a corresponding positioning member, the clamping assembly includes a left clamping cylinder 207 and a right clamping cylinder 208, the left clamping cylinder 207 and the right clamping cylinder 208 are respectively arranged on a vertical plate 216 and have corresponding positions, the positioning member includes a base 209 and a moving block 210, the base 209 is provided with a mounting groove, and one of the moving blocks 210 is provided with a mounting groove. The side is connected to the base 209 through a spring, and a positioning roller 211 is provided on the other side of the moving block. The positioning accessories include a positioning block 104, and a positioning groove 105 is provided on the positioning block 104. The positioning groove 105 is the same size as the positioning hole roller. When the test fixture 101 is positioned, the positioning roller 211 will be stuck in the positioning groove 105. The spring of the moving block 210 plays a role of buffering and pushing. After the test fixture 101 is positioned, the left clamping cylinder 207 pushes the test fixture 101. On one side of the jig 101, the right clamping cylinder 208 pushes the other side of the test jig 101, and through the joint action of the left and right clamping cylinders 208 on both sides of the first track 201, the test jig 101 accurately and stably stays on the stop position of the first track 201. When leaving the stop position, the left clamping cylinder 207 and the right clamping cylinder 208 no longer press the side of the test jig 101, the traction part pulls the test jig 101 to leave the stop position, and the positioning roller 211 exits the positioning groove 105.
[0045] In some cases, the positioning member may also be a positioning block 104 provided with a positioning groove 105, and the positioning accessory may also include a base 209 and a moving block 210, wherein the moving block 210 is connected to the base 209 via a spring, and a positioning roller 211 is provided on the moving block 210, and the positioning roller 211 in the positioning member may also replace the spherical protrusion.
[0046] In some embodiments, the second driving device includes a screw seat 212, a second motor 213, and a second screw 214. The second motor 213 and the second screw 214 are installed on the screw seat 212. The second motor 213 is connected to the second screw. The second screw is provided with a screw nut. The second screw 214 nut is connected to the moving seat 202.
[0047] During implementation, the second motor 213 and the second screw rod 214 are installed on the screw rod seat 212, the second screw rod 214 is connected to the output end of the second motor 213, a screw nut is installed on the second screw rod 214, the movable seat 202 is installed on the screw nut of the second screw rod 214, the second motor 213 is started, the second motor 213 drives the second screw rod 214 to rotate, and the screw nut on the second screw rod 214 can move on the second screw rod 214, and the screw nut drives the movable seat 202 to move on the second screw rod 214, so that the movable seat 202 drives the traction part to move the traction test fixture 101.
[0048] Specifically, a guide rail is further provided on the screw seat 212, and the movable seat 202 is connected to the guide rail on the screw seat 212 via a slide rail.
[0049] In some cases, the second drive device may also be a pneumatic cylinder or an electric push rod.
[0050] In some embodiments, the first track 201 includes a crossbeam 215 and two vertical plates 216 . The two vertical plates 216 are arranged on the crossbeam 215 in parallel and at intervals. Each vertical plate 216 is provided with a plurality of rolling bearings 217 arranged at intervals.
[0051] During implementation, two vertical plates 216 are installed on the crossbeam 215. The two vertical plates 216 are parallel to each other and spaced apart on the crossbeam 215. A plurality of rolling bearings 217 are arranged on the vertical plates 216. When the test fixture 101 is pulled onto the first track 201 for movement, the bottom of the test fixture 101 will abut against the rolling bearings 217, and the two sides of the test fixture 101 will abut against the rolling bearings 217 of the two vertical plates 216 respectively, so that the test fixture 101 can stably move on the first track 201. The crossbeam 215 is used to support the vertical plates 216.
[0052] In some cases, the first track 201 includes two vertical plates 216 and a bottom plate, and the two vertical plates 216 are respectively disposed on both sides of the bottom plate.
[0053] In some embodiments, the first driving device includes a first motor 218 and a first screw 219. The output end of the first motor 218 is connected to the first screw. The first screw 219 is provided with a screw nut. The cross beam 215 is provided with a connecting plate, which is connected to the screw nut on the first screw 219.
[0054] During implementation, the first screw rod 219 is connected to the output end of the first motor 218, and the cross beam 215 is connected to the screw nut on the first screw rod 219. The first motor 218 drives the first screw rod 219 to rotate, and the screw nut on the first screw rod 219 moves on the first screw rod 219. The screw nut drives the cross beam 215 to move, and the two vertical plates 216 follow the cross beam 215 to move, thereby realizing that the first driving device drives the first track 201.
[0055] Specifically, the transfer part 2 includes a machine compartment 220, in which four guide columns 221 are arranged, each guide column 221 is provided with a guide rail, and a slider is arranged on the guide rail. Two cross beams 215 are arranged, and the two ends of each cross beam 215 are respectively connected to a slider on a guide column 221, and two connecting plates are arranged between the two cross plates. A first driving device is arranged between every two guide columns 221, and a screw nut on the first screw rod 219 of each first driving device is connected to a connecting plate, and each driving motor is fixed on the machine compartment 220, and the first driving motor drives the first screw rod 219 to rotate The screw nut on the first screw rod 219 drives the first screw rod 219 on the connecting plate to move, that is, to move in the first direction. The connecting plate drives the crossbeam 215 to move on the guide rail on the guide column 221. The crossbeam 215 supports the vertical plate 216 to move on the guide column 221. In this embodiment, ten workstations are provided on the transfer vehicle 1. The ten workstations on the transfer vehicle 1 are arranged vertically. The first direction of movement of the first track 201 is also the vertical direction. By moving in the vertical direction to align the test fixture 101 on the transfer vehicle 1, the test fixture 101 at different positions can be taken out.
[0056] In some cases, the first driving device may also be a driving cylinder or a lifting electric push rod. If the ten workstations on the transfer vehicle 1 are arranged horizontally, the guide column 221 and the driving direction of the first driving device can be adjusted, that is, the first direction can be adjusted to the horizontal direction to adapt to the arrangement of the ten workstations of the transfer vehicle 1, thereby ensuring that the first track 201 can be moved to the position of each test fixture 101; the first track 201 may also be a slide groove, and the slide groove width is the same as the test fixture 101.
[0057] In some embodiments, the transfer part 2 is provided with a positioning member, the positioning member includes a rotating clamping claw cylinder 222, and the transfer vehicle 1 is provided with a positioning accessory, and the positioning accessory is docked with the rotating clamping claw cylinder 222. Among them, the positioning member is a component used to position the transfer vehicle 1 on the transfer part 2, and the positioning accessory is an accessory used to cooperate with the positioning member to position the transfer vehicle 1 on the transfer part 2.
[0058] During implementation, after the transfer vehicle 1 is docked to the transfer part 2, the rotating clamp cylinder 222 on the transfer part 2 clamps the positioning accessories on the transfer vehicle 1 so that the transfer vehicle 1 is positioned on the transfer part 2. When the transfer vehicle 1 needs to leave, the rotating clamp cylinder 222 can contact and clamp the transfer vehicle 1.
[0059] Specifically, the transfer vehicle 1 includes a frame 106 and wheels 107, the wheels 107 are arranged at the bottom of the frame 106, the test fixture 101 is arranged on the frame 106, the frame 106 is a frame structure composed of a support rod 108, the positioning accessories include a positioning block 109, the positioning block 109 is installed on the support rod 108, and the transfer part 2 is also provided with a metal proximity switch (not shown in the figure) and a control device, the metal proximity switch (not shown in the figure) is connected to the control device, and the control device is connected to the rotating clamping cylinder. When the transfer vehicle 1 approaches the transfer part 2 and reaches a predetermined position, the metal proximity switch (not shown in the figure) senses the transfer vehicle. 1 arrives at the predetermined position, the metal proximity switch (not shown in the figure) transmits the position signal of the transfer vehicle 1 to the control device, and after receiving the signal, the control device controls the rotating clamping claw cylinder 222 to clamp the positioning block 109, so as to achieve the purpose of positioning the transfer vehicle 1 in the transfer part 2, and finally complete the docking of the transfer vehicle 1 and the transfer part 2. The transfer part 2 includes a carriage 220, and the carriage 220 is provided with a docking interface. The part of the transfer vehicle 1 with the positioning accessories will enter the docking interface, and the rotating clamping claw cylinder 222 will position the transfer vehicle 1 in the docking interface. A guide plate is provided at the docking interface, and a roller is provided on the guide plate. After the transfer vehicle 1 enters the docking interface, it will conflict with the roller.
[0060] In some cases, the locking member can be a magnet disposed on the transfer part 2, and the locking accessory can be a magnet disposed on the transfer vehicle 1. When the transfer vehicle 1 reaches the predetermined position, the magnets will attract each other, so that the transfer vehicle 1 is locked on the transfer part 2.
[0061] In some embodiments, a limit assembly is provided on the test fixture 101, and the limit assembly includes a limit member 110, a spring, and a mounting seat 111. The mounting seat 111 is installed on the test fixture 101, the spring is installed in the mounting seat 111, and the limit member 110 is connected to the spring.
[0062] During implementation, the mounting base 111 equipped with the limit member 110 and the spring is installed on the test fixture 101. Before placing the PCB board 4 on the test fixture 101, the limit member 110 is lifted, and then the PCB board 4 is placed under the test fixture 101. After the limit member 110 is released, the limit member 110 is moved down due to the elastic force of the spring so that the limit member 110 contacts the PCB board 4, thereby achieving the purpose of stabilizing the PCB board 4 on the test fixture 101.
[0063] Specifically, the limiter 110 is a thumb-shaped knob, and the thumb-shaped knob has a protruding thumb-shaped pressure head. Before placing the PCB board 4, the pressure head can be rotated to a position where it does not stay on the test fixture 101, so as to avoid the pressure head from hindering the placement of the PCB board 4. After the PCB board 4 is placed, the thumb-shaped knob is rotated to turn the pressure head away from the upper spring of the test fixture 101, and the thumb-shaped knob is pressed down to press the pressure head on the PCB board 4. The mounting seat 111 is detachably mounted on the test fixture 101, and the test fixture 101 has a mounting hole. The mounting seat 111 is provided with a fixed knob, and the fixed knob includes a screw seat 112 and a locking block 113. The locking block 11 3 is arranged in the screw seat 112, and a spring is arranged in the screw seat 112, and the spring is connected to the locking block 113. The locking block 113 is a straight-line structure, and the mounting hole is also a straight-line structure. When installing the mounting seat 111, the locking block 113 is aligned with the mounting hole on the test fixture 101, and then the screw seat 112 is rotated to make the locking block 113 stuck in the mounting hole. The spring in the screw seat 112 will tighten the locking block 113 to achieve the purpose of fixing the mounting seat 111. In some cases, a through hole can be arranged on the mounting seat 111, and the test fixture 101 is provided with a screw hole corresponding to the position of the through hole. The mounting seat 111 can also be fixed to the test fixture 101 by bolts.
[0064] In some embodiments, a feeding platform 302 and a pushing cylinder 303 are provided on the material changing part 3 , and the pushing cylinder 303 is transmission-connected to the feeding platform 302 .
[0065] During implementation, the PCB board 4 to be tested is placed on the feeding platform 302. When the test fixture 101 is sent to the second track 301 of the material replacement part 3, the staff will remove the fixture after the test, and then push the cylinder 303 to push the feeding platform 302 to a position where the staff can channel the PCB board 4 to be tested. The staff then places the PCB board 4 to be tested on the test fixture 101, thereby completing the material replacement of the PCB board 4 to be tested and the PCB board 4 after the test.
[0066] In some embodiments, a positioning column 304 and a positioning cylinder 305 are provided on the material exchange part 3 , the positioning column 304 is transmission-connected with the positioning cylinder 305 , a positioning ring 114 is provided at the bottom of the test fixture 101 , and the positioning column 304 is docked with the positioning ring 114 .
[0067] During implementation, after the test fixture 101 is pushed onto the second track 301 , the positioning cylinder 305 drives the positioning column 304 to rise and the positioning column 304 docks with the positioning ring 114 , thereby positioning the test fixture 101 on the second track 301 for easy material replacement.
[0068] Specifically, the material changing part 3 includes a material changing platform, and the third track is arranged on the material changing platform. The above is a specific description of the preferred implementation of the present invention, but the invention is not limited to the embodiments, and technicians familiar with the art can make various equivalent deformations or substitutions without violating the spirit of the present invention, and these equivalent deformations or substitutions are all included in the scope defined by the claims of this application.
Claims
1. A PCB board transfer device, characterized in that: include: The transfer vehicle is equipped with multiple test fixtures, each of which is equipped with a traction accessory; The transfer part is connected to the transfer vehicle and is provided with a first track and a first driving device, wherein the first driving device is connected to the first track in a driving manner; a traction member, a second driving device and a third driving device are provided on the first track, wherein the traction member is connected to the traction accessory in a docking manner, the second driving device is connected to the traction member, and the third driving device is also connected to the traction member; The material changing part is connected with the transfer part, and a second track is arranged on the material changing part, and the second track is connected with the first track.
2. The PCB board transfer device according to claim 1, characterized in that: A moving seat is provided on the second driving device, the traction member includes a front hook rod and a rear hook rod, and the front hook rod and the rear hook rod are respectively arranged on the front and rear sides of the moving seat, the traction accessory includes a front hook ring and a rear hook ring, and the front hook ring and the rear hook ring are respectively arranged on the front and rear sides of the test fixture, and the third driving device includes a front cylinder and a rear cylinder, the front cylinder is installed on the front side of the moving seat and connected to the front hook rod, and the rear cylinder is installed on the rear side of the moving seat and connected to the rear hook rod.
3. The PCB board transfer device according to claim 1, characterized in that: The first track is provided with a stop position, the stop position is provided with a positioning piece and a clamping assembly, the fixture is provided with a positioning accessory, and the positioning accessory is docked with the positioning piece.
4. The PCB board transfer device according to claim 1, characterized in that: The clamping assembly comprises a left clamping cylinder and a right clamping cylinder, and the left clamping cylinder and the right clamping cylinder are respectively arranged on both sides of the first track.
5. The PCB board transfer device according to claim 1, characterized in that: The second driving device includes a screw seat, a second motor, and a second screw. The second motor and the second screw are installed on the screw seat. The second motor is connected to the second screw. The second screw is provided with a screw nut, and the second screw nut is connected to the moving seat.
6. The PCB board transfer device according to claim 1, characterized in that: The first track includes a crossbeam and two vertical plates, the two vertical plates are arranged on the crossbeam in parallel and at intervals, each vertical plate is provided with a plurality of rolling bearings arranged at intervals, the first driving device includes a first motor and a first screw, the output end of the first motor is connected to the first screw, the first screw is provided with a screw nut, and the crossbeam is connected to the screw nut on the first screw.
7. The PCB board transfer device according to claim 1, characterized in that: The transfer part is provided with a positioning piece, and the positioning piece includes a rotating clamping claw cylinder. The transfer vehicle is provided with a positioning accessory, and the positioning accessory is connected to the rotating clamping claw cylinder.
8. The PCB board transfer device according to claim 1, characterized in that: The test fixture is provided with a limit assembly, which includes a limit piece, a spring, and a mounting seat. The mounting seat is installed on the test fixture, the spring is installed in the mounting seat, and the thumb knob is connected to the spring.
9. The PCB board transfer device according to claim 1, characterized in that: The material changing part is provided with a material feeding platform and a pushing cylinder, and the pushing cylinder is drivingly connected with the material feeding platform.
10. The PCB board transfer device according to claim 1, characterized in that: The material changing part is provided with a positioning column and a positioning cylinder, the positioning column is drivingly connected with the positioning cylinder, the bottom of the test fixture is provided with a positioning ring, and the positioning column is butt-jointed with the positioning ring.
Citation Information
Patent Citations
Chip placing device for chip aging test
CN111940323A
Full-automatic burn-in test feeding and discharging system and method
CN112520413A
Feeding and discharging machine for chip detection
CN115848980A
Transfer mechanism
CN221459105U