Dry quenching pre-storage chamber pressure adjusting system and adjusting method
By using limit sensors, pressure regulating valves, desulfurization control valves and air introduction valves in the dry coke quenching system, the pressure control problem of pre-store chambers is solved, and the control of coke smoke and the reduction of coke burning is achieved. Ensures the safety and economic benefits of the system.
Patent Information
- Application Number
- CN202410976978.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-01
AI Technical Summary
In the dry coke quenching production, the prior art is difficult to effectively control the pressure of the pre-store chamber, resulting in an increase in the amount of smoke and air introduction, high burning of coke, and the regulating valve is malfunctioning, which easily causes smoke and dust spillage, affecting system safety.
The dry quenching pre-store chamber pressure regulation system is adopted, including limit sensors, pressure regulation valves, desulfurization control valves, air introduction valves and controllers. The air pressure of the pre-store chamber is controlled by automatically adjusting the opening of these valves to ensure that the pressure is 0~- Within the range of 100 Pa, reduce air inlet and start the quick shutoff valve when necessary to prevent smoke and dust from spilling out.
Effectively control the smoke from coke, reduce the burning of coke, reduce the amount of air introduction, improve the economic benefits of dry coke quenching, and ensure the safe and stable operation of the system.
Smart Images

Figure CN118879347A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of coking, and relates to a pressure regulating system and a regulating method for a dry coke quenching pre-storage chamber. Background Art
[0002] Coke dry quenching is a coke quenching process that uses direct contact heat exchange between hot coke and inert gas. The pre-storage chamber of the dry quenching furnace is located at the top of the furnace. Its main function is to store red coke and continuously supply the heat of red coke to the cooling chamber, reducing the time interval between coke loading and the fluctuation of circulating gas temperature, and continuously supplying heat to the boiler, thereby ensuring the stability of steam parameters.
[0003] In the daily production of CDQ, the pre-storage chamber pressure is an important adjustment parameter, which directly affects the safe and stable operation of the entire CDQ system. The CDQ pre-storage chamber pressure control system is to ensure the pressure balance and stability in the CDQ furnace during the quenching process, so that the pre-storage chamber pressure is controlled within 0~-100 Pa. If the pressure is too high, the smoke in the furnace will spread to the surrounding atmosphere, causing environmental pollution; if the pressure is too low, a large amount of surrounding air will be sucked into the furnace to burn coke, which will increase the burning loss and affect the boiler inlet temperature and the stability of the circulating gas. Therefore, stabilizing the pre-storage chamber pressure has an important influence and significance.
[0004] The pre-storage chamber pressure regulating valve is the main means of adjusting the pre-storage chamber pressure of the CDQ furnace. The valve is located on the heat pipe heat exchanger at the outlet of the circulating fan. When the opening is large, the pre-storage chamber pressure is reduced due to the release of more gas; on the contrary, when the opening is small, the pre-storage chamber pressure increases.
[0005] In actual production, when loading coke, the opening of the pre-storage chamber pressure regulating valve is increased to increase the negative pressure of the pre-storage chamber, thereby achieving the effect of controlling the smoke from loading coke. However, while this method effectively controls the smoke from loading coke, it increases the amount of air introduced into the system, and the coke burnout increases accordingly, causing the metallurgical coke rate to decrease; in addition, this adjustment method has a single means, and once the regulating valve fails, the pressure in the pre-storage chamber cannot be adjusted, which can easily cause smoke to overflow and even endanger the safety of the entire circulation system. Summary of the invention
[0006] In order to overcome the defects in the above-mentioned related technologies, on the one hand, the present invention proposes a dry quenching coke pre-storage chamber pressure regulating system, which combines a variety of adjustment means to effectively control the pressure of the dry quenching furnace pre-storage chamber, so that the smoke of the dry quenching furnace coke loading is controlled, the air introduction amount of the dry quenching furnace is reduced, the coke burning loss is reduced, the economic benefit of dry quenching is improved, and the safe and smooth operation of the system is ensured.
[0007] To achieve the above technical objectives, the present invention provides a CDQ pre-storage chamber pressure regulating system, which is arranged on the pre-storage chamber of the CDQ furnace, the pre-storage chamber is connected to the vent pipe and the air inlet pipe, and the end of the vent pipe close to the pre-storage chamber is also connected to the desulfurization air pipe.
[0008] The pressure regulating system of the CDQ pre-storage chamber includes: a limit sensor, a pressure regulating valve, a desulfurization control valve, an air introduction valve and a controller. The limit sensor is arranged at the upper end of the derrick of the hoist, and the limit sensor is configured to collect signals to transmit to the upper system when the coke tank rises to the highest point. The pressure regulating valve is arranged on the vent pipe. The desulfurization control valve is arranged on the desulfurization air pipe. The air introduction valve is arranged on the air intake pipe. The limit sensor, pressure regulating valve, desulfurization control valve and air introduction valve are all electrically connected to the controller.
[0009] Preferably, the CDQ pre-storage chamber pressure regulating system further comprises an air pressure sensor, the air pressure sensor is disposed in the pre-storage chamber, and the air pressure sensor is electrically connected to the controller.
[0010] Preferably, the dry coke quenching pre-storage chamber pressure regulating system further comprises a safety bypass, both ends of which are connected to the vent pipe, and the safety bypass pressure regulating valve is connected in parallel. The dry coke quenching pre-storage chamber pressure regulating system further comprises a quick cut-off valve, which is arranged on the safety bypass.
[0011] On the other hand, the present invention also provides a method for regulating the pressure of a dry coke quenching pre-storage chamber, which is applicable to the dry coke quenching pre-storage chamber pressure regulating system in the above aspect, wherein the dry coke quenching pre-storage chamber pressure regulating system comprises: a pressure regulating valve, a desulfurization control valve and an air introduction valve.
[0012] The method for regulating the pressure of the CDQ pre-storage chamber includes: collecting the coke tank position of the elevator, and when the coke tank is at the highest point of the elevator and moves toward the CDQ furnace, closing the air introduction valve, increasing the opening of the desulfurization control valve and the opening of the pressure regulating valve, so that the air pressure in the pre-storage chamber is between -100Pa and 0Pa.
[0013] Preferably, the CDQ pre-storage chamber pressure regulation method further includes: during the coke loading process, when the air pressure in the pre-storage chamber is less than -100 Pa, reducing the opening of the desulfurization control valve; and when the air pressure in the pre-storage chamber is greater than 0 Pa, increasing the opening of the desulfurization control valve.
[0014] Preferably, the CDQ pre-storage chamber pressure regulating method further comprises: when the air pressure in the pre-storage chamber is less than -500 Pa, closing the pressure regulating valve, and controlling the opening of the desulfurization control valve to make the air pressure in the pre-storage chamber between -100 Pa and 0 Pa.
[0015] Preferably, the CDQ pre-storage chamber pressure regulating system comprises: a safety bypass and a quick shut-off valve. The CDQ pre-storage chamber pressure regulating method further comprises: when the negative pressure in the pre-storage chamber cannot be maintained by controlling the opening of the pressure regulating valve, the desulfurization control valve and the air introduction valve, activating the quick shut-off valve to connect the safety bypass with the pre-storage chamber to prevent the coke loading dust from overflowing.
[0016] Preferably, the method for regulating the pressure of the CDQ pre-storage chamber further comprises: when the coke loading is completed, restoring the openings of the pressure regulating valve, the desulfurization control valve and the air introduction valve to a non-coke loading state.
[0017] The beneficial effects of the present invention are: During the coking process, the pressure regulating valve and desulfurization control valve are automatically adjusted to control the gas pressure inside the pre-storage chamber, which effectively controls the smoke from coking. At the same time, the air introduction valve is closed to avoid the intake of a large amount of air, which can reduce the coke burning rate and the amount of air introduced during the coking process, and the boiler inlet temperature fluctuates during the coking process. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or related technologies, the drawings required for use in the embodiments or related technical descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 It is a structural diagram of the present invention; Figure 2 It is a circuit structure diagram of the present invention. DETAILED DESCRIPTION
[0020] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.
[0021] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0022] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "plurality" means two or more.
[0023] like Figure 1 and Figure 2 As shown, on the one hand, the present invention proposes a dry quenching coke pre-storage chamber pressure regulating system, which combines a variety of adjustment means to effectively control the dry quenching furnace pre-storage chamber pressure, so that the smoke of the dry quenching furnace coke loading is controlled, the air introduction amount of the dry quenching furnace is reduced, the coke burning loss is reduced, the economic benefit of dry quenching coke is improved, and the safe and smooth operation of the system is ensured.
[0024] To achieve the above technical objectives, the present invention provides a CDQ pre-storage chamber pressure regulating system, which is arranged on the pre-storage chamber of the CDQ furnace, the pre-storage chamber is connected to the vent pipe and the air inlet pipe, and the end of the vent pipe close to the pre-storage chamber is also connected to the desulfurization air pipe.
[0025] The pressure regulating system of the CDQ pre-storage chamber includes: a limit sensor 1, a pressure regulating valve 2, a desulfurization control valve 3, an air introduction valve 4 and a controller 5. The limit sensor 1 is arranged at the upper end of the derrick of the hoist, and the limit sensor 1 is configured to collect signals and transmit signals to the upper system when the coke tank rises to the highest point. The pressure regulating valve 2 is arranged on the vent pipe. The desulfurization control valve 3 is arranged on the desulfurization air pipe. The air introduction valve is arranged on the air intake pipe. The limit sensor 1, the pressure regulating valve 2, the desulfurization control valve 3 and the air introduction valve 4 are all electrically connected to the controller 5.
[0026] The limit sensor 1 is arranged at the upper end of the derrick. When the coke tank is lifted to the highest point, the coke tank presses down the limit sensor 1, and the limit sensor 1 transmits a high-level signal to the controller 5.
[0027] The controller 5 may be a PLC.
[0028] The pressure regulating valve 2, the desulfurization control valve 3 and the air introduction valve 4 can be electric ball valves.
[0029] Preferably, the CDQ pre-storage chamber pressure regulating system further comprises an air pressure sensor, which is disposed in the pre-storage chamber and is electrically connected to the controller 5 .
[0030] Preferably, the dry coke quenching pre-storage chamber pressure regulating system further comprises a safety bypass, both ends of which are connected to the vent pipe, and the safety bypass pressure regulating valve 2 is connected in parallel. The dry coke quenching pre-storage chamber pressure regulating system further comprises a quick cut-off valve, which is arranged on the safety bypass.
[0031] On the other hand, the present invention also provides a method for regulating the pressure of a dry coke quenching pre-storage chamber, which is applicable to the dry coke quenching pre-storage chamber pressure regulating system in the above aspect, wherein the dry coke quenching pre-storage chamber pressure regulating system comprises: a pressure regulating valve, a desulfurization control valve and an air introduction valve.
[0032] The method for regulating the pressure of the CDQ pre-storage chamber includes: collecting the coke tank position of the elevator, and when the coke tank is at the highest point of the elevator and moves toward the CDQ furnace, closing the air introduction valve, increasing the opening of the desulfurization control valve and the opening of the pressure regulating valve, so that the air pressure in the pre-storage chamber is between -100Pa and 0Pa.
[0033] Preferably, the CDQ pre-storage chamber pressure regulation method further includes: during the coke loading process, when the air pressure in the pre-storage chamber is less than -100 Pa, reducing the opening of the desulfurization control valve; and when the air pressure in the pre-storage chamber is greater than 0 Pa, increasing the opening of the desulfurization control valve.
[0034] Preferably, the CDQ pre-storage chamber pressure regulating method further comprises: when the air pressure in the pre-storage chamber is less than -500 Pa, closing the pressure regulating valve, and controlling the opening of the desulfurization control valve to make the air pressure in the pre-storage chamber between -100 Pa and 0 Pa.
[0035] Preferably, the CDQ pre-storage chamber pressure regulating system comprises: a safety bypass and a quick shut-off valve. The CDQ pre-storage chamber pressure regulating method further comprises: when the negative pressure in the pre-storage chamber cannot be maintained by controlling the opening of the pressure regulating valve, the desulfurization control valve and the air introduction valve, activating the quick shut-off valve to connect the safety bypass with the pre-storage chamber to prevent the coke loading dust from overflowing.
[0036] Preferably, the method for regulating the pressure of the CDQ pre-storage chamber further comprises: when the coke loading is completed, restoring the openings of the pressure regulating valve, the desulfurization control valve and the air introduction valve to a non-coke loading state.
[0037] In some examples, the pressure regulating valve is arranged on the vent pipe. The pressure regulating valve is the main means to adjust the pressure of the pre-storage chamber of the CDQ furnace. The pressure regulating valve is located on the vent pipe at the outlet of the circulating fan. When the opening is large, the pressure of the pre-storage chamber becomes small due to the release of more gas; on the contrary, when the opening is small, the pressure of the pre-storage chamber becomes large.
[0038] A bypass pipe is arranged on the vent pipe, and both ends of the bypass pipe are respectively connected to the vent pipe, and are located above and below the pre-storage chamber pressure regulating valve. A quick cut-off valve is arranged on the bypass pipe, and the quick cut-off valve is closed under normal circumstances.
[0039] The desulfurization control valve is arranged at the lower part of the pressure regulating valve and is used for fine-tuning the pressure of the pre-storage chamber under normal production conditions.
[0040] A linkage relationship between the travel and translation of the elevator and the desulfurization control valve, pressure regulating valve and air inlet valve is established in the controller program.
[0041] Establish a linkage relationship between the pre-storage chamber pressure value and the desulfurization control valve, pressure regulating valve, and quick cut-off valve.
[0042] Under normal production conditions, when the hoist is lifted to the upper limit of the derrick and starts to move toward the CDQ furnace, the air inlet valve opening is automatically completely closed from 50±5%; the desulfurization control valve opening is automatically adjusted from 35±3% to 60±5%; the pressure regulating valve opening is automatically adjusted from 12±3% to 25±5%. At this time, the pressure in the pre-storage chamber should be controlled at -100~0Pa.
[0043] If the pressure in the pre-storage chamber is lower than -100Pa during the coking process, the desulfurization control valve will automatically close by 10±2%; if the pressure is higher than 0Pa, the desulfurization control valve will automatically open by 10±2%, thereby achieving fine-tuning of the pressure in the pre-storage chamber.
[0044] If the pressure in the pre-storage chamber is lower than -500Pa, the water in the water seal tank may be sucked into the dry quenching furnace. At this time, the pressure regulating valve will automatically close and the desulfurization control valve will automatically adjust the pressure to -100±30Pa.
[0045] If the pressure in the pre-storage chamber cannot maintain a slight negative pressure through normal adjustment means, the release quick shut-off valve on the bypass pipe will automatically open 80% to 100% to ensure that the coke dust does not overflow.
[0046] After the coke is loaded, the hoist starts to move toward the hoisting derrick. At this time, the pressure regulating valve automatically recovers from 25±5% to 12±3%; the desulfurization control valve automatically recovers from 60±5% to 35±3%; the air introduction valve automatically adjusts from fully closed to 50±5%, and the entire system returns to the non-coke loading state.
[0047] Through this adjustment method, when coke is loaded, the pressure of the pre-storage chamber is between -100 and -200 Pa, which avoids the inhalation of large amounts of air and ensures that there is no smoke and dust overflow during coke loading; when coke is not loaded, the pressure of the pre-storage chamber is between 0 and -100 Pa, while maintaining the H2 content in the circulating gas system less than 3%, the CO content less than 6%, and the O2 content less than 1%.
[0048] In the description of this specification, specific features, structures, materials or characteristics may be combined in an appropriate manner in any one or more embodiments or examples.
[0049] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A dry coke quenching pre-storage chamber pressure regulating system, which is arranged on the pre-storage chamber of the dry coke quenching furnace, wherein the pre-storage chamber is connected to a vent pipe and an air inlet pipe, and the end of the vent pipe close to the pre-storage chamber is also connected to a desulfurization air pipe; It is characterized in that The CDQ pre-storage chamber pressure regulation system includes: A limit sensor, which is arranged at the upper end of the derrick of the hoist, and is configured to collect a signal when the coke tank rises to the highest point and transmit it to the upper system; A pressure regulating valve, the pressure regulating valve being arranged on the vent pipe; A desulfurization control valve, wherein the desulfurization control valve is arranged on the desulfurization gas pipe; An air introduction valve, the air introduction valve is arranged on the air intake pipe; The controller, the limit sensor, the pressure regulating valve, the desulfurization control valve and the air introduction valve are all electrically connected to the controller.
2. The CDQ pre-storage chamber pressure regulating system according to claim 1, It is characterized in that The CDQ pre-storage chamber pressure regulating system further comprises an air pressure sensor, which is disposed in the pre-storage chamber and is electrically connected to the controller.
3. The CDQ pre-storage chamber pressure regulating system according to claim 2, It is characterized in that The CDQ pre-storage chamber pressure regulating system further comprises a safety bypass, both ends of which are connected to the vent pipe, and the safety bypass pressure regulating valve is connected in parallel; The CDQ pre-storage chamber pressure regulating system further comprises a quick cut-off valve, which is arranged on the safety bypass.
4. A method for regulating the pressure of a dry coke quenching pre-storage chamber, applicable to the dry coke quenching pre-storage chamber pressure regulating system according to any one of claims 1 to 3 above, wherein the dry coke quenching pre-storage chamber pressure regulating system include: Pressure regulating valve, desulfurization control valve and air inlet valve; Characterized in that, the method for regulating the pressure of the dry coke quenching pre-storage chamber comprises: The position of the coke drum of the elevator is collected. When the coke drum is at the highest point of the elevator and moves toward the CDQ furnace, the air inlet valve is closed, and the opening of the desulfurization control valve and the pressure regulating valve are increased to make the air pressure in the pre-storage chamber between -100 Pa and 0 Pa.
5. The method for regulating the pressure of the CDQ pre-storage chamber according to claim 4, It is characterized in that The method for regulating the pressure of the CDQ pre-storage chamber also includes: During the coking process, when the air pressure in the pre-storage chamber is less than -100 Pa, the opening of the desulfurization control valve is reduced, and when the air pressure in the pre-storage chamber is greater than 0 Pa, the opening of the desulfurization control valve is increased.
6. The method for regulating the pressure of the CDQ pre-storage chamber according to claim 5, It is characterized in that The method for regulating the pressure of the CDQ pre-storage chamber also includes: When the air pressure in the pre-storage chamber is less than -500 Pa, the pressure regulating valve is closed, and the opening of the desulfurization control valve is controlled to make the air pressure in the pre-storage chamber between -100 Pa and 0 Pa.
7. The method for regulating the pressure of the CDQ pre-storage chamber according to claim 6, It is characterized in that The CDQ pre-storage chamber pressure regulating system comprises: a safety bypass and a quick cut-off valve; The CDQ pre-storage chamber pressure regulation method further includes: when the negative pressure in the pre-storage chamber cannot be maintained by controlling the opening of the pressure regulating valve, the desulfurization control valve and the air introduction valve, starting the quick shut-off valve to connect the safety bypass with the pre-storage chamber to prevent the coke loading dust from overflowing.
8. The method for regulating the pressure of the CDQ pre-storage chamber according to claim 7, It is characterized in that The method for regulating the pressure of the CDQ pre-storage chamber further comprises: when the coke loading is completed, restoring the openings of the pressure regulating valve, the desulfurization control valve and the air introduction valve to a non-coke loading state.