Prefabricated erected steel-concrete composite beam with high construction efficiency and construction method
By using preset frames and preset parts fast positioning technology in the construction of steel-concrete composite beams, the problems of low construction efficiency and poor flexibility in the existing technology are solved, efficient combination beam splicing and flexible support structure are realized, and the Construction efficiency and flexibility.
Patent Information
- Application Number
- CN202411191616.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-01
AI Technical Summary
In the existing steel-concrete composite beam construction methods, the composite beam formwork support structure is slow to construct and has poor flexibility, and the cast composite beams are difficult to position during lifting and splicing, which affects the construction efficiency.
The preset frame is formed by the support pipe and the pull pipe through snap connection, and the preset piece 1 and the preset piece 2 are arranged, and the fast positioning is achieved through the retractable adjustment rod and the locking shaft, and can be flexibly combined and split to suit different sizes. support demand.
It improves the strength and construction efficiency at the connection, enhances construction flexibility, and can assemble support areas of different sizes according to needs, adapting to combined beam formwork of different sizes.
Smart Images

Figure CN118880751A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of prefabricated beam construction, and more specifically to a prefabricated steel-concrete composite beam with high construction efficiency and a construction method. Background Art
[0002] Conventional domestic steel-concrete composite beam construction methods are mostly to process steel beams into small sections in the factory, transport them to the construction site, and then assemble them into large sections for construction. In order to improve the construction efficiency of steel-concrete composite beams, the steel channel beams will be spliced as a whole and then erected and cast. However, this method has slow construction of the composite beam formwork support structure and poor construction flexibility during the construction process. In addition, the cast and superimposed composite beams are not easy to position during assembly, and the construction efficiency may not meet people's usage needs.
[0003] For example, the announcement number CN116335019A discloses a prefabricated steel-concrete composite beam erection and construction method, such as the following steps: preparation for making steel-concrete composite beams, the steps are as follows: assembling flange formwork; aligning and installing the flange formwork on both sides with the steel channel beam; installing the panel bottom formwork; sealing with glue; installing the steel bars; pouring the concrete layer; maintaining; preparation for erecting steel-concrete composite beams, the steps are as follows: preparing steel-concrete composite beams; transporting and lifting steel-concrete composite beams; feeding steel-concrete composite beams; using a bridge crane to lift and arrange the steel-concrete composite beams for erection; dropping beams; repeating the above steps until all erection construction is completed.
[0004] It can be seen from the above-mentioned public scheme that the channel steel beam and the supporting steel pipe are arranged on the surface of the pedestal. Since the pedestal needs to be poured with concrete first, and the poured pedestal takes a long time to solidify and be usable, and the area and position of the pedestal are fixed, which reduces the flexibility of use. In addition, when the cast steel-concrete composite beams are hoisted and assembled, they are large in size and heavy in weight, so it is not convenient to splice and position them with each other. At the same time, they will be damaged due to insufficient strength at the splicing points during splicing and positioning, thereby affecting the construction efficiency. Summary of the invention
[0005] In view of the problems existing in the prior art, the purpose of the present invention is to provide a prefabricated steel-concrete composite beam and a construction method with high construction efficiency. The prefabricated steel-concrete composite beam and the construction method with high construction efficiency can quickly position the composite beam body during the splicing process by means of preset parts one and two provided on the composite beam body, thereby greatly improving the strength of the connection and greatly improving the construction efficiency. In addition, the preset frames that can be flexibly combined and disassembled can be set at the erection position according to actual needs, and can be assembled into support areas of different sizes as needed, thereby supporting composite beam formworks of different sizes, thereby prefabricating composite beams of different sizes, greatly improving the construction flexibility.
[0006] To solve the above problems, the present invention adopts the following technical solutions.
[0007] A prefabricated steel-concrete composite beam with high construction efficiency comprises a preset frame, wherein the preset frame is formed by a plurality of support tubes and a plurality of pull tubes connected by buckles, one end of the support tube is provided with a retractable adjusting rod, the top of the preset frame is supported by a composite beam template, the bottom of the composite beam template is supported by a plurality of top columns, one end of the top column is fixedly connected to a lifting plate, the bottom of the lifting plate is provided with symmetrical lifting columns, the bottom of the lifting column is provided with a movable base, a composite beam body is formed on the inner side of the composite beam template, the composite beam body is a steel-concrete composite beam formed by casting a steel channel beam and concrete, a preset part 1 and a preset part 2 are respectively provided at both ends of the composite beam body, one end of the preset part 1 is provided with a docking groove, the other end of the preset part 1 is fixedly connected to a first connecting channel steel, both ends of the first connecting channel steel are provided with a first anti-drop plate, and one end of the preset part 2 The first end is fixedly connected with a second connecting channel steel, the two ends of the second connecting channel steel are provided with second anti-slip plates, the side of the second connecting channel steel is fixedly connected with a first reinforcing plate, one end of the first reinforcing plate is fixedly connected with a second reinforcing plate, and the adjacent first reinforcing plates and second reinforcing plates are enclosed to form a second anti-slip groove. The prefabricated erection steel-concrete composite beam and construction method with high construction efficiency can quickly position the composite beam body during splicing through the preset parts one and two set in the composite beam body, thereby greatly improving the strength of the connection and the construction efficiency. In addition, the preset frame that can be flexibly combined and disassembled can be set in the erection position according to actual needs, and can be assembled into support areas of different sizes according to needs, thereby supporting composite beam templates of different sizes, thereby prefabricating composite beams of different sizes, greatly improving the construction flexibility.
[0008] Furthermore, an adjustment hole is provided at one end of the support tube, and the inner wall of the adjustment hole is provided with an internal thread, the surface of the adjustment rod is provided with an external thread matching the internal thread of the adjustment hole, and the surface of the adjustment rod is provided with scale lines, so as to facilitate the control of the telescopic adjustment position of each adjustment rod through the scale lines.
[0009] Furthermore, a connecting hole is provided on the side of the composite beam body, a first through hole is provided on the inner wall of the docking groove which is concentric and coaxial with the connecting hole, and a second through hole is provided on the side of the preset part 2, so as to facilitate the insertion of a locking shaft for locking and pre-positioning through a locking nut or bolt.
[0010] Furthermore, a symmetrical first reinforcement column and a second reinforcement column are fixedly connected to the side of the preset component one, and one end of the first reinforcement column and the second reinforcement column are provided with an anti-slip block, and a first anti-slip groove is enclosed between adjacent second reinforcement columns, which can increase the bonding strength between the preset component one and the concrete.
[0011] Furthermore, one end of the adjusting rod is fixedly connected to a support plate, the shape of the support plate is cylindrical, the surface of the support plate is in contact and connected with the bottom of the combined beam formwork, and the support plate can increase the contact area with the combined beam formwork and improve the support stability.
[0012] Furthermore, the bottom of the mobile base is provided with symmetrical moving wheels and symmetrical adjusting columns, one end of the adjusting column is provided with a pad, the bottom of the pad is provided with anti-slip grooves, and the adjusting column can increase the supporting stability of the bottom of the mobile seat.
[0013] Furthermore, a first blocking block and a second blocking block are provided in the cavity of the composite beam template, and the surface of the first blocking block is in contact with and connected to the inner wall of the docking groove to prevent the docking groove from entering the concrete, while the preset part 2 can be protruded.
[0014] Furthermore, the number of the adjusting columns and the lifting columns is the same, and both the adjusting columns and the lifting columns are hydraulic telescopic columns, so that the lifting plate and the top column have the function of lifting and lowering to adjust the height.
[0015] Furthermore, an anti-skid plate is provided at one end of the support tube, which increases the support area of the bottom of the support tube and ensures the support stability of the support tube.
[0016] A construction method for prefabricated erection of steel-concrete composite beams with high construction efficiency of the present invention is characterized by comprising the following steps:
[0017] First, manually rotate the adjustment rod at one end of the support tubes to adjust to the appropriate support length;
[0018] Then, the adjusted support tubes and the multi-trunk pull tubes are connected and fixed by buckles to form a preset rack;
[0019] Then, the composite beam template assembly is lifted by a gantry crane and placed on the top of the preset frame, and assembled to form a composite beam template. Then, several top columns are moved to the bottom of the composite beam template for support by moving the base;
[0020] Then, the steel channel beam is hoisted by a gantry crane into the composite beam template for assembly. After the assembly is completed, the preset parts 1 and 2 are assembled with the combined channel steel beam, and the beam reinforcement is assembled at the same time;
[0021] Then, concrete is poured into the composite beam formwork by cement tank trucks and pump trucks, and after solidification, the composite beam body, i.e., the steel-concrete composite beam, is formed;
[0022] Then, the prefabricated composite beam body is hoisted across the pier by a gantry crane to the beam transport vehicle, and then transported to the erected beam body by the beam transport vehicle for assembly;
[0023] When assembling the composite beam body, the docking groove provided in the first preset part is engaged with the second preset part provided in the adjacent composite beam body, thereby completing the rapid positioning of the composite beam body;
[0024] Then, the locking shaft is inserted into the coaxial connecting hole, the first through hole and the second through hole and locked. After the assembled composite beam bodies are pre-positioned, the butt joints between the steel-concrete composite beam and the beam support are locked and fixed.
[0025] Compared with the prior art, the advantages of the present invention are:
[0026] (1) The present invention provides the pre-set component 1 and the pre-set component 2 on the composite beam body, which can be quickly positioned during the splicing process of the composite beam body, thereby greatly improving the strength of the connection and the construction efficiency.
[0027] (2) The present invention provides a pre-set frame that can be flexibly combined and disassembled. The pre-set frame can be set at the setting position according to actual needs, and can be assembled into support areas of different sizes according to needs, so as to support composite beam formworks of different sizes, thereby prefabricating composite beams of different sizes, which greatly improves the construction flexibility. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a three-dimensional diagram of the overall structure of the present invention;
[0029] Figure 2 It is a front view of the overall structure of the present invention;
[0030] Figure 3 It is a three-dimensional diagram of the structure of the composite beam body of the present invention;
[0031] Figure 4 for Figure 3 A top view of the overall structure of the preset parts;
[0032] Figure 5 for Figure 3 A top view of the overall structure of the preset component 2;
[0033] Figure 6 for Figure 5 Side view of the first reinforcement plate and the second reinforcement plate mounting structure.
[0034] Description of the numbers in the figure:
[0035] 1 preset frame, 11 support pipe, 12 adjustment rod, 13 anti-skid plate, 14 support plate, 15 pull pipe, 2 combined beam formwork, 21 first blocking block, 22 second blocking block, 3 combined beam body, 31 connecting hole, 4 movable base, 41 adjusting column, 42 lifting column, 43 lifting plate, 44 top column, 5 preset part one, 51 first through hole, 52 docking groove, 53 first reinforcement column, 54 second reinforcement column, 55 anti-slip block, 56 first anti-slip plate, 57 first connecting channel steel, 58 first anti-slip groove, 6 preset part two, 61 second through hole, 62 second connecting channel steel, 63 second anti-slip plate, 64 first reinforcement plate, 65 second reinforcement plate, 66 second anti-slip groove. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] Example 1
[0038] See also Figure 1-6A prefabricated steel-concrete composite beam with high construction efficiency comprises a preset frame 1, which is formed by connecting a plurality of support tubes 11 and a plurality of pull tubes 15 by buckles. A retractable adjusting rod 12 is arranged at one end of the support tube 11. A composite beam template 2 is supported on the top of the preset frame 1. The composite beam template 2 is a beam template component after leaving the factory. It is small in size and not very heavy in weight, which is convenient for transportation and hoisting. At the same time, a steel channel beam component and beam steel bars are assembled inside. The bottom of the composite beam template 2 is supported by a plurality of top columns 44. A lifting plate 43 is fixedly connected to one end of the top column 44. The lifting plate 43 can move up and down under the action of the lifting column 42, thereby driving one end of the top column 44 to contact and support the bottom of the composite beam template 2. A symmetrical lifting column 42 is arranged at the bottom of the lifting plate 43. A movable base 4 is arranged at the bottom of the lifting column 42. The movable base 4 is provided with rollers and can be moved to facilitate supporting the two ends of the bottom of the composite beam template 2. According to the prior art, a composite beam body 3 is formed on the inner side of the composite beam formwork 2. The composite beam body 3 is a steel-concrete composite beam formed by pouring a steel channel beam and concrete. A preset part 1 5 and a preset part 2 6 are respectively provided at both ends of the composite beam body 3. The preset part 1 5 and the preset part 2 6 are both metal parts, which can increase the strength of the splicing and are not easily damaged or deformed during splicing, thereby improving the construction efficiency. A docking groove 52 is provided at one end of the preset part 1 5, and a first connecting channel steel 57 is fixedly connected to the other end of the preset part 1 5. First anti-slip plates 56 are provided at both ends of the first connecting channel steel 57. One end of the preset part 2 6 is fixedly connected to a second connecting channel steel 62. Second anti-slip plates 63 are provided at both ends of the second connecting channel steel 62. A first reinforcing plate 64 is fixedly connected to the side of the second connecting channel steel 62. A second reinforcing plate 65 is fixedly connected to one end of the first reinforcing plate 64, and a second anti-slip groove 66 is enclosed between adjacent first reinforcing plates 64 and second reinforcing plates 65.
[0039] An adjustment hole is provided at one end of the support tube 11, and an internal thread is provided on the inner wall of the adjustment hole, an external thread matching the internal thread of the adjustment hole is provided on the surface of the adjustment rod 12, and scale lines are provided on the surface of the adjustment rod 12, so as to control the telescopic adjustment position of each adjustment rod 12 through the scale lines. A connecting hole 31 is provided on the side of the composite beam body 3, and a first through hole 51 which is coaxial and concentric with the connecting hole 31 is provided on the inner wall of the docking groove 52, and a second through hole 61 is provided on the side of the preset part 2 6, so as to facilitate the insertion of the locking shaft for locking and pre-positioning through a locking nut or bolt. The number of the adjusting column 41 and the lifting column 42 is the same, and both the adjusting column 41 and the lifting column 42 are hydraulic telescopic columns, so that the lifting plate 43 and the top column 44 have the function of lifting and adjusting the height.
[0040] A symmetrical first reinforcing column 53 and a second reinforcing column 54 are fixedly connected to the side of the preset component 5, and one end of the first reinforcing column 53 and the second reinforcing column 54 is provided with an anti-slip block 55, and a first anti-slip groove 58 is enclosed between adjacent second reinforcing columns 54, which can increase the bonding firmness between the preset component 5 and the concrete. One end of the adjusting rod 12 is fixedly connected to a support plate 14, and the shape of the support plate 14 is cylindrical. The surface of the support plate 14 is in contact with the bottom of the composite beam formwork 2. The support plate 14 can increase the contact area with the composite beam formwork 2 and improve the support stability. An anti-slip plate 13 is provided at one end of the support tube 11, which increases the support area of the bottom of the support tube 11 and ensures the support stability of the support tube 11.
[0041] The bottom of the mobile base 4 is provided with symmetrical moving wheels and symmetrical adjusting columns 41, one end of the adjusting column 41 is provided with a pad, the bottom of the pad is provided with anti-slip grooves, the adjusting column 41 can increase the supporting stability of the bottom of the mobile seat 4, and the first blocking block 21 and the second blocking block 22 are provided in the cavity of the combined beam formwork 2. The surface of the first blocking block 21 is in contact with the inner wall of the docking groove 52 to prevent the docking groove 52 from entering the concrete, and at the same time, the preset part 2 6 can be protruded.
[0042] A construction method for prefabricated erection of steel-concrete composite beams with high construction efficiency of the present invention is characterized by comprising the following steps:
[0043] P1. Manually rotate the adjustment rod 12 at one end of the plurality of support tubes 11 to adjust to a suitable support length, and adjust according to the actual support height so that the height of the preset rack 1 is flush;
[0044] P2. Then, the adjusted supporting tubes 11 and the multi-trunk pulling tubes 15 are fixed by snap connection, so as to form a preset frame 1, which can stably support the bottom of the composite beam formwork 2 and facilitate the assembly of the formwork components;
[0045] P3, then use the gantry crane to lift the composite beam template 2 assembly and place it on the top of the preset frame 1, and combine it to form the composite beam template 2, and then move several top columns 44 to the bottom of the composite beam template 2 for support through the mobile base 4;
[0046] P4, then the steel channel beam is hoisted into the composite beam template 2 by a gantry crane for assembly, and after the assembly is completed, the preset part 1 5 and the preset part 2 6 are assembled with the combined channel steel beam, and the beam reinforcement is assembled at the same time;
[0047] P5. Then, concrete is poured into the composite beam template 2 by cement tank trucks and pump trucks, and after solidification, a composite beam body 3, i.e., a steel-concrete composite beam, is formed;
[0048] P6. Then, the prefabricated composite beam body 3 is hoisted across the pier by a gantry crane to the beam transport vehicle, and then transported to the erected beam body by the beam transport vehicle for assembly. The hoisting process needs to comply with the existing construction process;
[0049] P7. When assembling the composite beam body 3, the docking groove 52 provided in the preset part 1 5 is engaged with the preset part 2 6 provided in the adjacent composite beam body 3, so that the composite beam body 3 can be quickly positioned. The existing construction process needs to be followed during the assembly process;
[0050] P8. Then insert the locking shaft into the coaxial connecting hole 31, the first through hole 51 and the second through hole 61 and lock them. After pre-positioning the assembled composite beam body 3, lock and fix the docking part between the steel-concrete composite beam and the beam body support. Inspectors are required to check the locking parts to ensure the safety of the locking operation.
[0051] The prefabricated steel-concrete composite beam and construction method with high construction efficiency can quickly position the composite beam body 3 during the splicing process by means of the preset part 1 5 and the preset part 2 6 provided on the composite beam body 3, thereby greatly improving the strength of the connection and greatly improving the construction efficiency. In addition, the preset frame 1 that can be flexibly combined and disassembled can be set at the erection position according to actual needs, and can be assembled into support areas of different sizes according to needs, thereby supporting composite beam formworks 2 of different sizes, thereby prefabricating composite beams of different sizes, greatly improving the construction flexibility.
[0052] The above is only a preferred specific implementation of the present invention; however, the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and its improved conception within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A prefabricated steel-concrete composite beam with high construction efficiency, comprising a prefabricated frame (1), characterized in that: The preset frame (1) is formed by connecting a plurality of support tubes (11) and a plurality of pull tubes (15) by means of buckles. A retractable adjustment rod (12) is arranged at one end of the support tube (11). The top of the preset frame (1) supports a composite beam template (2). The bottom of the composite beam template (2) supports a plurality of top columns (44). One end of the top column (44) is fixedly connected to a lifting plate (43). The bottom of the lifting plate (43) is provided with symmetrical lifting columns (42). The bottom of the lifting column (42) is provided with a movable base (4). A composite beam body (3) is formed on the inner side of the composite beam template (2). The composite beam body (3) is a steel-concrete composite beam formed by casting a steel channel beam and concrete. Both ends of the composite beam body (3) are A preset component 1 (5) and a preset component 2 (6) are respectively provided, one end of the preset component 1 (5) is provided with a docking groove (52), the other end of the preset component 1 (5) is fixedly connected to a first connecting channel steel (57), both ends of the first connecting channel steel (57) are provided with first anti-slip plates (56), one end of the preset component 2 (6) is fixedly connected to a second connecting channel steel (62), both ends of the second connecting channel steel (62) are provided with second anti-slip plates (63), the side surface of the second connecting channel steel (62) is fixedly connected to a first reinforcing plate (64), one end of the first reinforcing plate (64) is fixedly connected to a second reinforcing plate (65), and the adjacent first reinforcing plates (64) and second reinforcing plates (65) are enclosed to form a second anti-slip groove (66).
2. A prefabricated steel-concrete composite beam with high construction efficiency according to claim 1, characterized in that: An adjustment hole is provided at one end of the support tube (11), and an inner wall of the adjustment hole is provided with an internal thread, and an external thread matching the internal thread of the adjustment hole is provided on the surface of the adjustment rod (12), and scale lines are provided on the surface of the adjustment rod (12).
3. A prefabricated steel-concrete composite beam with high construction efficiency according to claim 1, characterized in that: The side of the composite beam body (3) is provided with a connection hole (31), the inner wall of the docking groove (52) is provided with a first through hole (51) which is coaxial and concentric with the connection hole (31), and the side of the second preset part (6) is provided with a second through hole (61).
4. A prefabricated steel-concrete composite beam with high construction efficiency according to claim 1, characterized in that: A symmetrical first reinforcement column (53) and a second reinforcement column (54) are fixedly connected to the side surface of the pre-set component 1 (5), and an anti-slip block (55) is provided at one end of each of the first reinforcement column (53) and the second reinforcement column (54), and a first anti-slip groove (58) is enclosed between adjacent second reinforcement columns (54).
5. A prefabricated steel-concrete composite beam with high construction efficiency according to claim 1, characterized in that: One end of the adjusting rod (12) is fixedly connected to a support plate (14), the support plate (14) is cylindrical in shape, and the surface of the support plate (14) is in contact with and connected to the bottom of the composite beam formwork (2).
6. A prefabricated steel-concrete composite beam with high construction efficiency according to claim 1, characterized in that: Symmetrical moving wheels and symmetrical adjusting columns (41) are arranged at the bottom of the moving base (4); a pad is arranged at one end of the adjusting column (41); and anti-slip grooves are arranged at the bottom of the pad.
7. A prefabricated steel-concrete composite beam with high construction efficiency according to claim 1, characterized in that: A first blocking block (21) and a second blocking block (22) are arranged in the cavity of the combined beam template (2), and the surface of the first blocking block (21) is in contact with and connected to the inner wall of the docking groove (52).
8. A prefabricated steel-concrete composite beam with high construction efficiency according to claim 1, characterized in that: The number of the adjusting columns (41) and the lifting columns (42) is the same, and both the adjusting columns (41) and the lifting columns (42) are hydraulic telescopic columns.
9. A prefabricated steel-concrete composite beam with high construction efficiency according to claim 1, characterized in that: An anti-skid plate (13) is provided at one end of the support tube (11).
10. A construction method for prefabricated erection of steel-concrete composite beams with high construction efficiency according to claims 1 to 9, characterized in that: The following steps are involved: P1. Manually rotate the adjustment rod (12) at one end of the plurality of support tubes (11) to adjust the support length to a suitable length; P2. Then, the adjusted supporting tubes (11) and the plurality of trunk pulling tubes (15) are fixed by snap-fit connection, thereby assembling into a preset rack (1); P3, then use a gantry crane to lift the combined beam template (2) assembly and place it on the top of the preset frame (1), and combine it to form a combined beam template (2), and then use a mobile base (4) to move a number of top columns (44) to the bottom of the combined beam template (2) for support; P4. Then, the steel channel beam is hoisted by a gantry crane into the composite beam template (2) for assembly. After the assembly is completed, the pre-set component 1 (5) and the pre-set component 2 (6) are assembled with the assembled channel steel beam, and the beam reinforcement is assembled at the same time; P5. Then, concrete is poured into the composite beam formwork (2) by using a cement tank truck and a pump truck, and after solidification, a composite beam body (3) is formed, i.e., a steel-concrete composite beam; P6, then the prefabricated composite beam body (3) is hoisted across the pier by a gantry crane to the beam transport vehicle, and then transported to the erected beam body by the beam transport vehicle for assembly; P7. When assembling the combined beam body (3), the docking groove (52) provided on the preset part 1 (5) is engaged with the preset part 2 (6) provided on the adjacent combined beam body (3), thereby completing the rapid positioning of the combined beam body (3); P8. Then, the locking shaft is inserted into the coaxial connecting hole (31), the first through hole (51) and the second through hole (61) and locked. After the assembled composite beam bodies (3) are pre-positioned, the butt joints between the steel-concrete composite beam and the beam support are locked and fixed.