Construction equipment and construction method for underwater operation of containment plate

By designing construction equipment for pile head connectors and enclosure plate fixtures, the problem of enclosure plates underwater operation is solved, safe and efficient underwater construction is achieved, engineering efficiency is improved and costs are reduced.

CN118880873BActive Publication Date: 2024-12-20TONGXIANG SMALL BOSS SPECIAL PLASTIC PROD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411388136.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-12-20
Estimated Expiration
2044-10-08

AI Technical Summary

Technical Problem

The existing enclosure plate construction equipment cannot operate underwater, which poses safety risks and is costly, which limits its application in underwater projects.

Method used

A construction equipment including pile head connector and enclosure plate fixing is designed. The portable parts and locking mechanisms are used to quickly position and stabilize the enclosure plate to avoid falling of enclosure plates and clamp them by force clamping. and rope pulling ensures the accuracy of the enclosure plate being penetrated underwater.

Benefits of technology

Underwater operations without robot assistance are achieved, operating efficiency is improved, costs are reduced, and it is not affected by the climate, making it suitable for construction all year round.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880873B_ABST
    Figure CN118880873B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of containment plate construction, and in particular to a construction equipment for underwater operation of containment plates, including a pile driver head connecting piece and a containment plate fixing piece, a guide piece is further provided between the pile driver head connecting piece and the containment plate fixing piece, the containment plate fixing piece is used to connect the containment plate, and is further provided with a locking mechanism to prevent the containment plate from falling down during operation; a guide groove is provided on the guide piece along the length direction, and the guide groove is connected with a connecting groove at the end of the containment plate fixed on the containment plate fixing piece. A construction method is also disclosed. The present invention can be connected with the containment plate and press the containment plate under the water surface to realize underwater operation, and when the rear containment plate is driven in, the front containment plate fixing piece is retained on the front containment plate to realize the docking of the rear containment plate with the front containment plate underwater.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of containment plate construction, and in particular to a construction device and a construction method for performing underwater operations on containment plates. Background Art

[0002] Huge waves, floods, mudslides and other natural disasters often cause great damage to ports, coasts, riverbanks, buildings, personnel, etc. For this reason, people have invented artificial dikes to prevent wave invasion, protect coasts, and protect riverbanks. The sheet piles currently used in the market for building dikes have the following main disadvantages: First, most of them are made of steel metal materials, which are easily corroded and rusted after being immersed in water for a long time, which poses a safety hazard and is not conducive to environmental protection; second, the cost is high, which is not conducive to popularization and application; third, the connection structure is relatively simple, usually only extending to both sides into a straight shape, and it is not easy to connect into various shapes according to actual needs, such as right-angle corners, squares, T-shaped structures, etc., which makes the application not convenient and flexible. In addition, the walls, swimming pools and other projects currently used are all made of bricks, which are not only complicated to construct, but also permanent once completed, and cannot be relocated, but can only be dismantled and scrapped, and the dismantled materials can only be discarded and cannot be reused. In short, the technical solutions currently used in such projects have both safety issues and problems such as inconvenient construction, slow progress, low construction efficiency, long construction period, and single function.

[0003] Containment panels are also called sheet piles. They are made of plastic and are composed of multiple plastic sheet piles connected to each other. Connectors are provided at both ends of the sheet piles. Adjacent sheet piles are connected together by inserting corresponding intermediate connectors through the connectors, or connected to each other through the sheet piles' own connectors. Sheet piles are connected at corners by cross connectors, T-shaped connectors or right-angle connectors. Made of plastic, they will not corrode or rust. They are connected through sheet pile connectors or intermediate connectors, and various corner structures are formed by S-shaped connectors and double G-shaped connectors, or cross connectors, T-shaped connectors, right-angle connectors, right-angle hook connectors, etc. The overall structural performance is good, and they are resistant to corrosion, leakage, and earthquakes. They can be used to build seawalls and dams to block waves, floods, landslides, mudslides, etc. They can also be used in the construction of walls, swimming pools, simple houses, etc. They have the advantages of convenient construction, improved work efficiency, and reduced project costs.

[0004] It is widely used. The current products are all exposed to the water surface during construction. However, as the use scenarios of the products change, they are mainly used to prevent water and soil erosion in the wading part of the river or coastline, but the containment plate does not need to be exposed to the water surface. For underwater operations, robots are currently required to assist, and the operation cost is too high, which is not suitable for general underwater engineering operations. Now there is no problem with the construction of products exposed to the water surface, but how to operate underwater has become a big problem. Summary of the invention

[0005] In order to solve the above-mentioned technical deficiencies, the present invention provides a construction equipment and a construction method for underwater operations on a containment plate. The two ends of the containment plate are connected to each other in a cooperative manner, that is, the connecting head at one end and the groove at the other end can be snap-connected. The containment plate body between the containment plate connecting head and the connecting groove can be a flat surface or a special-shaped structure, and the operation can be carried out all year round.

[0006] The present invention designs a construction equipment for underwater operation of containment plates, which includes a pile driver head connecting piece and a containment plate fixing piece. A guide piece is also provided between the pile driver head connecting piece and the containment plate fixing piece, one end of the guide piece is connected to the containment plate fixing piece, and the other end of the guide piece is connected to the pile driver head connecting piece; the containment plate fixing piece is provided with a locking mechanism to prevent the containment plate from falling down during operation; a guide groove is provided on the guide piece along the length direction; a connecting groove is provided on one side of the containment plate fixed on the containment plate fixing piece, the guide groove on the guide piece and the connecting groove on the containment plate are both located on the same side and are opposite to the connecting groove in the length direction, so that the connecting head of the latter containment plate can smoothly slide into the connecting groove of the guide piece of the former construction equipment after entering the guide groove during construction.

[0007] In order to quickly position and fix the containment plate, a guide part is provided at the upper end of the containment plate fixing piece. The lower end opening of the guide part is large, the upper end opening is small, and the inner bottom end surface of the guide part is located in the same plane.

[0008] In order to prevent the containment plate from falling down, the locking mechanism can be as follows: a through hole is provided at the upper end portion of the containment plate fixing piece, and a through hole corresponding to the through hole of the containment plate fixing piece is also provided on the containment plate. The through hole on the containment plate fixing piece and the through hole on the containment plate are fixed by bolts and nuts, or by a latch. The free end of the latch has a hole, and the hole of the latch can be prevented from falling out of the through hole by inserting an insert, such as a steel wire, a steel nail, etc.; an L-shaped component can also be inserted in the through hole, and the other end of the L-shaped component can pass through the containment plate and the containment plate fixing piece. A through hole, a hole is provided at the end of the passing end of the L-shaped member, the hole of the L-shaped member is for the hook-shaped body to hook, and the other end of the hook-shaped body is preferably fixed to the guide member by a tension spring; an L-shaped member can also be inserted in the through hole, one end of the L-shaped member can be inserted into the through hole of the containment plate and the containment plate fixing member, a circular hole is set at the passing end of the L-shaped member, a long hole is set on the side of the circular hole, the long hole is connected to the circular hole, the width of the long hole is smaller than the diameter of the circular hole, and a swinging member is connected to the circular hole through a polygonal pin shaft, and the polygonal pin shaft can rotate in the circular hole, but cannot rotate in the long hole.

[0009] In order to prevent the gap between the containment plate and the containment plate fixings from being too large before the containment plate is driven into the soil layer, causing the driven part to deviate from the predetermined position, the lower end of the containment plate fixings can be clamped with pliers, and after reaching the position, the pliers can be pulled with a rope.

[0010] The locking pliers include a first clamping arm, a second clamping arm, a tension spring, a support rod, a handle and a release plate. An extension portion is extended and fixed at the end of the handle, and an L-shaped release buckle is rotatably connected to the extension portion. One end of the L-shaped release buckle is in contact with the release plate, and a connecting rope is fixed to the other end of the L-shaped release buckle. The other end of the connecting rope is fixed to the end of the first clamping arm, and the rope is connected to the connecting rope.

[0011] The present invention discloses a construction method for underwater operation of a containment plate. In the first step, a first containment plate is arranged on a first containment plate fixing piece, and the construction equipment for underwater operation of the containment plate is detachably connected to a pile driver. Under the action of the pile driver, the first containment plate is driven into a set position depth, and the pile driver is separated from the first construction equipment for underwater operation of the containment plate; in the second step, after the second containment plate is arranged on a second containment plate fixing piece, the second construction equipment for underwater operation of the containment plate is detachably connected to a pile driver head, and under the action of the pile driver, the second containment plate is driven into a set position depth, and the second containment plate is connected to the first containment plate, that is, the connecting head of the second containment plate is inserted into the connecting groove of the first containment plate, and the two form a connection. Then the pile driver is separated from the second construction equipment for underwater operation on the containment plate; the third step is that the pile driver connects to the first construction equipment for underwater operation on the containment plate, separates the containment plate from the construction equipment for underwater operation on the containment plate, and inserts the separated construction equipment for underwater operation on the containment plate into a new containment plate, and the position of the new containment plate is driven into the set depth by the pile driver and the new containment plate is connected with the most recently driven containment plate, and the pile driver is separated from the construction equipment for underwater operation on the containment plate, and the above steps are repeated continuously; the fourth step is that after the construction of the last containment plate is completed, the pile driver pulls out the remaining construction equipment for underwater operation on the containment plate according to the rule of first in first out, and the construction is completed after all the pulling out is completed.

[0012] In order to make it easier to drive into the soil during construction, the length of the containment plate fixings is longer than the length of the containment plate. It is more appropriate to be about 5 cm longer, taking both economy and practicality into consideration.

[0013] The construction equipment and construction method for underwater operations on containment plates obtained by the present invention can be connected to the containment plates and press the containment plates below the water surface. When the rear containment plates are driven in, the previous construction equipment for underwater operations on the containment plates is retained on the front containment plates. The guide groove of the construction equipment for underwater operations on the containment plates is exposed on the water surface, so that the connecting head of the rear containment plate can be inserted into the guide groove and pressed down into the connecting groove of the front containment plate, so as to facilitate the docking between the two containment plates and realize underwater operations.

[0014] The present invention has the characteristics of being able to realize underwater operations without the assistance of robots and being able to operate at any time without being affected by the weather, and the operating efficiency is improved by more than 20% compared with the current level. In addition, the present invention also has the characteristics of simple construction equipment structure and convenient construction operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural front view of the construction equipment of the present invention (without showing the transition guide);

[0016] Figure 2 It is a structural front view of the construction equipment of the present invention (showing the transition guide);

[0017] Figure 3 It is a structural stereogram of the construction equipment of the present invention;

[0018] Figure 4 It is a schematic diagram of the structure of the construction equipment of the present invention (showing the containment plate);

[0019] Figure 5 It is a partial cross-sectional schematic diagram of the construction equipment of the present invention;

[0020] Figure 6 It is a partial cross-sectional schematic diagram of the construction equipment of the present invention after being connected to the containment plate;

[0021] Figure 7 It is a structural schematic diagram of the construction equipment of embodiment 2 of the present invention;

[0022] Figure 8 It is a partial cross-sectional schematic diagram of the construction equipment of Example 2 of the present invention;

[0023] Fig. 9 It is a cross-sectional schematic diagram of a bolt in Embodiment 1 of the present invention when the bolt is a locking mechanism;

[0024] Fig.10 for Fig. 9 A partial enlarged schematic diagram of

[0025] Fig.11 is a cross-sectional schematic diagram of a latch as a locking mechanism according to Embodiment 3 of the present invention;

[0026] Fig.12 for Fig.11 A partial enlarged schematic diagram of

[0027] Fig.13 It is a cross-sectional schematic diagram of embodiment 4 of the present invention;

[0028] Fig.14 for Fig.13 A partial enlarged schematic diagram of

[0029] Fig.15is a cross-sectional schematic diagram of embodiment 5 of the present invention;

[0030] Fig.16 for Fig.15 A partial enlarged schematic diagram of

[0031] Fig.17 It is a schematic diagram of the state of the construction process of the present invention;

[0032] Fig.18 It is a structural schematic diagram of the locking pliers of the present invention. DETAILED DESCRIPTION

[0033] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation mode, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments. Embodiment 1:

[0034] like Figure 1-Figure 4 As shown, the present invention discloses a construction equipment for underwater operation of a containment plate, including a pile driver head connecting member 1 and a containment plate fixing member 2, a guide member 3 is further provided between the pile driver head connecting member 1 and the containment plate fixing member 2, one end of the guide member 3 is connected to the containment plate fixing member 2, and the other end of the guide member 3 is connected to the pile driver head connecting member 1; the containment plate fixing member 2 is used to connect the containment plate 7, and is also provided with a locking mechanism to prevent the containment plate 7 from falling down during operation; a guide groove 31 is provided on the guide member 3 along the length direction, and a connecting groove 71 is provided on one side of the containment plate 7 fixed on the containment plate fixing member 2, the guide groove 31 on the guide member 3 and the connecting groove 71 on the containment plate 7 are both located on the same side and the guide groove 31 is opposite to the connecting groove 71 in the length direction, so that the connecting head 72 of the latter containment plate 7 can smoothly slide into the connecting groove 71 of the previous containment plate 7 after entering the guide groove 31 of the guide member 2 of the previous construction equipment during construction.

[0035] The containment plate 7 is an existing known product, that is, a sheet pile, one end of the body in the width direction of which is a connecting head 72, and the other end is a connecting groove 71. When the containment plate 7 is in use, two adjacent containment plates 7 are butted together, that is, the connecting head 72 of one containment plate 7 is inserted into the connecting groove 71 of another containment plate 7. The shape of the above-mentioned containment plate fixing member 2 is similar to the shape of the body of the containment plate 7, that is, when the containment plate fixing member 2 and the containment plate 7 are butted together, the two fit together. The guide member 3 is provided with a guide groove 31, and the guide groove 31 needs to be connected with the connecting groove 71 of the containment plate 7 fixed on the containment plate fixing member 2. Figure 2-6As shown, in order to adapt to different types of containment plates 7, the containment plate fixing member 2 and the guide member 3 can be made consistent in shape, and a guide member of corresponding length, namely, the containment plate 7, can be fitted on the guide member 3, so that the connecting groove 71 of the containment plate 7 on the guide member 3 is used as the guide groove 31, so that the guide groove 31 is connected with the connecting groove 71 on the containment plate fixing member 2. In this way, when corresponding to different containment plates 7, only the containment plate 7 on the guide member 3 needs to be replaced, and the guide groove 31 can be connected with the connecting groove 71 of the containment plate 7 below.

[0036] A guide part 5 is provided at the upper end of the containment plate fixing part 2, and the guide part 5 is opposite to the containment plate 7. The lower end opening of the guide part 5 is large, and the upper end opening is small. The inner bottom surface of the guide part 5 is flat, and the top end of the containment plate 7 enters the guide part 5 and fits with the inner bottom surface of the guide part 5.

[0037] A guide portion 5 is provided at the upper end of the containment plate fixing member 2, i.e., the junction of the containment plate fixing member 2 and the guide member 3. The guide portion 5 is used to facilitate the insertion of the containment plate 7 into the containment plate fixing member 2 and basically limit the position of the containment plate 7. The guide portion 5 cooperates with the containment plate fixing member 2 to clamp the containment plate 7, so that when the construction equipment cooperates with the pile driver to press the containment plate 7 into the riverbed, the containment plate 7 is more stable and will not deviate outward.

[0038] In order to prevent the containment plate 7 from falling down, the locking mechanism is as follows: Fig. 9 , Fig.10 As shown, a through hole 6 is provided at the upper end portion of the containment plate fixing member 2, and a through hole 6 corresponding to the through hole 6 of the containment plate fixing member 2 is also provided on the containment plate 7, and the through hole 6 on the containment plate fixing member 2 and the through hole 6 on the containment plate 7 are fixed by bolts 8 and nuts 9. Embodiment 2:

[0039] The present invention discloses a construction device for underwater operation of a containment plate, which is different from the first embodiment in that: Figure 7 , Figure 8 As shown, the shape of the guide member 3 is inconsistent with the shape of the containment plate 7. The guide member 3 is a flat structure, and a guide member is arranged on the guide member 3. A guide groove 31 is arranged at one end of the guide member, and the guide groove 31 is connected to the connecting groove 71 of the containment plate 7 fixed on the containment plate fixing member 2. Embodiment 3:

[0040] The present invention discloses a construction device for underwater operation of a containment plate, which is different from the first embodiment in that: Fig.11 , Fig.12As shown, the locking mechanism is a latch 10, and a hole is formed at the free end of the latch 10. The hole of the latch 10 can be inserted with an insert 11 to prevent the latch 10 from slipping out of the through hole 6. The insert 11 can be a steel wire, a steel nail, etc. Embodiment 4:

[0041] like Figure 1-Figure 6 As shown, the present invention discloses a construction equipment for underwater operation of a containment plate, including a pile driver head connecting member 1 and a containment plate fixing member 2, a guide member 3 is further provided between the pile driver head connecting member 1 and the containment plate fixing member 2, one end of the guide member 3 is connected to the containment plate fixing member 2, and the other end of the guide member 3 is connected to the pile driver head connecting member 1; the containment plate fixing member 2 is used to connect the containment plate 7, and is also provided with a locking mechanism to prevent the containment plate 7 from falling down during operation; a guide groove 31 is provided on the guide member 3 along the length direction, and the guide groove 31 is connected to the connecting groove 71 at the end of the containment plate 7 fixed on the containment plate fixing member 2.

[0042] A guide part 5 is provided at the upper end of the containment plate fixing part 2, and the guide part 5 is opposite to the containment plate 7. The lower end opening of the guide part 5 is large, and the upper end opening is small. The inner bottom surface of the guide part 5 is flat, and the top end of the containment plate 7 enters the guide part 5 and fits with the inner bottom surface of the guide part 5.

[0043] In order to prevent the containment plate 7 from falling down, the locking mechanism is as follows: Fig.13 , Fig.14 As shown, it is an L-shaped component 14, the other end of the L-shaped component 14 can pass through the through hole 6 of the containment plate 7 and the containment plate fixing member 2, and the end of the L-shaped component 14 through which it passes has a hole, and the hole of the L-shaped component 14 is for the hook-shaped body 12 to hook, and the other end of the hook-shaped body 12 is preferably fixed to the guide member 3 by a tension spring 13.

[0044] In order to prevent the containment plate 7 from deviating from the set position due to the large gap between the containment plate 7 and the containment plate fixing member 2 before being driven into the soil layer, the lower end of the containment plate fixing member 2 is clamped with a pliers 19. After reaching the position, the pliers 19 are pulled with a rope to retract the pliers 19. The pliers 19 are modified from American C-type pliers produced by Foshan Yingzhiyin Hardware Tools Manufacturing Co., Ltd.

[0045] like Fig.18As shown, the locking pliers 19 include a first clamping arm 1901, a second clamping arm 1902, a tension spring 1903, a support rod 1905, a handle 1904 and a release plate 1906, wherein the above-mentioned components are components of American C-type locking pliers produced by Foshan Yingzhiyin Hardware Tools Manufacturing Co., Ltd., and the mutual connection forms are all known, so they are not described in detail here; the structure of the above-mentioned locking pliers 19 is improved as follows: an extension portion 1907 is extended and fixed at the end of the handle 1904, and an L-shaped release buckle 1908 is rotatably connected to the extension portion 1907, one end of the L-shaped release buckle 1908 is in conflict with the release plate 1906, and a connecting rope 1909 is fixed at the other end of the L-shaped release buckle 1908, and the other end of the connecting rope 1909 is fixed to the end of the first clamping arm 1901, and the rope is connected to the connecting rope 1909.

[0046] During normal use, after the locking pliers 19 clamp the containment plate 7 and the containment plate fixing member 2, the release piece 1906 needs to be pressed to open the locking pliers 19. Therefore, a connecting rope 1909 is used to connect the end of the first clamping arm 1901 and the end of the L-shaped release buckle 1908. When release is required, the rope is pulled, and the L-shaped release buckle 1908 rotates during the pulling of the connecting rope, pressing the release piece 1903, so that the first clamping arm 1901 and the second clamping arm 1902 of the locking pliers 19 are opened, and can be removed from the containment plate 7 and the containment plate fixing member 2, and can be retracted by directly pulling the rope. Embodiment 5:

[0047] The present invention discloses a construction device for carrying out underwater operations on a containment plate, which differs from the fourth embodiment in that: its locking mechanism is: Fig.15 , Fig.16 As shown, an L-shaped member 14 is inserted into the through hole 6, one end of the L-shaped member 14 can be inserted into the through hole 6 of the containment plate 7 and the containment plate fixing member 2, a circular hole 15 is set at the passing end of the L-shaped member 14, and a long hole 16 is set on the side of the circular hole 15, the long hole 16 is connected to the circular hole 15, and the width of the long hole 16 is smaller than the diameter of the circular hole 15, and a swinging member 18 is connected to the circular hole 15 through a polygonal pin shaft 17, the polygonal pin shaft 17 can rotate in the circular hole 15, and cannot rotate in the long hole 16, so when the swinging member 18 rotates to be consistent with the axial direction of the passing end of the L-shaped member 14, it can pass through the through hole 6, and after passing through, the swinging member 18 rotates perpendicular to the passing end of the L-shaped member 14, and moves the polygonal pin shaft 17 into the long hole 16, so that the swinging member 18 maintains its position; wherein the cross-section of the polygonal pin shaft 17 is a regular polygonal structure, and the number of sides is an even number. Embodiment 6:

[0048] like Fig.17As shown, the present invention discloses a construction method for underwater operation of a containment plate. In the first step, a first containment plate 6 is inserted into a first containment plate fixing piece, and the containment plate fixing piece is detachably connected to a pile driver head. Under the action of the pile driver, the first containment plate 6 is driven into a set position depth, and the pile driver head is separated from the containment plate fixing piece; in the second step, after the second containment plate 6 is inserted into the second containment plate fixing piece, the containment plate fixing piece is detachably connected to the pile driver head, and under the action of the pile driver, the second containment plate 6 is driven into a set position depth along a guide groove, and the pile driver head is separated from the containment plate fixing piece; the second containment plate 6 is connected to the first containment plate 6 connection, that is, the second containment plate 6 is inserted into the connecting groove of the first containment plate 6, and the two are connected; the third step, the pile driver head clamps the first containment plate fixing part, separates the containment plate fixing part from the containment plate 6, and inserts the disassembled containment plate fixing part into a new containment plate 6, and drives the pile driver head into the position of the previous containment plate 6 to the set depth, separates the pile driver head from the clamping plate, and the pile driver head clamps the remaining containment plate fixing parts that were driven in first, and continues to repeat the above steps; the fourth step, after the construction of the last containment plate 6 is completed, the pile driver head pulls out the remaining containment plate fixing parts according to the first-in-first-out rule.

[0049] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simplified modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A construction device for underwater operation of a containment plate, characterized by: It comprises a pile driver head connecting piece and a containment plate fixing piece, and a guide piece is further provided between the pile driver head connecting piece and the containment plate fixing piece, one end of the guide piece is connected to the containment plate fixing piece, and the other end of the guide piece is connected to the pile driver head connecting piece; the containment plate fixing piece is used to connect the containment plate, and is also provided with a locking mechanism to prevent the containment plate from falling down during operation; a guide groove is provided on the guide piece along the length direction; a connection groove is provided on one side of the containment plate fixed on the containment plate fixing piece, and the guide groove on the guide piece and the connection groove on the containment plate are both located on the same side and the guide groove and the connection groove are directly opposite to each other in the length direction, so that the connection head of the latter containment plate can smoothly slide into the connection groove of the former containment plate after entering the guide groove of the guide piece of the former construction equipment during construction; the containment plate can be separated from the construction equipment for underwater operation on the containment plate, and the separated construction equipment for underwater operation on the containment plate is inserted into a new containment plate, and the position of the new containment plate is driven into the set depth under the action of the pile driver and the new containment plate is connected with the most recently driven containment plate.

2. The construction equipment for underwater operation of a containment plate according to claim 1 is characterized in that: A guide part is provided at the upper end of the containment plate fixing part, which is opposite to the containment plate. The lower end opening of the guide part is large, and the upper end opening is small. The inner bottom end surface of the guide part is located in the same plane. After the top end of the containment plate enters the guide part, it fits with the inner bottom surface of the guide part.

3. A construction device for underwater operation of a containment plate according to claim 1 or 2, characterized in that: The locking mechanism structure is as follows: a through hole is provided at the upper end portion of the containment plate fixing piece, and a through hole corresponding to the through hole of the containment plate fixing piece is also provided on the containment plate, and the through hole on the containment plate fixing piece is fixed to the through hole on the containment plate by bolts and nuts; or the through hole on the containment plate fixing piece is fixed to the through hole on the containment plate by a pin, and the free end of the pin has a hole, and the hole of the pin can be prevented from falling out of the through hole by inserting a plug-in.

4. A construction equipment for underwater operation of a containment plate according to claim 1 or 2, characterized in that: The locking mechanism structure is as follows: a through hole is provided at the upper end portion of the containment plate fixing piece, and a through hole corresponding to the through hole of the containment plate fixing piece is also provided on the containment plate, an L-shaped member is inserted in the through hole, and the other end of the L-shaped member can pass through the through holes of the containment plate and the containment plate fixing piece, and the end of the passing end of the L-shaped member has a hole, and the hole of the L-shaped member is for a hook-shaped body to hook, and the other end of the hook-shaped body is fixed to the guide member through a tension spring.

5. The construction equipment for underwater operation of containment plates according to claim 1 or 2, characterized in that: The locking mechanism structure is as follows: a through hole is provided at the upper end portion of the containment plate fixing piece, and a through hole corresponding to the through hole of the containment plate fixing piece is also provided on the containment plate, an L-shaped component is inserted in the through hole, one end of the L-shaped component can be inserted into the through hole of the containment plate and the containment plate fixing piece, a circular hole is provided at the passing end of the L-shaped component, a long hole is provided on the side of the circular hole, the long hole is connected with the circular hole, the width of the long hole is smaller than the diameter of the circular hole, a swinging member is connected in the circular hole through a polygonal pin shaft, and the polygonal pin shaft can rotate in the circular hole, but cannot rotate in the long hole.

6. The construction equipment for underwater operation of a containment plate according to claim 2 is characterized in that: The lower end of the containment plate fixing piece and the containment plate are clamped with a locking pliers, and a rope is arranged on the locking pliers.

7. The construction equipment for underwater operation of a containment plate according to claim 6 is characterized by: The locking pliers include a first clamping arm, a second clamping arm, a tension spring, a support rod, a handle and a release plate. An extension portion is extended and fixed at the end of the handle, and an L-shaped release buckle is rotatably connected to the extension portion. One end of the L-shaped release buckle is in contact with the release plate, and a connecting rope is fixed to the other end of the L-shaped release buckle. The other end of the connecting rope is fixed to the end of the first clamping arm, and the rope is connected to the connecting rope.

8. A method for underwater construction of a containment plate using the construction equipment as claimed in claim 1, characterized in that: the first step is: The first containment plate is set on the first containment plate fixing piece, and the construction equipment for underwater operation of the containment plate is detachably connected to the pile driver. Under the action of the pile driver, the first containment plate is driven into the set position depth, and the pile driver is separated from the first construction equipment for underwater operation of the containment plate; in the second step, after the second containment plate is set on the second containment plate fixing piece, the second construction equipment for underwater operation of the containment plate is detachably connected to the pile driver head, and under the action of the pile driver, the second containment plate is driven into the set position depth, and the second containment plate is connected to the first containment plate, that is, the connecting head of the second containment plate is inserted into the connecting groove of the first containment plate, and the two are connected; then the pile driver is separated from the second construction equipment for underwater operation of the containment plate; in the third step, the pile driver connects to the first construction equipment for underwater operation of the containment plate, separates the containment plate from the construction equipment for underwater operation of the containment plate, and carries out underwater operation of the containment plate. The construction equipment for underwater operation inserts a new containment plate, and under the action of the pile driver, the position of the new containment plate is driven into the set depth and the new containment plate is connected with the most recently driven containment plate, and the pile driver is separated from the construction equipment for underwater operation on the containment plate; the pile driver connects to the second construction equipment for underwater operation on the containment plate, separates the containment plate from the construction equipment for underwater operation on the containment plate, and inserts the separated construction equipment for underwater operation on the containment plate into a new containment plate, and under the action of the pile driver, the position of the new containment plate is driven into the set depth and the new containment plate is connected with the most recently driven containment plate, and the pile driver is separated from the construction equipment for underwater operation on the containment plate, and the above steps of the third step are repeated continuously; in the fourth step, after the construction of the last containment plate is completed, the pile driver pulls out the remaining construction equipment for underwater operation on the containment plate according to the first-in-first-out rule, and the construction is completed after all the pulling out is completed.