Fabricated composite open caisson structure for pipe jacking construction

By combining cast-in-place and prefabricated caisson technology, a prefabricated composite caisson structure for pipe top construction was designed, which solved the vibration and noise problems and poor stability of prefabricated pipe segments in urban construction, and achieved efficient and environmentally friendly Construction effect and good waterproofing performance.

CN118880920APending Publication Date: 2024-11-01ZHENGZHOU MUNICIPAL ENG CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411285871.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

When carrying out pipe top construction in urban areas, conventional steel sheet pile support or SMW construction methods are not suitable for vibration and noise issues. The cast-in-place caisson is cumbersome and occupies a large area. It is difficult to make prefabricated caisson prefabricated pipe sheets reserved holes in prefabricated caissons and is difficult to make And poor structural stability.

Method used

Combined with cast-in-place and prefabricated caisson technology, a prefabricated composite caisson structure for top pipe construction is designed, using a combination of cast-in-place part and prefabricated pipe sheet assembly part, and is connected through a waterproof mortar layer and a water-stop rubber plate layer. The L-shaped steel plate is connected to the inner steel plate, and the prefabricated pipe sheet is connected by arc bolts to form a stable structure.

Benefits of technology

It improves construction efficiency and structural stability, reduces construction site occupation and environmental pressure, and achieves good waterproofing performance and construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880920A_ABST
    Figure CN118880920A_ABST
Patent Text Reader

Abstract

The invention discloses a fabricated composite open caisson structure for pipe jacking construction. A reserved hole is formed in the side wall of an open caisson, and the open caisson structure comprises a cast-in-place part and a prefabricated pipe piece splicing part; the top end of the cast-in-place part is 1 meter higher than the reserved hole, the inner wall face of the cast-in-place part is aligned with the inner wall face of the prefabricated pipe piece splicing part in an up-down mode, and a step is defined between the top end of the cast-in-place part and the outer wall face of the prefabricated pipe piece splicing part; a waterproof mortar layer and a water stop rubber plate layer are arranged between the top end of the cast-in-place part and the bottom end of the prefabricated pipe piece splicing part and serve as a waterproof connecting layer; an inner steel plate is arranged at the inner end of the waterproof connecting layer, the upper portion of the inner steel plate is connected with the bottom of the prefabricated pipe piece splicing part through chemical bolts, and the lower portion of the inner steel plate is connected with the top of the cast-in-place part through chemical bolts. The invention further discloses a corresponding construction method. The structure of the cast-in-place part and the structure of the prefabricated pipe piece splicing part are overall designed, the advantages of the cast-in-place technology and the advantages of the prefabrication technology are integrated, the defects of the cast-in-place technology and the defects of the prefabrication technology are overcome, and compared with the cast-in-place technology and the prefabrication technology, the construction efficiency is improved, the structural stability is good, and the environment-friendly treatment pressure is small.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of trenchless municipal engineering construction, and in particular to a caisson technology in pipe jacking construction. Background Art

[0002] When constructing underground pipelines in urban areas with complete supporting facilities, excavation is not suitable for the purpose of protecting ground buildings and facilities, and pipe jacking becomes a common construction method.

[0003] Pipe jacking projects require the construction of working wells and receiving wells. In urban areas, there are often complicated underground pipelines, limited surrounding working space, and many surface structures. Conventional steel sheet pile support or SMW pile support requires a larger construction site, and the vibrations generated by the main mechanical equipment during work will disturb the surrounding soil and structures, and are prone to noise. They are not the best construction methods for pipe jacking working wells and receiving wells in urban areas.

[0004] Conventional fully cast-in-place caisson construction requires repeated tedious construction processes such as "rebar binding → formwork support → concrete pouring and maintenance → formwork removal". The construction site occupies a large area, has a long construction cycle, and has poor on-site environmental control.

[0005] The shortcomings of fully assembled caisson construction are that when reserving holes on the prefabricated segments of the assembled caisson, it is difficult to make and requires the addition of special matching templates, which will also cause poor overall structural stability of the segments.

[0006] The design idea of ​​the present invention is to comprehensively combine the cast-in-place caisson construction technology and the prefabricated caisson construction technology, avoid their respective defects, and pursue the highest possible construction efficiency and structural stability.

[0007] In the prior art, when carrying out the construction of assembled caissons, the blade foot part (the bottom of the caisson) of the caisson is often cast in situ. This is because different geological conditions have different requirements for the performance of the blade foot. The cast-in-situ blade foot can adapt to different engineering needs. This method of combining the cast-in-situ blade foot with the prefabricated pipe section (composed of prefabricated pipe segments) is not the "comprehensive combination" in the design concept of the present invention. The difference is that the existing technology of combining the cast-in-situ blade foot with the prefabricated pipe segment fails to coordinate the cast-in-situ construction and the assembly construction. It is necessary to reserve holes on the prefabricated pipe segments of the caisson. Compared with the prefabricated pipe segments without reserved holes, the number of such prefabricated pipe segments is very small (there are only two prefabricated pipe segments with reserved holes, and the other prefabricated pipe segments are calculated based on 6 pipe segments per layer, with a total of more than ten to dozens). The cost is high and the efficiency is low to make matching templates for these two pipe segments with reserved holes separately. The reserved hole is the weak point of the caisson structure, and the use of prefabricated pipe segments may cause the problem of poor overall structural stability. The above-mentioned problems existing in the existing technology of cast-in-place blade feet and prefabricated pipe sections are also proposed for the first time by the present invention. They are easy to understand after description, but they were not known to those skilled in the art before the present invention was described. Summary of the invention

[0008] The purpose of the present invention is to provide an assembled composite caisson structure for pipe jacking construction, which comprehensively combines the cast-in-place caisson construction technology and the assembled caisson construction technology, pursues the highest possible construction efficiency and structural stability, and has less environmental damage.

[0009] To achieve the above-mentioned purpose, the present invention provides an assembled composite caisson structure for pipe jacking construction, wherein the side wall of the caisson has a reserved hole for communicating with the underground pipeline, with the direction pointing to the center line of the caisson being the inward direction and the direction opposite being the outward direction; and comprises a cast-in-place part and a prefabricated pipe segment assembly part; The top of the cast-in-place part is 1 meter higher than the reserved opening, the inner wall surface of the cast-in-place part is aligned with the inner wall surface of the prefabricated segment assembly part, and the wall thickness of the cast-in-place part is greater than the wall thickness of the prefabricated segment assembly part, so that a step is formed between the top of the cast-in-place part and the outer wall surface of the prefabricated segment assembly part; A waterproof mortar layer and a waterproof rubber sheet layer are provided between the top of the cast-in-place part and the bottom of the prefabricated segment assembly part; the waterproof mortar layer and the waterproof rubber sheet layer are collectively referred to as a waterproof connection layer; An L-shaped steel plate is provided at the step, the vertical plate of the L-shaped steel plate is connected to the bottom of the prefabricated segment assembly part by chemical bolts, and the horizontal plate of the L-shaped steel plate is connected to the top of the cast-in-place part by chemical bolts; An inner steel plate is provided at the inner end of the waterproof connection layer, the upper part of the inner steel plate is connected to the bottom of the prefabricated pipe segment assembly part through chemical bolts, and the lower part of the inner steel plate is connected to the top of the cast-in-place part through chemical bolts.

[0010] The prefabricated pipe segment assembly part includes several layers of pipe segments assembled from prefabricated pipe segments; Each layer of pipe segment consists of 6 arc-shaped prefabricated segments, and the central angle of each prefabricated segment is 60 degrees; Each prefabricated pipe segment has the same structure. In the same layer of pipe segments, the lateral end faces of two circumferentially adjacent prefabricated pipe segments are same-layer connection end faces, and there is a same-layer end face waterproof connection structure between the two same-layer connection end faces. In the two adjacent layers of pipe sections, the upper and lower end surfaces of the two adjacent prefabricated pipe segments are adjacent layer connection end surfaces, and an adjacent layer end surface waterproof connection structure is provided between the two adjacent layer connection end surfaces; The same-layer connection end face and the adjacent-layer connection end face are collectively referred to as connection end faces, and the connection end faces include an A-end end face and a B-end end face, the A-end end face has a concave middle portion with a matching groove, and the B-end end face has a convex middle portion with a convex portion embedded in the matching groove; The A end face and the B end face on both sides of the raised part are respectively provided with water-stop half holes, and the two corresponding water-stop half holes on the A end face and the B end face are spliced ​​to form two water-stop holes, and water-expanding water-stop strips are respectively provided in the two water-stop holes.

[0011] The inner and outer ends of the A end face and the B end face are respectively provided with chamfer structures, and the chamfer structures of the inner and outer ends of the A end face and the B end face respectively constitute an inner groove and an outer groove, the inner groove is provided with an inner waterproof mortar structure, and the outer groove is provided with an outer waterproof mortar structure.

[0012] Each prefabricated pipe segment has two lateral end faces, two upper and lower end faces, an outer wall face and an inner wall face. The lateral end faces and the upper and lower end faces are collectively referred to as end faces. Each end face of the prefabricated pipe segment is evenly provided with three arc-shaped bolt holes, each arc-shaped bolt hole extends to the inner wall face, and an operating groove for convenient operation of the arc-shaped bolts is provided on the inner wall face around the opening of each arc-shaped bolt hole. In the same layer of pipe segments, the arc-shaped bolt holes between two circumferentially adjacent prefabricated segments correspond to each other, and the two circumferentially adjacent prefabricated segments are connected by arc-shaped bolts, and the two ends of each arc-shaped bolt are respectively located in the corresponding working grooves of the two circumferentially adjacent prefabricated segments; In two layers of pipe sections adjacent to each other, two adjacent prefabricated pipe segments are connected by arc bolts, and two ends of each arc bolt are respectively located in the corresponding working grooves of the two adjacent prefabricated pipe segments.

[0013] The present invention also provides a construction method of the assembled composite caisson structure for pipe jacking construction, which is carried out according to the following steps: The first step is to cast-in-place part construction and simultaneously make precast segments; The cast-in-place construction is: When the reserved opening is less than or equal to 2 meters, the cast-in-place part is cast in one go; When the diameter of the reserved hole is greater than 2 meters, the cast-in-place part is poured with concrete twice from bottom to top. The first pouring is to 50 cm below the reserved hole, and the second pouring is to 1 meter above the reserved hole. When pouring concrete for the second time, the top surface of the cast-in-place part is smoothed and leveled to make the top surface flatness deviation of the cast-in-place part less than or equal to 5 mm. When making prefabricated segments, the height of a single prefabricated segment is 2 meters; the center angle of a single prefabricated segment is 60 degrees; After the first step is completed, proceed to the second step; The second step is to sink the cast-in-place part; after the cast-in-place part is sunk until the top of the cast-in-place part is 50 cm below the ground, the third step is performed; The third step is to assemble the bottom layer of prefabricated segments. The prefabricated segments are assembled layer by layer, and every 6 prefabricated segments are assembled into a layer of pipe sections. The assembly of the bottom layer of prefabricated segments includes cast-in-place top waterproofing, assembly and sinking operations; The cast-in-place top waterproofing operation is to apply waterproof mortar on the top surface of the cast-in-place part to form a waterproof mortar layer, and then bond a circular water-stop rubber sheet to the waterproof mortar layer; The assembly operation is to assemble six prefabricated segments piece by piece on top of the cast-in-place part to form the lowest layer of pipe segments, and the arc-shaped bolt holes of two circumferentially adjacent prefabricated segments are connected one by one; The assembly operation includes alignment and circumferential bolt threading. The alignment action is: firstly, put the water-expandable water stop strips at the two corresponding water stop half holes on the end face of the A end and the end face of the B end, and then align the protrusions and matching grooves of the end face of the A end and the end face of the B end and plug them together; the end face of the A end and the end face of the B end in this step refer to the end face of the A end and the end face of the B end of the same layer of the connection end face; The circumferential bolt threading action is: insert the arc bolts into each working groove in the caisson, so that each arc bolt passes through the arc bolt holes of two adjacent prefabricated segments and both ends of each arc bolt are respectively located in the corresponding working grooves of two circumferentially adjacent prefabricated segments, and matching nuts are screwed on both ends of each arc bolt and tightened; The sinking operation refers to sinking the cast-in-place part and the assembled pipe section as a whole after assembling one layer of pipe sections, and stopping the sinking when the top of the uppermost pipe section is 0.5 meters below the ground; The fourth step is to assemble the pipe sections of each layer except the bottom layer, including waterproofing, assembling and sinking between pipe sections. The waterproofing work between pipe sections is to embed a water-expandable water stop strip in the water stop half hole at the top of the lower pipe section before the assembly work. After the assembly work in this step, waterproof mortar is applied to the inner groove and the outer groove respectively to form an outer waterproof mortar structure and an inner waterproof mortar structure. The assembly work in this step is based on the assembly work in the third step, and the upper and lower arc bolts are added with threading and insertion actions; The upper and lower arc bolts are inserted into the corresponding arc bolt holes of the two upper and lower adjacent prefabricated segments in the caisson, and the two ends of the corresponding arc bolts are respectively located in the corresponding working grooves of the two upper and lower adjacent prefabricated segments, and matching nuts are screwed on the two ends of each arc bolt and tightened; The alignment action in this step includes the A-end face and the B-end face of the connection end face of the same layer, and the A-end face and the B-end face of the connection end face of the adjacent layer; The sinking operation in this step is the same as the sinking operation in the third step; Execute the fourth step repeatedly until the caisson sinks to the designed depth and ensures that the top of the uppermost pipe section is more than 1.2 meters above the ground, and then proceed to the fifth step; The fifth step is the caisson bottom sealing operation, which involves pouring concrete at the bottom of the caisson to seal the bottom of the caisson; The sixth step is to backfill the well chamber, backfill earth in the inner cavity of the caisson to improve the stability and bearing capacity of the caisson; after backfilling to 50 cm above the bottom end of the uppermost pipe section, remove the prefabricated pipe segments of the uppermost pipe section and use them for the next caisson construction, and then continue to backfill the well chamber to the designed elevation position to complete all construction operations.

[0014] In the bolt threading action, the action of tightening the nut is divided into initial tightening and final tightening; Before all 6 prefabricated segments of a layer of pipe sections are assembled, after the arc bolts are connected between two adjacent prefabricated segments, the arc bolts are initially tightened to make the mating surfaces between the two circumferentially adjacent and vertically adjacent prefabricated segments form a tight fit; after all 6 prefabricated segments of the same layer of pipe sections are assembled, the arc bolts are finally tightened to correct the roundness deviation of the layer of pipe sections to ensure that the roundness deviation is less than or equal to 0.5%.

[0015] After the circumferential bolts are threaded and the upper and lower arc bolts are threaded, the working grooves at both ends of the arc bolts are sealed; the sealing action is to fill the working grooves at both ends of the arc bolts with waterproof mortar, and the waterproof mortar in the working grooves plays a triple role of waterproofing, surface leveling and preventing the arc bolts and nuts from loosening.

[0016] The present invention has the following advantages: The present invention has a simple structure. Under the guidance of the design concept of the present invention, the structure of the cast-in-place part and the prefabricated segment assembly part is comprehensively designed in the caisson construction, the construction of the cast-in-place part and the prefabricated segment assembly part is comprehensively arranged, the advantages of the two processes of cast-in-place and prefabrication are combined, and their respective defects are avoided. Compared with the two processes of cast-in-place and prefabrication, the construction efficiency is improved, the structural stability is good, and the pressure of environmental protection treatment is relatively small.

[0017] Specifically, compared with the cast-in-place process, the structure of the present invention reduces a large number of cumbersome construction processes such as "rebar binding → formwork support → concrete pouring and maintenance → formwork removal", reduces the area occupied by the construction site, improves construction efficiency, and reduces the pressure of on-site environmental protection control. Compared with the prefabrication process, it is no longer necessary to set up matching templates for only two prefabricated segments, and all the tube plates are completely consistent, which improves the production efficiency of prefabricated segments. It is no longer necessary to distinguish between two prefabricated segments with reserved openings during storage, transportation and assembly, and there is no need to pay special attention to and select them, which improves the efficiency of storage, transportation and assembly as a whole.

[0018] The waterproof connection layer plays a good waterproof role. The waterproof mortar layer cooperates closely with the cast-in-place part and can firmly bond and fix the water-stop rubber sheet layer upward. The prefabricated pipe segment assembly part forms a good sealing relationship with the water-stop rubber sheet layer under the action of gravity. The overall structure is firm and the waterproof efficiency is good.

[0019] The L-shaped steel plate can firmly connect the cast-in-place part and the prefabricated segment assembly part at the step, and the inner steel plate firmly connects the cast-in-place part and the prefabricated segment assembly part on the outer wall of the caisson, so that the cast-in-place part and the prefabricated segment assembly part are tightly combined and the structure is firm.

[0020] The inner waterproof mortar structure and the outer waterproof mortar structure play a waterproof role at the inner and outer ends of the connecting end surface, and the two water-swelling waterstop strips and the raised portion play a waterproof role in the middle of the connecting end surface, forming a total of five waterproof structures, so that the waterproof performance of the present invention basically reaches the waterproof performance of a fully cast caisson.

[0021] In the present invention, adjacent pipe segments are connected by three arc-shaped bolts, and the working grooves at both ends of each arc-shaped bolt are located on the inner wall surface of the caisson. All adjacent prefabricated pipe segments can be connected by the arc-shaped bolts in the caisson, which facilitates the connection operation between the prefabricated pipe segments and improves the connection efficiency between the prefabricated pipe segments.

[0022] The construction method of the present invention coordinates the construction of the cast-in-place part and the prefabricated pipe segment assembly part, various operations are simple and easy, the construction efficiency is high, the prefabricated pipe segments are tightly waterproofed, less construction waste is generated, and the pressure of environmental protection treatment is relatively small.

[0023] Adjacent prefabricated segments are connected by three arc-shaped bolts, which not only connect the prefabricated segments but also ensure tight waterproofing. By tightening the arc-shaped bolts, the water-swelling waterstop strips between adjacent prefabricated segments can be compressed and the protrusions and matching grooves can be tightly plugged in.

[0024] During the bottom sealing operation, the top of the uppermost pipe section is more than 1.2 meters above the ground, serving the dual purpose of temporary protection and water retaining wall.

[0025] Tighten the nuts twice, initially tightening and finally tightening. The initial tightening can achieve a tight fit between the connecting end faces of two adjacent prefabricated pipe segments, and the final tightening can correct the roundness deviation of the entire layer of pipe segments, which can significantly improve the construction quality.

[0026] The waterproof mortar in the working groove plays a triple role of leveling the surface and preventing the arc bolts and nuts from loosening. This structural triple role can ensure that the arc bolts and nuts will not loosen during long-term use of the caisson structure, and water will not enter the arc bolt holes, thereby ensuring that the caisson structure is structurally firm during long-term use. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic cross-sectional structural diagram of the junction of the cast-in-place part and the prefabricated pipe segment assembly part of the present invention, and the cross section is a vertical plane.

[0028] Figure 2 It is a schematic diagram of the three-dimensional structure of a single prefabricated pipe segment.

[0029] Figure 3 It is a three-dimensional structural schematic diagram of a single prefabricated pipe segment showing hidden lines.

[0030] Figure 4 It is a schematic diagram of the cross-sectional structure of two circumferentially adjacent prefabricated segments belonging to the same layer of pipe segments connected together, and the cross-section is a horizontal plane.

[0031] Figure 5 yes Figure 4 Enlarged view of point A in the middle.

[0032] Figure 6 It is a schematic diagram of the cross-sectional structure of two upper and lower adjacent prefabricated segments connected, and the cross section is a vertical plane. DETAILED DESCRIPTION

[0033] like Figures 1 to 6 As shown, the present invention discloses an assembled composite caisson structure for pipe jacking construction, wherein the side wall of the caisson has a reserved hole for communicating with an underground pipeline, with the direction pointing to the center line of the caisson being inward and the opposite direction being outward; the assembled composite caisson structure for pipe jacking construction of the present invention comprises a cast-in-place part 1 and a prefabricated pipe segment assembly part 2; the reserved hole is located in the cast-in-place part 1; the reserved hole of the caisson is a conventional technology, which is not shown in the figure.

[0034] The top of the cast-in-place part 1 is 1 meter higher than the reserved opening, the inner wall surface of the cast-in-place part 1 is aligned with the inner wall surface of the prefabricated segment assembly part 2, and the wall thickness of the cast-in-place part 1 is greater than the wall thickness of the prefabricated segment assembly part 2, so that a step is formed between the top of the cast-in-place part 1 and the outer wall surface of the prefabricated segment assembly part 2; A waterproof mortar layer and a waterproof rubber sheet layer are provided between the top of the cast-in-place part 1 and the bottom of the prefabricated pipe segment assembly part 2; the waterproof mortar layer and the waterproof rubber sheet layer are collectively referred to as a waterproof connection layer 3; the waterproof mortar and the waterproof rubber sheet are both conventional technologies, and the figure does not show the waterproof mortar layer and the waterproof rubber sheet layer in detail.

[0035] The step is provided with an L-shaped steel plate 4, the vertical plate of the L-shaped steel plate 4 is connected to the bottom of the prefabricated segment assembly part 2 by chemical bolts 5, and the horizontal plate of the L-shaped steel plate 4 is connected to the top of the cast-in-place part 1 by chemical bolts 5; An inner steel plate 6 is provided at the inner end of the waterproof connection layer 3 , the upper part of the inner steel plate 6 is connected to the bottom of the prefabricated pipe segment assembly part 2 through chemical bolts 5 , and the lower part of the inner steel plate 6 is connected to the top of the cast-in-place part 1 through chemical bolts 5 .

[0036] The present invention has a simple structure. Under the guidance of the design concept of the present invention, the cast-in-place part 1 and the prefabricated segment assembly part 2 are comprehensively arranged in the caisson construction, combining the advantages of the two processes of cast-in-place and prefabrication, avoiding their respective defects, and improving the construction efficiency compared with the two processes of cast-in-place and prefabrication, with good structural stability and less pressure on environmental protection treatment.

[0037] Specifically, compared with the cast-in-place process, the structure of the present invention reduces a large number of cumbersome construction processes such as "rebar binding → formwork support → concrete pouring and maintenance → formwork removal", reduces the area occupied by the construction site, improves construction efficiency, and reduces the pressure of on-site environmental protection control. Compared with the prefabrication process, it is no longer necessary to set up matching templates for only two prefabricated segments, and all the tube plates are completely consistent, which improves the production efficiency of prefabricated segments. It is no longer necessary to distinguish between two prefabricated segments with reserved openings during storage, transportation and assembly, and there is no need to pay special attention to and select them, which improves the efficiency of storage, transportation and assembly as a whole.

[0038] The waterproof connection layer 3 plays a good waterproof role, in which the waterproof mortar layer cooperates closely with the cast-in-place part 1 and can firmly bond and fix the waterproof rubber sheet layer upward. The prefabricated pipe segment assembly part 2 forms a good sealing cooperation relationship with the waterproof rubber sheet layer under the action of gravity. The overall structure is firm and the waterproof efficiency is good.

[0039] The L-shaped steel plate 4 can firmly connect the cast-in-place part 1 and the prefabricated pipe segment assembly part 2 at the step, and the inner steel plate 6 firmly connects the cast-in-place part 1 and the prefabricated pipe segment assembly part 2 on the outer wall of the caisson, so that the cast-in-place part 1 and the prefabricated pipe segment assembly part 2 are tightly combined and the structure is firm.

[0040] Among them, the waterproof mortar layer is preferably 2 cm thick.

[0041] The prefabricated pipe segment assembly part 2 includes a plurality of pipe segments assembled from prefabricated pipe segments 7; Each layer of pipe section includes 6 arc-shaped prefabricated pipe segments 7, each prefabricated pipe segment 7 has a central angle of 60 degrees, and the 6 prefabricated pipe segments 7 are circumferentially spliced ​​to form a complete cylindrical caisson pipe section.

[0042] Each prefabricated pipe segment 7 has the same structure. In the same layer of pipe segments, the lateral end faces of two circumferentially adjacent prefabricated pipe segments 7 are same-layer connection end faces, and there is a same-layer end face waterproof connection structure between the two same-layer connection end faces. In the two layers of pipe segments adjacent to each other, the upper and lower end surfaces of the two prefabricated pipe segments 7 adjacent to each other are adjacent layer connection end surfaces, and an adjacent layer end surface waterproof connection structure is provided between the two adjacent layer connection end surfaces; The same-layer connection end faces and the adjacent-layer connection end faces are collectively referred to as connection end faces. The connection end faces include an A-end face and a B-end face. The A-end face has a concave middle portion with a matching groove, and the B-end face has a convex middle portion with a convex portion embedded in the matching groove. In the figure, the convex portion and the matching groove occupy the same spatial position. Figure 5 The position indicated by the reference numeral 8 in the figure is the matching groove and the protrusion.

[0043] The A-end face and the B-end face on both sides of the raised part are respectively provided with water-stopping half holes, and the two corresponding water-stopping half holes on the A-end face and the B-end face are combined to form two water-stopping holes, and the two water-stopping holes are respectively provided with water-expanding water-stopping strips. The water-expanding water-stopping strips and the water-stopping holes occupy the same spatial position in the figure. Figure 5 Figure 6 The position indicated by the reference numeral 9 in the figure is the water-swellable water stop strip and the water stop hole.

[0044] The inner and outer ends of the A end face and the B end face are respectively provided with chamfer structures, and the chamfer structures of the inner and outer ends of the A end face and the B end face respectively form an inner groove and an outer groove, and the inner groove is provided with an inner waterproof mortar structure, and the outer groove is provided with an outer waterproof mortar structure. In the drawings, the inner groove and the inner waterproof mortar structure occupy the same spatial position and are indicated by the reference numeral 10; the outer groove and the outer waterproof mortar structure occupy the same spatial position and are indicated by the reference numeral 11. The inner waterproof mortar structure and the outer waterproof mortar structure play a waterproof role at the inner and outer ends of the connecting end surface, and the two water-swelling waterstop strips and the raised portion play a waterproof role in the middle of the connecting end surface, forming a total of five waterproof structures, so that the waterproof performance of the present invention basically reaches the waterproof performance of a fully cast caisson.

[0045] Each prefabricated pipe segment 7 has two lateral end faces 12, two upper and lower end faces 13, an outer wall face and an inner wall face. The lateral end faces 12 and the upper and lower end faces 13 are collectively referred to as end faces. Each end face of the prefabricated pipe segment 7 is evenly provided with three arc-shaped bolt holes 14. Each arc-shaped bolt hole 14 extends to the inner wall face. An opening depression around each arc-shaped bolt hole 14 is provided on the inner wall face with an operation groove 15 for convenient operation of the arc-shaped bolts. In the same layer of pipe segments, the arc-shaped bolt holes 14 between two circumferentially adjacent prefabricated segments 7 correspond to each other, and the two circumferentially adjacent prefabricated segments 7 are connected by arc-shaped bolts 16, and both ends of each arc-shaped bolt 16 are respectively located in the corresponding working grooves 15 of the two circumferentially adjacent prefabricated segments 7; In the two adjacent layers of pipe sections, the two adjacent prefabricated pipe segments 7 are connected by arc bolts 16, and both ends of each arc bolt 16 are respectively located in the working grooves 15 corresponding to the two adjacent prefabricated pipe segments 7.

[0046] In the present invention, adjacent pipe segments are connected by three arc-shaped bolts 16, and the working grooves 15 at both ends of each arc-shaped bolt 16 are located on the inner wall surface of the caisson. All adjacent prefabricated pipe segments 7 can be connected by the arc-shaped bolts 16 in the caisson, which facilitates the connection operation between the prefabricated pipe segments 7 and improves the connection efficiency between the prefabricated pipe segments 7.

[0047] The present invention also provides a construction method of the assembled composite caisson structure for pipe jacking construction, which is carried out according to the following steps: The first step is to construct the cast-in-place part 1 and simultaneously make the prefabricated segments 7; The construction of cast-in-place part 1 is: When the reserved opening is less than or equal to 2 meters, the cast-in-place part 1 is cast in one step; When the diameter of the reserved hole is greater than 2 meters, the cast-in-place part 1 is poured with concrete twice from bottom to top. The first pouring is to 50 cm below the reserved hole (including the blade foot structure at the bottom of the caisson), and the second pouring is to 1 meter above the reserved hole. When pouring concrete for the second time, the top surface of the cast-in-place part 1 is smoothed and leveled to make the top surface flatness deviation of the cast-in-place part 1 less than or equal to 5 mm. When making the prefabricated pipe segment 7, the height of a single prefabricated pipe segment 7 is 2 meters (each pipe segment is 2 meters high) and the thickness is 40 centimeters; the central angle of a single prefabricated pipe segment 7 is 60 degrees (six prefabricated pipe segments 7 are circumferentially spliced ​​to form a layer of pipe segments); After the first step is completed, proceed to the second step; The second step is to sink the cast-in-place part 1; after the cast-in-place part 1 is sunk until the top of the cast-in-place part 1 is 50 cm below the ground, the third step is performed; The third step is to assemble the bottom layer of prefabricated segments 7; the prefabricated segments 7 are assembled layer by layer, and every 6 prefabricated segments 7 are assembled into a layer of pipe sections; The assembly of the bottom prefabricated pipe segment 7 includes cast-in-place top waterproofing work, assembly work and sinking work; The cast-in-place top waterproofing operation is to apply waterproof mortar on the top surface of the cast-in-place part 1 to form a (2 cm thick) waterproof mortar layer, and then bond a ring-shaped water-stop rubber sheet to the waterproof mortar layer; The assembly operation is to assemble six prefabricated segments 7 piece by piece on the top of the cast-in-place part 1 to form the lowest layer of pipe segments, and the arc-shaped bolt holes 16 14 of two circumferentially adjacent prefabricated segments 7 are connected one by one; The assembly operation includes alignment and circumferential bolt threading. The alignment action is: firstly, put the water-expandable water stop strips at the two corresponding water stop half holes on the end face of the A end and the end face of the B end, and then align the protrusions and matching grooves of the end face of the A end and the end face of the B end and plug them together; the end face of the A end and the end face of the B end in this step refer to the end face of the A end and the end face of the B end of the same layer of the connection end face; The circumferential bolt threading action is: insert the arc bolts 16 into each working groove 15 in the caisson, so that each arc bolt 16 passes through the arc bolt 16 hole 14 of two adjacent prefabricated segments 7 and both ends of each arc bolt 16 are respectively located in the corresponding working groove 15 of two circumferentially adjacent prefabricated segments 7, and matching nuts are screwed on both ends of each arc bolt 16 and tightened; The sinking operation means that after assembling one layer of pipe segments, the cast-in-place part 1 and the assembled pipe segments are sunk as a whole until the top of the uppermost pipe segment is 0.5 meters below the ground. The fourth step is to assemble the pipe sections of each layer except the bottom layer, including waterproofing, assembling and sinking between pipe sections. The waterproofing work between pipe sections is to embed a water-expandable water stop strip in the water stop half hole at the top of the lower pipe section before the assembly work. After the assembly work in this step, waterproof mortar is applied to the inner groove and the outer groove respectively to form an outer waterproof mortar structure and an inner waterproof mortar structure. The assembly operation in this step is based on the assembly operation in the third step, and the upper and lower arc-shaped bolts 16 are added with the penetration and insertion actions; The upper and lower arc bolts 16 are inserted into the corresponding arc bolt 16 holes 14 of the two upper and lower adjacent prefabricated segments 7 in the caisson, and the two ends of the corresponding arc bolts 16 are respectively located in the corresponding working grooves 15 of the two upper and lower adjacent prefabricated segments 7, and matching nuts are screwed on the two ends of each arc bolt 16 and tightened; The alignment action in this step includes the A-end face and the B-end face of the connection end face of the same layer, and the A-end face and the B-end face of the connection end face of the adjacent layer; The sinking operation in this step is the same as the sinking operation in the third step; Execute the fourth step repeatedly until the caisson sinks to the designed depth and ensures that the top of the uppermost pipe section is more than 1.2 meters above the ground, and then proceed to the fifth step; The fifth step is the caisson bottom sealing operation, which involves pouring concrete at the bottom of the caisson to seal the bottom of the caisson; The sixth step is to backfill the well chamber, backfill earth in the inner cavity of the caisson to improve the stability and bearing capacity of the caisson; after backfilling to 50 cm above the bottom end of the uppermost pipe section, remove the prefabricated pipe segments 7 of the uppermost pipe section and use them for the next caisson construction, and then continue to backfill the well chamber to the designed elevation position to complete all construction operations.

[0048] The construction method of the present invention coordinates the construction of the cast-in-place part 1 and the prefabricated pipe segment 7 assembly part 2. Various operations are simple and easy, the construction efficiency is high, the prefabricated pipe segments 7 are tightly waterproofed, less construction waste is generated, and the pressure of environmental protection treatment is relatively small.

[0049] The adjacent prefabricated segments 7 are connected by three arc bolts 16, which not only connect the prefabricated segments 7, but also ensure waterproof tightness. By tightening the arc bolts 16, the water-swellable water stop strips between the adjacent prefabricated segments 7 can be compressed, and the protrusions and the matching grooves can be tightly plugged.

[0050] During the bottom sealing operation, the top of the uppermost pipe section is more than 1.2 meters above the ground, serving the dual purpose of temporary protection and water retaining wall.

[0051] In the bolt threading action, the action of tightening the nut is divided into initial tightening and final tightening; Before all 6 prefabricated segments 7 of a pipe segment of a layer are assembled, after the arc bolts 16 are connected between two adjacent prefabricated segments 7, the arc bolts 16 are initially tightened to make the matching surfaces between the two circumferentially adjacent and vertically adjacent prefabricated segments 7 form a close contact state; after all 6 prefabricated segments 7 of the same layer are assembled, each arc bolt 16 is finally tightened to correct the roundness deviation of the pipe segment of this layer to ensure that the roundness deviation is less than or equal to 0.5% (that is, the maximum deviation between the circular contour of the pipe segment of this layer and the ideal circle does not exceed 0.5% of the diameter).

[0052] The nuts are tightened twice, namely, the initial tightening and the final tightening. The initial tightening enables a close fit between the connecting end faces of two adjacent prefabricated pipe segments 7, and the final tightening corrects the roundness deviation of the entire layer of pipe segments, which can significantly improve the construction quality.

[0053] After the circumferential bolts 16 are threaded and the upper and lower arc bolts 16 are threaded, the working grooves 15 at both ends of the arc bolts 16 are sealed; the sealing action is to fill the working grooves 15 at both ends of the arc bolts 16 with waterproof mortar, and the waterproof mortar in the working grooves 15 plays a triple role of waterproofing, surface flattening and preventing the arc bolts 16 and nuts from loosening.

[0054] The waterproof mortar in the working groove 15 plays a triple role of leveling the surface and preventing the arc bolts 16 and nuts from loosening. This structural triple role can ensure that the arc bolts 16 and nuts will not loosen during long-term use of the caisson structure, and water will not enter the arc bolt 16 holes 14, thereby ensuring that the caisson structure is structurally firm during long-term use.

[0055] The above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.

Claims

1. An assembled composite caisson structure for pipe jacking construction, wherein the side wall of the caisson has a reserved hole for communicating with the underground pipeline, with the direction pointing to the center line of the caisson being inward and the direction opposite being outward; characterized in that: Including cast-in-place part and prefabricated segment assembly part; The top of the cast-in-place part is 1 meter higher than the reserved opening, the inner wall surface of the cast-in-place part is aligned with the inner wall surface of the prefabricated segment assembly part, and the wall thickness of the cast-in-place part is greater than the wall thickness of the prefabricated segment assembly part, so that a step is formed between the top of the cast-in-place part and the outer wall surface of the prefabricated segment assembly part; A waterproof mortar layer and a waterproof rubber sheet layer are provided between the top of the cast-in-place part and the bottom of the prefabricated segment assembly part; the waterproof mortar layer and the waterproof rubber sheet layer are collectively referred to as a waterproof connection layer; An L-shaped steel plate is provided at the step, the vertical plate of the L-shaped steel plate is connected to the bottom of the prefabricated segment assembly part by chemical bolts, and the horizontal plate of the L-shaped steel plate is connected to the top of the cast-in-place part by chemical bolts; An inner steel plate is provided at the inner end of the waterproof connection layer, the upper part of the inner steel plate is connected to the bottom of the prefabricated pipe segment assembly part through chemical bolts, and the lower part of the inner steel plate is connected to the top of the cast-in-place part through chemical bolts.

2. The assembled composite caisson structure for pipe jacking construction according to claim 1 is characterized in that: The prefabricated pipe segment assembly part includes several layers of pipe segments assembled from prefabricated pipe segments; Each layer of pipe segment consists of 6 arc-shaped prefabricated segments, and the central angle of each prefabricated segment is 60 degrees; Each prefabricated pipe segment has the same structure. In the same layer of pipe segments, the lateral end faces of two circumferentially adjacent prefabricated pipe segments are same-layer connection end faces, and there is a same-layer end face waterproof connection structure between the two same-layer connection end faces. In the two adjacent layers of pipe sections, the upper and lower end surfaces of the two adjacent prefabricated pipe segments are adjacent layer connection end surfaces, and an adjacent layer end surface waterproof connection structure is provided between the two adjacent layer connection end surfaces; The same-layer connection end face and the adjacent-layer connection end face are collectively referred to as connection end faces, and the connection end faces include an A-end end face and a B-end end face, the A-end end face has a concave middle portion with a matching groove, and the B-end end face has a convex middle portion with a convex portion embedded in the matching groove; The A end face and the B end face on both sides of the raised part are respectively provided with water-stop half holes, and the two corresponding water-stop half holes on the A end face and the B end face are spliced ​​to form two water-stop holes, and water-expanding water-stop strips are respectively provided in the two water-stop holes.

3. The assembled composite caisson structure for pipe jacking construction according to claim 2 is characterized in that: The inner and outer ends of the A end face and the B end face are respectively provided with chamfer structures, and the chamfer structures of the inner and outer ends of the A end face and the B end face respectively constitute an inner groove and an outer groove, the inner groove is provided with an inner waterproof mortar structure, and the outer groove is provided with an outer waterproof mortar structure.

4. The assembled composite caisson structure for pipe jacking construction according to claim 2 is characterized in that: Each prefabricated pipe segment has two lateral end faces, two upper and lower end faces, an outer wall face and an inner wall face. The lateral end faces and the upper and lower end faces are collectively referred to as end faces. Each end face of the prefabricated pipe segment is evenly provided with three arc-shaped bolt holes, each arc-shaped bolt hole extends to the inner wall face, and an operating groove for convenient operation of the arc-shaped bolts is provided on the inner wall face around the opening of each arc-shaped bolt hole. In the same layer of pipe segments, the arc-shaped bolt holes between two circumferentially adjacent prefabricated segments correspond to each other, and the two circumferentially adjacent prefabricated segments are connected by arc-shaped bolts, and the two ends of each arc-shaped bolt are respectively located in the corresponding working grooves of the two circumferentially adjacent prefabricated segments; In two layers of pipe sections adjacent to each other, two adjacent prefabricated pipe segments are connected by arc bolts, and two ends of each arc bolt are respectively located in the corresponding working grooves of the two adjacent prefabricated pipe segments.

5. The construction method of the assembled composite caisson structure for pipe jacking construction as claimed in claim 3 is characterized in that Follow these steps: The first step is to cast-in-place part construction and simultaneously make precast segments; The cast-in-place construction is: When the reserved opening is less than or equal to 2 meters, the cast-in-place part is cast in one go; When the diameter of the reserved hole is greater than 2 meters, the cast-in-place part is poured with concrete twice from bottom to top. The first pouring is to 50 cm below the reserved hole, and the second pouring is to 1 meter above the reserved hole. When pouring concrete for the second time, the top surface of the cast-in-place part is smoothed and leveled to make the top surface flatness deviation of the cast-in-place part less than or equal to 5 mm. When making prefabricated segments, the height of a single prefabricated segment is 2 meters; the center angle of a single prefabricated segment is 60 degrees; After the first step is completed, proceed to the second step; The second step is to sink the cast-in-place part; after the cast-in-place part is sunk until the top of the cast-in-place part is 50 cm below the ground, the third step is performed; The third step is to assemble the bottom layer of prefabricated segments. The prefabricated segments are assembled layer by layer, and every 6 prefabricated segments are assembled into a layer of pipe sections. The assembly of the bottom layer of prefabricated segments includes cast-in-place top waterproofing, assembly and sinking operations; The cast-in-place top waterproofing operation is to apply waterproof mortar on the top surface of the cast-in-place part to form a waterproof mortar layer, and then bond a circular water-stop rubber sheet to the waterproof mortar layer; The assembly operation is to assemble six prefabricated segments piece by piece on top of the cast-in-place part to form the lowest layer of pipe segments, and the arc-shaped bolt holes of two circumferentially adjacent prefabricated segments are connected one by one; The assembly operation includes alignment and circumferential bolt threading. The alignment action is: firstly, put the water-expandable water stop strips at the two corresponding water stop half holes on the end face of the A end and the end face of the B end, and then align the protrusions and matching grooves of the end face of the A end and the end face of the B end and plug them together; the end face of the A end and the end face of the B end in this step refer to the end face of the A end and the end face of the B end of the same layer of the connection end face; The circumferential bolt threading action is: insert the arc bolts into each working groove in the caisson, so that each arc bolt passes through the arc bolt holes of two adjacent prefabricated segments and both ends of each arc bolt are respectively located in the corresponding working grooves of two circumferentially adjacent prefabricated segments, and matching nuts are screwed on both ends of each arc bolt and tightened; The sinking operation refers to sinking the cast-in-place part and the assembled pipe section as a whole after assembling one layer of pipe sections, and stopping the sinking when the top of the uppermost pipe section is 0.5 meters below the ground; The fourth step is to assemble the pipe sections of each layer except the bottom layer, including waterproofing, assembling and sinking between pipe sections. The waterproofing work between pipe sections is to embed a water-expandable water stop strip in the water stop half hole at the top of the lower pipe section before the assembly work. After the assembly work in this step, waterproof mortar is applied to the inner groove and the outer groove respectively to form an outer waterproof mortar structure and an inner waterproof mortar structure. The assembly work in this step is based on the assembly work in the third step, and the upper and lower arc bolts are added with threading and insertion actions; The upper and lower arc bolts are inserted into the corresponding arc bolt holes of the two upper and lower adjacent prefabricated segments in the caisson, and the two ends of the corresponding arc bolts are respectively located in the corresponding working grooves of the two upper and lower adjacent prefabricated segments, and matching nuts are screwed on the two ends of each arc bolt and tightened; The alignment action in this step includes the A-end face and the B-end face of the connection end face of the same layer, and the A-end face and the B-end face of the connection end face of the adjacent layer; The sinking operation in this step is the same as the sinking operation in the third step; Execute the fourth step repeatedly until the caisson sinks to the designed depth and ensures that the top of the uppermost pipe section is more than 1.2 meters above the ground, and then proceed to the fifth step; The fifth step is the caisson bottom sealing operation, which involves pouring concrete at the bottom of the caisson to seal the bottom of the caisson; The sixth step is to backfill the well chamber, backfill earth in the inner cavity of the caisson to improve the stability and bearing capacity of the caisson; after backfilling to 50 cm above the bottom end of the uppermost pipe section, remove the prefabricated pipe segments of the uppermost pipe section and use them for the next caisson construction, and then continue to backfill the well chamber to the designed elevation position to complete all construction operations.

6. The construction method of the assembled composite caisson structure according to claim 5 is characterized in that: In the bolt threading action, the action of tightening the nut is divided into initial tightening and final tightening; Before all 6 prefabricated segments of a layer of pipe sections are assembled, after the arc bolts are connected between two adjacent prefabricated segments, the arc bolts are initially tightened to make the mating surfaces between the two circumferentially adjacent and vertically adjacent prefabricated segments form a tight fit; after all 6 prefabricated segments of the same layer of pipe sections are assembled, the arc bolts are finally tightened to correct the roundness deviation of the layer of pipe sections to ensure that the roundness deviation is less than or equal to 0.5%.

7. The construction method of the assembled composite caisson structure according to claim 5 is characterized by: After the circumferential bolts are threaded and the upper and lower arc bolts are threaded, the working grooves at both ends of the arc bolts are sealed; the sealing action is to fill the working grooves at both ends of the arc bolts with waterproof mortar, and the waterproof mortar in the working grooves plays a triple role of waterproofing, surface leveling and preventing the arc bolts and nuts from loosening.