Wall perpendicularity detection device for building construction

By introducing a comparison and lifting mechanism into the building wall detection device, the wall fitting curve is drawn, and the measurement accuracy is ensured through the calibration mechanism, the detection loss in the case where wall undulations and ground non-level in the prior art are solved. Accurate problem, achieving more accurate and portable wall verticality detection.

CN118882618AActive Publication Date: 2024-11-01CHONGQING WANYE CONSTR CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410984236.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-01
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

The existing building wall verticality detection device cannot effectively measure the ups and downs of the wall between the measuring rods and the misalignment of the detection data on non-horizontal ground.

Method used

A wall verticality detection device including a support mechanism, a comparison mechanism, a lift mechanism, a driving mechanism and a calibration mechanism are designed. The wall fitting curve is drawn by drawing components, and the verticality and flatness are judged by standard comparison comparison. , and ensure measurement accuracy through adjustment mechanism and calibration mechanism.

Benefits of technology

It realizes comprehensive inspection of wall undulations, improves measurement accuracy and data stability, and at the same time, the overall size of the device is smaller and easy to move.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118882618A_ABST
    Figure CN118882618A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of wall perpendicularity detection, and provides a wall perpendicularity detection device for building construction, which comprises a supporting mechanism, the supporting mechanism comprises a base, the bottom of the base is provided with moving wheels I, one side of the base is provided with a connecting arm, one end, far away from the base, of the connecting arm is provided with an adjusting mechanism, and the adjusting mechanism is arranged on the base. The wall surface calibration device comprises a wall surface, and further comprises a comparison mechanism, the comparison mechanism comprises a comparison plate and a drawing assembly, the comparison plate is provided with a standard comparison line, and the drawing assembly is used for drawing a curve fitting the wall surface on the comparison plate; through the comparison mechanism and the drawing assembly, in the process of measuring the perpendicularity of the wall body, a curve fitting the fluctuation of the wall surface can be drawn, so that the detection of the wall surface is more comprehensive, and the fluctuation state of each part of the wall surface can be better judged by comparing the curve with a standard comparison line.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of wall verticality detection, in particular to a device capable of detecting the verticality of a wall. Background Art

[0002] In the field of architecture and surveying, the verticality of the wall is a very important indicator, which directly affects the stability and aesthetics of the building structure. Therefore, when conducting surveying work, the accurate measurement and evaluation of the verticality of the wall is crucial.

[0003] Patent CN202310692824.9 discloses a building wall verticality detection device. Although the detection device in this patent can measure the verticality of the wall, the measurement position is limited to the verticality at the measuring position of the measuring rod. That is to say, if there are depressions or protrusions on the wall between the two measuring points, if the depressions and protrusions are located between the two measuring rods, it will be difficult for the device to measure them. In addition, when the ground is not horizontal, the base of the detection device will tilt, which will also cause inaccuracy in the detection data. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a wall verticality detection device for building construction to solve the problems in the prior art.

[0005] A wall verticality detection device for construction, comprising a support mechanism, the support mechanism comprising a base, a moving wheel 1 is installed at the bottom of the base, a connecting arm is arranged on one side of the base, an adjustment mechanism is arranged at one end of the connecting arm away from the base, and further comprising:

[0006] A comparison mechanism, the comparison mechanism comprising a comparison board and a drawing component, the comparison board is provided with a standard comparison line, and the drawing component is used to draw a curve fitting the wall surface on the comparison board, so as to achieve the purpose of comparing with the standard comparison line to determine the verticality and flatness of the wall surface;

[0007] A lifting mechanism, the lifting mechanism is arranged on the top of the base, and is used to drive the drawing component to move up and down so as to draw a curve fitting the wall;

[0008] A driving mechanism, the driving mechanism is used to drive the lifting mechanism to operate;

[0009] The calibration mechanism is used to measure the verticality of the lifting mechanism so as to adjust the verticality of the lifting mechanism through the adjustment mechanism so that the drawing component can move in the vertical direction.

[0010] As a technical solution of the present invention, the comparison plate is provided with a groove at each end of the standard comparison line, and the opposite sides of the inner walls of the two grooves are provided with inclined surfaces, and the two ends of the inclined surfaces smoothly transition with the inner walls of the grooves and the surface of the comparison plate.

[0011] As a technical solution of the present invention, the lifting mechanism includes two fixed frames symmetrically arranged on the top of the base, a lifting frame is installed between the two fixed frames, a rotating shaft is respectively installed on the top and bottom of the lifting frame, a pair of synchronous wheels are symmetrically installed on the surfaces of the two rotating shafts, and a synchronous belt is jointly mounted on the surfaces of the two synchronous wheels corresponding to different positions of the rotating shaft surfaces, a movable block is slidably installed on the side of the lifting frame away from the connecting arm, a connecting frame is arranged on the top of the fixed frame one close to the connecting arm, and the connecting frame and the movable block are fixedly connected to the synchronous belt.

[0012] As a technical solution of the present invention, the comparison plate is arranged on a side of the lifting frame close to the connecting arm, and the drawing component includes a drawing rod installed through the movable block, the end of the drawing rod away from the comparison plate passes through one side of the lifting frame, and a mounting frame is installed on the passing end, a roller is installed on the side of the mounting frame away from the drawing rod, the other end of the drawing rod passes through the other side of the lifting frame, and a drawing pen is installed on the passing end, a spring 1 is installed on the surface of the drawing rod between the mounting frame and the movable block, and the two ends of the spring 1 are respectively against the mounting frame and the movable block.

[0013] As a technical solution of the present invention, the drawing pen includes a hollow pen cover fixedly connected to the drawing rod, a pen core is installed inside the hollow pen cover, and the writing end of the pen core passes through an end of the hollow pen cover close to the comparison plate, a fixed cover is installed at an end of the hollow pen cover away from the comparison plate, a second spring is installed on the inside of the hollow pen cover between the pen core and the fixed cover, and the two ends of the second spring are respectively against the opposite sides of the fixed cover and the pen core.

[0014] As a technical solution of the present invention, the adjustment mechanism includes a through hole arranged at the top of the connecting arm, an adjustment rod is installed on the inner side of the through hole, a moving wheel 2 is installed at the bottom end of the adjustment rod, and an adjustment block is arranged at the top end of the adjustment rod.

[0015] As a technical solution of the present invention, an internal thread is arranged on the inner wall of the through hole, an external thread engaging with the internal thread is arranged on the outer side of the adjusting rod, and the adjusting rod and the through hole are threadably connected via the internal thread and the external thread.

[0016] As a technical solution of the present invention, the adjusting rod is slidably connected to the through hole, a screw is threadedly installed on the side of the connecting arm away from the base, one end of the screw is inserted into the through hole, and the other end of the screw is connected to a knob.

[0017] As a technical solution of the present invention, the calibration mechanism includes a second fixing frame fixedly arranged on the top of the connecting arm, a calibration plate is arranged on the top of the second fixing frame, a calibration pointer is rotatably installed on one side of the calibration plate, a connecting rod is arranged at the bottom of the calibration pointer, the bottom end of the connecting rod is connected to an inverted U-shaped frame, a swing shaft is also arranged on the inner side of the second fixing frame, a fixed block is arranged in the middle of the swing shaft, a rotating frame is rotatably installed on the outer side of the fixed block, a suspension rod is arranged at the bottom of the rotating frame, a plumb bob is connected to the bottom end of the suspension rod, a connecting plate is arranged on the top of the rotating frame, a strip groove is opened on the connecting plate, a linkage rod is arranged on the inner side of the inverted U-shaped frame, and the linkage rod passes through the inner side of the strip groove.

[0018] As a technical solution of the present invention, the driving mechanism includes a slide groove opened on the fixed frame 1, and slide blocks are provided at the bottom of both sides of the lifting frame, the two slide blocks are respectively inserted into the two slide grooves, and the slide blocks are slidably connected to the slide grooves, a lead screw is installed inside the slide groove, the lead screw passes through the slide block, and the slide block is threadedly connected to the lead screw, an installation groove is opened inside the base, the bottom end of the lead screw is inserted into the installation groove, and the inserted end is connected to a bevel gear 1, a transmission shaft is also installed in the installation groove, two bevel gears 2 are provided on the surface of the transmission shaft, and the two bevel gears 2 are respectively meshed and connected with the two bevel gears 1, a motor is also fixedly installed inside the installation groove, and the output end of the motor is transmission-connected to the transmission shaft.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] 1. The present invention can draw a curve that fits the undulation of the wall surface during the process of measuring the verticality of the wall by setting up a comparison mechanism and a drawing component, so that the detection of the wall surface is more comprehensive. By comparing the curve with the standard comparison line, the undulation state of various parts of the wall surface can be better determined.

[0021] 2. The present invention provides a lifting mechanism, which enables the movable block to have a larger moving stroke and makes the height of the lifting mechanism lower in the folded state, thereby making the overall size of the device smaller and facilitating the movement of the device between different walls to be tested. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a three-dimensional schematic diagram of the present invention as a whole;

[0023] Figure 2 It is a plan view of the comparison plate in the present invention;

[0024] Figure 3 It is a schematic plan view of one of the adjustment mechanisms of the present invention;

[0025] Figure 4 is a plan view of another adjusting mechanism in the present invention;

[0026] Figure 5 It is a schematic plan cross-sectional view of the whole of the present invention;

[0027] Figure 6 It is a transmission schematic diagram of the lifting mechanism in the driving mechanism of the present invention;

[0028] Figure 7 It is a schematic plan cross-sectional view of the drawing pen and the comparison board in the present invention;

[0029] Figure 8 It is a three-dimensional schematic diagram of the calibration mechanism in the present invention.

[0030] In the figure:

[0031] Support mechanism: 101, base; 102, connecting arm; 103, moving wheel 1;

[0032] Adjustment mechanism: 201, through hole; 202, adjustment rod; 203, adjustment block; 204, moving wheel 2; 205, screw rod; 206, knob;

[0033] Comparison mechanism: 301, comparison plate; 302, standard comparison line; 303, groove; 304, inclined surface;

[0034] Drawing components: 401, drawing rod; 402, mounting frame; 403, roller; 404, drawing pen; 405, spring 1; 406, hollow pen cover; 407, pen core; 408, fixed cover; 409, spring 2;

[0035] Lifting mechanism: 501, fixed frame 1; 502, lifting frame; 503, rotating shaft; 504, synchronous wheel; 505, synchronous belt; 506, movable block; 507, connecting frame;

[0036] Calibration mechanism: 601, fixed frame 2; 602, calibration plate; 603, calibration pointer; 604, connecting rod; 605, inverted U-shaped frame; 606, swing shaft; 607, fixed block; 608, rotating frame; 609, suspension rod; 610, plumb bob; 611, connecting plate; 612, strip groove; 613, linkage rod;

[0037] Driving mechanism: 701, slide groove; 702, slider; 703, lead screw; 704, bevel gear one; 705, transmission shaft; 706, bevel gear two; 707, motor. DETAILED DESCRIPTION

[0038] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0039] like Figure 1-8 As shown, the present invention provides a wall verticality detection device for construction, including a support mechanism, the support mechanism includes a base 101, a moving wheel 103 is installed at the bottom of the base 101, and the moving wheel is a universal wheel with a brake, which can facilitate the movement of the device on the one hand, and can keep the device stable during the detection process in the brake stop state on the other hand, a connecting arm 102 is arranged on one side of the base 101, and the connecting arm 102 is arranged vertically with the base 101, and an adjustment mechanism is arranged at one end of the connecting arm 102 away from the base 101, and the adjustment mechanism is used to adjust the support mechanism. It should be noted that, with the extension direction of the base 101 as the front and back, and the extension direction of the connecting arm 102 as the left and right, the adjustment mechanism adjusts the horizontality of the support mechanism in the left and right direction rather than the horizontality in the front and back direction, and also includes:

[0040] The comparison mechanism includes a comparison plate 301 and a drawing component. The comparison plate 301 is provided with a standard comparison line 302. The standard comparison line 302 is a straight line and is parallel to the moving path of the movable block 506. It is used to determine the reference line for detection. The drawing component is used to draw a curve fitting the wall surface on the comparison plate 301, so as to achieve the purpose of comparing with the standard comparison line 302 to judge the verticality and flatness of the wall surface. Preferably, between the two ends of the standard comparison line 302, the comparison plate 301 is also provided with a plurality of scale lines perpendicular to the standard comparison line 302. The scale lines can be used to observe the distance of the wall surface fitting curve from the standard comparison line 302, so as to judge the verticality of the wall;

[0041] A lifting mechanism, which is disposed on the top of the base 101 and is used to drive the drawing component to move up and down so as to draw a curve that fits the wall;

[0042] A driving mechanism, which is used to drive the lifting mechanism to operate;

[0043] The calibration mechanism is used to measure the verticality of the lifting mechanism so that the verticality of the lifting mechanism can be adjusted through the adjustment mechanism to move the drawing component in the vertical direction. The calibration mechanism is used to provide a reference for adjusting the supporting mechanism through the adjustment mechanism.

[0044] Among them, the comparison plate 301 is provided with a groove 303 at both ends of the standard comparison line 302, and the opposite sides of the inner walls of the two grooves 303 are provided with inclined surfaces 304. The two ends of the inclined surface 304 smoothly transition with the inner wall of the groove 303 and the surface of the comparison plate 301. The groove 303 is used to provide a reference for the drawing component at the beginning of measurement. By placing the writing end of the pen core 407 in the drawing component in the groove 303, the starting point of the drawn wall fitting curve can be made to coincide with the end point of the standard comparison line 302. In the process of drawing the wall fitting curve, the distance that the wall fitting curve deviates from the standard comparison line 302 is the distance that the wall deviates from the vertical plane.

[0045] The lifting mechanism includes two fixed frames 501 symmetrically arranged on the top of the base 101, a lifting frame 502 is installed between the two fixed frames 501, a rotating shaft 503 is respectively installed on the top and bottom of the lifting frame 502, and a pair of synchronous wheels 504 are symmetrically installed on the surfaces of the two rotating shafts 503. The synchronous wheels 504 and the rotating shafts 503 can be rotatably connected or fixedly connected. When the synchronous wheels 504 and the rotating shafts 503 are fixedly connected, the rotating shafts 503 and the lifting frame 502 need to be rotatably connected. The surfaces of the two synchronous wheels 504 corresponding to the surface positions of the rotating shafts 503 are jointly covered with a synchronous belt 505. A movable block 506 is slidably installed on the side of the lifting frame 502 away from the connecting arm 102, and a movable block 506 is slidably installed on the top of the fixed frame 501 close to the connecting arm 102. The connecting frame 507 and the movable block 506 are fixedly connected to the synchronous belt 505. The distance between the two sides of the connecting frame 507 and the two sides of the movable block 506 is equal. During the rising process of the lifting frame 502, the connecting frame 507 moves downward relative to the lifting frame 502, thereby pulling the synchronous belt 505, and pulling the movable block 506 through the synchronous belt 505 to move it upward relative to the lifting frame 502. That is, during the process of the movable block 506 moving from the bottom to the top of the lifting frame 502, the lifting frame 502 simultaneously moves from the bottom to the top of the fixed frame 501, which allows the movable block 506 to have a larger moving stroke and can reduce the height of the telescopic device in the folded state. While facilitating the movement and transportation of the device, it effectively increases the measuring range of the movable block 506.

[0046] The comparison plate 301 is arranged on a side of the lifting frame 502 close to the connecting arm 102, and the drawing assembly includes a drawing rod 401 installed on the movable block 506, and the end of the drawing rod 401 away from the comparison plate 301 passes through the side of the lifting frame 502, and the end passing through is installed with a mounting frame 402, and the side of the mounting frame 402 away from the drawing rod 401 is installed with a roller 403, and the roller 403 can roll along the up and down direction of the wall, and the roller 403 can move according to the ups and downs of the wall, thereby driving the drawing rod 401 To draw a curve, the other end of the drawing rod 401 passes through the other side of the lifting frame 502, and a drawing pen 404 is installed at the protruding end. The drawing pen 404 is used to draw a curve on the comparison plate 301. A spring 405 is installed on the surface of the drawing rod 401 between the mounting frame 402 and the movable block 506, and the two ends of the spring 405 are respectively against the mounting frame 402 and the movable block 506. The spring 405 realizes the rebound of the mounting frame 402 and the roller 403, so that the roller 403 is always in contact with the wall surface.

[0047] The drawing pen 404 includes a hollow pen sleeve 406 fixedly connected to the drawing rod 401, a pen core 407 is installed inside the hollow pen sleeve 406, and the pen core 407 is movably installed inside the hollow pen sleeve 406, and the writing end of the pen core 407 passes through the end of the hollow pen sleeve 406 close to the comparison board 301, and the writing end of the pen core 407 is used to draw on the comparison board 301, and a fixed cover 408 is installed at the end of the hollow pen sleeve 406 away from the comparison board 301, and the fixed cover 408 is detachably installed. Specifically, the fixed cover 408 and The hollow pen caps 406 can be connected by a threaded structure, so that the fixed cover 408 can be opened, so that the internal pen core 407 can be taken out for replacement. A spring 2 409 is installed on the inner side of the hollow pen cap 406 between the pen core 407 and the fixed cover 408, and the two ends of the spring 2 409 are respectively against the opposite sides of the fixed cover 408 and the pen core 407. The pen core 407 is squeezed by the spring 2 409 so that the writing end of the pen core 407 can be abutted against the surface of the comparison board 301, thereby improving the stability during the drawing of the wall fitting curve.

[0048] Among them, the adjustment mechanism includes a through hole 201 set at the top of the connecting arm 102, an adjusting rod 202 is installed on the inner side of the through hole 201, and a moving wheel 204 is installed at the bottom end of the adjusting rod 202. The moving wheel 204 can be a universal wheel without a braking function or a universal wheel with a braking function. The adjusting rod 202 is used to adjust the height of the moving wheel 204, thereby realizing the horizontal adjustment of the supporting mechanism, and an adjustment block 203 is set at the top of the adjusting rod 202.

[0049] In one embodiment, an internal thread is provided on the inner wall of the through hole 201, an external thread engaged with the internal thread is provided on the outer side of the adjusting rod 202, and the adjusting rod 202 is threadedly connected to the through hole 201 via the internal thread and the external thread. In this embodiment, by rotating the adjusting rod 202 threadedly connected to the through hole 201, the height of the moving wheel can be changed, thereby realizing the horizontal adjustment of the supporting mechanism.

[0050] In another embodiment, the adjusting rod 202 is slidably connected to the through hole 201, a screw 205 is threadedly installed on one side of the connecting arm 102, and one end of the screw 205 is inserted into the through hole 201, and the other end of the screw 205 is connected to a knob 206. In this embodiment, after adjusting the connecting arm 102 to a horizontal state by adjusting the adjusting rod 202, the knob 206 can be rotated to change the depth of the screw 205 inserted into the through hole 201, thereby achieving the locking of the adjusting rod 202 to achieve the purpose of keeping the connecting arm 102 in a horizontal state.

[0051] The calibration mechanism includes a second fixing frame 601 fixedly arranged on the top of the connecting arm 102, a calibration plate 602 is arranged on the top of the second fixing frame 601, a calibration line is arranged on the calibration plate 602, and the calibration line is arranged parallel to the moving path of the movable block 506, a calibration pointer 603 is rotatably installed on one side of the calibration plate 602, a connecting rod 604 is arranged at the bottom of the calibration pointer 603, and an inverted U-shaped frame 605 is connected to the bottom end of the connecting rod 604, and a pendulum is also arranged on the inner side of the second fixing frame 601. Axle 606, a fixed block 607 is arranged in the middle of the swing shaft 606, a rotating frame 608 is rotatably installed on the outer side of the fixed block 607, a suspension rod 609 is arranged at the bottom of the rotating frame 608, a plumb bob 610 is connected to the bottom end of the suspension rod 609, a connecting plate 611 is arranged at the top of the rotating frame 608, a strip groove 612 is opened on the connecting plate 611, a linkage rod 613 is arranged on the inner side of the inverted U-shaped frame 605, the linkage rod 613 is arranged in the front-back direction, and the linkage rod 613 extends from the strip groove 612. , under the action of gravity, the plumb bob 610 and the suspension rod 609 always maintain a vertical downward state. Therefore, according to the inclination state of the support mechanism, the plumb bob 610 will swing to the left or right, causing the connecting plate 611 to produce a corresponding action, and the linkage rod 613 is rotated in the direction opposite to the moving direction of the plumb bob 610 through the connecting plate 611. In this process, the front-to-back swing of the plumb bob 610 is filtered by the rotation of the swing shaft 606 and the setting of the strip groove 612, so that the front-to-back swing of the plumb bob 610 will not cause the calibration pointer 603 to rotate. The left-right swing of the plumb bob 610 causes the calibration pointer 603 to deviate from the calibration line. At this time, the angle between the calibration pointer 603 and the calibration line is the inclination angle of the support mechanism. The height of one end of the connecting arm 102 is adjusted by the adjustment mechanism, so as to achieve the state of keeping the calibration line vertical in the left-right direction, so as to achieve the coincidence of the calibration pointer 603 with the calibration line, and the moving path of the movable block 506 can be kept vertical in the left-right direction.

[0052] The driving mechanism includes a slide groove 701 provided on the fixed frame 501, and sliders 702 are provided at the bottom of both sides of the lifting frame 502. The two sliders 702 are respectively inserted into the two slide grooves 701, and the sliders 702 are slidably connected with the slide grooves 701. The arrangement of the sliders 702 and the slide grooves 701 can improve the stability of the lifting frame 502 during the rising and falling process. A lead screw 703 is installed inside the slide groove 701, and the lead screw 703 passes through the slider 702, and the slider 702 is connected with the lead screw 703. 03 are threadedly connected. When the lead screw 703 rotates, the lead screw 703 threadedly connected thereto will move upward or downward according to the direction of rotation of the lead screw 703. A mounting groove is provided inside the base 101. The bottom end of the lead screw 703 penetrates into the mounting groove, and one end penetrated therein is connected with a bevel gear 1 704. A transmission shaft 705 is also installed in the mounting groove. Two bevel gears 2 706 are provided on the surface of the transmission shaft 705, and the two bevel gears 2 706 are respectively meshed and connected with the two bevel gears 1 704.

[0053] At this time, the thread directions of the two lead screws 703 need to be set in opposite directions. When the two bevel gears 706 are both located on one side of the bevel gear 1 704, since the two lead screws 703 have the same rotation direction, the thread directions of the two lead screws 703 need to be set in the same direction. A motor 707 is also fixedly installed inside the mounting groove, and the output end of the motor 707 is connected to the transmission shaft 705 for transmission. The transmission shaft 705 is driven by the motor 707 to rotate, and the lead screw 703 is driven to rotate through the bevel gear 1 704 and the bevel gear 2 706.

[0054] Specific working principle:

[0055] Before using the detection device of the present invention, it is necessary to first connect the present invention to an external power source and a controller.

[0056] Step 1: When using the present invention, first move the device to the vicinity of the wall to be detected, and at the same time make the end of the drawing rod 401 provided with the roller 403 face the wall, and then start to calibrate the drawing starting point and verticality of the drawing pen of the device:

[0057] The calibration method of the drawing pen 404 is as follows: the device is pushed close to the wall, and is blocked by the wall. The drawing rod 401 remains stationary, and the comparison plate 301 continues to approach the wall. After the writing end of the pen core 407 coincides with the groove 303 at the bottom end of the standard comparison line 302, the writing end of the pen core 407 bounces into the groove 303 under the elastic force of the second spring 409, completing the initialization setting of the drawing origin, and then locking the brake on the moving wheel 103;

[0058] The verticality calibration method is: while keeping the drawing pen 404 in the groove 303, by observing the direction of the calibration pointer 603 on the calibration plate 602, if the calibration pointer 603 is located on the left side of the calibration line, it means that the left side of the support mechanism is too low. At this time, the height of the end of the connecting arm 102 away from the base 101 can be raised by the adjustment mechanism to make the calibration pointer 603 coincide with the calibration line. Similarly, if the calibration pointer 603 is located on the right side of the calibration line, it is necessary to lower the height of the end of the connecting arm 102 away from the base 101 so that the calibration pointer 603 coincides with the calibration line.

[0059] After the calibration is completed, the verticality of the wall will be checked.

[0060] Step 2: After the detection begins, the motor 707 is started through the external controller, and the motor 707 drives the transmission shaft 705 to rotate. The transmission shaft 705 drives the bevel gear 2 706 on its surface to rotate, and the bevel gear 2 706 drives the bevel gear 1 704 meshing with it to rotate, and finally the two bevel gears 1 704 respectively drive the two lead screws 703 to rotate. During the rotation of the lead screw 703, the slider 702 threadedly connected to it drives the lifting frame 502 to rise. Through the arrangement of the two lead screws 703, the forces on both sides of the lifting frame 502 are kept balanced during the movement, which is conducive to improving the stability of the movement of the lifting frame 502 and the movable block 506 installed on the inner side of the lifting frame 502, so that the measured data is more accurate. During the rising process of the lifting frame 502, the connecting frame 507 is relatively As the lifting frame 502 moves downward and pulls the synchronous belt 505 to rotate, during the rotation of the synchronous belt 505, the movable block 506 connected to the synchronous belt 505 moves upward in the lifting frame 502 and drives the drawing component to move. At the same time, as the wall surface rises and falls, the drawing pen 404 in the drawing component will move left or right synchronously, and then draw a curve fitting the wall surface rise and fall state on the comparison board 301. At the same time, since the starting point of the curve is the same as the standard comparison line 302, it is only necessary to observe the distance that the curve deviates from the standard comparison line 302 to judge the rise and fall of the wall surface and the verticality information of the wall. It should be noted that the travel of the movable block 506 relative to the ground is twice its travel relative to the comparison board 301, that is, the length of the drawn wall fitting curve is half of the measured height.

[0061] Step 3: After completing a measurement, you only need to erase the curve drawn on the comparison board 301, move the device to the vicinity of the next wall to be measured, and repeat steps 1 to 2. If the next wall to be measured is closer, it is not necessary to reset the lifting mechanism during steps 1 to 2. Instead, the writing end of the drawing pen 404 is made to coincide with the groove 303 at the top of the standard comparison line 302, and the wall is inspected from top to bottom. When the next wall to be measured is far away, the lifting mechanism needs to be reset first to facilitate the movement of the device; after the ink in the pen core 407 is used up, you only need to open the fixed cover 408, remove the spring 2 409 and the pen core 407 in turn, re-insert the new pen core 407, and then install the spring 2 409 and the fixed cover 408 in turn.

[0062] The embodiments of the present invention are provided for the purpose of illustration and description. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A wall verticality detection device for construction, comprising a support mechanism, the support mechanism comprising a base (101), a moving wheel (103) being installed at the bottom of the base (101), a connecting arm (102) being arranged on one side of the base (101), an adjusting mechanism being arranged at one end of the connecting arm (102) away from the base (101), characterized in that: Also includes: A comparison mechanism, the comparison mechanism comprising a comparison plate (301) and a drawing component, the comparison plate (301) being provided with a standard comparison line (302), the drawing component being used to draw a curve fitting the wall surface on the comparison plate (301), so as to achieve the purpose of comparing with the standard comparison line (302) to determine the verticality and flatness of the wall surface; A lifting mechanism, the lifting mechanism being arranged on the top of the base (101), and being used to drive the drawing component to be lifted and lowered so as to draw a curve fitting the wall surface; A driving mechanism, the driving mechanism is used to drive the lifting mechanism to operate; The calibration mechanism is used to measure the verticality of the lifting mechanism so as to adjust the verticality of the lifting mechanism through the adjustment mechanism so that the drawing component can move in the vertical direction.

2. The wall verticality detection device for construction as claimed in claim 1, characterized in that: The comparison plate (301) is provided with a groove (303) at each end of the standard comparison line (302), and the inner walls of the two grooves (303) are opposite to each other on one side thereof and the two ends of the slope (304) smoothly transition with the inner walls of the grooves (303) and the surface of the comparison plate (301).

3. The wall verticality detection device for construction as claimed in claim 1, characterized in that: The lifting mechanism comprises two fixed frames (501) symmetrically arranged on the top of the base (101), a lifting frame (502) is installed between the two fixed frames (501), a rotating shaft (503) is installed on the top and bottom of the lifting frame (502), a pair of synchronous wheels (504) are symmetrically installed on the surfaces of the two rotating shafts (503), and a synchronous belt (505) is commonly sheathed on the surfaces of the two synchronous wheels (504) corresponding to the surface positions of different rotating shafts (503), a movable block (506) is slidably installed on the side of the lifting frame (502) away from the connecting arm (102), a connecting frame (507) is arranged on the top of the fixed frame (501) close to the connecting arm (102), and the connecting frame (507) and the movable block (506) are both fixedly connected to the synchronous belt (505).

4. The wall verticality detection device for construction as claimed in claim 3, characterized in that: The comparison plate (301) is arranged on a side of the lifting frame (502) close to the connecting arm (102); the drawing component comprises a drawing rod (401) installed through the movable block (506); an end of the drawing rod (401) away from the comparison plate (301) passes through a side of the lifting frame (502), and a mounting frame (402) is installed on the end that passes through; a roller (403) is installed on the side of the mounting frame (402) away from the drawing rod (401); the other end of the drawing rod (401) passes through the other side of the lifting frame (502), and a drawing pen (404) is installed on the end that passes through; a spring (405) is installed on the surface of the drawing rod (401) between the mounting frame (402) and the movable block (506), and two ends of the spring (405) are respectively against the mounting frame (402) and the movable block (506).

5. The wall verticality detection device for construction as claimed in claim 4, characterized in that: The drawing pen (404) comprises a hollow pen sleeve (406) fixedly connected to the drawing rod (401), a pen core (407) is installed inside the hollow pen sleeve (406), and the writing end of the pen core (407) passes through the end of the hollow pen sleeve (406) close to the comparison board (301), a fixed cover (408) is installed at the end of the hollow pen sleeve (406) away from the comparison board (301), and a second spring (409) is installed inside the hollow pen sleeve (406) between the pen core (407) and the fixed cover (408), and the two ends of the second spring (409) are respectively against the opposite sides of the fixed cover (408) and the pen core (407).

6. The wall verticality detection device for construction as claimed in claim 1, characterized in that: The adjustment mechanism comprises a through hole (201) arranged at the top of the connecting arm (102), an adjustment rod (202) is installed on the inner side of the through hole (201), a moving wheel 2 (204) is installed at the bottom end of the adjustment rod (202), and an adjustment block (203) is arranged at the top end of the adjustment rod (202).

7. The wall verticality detection device for construction as claimed in claim 6, characterized in that: An internal thread is provided on the inner wall of the through hole (201), an external thread engaging with the internal thread is provided on the outer side of the adjusting rod (202), and the adjusting rod (202) and the through hole (201) are threadedly connected via the internal thread and the external thread.

8. The wall verticality detection device for construction as claimed in claim 6, characterized in that: The adjusting rod (202) is slidably connected to the through hole (201); a screw rod (205) is threadedly installed on one side of the connecting arm (102) away from the base (101); one end of the screw rod (205) penetrates into the through hole (201); and the other end of the screw rod (205) is connected to a knob (206).

9. The wall verticality detection device for construction as claimed in claim 1, characterized in that: The calibration mechanism comprises a second fixing frame (601) fixedly arranged on the top of the connecting arm (102); a calibration plate (602) is arranged on the top of the second fixing frame (601); a calibration pointer (603) is rotatably mounted on one side of the calibration plate (602); a connecting rod (604) is arranged at the bottom of the calibration pointer (603); an inverted U-shaped frame (605) is connected to the bottom end of the connecting rod (604); a swing shaft (606) is also arranged on the inner side of the second fixing frame (601); a fixed rod (606) is arranged in the middle of the swing shaft (606); A fixed block (607) is rotatably mounted on the outer side of the fixed block (607), a rotating frame (608) is rotatably mounted, a suspension rod (609) is arranged at the bottom of the rotating frame (608), a plumb bob (610) is connected to the bottom end of the suspension rod (609), a connecting plate (611) is arranged at the top of the rotating frame (608), a strip groove (612) is opened on the connecting plate (611), a linkage rod (613) is arranged on the inner side of the inverted U-shaped frame (605), and the linkage rod (613) passes through the inner side of the strip groove (612).

10. The wall verticality detection device for construction as claimed in claim 3, characterized in that: The driving mechanism comprises a slide groove (701) provided on the fixing frame (501), and sliders (702) are provided at the bottom of both sides of the lifting frame (502), and the two sliders (702) are respectively inserted into the two slide grooves (701), and the sliders (702) and the slide grooves (701) are slidably connected, and a lead screw (703) is installed inside the slide groove (701), and the lead screw (703) passes through the slider (702), and the slider (702) and the lead screw (703) are threadedly connected, and the base (101) has an installation groove inside, the bottom end of the lead screw (703) is inserted into the installation groove, and the inserted end is connected to a bevel gear one (704), a transmission shaft (705) is also installed in the installation groove, two bevel gears two (706) are arranged on the surface of the transmission shaft (705), and the two bevel gears two (706) are respectively meshed and connected with the two bevel gears one (704), a motor (707) is also fixedly installed in the installation groove, and the output end of the motor (707) is connected to the transmission shaft (705) in a transmission manner.

Citation Information

Patent Citations

  • Wall perpendicularity detection device for building measurement

    CN114152246A

  • Building horizontal surveying and mapping device for wall surface

    CN209623696U

  • Verticality detection device for engineering supervision

    CN209820426U

  • Inclination measuring device

    CN216159873U

  • Perpendicularity calibration and detection device for constructional engineering

    CN218035066U