Method for evaluating gas injection scheme of gas storage
Through iterative evaluation of gas injection volume and traffic pipe pressure prediction models, the problems of computational complexity and large data volume in gas injection scheme evaluation in gas storage storage are solved, and accurate evaluation and low-cost calculation of gas injection scheme are realized, which is suitable for large-scale exhaustion Gas reservoir type gas storage.
Patent Information
- Application Number
- CN202410929897.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-01
AI Technical Summary
The calculation parameters and data of the existing gas storage gas injection scheme evaluation method are large and complex, making it difficult to meet actual production needs.
The gas injection volume prediction model and the traffic pipe pressure prediction model are used to obtain the fitting equations between the gas storage operating parameters through multiple linear regression fitting, and iteratively predict the gas injection volume and traffic pipe pressure, combining the inventory volume and compressor running time, and evaluate the Whether the gas injection scheme meets the upper pressure limit constraints.
It realizes accurate evaluation of the gas injection plan, reduces calculation costs, simplifies the calculation process, and is suitable for large depleted gas reservoirs, improving the accuracy and reliability of the evaluation.
Smart Images

Figure CN118886356A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of gas storage reservoir gas injection capacity prediction, and in particular relates to a gas storage reservoir gas injection scheme evaluation method. Background Art
[0002] The gas injection capacity of a gas storage facility is a key indicator for measuring its ability to effectively store and release natural gas, and is of great significance for ensuring energy security and stable supply. In order to ensure the efficient and reasonable development of oil and gas fields, the gas injection capacity evaluation must be carried out accurately. The importance of accurately evaluating the gas injection capacity of a gas storage facility is self-evident. This work is not only related to the improvement of the overall mining efficiency of the oil field, but also directly affects the economic benefits and resource utilization efficiency of the enterprise. Therefore, how to use a scientific methodology system, combined with advanced technical means, to achieve accurate evaluation and effective control of gas injection capacity is a major issue and challenge currently faced.
[0003] When designing the gas injection scheme for a gas storage reservoir, the compressor working time (i.e., compressor running time) is usually designed in combination with the target gas injection volume and the working capacity of the compressor; however, under actual gas injection conditions, the influence of formation pressure also needs to be considered, that is, for the compressor, at the end of the entire gas injection cycle, the compressor manifold pressure cannot exceed a certain pressure upper limit, otherwise it may cause safety hazards; therefore, it is very important to evaluate whether the gas storage reservoir gas injection scheme can meet the constraints of the compressor manifold pressure upper limit.
[0004] At present, the main methods related to the evaluation of gas storage injection schemes include geological modeling and dynamic simulation. The geological modeling method establishes a reservoir geomechanical model, analyzes the pore structure, permeability, stress state and other factors of the gas reservoir, and evaluates the stability of the formation during the injection and production process of the gas storage injection scheme, as well as the compressibility of the reservoir and the gas migration efficiency. This method can use field measured data, but it requires high-quality well test data and a reasonable inversion algorithm, and the calculation is relatively complex. The dynamic simulation method uses numerical simulation software to simulate the gas injection and production process under different working conditions, and predicts the pressure changes, gas injection rate, gas production rate and gas well capacity attenuation of the gas storage under the gas storage injection scheme; this method can take into account a variety of actual influencing factors, but it also requires a large number of parameters and calculations, and is sensitive to the selection of initial conditions and boundary conditions. Summary of the invention
[0005] The purpose of the present invention is to provide a method for evaluating a gas storage reservoir injection plan, which is used to solve the problem that the evaluation method for a gas storage reservoir injection plan in the prior art has high requirements on the amount of calculation parameter data and has large calculation amount and complex calculation.
[0006] In order to achieve the above-mentioned object, the present invention provides a method for evaluating a gas storage gas injection scheme. According to the values of each operating parameter in a selected time period, a gas injection volume prediction model and a manifold pressure prediction model are used to obtain the predicted values of the gas injection volume and manifold pressure in the first time period thereafter; the operating parameters include the planned operating time of the compressor in the next time period of the gas storage and the gas injection volume in the current time period, the compressor operating time determined according to the gas injection scheme to be evaluated, the manifold pressure and the gas storage inventory;
[0007] According to the predicted values of the gas injection volume and the manifold pressure in the first time period thereafter and the values of other operating parameters in the time period, the two prediction models are used respectively to obtain the predicted values of the gas injection volume and the manifold pressure in the second time period thereafter; it is iterated successively until the predicted value of the manifold pressure is greater than the set pressure upper limit, if the sum of the predicted values of the gas injection volume before the time period is less than the gas injection target, it is determined that the gas injection plan does not meet the requirements, otherwise it is determined to meet the requirements.
[0008] Furthermore, the gas injection volume prediction model is a fitting equation between the operating parameters of each gas storage reservoir.
[0009] Furthermore, the gas injection volume prediction model is obtained by performing multivariate linear regression fitting on historical data of operating parameters of each gas storage reservoir.
[0010] Furthermore, the manifold pressure prediction model is a fitting equation between the operating parameters of each gas storage reservoir.
[0011] Furthermore, the manifold pressure prediction model is obtained by performing multivariate linear regression fitting on historical data of operating parameters of each gas storage reservoir.
[0012] Furthermore, the data set corresponding to the historical data of the operating parameters of each gas storage reservoir is updated according to a set time period; after the data set is updated, multivariate linear regression fitting is performed based on the historical data in the new data set to update the gas injection volume prediction model and the manifold pressure prediction model.
[0013] Furthermore, it is characterized in that the set pressure upper limit is determined according to the design pressure upper limit of the gas storage reservoir itself.
[0014] Furthermore, the data set corresponding to the historical data of the operating parameters of each gas storage facility is updated according to a set time period in the following manner:
[0015] After each set time period, on the basis of retaining the original historical data in the data set, new data generated by the operation of the gas storage facility within the current set time period is added to the data set to update the data set.
[0016] Furthermore, the method of using the two prediction models respectively to obtain the predicted values of the gas injection volume and the manifold pressure in the second time period includes:
[0017] The predicted values of the gas injection volume and the manifold pressure in the first time period after the selected time period are respectively used as the values of the gas injection volume and the manifold pressure in the current time period in the operating parameters, and together with the values of other operating parameters in the first time period after the selected time period, are substituted into the gas injection volume prediction model and the manifold pressure prediction model respectively to obtain the predicted values of the gas injection volume and the manifold pressure in the second time period after the selected time period.
[0018] Furthermore, the gas storage reservoir inventory in the first time period thereafter is determined based on the sum of the gas injection volume and the gas storage reservoir inventory in a selected time period; the gas storage reservoir inventory in the Mth time period after the selected time period is determined based on the sum of the gas storage reservoir inventory in the M-1th time period and the predicted value of the gas injection volume in the M-1th time period; M is an integer greater than 1.
[0019] The above technical solution of the present invention provides a new method for evaluating the gas injection scheme of a gas storage, and its beneficial effects include:
[0020] By including the gas storage reservoir inventory, the gas injection volume and manifold pressure in the current time period, which are physical factors related to the gas injection conditions, and the variable factors of the operating parameters of the planned operating time of the compressor in the current time period and the next time period (i.e., factors that can be changed by artificial settings under actual conditions), the gas storage reservoir operating parameters and the gas injection volume prediction model and the manifold pressure prediction model are used to iteratively predict the gas injection volume and manifold pressure in each time period after a selected time period. This can fully consider the impact and limitation of the actual operating conditions of the compressor on the manifold pressure and gas injection volume during the gas storage reservoir gas injection process, and realize the evaluation of whether the gas injection scheme can meet the actual production needs (i.e., whether it meets the requirements). At the same time, the calculation method is simple, the calculation amount is small, and the requirement for the amount of calculation parameter data is not high, so that the calculation cost of evaluating the gas injection volume scheme using this gas injection scheme evaluation method is lower. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a flowchart of a method for evaluating a gas injection scheme for a gas storage reservoir in an embodiment of the method for evaluating a gas injection scheme for a gas storage reservoir of the present invention;
[0022] Figure 2 It is a schematic diagram of the pipeline flow of the gathering and transportation station and the gas injection well field of the W11 gas storage in the embodiment of the gas storage injection scheme evaluation method of the present invention;
[0023] Figure 3 This is an example diagram of historical data of operating parameters of various gas storages corresponding to the W11 gas storage in the embodiment of the gas storage injection scheme evaluation method of the present invention. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is further described in detail below with reference to the accompanying drawings and embodiments.
[0025] Example of gas storage injection scheme evaluation method
[0026] This embodiment provides a technical solution for a method for evaluating a gas injection scheme of a gas storage reservoir. The method combines the inventory of the gas storage reservoir, the production data of the gas injection wells within the gas storage reservoir cycle (such as the gas injection volume), the operation data of the compressor unit (such as the planned operation time of the compressor) and the manifold pressure, and uses the gas injection volume prediction model and the manifold pressure prediction model obtained by fitting the multivariate linear regression analysis. By iteratively predicting the manifold pressure and gas injection volume of the gas storage reservoir in each time period, and by determining whether the sum of the previously predicted gas injection volumes meets the standard when the predicted manifold pressure reaches the upper limit, it is possible to evaluate whether the gas injection scheme can meet the actual production demand (i.e., whether it meets the requirements). The calculation cost is low and the requirement for the amount of calculated data is also small; and as the operation time of the gas storage reservoir goes by, new data is continuously generated, and the data set corresponding to the historical data is updated and expanded in combination with the new and old data, which is used to timely update the gas injection volume prediction model and the manifold pressure prediction model, that is, by continuously enriching the data set, the prediction accuracy is continuously improved to ensure the reliability of the evaluation results. The method is suitable for large-scale depleted gas reservoir-type gas storage and has low calculation time consumption and high accuracy.
[0027] The evaluation method of the gas storage gas injection scheme in this embodiment refers to Figure 1 The prediction method uses the gas injection volume prediction model and the manifold pressure prediction model according to the values of the operating parameters (i.e., the operating parameters of the gas storage) in a selected time period to obtain the predicted values of the gas injection volume and the manifold pressure in the first time period after the selected time period; wherein, the operating parameters of the gas storage include the planned operating time of the compressor in the next time period of the gas storage, the gas injection volume in the current time period, the compressor operating time determined according to the gas injection scheme to be evaluated, the manifold pressure, and the gas storage inventory;
[0028] According to the predicted values of the gas injection volume and manifold pressure in the first time period after a selected time period and the values of other operating parameters in the time period, the predicted values of the gas injection volume and manifold pressure in the second time period after the selected time period are obtained by using the gas injection volume prediction model and the manifold pressure prediction model respectively; it is iterated in sequence until the predicted value of the manifold pressure is greater than the set pressure upper limit. If the sum of the predicted values of the gas injection volume before the time period (i.e., the time period in which the predicted value of the manifold pressure is greater than the set pressure upper limit) is less than the gas injection target, it is determined that the gas injection plan does not meet the production requirements, otherwise it is determined that it meets the production requirements. Among them, the set pressure upper limit is determined according to the design pressure upper limit of the gas storage reservoir itself.
[0029] When the predicted value of the manifold pressure is greater than the set upper pressure limit, according to normal gas injection logic, the gas injection operation can no longer be continued. However, the sum of the predicted values of the gas injection volume before this time period is still less than the gas injection target, which means that the gas injection target cannot be achieved under the premise of meeting the constraint conditions of the manifold pressure. Therefore, this plan either exceeds the upper limit of the manifold pressure, causing safety hazards, or fails to achieve the gas injection target. Obviously, both cannot meet the actual gas injection needs. It can be determined that the gas injection plan does not meet the production requirements.
[0030] Note that this embodiment and Figure 1 The "after" in the "first time period after", "second time period after" and "Nth time period after" mentioned in the above all refers to after a selected time period. In addition, the "operating time" in the compressor operating time and the compressor planned operating time refers to the sum of the operating time of all compressors when the gas storage is in operation (for example, if two compressors are turned on in a certain time period, one compressor operates for 12 hours and the other compressor operates for 15 hours, then the compressor operating time in this time period is 12+15=27 hours, and so on).
[0031] Therefore, through the various gas storage operating parameters and the gas injection volume prediction model and the manifold pressure prediction model, which include both the physical factors related to the gas injection conditions, such as the gas storage inventory, the gas injection volume and the manifold pressure in the current time period, and the variable factors of the operating parameters of the planned operating time of the compressor in the current time period and the next time period (that is, the factors that can be changed by artificial setting under actual working conditions), the gas injection volume and the manifold pressure in each time period after a selected time period are iteratively predicted, which can fully consider the influence and limitation of the actual operating conditions of the compressor on the manifold pressure and the gas injection volume during the gas storage gas injection process, and realize the evaluation of whether the gas injection scheme can meet the actual production needs (that is, whether it meets the requirements); at the same time, the calculation method is simple, the calculation amount is small, and the requirement for the amount of calculation parameter data is not high, so that the calculation cost of evaluating the gas injection volume scheme using the gas injection scheme evaluation method is lower.
[0032] Among them, the gas storage reservoir inventory in the first time period after a selected time period is determined according to the sum of the gas injection volume and the gas storage reservoir inventory in the selected time period; the gas storage reservoir inventory in the Mth time period after the selected time period is determined according to the sum of the gas storage reservoir inventory in the M-1th time period and the predicted value of the gas injection volume in the M-1th time period; M is an integer greater than 1, that is, in the prediction process, the gas storage reservoir inventory in each time period is updated according to the predicted value of the gas injection volume in the previous time period and the gas storage reservoir inventory.
[0033] In this embodiment, the gas injection volume prediction model is a fitting equation between the operating parameters of each gas storage reservoir; the gas injection volume prediction model is obtained by performing multiple linear regression fitting on the historical data of the operating parameters of each gas storage reservoir; similarly, the manifold pressure prediction model is a fitting equation between the operating parameters of each gas storage reservoir; the manifold pressure prediction model is obtained by performing multiple linear regression fitting on the historical data of the operating parameters of each gas storage reservoir. Multiple linear regression fitting can take into account the correlation between multiple parameters, and has a simple form, small amount of calculation, and fast fitting speed, which can reduce the cost of gas injection scheme evaluation; and the gas injection volume prediction model and the manifold pressure prediction model are independent of each other, avoiding the mutual influence of the prediction results in the same time period when one of the two has a large error.
[0034] In this embodiment, each time period is 1 day, and the planned compressor operation time of the next time period in the operation parameters of each gas storage reservoir is the planned compressor operation time of the next day, and the gas injection volume, compressor operation time and manifold pressure of the current time period are respectively the gas injection volume, compressor operation time and manifold pressure of the day; the gas injection volume and manifold pressure of the next time period when predicting are respectively the gas injection volume and manifold pressure of the next day, as shown in Table 1:
[0035] Table 1
[0036] Parameter factors involved in the prediction process Physical symbols unit Compressor operating time for the day <![CDATA[S t ]]> h Compressor planned operating time for the next day <![CDATA[S t+1 ]]> h Gas storage inventory on the day <![CDATA[Q kct ]]> <![CDATA[10 4 m 3 ]]> Gas injection volume of gas storage on the day <![CDATA[Q t ]]> <![CDATA[10 4 m 3 ]]> The pressure of the day <![CDATA[P t ]]> MPa Gas storage gas injection volume for the next day (predicted value) <![CDATA[Q t+1 ]]> <![CDATA[10 4 m 3 ]]> The next day's manifold pressure (predicted value) <![CDATA[P t+1 ]]> MPa
[0037] In other embodiments, each time period may also be other days, such as 1 hour, 12 hours, a week, etc. The specific length of the time period may be flexibly selected according to the sampling time of the historical data or other actual needs and condition constraints.
[0038] The multivariate linear regression fitting in this embodiment is performed using the least squares method. Taking the case where each time period is 1 day as an example, the specific fitting process is as follows:
[0039] First, the gas injection volume prediction model in the form of a fitting equation between the operating parameters of each gas storage is listed as follows:
[0040] Q t+1 =α1S t +α2S t+1 +α3Q kct +α4Q t +α5P t +α6
[0041] Among them, α1, α2, α3, α4 and α5 are the corresponding coefficients of the gas injection volume prediction model, and α6 is the intercept; the meanings of other parameters refer to Table 1;
[0042] If the compressor running time S t , The next day's compressor planned operating time St+1 、Gas storage daily inventory Q kct 、Gas injection volume of gas storage on the day Q t and the daily manifold pressure P t These five parameters form a vector X, and the above gas injection volume prediction model can be rewritten as an augmented matrix, expressed as follows:
[0043] AX=B
[0044] Among them, A=(a1 a2 a3 a4 a5), B=Q t+1 -a6; the meaning of other parameters refer to Table 1;
[0045] The least square method is used to perform multivariate linear regression fitting, and finally the coefficients α1, α2, α3, α4 and α5 and the intercept α6 are calculated to obtain a gas injection volume prediction model that can be used for iterative gas injection volume prediction.
[0046] Similarly, the manifold pressure prediction model in the form of a fitting equation between the operating parameters of each gas storage facility is listed as follows:
[0047] P t+1 =m1 S t +m2S t+1 +m3Q kct +m4Q t +m5P t +m6
[0048] Among them, m1, m2, m3, m4 and m5 are the corresponding coefficients of the manifold pressure prediction model, and m6 is the intercept; the meanings of other parameters refer to Table 1; the least squares method is used to perform multivariate linear regression fitting, and finally the coefficients m1, m2, m3, m4 and m5 and the intercept m6 are calculated to obtain the manifold pressure prediction model that can be used for iterative manifold pressure prediction.
[0049] Specifically, according to the values of the operating parameters of each gas storage reservoir in a selected time period, the gas injection volume prediction model and the manifold pressure prediction model are used respectively to obtain the predicted values of the gas injection volume and the manifold pressure in the first time period thereafter. The method is to substitute the values of the operating parameters of each gas storage reservoir in the selected time period into the gas injection volume prediction model and the manifold pressure prediction model respectively to obtain the predicted values of the gas injection volume and the manifold pressure in the first time period after the selected time period.
[0050] Taking the case where each time period is 1 day as an example, the known daily gas injection volume on day T0 (a selected time period) is taken as Q t , the compressor operation time on day T0 is taken as S t , the manifold pressure on day T0 is taken as P t, and the planned compressor operation time on day T1 (the first day after day T0, i.e., the first time period after the selected time period) is taken as S t+1 The daily inventory of the gas storage is Q kct , then these parameters are substituted into the above-mentioned gas injection volume prediction model that can be used for iterative gas injection volume prediction and the manifold pressure prediction model that can be used for iterative manifold pressure prediction, and the predicted values of the gas injection volume and manifold pressure on the T1 day (that is, the predicted values of the gas injection volume and manifold pressure in the first time period after a selected time period) can be obtained.
[0051] Then, the gas injection volume prediction model and the manifold pressure prediction model are used to obtain the predicted values of the gas injection volume and the manifold pressure in the second time period, including:
[0052] The predicted values of the gas injection volume and manifold pressure in the first time period after a selected time period are used as the values of the gas injection volume and manifold pressure in the current time period in the operating parameters, respectively, and together with the values of other operating parameters in the first time period after the selected time period, are substituted into the gas injection volume prediction model and the manifold pressure prediction model, respectively, to obtain the predicted values of the gas injection volume and manifold pressure in the second time period after the selected time period.
[0053] Similarly, taking the case where each time period is 1 day as an example, after obtaining the predicted values of the gas injection volume and manifold pressure on day T1 (i.e., the predicted values of the gas injection volume and manifold pressure in the first time period after the selected time period), the predicted value of the gas injection volume on day T1 is used as the new Q t The predicted value of the manifold pressure on day T1 is taken as the new P t ; and the compressor running time on day T1 is taken as the new S t , the planned compressor operation time on day T2 (the second day after day T0, i.e., the second time period after the selected time period) is taken as the new S t+1 The gas storage inventory on day T2 (i.e., the gas storage inventory on day T1 plus the predicted gas injection volume on day T1) is taken as the new Q kct , then these parameters are substituted into the above-mentioned gas injection volume prediction model that can be used for iterative gas injection volume prediction and the manifold pressure prediction model that can be used for iterative manifold pressure prediction, and the predicted values of the gas injection volume and manifold pressure on the T2 day (i.e. the predicted values of the gas injection volume and manifold pressure in the second time period after a selected time period) can be obtained.
[0054] By analogy, the process of iterating and obtaining the predicted values of the gas injection volume and manifold pressure for the next N time periods is to predict the gas injection volume and manifold pressure on day T1 by using the known parameters on day T0, and to predict the gas injection volume and manifold pressure on day T2 by using the predicted gas injection volume and manifold pressure on day T1 as known parameters, and ..., N-1 The injection volume and manifold pressure of the day are used as known parameters to predict the N The gas injection volume and manifold pressure of the day, and then the N By accumulating the predicted gas injection volumes of each day (i.e. the predicted value of the gas injection volume for the next N time periods), we can obtain the gas injection volume for the next N days after day T0 (i.e. the predicted value of the gas injection volume for the total cycle corresponding to N time periods after a selected time period), thereby realizing the gas injection capacity evaluation.
[0055] In addition, in this embodiment, the data set corresponding to the historical data of the operating parameters of each gas storage reservoir is updated according to a set time period; after the data set is updated, a multivariate linear regression fitting is performed based on the historical data in the new data set to update the above-mentioned gas injection volume prediction model and the manifold pressure prediction model.
[0056] Specifically, the data set corresponding to the historical data of the operating parameters of each gas storage facility is updated according to the set time period in the following manner:
[0057] After each set time period, on the basis of retaining the original historical data in the data set corresponding to the historical data of the operating parameters of each gas storage, the new data generated by the operation of the gas storage within the current set time period is added to the data set to update the data set. In this embodiment, the time period is set to 1 month. For example, when analyzing the data of the previous m months, a gas injection volume prediction model and a manifold pressure prediction model are established based on the gas storage operation historical data of the previous m months, so as to predict the changes in the manifold pressure and daily gas injection volume in the m+1th month; when the current time node reaches the m+2th month, the gas storage operation historical data of the m+1th month is added to the data set corresponding to the historical data of the operating parameters of each gas storage, that is, the data of the previous m+1 months is used as the new data set corresponding to the historical data of the operating parameters of each gas storage, and the gas injection volume prediction model and the manifold pressure prediction model are updated according to the new data set.
[0058] In this way, it can be ensured that as the gas storage facility operates over time, the data set corresponding to the historical data can be updated and expanded in combination with the continuously generated new data and old data, so that the gas injection volume prediction model and the manifold pressure prediction model can be updated in time. That is, by continuously enriching the data set, the accuracy of the gas injection volume prediction model and the manifold pressure prediction model fitted by the data set can be improved, thereby achieving the effect of continuously improving the prediction accuracy.
[0059] Furthermore, in order to minimize the impact of the updating of the gas injection volume prediction model and the manifold pressure prediction model on the gas injection volume prediction process, the time period (i.e., the period for updating the data set corresponding to the historical data of the operating parameters of each gas storage reservoir) is set to be greater than or equal to the total period corresponding to the completion of a gas injection plan. This can avoid the gas injection volume prediction model and the manifold pressure prediction model being updated during a certain gas injection plan evaluation process, resulting in inconsistency between the gas injection volume prediction model and the manifold pressure prediction model used in the previous and next stages of the gas injection volume prediction process, which leads to evaluation errors.
[0060] Specifically, the prediction method of this embodiment can be developed through encapsulation and back-end microservice architecture mode. First, the known data is obtained from the database, integrated into a data set, and the gas injection volume prediction model and the manifold pressure prediction model are obtained by regression fitting and saved on the server. The update time interval of the gas injection volume prediction model and the manifold pressure prediction model is set, and the model is automatically updated once a month to obtain a new gas injection volume prediction model and manifold pressure prediction model. Using the new gas injection volume prediction model and manifold pressure prediction model, the gas injection volume in the next 10 days, 20 days or 30 days is predicted according to user needs, and the prediction results are displayed on the page through front-end technology.
[0061] Next, still taking the case where each time period is 1 day as an example, the specific application of the above prediction method of this embodiment is explained through the W11 gas storage:
[0062] Among them, refer to Figure 2 , W11 gas storage contains 10 gas injection wells, namely C1, C2... and so on; in this period, 10 wells are injected with gas at the same time, and the total injection period is from May to November. W11 gas storage contains 1 compressor unit, including 3 compressors, namely YSJ1, YSJ2 and YSJ3. The compressor outlet has a unified manifold, and then the pressure is transmitted to the next level pipeline. Then part of the historical data of the operating parameters of each gas storage corresponding to W11 gas storage is as follows Figure 3 As shown (where "compressor running time next day" is the planned running time of the compressor next day).
[0063] Through these historical data, multiple linear regression fitting is performed to solve the gas injection volume prediction model as follows:
[0064] Q t+1 =-3.53S t +4.34S t+1 -2.15×10 -3 Q kct +0.63Q t +11.91P t -126.6
[0065] That is, the values of the coefficients and intercepts obtained after fitting are:
[0066] a1=-3.53, a2=4.34, a3=-2.15×10 -3 , a4=0.63, a5=11.91, a6=-126.6;
[0067] Through these historical data, multivariate linear regression fitting is performed to solve the manifold pressure prediction model:
[0068] P t+1 =-3.37×10 -2 S t +4.32×10 -2 S t+1 +8.91×10 -5 Q kct +4.94×10 -3 Q t +3.24×10 -1 P t +10.21
[0069] That is, the values of the coefficients and intercepts obtained after fitting are:
[0070] m1=-3.37×10 -2 , m2=4.32×10 -2 , m3=8.91×10 -5 , m4=4.94×10 -3 , m5=3.24×10 -1 ;
[0071] m6=10.21;
[0072] Using the above-solved gas injection volume prediction model and manifold pressure prediction model, with April 2023 as the total cycle (i.e., April 2023 as the total cycle corresponding to the implementation of a certain gas injection plan), iterative prediction is performed; on the basis of the known compressor operation time on April 1, 2023, the planned compressor operation time on the next day, the daily gas injection volume, the inventory, and the manifold pressure, the predicted values of the manifold pressure and daily gas injection volume on April 2 are obtained, and so on (following the Markov model theory), the manifold pressure and daily gas injection volume on April 30, 2023 are obtained. After calculation, the average absolute error between the predicted value of the manifold pressure for 30 days in April 2023 and the actual measured value of the manifold pressure is 1.26MPa; the average absolute error between the predicted value of the daily gas injection volume and the actual measured value of the daily gas injection volume is 20.59×10 4 m 3 / d, the predicted gas injection capacity (i.e. the predicted value of gas injection volume in April 2023) is 9101.3×104 m 3 The actual gas injection volume is 9719×10 4 m 3 , that is, the gas injection capacity error in April is 617.7×10 4 m 3 , with an accuracy rate of 93.64%.
[0073] In addition, when predicting the gas injection volume in May 2023, the actual measurement data in April 2023 is added to the data set corresponding to the historical data of the operating parameters of each gas storage reservoir, and the multivariate linear regression fitting is re-performed to update the gas injection volume prediction model and the header pressure prediction model; specifically, the new gas injection volume prediction model and the header pressure prediction model are calculated as follows:
[0074] Q t+1 =-3.84S t +4.66S t+1 -8.05×10 -4 Q kct +0.74Q t +2.63P t +5.07
[0075] P t+1 =-2.29×10 -2 S t +3.37×10 -2 S t+1 +2.97×10 -5 Q kct -1.62×10 -7 Q t +7.33×10 -1 P t +4.41
[0076] According to the above new gas injection volume prediction model and manifold pressure prediction model, the average absolute error between the predicted value of the manifold pressure on May 31, 2023 and the actual measured value of the manifold pressure is 0.82 MPa; the average absolute error between the predicted value of the daily gas injection volume and the actual measured value of the daily gas injection volume is 14.15×10 4 m 3 , gas injection capacity is 7150.3×10 4 m 3 The actual gas injection volume is 7589×10 4 m 3 The gas injection capacity error in May was 438.7×10 4 m 3The accuracy rate is 94.21%. Therefore, the relatively accurate and reliable gas injection volume prediction value and manifold pressure prediction value based on the gas injection volume prediction model and the manifold pressure prediction model can ensure that a relatively accurate and reliable evaluation result of the gas injection volume scheme is obtained.
[0077] The present invention has the following characteristics:
[0078] 1) By including the physical factors related to the gas injection conditions, such as the gas storage inventory, the gas injection volume and the manifold pressure in the current time period, and the variable factors of the operating parameters of the planned operating time of the compressor in the current time period and the next time period (i.e., factors that can be changed by artificial settings under actual working conditions), the gas storage operating parameters and the gas injection volume prediction model and the manifold pressure prediction model are used to iteratively predict the gas injection volume and the manifold pressure in each time period after a selected time period. This can fully consider the influence and limitation of the actual operating conditions of the compressor on the manifold pressure and the gas injection volume during the gas storage gas injection process, and realize the evaluation of whether the gas injection scheme can meet the actual production needs (i.e., whether it meets the requirements); at the same time, the calculation method is simple, the calculation amount is small, and the requirement for the amount of calculation parameter data is not high, so that the calculation cost of evaluating the gas injection volume scheme using the gas injection scheme evaluation method is lower.
[0079] 2) The gas injection volume prediction model and the manifold pressure prediction model are obtained in the form of fitting equations between the operating parameters of each gas storage reservoir through multivariate linear regression fitting. They can take into account the correlation between multiple parameters and have simple forms, small calculation amount, and fast fitting speed, which can reduce the cost of gas injection scheme evaluation. Moreover, the gas injection volume prediction model and the manifold pressure prediction model are independent of each other, which avoids the mutual influence of the prediction results in the same time period when one of them has a large error.
[0080] 3) Ensure that as the gas storage facility operates over time, the data set corresponding to the historical data can be updated and expanded in combination with the continuously generated new data and old data, so as to timely update the gas injection volume prediction model and the manifold pressure prediction model. That is, by continuously enriching the data set, the accuracy of the gas injection volume prediction model and the manifold pressure prediction model fitted by the data set is improved, thereby achieving the effect of continuously improving the prediction accuracy and the reliability of the gas storage facility solution evaluation.
[0081] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, but do not constitute a limitation to the present invention.
Claims
1. A method for evaluating a gas storage injection scheme, characterized in that: According to the values of each operating parameter in a selected time period, the gas injection volume prediction model and the manifold pressure prediction model are used to obtain the predicted values of the gas injection volume and the manifold pressure in the first time period; the operating parameters include the planned operating time of the compressor in the next time period of the gas storage, the gas injection volume in the current time period, the compressor operating time determined according to the gas injection scheme to be evaluated, the manifold pressure and the gas storage inventory; According to the predicted values of the gas injection volume and the manifold pressure in the first time period thereafter and the values of other operating parameters in the time period, the two prediction models are used respectively to obtain the predicted values of the gas injection volume and the manifold pressure in the second time period thereafter; it is iterated successively until the predicted value of the manifold pressure is greater than the set pressure upper limit, if the sum of the predicted values of the gas injection volume before the time period is less than the gas injection target, it is determined that the gas injection plan does not meet the requirements, otherwise it is determined to meet the requirements.
2. The gas storage reservoir gas injection scheme evaluation method according to claim 1, characterized in that: The gas injection volume prediction model is a fitting equation between the operating parameters of each gas storage reservoir.
3. The method for evaluating a gas storage injection plan according to claim 2, characterized in that: The gas injection volume prediction model is obtained by performing multivariate linear regression fitting on the historical data of the operating parameters of each gas storage reservoir.
4. The method for evaluating a gas storage injection scheme according to claim 1, characterized in that: The manifold pressure prediction model is a fitting equation between the operating parameters of each gas storage reservoir.
5. The method for evaluating a gas storage injection plan according to claim 4, characterized in that: The manifold pressure prediction model is obtained by performing multivariate linear regression fitting on historical data of operating parameters of each gas storage reservoir.
6. The method for evaluating a gas storage injection scheme according to any one of claims 1 to 5, characterized in that: The data set corresponding to the historical data of the operating parameters of each gas storage reservoir is updated according to the set time period; after the data set is updated, multivariate linear regression fitting is performed based on the historical data in the new data set to update the gas injection volume prediction model and the manifold pressure prediction model.
7. The method for evaluating a gas storage injection scheme according to any one of claims 1 to 5, characterized in that: The set pressure upper limit is determined according to the design pressure upper limit of the gas storage reservoir itself.
8. The method for evaluating a gas storage injection plan according to claim 6, characterized in that: The data sets corresponding to the historical data of the operating parameters of each gas storage facility are updated according to the set time period in the following ways: After each set time period, on the basis of retaining the original historical data in the data set, new data generated by the operation of the gas storage facility within the current set time period is added to the data set to update the data set.
9. The method for evaluating a gas storage injection scheme according to any one of claims 1 to 5, characterized in that: The method of using the two prediction models to obtain the predicted values of the gas injection volume and the manifold pressure in the second time period includes: The predicted values of the gas injection volume and the manifold pressure in the first time period after the selected time period are respectively used as the values of the gas injection volume and the manifold pressure in the current time period in the operating parameters, and together with the values of other operating parameters in the first time period after the selected time period, are substituted into the gas injection volume prediction model and the manifold pressure prediction model respectively to obtain the predicted values of the gas injection volume and the manifold pressure in the second time period after the selected time period.
10. The method for evaluating a gas storage injection scheme according to any one of claims 1 to 5, characterized in that: The gas storage reservoir inventory in the first time period thereafter is determined based on the sum of the gas injection volume and the gas storage reservoir inventory in a selected time period; the gas storage reservoir inventory in the Mth time period after the selected time period is determined based on the sum of the gas storage reservoir inventory in the M-1th time period and the predicted value of the gas injection volume in the M-1th time period; M is an integer greater than 1.