Cable production link monitoring system and method based on cable image

By identifying the images and information of the cable production link and automatically monitoring the cable characteristics and parameter comparison, the problem of not being able to detect cable abnormalities in the existing technology is solved, and intelligent quality inspection of the cable production link is realized, which improves the product pass rate and Resource utilization rate.

CN118887599APending Publication Date: 2024-11-01GUANGZHOU PANYU CABLE WORKS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410854508.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

In the prior art, abnormal problems cannot be discovered intelligently in the cable production process, resulting in waste of resources and a low pass rate of finished cables.

Method used

By obtaining the image and equipment information of the cable production link, identifying the cable characteristics, obtaining detection requirements and pre-store comparison information, performing parameter comparison, and automatically monitoring abnormal situations in the cable production link.

Benefits of technology

It realizes automated quality inspection in the cable production process, timely discovers abnormal problems, improves the pass rate of finished cables, and reduces resource waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118887599A_ABST
    Figure CN118887599A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses a cable production link monitoring system and method based on a cable image, and the method comprises the steps: obtaining a cable image and operation equipment information, which are collected at present, in a cable production link, and determining one or more to-be-determined production nodes based on the operation equipment information, determining a first cable feature of a to-be-determined production node, performing identification processing on the cable image according to the first cable feature to obtain the production node, obtaining detection requirement information associated with the production node, performing parameter identification on the cable image according to the detection requirement information to obtain to-be-compared parameter information, and obtaining pre-stored comparison information of the production node; and comparing the to-be-compared parameter information with pre-stored comparison information, and determining a monitoring result of the cable production link based on a comparison result. According to the scheme, the monitoring result is obtained by identifying the image in the cable production link and comparing the identification information, the quality detection can be automatically and intelligently carried out in the cable production link, and the abnormal problem of the cable can be found in time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the field of cable monitoring technology, and in particular, to a cable production process monitoring system and method based on cable images. Background Art

[0002] As a dielectric material, wires and cables play a key role in transmitting electric energy in the operation of the power system. The quality of wires and cables directly affects whether the power consumption is safe and stable. The quality of wires and cables currently available on the market is uneven and cannot guarantee to meet the operation requirements of the power system. At the same time, wires and cables have become indispensable products in the fields of national economy, construction, life, etc., and their scale occupies a large proportion in the power industry. Its extensiveness and necessity require that the detection of wires and cables must be strictly and accurately carried out.

[0003] The cable production process refers to the process of making raw materials into finished cables through a series of processing and treatment processes. In the relevant cable quality inspection technology, quality confirmation is usually carried out after the cable production is completed, or manual inspection is carried out during the cable production process. It is impossible to intelligently detect abnormal problems of the cable in time during the cable production process, resulting in waste of resources and a low qualified rate of finished cables. Summary of the invention

[0004] The embodiments of the present invention provide a cable production link monitoring system and method based on cable images, which solves the problem in the prior art that abnormal problems of cables cannot be intelligently discovered in time during the cable production process, resulting in waste of resources and a low qualified rate of finished cables. Quality inspection can be automatically and intelligently performed in the cable production link to discover abnormal problems of cables in time.

[0005] In a first aspect, an embodiment of the present invention provides a cable production link monitoring method based on cable images, comprising:

[0006] Obtain the cable images and operating equipment information currently collected in the cable production process;

[0007] Determine one or more production nodes to be determined based on the operating equipment information, and determine a first cable feature of the production node to be determined, perform recognition processing on the cable image according to the first cable feature to obtain the production node of the cable image, obtain detection requirement information associated with the production node, perform parameter recognition on the cable image according to the detection requirement information to obtain parameter information to be compared of the cable image;

[0008] The pre-stored comparison information of the production node is obtained, the parameter information to be compared is compared with the pre-stored comparison information, and the monitoring result of the cable production link is determined based on the comparison result.

[0009] Optionally, the identifying and processing the cable image according to the first cable feature to obtain the production node of the cable image includes:

[0010] identifying whether the first cable feature exists in the cable image, and if the first cable feature exists, determining the to-be-determined production node corresponding to the first cable feature as the production node of the cable image;

[0011] If the first cable feature does not exist, a second cable feature corresponding to a previous production node of the production node to be determined is determined, and the cable image is identified based on the second cable feature to obtain the production node of the cable image.

[0012] Optionally, the identifying the cable image based on the second cable feature to obtain the production node of the cable image includes:

[0013] Identify whether the second cable feature exists in the cable image. If the second cable feature exists in the cable image, determine the link connection point between the previous production node and the corresponding production node to be determined as the production node of the cable image.

[0014] Optionally, performing parameter recognition on the cable image according to the detection requirement information to obtain parameter information to be compared of the cable image includes:

[0015] The influencing subject and influencing parameters of the detection requirement information are determined, and parameter identification is performed on the cable image according to the influencing subject and the influencing parameters to obtain parameter information to be compared of the cable image.

[0016] Optionally, determining the influencing subject and influencing parameters of the detection requirement information includes:

[0017] According to the detection requirement information, a preset impact information comparison table is queried to obtain the corresponding impact subject to be determined and the impact parameter to be determined;

[0018] When multiple influencing subjects to be determined and corresponding influencing parameters to be determined are determined, the production subject when the production node corresponding to the detection requirement information is running is determined, and the influencing subjects to be determined and the corresponding influencing parameters to be determined that are the same as the production subject are determined as the influencing subjects and influencing parameters of the detection requirement information.

[0019] Optionally, performing parameter identification on the cable image according to the influencing subject and the influencing parameter to obtain parameter information to be compared of the cable image includes:

[0020] The influencing subject is located and identified to obtain the subject position, the subject position is scanned according to the influencing parameter to obtain scanning information of the influencing parameter, and the scanning information is determined as the parameter information to be compared of the cable image.

[0021] Optionally, determining the monitoring result of the cable production link based on the comparison result includes:

[0022] In the case where the parameter information to be compared is successfully compared with the pre-stored comparison information, determining that the monitoring result of the cable production link is that the production node is operating normally;

[0023] When the comparison between the parameter information to be compared and the pre-stored comparison information is unsuccessful, the abnormal cause of the production node is generated based on the influencing subject and influencing parameters corresponding to the parameter information to be compared, and the abnormal cause is determined as the monitoring result of the cable production link.

[0024] In a second aspect, an embodiment of the present invention further provides a cable production link monitoring system based on cable images, comprising:

[0025] The acquisition module is used to obtain the cable images and operating equipment information currently collected in the cable production link;

[0026] A node determination module, used to determine one or more production nodes to be determined based on the operating equipment information;

[0027] A feature determination module, determining a first cable feature of the production node to be determined;

[0028] An identification processing module, used for performing identification processing on the cable image according to the first cable feature to obtain a production node of the cable image;

[0029] The acquisition module is further used to acquire the detection requirement information associated with the production node;

[0030] The recognition processing module is further used to perform parameter recognition on the cable image according to the detection requirement information to obtain parameter information to be compared of the cable image;

[0031] The acquisition module is further used to acquire pre-stored comparison information of the production node;

[0032] A comparison module, used for comparing the parameter information to be compared with the pre-stored comparison information;

[0033] The result determination module is used to determine the monitoring result of the cable production link based on the comparison result.

[0034] In a third aspect, an embodiment of the present invention further provides a cable production link monitoring device based on cable images, the device comprising:

[0035] one or more processors;

[0036] a storage device for storing one or more programs,

[0037] When the one or more programs are executed by the one or more processors, the one or more processors implement the cable production link monitoring method based on cable images described in the embodiment of the present invention.

[0038] In a fourth aspect, an embodiment of the present invention further provides a storage medium storing computer executable instructions, which, when executed by a computer processor, are used to execute the cable production link monitoring method based on cable images described in an embodiment of the present invention.

[0039] In an embodiment of the present invention, the cable image and operating equipment information currently collected in the cable production link are obtained, one or more production nodes to be determined are determined based on the operating equipment information, and the first cable feature of the production node to be determined is determined, the cable image is identified and processed according to the first cable feature to obtain the production node of the cable image, the detection requirement information associated with the production node of the cable image is obtained, the cable image is parameter identified according to the detection requirement information to obtain the parameter information to be compared of the cable image, the pre-stored comparison information of the production node of the cable image is obtained, the parameter information to be compared is compared with the pre-stored comparison information, and the monitoring result of the cable production link is determined based on the comparison result. This solution obtains the monitoring result by identifying the image in the cable production link and comparing the identification information, which solves the problem in the prior art that the abnormal problems of the cable cannot be discovered in time during the cable production process intelligently, resulting in waste of resources and low qualified rate of finished cables, and can automatically and intelligently perform quality inspection in the cable production link and discover abnormal problems of the cable in time. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 A flowchart of a cable production link monitoring method based on cable images provided by an embodiment of the present invention;

[0041] Figure 2 A flowchart of a method for determining a production node of a cable image provided by an embodiment of the present invention;

[0042] Figure 3 A flowchart of a method for determining parameter information to be compared of a cable image provided by an embodiment of the present invention;

[0043] Figure 4A module structure block diagram of a cable production link monitoring system based on cable images provided by an embodiment of the present invention;

[0044] Figure 5 A schematic structural diagram of a cable production link monitoring device based on cable images provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0045] The embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the embodiments of the present invention, rather than to limit the embodiments of the present invention. It is also necessary to explain that, for ease of description, only parts related to the embodiments of the present invention are shown in the accompanying drawings, rather than all structures.

[0046] The terms "first", "second", etc. in the specification and claims of this application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and or or" in the specification and claims represents at least one of the connected objects, and the character "or" generally indicates that the objects associated before and after are in an "or" relationship.

[0047] The cable production link monitoring method based on cable images provided in the embodiment of the present application can be applied to the quality inspection scenario in the cable production link. The cable production link monitoring method based on cable images provided in the embodiment of the present application, the execution subject of each step can be a computer device, which refers to any electronic device with data calculation, processing and storage capabilities, such as mobile phones, PCs (Personal Computers), tablet computers and other terminal devices, and can also be servers and other devices, which are not limited in the embodiment of the present application.

[0048] Figure 1 A flowchart of a cable production monitoring method based on cable images provided by an embodiment of the present invention is shown in FIG. Figure 1 As shown, specifically including:

[0049] Step S101, obtaining the currently collected cable image and operation equipment information in the cable production link, determining one or more production nodes to be determined based on the operation equipment information, and determining the first cable feature of the production node to be determined.

[0050] Among them, the cable production link is used to characterize the various processes of cable production. For example, the various processes of cable production include conductor twisting, insulation treatment, sheath treatment and other processes; the cable image is used to characterize the image of the cable production captured in the current cable production link; the operating equipment information is used to characterize the information of the cable production equipment running in the current cable production link; the production node to be determined is used to characterize the node waiting to be determined whether it is the production node at the current time; the first cable feature is used to characterize the feature of the unformed cable produced in the process of the production node to be determined. The cable image and operating equipment information in the cable production link currently collected are obtained, one or more production nodes to be determined are determined based on the current operating equipment information obtained, and the first cable feature of the production node to be determined is determined. In one embodiment, the cable image in the cable production link currently captured by the shooting device is obtained, and the equipment currently running for cable production is obtained as an extruder. According to the extruder, the pre-set production node mapping table is queried to obtain two production nodes to be determined, which are the insulation processing node and the sheath processing node. It is determined that the first cable feature associated with the insulation processing node is the insulation layer, and the first cable feature associated with the sheath processing node is the sheath layer. In the production process of wires and cables, most processes require specific machines and equipment to complete, and some production links will use the same equipment. According to the current operating equipment information, the production nodes to be determined can be screened out from all production nodes.

[0051] Step S102: performing recognition processing on the cable image according to the first cable feature to obtain a production node of the cable image.

[0052] Among them, the production node is used to characterize a certain process in the cable production link at the current time. After obtaining the cable image and operating equipment information in the currently collected cable production link, and determining the production node to be determined and the corresponding first cable feature based on the operating equipment information, the cable image is identified and processed according to the first cable feature of the production node to be determined to obtain the production node of the cable image. In one embodiment, two production nodes to be determined are determined, namely the insulation processing node and the sheath processing node. The first cable feature of the insulation processing node is the insulation layer, and the first cable feature of the sheath processing node is the sheath layer. It is identified whether there is an insulation layer or a sheath layer in the cable image, and the production node of the cable image is determined based on the identification result of the first cable feature. The production node of each cable has a corresponding independent feature. The production node is obtained by identifying and processing the cable image based on the first cable feature of the production node to be determined, which can improve the accuracy and rationality of the determined production node.

[0053] Step S103: Acquire the detection requirement information associated with the production node, and perform parameter recognition on the cable image according to the detection requirement information to obtain parameter information to be compared of the cable image.

[0054] Among them, the detection requirement information is used to characterize the relevant requirements for quality inspection of the production node, exemplarily, requiring the insulation performance of the cable to be inspected; the parameter information to be compared is used to characterize the parameter information identified in the cable image to be compared. After the cable image is identified and processed according to the first cable feature of the production node to be determined to obtain the production node of the cable image, the detection requirement information associated with the production node of the cable image is obtained, and the cable image is parameter-identified according to the detection requirement information associated with the production node to obtain the parameter information to be compared of the cable image. In one embodiment, the influencing subject and influencing parameter of the detection requirement information associated with the production node of the cable image are determined, and the cable image is parameter-identified according to the influencing subject and influencing parameter of the detection requirement information to obtain the parameter information to be compared of the cable image. Parameter identification of the cable image through the detection requirement information associated with the production node can meet the user's detection requirements for each production node of the cable, and improve the cable's pass rate and user satisfaction.

[0055] Step S104: obtaining pre-stored comparison information of the production node, comparing the parameter information to be compared with the pre-stored comparison information, and determining the monitoring result of the cable production link based on the comparison result.

[0056] Among them, the pre-stored comparison information is the information for comparison corresponding to the pre-stored production node. After the cable image is parameter-identified according to the detection requirement information to obtain the parameter information to be compared of the cable image, the pre-stored comparison information of the production node of the cable image is obtained, and the parameter information to be compared of the cable image is compared with the pre-stored comparison information, and the monitoring result of the cable production link is determined based on the comparison result. Optionally, when the comparison between the parameter information to be compared and the pre-stored comparison information is successful, the monitoring result of the cable production link is determined to be that the production node is operating normally. When the comparison between the parameter information to be compared and the pre-stored comparison information is unsuccessful, the abnormal cause of the production node is generated based on the influencing subject and the influencing parameter corresponding to the parameter information to be compared, and the abnormal cause is determined as the monitoring result of the cable production link. In one embodiment, the production node of the cable image is an insulation processing node, and the detection requirement information associated with the insulation processing node is insulation performance. The corresponding influencing subject is determined to be the insulation layer, and the influencing parameter is thickness. The insulation layer thickness of the cable image is identified to be 2 mm and determined as the parameter information to be compared. The pre-stored comparison information is not less than 4.5 mm. The comparison result between the parameter information to be compared of the cable image and the pre-stored comparison information is unsuccessful. Then, based on the influencing subject being the insulation layer and the influencing parameter being thickness, the abnormal reason for generating the insulation processing node is that the thickness of the insulation layer is unqualified.

[0057] As can be seen from the above, the cable image and operating equipment information currently collected in the cable production link are obtained, one or more production nodes to be determined are determined based on the operating equipment information, and the first cable feature of the production node to be determined is determined, the cable image is identified and processed according to the first cable feature to obtain the production node of the cable image, the detection requirement information associated with the production node of the cable image is obtained, the cable image is parameter identified according to the detection requirement information to obtain the parameter information to be compared of the cable image, the pre-stored comparison information of the production node of the cable image is obtained, the parameter information to be compared is compared with the pre-stored comparison information, and the monitoring result of the cable production link is determined based on the comparison result. This solution obtains the monitoring result by identifying the image in the cable production link and comparing the identification information, which solves the problem in the prior art that the abnormal problems of the cable cannot be discovered in time during the cable production process intelligently, resulting in waste of resources and low qualified rate of finished cables. It can automatically and intelligently perform quality inspection in the cable production link and discover abnormal problems of the cable in time.

[0058] Figure 2 A flowchart of a method for determining a production node of a cable image provided by an embodiment of the present invention is shown in FIG. Figure 2 As shown, specifically including:

[0059] Step S201, obtaining the currently collected cable image and operating equipment information in the cable production link, determining one or more production nodes to be determined based on the operating equipment information, and determining the first cable feature of the production node to be determined.

[0060] Step S202: Identify whether the first cable feature exists in the cable image; if so, determine the to-be-determined production node corresponding to the first cable feature as the production node of the cable image; if not, determine the second cable feature corresponding to the previous production node of the to-be-determined production node; and identify the cable image based on the second cable feature to obtain the production node of the cable image.

[0061] Among them, after obtaining the cable image and operating equipment information in the current cable production link, and determining the production node to be determined and the corresponding first cable feature based on the operating equipment information, it is identified whether the first cable feature of the production node to be determined exists in the cable image. If the first cable feature exists, the production node to be determined corresponding to the first cable feature is determined as the production node of the cable image. If the first cable feature does not exist, the second cable feature corresponding to the previous production node of the production node to be determined is determined, and the cable image is identified based on the second cable feature to obtain the production node of the cable image. Optionally, it is identified whether the second cable feature exists in the cable image. When the second cable feature exists in the cable image, the link connection point between the previous production node and the corresponding production node to be determined is determined as the production node of the cable image. In one embodiment, two production nodes to be determined are determined, namely, an insulation processing node and a sheath processing node. The first cable feature of the insulation processing node is an insulation layer, the first cable feature of the sheath processing node is a sheath layer, it is recognized that there is no insulation layer and sheath layer in the cable image, the previous production node of the insulation processing node is a wire drawing node, the previous production node of the sheath processing node is a braiding node, the second cable feature of the wire drawing node is a stretched conductor, the second cable feature of the braiding node is a mesh structure, it is recognized that there is a mesh structure in the cable image, and the link connection point between the braiding node and the sheath processing node is determined as the production node of the cable image. In another embodiment, the cable image is compared with the pre-stored comparison images of each production node for similarity, and the production node of the comparison image whose similarity with the cable image is greater than the preset similarity is determined as the production node of the cable image.

[0062] Step S203: Acquire the detection requirement information associated with the production node, and perform parameter recognition on the cable image according to the detection requirement information to obtain parameter information to be compared of the cable image.

[0063] Step S204: obtaining pre-stored comparison information of the production node, comparing the parameter information to be compared with the pre-stored comparison information, and determining the monitoring result of the cable production link based on the comparison result.

[0064] From the above, it can be known that it is necessary to identify whether there is a first cable feature of the production node to be determined in the cable image. If the first cable feature exists, the production node to be determined corresponding to the first cable feature is determined as the production node of the cable image. If the first cable feature does not exist, the second cable feature corresponding to the previous production node of the production node to be determined is determined, and the cable image is identified based on the second cable feature to obtain the production node of the cable image. This solution identifies and processes the cable image based on the first cable feature of the production node to be determined to obtain the production node of the cable image, which can improve the accuracy and rationality of the determined production node.

[0065] Figure 3 A flowchart of a method for determining parameter information to be compared of a cable image provided by an embodiment of the present invention, such as Figure 3 As shown, specifically including:

[0066] Step S301, obtaining the cable image and operating equipment information currently collected in the cable production link, determining one or more production nodes to be determined based on the operating equipment information, and determining the first cable feature of the production node to be determined.

[0067] Step S302: performing recognition processing on the cable image according to the first cable feature to obtain a production node of the cable image.

[0068] Step S303: Acquire the detection requirement information associated with the production node, determine the influencing subject and influencing parameters of the detection requirement information, and perform parameter identification on the cable image according to the influencing subject and the influencing parameters to obtain the parameter information to be compared of the cable image.

[0069] Among them, the influencing subject is used to characterize the object that affects the detection requirement information; the influencing parameter is used to characterize the object parameter that affects the detection requirement information. After obtaining the detection requirement information of the production node of the cable image, the influencing subject and the influencing parameter of the detection requirement information are determined. Optionally, the preset influencing information comparison table is queried according to the detection requirement information to obtain the corresponding influencing subject to be determined and the influencing parameter to be determined. In the case of determining multiple influencing subjects to be determined and the corresponding influencing parameters to be determined, the production subject when the production node corresponding to the detection requirement information is running is determined, and the influencing subject to be determined and the corresponding influencing parameter to be determined that is the same as the production subject are determined as the influencing subject and influencing parameter of the detection requirement information. According to the influencing subject and the influencing parameter of the detection requirement information, the cable image is parameter-identified to obtain the parameter information to be compared of the cable image. Optionally, the influencing subject is located and identified to obtain the subject position, and the subject position is scanned according to the influencing parameter to obtain the scanning information of the influencing parameter, and the scanning information is determined as the parameter information to be compared of the cable image. In one embodiment, the production node is a sheath processing node, and the associated detection requirement information is the mechanical properties of the cable. According to the mechanical properties, the preset influence information comparison table is queried to obtain the influence subjects to be determined as the sheath layer and the braided layer. The corresponding influence parameter to be determined for the sheath layer is the thickness, and the corresponding influence parameter to be determined for the braided layer is the density. It is determined that the production subject when the sheath processing node is running is the sheath layer, then the sheath layer is determined as the influence subject of the detection requirement information, and the thickness is determined as the influence parameter of the detection requirement information. The sheath layer is located and identified in the cable image to obtain the position of the sheath layer, and the thickness scan is performed at the position of the sheath layer to obtain the thickness value of the sheath layer, and the thickness value of the sheath layer is determined as the parameter information to be compared of the cable image. In another embodiment, the preset parameter identification information corresponding to the production node is obtained, and the cable image is parameter identified based on the preset parameter identification information to obtain the parameter information to be compared of the cable image.

[0070] Step S304: obtaining pre-stored comparison information of the production node, comparing the parameter information to be compared with the pre-stored comparison information, and determining the monitoring result of the cable production link based on the comparison result.

[0071] From the above, it can be seen that after obtaining the detection requirement information of the production node of the cable image, the influencing subject and influencing parameter of the detection requirement information are determined, and the cable image is parameter-identified according to the influencing subject and influencing parameter of the detection requirement information to obtain the parameter information to be compared of the cable image. This solution performs parameter identification on the cable image through the detection requirement information associated with the production node, which can meet the user's detection requirements for each production node of the cable, and improve the qualified rate of the cable and the user's satisfaction.

[0072] Figure 4This is a module structure diagram of a cable production link monitoring system based on cable images provided by an embodiment of the present invention. The system is used to execute the cable production link monitoring method based on cable images provided by the above embodiment, and has the corresponding functional modules and beneficial effects of the execution method. Figure 4 As shown, the system specifically includes:

[0073] The acquisition module 101 is used to acquire the cable image and operating equipment information in the current cable production link;

[0074] A node determination module 102, configured to determine one or more production nodes to be determined based on the operating equipment information;

[0075] A feature determination module 103 determines a first cable feature of the production node to be determined;

[0076] An identification processing module 104 is used to perform identification processing on the cable image according to the first cable feature to obtain a production node of the cable image;

[0077] The acquisition module 101 is further used to acquire the detection requirement information associated with the production node;

[0078] The identification processing module 104 is further used to perform parameter identification on the cable image according to the detection requirement information to obtain parameter information to be compared of the cable image;

[0079] The acquisition module 101 is further used to acquire the pre-stored comparison information of the production node;

[0080] A comparison module 105, used to compare the parameter information to be compared with the pre-stored comparison information;

[0081] The result determination module 106 is used to determine the monitoring result of the cable production link based on the comparison result.

[0082] It can be seen from the above scheme that the cable image and operating equipment information currently collected in the cable production link are obtained, one or more production nodes to be determined are determined based on the operating equipment information, and the first cable feature of the production node to be determined is determined, the cable image is identified and processed according to the first cable feature to obtain the production node of the cable image, the detection requirement information associated with the production node of the cable image is obtained, the cable image is parameter identified according to the detection requirement information to obtain the parameter information to be compared of the cable image, the pre-stored comparison information of the production node of the cable image is obtained, the parameter information to be compared is compared with the pre-stored comparison information, and the monitoring result of the cable production link is determined based on the comparison result. This scheme obtains the monitoring result by identifying the image in the cable production link and comparing the identification information, which solves the problem in the prior art that the abnormal problems of the cable cannot be discovered in time during the cable production process intelligently, resulting in waste of resources and low qualified rate of finished cables, and can automatically and intelligently perform quality inspection in the cable production link and discover abnormal problems of the cable in time.

[0083] In a possible embodiment, the identification processing module 104 is specifically configured to:

[0084] identifying whether the first cable feature exists in the cable image, and if the first cable feature exists, determining the to-be-determined production node corresponding to the first cable feature as the production node of the cable image;

[0085] If the first cable feature does not exist, a second cable feature corresponding to a previous production node of the production node to be determined is determined, and the cable image is identified based on the second cable feature to obtain the production node of the cable image.

[0086] In a possible embodiment, the identification processing module 104 is further configured to:

[0087] Identify whether the second cable feature exists in the cable image. If the second cable feature exists in the cable image, determine the link connection point between the previous production node and the corresponding production node to be determined as the production node of the cable image.

[0088] In a possible embodiment, the identification processing module 104 is further configured to:

[0089] The influencing subject and influencing parameters of the detection requirement information are determined, and parameter identification is performed on the cable image according to the influencing subject and the influencing parameters to obtain parameter information to be compared of the cable image.

[0090] In a possible embodiment, the identification processing module 104 is further configured to:

[0091] According to the detection requirement information, a preset impact information comparison table is queried to obtain the corresponding impact subject to be determined and the impact parameter to be determined;

[0092] When multiple influencing subjects to be determined and corresponding influencing parameters to be determined are determined, the production subject when the production node corresponding to the detection requirement information is running is determined, and the influencing subjects to be determined and the corresponding influencing parameters to be determined that are the same as the production subject are determined as the influencing subjects and influencing parameters of the detection requirement information.

[0093] In a possible embodiment, the identification processing module 104 is further configured to:

[0094] The influencing subject is located and identified to obtain the subject position, the subject position is scanned according to the influencing parameter to obtain scanning information of the influencing parameter, and the scanning information is determined as the parameter information to be compared of the cable image.

[0095] In a possible embodiment, the result determination module 106 is specifically configured to:

[0096] In the case where the parameter information to be compared is successfully compared with the pre-stored comparison information, determining that the monitoring result of the cable production link is that the production node is operating normally;

[0097] When the comparison between the parameter information to be compared and the pre-stored comparison information is unsuccessful, the abnormal cause of the production node is generated based on the influencing subject and influencing parameters corresponding to the parameter information to be compared, and the abnormal cause is determined as the monitoring result of the cable production link.

[0098] Figure 5 A schematic diagram of a cable production monitoring device based on cable images provided by an embodiment of the present invention is shown in FIG. Figure 5 As shown, the device includes a processor 201, a memory 202, an input device 203 and an output device 204; the number of processors 201 in the device can be one or more. Figure 5 A processor 201 is taken as an example; the processor 201, memory 202, input device 203 and output device 204 in the device can be connected by a bus or other means. Figure 5In the example, the connection through the bus is taken. The memory 202, as a computer-readable storage medium, can be used to store software programs, computer executable programs and modules, such as program instructions or modules corresponding to the cable production link monitoring method based on cable images in the embodiment of the present invention. The processor 201 executes various functional applications and data processing of the device by running the software programs, instructions and modules stored in the memory 202, that is, realizes the above-mentioned cable production link monitoring method based on cable images. The input device 203 can be used to receive input digital or character information, and generate key signal input related to user settings and function control of the device. The output device 204 may include a display device such as a display screen.

[0099] An embodiment of the present invention further provides a storage medium comprising computer executable instructions, wherein the computer executable instructions are used to execute a cable production link monitoring method based on cable images when executed by a computer processor, the method comprising:

[0100] Obtain the cable images and operating equipment information currently collected in the cable production process;

[0101] Determine one or more production nodes to be determined based on the operating equipment information, and determine a first cable feature of the production node to be determined, perform recognition processing on the cable image according to the first cable feature to obtain the production node of the cable image, obtain detection requirement information associated with the production node, perform parameter recognition on the cable image according to the detection requirement information to obtain parameter information to be compared of the cable image;

[0102] The pre-stored comparison information of the production node is obtained, the parameter information to be compared is compared with the pre-stored comparison information, and the monitoring result of the cable production link is determined based on the comparison result.

[0103] It is worth noting that in the above-mentioned embodiment of the cable production process monitoring method system based on cable images, the various units and modules included are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the protection scope of the embodiments of the present invention.

[0104] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the embodiments of the present invention are not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the protection scope of the embodiments of the present invention. Therefore, although the embodiments of the present invention are described in more detail through the above embodiments, the embodiments of the present invention are not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the embodiments of the present invention, and the scope of the embodiments of the present invention is determined by the scope of the appended claims.

Claims

1. A cable production monitoring method based on cable images, characterized in that: include: Obtain the cable images and operating equipment information currently collected in the cable production process; Determine one or more production nodes to be determined based on the operating equipment information, and determine a first cable feature of the production node to be determined, perform recognition processing on the cable image according to the first cable feature to obtain the production node of the cable image, obtain detection requirement information associated with the production node, perform parameter recognition on the cable image according to the detection requirement information to obtain parameter information to be compared of the cable image; The pre-stored comparison information of the production node is obtained, the parameter information to be compared is compared with the pre-stored comparison information, and the monitoring result of the cable production link is determined based on the comparison result.

2. The cable production link monitoring method based on cable images according to claim 1 is characterized in that: The step of identifying and processing the cable image according to the first cable feature to obtain a production node of the cable image includes: identifying whether the first cable feature exists in the cable image, and if the first cable feature exists, determining the to-be-determined production node corresponding to the first cable feature as the production node of the cable image; If the first cable feature does not exist, a second cable feature corresponding to a previous production node of the production node to be determined is determined, and the cable image is identified based on the second cable feature to obtain the production node of the cable image.

3. The cable production link monitoring method based on cable images according to claim 2 is characterized in that: The step of identifying the cable image based on the second cable feature to obtain a production node of the cable image includes: Identify whether the second cable feature exists in the cable image. If the second cable feature exists in the cable image, determine the link connection point between the previous production node and the corresponding production node to be determined as the production node of the cable image.

4. The cable production link monitoring method based on cable images according to any one of claims 1 to 3, characterized in that: The step of performing parameter recognition on the cable image according to the detection requirement information to obtain the parameter information to be compared of the cable image includes: The influencing subject and influencing parameters of the detection requirement information are determined, and parameter identification is performed on the cable image according to the influencing subject and the influencing parameters to obtain parameter information to be compared of the cable image.

5. The cable production link monitoring method based on cable images according to claim 4 is characterized in that: The determining of the influencing subject and influencing parameters of the detection requirement information includes: According to the detection requirement information, a preset impact information comparison table is queried to obtain the corresponding impact subject to be determined and the impact parameter to be determined; When multiple influencing subjects to be determined and corresponding influencing parameters to be determined are determined, the production subject when the production node corresponding to the detection requirement information is running is determined, and the influencing subjects to be determined and the corresponding influencing parameters to be determined that are the same as the production subject are determined as the influencing subjects and influencing parameters of the detection requirement information.

6. The cable production link monitoring method based on cable images according to claim 4 is characterized in that: The step of performing parameter identification on the cable image according to the influencing subject and the influencing parameter to obtain the parameter information to be compared of the cable image includes: The influencing subject is located and identified to obtain the subject position, the subject position is scanned according to the influencing parameter to obtain scanning information of the influencing parameter, and the scanning information is determined as the parameter information to be compared of the cable image.

7. The cable production link monitoring method based on cable images according to any one of claims 1 to 6, characterized in that: The determining of the monitoring result of the cable production link based on the comparison result includes: In the case where the parameter information to be compared is successfully compared with the pre-stored comparison information, determining that the monitoring result of the cable production link is that the production node is operating normally; When the comparison between the parameter information to be compared and the pre-stored comparison information is unsuccessful, the abnormal cause of the production node is generated based on the influencing subject and influencing parameters corresponding to the parameter information to be compared, and the abnormal cause is determined as the monitoring result of the cable production link.

8. The cable production monitoring system based on cable images is characterized by: include: The acquisition module is used to obtain the cable images and operating equipment information currently collected in the cable production link; A node determination module, used to determine one or more production nodes to be determined based on the operating equipment information; A feature determination module, determining a first cable feature of the production node to be determined; An identification processing module, used for performing identification processing on the cable image according to the first cable feature to obtain a production node of the cable image; The acquisition module is further used to acquire the detection requirement information associated with the production node; The recognition processing module is further used to perform parameter recognition on the cable image according to the detection requirement information to obtain parameter information to be compared of the cable image; The acquisition module is further used to acquire pre-stored comparison information of the production node; A comparison module, used for comparing the parameter information to be compared with the pre-stored comparison information; The result determination module is used to determine the monitoring result of the cable production link based on the comparison result.

9. A cable production monitoring device based on cable images, the device comprising: one or more processors; A storage device for storing one or more programs. When the one or more programs are executed by the one or more processors, the one or more processors implement the cable production link monitoring method based on cable images as described in any one of claims 1-7.

10. A storage medium storing computer executable instructions, wherein the computer executable instructions, when executed by a computer processor, are used to execute the cable production link monitoring method based on cable images as described in any one of claims 1 to 7.