Cable laying construction system and construction method

By integrating tension control mechanism and intelligent cable release speed adjustment in the cable laying system, the problems of inaccurate tension control and simple guide device design are solved, efficient and accurate cable laying is achieved, extending the service life of the cable and improving the Construction safety.

CN118889261APending Publication Date: 2024-11-01GUANGXI HYDROELECTRIC CONSTR BUREAU
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410922046.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The existing cable laying system has problems such as inaccurate tension control, simple guide device design and low degree of automation, resulting in low cable laying efficiency, unstable quality and short service life.

Method used

A cable laying system with integrated tension control mechanism, intelligent cable release speed adjustment and guidance and support structure is designed, including cable release pulley, traction machine, cable release frame and motor drive system, through brake belt, screw rod and clamp The wheels enable precise tension control and adaptive support.

Benefits of technology

It improves the accuracy and efficiency of cable laying, reduces manual intervention, extends the service life of the cable, and ensures laying quality and construction safety, especially under complex terrain conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889261A_ABST
    Figure CN118889261A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of cable laying, and provides a cable laying construction system and method. The system mainly comprises a cable trough, a cable laying pulley, a traction machine, a cable laying frame and an advanced tension control system. The cable laying rack realizes accurate control on the tension of the cable through a brake mechanism driven by a brake belt and a screw rod; the built-in motor and the gear set work cooperatively, and the cable releasing speed is automatically adjusted. Due to the innovative design of the cable laying tackle and the adoption of a self-adaptive clamping wheel structure, the cable is effectively protected from being damaged. In addition, the system is provided with a T-shaped plate and double-layer guide wheels, so that accurate cable guiding is ensured, and the system is especially suitable for laying in complex terrains. According to the system and method disclosed by the invention, the construction efficiency is remarkably improved, the manpower demand and the cable damage risk are reduced, and the system and method are widely applied to cable laying projects in the electric power and communication industry. By integrating automatic control and precise mechanical design, a high-efficiency and high-quality solution is provided for cable laying operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of support foundations, and in particular to a cable laying construction system and a construction method. Background Art

[0002] In the construction and renovation of modern urban infrastructure, cable laying is an indispensable part of projects such as power transmission and communication network deployment. Traditional cable laying methods often rely on a large amount of manpower, which is not only inefficient, but also prone to damage to cables due to improper operation, affecting their service life. With the development of technology, automated and intelligent cable laying technology has gradually become a trend in the industry, aiming to improve construction efficiency, reduce labor costs, and ensure construction quality and safety.

[0003] However, some cable laying systems in the existing technology still face several challenges, such as: imprecise cable tension control, which can easily cause cable strain or loosening and knotting during the laying process; the cable guide device is simply designed and cannot effectively cope with complex terrain or changes in cable diameter; and the degree of automation is not high, requiring more manual intervention, affecting construction efficiency and continuity. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a cable laying construction system and a construction method, which integrates a sophisticated tension control mechanism, intelligent cable laying speed adjustment, and a guide and support structure that provides comprehensive protection for the cable, making the cable laying more precise and controllable, and meeting the requirements for high-efficiency and high-quality cable laying in the complex environment of modern cities.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a cable laying construction system, including a plurality of cable-laying pulleys and a traction machine arranged in a cable trough, and a cable-laying rack arranged on the ground. The cable on the cable-laying rack enters the cable trough from an opening at one end of the cable trough and is connected to the traction machine after passing through a plurality of cable-laying pulleys.

[0006] In a preferred solution, the cable payout rack comprises a cable payout rack base and a cable drum fixed on the cable payout rack base, a brake belt groove is provided on one side of the cable drum, a brake belt located in the brake belt groove is provided on the cable payout rack base, one end of the brake belt is connected and fixed to a fixing piece on one end of the cable payout rack base, and the other end is connected to a brake rod provided on the other end of the cable payout rack base.

[0007] In a preferred solution, a slide groove is provided on the base of the cable rack, a vertical slide rod is provided in the slide groove, and a horizontal screw rod passing through the lower end of the slide rod is provided in the slide groove; One end of the brake rod is connected with a hinge seat on the base of the cable rack, and the brake belt is connected to the other end of the brake rod. The brake rod is provided with a strip hole, and the upper end of the slide rod is provided with a column head located in the strip hole.

[0008] In a preferred solution, the cable-releasing rack includes a screw rod with one end extending to the outside of the end surface of the cable-releasing rack base, and a driven gear is provided on the screw rod end, and a motor is provided on the cable-releasing rack base, and a driving gear meshing with the driven gear is provided on the motor.

[0009] In a preferred solution, an opening is provided on one end of the cable rack base, a T-shaped plate is inserted into the opening, and two sets of upper and lower fixed guide wheels are provided on the T-shaped plate. The cables output by the cable rack pass through the two sets of fixed guide wheels.

[0010] In a preferred solution, the cable-releasing pulley comprises a pulley base, a vertical plate on the pulley base, three vertical grooves are arranged on the vertical plate, and a slider and a guide rod vertically passing through the slider are arranged in each of the three vertical grooves; A spring is sleeved on the guide rod on the same side of the slider in the vertical grooves on both sides, and a spring is sleeved on the guide rod on the other side of the slider in the middle vertical groove; The slide block is provided with two clamping wheels, and the cable is arranged to pass through between the two clamping wheels.

[0011] The cable laying construction method based on the above cable laying construction system comprises the following steps: 1) Arrange the cable rack at the opening at one end of the cable trough, and insert a T-shaped plate into the opening to fix the position of the cable rack at one end of the cable trough; 2) Arrange multiple cable-laying pulleys at equal intervals in the cable trough and set up a traction machine; 3) The manual traction cable is output from the cable rack. The cable passes through two sets of fixed guide wheels on the T-shaped plate and fixed guide wheels on multiple cable pulleys in sequence, and is connected and fixed to the traction head on the traction machine through an anti-twist device; 4) Use a traction machine to pull one end of the cable to lay the cable in the cable trough.

[0012] In a preferred solution, during the cable laying process, the brake belt and the brake rod cooperate to adjust the horizontal position of the slide rod through the screw rod to achieve rotation angle control of the brake rod, and apply a preset tension to the cable on the cable rack base.

[0013] In a preferred solution, during the cable laying process, a slider with a clamping wheel on the cable laying trolley adaptively clamps the cable to maintain stable support and guidance according to changes in the diameter of the cable.

[0014] In a preferred solution, after the cable is laid, it is tied with cable ties, the tying points are arranged at equal distances, and wiring points are reserved according to the wiring positions. After the cable is cut and a temporary cable sign is hung, the next cable is laid.

[0015] The photovoltaic support anchor foundation provided by the present invention has the following beneficial effects by adopting the above structure: (1) The integrated motor drive and gear transmission system, as well as the precise screw brake control, realize the automatic adjustment of cable laying speed and tension, greatly reducing manual intervention and improving the overall efficiency of laying operations; (2) The unique clamping wheel design and spring-loaded slider of the cable laying pulley can adapt to cables of different diameters, reduce physical damage during the laying process, ensure the integrity of the cable during the laying process, and thus extend its service life; (3) Through the ingenious design of the brake belt and brake rod, combined with the adjustment mechanism of the slide rod and the screw rod, precise control of the cable tension is achieved, avoiding cable damage or construction obstacles caused by improper tension, and ensuring the laying quality; (4) The design of the T-shaped plate and the upper and lower sets of fixed guide wheels enhances the ability to guide the cable direction and at the same time ensures the stability of the cable rack during the construction process. It can also ensure the smoothness and accuracy of cable laying under complex terrain or confined space conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0017] Figure 2 It is a schematic diagram of the cable rack structure of the present invention.

[0018] Figure 3 It is a schematic diagram of the cable reel structure of the present invention.

[0019] Figure 4 It is a schematic structural diagram of a cable laying pulley of the present invention.

[0020] Figure 5 It is a schematic diagram of the slider structure of the present invention.

[0021] In the figure: cable trough 1, cable rack 2, cable 3, cable pulley 4, traction machine 5, cable rack base 6, slide 601, cable drum 7, brake belt 8, fixing part 9, hinge seat 10, brake rod 11, bar hole 111, screw rod 12, slide rod 13, column head 131, driven gear 14, motor 15, driving gear 16, brake belt groove 17, pulley base 18, vertical groove 19, slider 20, clamping wheel 21, T-shaped plate 22, fixed guide wheel 23. DETAILED DESCRIPTION

[0022] Embodiment 1: like Figure 1-5In the invention, a cable laying construction system is provided, comprising a plurality of cable laying pulleys 4 and a traction machine 5 arranged in a cable trough 1, and a cable laying rack 2 arranged on the ground. The cable 3 on the cable laying rack 2 enters the cable trough 1 from an opening at one end of the cable trough 1 and is connected to the traction machine 5 after passing through the plurality of cable laying pulleys 4.

[0023] In the preferred solution, the cable payout rack 2 includes a cable payout rack base 6 and a cable drum 7 fixed on the cable payout rack base 6, a brake belt groove 17 is provided on one side of the cable drum 7, and a brake belt 8 located in the brake belt groove 17 is provided on the cable payout rack base 6, one end of the brake belt 8 is connected and fixed to a fixing piece 9 on one end of the cable payout rack base 6, and the other end is connected to a brake rod 11 provided on the other end of the cable payout rack base 6.

[0024] In a preferred embodiment, a slide groove 601 is provided on the cable rack base 6, a vertical slide rod 13 is provided in the slide groove 601, and a horizontal screw rod 12 passing through the lower end of the slide rod 13 is provided in the slide groove 601; One end of the brake rod 11 is connected to the hinge seat 10 on the cable rack base 6, and the brake belt 8 is connected to the other end of the brake rod 11. The brake rod 11 is provided with a strip hole 111, and the upper end of the slide rod 13 is provided with a column head 131 located in the strip hole 111.

[0025] In a preferred embodiment, the cable-releasing rack 2 includes a screw rod 12 whose one end extends to the outside of the end surface of the cable-releasing rack base 6, and a driven gear 14 is provided on this end of the screw rod 12. The cable-releasing rack base 6 is provided with a motor 15, and the motor 15 is provided with a driving gear 16 meshing with the driven gear 14.

[0026] In a preferred solution, an opening is provided on one end of the cable rack base 6, a T-shaped plate 22 is inserted into the opening, and two sets of upper and lower fixed guide wheels 23 are provided on the T-shaped plate 22. The cable 3 output by the cable rack 2 passes through the two sets of fixed guide wheels 23.

[0027] In a preferred embodiment, the cable-releasing pulley 4 comprises a pulley base 18, a vertical plate on the pulley base 18, three vertical grooves 19 are arranged on the vertical plate, and a slider 20 and a guide rod vertically passing through the slider 20 are arranged in each of the three vertical grooves 19; The guide rods on the same side of the sliders 20 in the vertical grooves 19 on both sides are sleeved with springs, and the guide rods on the other side of the sliders 20 in the middle vertical groove 19 are sleeved with springs; The slider 20 is provided with two clamping wheels 21 , and the cable 3 is arranged to pass through between the two clamping wheels 21 .

[0028] The cable laying construction method based on the above cable laying construction system comprises the following steps: 1) Arrange the cable rack 2 at the opening at one end of the cable trough 1, and insert a T-shaped plate 22 into the opening to fix the position of the cable rack 2 at one end of the cable trough 1; 2) Arrange multiple cable-laying pulleys 4 at equal intervals in the cable trough 1, and set up a traction machine 5; 3) The manually pulled cable 3 is output from the cable-releasing rack 2. The cable 3 passes through two sets of fixed guide wheels 23 on the T-shaped plate 22 and multiple fixed guide wheels 23 on the cable-releasing pulleys 4 in sequence, and is then connected and fixed to the traction head on the traction machine 5 through an anti-twisting device; 4) One end of the cable 3 is pulled by the traction machine 5 to achieve laying of the cable 3 in the cable trough 1.

[0029] In a preferred solution, during the laying of the cable 3, the brake belt 8 cooperates with the brake rod 11, and the horizontal position of the slide rod 13 is adjusted by the screw rod 12 to achieve the rotation angle control of the brake rod 11, and a preset tension is applied to the cable on the cable rack base 6.

[0030] In a preferred solution, during the laying process of the cable 3 , the slider 20 with the clamping wheel 21 on the cable laying pulley 4 adaptively clamps the cable, and maintains stable support and guidance according to the change in the diameter of the cable 3 .

[0031] In a preferred solution, after the cable 3 is laid, it is tied with a cable tie, the tying points are arranged equidistantly, and wiring points are reserved according to the wiring position. After the cable is cut and a temporary cable sign is hung, the next cable 3 is laid.

[0032] Embodiment 2: In the above-mentioned embodiment 1, the entire system is laid synchronously by terminal traction, mechanical transportation and manual guidance.

[0033] A cable pulley 4 is placed on the ground every 10m to reduce the friction of the cable 3, and the cable is pulled by a traction machine 5 with a traction force of 3 tons. An anti-twist device is installed between the traction head and the cable 3 to control the mechanical traction force to be no more than 21kN, the lateral pressure at the cable bend to be no more than 3kN / m, the mechanical laying speed to be no more than 15m / min, and the cable bending radius to be no less than 1.5m. Embodiment 3: This embodiment provides a specific application example of a cable laying construction system, which is constructed based on the above-mentioned embodiment 1, and the specific steps are as follows: 1. System assembly: First, build the cable rack 2, fix the cable drum 7 on the cable rack base 6, ensure that one end of the cable 3 is connected to the cable rack and perform initial tension adjustment through the brake belt 8 and the brake rod 11.

[0034] A motor 15 and a driving gear 16 are installed on the cable rack base 6 and are connected to the screw rod 12. The other end of the screw rod 12 is connected to the motor power system through the driven gear 14. The purpose of tension adjustment can be directly achieved by relying on the motor 15 in the motor power system.

[0035] 2. Cable guide settings: At the opening at one end of the cable rack 2, a T-shaped plate 22 is assembled and two sets of upper and lower fixed guide wheels 23 are installed to provide a smooth outlet path for the cable 3 to be laid.

[0036] 3. Cable trough and pulley layout: The cable trough 1 is arranged on the laying path, and a plurality of cable laying pulleys 4 are pre-installed in the trough. Each pulley 4 is composed of a pulley base 18, a vertical plate and three vertical grooves 19. A slider 20 is installed in each groove and loaded by a spring. A clamping wheel 21 is installed on the slider 20 to adapt to the stable passage of cables 3 with different diameters.

[0037] 4. Cable laying and pulling operation: The motor 15 is turned on, and the screw rod 12 starts to rotate through the cooperation of the driving gear 16 and the driven gear 14, driving the brake belt 8 to adjust the tension and cooperate with the traction machine 5 at the same time to realize the uniform speed release of the cable 3.

[0038] The cable passes through the fixed guide wheel 23 on the T-shaped plate 22 and enters the cable duct 1 , then passes around each pulley 4 and is finally connected to the traction machine 5 .

[0039] 5. Laying monitoring and adjustment: During the laying process of cable 3, the operator monitors the cable tension, cable release speed and other parameters in real time through the control system. When necessary, the operator adjusts the speed of the motor or manually adjusts the brake device to cope with changes in site conditions and ensure smooth laying operations.

Claims

1. A cable laying construction system, characterized in that: The invention comprises a plurality of cable-releasing pulleys (4) and a traction machine (5) arranged in a cable trough (1), and a cable-releasing rack (2) arranged on the ground, wherein the cable (3) on the cable-releasing rack (2) enters the cable trough (1) from an opening at one end of the cable trough (1) and passes through the plurality of cable-releasing pulleys (4) before being connected to the traction machine (5).

2. A cable laying construction system according to claim 1, characterized in that: The cable-releasing frame (2) comprises a cable-releasing frame base (6) and a cable drum (7) fixed on the cable-releasing frame base (6); a brake belt groove (17) is provided on one side of the cable drum (7); a brake belt (8) located in the brake belt groove (17) is provided on the cable-releasing frame base (6); one end of the brake belt (8) is connected and fixed to a fixing member (9) on one end of the cable-releasing frame base (6); and the other end is connected to a brake rod (11) provided on the other end of the cable-releasing frame base (6).

3. A cable laying construction system according to claim 2, characterized in that: The cable rack base (6) is provided with a slide groove (601), a vertical slide rod (13) is provided in the slide groove (601), and a horizontal screw rod (12) passing through the lower end of the slide rod (13) is provided in the slide groove (601); One end of the brake rod (11) is connected to a hinge seat (10) on a cable rack base (6), and a brake belt (8) is connected to the other end of the brake rod (11). The brake rod (11) is provided with a strip hole (111), and the upper end of the slide rod (13) is provided with a column head (131) located in the strip hole (111).

4. A cable laying construction system according to claim 3, characterized in that: The cable-releasing rack (2) comprises a screw rod (12) having one end extending to the outside of the end surface of the cable-releasing rack base (6), and a driven gear (14) is provided on the screw rod (12) at the end, and a motor (15) is provided on the cable-releasing rack base (6), and a driving gear (16) is provided on the motor (15) and meshes with the driven gear (14).

5. A cable laying construction system according to claim 2, characterized in that: An opening is provided at one end of the cable-releasing rack base (6), a T-shaped plate (22) is inserted into the opening, and two sets of upper and lower fixed guide wheels (23) are provided on the T-shaped plate (22), and the cable (3) output from the cable-releasing rack (2) passes through the two sets of fixed guide wheels (23).

6. A cable laying construction system according to claim 1, characterized in that: The cable-releasing pulley (4) comprises a pulley base (18), a vertical plate on the pulley base (18), three vertical grooves (19) being provided on the vertical plate, a slider (20) and a guide rod vertically passing through the slider (20) being provided in each of the three vertical grooves (19); The guide rods on the same side of the sliders (20) in the vertical grooves (19) on both sides are sleeved with springs, and the guide rods on the other side of the sliders (20) in the middle vertical groove (19) are sleeved with springs; The slider (20) is provided with two clamping wheels (21), and the cable (3) is arranged to pass through between the two clamping wheels (21).

7. A cable laying construction method based on a cable laying construction system according to any one of claims 1 to 6, characterized in that The following steps are involved: 1) arranging a cable-laying rack (2) at an opening at one end of the cable trough (1), and inserting a T-shaped plate (22) into the opening to fix the position of the cable-laying rack (2) at one end of the cable trough (1); 2) arranging a plurality of cable-laying pulleys (4) at equal intervals in the cable trough (1), and providing a traction machine (5); 3) The manual traction cable (3) is output from the cable-releasing rack (2), and the cable (3) passes through two sets of fixed guide wheels (23) on the T-shaped plate (22) and the fixed guide wheels (23) on the plurality of cable-releasing pulleys (4) in sequence, and is then connected and fixed to the traction head on the traction machine (5) through an anti-twist device; 4) One end of the cable (3) is pulled by a pulling machine (5) to achieve laying of the cable (3) in the cable trough (1).

8. A cable laying method according to claim 7, characterized in that: During the laying process of the cable (3), the brake belt (8) cooperates with the brake rod (11), and the horizontal position of the slide rod (13) is adjusted through the screw rod (12) to achieve the rotation angle control of the brake rod (11), so as to apply a preset tension to the cable on the cable rack base (6).

9. A cable laying method according to claim 7, characterized in that: During the laying process of the cable (3), the slider (20) with the clamping wheel (21) on the cable laying pulley (4) adaptively clamps the cable, and maintains stable support and guidance according to the change in the diameter of the cable (3).

10. A cable laying method according to claim 7, characterized in that: After the cable (3) is laid, it is tied with a cable tie, the tying points are arranged at equal distances, and wiring points are reserved according to the wiring positions. After the cable is cut and a temporary cable sign is hung, the next cable (3) is laid.

Citation Information

Cited By

  • Charging pile