Vehicle-mounted power control method, device and equipment for explosion-proof electric vehicle and storage medium

Connect the vehicle controller and independent controller through the CAN bus, and optimize the priority allocation of node parameters by using dynamic priority allocation algorithm and fuzzy neural network, the problem of large number of explosion-proof boxes in explosion-proof electric vehicles is solved, and the data is improved The rapidity and reliability of transmission improve the flexibility of the layout of the entire vehicle.

CN118893988APending Publication Date: 2024-11-05HUBEI KUNBO TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411235366.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

In the existing power control scheme for explosion-proof electric vehicles, there are numerous explosion-proof boxes and large volume and weight, which makes it difficult to layout the entire vehicle.

Method used

The vehicle controller and independent controller are connected through the CAN bus, and a dynamic priority allocation algorithm and a fuzzy neural network are used to optimize the priority allocation of node parameters to achieve rapid and reliable data transmission.

Benefits of technology

It reduces the system complexity and number of wiring, reduces the volume of explosion-proof boxes, improves the technical level of explosion-proof electric vehicles, and ensures the rapidity and reliability of data transmission under different operating conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118893988A_ABST
    Figure CN118893988A_ABST
Patent Text Reader

Abstract

The invention discloses a vehicle-mounted power control method, device and equipment for an anti-explosion electric vehicle and a storage medium. The control method comprises the steps that node parameters of an anti-explosion electric vehicle control system and working condition data corresponding to the node parameters are obtained through a CAN bus network; inputting the node parameters and the working condition data corresponding to the node parameters into a pre-trained dynamic priority distribution model to obtain fuzzy membership degree vectors of node parameter priorities; and according to the fuzzy membership degree vector of the node parameter priority, controlling sending and receiving of data of each node parameter. A vehicle control unit and other independent controllers are connected through a CAN bus, an optimal distribution scheme of priorities is obtained based on a dynamic priority distribution algorithm and a fuzzy neural network, and rapidness and reliability of data transmission under different operation conditions are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of electric vehicle control, and in particular relates to an explosion-proof electric vehicle on-board power control method, device, equipment and storage medium. Background Art

[0002] Existing explosion-proof electric vehicles have multiple controllers, including drive motor controllers, pump motor controllers, AC / DC and insulation monitoring, etc. These mature components on the market are designed according to the electrical architecture of passenger cars and have independent shells. Since they are used in explosion-proof electric vehicles, these components need to add explosion-proof box structures. One is that each component is installed in an explosion-proof box, and there are many explosion-proof boxes on the vehicle; the other is that all components are installed in one explosion-proof box, which will be very large in size and weight, making the layout of the whole vehicle difficult.

[0003] Therefore, the existing explosion-proof electric vehicle power control solutions are equipped with a large number of explosion-proof boxes, and the explosion-proof boxes are very large in size and weight, making the layout of the entire vehicle difficult. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide an explosion-proof electric vehicle on-board power control method, device, equipment and storage medium, which connect the whole vehicle controller and other independent controllers through the CAN bus, obtain the optimal priority allocation scheme based on the dynamic priority allocation algorithm and fuzzy neural network, and ensure the rapidity and reliability of data transmission under different operating conditions.

[0005] To achieve the above object, the present invention is implemented by adopting the following technical solutions:

[0006] In a first aspect, the present invention provides a method for controlling the onboard power of an explosion-proof electric vehicle, comprising:

[0007] Obtain node parameters of the explosion-proof electric vehicle control system and the operating condition data corresponding to the node parameters through the CAN bus network;

[0008] Input the node parameters and the working condition data corresponding to the node parameters into the pre-trained dynamic priority allocation model to obtain the fuzzy membership vector of the node parameter priority; wherein the fuzzy membership vector of the node parameter priority is represented as the priority arrangement of the node parameters;

[0009] According to the fuzzy membership vector of the node parameter priority, the sending and receiving of the data of each node parameter is controlled.

[0010] Furthermore, the training method of the dynamic priority allocation model includes:

[0011] Construct a dynamic priority allocation model based on fuzzy neural network and dynamic priority allocation algorithm;

[0012] The node parameters of the explosion-proof electric vehicle and the working condition data corresponding to the node parameters are obtained through the CAN bus network, and the node parameters are initialized to obtain the weights and thresholds of the node parameters and stored in the fuzzy neural network;

[0013] A training set is constructed based on the node parameters and the working condition data corresponding to the node parameters, and the dynamic priority allocation model is trained using the training set to obtain a trained dynamic priority allocation model.

[0014] Furthermore, the using the training set to train the dynamic priority allocation model includes:

[0015] The dynamic priority allocation model obtains the priority of the node parameters through the dynamic priority allocation algorithm, and uses the weight and threshold of the node parameters to perform fuzzy processing on the node parameters to obtain the fuzzy vector of the node parameters;

[0016] The priority of the node parameter and the fuzzy vector of the node parameter are input into the fuzzy neural network to obtain the fuzzy membership vector of the node parameter priority; wherein the fuzzy membership vector of the node parameter priority is represented as the priority arrangement of the node parameter.

[0017] Furthermore, the dynamic priority allocation model obtains the priority of the node parameter through a dynamic priority allocation algorithm, including:

[0018] Initialize the parameters of each node on the CAN bus network and assign an initial priority to each node parameter; wherein the priority of each node parameter is different;

[0019] When no conflict occurs, each node parameter completes data transmission according to the initial priority;

[0020] When a conflict occurs, the node parameter with a higher priority wins the competition and sends data, and the priority of the node parameter that fails in the competition is raised by one level to participate in the next competition.

[0021] Furthermore, if the priority arrangement of the node parameters obtained through training is unreasonable, the weights and thresholds of the node parameters are reinitialized, and then the dynamic priority allocation model is trained using the training set.

[0022] Furthermore, the judgment condition of whether the priority arrangement of the node parameters is reasonable is:

[0023] If the fuzzy membership vectors of all node parameter priorities are smaller than the corresponding threshold vectors, it means that the priority distribution of node parameters is reasonable;

[0024] If there is a fuzzy membership vector of the node parameter priority that is greater than or equal to the corresponding threshold vector, it means that the priority allocation of the node parameter is unreasonable.

[0025] Furthermore, the node parameters include: vehicle control, battery box, assisted driving, drive motor, wiper motor, defogger, hydraulic pump motor and light warning sound;

[0026] The CAN bus network includes a high-speed CAN bus network and a low-speed CAN bus network; the high-speed CAN bus network and the low-speed CAN bus network are connected via a gateway central control;

[0027] Among them, the whole vehicle control, battery box, auxiliary driving and drive motor are connected to the explosion-proof electric vehicle control system through the high-speed CAN bus network, and the wiper motor, defogger, hydraulic pump motor and light alarm are connected to the explosion-proof electric vehicle control system through the low-speed CAN bus network.

[0028] In a second aspect, the present invention provides an explosion-proof electric vehicle onboard power control device, comprising:

[0029] An acquisition module is used to acquire node parameters of the explosion-proof electric vehicle control system and operating condition data corresponding to the node parameters through a CAN bus network;

[0030] A dynamic priority allocation module, used for inputting node parameters and working condition data corresponding to the node parameters into a pre-trained dynamic priority allocation model to obtain a fuzzy membership vector of the node parameter priority; wherein the fuzzy membership vector of the node parameter priority is represented as a priority arrangement of the node parameters;

[0031] The control module is used to control the sending and receiving of data of each node parameter according to the fuzzy membership vector of the node parameter priority.

[0032] In a third aspect, the present invention provides an electronic device, comprising a processor and a memory connected to the processor, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the steps of the on-board power control method of an explosion-proof electric vehicle as described in the first aspect are performed.

[0033] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the on-board power control method of an explosion-proof electric vehicle described in the first aspect.

[0034] Compared with the prior art, the present invention has the following beneficial effects:

[0035] Connecting the vehicle controller and other independent controllers through the CAN bus reduces system complexity and wiring quantity, improves system reliability, reduces the volume of explosion-proof boxes, and improves the technical level of explosion-proof electric vehicles. The integrated system of electric vehicle controllers based on the CAN bus uses multi-channel sensors to collect data from electric vehicles in real time to ensure the rapidity and reliability of data transmission under different operating conditions. Based on the dynamic priority allocation algorithm and fuzzy neural network, the optimal priority allocation scheme is obtained to ensure the rapidity and reliability of data transmission under different operating conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 The figure shows a schematic diagram of the CAN bus structure of an explosion-proof electric vehicle provided by an embodiment of the present invention;

[0037] Figure 2 Shown is a schematic diagram of control parameter priority determination provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0038] The technical concept of the present invention is: connecting the vehicle controller and other independent controllers through the CAN bus, reducing the system complexity and the number of wiring, improving the system reliability, reducing the volume of the explosion-proof box, and improving the technical level of explosion-proof electric vehicles. The integrated system of the electric vehicle controller based on the CAN bus uses multi-channel sensors to collect data from the electric vehicle in real time to ensure the rapidity and reliability of data transmission under different operating conditions. Based on the dynamic priority allocation algorithm and fuzzy neural network, the optimal priority allocation scheme is obtained to ensure the rapidity and reliability of data transmission under different operating conditions.

[0039] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present application and its application or use.

[0040] Example 1

[0041] This embodiment provides a method for controlling the onboard power of an explosion-proof electric vehicle, comprising:

[0042] Obtain node parameters of the explosion-proof electric vehicle control system and the operating condition data corresponding to the node parameters through the CAN bus network;

[0043] Input the node parameters and the working condition data corresponding to the node parameters into the pre-trained dynamic priority allocation model to obtain the fuzzy membership vector of the node parameter priority; wherein the fuzzy membership vector of the node parameter priority is represented as the priority arrangement of the node parameters;

[0044] According to the fuzzy membership vector of the node parameter priority, the sending and receiving of the data of each node parameter is controlled.

[0045] The training method of the dynamic priority allocation model comprises:

[0046] Construct a dynamic priority allocation model based on fuzzy neural network and dynamic priority allocation algorithm;

[0047] The node parameters of the explosion-proof electric vehicle and the working condition data corresponding to the node parameters are obtained through the CAN bus network, and the node parameters are initialized to obtain the weights and thresholds of the node parameters and stored in the fuzzy neural network;

[0048] A training set is constructed based on the node parameters and the working condition data corresponding to the node parameters, and the dynamic priority allocation model is trained using the training set to obtain a trained dynamic priority allocation model.

[0049] The method of using the training set to train the dynamic priority allocation model includes:

[0050] The dynamic priority allocation model obtains the priority of the node parameters through the dynamic priority allocation algorithm, and uses the weight and threshold of the node parameters to perform fuzzy processing on the node parameters to obtain the fuzzy vector of the node parameters;

[0051] The priority of the node parameter and the fuzzy vector of the node parameter are input into the fuzzy neural network to obtain the fuzzy membership vector of the node parameter priority; wherein the fuzzy membership vector of the node parameter priority is represented as the priority arrangement of the node parameter.

[0052] The dynamic priority allocation model obtains the priority of the node parameter through a dynamic priority allocation algorithm, including:

[0053] Initialize the parameters of each node on the CAN bus network and assign an initial priority to each node parameter; wherein the priority of each node parameter is different;

[0054] When no conflict occurs, each node parameter completes data transmission according to the initial priority;

[0055] When a conflict occurs, the node parameter with a higher priority wins the competition and sends data, and the priority of the node parameter that fails in the competition is increased by one level to participate in the next competition.

[0056] If the priority arrangement of the node parameters obtained through training is unreasonable, the weights and thresholds of the node parameters are reinitialized, and the dynamic priority allocation model is trained using the training set.

[0057] The judgment condition of whether the priority arrangement of the node parameters is reasonable is:

[0058] If the fuzzy membership vectors of all node parameter priorities are smaller than the corresponding threshold vectors, it means that the priority distribution of node parameters is reasonable;

[0059] If there is a fuzzy membership vector of the node parameter priority that is greater than or equal to the corresponding threshold vector, it means that the priority allocation of the node parameter is unreasonable.

[0060] The node parameters include: vehicle control, battery box, assisted driving, drive motor, wiper motor, defogger, hydraulic pump motor and light warning sound;

[0061] The CAN bus network includes a high-speed CAN bus network and a low-speed CAN bus network; the high-speed CAN bus network and the low-speed CAN bus network are connected via a gateway central control;

[0062] Among them, the whole vehicle control, battery box, auxiliary driving and drive motor are connected to the explosion-proof electric vehicle control system through the high-speed CAN bus network, and the wiper motor, defogger, hydraulic pump motor and light alarm are connected to the explosion-proof electric vehicle control system through the low-speed CAN bus network.

[0063] An example is provided below to illustrate the training method of the dynamic priority allocation model of this embodiment.

[0064] In order to realize the above method, the explosion-proof electric vehicle integrated controller adopts the integrated design of CAN network, and its structure is as follows Figure 1 As shown in the figure, the vehicle CAN network is divided into high-speed and low-speed networks according to the type of explosion-proof vehicle network node data. The whole vehicle control, battery box, auxiliary driving and drive motor of the explosion-proof electric vehicle use high-speed CAN bus, while the wiper motor, defogger, hydraulic pump motor and light alarm use low-speed bus. The gateway central control is connected between high and low speed, which effectively increases the network bandwidth, improves the real-time and reliability of data transmission on the low-speed CAN network, and reduces the bus cost of the whole vehicle.

[0065] Using dynamic priority allocation algorithm on CAN bus to reduce bus load and increase the impact on real-time data transmission of system, dynamic priority allocation method is adopted, such as Figure 2 shown.

[0066] A dynamic priority allocation model is constructed based on fuzzy neural network and dynamic priority allocation algorithm; the fuzzy neural network model adopted is an existing conventional model named adaptive neuro-fuzzy system.

[0067] The node parameters of the explosion-proof electric vehicle and the working condition data corresponding to the node parameters are obtained through the CAN bus network, and the node parameters are initialized to obtain the weights and thresholds of the node parameters and stored in the fuzzy neural network;

[0068] A training set is constructed based on the node parameters and the working condition data corresponding to the node parameters, and the dynamic priority allocation model is trained using the training set to obtain a trained dynamic priority allocation model.

[0069] The method of using the training set to train the dynamic priority allocation model includes:

[0070] The dynamic priority allocation model obtains the priority of the node parameters through the dynamic priority allocation algorithm, and uses the weight and threshold of the node parameters to perform fuzzy processing on the node parameters to obtain the fuzzy vector of the node parameters;

[0071] The priority of the node parameter and the fuzzy vector of the node parameter are input into the fuzzy neural network to obtain the fuzzy membership vector of the node parameter priority; wherein the fuzzy membership vector of the node parameter priority is represented as the priority arrangement of the node parameter.

[0072] The dynamic priority allocation model obtains the priority of the node parameter through a dynamic priority allocation algorithm, including:

[0073] Initialize the parameters of each node on the CAN bus network and assign an initial priority to each node parameter; wherein the priority of each node parameter is different;

[0074] When no conflict occurs, each node parameter completes data transmission according to the initial priority;

[0075] When a conflict occurs, the node parameter with a higher priority wins the competition and sends data, and the priority of the node parameter that fails in the competition is raised by one level to participate in the next competition.

[0076] In the initial state, each node on the bus is assigned a priority, and each station competes for the control of the bus medium according to the original priority to complete the data transmission. When a conflict occurs, the node with a higher priority wins after comparison and completes the data transmission. If it is necessary to make the low-priority node have a greater probability of comparison in future transmissions, the priority of the failed node can be set. After repeated comparison failures, the priority of the node will be gradually improved, so that the probability of control of the bus is increased, which is conducive to the transmission and reception of data. In order to ensure the uniqueness of the priority, a queue of all nodes is established and arranged according to the priority. If the node that failed in the comparison needs to increase its priority, the priority of this node and the previous node can be exchanged.

[0077] If the priority arrangement of the node parameters obtained through training is unreasonable, the weights and thresholds of the node parameters are reinitialized, and the dynamic priority allocation model is trained using the training set.

[0078] The judgment condition of whether the priority arrangement of the node parameters is reasonable is:

[0079] If the fuzzy membership vectors of all node parameter priorities are smaller than the corresponding threshold vectors, it means that the priority distribution of node parameters is reasonable;

[0080] If there is a fuzzy membership vector of the node parameter priority that is greater than or equal to the corresponding threshold vector, it means that the priority allocation of the node parameter is unreasonable.

[0081] During the execution cycle of the CAN bus, the priority of the nodes is allocated to the bus through various time windows. The signal of each node transmits data within its own time window to eliminate mutual influence between nodes.

[0082] The on-board power integrated controller of explosion-proof electric vehicles obtains the working condition data of the CAN bus in real time and uses the neural network TRAINGDX function for training. The number of input neurons is equal to the number of working condition data, which is set to 8. The principle of selecting the number of hidden layer neurons is to determine the output of the neurons in combination with the previous training samples under the premise of meeting the judgment rules.

[0083] The fuzzy rule retrieves the weights and thresholds of the parameters in the neural network according to the output of the neurons. The process is to determine the membership of each parameter according to the grammatical rules (IF i1 = operating data parameter 1 and i2 = operating data parameter 2 and…and i8 = operating data parameter 8, THEN fi).

[0084] The diagnostic method of CAN bus priority is to find out the membership degree of each parameter. Figure 1 It can be seen that there are 8 types of control objects here, so the fuzzy vector can be set as:

[0085]

[0086] The definition of CAN bus priority is:

[0087]

[0088] The solution of fuzzy priority is:

[0089]

[0090] Among them, R represents the fuzzy relationship between priority and control object.

[0091] When using fuzzy neural network for priority judgment, the signal sent by the controlled object is connected to the network input layer, the fuzzy vector i of the controlled object is processed by fuzzification, and then input into the neural network for calculation, giving a set of threshold vectors:

[0092]

[0093] Whether the priority of node parameters is reasonable is judged as follows:

[0094] when , it means that the priority of the node parameters is reasonable;

[0095] when When , it means that the priority of the node parameters is unreasonable. It is necessary to reinitialize the weights and thresholds of the node parameters and use the training set to train the dynamic priority allocation model.

[0096] Example 2

[0097] This embodiment provides an explosion-proof electric vehicle on-board power control device, including:

[0098] An acquisition module is used to acquire node parameters of the explosion-proof electric vehicle control system and operating condition data corresponding to the node parameters through a CAN bus network;

[0099] A dynamic priority allocation module, used for inputting node parameters and working condition data corresponding to the node parameters into a pre-trained dynamic priority allocation model to obtain a fuzzy membership vector of the node parameter priority; wherein the fuzzy membership vector of the node parameter priority is represented as a priority arrangement of the node parameters;

[0100] The control module is used to control the sending and receiving of data of each node parameter according to the fuzzy membership vector of the node parameter priority.

[0101] Example 3

[0102] This embodiment provides an electronic device, including a processor and a memory connected to the processor, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the steps of the on-board power control method of an explosion-proof electric vehicle as described in Example 1 are executed.

[0103] Example 4

[0104] This embodiment provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the steps of the on-board power control method of an explosion-proof electric vehicle described in Embodiment 1 are implemented.

[0105] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0106] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0107] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0108] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0109] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for controlling the onboard power of an explosion-proof electric vehicle, characterized in that: include: Obtain node parameters of the explosion-proof electric vehicle control system and the corresponding working condition data of the node parameters through the CAN bus network; Inputting the node parameters and the working condition data corresponding to the node parameters into a pre-trained dynamic priority allocation model to obtain a fuzzy membership vector of the node parameter priority; wherein the fuzzy membership vector of the node parameter priority is represented as a priority arrangement of the node parameters; According to the fuzzy membership vector of the node parameter priority, the sending and receiving of the data of each node parameter is controlled.

2. The explosion-proof electric vehicle onboard power control method according to claim 1, characterized in that: The training method of the dynamic priority allocation model includes: Construct a dynamic priority allocation model based on fuzzy neural network and dynamic priority allocation algorithm; The node parameters of the explosion-proof electric vehicle and the corresponding working condition data of the node parameters are obtained through the CAN bus network, and the node parameters are initialized to obtain the weights and thresholds of the node parameters and stored in the fuzzy neural network; A training set is constructed based on the node parameters and the working condition data corresponding to the node parameters, and the dynamic priority allocation model is trained using the training set to obtain a trained dynamic priority allocation model.

3. The explosion-proof electric vehicle onboard power control method according to claim 2, characterized in that: The method of using the training set to train the dynamic priority allocation model includes: The dynamic priority allocation model obtains the priority of node parameters through the dynamic priority allocation algorithm, and uses the weight and threshold of the node parameters to perform fuzzy processing on the node parameters to obtain the fuzzy vector of the node parameters; The priority of the node parameter and the fuzzy vector of the node parameter are input into the fuzzy neural network to obtain the fuzzy membership vector of the node parameter priority; wherein the fuzzy membership vector of the node parameter priority is expressed as the priority arrangement of the node parameter.

4. The explosion-proof electric vehicle onboard power control method according to claim 3, characterized in that: The dynamic priority allocation model obtains the priority of the node parameters through a dynamic priority allocation algorithm, including: Initialize the parameters of each node on the CAN bus network and assign an initial priority to each node parameter; wherein the priority of each node parameter is different; When no conflict occurs, each node sends data according to the initial priority. When a conflict occurs, the node parameter with a higher priority wins the competition and sends data, and the priority of the node parameter that fails in the competition is raised by one level to participate in the next competition.

5. The explosion-proof electric vehicle onboard power control method according to claim 3, characterized in that: If the priority arrangement of the node parameters obtained through training is unreasonable, the weights and thresholds of the node parameters are reinitialized, and the dynamic priority allocation model is trained using the training set.

6. The explosion-proof electric vehicle onboard power control method according to claim 5, characterized in that: The judgment conditions for whether the priority arrangement of the node parameters is reasonable are: If the fuzzy membership vectors of all node parameter priorities are smaller than the corresponding threshold vectors, it means that the priority distribution of node parameters is reasonable; If the fuzzy membership vector of the node parameter priority is greater than or equal to the corresponding threshold vector, it means that the priority allocation of the node parameter is unreasonable.

7. The explosion-proof electric vehicle onboard power control method according to claim 1, characterized in that: The node parameters include: vehicle control, battery box, assisted driving, drive motor, wiper motor, defogger, hydraulic pump motor and light warning sound; The CAN bus network includes a high-speed CAN bus network and a low-speed CAN bus network; the high-speed CAN bus network and the low-speed CAN bus network are connected via a gateway central control; Among them, the vehicle control, battery box, auxiliary driving and drive motor are connected to the explosion-proof electric vehicle control system through the high-speed CAN bus network, and the wiper motor, defogger, hydraulic pump motor and light warning sound are connected to the explosion-proof electric vehicle control system through the low-speed CAN bus network.

8. An explosion-proof electric vehicle onboard power control device, characterized in that: include: An acquisition module is used to obtain node parameters of the explosion-proof electric vehicle control system and working condition data corresponding to the node parameters through the CAN bus network; A dynamic priority allocation module is used to input node parameters and operating condition data corresponding to the node parameters into a pre-trained dynamic priority allocation model to obtain a fuzzy membership vector of the node parameter priority; wherein the fuzzy membership vector of the node parameter priority is represented as a priority arrangement of the node parameters; The control module is used to control the sending and receiving of data of each node parameter according to the fuzzy membership vector of the node parameter priority.

9. An electronic device, characterized in that: It includes a processor and a memory connected to the processor, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the steps of the explosion-proof electric vehicle on-board power control method according to any one of claims 1 to 6 are executed.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the explosion-proof electric vehicle on-board power control method described in any one of claims 1 to 6 are implemented.