Reinforcement cage centering suspension tool
By designing a centrally suspended steel cage fixture, and utilizing a base, connecting blocks, support frames, and central control components, the problems of floating and resource waste during the suspension process of the steel cage are solved, achieving stable suspension and resource recycling.
Patent Information
- Application Number
- CN202411250628.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-05
Smart Images

Figure CN118894439A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of cast-in-place pile reinforcement cage installation, and in particular to a reinforcement cage central suspension tooling. Background Art
[0002] In building construction, especially in pile foundation construction, in order to ensure the quality of the pile head, the pile top elevation is generally higher than the design elevation. When pouring concrete, the sediment at the bottom of the pile and the impurities precipitated in the mud during the pouring process will form a certain thickness of floating slurry on the concrete surface. After the concrete solidifies, the over-poured part must be chiseled off to expose the main reinforcement above the pile top elevation. After the pile foundation is tested and qualified, the construction of the base can be carried out.
[0003] A common cast-in-place pile in the related art includes a hanger bar, a steel cage, a casing, and a frame rod, wherein the steel cage is fixed by an annular ring bar arranged in a ring shape and a vertical main bar, and the hanger bar and the steel cage are welded as a whole; during the construction of the cast-in-place pile, a pile pit is first preset on the ground, and the casing is buried in the pile pit, and then the steel cage is vertically lifted into the casing by a crane, and then the frame rod is passed through the lifting ring at the top of the hanger bar, and the two ends of the frame rod are erected on the top of the casing, so as to complete the suspension of the steel cage in the casing, and finally concrete is poured into the casing, and after the concrete solidifies, the over-poured part is chiseled out.
[0004] In the process of implementing this application, it was found that there are at least the following problems in this technology: due to the influence of the gravity operation of the steel cage, some hanger bars with welding defects will break, and when the steel cage is subjected to the upward supporting force of concrete, it is easy to cause the steel cage to float, and in the process of pouring the pile foundation, the hanger bars, as part of the suspension structure, will eventually be cast as a whole with the steel cage and cannot be recycled, resulting in resources. Summary of the invention
[0005] In order to avoid the floating of the steel cage as much as possible, improve the stability of the steel cage suspension, and facilitate the recycling of the suspension structure, the present application provides a steel cage central suspension tooling.
[0006] The present application provides a steel cage central suspension tooling that adopts the following technical solution: A steel cage central suspension tooling, comprising a base, a plurality of connecting blocks connected to the main reinforcement of the steel cage, the base being provided with a sleeve hole adapted to mutually match the casing, the base being provided with a plurality of detachable support frames fixedly installed, all of the support frames being symmetrically arranged around the sleeve hole, the support frames corresponding to the connecting blocks one by one, and a limited floating rod and a bearing rod being horizontally and fixedly arranged on the support frame; the connecting block comprises a transverse portion, a lower vertical portion, and an upper vertical portion, the transverse portion, the lower vertical portion, and the upper vertical portion being integrally formed, a mounting hole for the main reinforcement of the steel cage passing through being provided through the center of the transverse portion, a tool clamp being installed at each end of the mounting hole, the two tool clamps being installed in opposite directions and clamping the same main reinforcement of the steel cage at the same time, the upper vertical portion being vertically arranged upward at one end of the transverse portion, and the lower vertical portion being vertically arranged downward at the other end of the transverse portion, the limited floating rod abuts against the top side of the transverse portion close to one end of the upper vertical portion, and the bearing rod abuts against the bottom side of the transverse portion close to one end of the lower vertical portion.
[0007] By adopting the above technical solution, the base is installed horizontally on the ground, and the sleeve hole is sleeved outside the casing to complete the placement of the tooling; when performing the suspension installation of the steel cage, the main reinforcement of the steel cage is first passed through the installation hole of the connecting block. Due to the arrangement of the tool clips at both ends of the installation hole, according to the working principle that the tool clips are tighter when loaded, the two tool clips can carry the steel cage in the vertical direction, preventing the main reinforcement of the steel cage from sliding upward or downward in the installation hole; then, the support frame is removed from the base, and the interference of the floating rod and the load-bearing rod on the placement of the steel cage is avoided as much as possible; then, Use a crane to lower the steel cage into the casing; finally, reinstall the support frame on the base so that the float-limiting rod abuts against the top side of the transverse part, and the load-bearing rod abuts against the bottom side of the transverse part, thereby achieving stable suspension of the steel cage; and the float-limiting rod is located between the main reinforcement of the steel cage and the upper vertical part and cannot be directly detached, and the load-bearing rod is located between the main reinforcement of the steel cage and the lower vertical part and cannot be directly detached, thereby improving the reliability and stability of the tooling suspension; thereby effectively avoiding the problem of steel cage floating due to welding defects of the suspension bars, and at the same time, since the connecting block is detachable, it is easy to recycle and save resources.
[0008] Preferably, a base is fixedly provided at the bottom of the support frame, a plurality of first fixing bolts are provided on the base, and the base is mounted on the base through the first fixing bolts.
[0009] By adopting the above technical solution, the first fixing bolt can be used to achieve a detachable connection between the support frame and the base, which is convenient for installation and disassembly, and the base bracket increases the contact area between the support frame and the base, thereby improving the stability of the installation. At the same time, during the installation process, the cooperation between the base bracket and the first fixing bolt helps to determine the installation position of the support frame, thereby facilitating positioning.
[0010] Preferably, the float limiting rod is in contact with the side wall of the upper vertical portion, and the load-bearing rod is in contact with the side wall of the lower vertical portion.
[0011] By adopting the above technical solution, the float limiting rod is in contact with the side wall of the upper vertical part, and the load-bearing rod is in contact with the side wall of the lower vertical part, which further enhances the limiting effect on the connecting block and improves the stability and reliability of the entire tooling when limiting the floating of the steel cage.
[0012] Preferably, a centering control component is also provided on the base, and the centering control component is used to drive the steel cage to approach the center of the socket hole.
[0013] By adopting the above technical solution, the centering control component is used to drive the steel cage to approach the center of the socket hole, which can ensure that the steel cage is in a centered position when placed in the casing, improve the construction accuracy and quality, and reduce construction problems caused by the deviation of the steel cage.
[0014] Preferably, the centering control assembly includes a guide rail, a sliding block, an outer extension frame, an abutment rod, and a synchronous sliding member. At least three guide rails are vertically and fixedly installed on the base, and all the guide rails are symmetrically arranged around the socket holes. Two sliding blocks are slidingly arranged in the guide rails, and two outer extension frames are arranged. The two outer extension frames are equal in length, one of the outer extension frames is rotatably connected to one of the sliding blocks, and the other outer extension frame is rotatably connected to the other sliding block. The abutment rod is simultaneously rotatably connected to one end of the two outer extension frames away from the sliding block, and the abutment rod can abut against the steel cage. The synchronous sliding member is arranged on each guide rail, and the synchronous sliding member is used to drive the two sliding blocks to approach or move away from each other synchronously.
[0015] By adopting the above technical scheme, when the steel cage needs to be centered in the casing, the two sliding blocks on the same guide rail are driven to approach each other synchronously through the synchronous sliding member, and the movement of the sliding block drives one end of the outer extension frame rotatably connected thereto to move. Since the other end of the outer extension frame is rotatably connected to the abutment rod, and the two outer extension frames are of equal length, the outer extension frame will rotate under the action of the equidistant sliding of the sliding block, pushing the abutment rod in the direction away from the guide rail, and the height position of the abutment rod remains unchanged, and the abutment rod moves in the direction close to the steel cage. Multiple abutment rods abut against the steel cage from different directions at the same time. Under the pushing and adjusting action of multiple abutment rods, the steel cage is gradually adjusted, thereby realizing the centering control of the steel cage in the casing. Since the height position of the abutment rod remains unchanged, the friction when abutting against the steel cage is reduced.
[0016] Preferably, the synchronous sliding member is a double-threaded screw, which is provided with two thread segments with opposite rotation directions and equal pitches. The double-threaded screw is rotatably arranged in a guide rail, one of the thread segments of the double-threaded screw cooperates with the thread of one of the sliding blocks, and the other thread segment of the double-threaded screw cooperates with the thread of the other sliding block.
[0017] By adopting the above technical solution, when the double-thread screw is rotated, since the two thread segments have opposite rotation directions and equal pitches, the two sliding blocks can achieve synchronous reverse and equidistant sliding in the guide rail, thereby accurately controlling the movement of the external extension frame and the abutment rod, and achieving centering control of the steel cage in the casing.
[0018] Preferably, the bottom of the double-threaded screw passes through the base and is fixedly provided with a first sprocket, and a transmission chain is commonly provided on all the first sprockets, the transmission chains are connected end to end, and each of the first sprockets is pressed against the transmission chain and meshes with the transmission chain.
[0019] By adopting the above technical solution, when one of the first sprockets rotates, the other first sprockets will also rotate synchronously through the transmission action of the transmission chain, and then the corresponding double-threaded screws will rotate synchronously, thereby realizing the synchronous movement of the sliding blocks in all guide rails, so that the distance from each abutment rod to the corresponding guide rail is kept consistent at any time, ensuring that multiple abutment rods can synchronously adjust the center of the steel cage in the casing, thereby improving the efficiency and accuracy of the centering control.
[0020] Preferably, a transmission shaft is penetrated and rotatably arranged in the base, a second sprocket is fixedly arranged at the bottom of the transmission shaft, the second sprocket presses against the transmission chain and meshes with the transmission chain, a motor is fixedly mounted on the base, and the drive shaft of the motor is connected to the top of the transmission shaft.
[0021] By adopting the above technical solution, when it is necessary to adjust the centering position of the steel cage, the motor is started, and the driving shaft of the motor drives the transmission shaft to rotate, and the second sprocket at the bottom of the transmission shaft rotates accordingly. The second sprocket drives each first sprocket to rotate through the transmission chain, thereby realizing synchronous driving of all double-threaded screws. The entire driving process is efficient and stable, providing reliable power support for the operation of the centering control component.
[0022] Preferably, a mounting frame is fixedly provided on the motor, a second fixing bolt is provided on the mounting frame, and the mounting frame is mounted on the base through the second fixing bolt; a slot for inserting the driving shaft of the power supply motor is provided on the top of the transmission shaft, a driving block is fixedly provided on the driving shaft of the motor, a driving groove is provided on the side wall of the slot, and the driving block can be inserted into the driving groove and abut against the side wall of the driving groove.
[0023] By adopting the above technical solution, the motor can be fixedly installed on the base using the second fixing bolt. This installation method is stable and easy to disassemble and repair. A slot is provided on the top of the transmission shaft, and the drive shaft of the motor can be inserted into the slot. At the same time, the driving block on the motor drive shaft can be inserted into the driving groove of the side wall of the slot and abut against it to achieve transmission. Such a design facilitates the rapid installation and disassembly of the motor on the base. When the present application is applied to large-diameter bored piles, due to the large diameter of the bored piles, the weight of the motor may cause the center of the base to shift, which is not conducive to the installation of the socket hole of the base outside the casing. At this time, the motor can be removed and reinstalled after the installation of the base is completed, which is convenient for the installation and placement of the base.
[0024] Preferably, a plurality of supporting legs are fixedly provided on the bottom of the base.
[0025] By adopting the above technical solution, the support legs can support the base, making the base more stable, and can reduce the direct contact between the base and the ground, thereby avoiding bumps on the base as much as possible.
[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. By setting the base, connection block, socket hole, support frame, floating limit rod, bearing rod, transverse part, lower vertical part, upper vertical part, installation hole and tool clip, the steel cage is prevented from floating as much as possible, the stability of the steel cage suspension is improved, and the recycling of the suspension structure is facilitated; 2. By setting guide rails, sliding blocks, external extension frames, abutment rods, and double-threaded screws, multiple abutment rods are used to abut against the steel cage from different directions at the same time to adjust the position of the steel cage, thereby realizing the centering control of the steel cage in the casing; 3. By setting the first sprocket, the transmission chain, the transmission shaft, the second sprocket, the second fixing bolt, the motor, the mounting frame, the slot, the driving block, and the driving slot, the synchronous driving of all the double-threaded screws is realized. The whole driving process is efficient and stable, which provides reliable power support for the centering control of the steel cage in the casing. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a structural schematic diagram of a steel cage central suspension tooling provided in an embodiment of the present application.
[0028] Figure 2 yes Figure 1 Enlarged view of part A Figure 3 It is a schematic diagram of the back structure of a steel cage central suspension tooling provided in an embodiment of the present application.
[0029] Figure 4 It is a partial structural schematic diagram of the position of the transmission shaft in the embodiment of the present application.
[0030] Figure 5 It is a schematic diagram of the installation structure of a steel cage centrally suspended by a tool for suspending a steel cage provided in an embodiment of the present application.
[0031] Explanation of the reference numerals in the accompanying drawings: 1. base; 11. socket hole; 12. transmission shaft; 121. second sprocket; 122. slot; 1221. driving slot; 13. mounting frame; 131. second fixing bolt; 14. motor; 141. driving block; 15. support foot; 16. external sprocket; 2. connecting block; 21. transverse portion; 211. mounting hole; 212. tool clip; 22. lower vertical portion; 23. upper vertical portion; 3. supporting frame; 31. float limiting rod; 32. load-bearing rod; 33. bottom support; 331. first fixing bolt; 4. centering control assembly; 41. guide rail; 42. sliding block; 43. external extension frame; 44. abutment rod; 45. double-threaded screw; 451. first sprocket; 46. transmission chain. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-5 This application is described in further detail.
[0033] The present application embodiment discloses a steel cage central suspension tool. Figures 1 to 5 It includes a base 1 and several connecting blocks 2 connected to the main bars of the steel cage. The base 1 is arranged in a ring shape and has a sleeve hole 11 adapted to the casing in the center. Several legs 15 are fixedly arranged at the bottom of the base 1. Before the steel cage is suspended and installed, the sleeve hole 11 is sleeved on the outside of the casing, and the base 1 is against the ground through the legs 15 and installed horizontally on the ground.
[0034] Reference Figure 2 and Figure 5 The connecting block 2 includes a transverse portion 21, a lower vertical portion 22, and an upper vertical portion 23. The transverse portion 21, the lower vertical portion 22, and the upper vertical portion 23 are integrally formed. A mounting hole 211 is provided in the center of the transverse portion 21 for the main reinforcement of the steel cage to pass through. A tool clip 212 is installed at each end of the mounting hole 211. The two tool clips 212 are installed in opposite directions and clamp the same main reinforcement of the steel cage at the same time. Before the suspension installation of the steel cage is performed, the main reinforcement of the steel cage is passed through the mounting hole 211 of the connecting block 2. Due to the characteristics of the tool clip 212 that the tool clip 212 is tightened when it is loaded, the two tool clips 212 simultaneously restrict the main reinforcement of the steel cage from sliding in the mounting hole 211, thereby connecting a plurality of connecting blocks 2 to the steel cage.
[0035] Reference Figure 2, a number of detachable support frames 3 are fixedly installed on the base 1. A bottom bracket 33 is fixedly arranged at the bottom of the support frame 3, and a number of first fixing bolts 331 are arranged on the bottom bracket 33, and the bottom bracket 33 is installed on the base 1 through the first fixing bolts 331. All support frames 3 are symmetrically arranged around the socket hole 11, and the support frames 3 correspond to the connecting blocks 2 one by one. The limited floating rod 31 and the load-bearing rod 32 are horizontally and fixedly arranged on the support frame 3. After connecting a number of connecting blocks 2 to the steel cage, the support frame 3 is separated from the base 1 by removing the first fixing bolt 331, and the steel cage is hoisted into the casing by a crane or other lifting equipment, and the interference of the limited floating rod 31 and the load-bearing rod 32 on the placement of the steel cage into the casing is avoided as much as possible.
[0036] Reference Figure 2 and Figure 5 , the upper vertical portion 23 is vertically arranged upward at one end of the transverse portion 21, and the floating rod 31 is against the top side of the transverse portion 21 near the upper vertical portion 23, and at the same time fits with the side wall of the upper vertical portion 23. The lower vertical portion 22 is vertically arranged downward at the other end of the transverse portion 21, and the bearing rod 32 is against the bottom side of the transverse portion 21 near the lower vertical portion 22, and at the same time fits with the side wall of the lower vertical portion 22. After the steel cage is hoisted into the casing, the support frame 3 is reinstalled on the base 1, so that the floating rod 31 is against the top side of the transverse portion 21, and the floating rod 31 is located between the main reinforcement of the steel cage and the upper vertical portion 23, and cannot be directly detached, thereby limiting the floating of the steel cage. The bearing rod 32 is against the bottom side of the transverse portion 21, and the bearing rod 32 is located between the main reinforcement of the steel cage and the lower vertical portion 22, and cannot be directly detached, thereby limiting the sinking of the steel cage. Thereby, the stable suspension of the steel cage is achieved, and the floating problem of the steel cage caused by welding defects of the suspension rods is effectively avoided. At the same time, since the connecting block 2 is detachable, it is easy to recycle and save resources.
[0037] In order to achieve the centering control of the steel cage in the casing, refer to Figure 1 and Figure 5, a centering control assembly 4 is also provided on the base 1, which is used to drive the steel cage to approach the center of the pouring hole. The centering control assembly 4 includes a guide rail 41, a sliding block 42, an outer extension frame 43, an abutment rod 44 and a synchronous sliding member. Three guide rails 41 are vertically and fixedly installed on the base 1, and all guide rails 41 are symmetrically arranged around the sleeve hole 11. Two sliding blocks 42 are slidingly arranged in each guide rail 41, and two outer extension frames 43 are set with equal lengths. One of the outer extension frames 43 is rotatably connected to one of the sliding blocks 42, and the other outer extension frame 43 is rotatably connected to the other sliding block 42. The abutment rod 44 is rotatably connected to one end of the two outer extension frames 43 away from the sliding block 42 at the same time, and can abut against the steel cage. A synchronous sliding member is provided on each guide rail 41, and the synchronous sliding member is used to drive the two sliding blocks 42 to synchronously approach or move away from each other. The synchronous sliding member is specifically a double-threaded screw 45, which is provided with two thread segments with opposite rotation directions and equal pitches. The double-threaded screw 45 is rotatably set in the guide rail 41, one of the thread segments is threadedly matched with one of the sliding blocks 42, and the other thread segment is threadedly matched with the other sliding block 42.
[0038] Reference Figure 1 and Figure 5 When it is necessary to control the steel cage to be centered in the casing, all double-threaded screws 45 are rotated, and the double-threaded screws 45 drive the two sliding blocks 42 on the same guide rail 41 to approach each other synchronously. The movement of the sliding block 42 drives one end of the outer extension frame 43 that is rotatably connected to it to move. The two outer extension frames 43 will rotate, and the angle will become smaller, pushing the abutment rod 44 away from the guide rail 41. The height position of the abutment rod 44 remains unchanged during the whole process. Multiple abutment rods 44 abut against the steel cage from different directions at the same time, and the position of the steel cage is gradually adjusted, thereby realizing the control of the centering of the steel cage in the casing.
[0039] In order to rotate all double-threaded screws 45 simultaneously, refer to Figure 1 , Figure 3 and Figure 4The bottom of the double-threaded screw 45 passes through the base 1 and is fixedly provided with a first sprocket 451. A transmission chain 46 is provided on the first sprocket 451 for common transmission. The transmission chain 46 is connected end to end, and each first sprocket 451 is pressed against the transmission chain 46 and meshes with the transmission chain 46. A transmission shaft 12 is provided inside the base 1 and is rotatably provided. A second sprocket 121 is fixedly provided at the bottom of the transmission shaft 12. A motor 14 is fixedly installed on the base 1, and a driving shaft of the motor 14 is connected to the top of the transmission shaft 12. When it is necessary to adjust the center of the steel cage, the motor 14 is started, and the motor 14 drives the second sprocket 121 to rotate through the transmission shaft 12. The second sprocket 121 drives the other first sprockets 451 to rotate synchronously through the transmission chain 46, so that all the double-threaded screws 45 rotate synchronously, realizing the synchronous action of the sliding blocks 42 in each guide rail 41, and ensuring that the abutment rod 44 synchronously adjusts the steel cage to the center.
[0040] In addition, if the diameter of the bored pile is large, refer to Figure 3 , an outer supporting sprocket 16 can also be rotatably arranged at the bottom of the base 1, and the outer supporting sprocket 16 also presses against the transmission chain 46 and meshes with the transmission chain 46. The outer supporting sprocket 16 simply increases the number of sprockets meshing on the inner side of the transmission chain 46, and supports the transmission chain 46 from the inner side of the transmission chain 46, so that the transmission chain 46 is away from the socket hole 11, thereby avoiding the transmission chain 46 from scratching the casing as much as possible.
[0041] Reference Figure 3 and Figure 4 The motor 14 is fixedly provided with a mounting frame 13, and the mounting frame 13 is provided with a second fixing bolt 131. The mounting frame 13 is mounted on the base 1 through the second fixing bolt 131. A slot 122 is provided at the top of the transmission shaft 12 for inserting the drive shaft of the power supply machine 14. A driving block 141 is vertically and fixedly provided on the drive shaft of the motor 14. A driving groove 1221 is provided on the side wall of the slot 122. The driving block 141 can be inserted into the driving groove 1221 and abut against the side wall of the driving groove 1221. The mounting frame 13 and the second fixing bolt 131 can realize the rapid installation and removal of the motor 14. The slot 122, the driving block 141, and the driving shaft can realize the transmission connection and separation between the drive shaft of the motor 14 and the transmission shaft 12. If the diameter of the bored pile is large, the weight of the motor 14 may cause the center of the base 1 to shift, which is not conducive to the installation of the socket hole 11 of the base 1 outside the casing. At this time, the motor 14 can be removed and reinstalled after the installation of the base 1 is completed, which is convenient for the installation and placement of the base 1.
[0042] The implementation principle of the central suspension tooling of a steel cage in the embodiment of the present application is as follows: before the steel cage is suspended and installed, the sleeve hole 11 is sleeved on the outside of the casing, and the base 1 is placed horizontally on the ground through the support legs 15. The main reinforcement of the steel cage is passed through the installation hole 211 of the connecting block 2, and the two tool clips 212 simultaneously restrict the main reinforcement of the steel cage from sliding in the installation hole 211, and the steel cage is connected to a plurality of connecting blocks 2.
[0043] When suspending and installing the steel cage, first remove the first fixing bolt 331 to separate the support frame 3 from the base 1, use a crane or other lifting equipment to lift the steel cage into the casing, and keep the crane suspending the steel cage.
[0044] Then, the steel cage is controlled to be centered, and the motor 14 is started. The motor 14 drives the transmission shaft 12 through the cooperation between the driving block 141 and the driving groove 1221 to drive the second sprocket 121 to rotate. The second sprocket 121 drives all the first sprockets 451 to rotate synchronously through the transmission chain 46, so as to drive all the double-threaded screws 45 to rotate together. Each double-threaded screw 45 drives the two sliding blocks 42 to approach each other, and the two outer extension frames 43 rotate and the angle becomes smaller, pushing the abutment rod 44 to move away from the guide rail 41. Multiple abutment rods 44 abut against the steel cage from different directions at the same time, so that the steel cage is located in the center of the casing.
[0045] Finally, the steel cage is suspended and the support frame 3 is reinstalled on the base 1, so that the float limit rod 31 is against the top side of the transverse portion 21, and the float limit rod 31 is located between the main reinforcement of the steel cage and the upper vertical portion 23, and cannot be directly detached, thereby limiting the steel cage from floating up. The load-bearing rod 32 is against the bottom side of the transverse portion 21, and the load-bearing rod 32 is located between the main reinforcement of the steel cage and the lower vertical portion 22, and cannot be directly detached, thereby limiting the steel cage from sinking. After the cast-in-place pile is cast, the connecting block 2 is removed from the upper main reinforcement and reused. In this way, the floating of the steel cage is avoided as much as possible, the stability of the steel cage suspension is improved, and the recycling of the suspension structure is facilitated.
[0046] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A steel cage central suspension tool, characterized by: The invention comprises a base (1) and a plurality of connection blocks (2) connected to the main bars of the steel cage, wherein the base (1) is provided with a sleeve hole (11) adapted to the casing, and a plurality of detachable support frames (3) are fixedly installed on the base (1), and all the support frames (3) are symmetrically arranged around the sleeve hole (11), and the support frames (3) correspond to the connection blocks (2) one by one, and a limited floating rod (31) and a bearing rod (32) are horizontally and fixedly arranged on the support frames (3); the connection block (2) comprises a transverse portion (21), a lower vertical portion (22), and an upper vertical portion (23), and the transverse portion (21), the lower vertical portion (22), and the upper vertical portion (23) are integrally formed. The cross section (21) is provided with a mounting hole (211) through the center thereof for the main reinforcement of the steel cage to pass through, and a tool clamp (212) is installed at each end of the mounting hole (211). The two tool clamps (212) are installed in opposite directions and clamp the same main reinforcement of the steel cage at the same time. The upper vertical section (23) is vertically arranged upward at one end of the cross section (21), and the lower vertical section (22) is vertically arranged downward at the other end of the cross section (21). The floating limit rod (31) abuts against the top side of the cross section (21) near the upper vertical section (23), and the bearing rod (32) abuts against the bottom side of the cross section (21) near the lower vertical section (22).
2. A steel cage central suspension tooling according to claim 1, characterized in that: A bottom bracket (33) is fixedly arranged at the bottom of the support frame (3), a plurality of first fixing bolts (331) are arranged on the bottom bracket (33), and the bottom bracket (33) is mounted on the base (1) via the first fixing bolts (331).
3. The steel cage central suspension tooling according to claim 1 is characterized in that: The floating limit rod (31) is in contact with the side wall of the upper vertical portion (23), and the bearing rod (32) is in contact with the side wall of the lower vertical portion (22).
4. The steel cage central suspension tooling according to claim 1 is characterized in that: A centering control component (4) is also provided on the base (1), and the centering control component (4) is used to drive the steel cage to approach the center of the sleeve hole (11).
5. A steel cage central suspension tooling according to claim 4, characterized in that: The centering control assembly (4) comprises a guide rail (41), a sliding block (42), an external extension frame (43), an abutment rod (44), and a synchronous sliding member. At least three guide rails (41) are vertically and fixedly installed on the base (1). All the guide rails (41) are symmetrically arranged around the sleeve hole (11). Two sliding blocks (42) are slidably arranged in the guide rail (41). Two external extension frames (43) are arranged. The two external extension frames (43) are equal in length. One of the outer extension frames (43) is rotatably connected to one of the sliding blocks (42), and the other outer extension frame (43) is rotatably connected to the other sliding block (42). The abutment rod (44) is rotatably connected to one end of the two outer extension frames (43) away from the sliding block (42). The abutment rod (44) can abut against the steel cage. The synchronous sliding member is arranged on each guide rail (41), and the synchronous sliding member is used to drive the two sliding blocks (42) to move synchronously toward or away from each other.
6. A steel cage central suspension tooling according to claim 5, characterized in that: The synchronous sliding member is a double-threaded screw (45), on which two thread segments with opposite rotation directions and equal pitches are arranged. The double-threaded screw (45) is rotatably arranged in the guide rail (41), one thread segment of the double-threaded screw (45) is threadably matched with one of the sliding blocks (42), and the other thread segment of the double-threaded screw (45) is threadably matched with the other sliding block (42).
7. A steel cage central suspension tooling according to claim 6, characterized in that: The bottom of the double-threaded screw (45) passes through the base (1) and is fixedly provided with a first sprocket (451); a transmission chain (46) is commonly provided on all the first sprockets (451); the transmission chains (46) are connected end to end; each of the first sprockets (451) is pressed against the transmission chain (46) and meshes with the transmission chain (46).
8. The steel cage central suspension tooling according to claim 7, characterized in that: A transmission shaft (12) is rotatably disposed through the base (1), a second sprocket (121) is fixedly disposed at the bottom of the transmission shaft (12), the second sprocket (121) is pressed against a transmission chain (46) and meshes with the transmission chain (46), a motor (14) is fixedly mounted on the base (1), and a drive shaft of the motor (14) is connected to the top of the transmission shaft (12).
9. A steel cage central suspension tooling according to claim 8, characterized in that: The motor (14) is fixedly provided with a mounting frame (13), the mounting frame (13) is provided with a second fixing bolt (131), and the mounting frame (13) is mounted on the base (1) via the second fixing bolt (131); a slot (122) for inserting the drive shaft of the power supply machine (14) is provided at the top of the transmission shaft (12), a driving block (141) is fixedly provided on the drive shaft of the motor (14), a driving groove (1221) is provided on the side wall of the slot (122), and the driving block (141) can be inserted into the driving groove (1221) and abut against the side wall of the driving groove (1221).
10. The steel cage central suspension tooling according to claim 1, characterized in that: A plurality of supporting legs (15) are fixedly arranged on the bottom of the base (1).