Coal series shale gas and sandstone gas combined mining and co-mining design method
By adopting branch pipeline design and real-time monitoring system in the joint exploitation of coal-bearing shale gas and sandstone gas, the problem of pipeline interference was solved, and safe and efficient coal-bearing gas exploitation was achieved.
Patent Information
- Application Number
- CN202411001901.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-05
AI Technical Summary
In existing design methods for the joint exploitation of coal-bearing shale gas and sandstone gas, pipelines for gas extraction in shale and sandstone formations are prone to mutual interference, leading to frequent accidents.
A branch pipeline design and real-time monitoring system are adopted. First and second underground gas transmission pipelines are inserted into the shale and sandstone layers respectively, and a monitoring and adjustment system is set up to ensure the safety and efficiency of the mining process.
This effectively avoids pipeline interference, improves the continuity and safety of extraction, enhances gas transmission efficiency, and reduces the probability of accidents.
Smart Images

Figure CN118895957A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mines, and in particular to a design method for joint mining of coal-bearing shale gas and sandstone gas. Background Art
[0002] Coal-bearing gas refers to all natural gas with methane as the main component that is present in coal-bearing strata and generated from coal-bearing hydrocarbon parent materials during the geological evolution process. It includes coalbed methane, tight sandstone gas, tight carbonate gas, coal-bearing shale gas and natural gas hydrates from coal-type gas sources.
[0003] After checking the publication number: CN11718916A, a method and system for the coordinated mining of coal and natural gas are disclosed, including: setting a natural gas collection chamber in the stable rock layer below the coal seam, and setting the coal-based gas collection equipment in the natural gas collection chamber, and extracting the natural gas in the sandstone layer below the rock layer; transporting the extracted natural gas to the ground through a gas pipeline, wherein the gas pipeline is sequentially arranged in the natural gas collection chamber, the coal mining tunnel and the auxiliary shaft, and the wellhead of the auxiliary shaft is arranged above the ground. By setting a natural gas collection chamber in the stable rock layer below the coal seam, and setting the coal-based gas collection equipment in the natural gas collection chamber, the natural gas in the sandstone layer below the rock layer is extracted. Since the natural gas well does not need to pass through the coal seam, it can effectively avoid the problem of natural gas well pressure in the process of coal and natural gas co-mining, and reduce the mining impact caused by coal seam mining and the impact of overburden fractures on the natural gas well.
[0004] Based on the above-mentioned prior art, the existing design method for the joint exploitation of coal-bearing shale gas and sandstone gas still has the following problems. When natural gas is currently exploited, most of the shale layer and sandstone layer gas exploitation pipelines will interact with each other, which will cause interference between the pipelines and easily cause accidents. Therefore, the present invention provides a design method for the joint exploitation of coal-bearing shale gas and sandstone gas. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention provides a design method for the joint exploitation of coal-bearing shale gas and sandstone gas, which solves the following problems in the existing design method for the joint exploitation of coal-bearing shale gas and sandstone gas: when natural gas is currently exploited, most of the shale layer and sandstone layer gas exploitation pipelines will interact with each other, interference will occur between the pipelines, and accidents are prone to occur.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a design method for the joint exploitation of coal-bearing shale gas and sandstone gas, including a rock layer, a shale layer and a sandstone layer are arranged in the lower layer of the rock layer, a coal-bearing gas collection device is arranged on the ground above the rock layer, a ground gas pipeline is arranged on one side of the coal-bearing gas collection device, the coal-bearing gas collection device is connected to a branch pipe through the ground gas pipeline, and a second underground gas pipeline is arranged below the coal-bearing gas collection device, and the second underground gas pipeline penetrates the rock layer and is inserted into the interior of the sandstone layer, and a plurality of branch pipes are arranged on the surface of the second underground gas pipeline.
[0007] Preferably, a first underground gas pipeline is provided at the bottom end of the gas station, and the bottom end of the first underground gas pipeline penetrates the rock layer and is inserted into the interior of the shale layer.
[0008] Preferably, a monitoring and adjustment system is provided inside the coal-bearing gas collection equipment to monitor the natural gas production situation in the shale layer and the sandstone layer and to adjust the production plan and production safety measures in a timely manner.
[0009] Preferably, the mining method includes: detailed exploration of the geological structure of the target area, shale layer and sandstone layer gas reservoir characteristics, and evaluation of the resource volume, mining potential and economic value of shale layer and sandstone layer gas.
[0010] Preferably, the mining method also includes: formulating a coordinated mining plan based on geological exploration results and resource assessment data, determining the mining area, dividing the mining layers, selecting the mining method, and separating the second underground gas pipeline from the first underground gas pipeline to mine the shale layer and the sandstone layer, and designing the mining process to ensure the combined mining of shale layer and sandstone layer gas.
[0011] Preferably, the mining method also includes: designing the layout of the pipeline according to the joint mining plan, and the layout of the pipeline should meet the needs of shale and sandstone gas mining, while considering factors such as the distance and depth between the pipelines to avoid mutual interference and safety hazards.
[0012] Preferably, the mining method further comprises: designing a shale layer and sandstone layer gas extraction system, wherein the extraction system should ensure efficient collection, safe transportation and effective utilization of shale layer and sandstone layer gas.
[0013] Preferably, the mining method further comprises: during the shale gas extraction process, simultaneously implementing sandstone gas extraction, and realizing the combined extraction of shale and sandstone gas through a reasonable mining sequence and extraction strategy.
[0014] Preferably, the mining method further comprises: formulating strict production safety measures to ensure the safety and stability of the mining process, including the construction of a ventilation system, and fire and explosion prevention measures.
[0015] Preferably, the mining method also includes: during the mining process, real-time monitoring of the mining situation of shale layer and sandstone layer gas through a monitoring and adjustment system, timely adjustment of mining planning and production safety measures, and use of advanced monitoring technology and data analysis methods to optimize mining strategies and improve mining efficiency and resource utilization.
[0016] The present invention provides a design method for the joint exploitation of coal-bearing shale gas and sandstone gas. Compared with the prior art, it has the following beneficial effects:
[0017] 1. In the design method for the joint exploitation of coal-bearing shale gas and sandstone gas, the shale layer and sandstone layer gas extraction pipelines do not directly interact with each other, which can ensure that the two extraction processes do not interfere with each other, reduce the probability of accidents, and thus ensure the continuity and efficiency of coal-bearing gas extraction.
[0018] 2. The design method for the joint exploitation of coal-bearing shale gas and sandstone gas is characterized by arranging multiple branch pipes on the outer sides of the first underground gas pipeline and the second underground gas pipeline. Branching into multiple pipelines can significantly increase the transportation capacity of coal-bearing gas in the ore layer, which helps to meet the high demand for coal-bearing gas in large-scale mining processes and ensure the continuity and efficiency of the mining process. Compared with a single pipeline, a multi-pipeline system can transport coal-bearing gas in parallel, thereby improving the overall gas transmission efficiency without increasing additional pressure loss.
[0019] 3. The design method for the joint mining of coal-bearing shale gas and sandstone gas has a monitoring and adjustment system in the internal design of the coal-bearing gas collection equipment, so that the operating status of the coal-bearing gas collection equipment can be monitored in real time, including key parameters such as pressure, temperature, and flow. Once these parameters are abnormal, the system can immediately issue an alarm, so as to timely discover potential safety hazards and prevent accidents. Through real-time monitoring of the equipment status, safety risks such as equipment overload and leakage can be avoided to ensure the safety of the mining process. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural layout diagram of the present invention;
[0021] Figure 2 It is a top view of the first and second underground gas pipelines of the present invention;
[0022] Figure 3 It is the collection flow diagram of the present invention;
[0023] Figure 4 It is a diagram of the method steps of the present invention;
[0024] Figure 5 The coal-based gas collection equipment of the present invention includes FIG.
[0025] In the figure: 1-rock layer, 2-shale layer, 3-sandstone layer, 4-gas station, 5-first underground gas pipeline, 6-branch pipe, 7-surface gas pipeline, 8-coal-bearing gas collection equipment, 9-second underground gas pipeline. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] See also Figure 1-Figure 5 , the present invention provides a technical solution:
[0028] A design method for the joint exploitation of coal-bearing shale gas and sandstone gas comprises a rock layer 1, a shale layer 2 and a sandstone layer 3 are arranged below the rock layer 1, a coal-bearing gas collection device 8 is arranged on the ground above the rock layer 1, a ground gas pipeline 7 is arranged on one side of the coal-bearing gas collection device 8, the coal-bearing gas collection device 8 is connected to a branch pipe 6 through the ground gas pipeline 7, and a second underground gas pipeline 9 is arranged below the coal-bearing gas collection device 8, and the second underground gas pipeline 9 penetrates the rock layer 1 and is inserted into the interior of the sandstone layer 3, and a plurality of branch pipes 6 are arranged on the surface of the second underground gas pipeline 9.
[0029] In this embodiment, a first underground gas pipeline 5 is provided at the bottom end of the gas station 4 , and the bottom end of the first underground gas pipeline 5 penetrates the rock layer 1 and is inserted into the interior of the shale layer 2 .
[0030] The shale layer and sandstone layer gas extraction pipelines do not interact directly, which can ensure that the two extraction processes do not interfere with each other, reduce the probability of accidents, and thus ensure the continuity and efficiency of coal-bearing gas extraction.
[0031] Multiple branch pipes are arranged on the outside of the first underground gas pipeline and the second underground gas pipeline. Branching into multiple pipelines can significantly increase the transportation capacity of coal-based gas in the mineral layer, help meet the high demand for coal-based gas in large-scale mining processes, and ensure the continuity and efficiency of the mining process. Compared with a single pipeline, a multi-pipeline system can transport coal-based gas in parallel, thereby improving the overall gas transmission efficiency without increasing additional pressure loss.
[0032] In this embodiment, a monitoring and adjustment system is provided inside the coal-based gas collection equipment 8 to monitor the natural gas production conditions in the shale layer and the sandstone layer and to adjust the production plan and production safety measures in a timely manner.
[0033] The internal design of the coal-based gas collection equipment is equipped with a monitoring and adjustment system, which can monitor the operating status of the coal-based gas collection equipment in real time, including key parameters such as pressure, temperature, and flow. Once these parameters are abnormal, the system can immediately issue an alarm, thereby promptly discovering potential safety hazards and preventing accidents. Through real-time monitoring of the equipment status, safety risks such as equipment overload and leakage can be avoided to ensure the safety of the mining process.
[0034] In this embodiment, the mining method includes: detailed exploration of the geological structure of the target area, the characteristics of the shale and sandstone gas reservoirs, and evaluation of the resource volume, mining potential, and economic value of the shale and sandstone gas.
[0035] In this embodiment, the mining method also includes: formulating a coordinated mining plan based on geological exploration results and resource assessment data, determining the mining area, dividing the mining layers, selecting the mining method, and separating the second underground gas pipeline 9 from the first underground gas pipeline 5 to mine the shale layer 2 and the sandstone layer 3, and designing the mining process to ensure the combined mining of gas from the shale layer 2 and the sandstone layer 3.
[0036] In this embodiment, the mining method also includes: designing the layout of the pipeline according to the joint mining plan. The layout of the pipeline should meet the needs of shale layer 2 and sandstone layer 3 gas mining, while considering factors such as the distance and depth between the pipelines to avoid mutual interference and safety hazards.
[0037] In this embodiment, the mining method also includes: designing a shale layer and sandstone layer gas extraction system, and the extraction system should ensure the efficient collection, safe transportation and effective utilization of the shale layer and sandstone layer gas.
[0038] In this embodiment, during the shale layer gas extraction process, sandstone layer gas extraction is simultaneously implemented, and the combined extraction of shale layer and sandstone layer gas is achieved through a reasonable production sequence and extraction strategy.
[0039] In this embodiment, the mining method also includes: formulating strict production safety measures to ensure the safety and stability of the mining process, including the construction of a ventilation system and fire and explosion prevention measures.
[0040] In this embodiment, the mining method also includes: during the mining process, real-time monitoring of the mining situation of shale layer and sandstone layer gas through a monitoring and adjustment system, timely adjustment of mining plans and production safety measures, and use of advanced monitoring technology and data analysis methods to optimize mining strategies and improve mining efficiency and resource utilization.
[0041] In summary, first, the geological structure, shale layer and sandstone layer gas reservoir characteristics of the target area are explored in detail, and the resource volume, mining potential and economic value of the shale layer and sandstone layer gas are evaluated. Then, based on the geological exploration results and resource evaluation data, a coordinated mining plan is formulated to determine the mining area, divide the mining layers, select the mining method, and separate the second underground gas pipeline 9 from the first underground gas pipeline 5 to mine the shale layer 2 and the sandstone layer 3. The mining process is designed to ensure the combined mining of the shale layer 2 and the sandstone layer 3 gas. Then, according to the combined mining plan, the layout of the pipeline is designed. The layout of the pipeline should meet the needs of shale layer 2 and sandstone layer 3 gas mining. At the same time, factors such as the distance and depth between the pipelines should be considered to avoid mutual interference and safety hazards. Secondly, design the shale and sandstone gas extraction system. The extraction system should ensure the efficient collection, safe transportation and effective utilization of shale and sandstone gas. Furthermore, in the process of shale gas extraction, sandstone gas extraction should be implemented at the same time. Through reasonable mining sequence and extraction strategy, the combined mining of shale and sandstone gas can be realized. Then, strict safety production measures should be formulated to ensure the safety and stability of the mining process, including ventilation system construction, fire prevention and explosion prevention measures. Finally, in the mining process, the mining situation of shale and sandstone gas should be monitored in real time through the monitoring and adjustment system, and the mining plan and safety production measures should be adjusted in time. Advanced monitoring technology and data analysis methods should be used to optimize the mining strategy and improve mining efficiency and resource utilization.
[0042] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0043] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0044] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A design method for joint mining of coal-bearing shale gas and sandstone gas, characterized by: The invention comprises a rock layer (1), wherein a shale layer (2) and a sandstone layer (3) are arranged below the rock layer (1), a coal-bearing gas collection device (8) is arranged on the ground above the rock layer (1), a ground gas pipeline (7) is arranged on one side of the coal-bearing gas collection device (8), the coal-bearing gas collection device (8) is connected to a branch pipe (6) via the ground gas pipeline (7), and a second underground gas pipeline (9) is arranged below the coal-bearing gas collection device (8), and the second underground gas pipeline (9) penetrates the rock layer (1) and is inserted into the interior of the sandstone layer (3), and a plurality of branch pipes (6) are arranged on the surface of the second underground gas pipeline (9).
2. A method for designing the joint exploitation of coal-bearing shale gas and sandstone gas according to claim 1, characterized in that: A first underground gas pipeline (5) is provided at the bottom end of the gas station (4), and the bottom end of the first underground gas pipeline (5) penetrates the rock layer (1) and is inserted into the interior of the shale layer (2).
3. The method for designing the joint exploitation of coal-bearing shale gas and sandstone gas according to claim 1 is characterized by: The coal-measure gas collection equipment (8) is internally provided with a monitoring and adjustment system to monitor the natural gas extraction conditions of the shale layer and the sandstone layer and to timely adjust the extraction plan and production safety measures.
4. The method for designing the joint exploitation of coal-bearing shale gas and sandstone gas according to claim 1, characterized in that: The mining method includes: detailed exploration of the geological structure of the target area, the characteristics of the shale and sandstone gas reservoirs, and evaluation of the resource volume, mining potential and economic value of the shale and sandstone gas.
5. The method for designing the joint exploitation of coal-bearing shale gas and sandstone gas according to claim 1 is characterized by: The mining method further comprises: formulating a coordinated mining plan based on geological exploration results and resource assessment data, determining the mining area, dividing the mining layers, selecting the mining method, and separating the second underground gas pipeline (9) from the first underground gas pipeline (5) to mine the shale layer (2) and the sandstone layer (3), and designing the mining process to ensure the combined mining of the shale layer (2) and the sandstone layer (3).
6. The method for designing the joint exploitation of coal-bearing shale gas and sandstone gas according to claim 1 is characterized by: The mining method further includes: designing the layout of pipelines according to the joint mining plan, wherein the layout of pipelines should meet the requirements of gas mining in the shale layer (2) and the sandstone layer (3), while considering factors such as the distance and depth between pipelines to avoid mutual interference and safety hazards.
7. The method for designing the joint exploitation of coal-bearing shale gas and sandstone gas according to claim 1, characterized in that: The mining method also includes: designing a shale layer and sandstone layer gas extraction system, and the extraction system should ensure the efficient collection, safe transportation and effective utilization of the shale layer and sandstone layer gas.
8. The method for designing the joint exploitation of coal-bearing shale gas and sandstone gas according to claim 1 is characterized by: The mining method also includes: during the shale layer gas extraction process, simultaneously implementing sandstone layer gas extraction, and realizing the combined extraction of shale layer and sandstone layer gas through a reasonable mining sequence and extraction strategy.
9. The method for designing the joint exploitation of coal-bearing shale gas and sandstone gas according to claim 1, characterized in that: The mining method also includes: formulating strict production safety measures to ensure the safety and stability of the mining process, including the construction of ventilation systems and fire and explosion prevention measures.
10. The method for designing the joint exploitation of coal-bearing shale gas and sandstone gas according to claim 1, characterized in that: The mining method also includes: during the mining process, real-time monitoring of the mining status of shale layer and sandstone layer gas through a monitoring and adjustment system, timely adjustment of mining plans and production safety measures, and use of advanced monitoring technology and data analysis methods to optimize mining strategies and improve mining efficiency and resource utilization.