Method and device for separating gas through pressure swing adsorption
By using adjustable valves and high-pressure towers in the pressure-switch adsorption separation gas device, the process flow and timing are optimized, and the adsorbent fluidization and product gas fluctuations caused by diameter fixation are solved, thereby improving hydrogen recovery Rate and output stability extend the life of the adsorbent.
Patent Information
- Application Number
- CN202411182639.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-08
AI Technical Summary
The existing pressure-switch adsorption separation gas device is fixed in the pressure equalization, reverse discharge and final charging steps, resulting in fluidization, powderization, and large fluctuations in the product gas, and lacks fine control of the fluctuation process, affecting the adsorbent. Regeneration effect and stable output of product gas.
The adjustable valve controls the pressure equalization and reverse discharge steps. The high-pressure tower and the low-pressure tower are directly connected to the air-release and flush. In the final charging step, raw material gas or raw material gas plus product gas are used for final charging, and the process flow and timing are optimized to Achieve more granular control.
Improve the recovery rate and output stability of product gas, extend the service life of adsorbent, control the average pressure gas speed and reverse air discharge flow through adjustable valves, avoiding the fluidization of adsorbent, achieving better desorption effect and continuous stability Final charge.
Smart Images

Figure CN118904016A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of preparing hydrogen by pressure swing adsorption, and in particular relates to a method and a device for separating gas by pressure swing adsorption. Background Art
[0002] Pressure swing adsorption technology is an important method for separating gases. In existing pressure swing adsorption gas separation devices, multiple towers are usually operated, and a pressure swing adsorption cycle usually includes steps such as adsorption, pressure drop, forward release, reverse release, flushing, pressure increase, and final filling. The pressure equalization step can recover energy, and at the same time recover and utilize the useful components remaining in the dead space in the adsorption bed at the end of adsorption. The appropriate pressure equalization final pressure can not only ensure the purity of the product gas, but also optimize the recovery rate of the product gas. At present, the programmable valve used in the pressure equalization step has a fixed diameter, and the pressure equalization speed and pressure equalization time are not easy to control, which is not conducive to adjusting to the appropriate pressure equalization final pressure, and it is easy to cause fluidization and pulverization of the adsorbent in the adsorption tower.
[0003] The downstream step usually further recovers the useful components in the dead space to be used as flushing gas to directly flush another tower, but there is a lack of more detailed research on how to make direct flushing achieve better desorption effect.
[0004] The reverse step further reduces the pressure, allowing the impurities adsorbed in the adsorbent to be desorbed. At present, the diameter of the programmable valve used in the reverse step is also fixed. However, during the reverse step, since the direction of gas discharge from the adsorption tower is opposite to the adsorption direction, the process in which the gas at the product gas end of the tower is discharged from the gas inlet end is equivalent to a pre-flushing process. If this process can be more finely controlled, the regeneration effect of the adsorbent will be further improved.
[0005] The final filling step makes the pressure of the adsorption tower finally rise to the adsorption pressure. At present, product gas is generally used for final filling, which will cause the product gas to fluctuate greatly and cannot be output stably. Summary of the invention
[0006] In view of the above problems, the present invention provides a method and apparatus for separating gas by pressure swing adsorption, which can improve the recovery rate of product gas while enhancing the stability of product gas output and prolonging the service life of the adsorbent.
[0007] The technical solution provided by the present invention is:
[0008] A method for separating gas by pressure swing adsorption, the pressure swing adsorption device comprising at least four adsorption towers; industrial gas containing target components passes through the adsorption towers to obtain product gas; each adsorption tower sequentially undergoes the following seven basic steps: adsorption step, pressure drop step, forward discharge step, reverse discharge step, forward discharge gas flushing step, pressure increase step, and raw gas final filling step;
[0009] in
[0010] In the pressure-dropping and pressure-raising steps, the pressure-equalizing valve is an adjustable valve;
[0011] and / or,
[0012] In the step of flushing with the discharged gas, the high-pressure tower is directly connected to the low-pressure tower, and the discharged gas from the high-pressure tower directly flushes the low-pressure tower, and the timing is optimized;
[0013] and / or,
[0014] In the reversing step, an adjustable valve is used for the reversing valve, and the reversing valve is gradually opened during the reversing process;
[0015] and / or,
[0016] In the final filling step, the raw gas is used for final filling, or the raw gas and the product gas are used for final filling simultaneously.
[0017] The pressure swing adsorption device comprises at least four adsorption towers, preferably six adsorption towers; the industrial gas containing the target component passes through the adsorption towers at a certain pressure.
[0018] Further preferred, a method for separating gas by pressure swing adsorption, using a pressure swing adsorption device to remove impurities from industrial gas containing target components and impurity components, to obtain a product gas containing a high-purity target component; the target component is one or more of hydrogen, helium, argon or neon, preferably, the target component is hydrogen; the impurity components are carbon dioxide, methane, nitrogen, carbon monoxide, etc.; the pressure swing adsorption device includes at least four adsorption towers and a plurality of control valves for controlling the flow and disconnection of gas flow; industrial gas passes through the adsorption tower at a certain pressure at room temperature to obtain product gas; each adsorption tower is equipped with an adsorbent that can selectively adsorb impurity gas; each adsorption tower sequentially undergoes seven basic steps, namely, adsorption step, pressure drop step, forward release step, reverse release step, forward release gas flushing step, pressure rise step, and raw gas final filling step. In the above seven basic steps, different process flows can be designed by selecting the time of the steps; the timing steps of the four-tower or multi-tower process are set by controlling the switch of the valve, and the industrial gas containing the target component is used as the raw gas by alternating the four or multi-towers to continuously produce the product gas.
[0019] Further preferably, the target component is a non-adsorbed phase.
[0020] Taking hydrogen as an example, the specific process control of the pressure swing adsorption cycle of the present invention is as follows:
[0021] Adsorption (AD): Depending on the amount of gas to be processed, one or more adsorption towers are selected to simultaneously feed hydrogen-containing industrial gas. The adsorption pressure is selected to be 0.3-5.5MPa (gauge pressure), and the optimal selection is 0.6-4.0MPa (gauge pressure). The adsorbent in the adsorption tower can be selected from one or more of molecular sieves, activated carbon, silica gel, and other adsorbents that can selectively adsorb impurities such as carbon dioxide, methane, nitrogen, carbon monoxide, argon, etc. The hydrogen-containing industrial gas enters from the air inlet end at the bottom of the adsorption tower, and gases such as carbon dioxide, methane, nitrogen, carbon monoxide, argon, etc. are adsorbed by the adsorbent as impurities, and hydrogen is drawn out from the product gas end at the top of the adsorption tower as product gas.
[0022] Equalizing pressure drop step (ED): The purpose of the equalizing pressure drop step is to make the high-pressure gas in the dead space of the high-pressure tower evenly flow into the low-pressure tower. While recovering hydrogen, the pressure of the high-pressure tower decreases and the pressure of the low-pressure tower increases. As needed, one or more equalizing pressure drops can be performed. If only one equalizing pressure drop is performed, at the product gas end of the adsorption tower, the high-pressure tower at the end of adsorption is connected to the low-pressure tower that has completed the flushing step of venting and performing equalizing pressure drop. If multiple equalizing pressure drops are performed, the high-pressure tower that performs the last equalizing pressure drop is connected to the low-pressure tower that has completed the flushing step of venting and then connected to the low-pressure tower that has completed the last equalizing pressure increase in turn, and other equalizing pressure drops are performed until the high-pressure tower at the end of adsorption is connected to the corresponding low-pressure tower to complete the first equalizing pressure drop. For example, when there are three pressure equalization processes, the high-pressure tower that has completed the second pressure drop is connected to the low-pressure tower that has completed the forward venting and flushing step to perform the third pressure drop; the high-pressure tower that has completed the first pressure drop is connected to the low-pressure tower that has completed the third pressure increase to perform the second pressure drop; the high-pressure tower at the end of adsorption is connected to the low-pressure tower that has completed the second pressure increase to perform the first pressure drop.
[0023] Forward discharge step (PP): At the product gas end of the adsorption tower, the high-pressure tower where the equalization pressure drop is completed is connected with the low-pressure tower where the reverse discharge step is completed, so that the hydrogen-containing gas in the dead space of the high-pressure tower is forwardly discharged into the low-pressure tower. On the one hand, the pressure of the high-pressure tower is further reduced; on the other hand, the hydrogen-containing gas in the dead space of the high-pressure tower is further recovered to flush the low-pressure tower, and the desorbed gas obtained by flushing is discharged from the air inlet end of the low-pressure tower.
[0024] Reverse step (BD): After the forward step, the gas in the tower is discharged to the outside of the tower in the opposite direction of the air inlet until the pressure in the tower drops to atmospheric pressure, at which time the adsorbent in the tower is partially desorbed.
[0025] Forward gas flushing (P): connect the low-pressure tower after the inversion step with the high-pressure tower in the forward step, and flush the low-pressure tower with forward gas to achieve deeper desorption of the adsorbent.
[0026] Pressure equalization step (ER): The purpose of pressure equalization is to make the high-pressure gas in the dead space of the high-pressure tower flow to the low-pressure tower. While recovering hydrogen, the pressure of the high-pressure tower decreases and the pressure of the low-pressure tower increases. One or more pressure equalization steps can be performed as needed. If only one pressure equalization step is performed, at the product gas end of the tower, the low-pressure tower that has completed the flushing step of venting gas is connected to the high-pressure tower that has finished adsorption, and the pressure equalization step is performed. If multiple pressure equalization steps are performed, the low-pressure tower that has completed the flushing step of venting gas is connected to the high-pressure tower that has started the last pressure equalization step, and the pressure equalization step is performed; then, the low-pressure tower that has started the last pressure equalization step is connected in turn to complete the other pressure equalization steps, until it is connected to the high-pressure tower that has finished adsorption to complete the first pressure equalization step. For example, when there are three pressure equalization processes, the low-pressure tower that has completed the forward venting and flushing step is connected to the high-pressure tower that has started the third pressure drop for the third pressure equalization, and the low-pressure tower that has completed the third pressure equalization is connected to the high-pressure tower that has started the second pressure drop for the second pressure equalization; the low-pressure tower that has completed the second pressure equalization is connected to the high-pressure tower at the end of adsorption for the first pressure equalization.
[0027] Final filling (FR): After the flushing of the vent gas is completed, the adsorption tower is finally pressurized with raw gas or raw gas plus product gas so that the pressure in the adsorption tower reaches the adsorption working pressure.
[0028] It is further preferred that the pressure equalizing valve involved in the pressure drop and pressure increase steps adopts an adjustable valve. Compared with the switch valve commonly used in the prior art, the present invention controls the pressure equalization speed and obtains the optimal final pressure of the pressure equalization by adjusting the opening of the pressure equalizing valve, thereby improving the recovery rate of the product gas and extending the service life of the adsorbent.
[0029] It is further preferred that in the discharge step and the discharge gas flushing step, the high-pressure tower is directly connected to the low-pressure tower, and the discharge gas of the high-pressure tower directly flushes the low-pressure tower, and the timing is optimized. The preferred method for optimizing the timing is to divide the discharge gas into n parts in chronological order, where n is an integer greater than 1, and the earlier the discharge gas is, the less impurity content it has; the discharge gas of different parts flushes different towers, so that a flushed low-pressure tower can be flushed by the discharge gas with a higher impurity content in the later stage of the discharge, and then by the discharge gas with a lower impurity content in the early stage of the discharge, so that the adsorption bed is better desorbed and has a better concentration distribution, which is beneficial to improve the recovery rate of the product gas.
[0030] For further optimization, in the reverse step, an adjustable valve is used for the reverse valve, and the reverse valve is gradually opened during the reverse process, so that the reverse gas flow passes through the bed evenly throughout the reverse process, thereby allowing the adsorption bed to be better desorbed, which is beneficial to improving the recovery rate of the product gas.
[0031] Further optimization is carried out, in the final filling step, the final filling of raw gas is adopted, or the final filling of raw gas and product gas is carried out simultaneously, at which time the volume ratio of product gas to the final total pressurized gas is 1-20%. And through the optimization of timing, the final filling is realized continuously and stably throughout the whole cycle, so that the adsorption tower can stably input the feed gas during the whole operation cycle, and the stability of the product gas output is enhanced.
[0032] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention provides a device and method for separating gas by pressure swing adsorption, which removes impurities from industrial gas containing target components and impurity components through a pressure swing adsorption device to obtain product gas containing high-purity target components, and has the characteristics of improving the recovery rate of product gas, enhancing the stability of product gas output, and extending the service life of the adsorbent. The inventor unexpectedly discovered that the recovery rate of product gas can be improved by optimizing one of the equipment, process and timing optimization; and optimizing the above items at the same time produces a synergistic effect.
[0033] Specifically, the advantages of the present invention include:
[0034] (1) Improving the recovery rate of product gas. Since the pressure equalization step is controlled by an adjustable valve, it is beneficial to adjust to the optimal final pressure of the pressure equalization. The reverse discharge step is controlled by an adjustable valve, so that the reverse discharge gas flow passes through the bed more evenly during the entire reverse discharge process, which is beneficial to the desorption of the bed. The forward discharge and forward discharge gas flushing steps are optimized, so that the bed is more fully desorbed; thus, the recovery rate of product gas can be further improved.
[0035] (2) Enhance the stability of product gas output. By using raw gas for final filling and optimizing the timing to achieve continuous and stable final filling throughout the entire cycle, stable output of product gas can be achieved.
[0036] (3) Prolonging the service life of the adsorbent. Since the pressure equalization step is controlled by an adjustable valve, the pressure equalization gas velocity can be better controlled, avoiding the possibility of fluidization, thereby prolonging the service life of the adsorbent. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a flow chart of the method for separating gas by pressure swing adsorption provided by the present invention;
[0038] Figure 2 is the pressure equalization speed when the pressure equalization valve is a switch valve (comparative example 1) and an adjustable valve (example 2);
[0039] Figure 3 is the reverse discharge air flow rate when the reverse discharge valve is a switch valve (comparative example 1) and an adjustable valve (example 4);
[0040] Figure 4are the product gas flow rates when the product gas is finally filled (Comparative Example 1) and the raw material gas is finally filled (Example 5).
[0041] In the attached figure, T1-the first adsorption tower, T2-the second adsorption tower, T3-the third adsorption tower, T4-the fourth adsorption tower, T5-the fifth adsorption tower, T6-the sixth adsorption tower, V1-the desorption gas tank, 1-the pressure equalizing valve, 2-the forward valve, and 3-the reverse valve. DETAILED DESCRIPTION
[0042] The present invention is further described below by way of examples in conjunction with the accompanying drawings, but the scope of the present invention is not limited in any way. In the following examples 1 to 5 and comparative example 1, the industrial gas compositions treated are: argon 0.02%, methane 0.03%, carbon monoxide 12.60%, carbon dioxide 1.00%, hydrogen 84.35%, nitrogen 2.00% (all in mole percentage); the adsorption pressure is 3.4MPa (gauge pressure); the desorption pressure is 0.01MPa (gauge pressure); the operation is carried out at room temperature; activated carbon and 5A molecular sieve are used as adsorbents.
[0043] Embodiment 1
[0044] The present invention provides a device and method for preparing hydrogen by pressure swing adsorption, wherein impurities in industrial gas containing hydrogen and impurity gases are removed by a pressure swing adsorption device to obtain a product gas containing high-purity hydrogen. The device for preparing hydrogen by pressure swing adsorption comprises at least four adsorption towers; the industrial gas containing hydrogen passes through the adsorption towers; each adsorption tower sequentially undergoes seven basic steps, namely, an adsorption step, a pressure drop step, a forward release step, a reverse release step, a forward release gas flushing step, a pressure increase step, and a raw gas final filling step. In the above seven basic steps, different process flows can be designed by selecting the time of the steps; the timing steps of the process steps of four or more towers are set by controlling the switch of the valve, and the use of the industrial gas containing hydrogen as the raw gas is realized by alternating the use of the four or more towers to continuously produce hydrogen.
[0045] Figure 1 The following examples are implemented by the method of the present invention, and the pressure swing adsorption device used is a system composed of six adsorption towers. The timing of one cycle of the system is shown in Table 1.
[0046] Table 1 Example 1 Cycle sequence of six-tower pressure swing adsorption to prepare hydrogen
[0047]
[0048] AD-adsorption, ED1-primary average pressure drop, ED2-secondary average pressure drop, PP-forward discharge, BD-reverse discharge, P-forward discharge and flushing, ER1-primary average pressure increase, ER2-secondary average pressure increase, FR-final charge.
[0049] As shown in Table 1, in each period of the adsorption regeneration cycle, the towers of the system are in different working states. For example, in a period shown in the bold box in Table 1, the working conditions of the towers are:
[0050] The T1 tower is in the adsorption step. The industrial gas containing hydrogen enters the tower from the bottom for adsorption. The impurities in the industrial gas are retained in the adsorption bed by the adsorbent, and the qualified hydrogen product gas is drawn out from the top of the tower.
[0051] In the first half of the time, the T2 tower is in a step of equalizing and final charging. The top of the tower is connected to the T6 tower which is in a step of equalizing and lowering for pressure equalization, while the bottom of the tower is finally charged with raw gas through the intake. In the second half of the time, the equalizing pressure increase is stopped and the final charging of raw gas continues.
[0052] The first half of the T3 tower is in the flushing step, and the downstream gas from the T5 tower is used to flush it, and the desorbed gas is discharged from the bottom of the T3 tower. At this time, the T3 tower enters the final stage of flushing, and the downstream gas from the T5 tower entering it is the downstream gas with a higher hydrogen content in the first half of the downstream discharge; the second half of the time is in the second equalization step, and the top of the tower is connected to the T6 tower in the second equalization step for pressure equalization.
[0053] The T4 tower is in the reverse discharge step in the first half, and the desorbed gas is discharged from the bottom of the tower; the second half is in the forward discharge flushing step, and the forward discharge gas from the T5 tower is flushed, and the desorbed gas is discharged from the bottom of the T4 tower. At this time, the T4 tower has just entered the initial stage of flushing, and the forward discharge gas from the T5 tower entering it is the forward discharge gas with a lower hydrogen content in the second half of the forward discharge.
[0054] The T5 tower is in the sequential placement step.
[0055] The first half of the T6 tower is in the first equalization step; the second half of the T6 tower is in the second equalization step.
[0056] In the pressure equalization step, the pressure equalization valve adopts an adjustable valve. By adjusting the pressure equalization valve, a suitable pressure equalization speed is obtained to avoid fluidization in the tower, thereby ensuring the service life of the adsorbent; at the same time, the pressure at the end of the pressure equalization is adjusted to the optimal performance point of the device, 1.40MPa (gauge pressure). In the forward release step, the forward release gas is divided into two parts, the first part is the part with less impurity content in the early stage, and the second part is the part with more impurity content in the later stage. In the reverse release step, the reverse release valve adopts an adjustable valve, and the reverse release valve is adjusted. When the reverse release valve is gradually opened, a more uniform flushing gas volume can pass through the entire reverse release process, which is beneficial to the desorption of the bed, thereby obtaining better device performance. In the flushing step, the flushing sequence is adjusted, and the adsorption tower is first flushed with the second part of the forward release gas in the forward release step, and then the adsorption tower is flushed with the first part of the forward release gas in the forward release step, thereby achieving better flushing effect and concentration distribution in the tower. In the final filling step, continuous raw gas final filling is used throughout the operation cycle, which also makes the raw gas intake flow rate and product gas flow rate more stable.
[0057] The obtained product gas composition is 0.012% argon, no methane detected, 13 ppm carbon monoxide, no carbon dioxide detected, 99.984% hydrogen, and 27 ppm nitrogen; the hydrogen yield is 90.8%.
[0058] Comparative Example 1
[0059] This comparative example provides a method for preparing hydrogen by pressure swing adsorption. The pressure swing adsorption device used is a system consisting of six adsorption towers. The timing of one cycle of the system is shown in Table 1.
[0060] Table 2 Comparative Example 1 Cycle sequence of hydrogen preparation by six-tower pressure swing adsorption
[0061]
[0062] As shown in Table 2, in each period of the adsorption regeneration cycle, the towers of the system are in different working states. For example, in a period shown in the bold box in Table 2, the working conditions of the towers are:
[0063] Tower T1 and tower T2 are in the adsorption step. Industrial gas containing hydrogen enters the tower from the bottom for adsorption. Impurities in the industrial gas are retained in the adsorption bed by the adsorbent, and qualified product gas is drawn out from the top of the tower.
[0064] In the first half of the time, the T3 tower is in an equalizing step, and the top of the tower is connected to the T6 tower which is in an equalizing step for pressure equalization; in the second half of the time, the pressure equalization is stopped and the tower is finally filled with product gas.
[0065] The T4 tower is in the flushing step in the first half of the time, and is flushed by the downstream gas from the T5 tower, and the desorbed gas is discharged from the bottom of the T4 tower. At this time, the downstream gas from the T5 tower entering it is the downstream gas with higher hydrogen content that flushes first, and the downstream gas with lower hydrogen content flushes later; the second half of the time is in the second equalization step, and the top of the tower is connected to the T6 tower in the second equalization step for pressure equalization.
[0066] The first half of the T5 tower is in the forward placement step; the second half is in the reverse placement step.
[0067] The first half of the T6 tower is in the first equalization step; the second half of the T6 tower is in the second equalization step.
[0068] Compared with Example 1, the difference is that: in the pressure equalization step, the pressure equalization valve adopts a switch valve. When the adsorption pressure drop is completed, it will be equalized to 1.14MPa (gauge pressure) with the tower in the pressure rise. In the forward discharge step, the forward discharge is one part. In the reverse discharge step, the reverse discharge valve adopts a switch valve. In the flushing step, the forward discharge with higher hydrogen content is flushed first, and the forward discharge with lower hydrogen content is flushed later. In the final filling step, the product gas is used for final filling.
[0069] The obtained product gas composition is 0.013% argon, no methane detected, 14 ppm carbon monoxide, no carbon dioxide detected, 99.983% hydrogen, and 27 ppm nitrogen; the hydrogen yield is 88.8%.
[0070] Embodiment 2
[0071] Compared with the comparative example 1, the difference is that the pressure equalizing valve in the embodiment 2 is changed into an adjustable valve, and the appropriate pressure equalizing speed is obtained by adjusting the pressure equalizing valve. Figure 2 As shown, fluidization in the tower is avoided, thereby ensuring the service life of the adsorbent; at the same time, the final pressure of the equalization pressure is adjusted to the optimal performance point of the device, 1.40 MPa (gauge pressure).
[0072] The obtained product gas composition is 0.012% argon, no methane detected, 12 ppm carbon monoxide, no carbon dioxide detected, 99.984% hydrogen, and 26 ppm nitrogen; the hydrogen yield is 89.6%.
[0073] Embodiment 3
[0074] Compared with comparative example 1, the difference is that Example 3 adjusts the timing as shown in Table 3, so that in the flushing step, flushing can be achieved first with the downstream gas containing less hydrogen, and then with the downstream gas containing more hydrogen, so that the adsorption tower can obtain a better desorption effect.
[0075] Table 3 Cycle sequence of hydrogen preparation by six-tower pressure swing adsorption in Example 3
[0076]
[0077] The obtained product gas composition is 0.014% argon, no methane detected, 13 ppm carbon monoxide, no carbon dioxide detected, 99.982% hydrogen, and 27 ppm nitrogen; the hydrogen yield is 89.2%.
[0078] Embodiment 4
[0079] Compared with the comparative example 1, the difference is that the reverse discharge valve in the fourth embodiment is changed into an adjustable valve, and the reverse discharge valve is gradually opened during the reverse discharge process, so that the reverse discharge gas can pass through the bed layer more evenly. Figure 3 As shown, a better pre-rinsing effect is obtained.
[0080] The obtained product gas composition is 0.013% argon, no methane detected, 14 ppm carbon monoxide, no carbon dioxide detected, 99.983% hydrogen, and 25 ppm nitrogen; the hydrogen yield is 89.1%.
[0081] Embodiment 5
[0082] Compared with the comparative example 1, the difference is that the timing of the embodiment 5 is adjusted as shown in Table 4, and the final filling is changed to a continuous final filling of raw gas in the entire operation cycle, so that the product gas flow rate is more stable. Figure 4 shown.
[0083] Table 4 Cycle sequence of hydrogen preparation by pressure swing adsorption in Example 5 and 6
[0084]
[0085] The obtained product gas composition is 0.013% argon, no methane detected, 16 ppm carbon monoxide, no carbon dioxide detected, 99.983% hydrogen, and 25 ppm nitrogen; the hydrogen yield is 88.9%.
[0086] The yields of Examples 1 to 5 and Comparative Example 1 are summarized in Table 5. Comparative Example 1 adopts the traditional operation mode, that is, in the pressure equalization step, the pressure equalization valve adopts a switch valve. When the adsorption pressure drop is over, it will be equalized to 1.14MPa (gauge pressure) with the tower in the pressure rise; in the forward release step, the forward release gas is one part; in the reverse release step, the reverse release valve adopts a switch valve; in the flushing step, the forward release gas with a higher hydrogen content is flushed first, and the forward release gas with a lower hydrogen content is flushed later; in the final filling step, the product gas is final filled; its yield is the lowest. Example 2, on the basis of Comparative Example 1, changes the pressure equalization valve into an adjustable valve to obtain the best pressure equalization end pressure of 1.4MPa (gauge pressure), and its yield is increased by 0.8 percentage points on the basis of Comparative Example 1. Example 3, on the basis of Comparative Example 1, enables the flushing step to be realized by first flushing with the forward release gas with less hydrogen content, and then flushing with the forward release gas with more hydrogen content, and its yield is increased by 0.4 percentage points on the basis of Comparative Example 1. Based on comparative example 1, Example 4 changes the inverted valve into an adjustable valve, and the yield thereof is increased by 0.3 percentage points over that of comparative example 1. Based on comparative example 1, Example 5 changes the final filling of product gas into continuous final filling of raw gas, and the yield thereof is increased by 0.1 percentage points over that of comparative example 1. Based on comparative example 1, Example 1 comprehensively improves all the technical points of Examples 2 to 5, and the yield thereof is increased by 2.0 percentage points over that of comparative example 1; and the total increase in the yield of Examples 2 to 5 relative to that of Comparative Example 1 is only 1.6 percentage points; thus, it can be seen that, with respect to the yield of hydrogen, the improvement efficiency of Example 1 is 25% higher than the total improvement efficiency of Examples 2 to 5. At the same time, according to Figure 2 It can be seen that when the pressure equalizing valve adopts an adjustable valve, it can better control the pressure equalizing gas velocity and avoid fluidization, thereby extending the service life of the adsorbent compared with the case of using a switch valve. Figure 4 It can be seen that the continuous final filling of raw gas in the entire operation cycle can make the product gas flow more stable and improve the stability of the product gas compared with the final filling of product gas. It can be seen that the method of Example 1 achieves an excellent synergistic effect.
[0087] Table 5 Comparison of hydrogen yields of Examples 1-5 and Comparative Example 1
[0088] project Hydrogen yield (%) Embodiment 1 90.8 Embodiment 2 89.6 Embodiment 3 89.2 Embodiment 4 89.1 Embodiment 5 88.9 Comparative Example 1 88.8
[0089] Embodiment 6
[0090] The composition of the industrial gas treated is: 49.3397% helium, 32.46% neon, 18.20% nitrogen, and 0.0003% oxygen (all in mole percentage); the adsorption pressure is 3.1 MPa (gauge pressure); the desorption pressure is 0.01 MPa (gauge pressure); Li-LSX molecular sieve is used as the adsorbent; at room temperature, the operation is carried out according to the timing table 1 of Example 1.
[0091] In the pressure equalization step, the pressure equalization valve adopts an adjustable valve. By adjusting the pressure equalization valve, the final pressure of the pressure equalization is adjusted to the optimal point of device performance 1.15MPa (gauge pressure). In the forward release step, the forward release gas is divided into two parts, the first part is the part with less impurity content in the early stage, and the second part is the part with more impurity content in the later stage. In the reverse release step, the reverse release valve adopts an adjustable valve, and the reverse release valve is adjusted. When the reverse release valve is gradually opened, a more uniform flushing gas volume can pass through the entire reverse release process, which is beneficial to the desorption of the bed, thereby obtaining better device performance. In the flushing step, the flushing sequence is adjusted. First, the second part of the forward release gas in the forward release step is used to flush the adsorption tower, and then the first part of the forward release gas in the forward release step is used to flush the adsorption tower, thereby achieving better flushing effect and concentration distribution in the tower. In the final filling step, continuous raw gas final filling is used throughout the operation cycle, which also makes the raw gas intake flow rate and product gas flow rate more stable.
[0092] The target product gas is helium and neon, and the obtained product gas composition is 99.99% helium and neon, and 100 ppm oxygen and nitrogen; the yield of helium and neon is 89.44%.
[0093] It should be noted that the purpose of publishing the embodiments is to help further understand the present invention, but those skilled in the art can understand that various substitutions and modifications are possible without departing from the spirit and scope of the present invention and the appended claims. Therefore, the present invention should not be limited to the contents disclosed in the embodiments, and the scope of protection claimed by the present invention shall be subject to the scope defined in the claims.
Claims
1. A method for separating gas by pressure swing adsorption, wherein the pressure swing adsorption device comprises at least four adsorption towers; industrial gas containing target components passes through the adsorption towers to obtain product gas; each adsorption tower sequentially undergoes the following seven basic steps: adsorption step, pressure drop step, forward discharge step, reverse discharge step, forward discharge gas flushing step, pressure increase step, and raw gas final filling step; It is characterized in that in In the pressure-dropping and pressure-raising steps, the pressure-equalizing valve is an adjustable valve; and / or, In the step of flushing with the discharged gas, the high-pressure tower is directly connected to the low-pressure tower, and the discharged gas from the high-pressure tower directly flushes the low-pressure tower, and the timing is optimized; and / or, In the reversing step, an adjustable valve is used for the reversing valve, and the reversing valve is gradually opened during the reversing process; and / or, In the final filling step, the raw gas is used for final filling, or the raw gas and the product gas are used for final filling simultaneously.
2. The method according to claim 1, It is characterized in that The pressure swing adsorption device includes more than six adsorption towers.
3. The method according to claim 1, It is characterized in that The target component is one or more of hydrogen, helium, argon or neon.
4. The method according to any one of claims 1 to 3, It is characterized in that The method for optimizing the timing in the discharge step and the discharge gas flushing step is as follows: the discharge gas is divided into n parts in chronological order, and the earlier the discharge gas is, the less impurity content it contains; the discharge gas from different parts flushes different towers, so that a low-pressure tower being flushed can be flushed with the discharge gas with a higher impurity content in the later stage of the discharge, and then flushed with the discharge gas with a lower impurity content in the early stage of the discharge; and n is an integer greater than 1.
5. The method according to any one of claims 1 to 3, It is characterized in that In the final charging step, the volume ratio of the product gas to the final total pressurized gas is 1-20%.
6. The method according to any one of claims 1 to 3, It is characterized in that The adsorbent in the adsorption tower is one or more of molecular sieve, activated carbon and silica gel.
7. The method according to any one of claims 1 to 3, It is characterized in that The adsorption pressure is selected as a gauge pressure of 0.3-5.5MPa.
8. The method according to any one of claims 1 to 3, It is characterized in that The target component is a non-adsorbed phase.
9. A pressure swing adsorption device used in the method according to any one of claims 1 to 8.
10. Use of the pressure swing adsorption device according to claim 9 in pressure swing adsorption separation of gas.