Automatic installation operation system for large-diameter high-strength steel pipe of deep shaft

By designing an automatic installation operating system in deep vertical shafts, the problems of low lifting efficiency, high safety risks and low manual welding efficiency of traditional locks are solved, and efficient mechanized installation and welding of steel pipes are achieved, improving construction safety and efficiency.

CN118908024APending Publication Date: 2024-11-08SINOHYDRO BUREAU 12 CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410826381.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

When installing large diameter high-strength steel pipes in deep vertical shafts, traditional locks have low lifting efficiency and high safety risks, difficult alignment and adjustment of steel pipes, low manual welding efficiency and high pollution, and poor stability of the working platform, resulting in low construction safety and efficiency.

Method used

An automatic installation operating system was designed, including lifting equipment, lifting balance beams, automatic grab beams, working platform locking beams and welding operation plates. Remote remote control and hydraulic cylinder support rods are used to realize steel pipe lifting, alignment and welding. Mechanization of other processes reduces manual operations and improves efficiency and safety.

Benefits of technology

It improves the mechanized automation level of steel pipe installation, reduces repeated operations, improves construction safety and work efficiency, ensures the accuracy of steel pipe alignment and welding quality, and reduces the risk of pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118908024A_ABST
    Figure CN118908024A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic installation operation system for a large-diameter high-strength steel pipe of a deep shaft, which comprises hoisting equipment, a hoisting balance beam, an operation platform locking beam and an operation platform which are connected in sequence, and the bottom of the hoisting balance beam is connected with a to-be-installed steel pipe through an automatic unhooking mechanism and a first steel wire rope; the bottom of the hoisting balance beam is detachably connected with an automatic grabbing beam through a second steel wire rope; a beam body alignment mechanism and a grabbing mechanism which are matched with each other are arranged between the working platform locking beam and the automatic grabbing beam, the end of the working platform locking beam is telescopically connected with a locking mechanism, and the working platform comprises a seam pressing working plate and a welding working plate. According to the system, automatic alignment and grabbing of the working platform locking beam are achieved through the automatic grabbing beam, locking or unlocking of the working platform locking beam and the steel pipe is achieved through the cooperation of the automatic grabbing beam and the locking mechanism, then position control over the working platform is achieved, staggered joint adjustment and welding operation of the steel pipe are conducted through the working platform, and the working efficiency is improved. And the underground construction safety and the working efficiency are greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shaft steel pipe installation, and in particular to an automatic installation operation system for large-diameter high-strength steel pipes in deep shafts. Background Art

[0002] During the construction of a hydropower station, the installation of the water diversion penstock is a crucial step. The water diversion penstock is large in size, the weight of a single section is heavy, the hoisting and transportation space in the shaft is narrow, the installation operation is cumbersome, and the safety risk is high. There are the following difficulties in the construction process:

[0003] 1. During the installation of shaft steel pipes, it is necessary to set up a working platform in the shaft to facilitate workers to perform welding and other construction operations. However, since the inner wall of the high-strength steel pipe does not allow welding of fixings, the working platform must be fixed in other ways. The current commonly used method is to use locks to temporarily lock the working platform to the top pipe mouth of the installed steel pipe. The locks include two sets of wire rope hooks, each set has four groups in four directions, and each group has two wire rope hooks, one long and one short. The working platform is hung on the top pipe mouth of the installed steel pipe with wire rope hooks. When the steel pipe to be installed is lowered, it is affected by the locks on the pipe mouth of the installed steel pipe. The steel pipe to be installed cannot fall directly to the position and needs to stop when it reaches the pipe mouth with 20cm left. After the worker enters the working platform, he climbs up and manually hangs the long wire rope hook to the top of the steel pipe to be installed. At the top pipe mouth, the crane lifts the steel pipe to be installed together with the working platform to be appropriately lifted. The short wire rope hook is no longer under stress, and the short wire rope hook is manually removed. At this time, there is no obstacle to the aligned pipe mouth, and the steel pipe to be installed falls to complete the alignment. The lifting wire rope on the steel pipe to be installed is released, and the crane lifts the working platform to the working height, and the short wire rope hook is hung to the pipe mouth of the newly installed pipe section for the next lifting operation. However, this steel pipe lifting method is cumbersome and complicated to operate. Each time the steel pipe is aligned, the lock needs to be manually changed, which not only increases the labor intensity and seriously affects the work efficiency, but also the height of a single section of steel pipe is generally 3-6m, and the workers have high risks and low safety when working at heights.

[0004] 2. After the steel pipe is hoisted, the joints of the steel pipe need to be precisely adjusted to ensure accurate alignment between the upper and lower sections of the steel pipe. Due to the heavy weight of the deep shaft high-strength steel pipe, the adjustment process is very difficult. And because manual welding is currently basically adopted, and the wall thickness of the deep shaft high-strength steel pipe is relatively thick, multiple workers are required for welding, the welding efficiency is low, the welding workload is large, and a lot of manpower and time are consumed. In addition, the smoke and dust generated by manual welding is difficult to dissipate in the deep well, which is not good for the health of the workers. In addition, when the workers are walking, pressing the seams and welding, the working platform is prone to shaking and has poor stability. It is not only easy to bump against the inner wall of the steel pipe, but also the personal safety of the workers cannot be guaranteed. Summary of the invention

[0005] In order to solve the above-mentioned technical problems, the present invention provides an automatic installation operation system for large-diameter high-strength steel pipes in deep vertical shafts, which solves the problems of low efficiency and high safety risks in the prior art of lifting steel pipes with traditional locks, the difficult adjustment of steel pipe pressing seam operations, heavy manual welding operations and high pollution, as well as the easy shaking and high danger of the working platform. It realizes the mechanization of the pressure steel pipe installation operation in the vertical shaft, improves the steel pipe alignment and welding efficiency, reduces repetitive operations, and thereby improves construction safety and work efficiency.

[0006] An automatic installation system for large-diameter high-strength steel pipes in deep shafts, comprising:

[0007] A lifting device having a weight sensor disposed on its hook;

[0008] A hoisting balance beam is connected to the hook of the lifting equipment. The two ends of the bottom of the hoisting balance beam are detachably connected to the first steel wire rope through an automatic unhooking mechanism. The other end of the first steel wire rope is fixedly connected to the steel pipe to be installed. The middle of the bottom of the hoisting balance beam is detachably connected to the automatic grab beam through multiple second steel wire ropes.

[0009] The working platform locking beam is arranged below the automatic grabbing beam. A plurality of mutually adapted beam body alignment mechanisms and grabbing mechanisms are arranged between the working platform locking beam and the automatic grabbing beam. A hoisting part is arranged at the bottom of the working platform locking beam. The end of the working platform locking beam is telescopically connected to the locking mechanism. The locking mechanism is detachably connected to the top of the installed steel pipe.

[0010] The working platform comprises a first supporting beam and a second supporting beam which are arranged in parallel up and down. A seam pressing working plate is fixedly connected to the top of the first supporting beam. A rotating mechanism is arranged at the center of the seam pressing working plate. The rotating mechanism is rotatably connected to a hydraulic cylinder supporting rod which is parallel to the cross section of the steel pipe. The two ends of the hydraulic cylinder supporting rod are fixedly connected to the first hydraulic cylinder. The top of the rotating mechanism is fixedly connected to the hanging piece. A welding working plate is fixedly connected to the top surface of the second supporting beam. A connecting column is fixedly connected between the top center of the welding working plate and the bottom of the first supporting beam. A sliding track is arranged circumferentially on the welding working plate with its center as the center of the circle. A welding operating room is slidably connected to the sliding track through a walking mechanism. An automatic submerged arc welding machine for circumferential welding of steel pipe seams, an automatic flux recovery machine and a seat box are arranged in the welding operating room.

[0011] A further technical solution is: the beam alignment mechanism includes an insertion shaft arranged at the bottom of the automatic grab beam and an alignment cylinder arranged at the top of the working platform locking beam, the insertion shaft and the alignment cylinder are adapted to each other, and a first limit sensor is arranged in the alignment cylinder.

[0012] A further technical solution is: the grabbing mechanism includes a docking lug arranged at the bottom of the automatic grabbing beam, and two grabbing lug plates arranged in parallel at the top of the locking beam of the working platform, wherein a telescopic push rod is fixedly connected to the outer side of one of the grabbing lug plates, and a through hole and a lifting hole for the telescopic shaft on the telescopic push rod to pass through are respectively provided on the grabbing lug plate and the docking lug.

[0013] A further technical solution is: the locking mechanism includes a locking claw slidably connected to the end of the locking beam of the working platform, a locking slot is provided at the bottom of the locking claw, a second limit sensor is provided in the locking claw, and a driving component for driving the locking claw to be extended and retracted is connected to the locking claw. The driving component includes a driving push rod fixed to the bottom of the locking beam of the working platform, a connecting plate is fixedly connected to the telescopic end of the driving push rod, the top of the connecting plate is fixedly connected to the bottom of the locking claw, and a sliding groove for sliding through the connecting plate is provided at the bottom of each end of the locking beam of the working platform.

[0014] A further technical solution is: limiting tracks are symmetrically laid on both sides of the inner wall of the shaft, and limiting wheels compatible with the limiting tracks are arranged at both ends of the lifting balance beam; a steel pipe alignment mechanism is arranged on the installed steel pipe, and the steel pipe alignment mechanism includes a plurality of alignment plates arranged circumferentially on the stiffening ring at the outer wall of the top pipe mouth of the installed steel pipe, and a guiding slope is arranged on the side of the part of the alignment plate extending out of the pipe mouth facing the center of the pipe mouth.

[0015] A further technical solution is: the automatic unhooking mechanism includes two unhooking ear plates arranged in parallel at the bottom of the lifting balance beam, one side of one of the unhooking ear plates is fixedly connected to an unhooking push rod, the unhooking push rod has a built-in limit sensor, and a pin is fixedly connected to the telescopic end of the unhooking push rod, the pin passes through the through holes on the two unhooking ear plates, and a first steel wire rope is hung on the pin between the two unhooking ear plates.

[0016] A further technical solution is: a protective cover is provided on the top of the locking beam of the working platform, and a plurality of lateral limiting wheels are symmetrically provided on the top of the protective cover.

[0017] A further technical solution is: the rotating mechanism includes an installation column fixedly connected to the center of the seam pressing operation plate, a rotating platform is provided on the top of the installation column, a rotating support is fixedly connected to the rotating platform, the hydraulic cylinder support rod is passed through and fixed in the rotating support, and the top of the rotating support is fixedly connected to the bottom end of the lifting part.

[0018] A further technical solution is: a column located in the sliding track circle is arranged between the seam pressing work plate and the welding work plate, a positioning seat is arranged on the column, a positioning push rod is arranged on one side of the top of the welding operation room, a connecting claw for connecting to the positioning seat is arranged on the telescopic end of the positioning push rod, and a supporting wheel is arranged on one side of the top of the welding operation room close to the inner wall of the steel pipe.

[0019] A further technical solution is: a limit adjustment mechanism is provided at the bottom of each end of the first support beam and the second support beam, the limit adjustment mechanism includes a support frame, the side of the support frame close to the inner wall of the steel pipe is rotatably connected to a roller through a connecting rod, the other side of the support frame is fixedly connected to a spring through a connecting groove, the other end of the spring is fixedly connected to the bottom surface of the first support beam or the second support beam, a triangular connecting rod is hinged at the bottom of the support frame, one end of the triangular connecting rod close to the inner wall of the steel pipe is hinged with a support shoe, and the end of the triangular connecting rod away from the inner wall of the steel pipe is hinged with a second hydraulic cylinder, and the other end of the second hydraulic cylinder is fixed to the bottom of the first support beam or the second support beam through a connecting frame.

[0020] Beneficial effects of the present invention:

[0021] 1. The lifting equipment, hoisting balance beam, automatic grab beam, working platform locking beam and working platform provided in the system of the present invention realize the construction processes such as steel pipe hoisting and docking, working platform alignment, grabbing and locking, steel pipe pressing and welding by remote control, thus improving the mechanization and automation level of large-diameter high-strength steel pipe installation in deep shafts, and improving work efficiency and quality.

[0022] 2. This method system realizes the alignment of the lifting balance beam and the automatic grabbing beam through the plug-in shaft and the alignment cylinder of the beam body alignment mechanism. When the plug-in shaft contacts the alignment cylinder, it is monitored by the first limit sensor to confirm that the alignment of the lifting balance beam and the automatic grabbing beam is successful; and the locking connection between the lifting balance beam and the automatic grabbing beam is realized through the telescopic push rod and docking ear of the grabbing mechanism, and the lifting balance beam and the automatic grabbing beam are locked to each other by passing the telescopic shaft through the docking ear.

[0023] 3. The system of the present invention realizes the locking connection between the locking beam of the working platform and the steel pipe through the locking mechanism. The locking claw of the locking mechanism is provided with a locking slot adapted to the side wall of the pipe mouth of the steel pipe. The locking claw can be extended or retracted under the drive of the driving component, and cooperates with the lifting and lowering of the lifting equipment to realize the locking and unlocking between the locking beam of the working platform and the steel pipe. The mechanized operation is realized through the locking mechanism, and there is no need for manual lock conversion, and the alignment installation of the steel pipe is not affected, which facilitates the smooth rotation of the hoisting and welding processes of each section of the steel pipe, has strong safety and higher efficiency, and ensures the stability and safety of the working platform during the workers' welding operations.

[0024] 4. The system of the present invention adopts a rotating mechanism, a hydraulic cylinder support rod and a first hydraulic steel pipe to perform steel pipe alignment and seam pressing operations. The rotating mechanism controls the hydraulic cylinder support rod to rotate and adjust the angle, and starts the first hydraulic cylinder to push out and correct the misalignment of the steel pipe mouth. The adjustment efficiency is higher, the labor burden of workers is reduced, the alignment of the steel pipe is accurate, and the installation quality of the steel pipe is ensured.

[0025] 5. The system of the present invention adopts a welding operation room equipped with a submerged arc automatic welding machine and a flux automatic recovery machine. The welding operation room moves in a circle driven by a sliding track and a walking mechanism. Workers can sit in the welding operation room to perform welding operations, realizing mechanized operations, which greatly reduces the labor burden of welding operations. In addition, the quality of welding using a submerged arc automatic welding machine is better than that of manual welding, no harmful gases are generated, and the pollution is smaller.

[0026] The system of the present invention is particularly suitable for the installation of large-diameter high-strength steel pipes with a vertical shaft chamber depth of more than 50 meters and a strength of 600MPa or more. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of a partial structural section of an automatic installation system for large-diameter high-strength steel pipes in deep shafts;

[0028] Figure 2 It is a structural diagram of the hoisting balance beam;

[0029] Figure 3 It is a structural diagram of the locking beam of the working platform;

[0030] Figure 4 It is a structural schematic diagram of the automatic unhooking mechanism;

[0031] Figure 5 It is a structural diagram of an automatic grab beam;

[0032] Figure 6 is a schematic diagram of the structure of the locking mechanism;

[0033] Figure 7 It is a structural diagram of the working platform;

[0034] Figure 8 is a schematic diagram of the result of protecting the cover;

[0035] Fig. 9 It is a structural schematic diagram of a seam pressing operation board;

[0036] Fig.10 is a structural schematic diagram of a limit adjustment mechanism at the bottom of the first support beam;

[0037] Fig.11 It is a schematic diagram of welding operation in the welding operation room;

[0038] Fig.12 This is a schematic diagram of the welding operation room when its position is returned to the correct position;

[0039] Fig.13 is a schematic diagram of lowering the steel pipe in step S4 of the method of use of the present invention;

[0040] Fig.14is a schematic diagram of the grabbing mechanism completing the grabbing action of the locking beam of the working platform in step S4 of the method of use of the present invention;

[0041] Fig.15 is a schematic diagram of the locking mechanism after it is retracted in step S5 of the method of use of the present invention;

[0042] Fig.16 is a schematic diagram of the steel pipes after being butted together in step S6 of the method of use of the present invention;

[0043] Fig.17 is a schematic diagram of the locking mechanism after it is extended in step S7 of the method of use of the present invention;

[0044] Fig.18 It is a schematic diagram of the gripping mechanism after completing the release action of the locking beam of the working platform in step S8 of the method of use of the present invention.

[0045] In the figure:

[0046] 1. Hoisting balance beam, 2. Steel pipes to be installed, 3. Installed steel pipes, 4. Well wall, 5. Working platform locking beam, 51. Protective cover plate, 52. Lateral limit wheel,

[0047] 6. Work platform, 61. Work platform control module, 62. First support beam, 621. Pressing seam work plate, 622. Mounting column, 623. Rotating table, 624. Hydraulic cylinder support rod, 625. First hydraulic cylinder, 626. Rotating support, 63. Second support beam, 631. Welding work plate, 632. Connecting column, 633. Sliding track, 634. Walking mechanism, 635. Welding operation room, 636. Seat box, 637. Submerged arc Automatic welding machine, 6371, welding nozzle, 6372, flux hopper, 638, flux automatic recovery machine, 639, wheel, 6310, column, 6311, positioning seat, 6312, positioning push rod, 6313, connecting claw, 6314, up and down ladder, 64, limit adjustment mechanism, 641, support frame, 642, roller, 643, spring, 644, triangular connecting rod, 645, support shoe, 646, second hydraulic cylinder, 647, connecting frame,

[0048] 7. Limit track, 8. Limit wheel, 9. Pulley assembly, 10. First steel wire rope, 11. Second steel wire rope, 12. Automatic unhooking mechanism, 13. Automatic beam grabbing, 14. Beam alignment mechanism, 15. Insert shaft, 16. Alignment cylinder, 17. Grabbing mechanism, 18. Grabbing ear plate, 19. Telescopic push rod, 20. Lifting hole, 21. Docking ear, 22. Locking mechanism, 23. Locking claw, 24. Locking slot, 25. Driving push rod, 26. Steel pipe alignment mechanism, 27. Alignment plate, 28. Guide slope, 29. Lifting parts, 30. Connecting plate, 31. Telescopic ladder, 32. Unhooking ear plate, 33. Unhooking push rod, 34. Pin shaft. DETAILED DESCRIPTION

[0049] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.

[0050] In the description of the present invention, it should be noted that the orientations or positional relationships indicated by terms such as "center", "up", "down", "left", "right", "vertical", "horizontal", "inside" and "outside" are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or device referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention.

[0051] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two devices. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0052] Reference Figure 1-Figure 18 As shown, an automatic installation system for large-diameter high-strength steel pipes in deep shafts includes a lifting device, a hoisting balance beam 1, a work platform locking beam 5 and a work platform 6.

[0053] The lifting equipment is arranged on the ground, and a weight sensor is arranged on the hook of the lifting equipment.

[0054] The top of the hoisting balance beam 1 is connected to the hook of the lifting equipment, the two ends of the bottom of the hoisting balance beam 1 are detachably connected to the first steel wire rope 10 through the automatic unhooking mechanism 12, the other end of the first steel wire rope 10 is fixedly connected to the steel pipe 2 to be installed, and the middle of the bottom of the hoisting balance beam 1 is detachably connected to the automatic grab beam 13 through multiple second steel wire ropes 11. Preferably, the first steel wire rope 10 and the second steel wire rope 11 are symmetrically arranged in multiple groups, and the length of the second steel wire rope 11 is greater than the sum of the lengths of the first steel wire rope 10 and the steel pipe 2 to be installed. The top of the second steel wire rope 11 is fixedly connected to the hook, and is detachably connected to the bottom of the hoisting balance beam 1 through the hook.

[0055] The working platform locking beam 5 is arranged below the automatic grabbing beam 13, and a plurality of mutually adaptable beam alignment mechanisms 14 and grabbing mechanisms 17 are arranged between the working platform locking beam 5 and the automatic grabbing beam 13. A hoisting part for connecting the working platform 6 is arranged at the bottom of the working platform locking beam 5, and a locking mechanism 22 is telescopically connected to the end of the working platform locking beam 5, and the locking mechanism 22 is detachably connected to the top of the installed steel pipe 3.

[0056] like Figure 3 As shown, the beam alignment mechanism 14 includes an insert shaft 15 arranged at the bottom of the automatic grab beam 13 and an alignment cylinder 16 arranged at the top of the working platform locking beam 5. The insert shaft 15 and the alignment cylinder 16 are adapted to each other, and the positions and quantities of the insert shaft 15 and the alignment cylinder 16 correspond to each other. A first limit sensor is arranged in the alignment cylinder 16. In a specific embodiment, the first limit sensor is arranged at the bottom of the alignment cylinder 16. When the insert shaft 15 is connected to the alignment cylinder 16, the hoisting balance beam 1 and the working platform locking beam 5 are aligned, the first limit sensor feedbacks a signal, and the lifting equipment stops lowering. In a preferred embodiment, the diameter of the barrel mouth of the alignment cylinder 16 gradually increases from bottom to top. Specifically, the barrel mouth of the alignment cylinder 16 is set as a trumpet-shaped structure, which facilitates the insert shaft 15 to be inserted into the alignment cylinder 16 along the side wall of the barrel mouth, reduces the influence of the position deviation of the automatic grab beam 13 on the alignment of the automatic grab beam 13 and the working platform locking beam 5 during the lowering process, and realizes rapid alignment.

[0057] The grabbing mechanism 17 includes a docking lug 21 arranged at the bottom of the automatic grabbing beam, and two grabbing lug plates 18 arranged in parallel at the top of the working platform locking beam 5, a telescopic push rod 19 is fixedly connected to the outer side of one of the grabbing lug plates 18, and a through hole and a hanging hole 20 for the telescopic shaft on the telescopic push rod 19 to pass through are respectively opened on the grabbing lug plate 18 and the docking lug 21. The telescopic push rod 19 uses an electric push rod, and the telescopic shaft is a push rod. The telescopic push rod 19 has a built-in limit sensor that can control the travel of the telescopic shaft. Its specific structure and electrical connection method are all existing technologies and will not be repeated here.

[0058] The locking mechanism 22 includes a locking claw 23 slidably connected to the end of the working platform locking beam 5, and a driving assembly for driving the locking claw 23 to extend and retract is connected to the locking claw 23. A locking slot 24 is arranged at the bottom of the locking claw 23, and the locking slot 24 matches the top pipe wall of the installed steel pipe 3. A second limit sensor is arranged inside the locking claw 23. Specifically, the second limit sensor is arranged corresponding to the notch direction of the locking slot 24, and is used to monitor whether the locking slot 24 is locked with the steel pipe wall. In some embodiments, the driving assembly includes a driving push rod 25, and the fixed end of the driving push rod 25 is fixedly connected to the bottom of the working platform locking beam 5. A connecting plate is fixedly connected to the telescopic end of the driving push rod 25, and the top of the connecting plate is fixedly connected to the bottom of the locking claw 23. A sliding groove for sliding through the connecting plate is provided at the bottom of each end of the working platform locking beam 5. By controlling the extension and retraction of the driving push rod 25, the locking claw 23 is driven to extend or retract, so that the locking mechanism 22 is located outside or inside the working platform locking beam 5. The driving push rod 25 is an electric push rod, and the driving push rod 25 has a built-in limit sensor, which can control the stroke of the push rod inside the driving push rod. Its specific structure and electrical connection method are all existing technologies and will not be repeated here.

[0059] like Figure 2 As shown, the limiting rails 7 are symmetrically laid on both sides of the inner wall of the shaft, and the limiting wheels 8 matching the limiting rails 7 are arranged at both ends of the hoisting balance beam 1. The limiting wheels 8 are slidably connected to the limiting rails 7, so that the hoisting balance beam 1 can move smoothly along the predetermined track route, avoiding the collision between the steel pipe 2 to be installed and the shaft wall 4, and preliminarily controlling the alignment accuracy of the hoisting balance beam, so as to facilitate accurate and rapid automatic alignment between the hoisting balance beam 1 and the automatic grab beam 13, and between the steel pipe 2 to be installed and the installed steel pipe 3.

[0060] like Figure 3 As shown, the system of the present invention also includes a steel pipe alignment mechanism 26 arranged on the installed steel pipe 3, and the steel pipe alignment mechanism 26 includes a plurality of alignment plates 27 arranged circumferentially on a stiffening ring at the outer wall of the top pipe mouth of the installed steel pipe 3, and a guide slope 28 is provided on the side of the portion of the alignment plate 27 extending out of the pipe mouth that is opposite to the center of the pipe mouth. Preferably, the guide slope 28 has an inclination angle of 30°. By providing the alignment plate 27, it is convenient for the steel pipe 2 to be installed to slide along the guide slope 28 of the alignment plate 27 into the docking position at the top of the installed steel pipe 3, thereby reducing the influence of the position deviation of the steel pipe 2 to be installed on the steel pipe alignment during the lowering process, and realizing the rapid and automatic alignment of the steel pipe 2 to be installed and the installed steel pipe 3.

[0061] like Figure 4As shown, the automatic unhooking mechanism 12 is used to control the connection or disconnection of the first steel wire rope 10, and includes two unhooking ear plates 32 arranged in parallel at the bottom of the hoisting balance beam 1, one side of one of the unhooking ear plates is fixedly connected with an unhooking push rod 33, and the telescopic end of the unhooking push rod 33 is fixedly connected with a pin 34, which passes through the through holes on the two unhooking ear plates 32, and the first steel wire rope 11 is hung on the pin 34 between the two unhooking ear plates 32. Specifically, the unhooking push rod 33 uses an electric push rod, which includes a motor, a reducer and a screw push rod. The electric push rod is built with a limit sensor for controlling the stroke of the screw push rod. Its specific structure and connection method belong to the prior art and will not be repeated here. The pin is driven to extend and retract by the electric push rod, and then the pin is controlled to exit the unhooking ear plate, so as to realize the automatic shedding of the first steel wire rope.

[0062] In a preferred embodiment, a first monitoring camera facing the grabbing mechanism 17 is provided at the bottom of the automatic grabbing beam 13, and the first monitoring camera is used to monitor whether the telescopic shaft on the telescopic push rod 19 passes through or exits the through hole and the lifting hole, so as to confirm that the automatic grabbing beam 13 completes the grabbing action or releasing action of the working platform locking beam 5 through the grabbing mechanism 17. A second monitoring camera facing the automatic unhooking mechanism 12 is provided at the bottom of the hoisting balance beam 1, and the second monitoring camera is used to monitor whether the pin shaft 34 of the automatic unhooking mechanism 12 exits the unhooking ear plate 32 to cause the first wire rope 10 to fall, so as to confirm that the automatic unhooking mechanism 12 completes the unhooking action. A third monitoring camera facing the locking mechanism 22 is provided at the bottom of the working platform locking beam 5, and the third monitoring camera is used to monitor whether the locking groove 24 of the locking claw 23 fits on the top pipe wall of the steel pipe, so as to confirm that the locking mechanism 22 completes the locking action between the top pipe wall of the steel pipe.

[0063] The device of the present invention also includes a first mobile power supply and a first electric control box arranged on the hoisting balance beam 1. The first mobile power supply provides power for the unhooking push rod 33, etc. The first electric control box is provided with a PLC controller and a wireless signal transceiver, etc., which can process various feedback signals and issue command signals, remotely control the actions of the lifting equipment, the beam alignment mechanism 14, the grabbing mechanism 17, the locking mechanism 22, the automatic unhooking mechanism 12, etc., realize intelligent control, and effectively improve the hoisting efficiency and safety. An operating table is arranged on the ground, and the operating table is electrically connected to the first electric control box. A monitoring display is arranged on the operating table, and the video images obtained by the first monitoring camera, the second monitoring camera and the third monitoring camera are displayed through the monitoring display, and the execution of key construction steps is monitored to ensure that the hoisting process is accurate and the safety of the construction is guaranteed. The specific arrangement of the first mobile power supply, the first electric control box and the operating table is a mature existing technology, which will not be repeated here.

[0064] The hoisting balance beam 1 and the automatic grab beam 13 are both arranged at the center of the shaft and are located on the same vertical plane. The lengths of the hoisting balance beam 1 and the work platform locking beam 5 are both less than the diameter of the steel pipe to facilitate up and down movement. In one embodiment, the work platform locking beam 5 is a cross-shaped structure, specifically, including mutually perpendicular cross beams and longitudinal beams, and four sets of locking mechanisms 22 are arranged at both ends of the cross beam and the longitudinal beam. The cross beam is parallel to the automatic grab beam 13 and is located on the same vertical plane. The grab mechanism 17 and the beam body alignment mechanism 14 are arranged between the cross beam and the automatic grab beam 13. In other embodiments, the work platform locking beam 5 can also be set to a straight or cross-shaped structure. In a preferred embodiment, a protective plate (not shown in the figure) is provided on the hoisting balance beam 1 and is covered above the work platform 6. The protective plate can intercept falling rocks and protect the safe construction of the work platform 6 below.

[0065] The top of the hoisting balance beam 1 is provided with a first connection assembly for connecting with a lifting device. The first connection assembly includes a pulley assembly 9 fixedly connected to the top of the hoisting balance beam 1. The pulley assembly 9 is connected to the hook of the lifting device through a lifting rope. A weight sensor is provided on the lifting device to monitor the hoisting weight and to monitor whether the steel pipe is completely placed at the docking position. Specifically, the lifting device is a crane, and the specific structure and connection method of the lifting device are all existing technologies, which will not be repeated here.

[0066] The bottom of the work platform locking beam 5 is connected to the work platform 6 through a hoisting member 29. Specifically, the hoisting member 29 includes two chain electric hoists, and the bottom ends of the chain electric hoists are fixedly connected to the work platform 6 through a connecting plate 30. Two chain electric hoists are provided, one for use and one for backup, to provide double insurance, and the distance between the work platform 6 and the work platform locking beam 5 is adjusted by the chain electric hoist.

[0067] In a preferred embodiment, Figure 8 As shown, a protective cover plate 51 is provided on the top of the working platform locking beam 5, and the protective cover plate 51 can protect the safe construction of the working platform 6 below and prevent falling objects from falling and injuring workers.

[0068] A plurality of lateral limiting wheels 52 are symmetrically arranged on the top of the protective cover plate 51. Specifically, the lateral limiting wheels 52 are composed of a wheel frame and a pulley, and four lateral limiting wheels 52 are symmetrically arranged on the edge of the protective cover plate 51. The pulley is made of rubber material, which can protect the paint on the inner wall of the steel pipe from being damaged when sliding. The pulley is in close contact with the pipe wall and maintains a certain elastic force, ensuring a smooth rise during lifting. When deflection occurs, the lateral limiting wheels 52 can rise along the steel pipe wall to avoid collision between the platform and the inner wall of the steel pipe.

[0069] like Figure 7As shown, the working platform 6 includes a first support beam 62 and a second support beam 63 arranged in parallel up and down. A seam pressing working plate 621 is fixedly connected to the top of the first support beam 62, and a rotating mechanism is arranged at the center of the seam pressing working plate 621. The rotating mechanism is rotatably connected to a hydraulic cylinder support rod 624 parallel to the cross section of the steel pipe, and the first hydraulic cylinder 625 is fixedly connected to both ends of the hydraulic cylinder support rod 624. The top of the rotating mechanism is fixedly connected to the chain electric hoist through a mounting plate.

[0070] like Fig. 9 As shown, a welding work plate 631 is fixedly connected to the top surface of the second support beam 63, a connecting column 632 is fixedly connected between the top center of the welding work plate 631 and the bottom of the first support beam 62, a sliding track 633 is circumferentially arranged with the center of the welding work plate 631 as the center of the circle, a welding operation room 635 is slidably connected to the sliding track 633 through a walking mechanism 634, and a submerged arc automatic welding machine 637 for circumferential welding of steel pipe seams, an automatic flux recovery machine 638 for recovering flux, and a seat box 636 for workers to sit on are arranged in the welding operation room 635.

[0071] The rotating mechanism includes a mounting column 622 fixedly connected to the center of the seam pressing operation plate 621, a rotating platform 623 is arranged on the top of the mounting column 622, a rotating support 626 is fixedly connected to the rotating platform 623, and a hydraulic cylinder support rod 624 is passed through and fixed in the rotating support 626. Specifically, the rotating platform 623 can be an electric rotating platform or a hydraulic rotating platform in the prior art. By starting the rotating platform 623, the hydraulic cylinder support rod 624 is driven to rotate, and then the first hydraulic cylinder 625 is controlled to rotate, so that the first hydraulic cylinder 625 is adjusted to the staggered position of the steel pipe. In one embodiment, the rotating support 626 is U-shaped, including two parallel upper and lower side plates and a side plate connected between the two side plates. The bottom of the lower side plate of the rotating support 626 is fixedly connected to the top table surface of the rotating table 623. The hydraulic cylinder support rod 624 transversely passes through the two side plates of the rotating support 626 and is fixedly connected thereto. The top of the upper side plate of the rotating support 626 is fixedly connected to a connecting plate 30, and the connecting plate 30 is fixedly connected to the bottom end of the chain electric hoist.

[0072] like Fig.11 and Fig.12 As shown, the welding operation room 635 is a square frame beam formed by square steel, the submerged arc automatic welding machine 637 is arranged on one side of the middle part of the square frame beam close to the steel pipe wall, the flux automatic recovery machine 638 is fixedly connected to the top of the square frame beam, and the seat box 636 is arranged on one side of the bottom of the square frame beam close to the slide track 633. In one embodiment, two groups of welding operation rooms 635 are symmetrically arranged on the slide track 633, and the two welding operation rooms 635 have the same walking speed, so welding operations can be carried out at the same time, thereby improving construction efficiency.

[0073] Specifically, the welding position of the submerged arc automatic welding machine 637 is horizontal welding, and the welding nozzle 6371 of the submerged arc automatic welding machine 637 corresponds to the joint between the upper and lower sections of the steel pipe. A flux recovery tray is provided at the lower part of the welding nozzle 6371. The submerged arc automatic welding machine 637 uses negative pressure to recover the flux at the flux recovery tray and feed it into the flux hopper 6372, which can not only cover and protect the welding molten pool but also prevent flux waste. The submerged arc automatic welding machine 637 and the flux automatic recovery machine 638 use supporting equipment sold on the market, preferably submerged arc horizontal welding equipment with high welding efficiency, less air and light pollution, and low requirements for the welding environment. Its specific structure and implementation principle belong to the existing mature technology and will not be repeated here.

[0074] A column 6310 located in the circle of the sliding track 633 is arranged between the seam pressing operation plate 621 and the welding operation plate 631, and a positioning seat 6311 is arranged on the column 6310. A positioning push rod 6312 is arranged on one side of the top of the welding operation room 635, and a connecting claw 6313 for connecting with the positioning seat 6311 is arranged on the telescopic end of the positioning push rod 6312. Specifically, the positioning push rod 6312 uses an electric push rod, and a limit sensor for controlling the stroke is arranged in the electric push rod. In one embodiment, the positioning seat 6311 is a columnar structure adapted to the positioning grip, so that the positioning grip can grip the positioning seat 6311. A supporting wheel 639 is arranged on one side of the top of the welding operation room 635 close to the inner wall of the steel pipe, and the supporting wheel 639 is rollingly connected to the inner wall of the steel pipe. Preferably, the supporting wheel 639 is made of rubber material.

[0075] The surface of the slide track 633 is a smooth arc surface, and the travel mechanism 634 includes an arc groove travel wheel slidably connected to the slide track 633, and the travel wheel is connected to a drive motor for driving the travel wheel to rotate. The drive motor is arranged inside the seat box 636. The smooth arc surface of the slide track 633 allows the travel wheel to always maintain a stable connection with the slide track 633 when the welding operation room 635 is in a tilted or straightened state.

[0076] When welding is performed, the telescopic end of the positioning push rod 6312 is extended until the wheel 639 on the top of the operating room leans against the inner wall of the steel pipe, and the connecting claw 6313 is manually driven to disengage from the locking seat, and the telescopic end of the positioning push rod 6312 is controlled to retract, so that the connecting claw 6313 is unlocked from the locking seat. The welding nozzle 6371 of the submerged arc automatic welding machine 637 corresponds to the joint of the steel pipe, and the driving motor drives the travel wheel to move, thereby driving the bottom of the welding operating room 635 to move on the sliding track, and the wheel 639 on the top of the welding operating room 635 rolls around the inner wall of the steel pipe to ensure the stable movement of the welding operating room 635, and the submerged arc automatic welding machine 637 then performs circumferential seam welding, and the welding speed is the travel speed of the travel mechanism 634. When the welding operation is completed, the telescopic end of the positioning push rod 6312 is controlled to extend, and after the connecting claw 6313 is connected to the locking seat, the telescopic end of the positioning push rod 6312 is controlled to retract, thereby driving the position of the welding operating room 635 to return to the correct position.

[0077] like Fig.10 As shown, a limit adjustment mechanism 64 is provided at the bottom of each end of the first support beam 62 and the second support beam 63. The limit adjustment mechanism 64 includes a support frame 641 fixedly connected to the bottom surface of the end of the first support beam 62 or the second support beam 63. The support frame 641 is rotatably connected to a roller 642 on one side close to the inner wall of the steel pipe through a connecting rod. The other side of the support frame 641 is fixedly connected to a spring 643 through a connecting groove. The other end of the spring 643 is fixedly connected to the bottom surface of the first support beam 62 or the second support beam 63. Preferably, the roller 642 is made of rubber material, and the roller 642 is in close contact with the inner wall of the steel pipe, which plays a role of limit and protection. The spring 643 is provided to play a role of shock absorption and buffering, thereby improving the overall stability of the platform.

[0078] A triangular link 644 is hinged at the bottom of the support frame 641, and a support shoe 645 is hinged at one end of the triangular link 644 close to the inner wall of the steel pipe, and a second hydraulic cylinder 646 is hinged at one end of the triangular link 644 away from the inner wall of the steel pipe, and the other end of the second hydraulic cylinder 646 is fixed to the bottom of the first support beam 62 or the second support beam 63 through a connecting frame 647. Specifically, the second hydraulic cylinder 646 is a double-acting hydraulic cylinder. When the work platform 6 is under construction, the second hydraulic cylinder 646 is controlled to extend and then drive the triangular link 644 to push out the support shoe 645, so that the support shoe 645 is tightly pressed against the inner wall of the steel pipe, so as to ensure that the work platform 6 is stable and fixed as a whole and avoid shaking. When the work platform 6 is lifted and moved as a whole, the second hydraulic cylinder 646 is controlled to retract and the triangular link 644 retracts the support shoe 645, so that the support shoe 645 is separated from the inner wall of the steel pipe, and the roller 642 is used to close the steel pipe wall to limit the position, so as to ensure that the work platform 6 is stable as a whole and avoid bumping and shaking. Preferably, a rubber pad is provided on one side of the support shoe 645 close to the inner wall of the steel pipe, which can be used to protect the paint on the inner wall of the steel pipe.

[0079] The first support beam 62 and the second support beam 63 are square tube cross beams, and the width and length of the cross beams are the same and are both smaller than the diameter of the steel tube.

[0080] A telescopic ladder 31 is provided between the work platform locking beam 5 and the work platform 6, and a through hole corresponding to the exit of the telescopic ladder 31 is provided on the protective cover plate 51. Specifically, the telescopic ladder 31 uses a commercially available telescopic ladder, such as an electric remote-controlled telescopic folding ladder, whose bottom can be telescoped and folded upward. When the seam pressing operation is required, the telescopic ladder 31 is controlled to shrink and fold upward; when it is necessary to move to the protective cover plate 51 on the work platform locking beam 5, the telescopic ladder 31 is started to extend downward, and the worker can reach the protective cover plate 51 through the telescopic ladder 31. An up-and-down ladder 6314 is provided between the seam pressing operation plate 621 and the welding operation plate 631, and a through hole corresponding to the exit of the up-and-down ladder 6314 is provided on the seam pressing operation plate 621. Workers can enter and exit the work platform 6 by carrying a lifting cage, which is connected to a hoisting device. The lifting cage and the hoisting device are prior art, and their specific structure and arrangement are not repeated here.

[0081] The seam pressing operation board 621 is provided with an operation platform control module 61, including a second electric control box, a second hydraulic pump station and a second mobile power supply. The second hydraulic pump station provides hydraulic power for the first hydraulic cylinder 625 and the second hydraulic cylinder 646, etc. The second mobile power supply provides power for components such as the submerged arc automatic welding machine 637. The second electric control box is provided with a PLC controller and a 5G signal transceiver for processing various feedback signals and issuing command signals in the operation platform 6, and realizing remote control operation and signal feedback. The specific implementation and arrangement of the operation platform control module belong to the prior art and will not be repeated here.

[0082] The method for using the automatic installation operation system for large-diameter high-strength steel pipes in deep shafts includes the following steps:

[0083] S1: The first section of the steel pipe 2 to be installed is hung on the bottom of the hoisting balance beam 1 through the first steel wire rope 10 and the automatic unhooking mechanism 12, and the hoisting balance beam 1 is lowered by the lifting equipment. After the first section of the steel pipe 2 to be installed is placed at the designated position at the bottom of the well, the automatic unhooking mechanism 12 is disconnected from the first steel wire rope 10, and the lifting equipment lifts the hoisting balance beam 1 to the wellhead;

[0084] S2: The automatic grab beam 13 is hung on the bottom of the hoisting balance beam 1 through the second steel wire rope 11. The bottom of the automatic grab beam 13 is connected to the working platform locking beam 5 through the grabbing mechanism 17. The locking mechanisms 22 are all extended to the outside of the end of the working platform locking beam 5. The bottom of the working platform locking beam 5 is connected to the working platform 6 through the chain electric hoist. The distance between the working platform locking beam 5 and the working platform 6 is adjusted by the chain electric hoist to adapt to the installation height of the working platform in the single-section steel pipe;

[0085] S3: The lifting equipment drives the lifting balance beam 1 to be lowered until the locking mechanism 22 at the end of the working platform locking beam 5 completes the locking action with the top pipe opening of the first section of the steel pipe 2 to be installed, the lifting equipment stops lowering, the grabbing mechanism 17 completes the release action of the working platform locking beam 5, and the lifting equipment lifts the lifting balance beam 1 and the automatic grabbing beam 13 to the wellhead;

[0086] S4: The next section of the steel pipe 2 to be installed is hung at the bottom of the hoisting balance beam 1 through the automatic unhooking mechanism 12 and the first steel wire rope 10. Fig.13 As shown, the lifting equipment drives the lifting balance beam 1 to be lowered, and when the beam alignment mechanism 14 completes the alignment action between the automatic grab beam 13 and the working platform locking beam 5, as shown in FIG. Fig.14 As shown, the lifting equipment stops lowering, and the grabbing mechanism 17 completes the grabbing action of the working platform locking beam 5;

[0087] S5: Fig.15 As shown, the lifting equipment lifts the hoisting balance beam 1 upward for a distance, so that the locking claws 23 at each end of the working platform locking beam 5 are separated from the installed steel pipe 3, and the locking mechanism 22 is retracted into the end of the working platform locking beam 5, so as to prevent the working platform locking beam 5 from affecting the alignment and installation of the steel pipe;

[0088] S6: Fig.16 As shown, the lifting equipment lowers the lifting balance beam 1 until the section of the steel pipe 2 to be installed is connected with the previous section of the installed steel pipe 3, the lifting equipment stops lowering, and the automatic unhooking mechanism 12 disconnects from the first steel wire rope 10;

[0089] S7: Fig.17 As shown, the lifting equipment lifts the hoisting balance beam 1 for a distance, so that the working platform locking beam 5 is higher than the top pipe opening of the section of steel pipe 2 to be installed, and the locking mechanism 22 extends out of the end of the working platform locking beam 5;

[0090] S8: The lifting equipment lowers the lifting balance beam 1 until the locking mechanism 22 at the end of the working platform locking beam 5 completes the locking action with the top pipe opening of the section of steel pipe 2 to be installed. The lifting equipment stops lowering, and the grabbing mechanism 17 completes the release action of the working platform locking beam 5, that is, the lifting operation of the section of steel pipe 2 to be installed is completed. Fig.18 As shown, the distance between the working platform locking beam 5 and the working platform 6 is adjusted by the electric chain hoist to adapt to the working height of the working platform 6 relative to the steel pipe, so as to facilitate the workers to carry out construction work on the working platform 6, so that the installation of the section of steel pipe to be installed is completed;

[0091] S9: The hoisting equipment lifts the hoisting balance beam 1 to the wellhead, and steps S4-S8 are repeated to carry out the hoisting operation of the next section of the steel pipe to be installed.

[0092] The grabbing mechanism 17 completes the grabbing action of the working platform locking beam 5 by the telescopic push rod 19 driving the telescopic shaft to extend, and the telescopic shaft passes through the lifting hole 20 of the docking lifting ear 21 and the through hole of the grabbing ear plate 18 in turn; the grabbing mechanism 17 completes the releasing action of the working platform locking beam 5 by the telescopic push rod 19 driving the telescopic shaft to retract, and the telescopic shaft withdraws from the through hole of the grabbing ear plate 18 and the lifting hole 20 of the docking lifting ear 21 in turn.

[0093] The alignment action of the beam alignment mechanism 14 is completed by inserting the insertion shaft 15 into the alignment cylinder 16 and connecting it therewith, so as to trigger the first limit sensor to feedback the signal to the electric control box, thereby realizing the alignment between the automatic grab beam 13 and the working platform locking beam 5. The locking action of the locking mechanism 22 is completed by the locking groove 24 of the locking claw 23 fitting with the pipe wall of the top pipe opening of the steel pipe, so as to trigger the second limit sensor to feedback the signal to the electric control box.

[0094] The unhooking action of the automatic unhooking mechanism 12 is that the unhooking push rod 33 drives the pin shaft 34 to retract and then withdraw from the unhooking ear plate 32, so that the first steel wire rope 10 falls off and disconnects the first steel wire rope 10. When the steel pipe needs to be hung at the bottom of the hoisting balance beam 1, the first steel wire rope 10 passes through the pin shaft 34, and the unhooking push rod 33 is controlled to drive the pin shaft 34 to extend and then pass through the unhooking ear plate 32, so that the first steel wire rope 10 is connected to the hoisting balance beam 1 through the automatic unhooking mechanism 12.

[0095] In step S3 and step S8, after the gripping mechanism 17 completes the release action, the hoisting operation of the steel pipe section is completed, and the worker takes the lifting cage to enter and exit the working platform 6 to perform seam pressing and welding construction on the steel pipe, and arranges the steel pipe alignment mechanism 26 on the outer wall of the top pipe mouth of the steel pipe section. By arranging the steel pipe alignment mechanism 26, when the next steel pipe section to be installed is hoisted, the next steel pipe section to be installed slides into the docking position of the steel pipe section along the guiding inclined surface 28 of the alignment plate 27, so as to achieve rapid alignment.

[0096] In step S1 and step S6, when placing the steel pipe, the lifting weight is monitored by the weight sensor arranged on the lifting equipment. When the weight sensor monitors the empty weight, the steel pipe to be installed is completely placed at the designated docking position, and the weight sensor feeds back the signal to the electric control box.

[0097] In step S8, the construction steps of the workers on the working platform 6 are as follows:

[0098] S801: The chain electric hoist lowers one end of the seam pressing operation plate 621, drives the rotating table 623 to rotate, adjusts the first hydraulic cylinder 625 to the offset position between the steel pipe to be installed and the previous installed steel pipe 3, drives the second hydraulic cylinder 646 to extend and drives the support shoe 645 to press against the inner wall of the steel pipe, drives the first hydraulic cylinder 625 to extend and then slowly pushes the pipe wall of the steel pipe 2 to be installed at the offset position until the offset adjustment is completed, drives the second hydraulic cylinder 646 to retract and drives the support shoe 645 to withdraw from the inner wall of the steel pipe;

[0099] S802: The chain electric hoist lifts the seam pressing work plate 621 for a distance, drives the positioning push rod 6312 to extend, and tilts the welding operation room 635 until the wheel 639 leans against the inner wall of the steel pipe. Then, the chain electric hoist is used to accurately adjust the position height of the welding work plate 631 until the welding nozzle 6371 of the submerged arc automatic welding machine 637 is aligned with the joint position between the steel pipe 2 to be installed and the previous section of installed steel pipe. The worker lifts the connecting claw 6313 to separate it from the positioning seat 6311, and drives the positioning push rod 6312 to retract, and drives the second hydraulic cylinder 646 to extend to drive the support shoe 645 to press against the inner wall of the steel pipe.

[0100] S803: The worker enters the welding operation room 635, drives the walking mechanism 634 to drive the welding operation room 635 to move at a constant speed on the sliding track 633, and starts the submerged arc automatic welding machine 637 to weld the steel pipe joint until the full ring welding operation of the steel pipe joint is completed;

[0101] S804: The worker exits the welding operation room 635 and drives the positioning push rod 6312 to extend. After the worker lifts the connecting claw 6313 to connect it with the positioning seat 6311, the positioning push rod 6312 is driven to retract and drive the position of the welding operation room 635 to return to the correct position, and the second hydraulic cylinder 646 is driven to retract and drive the support shoe 645 to withdraw from the inner wall of the steel pipe.

[0102] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. An automatic installation system for large-diameter high-strength steel pipes in deep shafts, characterized in that: include: A lifting device having a weight sensor disposed on its hook; A hoisting balance beam is connected to the hook of the lifting equipment. The two ends of the bottom of the hoisting balance beam are detachably connected to the first steel wire rope through an automatic unhooking mechanism. The other end of the first steel wire rope is fixedly connected to the steel pipe to be installed. The middle of the bottom of the hoisting balance beam is detachably connected to the automatic grab beam through multiple second steel wire ropes. The working platform locking beam is arranged below the automatic grabbing beam. A plurality of mutually adapted beam body alignment mechanisms and grabbing mechanisms are arranged between the working platform locking beam and the automatic grabbing beam. A hoisting part is arranged at the bottom of the working platform locking beam. The end of the working platform locking beam is telescopically connected to the locking mechanism. The locking mechanism is detachably connected to the top of the installed steel pipe. The working platform comprises a first supporting beam and a second supporting beam which are arranged in parallel up and down. A seam pressing working plate is fixedly connected to the top of the first supporting beam. A rotating mechanism is arranged at the center of the seam pressing working plate. The rotating mechanism is rotatably connected to a hydraulic cylinder supporting rod which is parallel to the cross section of the steel pipe. The two ends of the hydraulic cylinder supporting rod are fixedly connected to the first hydraulic cylinder. The top of the rotating mechanism is fixedly connected to the hanging piece. A welding working plate is fixedly connected to the top surface of the second supporting beam. A connecting column is fixedly connected between the top center of the welding working plate and the bottom of the first supporting beam. A sliding track is arranged circumferentially on the welding working plate with its center as the center of the circle. A welding operating room is slidably connected to the sliding track through a walking mechanism. An automatic submerged arc welding machine for circumferential welding of steel pipe seams, an automatic flux recovery machine and a seat box are arranged in the welding operating room.

2. The automatic installation system for large-diameter high-strength steel pipes in deep shafts according to claim 1, characterized in that: The beam alignment mechanism includes an insertion shaft arranged at the bottom of the automatic grab beam and an alignment cylinder arranged at the top of the working platform locking beam. The insertion shaft and the alignment cylinder are adapted to each other, and a first limit sensor is arranged in the alignment cylinder.

3. An automatic installation system for large-diameter high-strength steel pipes in deep shafts according to claim 1 or 2, characterized in that: The grabbing mechanism includes a docking lug arranged at the bottom of the automatic grabbing beam, and two grabbing lug plates arranged in parallel at the top of the locking beam of the working platform. A telescopic push rod is fixedly connected to the outer side of one of the grabbing lug plates, and a through hole and a lifting hole for the telescopic shaft on the telescopic push rod to pass through are respectively provided on the grabbing lug plate and the docking lug.

4. The automatic installation system for large-diameter high-strength steel pipes in deep shafts according to claim 1, characterized in that: The locking mechanism includes a locking claw slidably connected to the end of the locking beam of the working platform, a locking slot is provided at the bottom of the locking claw, a second limit sensor is provided in the locking claw, and a driving component for driving the locking claw to be extended and retracted is connected to the locking claw. The driving component includes a driving push rod fixed to the bottom of the locking beam of the working platform, a connecting plate is fixedly connected to the telescopic end of the driving push rod, the top of the connecting plate is fixedly connected to the bottom of the locking claw, and a sliding groove for sliding through the connecting plate is provided at the bottom of each end of the locking beam of the working platform.

5. The automatic installation system for large-diameter high-strength steel pipes in deep shafts according to claim 1, characterized in that: Limiting tracks are symmetrically laid on both sides of the inner wall of the shaft, and limiting wheels compatible with the limiting tracks are arranged at both ends of the hoisting balance beam; a steel pipe alignment mechanism is arranged on the installed steel pipe, and the steel pipe alignment mechanism includes a plurality of alignment plates arranged circumferentially on the stiffening ring at the outer wall of the top pipe mouth of the installed steel pipe, and a guiding slope is arranged on the side of the part of the alignment plate extending out of the pipe mouth facing the center of the pipe mouth.

6. The automatic installation system for large-diameter high-strength steel pipes in deep shafts according to claim 1, characterized in that: The automatic unhooking mechanism includes two unhooking ear plates arranged in parallel at the bottom of the lifting balance beam, one side of one of the unhooking ear plates is fixedly connected to an unhooking push rod, the unhooking push rod has a built-in limit sensor, and a pin is fixedly connected to the telescopic end of the unhooking push rod, the pin passes through the through holes on the two unhooking ear plates, and a first steel wire rope is hung on the pin between the two unhooking ear plates.

7. The automatic installation system for large-diameter high-strength steel pipes in deep shafts according to claim 1, characterized in that: A protective cover is arranged on the top of the locking beam of the working platform, and a plurality of lateral limiting wheels are symmetrically arranged on the top of the protective cover.

8. The automatic installation system for large-diameter high-strength steel pipes in deep shafts according to claim 1, characterized in that: The rotating mechanism includes a mounting column fixedly connected to the center of the seam pressing operation plate, a rotating platform is arranged on the top of the mounting column, a rotating support is fixedly connected to the rotating platform, a hydraulic cylinder support rod is passed through and fixed in the rotating support, and the top of the rotating support is fixedly connected to the bottom end of the lifting part.

9. The automatic installation system for large-diameter high-strength steel pipes in deep shafts according to claim 1, characterized in that: A column located in the sliding track circle is arranged between the seam pressing work plate and the welding work plate, a positioning seat is arranged on the column, a positioning push rod is arranged on one side of the top of the welding operation room, a connecting claw for connecting the positioning seat is arranged on the telescopic end of the positioning push rod, and a supporting wheel is arranged on one side of the top of the welding operation room close to the inner wall of the steel pipe.

10. The automatic installation system for large-diameter high-strength steel pipes in deep shafts according to claim 1, characterized in that: A limit adjustment mechanism is provided at the bottom of each end of the first support beam and the second support beam, the limit adjustment mechanism includes a support frame, the side of the support frame close to the inner wall of the steel pipe is rotatably connected to a roller through a connecting rod, the other side of the support frame is fixedly connected to a spring through a connecting groove, the other end of the spring is fixedly connected to the bottom surface of the first support beam or the second support beam, a triangular connecting rod is hinged at the bottom of the support frame, one end of the triangular connecting rod close to the inner wall of the steel pipe is hinged with a support shoe, and one end of the triangular connecting rod away from the inner wall of the steel pipe is hinged with a second hydraulic cylinder, and the other end of the second hydraulic cylinder is fixed to the bottom of the first support beam or the second support beam through a connecting frame.

Citation Information

Cited By

  • Oversized derrick fixing device for vertical shaft

    CN119957227A

  • An extra-large derrick fixing device for a vertical shaft

    CN119957227B

  • Pressure steel pipe construction method

    CN121025250A