Tower crane top lifting section whole-process operation safety monitoring method
By formulating strict operating procedures and standardized processes, combined with real-time monitoring of displacement sensor data, the problem of safety risks during the tower crane top lifting festival is solved, real-time monitoring of tower crane equipment and personnel behavior is achieved, and accidents are reduced Probability and improve construction safety.
Patent Information
- Application Number
- CN202411082175.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-08
AI Technical Summary
There is a lack of effective information monitoring methods during the tower crane lifting festival, which leads to the inability to effectively control safety risks and leads to frequent accidents.
Develop strict operating procedures and standardized processes, collect data through displacement sensors, and use step-by-step logic and alarm logic for real-time monitoring to ensure that each step of the tower crane during the lifting and lowering process complies with the safety monitoring content and correct values. Identify and warn of potential risks in real time.
Through real-time monitoring and intelligent early warning, the probability of accidents will be reduced, the safety of workers' lives and property will be guaranteed, the efficiency of operations will be improved, and the overall safety management level of construction will be improved.
Smart Images

Figure CN118908066A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of safety monitoring during the operation of a tower crane top lifting section, and in particular to a method for safety monitoring during the entire operation of a tower crane top lifting section. Background Art
[0002] Existing tower crane safety monitoring solutions usually consist of the following parts: Hook visual monitoring: mainly used to assist the tower crane driver to monitor the key parts of the tower crane such as the hoisting winch, travel winch, and hoisting area.
[0003] Lifting weight limiter: also known as overload limiter, is a protective device that can prevent the crane from overloading. When the lifting weight exceeds the rated lifting weight, it can automatically cut off the power supply of the lifting mechanism or sound an alarm to avoid overloading the crane.
[0004] Torque limiter: Its function is to limit the actual operating lifting torque of the tower crane to prevent the whole machine from tipping over due to overload. When the torque exceeds the safe value, it will issue an early warning to remind the operator to take measures to reduce the load on the crane arm. Height limiter: Also called hook height limiter, usually installed at the head of the crane arm. When the hook slides to the limit position, it will cut off the circuit and stop the machine, ensuring that the hook will not collide with the arm head, thus preventing accidents.
[0005] Travel limiter: used to prevent the crane from crashing or limiting its travel within a certain range. It is usually installed on the inside of the active trolley, and the limit baffle touches the travel switch to cut off the power supply for controlling the travel, ensuring that the crane can operate safely within the specified area. Amplitude limiter: also called amplitude limiter or amplitude indicator. It is installed on the crane arm and displays the rated lifting capacity at various amplitudes through the pointer on the indicator plate. When the boom moves to the upper and lower limit positions, the sub-limit switch will cut off the main control circuit, stop the amplitude motor, and achieve the limit function. These devices work together mainly to ensure the safety and stability of the tower crane during operation and to prevent accidents caused by operational errors or overloads.
[0006] The above scheme monitors the tower crane during hoisting operations. However, due to the lack of effective information monitoring methods during the lifting and lowering of the tower crane, the safety risks in these links cannot be effectively controlled.
[0007] The existing safety monitoring of tower cranes is completed through video and various limiters. It mainly monitors various parameters of the tower crane during operation, such as weight, height, speed, angle, etc., and cannot complete the monitoring of the tower crane during the top lifting and lowering process.
[0008] The installation and lowering of tower cranes is currently mainly based on the experience of the installation and dismantling workers. However, due to their generally weak safety awareness, major safety accidents occur frequently during this process, among which illegal lifting and lifting errors are one of the main reasons. These accidents usually occur due to the following problems: The tower crane installation and dismantling workers were not adequately trained, had insufficient skills, and lacked safety awareness; Tower crane installers often rely on experience and perform unsafe operations; The safety status of equipment cannot be known in real time and effectively monitored; On-site operation conditions cannot be obtained and supervised in real time; The on-site personnel cannot grasp the situation in real time and it is difficult to supervise; There is no information-based supervision technology during tower crane installation and dismantling operations.
[0009] To solve the above problems, technical personnel in this field need to study a method specifically for the tower crane top lifting section operation to reduce the probability of accidents, protect the lives and property of workers and ensure the continuous and stable operation of the equipment.
[0010] The information disclosed in this background technology section is only intended to deepen the understanding of the overall background technology of the present invention, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to those skilled in the art. Summary of the invention
[0011] In view of the problems existing in the prior art, the present invention provides a method for safety monitoring of the entire operation process of the top lifting section of a tower crane, which reduces the probability of accidents and improves operating efficiency by formulating more stringent operating procedures and standardized processes.
[0012] In order to achieve the above object, the present invention adopts the following technical solutions: A method for safety monitoring of the entire process of tower crane top lifting section operation, the method specifically comprising: Safety monitoring content and correct values are formulated for each step in the tower crane lifting process; safety monitoring content and correct values are formulated for each step in the tower crane lowering process; when the tower crane is at the top or bottom, the condition for step execution is identified based on the change in the displacement of the lifting cylinder, and the hexadecimal value collected by the displacement sensor is calculated through a conversion formula; there are two execution logics for tower crane monitoring, the first is the jump step logic: in the current step, the displacement will be used as the condition for entering the next step. If the condition is met, it will enter the next step, otherwise it will stay in this step until the condition is met; the second is the alarm logic, different monitoring contents are set in the current step, and an alarm will be issued if the monitoring value does not meet the current monitoring content.
[0013] Furthermore, specific steps and safety monitoring contents are formulated for each step in the tower crane jacking process. The specific steps are differentiated according to the standard section height of the tower crane. For the jacking operation, the main distinction is the number of jacking cycles in the operation steps. At present, the tower cranes on the market are mainly divided into two-stroke, three-stroke and five-stroke. The following takes the three-stroke as an example, as follows: S1. Preparation before jacking operation: Execution conditions are: personnel verification is completed and the system is started; safety monitoring content includes: (1) the connection status of the tower body and the support; (2) the connection status of the jacking beam pin shaft; (3) wind speed and tower crane balance status; S2, first jacking: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 11cm, the operation step automatically enters the first jacking from the pre-jacking operation preparation; the safety monitoring content includes: (1) displacement speed is not greater than 1cm / s; (2) climbing claw status; (3) wind speed and tower crane balance status; S3, first beam recovery: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 60cm, the operation step automatically enters the first beam recovery from the first jacking step; the safety monitoring content includes: (1) displacement speed is less than 1cm / s; (2) the state of the jacking beam pin; (3) wind speed and tower crane balance state; S4, second jacking: The execution condition is: when the current displacement meter value is less than the initial displacement meter value -40cm, the operation step automatically enters the second jacking from the first beam recovery; the safety monitoring content includes: (1) the displacement speed is not greater than 1cm / s; (2) the position status of the jacking beam pin shaft; (3) the wind speed and the balance status of the tower crane; S5, Second beam recovery: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 70cm, the operation step automatically changes from the second jacking to the second beam recovery; the safety monitoring content includes: (1) the displacement speed is not greater than 1cm / s; (2) the position status of the jacking beam pin shaft; (3) the wind speed and the balance status of the tower crane; S6, third jacking: The execution condition is: when the current displacement meter value is less than the initial displacement meter value -40cm, the operation step automatically enters the third jacking from the second beam recovery. The safety monitoring content includes: (1) displacement speed is not greater than 1cm / s; (2) the state of the climbing claw; (3) wind speed and tower crane balance state; S7, introduction of standard section: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 60cm, the operation step automatically enters the introduction of the standard section from the third jacking. The safety monitoring content includes: (1) displacement speed 1cm / s; (2) the position of the introduction trolley; (3) wind speed and tower crane balance status; S8. Safety check at the end of jacking: The execution condition is: when the current displacement meter value is less than the initial displacement meter value + 11 cm, the operation step automatically enters the safety check at the end of jacking from the introduction of the standard section. The safety monitoring content includes: (1) the connection status of the tower body and the support; (2) wind speed and tower crane balance status.
[0014] Furthermore, specific steps and safety monitoring contents are formulated for each step in the tower crane lowering process. The specific steps are differentiated according to the standard tower crane section height. For the lowering operation, the main distinction is the number of lowering cycles in the operation steps. At present, the tower cranes on the market are mainly divided into two-stroke, three-stroke and five-stroke. The following takes the three-stroke as an example, as follows: S1. Preparation before lowering: The execution conditions are: the verification of personnel and the system is started; the safety monitoring content includes: (1) the connection status of the tower body and the support; (2) the wind speed and the balance status of the tower crane; (3) the connection status of the pin shaft of the jacking beam; S2, first disassembly: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 60cm, the operation step automatically enters the first disassembly from the preparation before the lowering operation; the safety monitoring content includes: (1) the speed is not greater than 1cm / s; (2) the connection status of the pin shaft of the jacking beam; (3) the wind speed and the balance status of the tower crane; S3, first extension of the beam: The execution condition is: when the current displacement meter value is less than the initial displacement meter value -50cm, the operation step automatically enters the first extension of the beam from the first disassembly; the safety monitoring content includes: (1) speed 1cm / s; (2) the state of the climbing claw; (3) wind speed and tower crane balance state; S4, second lowering: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 70cm, the operation step automatically enters the second lowering from the first extension of the beam; the safety monitoring content includes: (1) speed not greater than 1cm / s; (2) the state of the pin shaft of the jacking beam; (3) wind speed and tower crane balance state; S5, second extension of the beam: The execution condition is: when the current displacement meter value is less than the initial displacement meter value -50cm, the operation step automatically changes from the second lowering to the second extension of the beam; the safety monitoring content includes: (1) the speed is not greater than 1cm / s; (2) the pin shaft of the jacking beam is connected correctly; (3) the wind speed and the balance state of the tower crane; S6, third lowering: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 70cm, the operation step automatically enters the third lowering from the second extension of the beam; the safety monitoring content includes: (1) speed not greater than 1cm / s; (2) the state of the climbing claw; (3) wind speed and tower crane balance state; S7. Safety check at the end of jacking: The execution condition is: when the current displacement meter value is less than the initial displacement meter value + 20 cm, the operation step automatically enters the safety check at the end of jacking from the third step down. The safety monitoring content includes: (1) the connection status of the tower body and the support; (2) wind speed and tower crane balance status.
[0015] Further, the conversion formula is as follows: ; The resolution of the sensor is R mm / unit, and the output range is 0 to M hexadecimal units, corresponding to actual displacements from 0 to D cm, where the resolution needs to be converted from mm to cm by dividing by 10; The scaling factor used to map the full range of hexadecimal values to the actual displacement range D cm depends on the specific values of M and D. The scaling factor is expressed as: ; Therefore, the complete conversion formula is: .
[0016] By adopting the above technical solution, the present invention has the following beneficial effects: This application uses advanced information technology and monitoring methods to monitor the safety status of tower cranes in real time during the lifting and lowering process, promptly discover potential safety risks, and ensure the safety of operations and personnel on the construction site through intelligent early warning and remote monitoring, reduce the economic losses of construction companies, and improve the overall safety level of the construction industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 It is a control logic diagram of the method for safety monitoring of the whole process of tower crane top lifting section operation of the present invention; Figure 2 The present invention is a monitoring execution logic diagram of the method for safety monitoring of the entire process of tower crane top lifting section operation. DETAILED DESCRIPTION
[0019] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.
[0021] The purpose of the present invention is to monitor the equipment status of the tower crane during the jacking and lowering operations. By collecting a large number of equipment status parameters, the construction process of the tower crane program operation is obtained, and a monitoring method for the safety of the tower crane program operation in construction projects is constructed. Through this method, we can formulate more stringent operating procedures and standardized processes to reduce the probability of accidents and improve operating efficiency.
[0022] The application of tower crane operation safety monitoring methods in construction projects can greatly improve the safety of the construction site, effectively prevent and reduce accidents caused by tower crane operations, and protect the lives and property of construction workers. At the same time, it optimizes construction efficiency and reduces project costs through real-time monitoring and data analysis, promotes technological progress and standardized management in the construction industry, improves the overall safety management level of construction, and promotes social harmony and development.
[0023] The core of this application is to monitor in real time the unsafe state of tower crane equipment and the unsafe behavior of personnel during the tower crane lifting or lowering operation.
[0024] Unsafe state of tower crane equipment It refers to whether the on-site environment meets the safety requirements (wind speed not exceeding 9m / s is normal) and whether the balance state of the tower crane meets the safety requirements (inclination less than 1.2° is normal).
[0025] Unsafe behavior of personnel Focus on monitoring the following unsafe behaviors of personnel. These behaviors are very dangerous and can easily lead to major safety accidents such as tilting, breaking, and collapse of tower cranes. However, due to the inadequate skill training and weak safety awareness of some installation and demolition workers, these behaviors often occur in actual operations.
[0026] Before jacking, the tower body and the lower slewing bearing were not disconnected; after jacking was completed, the tower body and the slewing bearing were not connected in time (bolts were tightened).
[0027] During jacking, the jacking beam was not properly positioned and the jacking beam pin was not connected.
[0028] Before lowering, the tower body and the lower slewing bearing were not disconnected; after lowering, the tower body and the slewing bearing were not connected in time (bolts were tightened).
[0029] When lowering the section, the climbing claws were not properly positioned and the latches of the lifting beam were not released.
[0030] The specific safety monitoring indicators are described in detail as follows:
[0031] Combination Figure 1-2 As shown, based on an in-depth investigation and understanding of the tower crane lifting and installation operation process, this application summarizes the tower crane lifting and installation operation steps, as well as the safety monitoring content of each step, and uses this as the core logic guide for the development of the monitoring system.
[0032] The tower crane top lifting section is divided into two-stroke, three-stroke and five-stroke according to the standard section height. The main difference lies in the number of lifting and lowering times during the top lifting and lowering process. This embodiment takes the three-stroke lifting and lowering of a tower crane as an example to illustrate the operation steps and monitoring points: The operation steps and safety monitoring contents of three-stroke tower crane jacking:
[0033] 2) Operation steps and safety monitoring contents of three-stroke tower crane lowering:
[0034] The displacement calculation method of this application is: When the tower crane is lifting the top section, the condition for executing the step is identified based on the change in displacement. Since the value collected by the displacement sensor is in hexadecimal output format, we can calculate it using the following formula: ; The resolution of the sensor is R mm / unit (a digit in hexadecimal, usually a power of 16), and the output range is 0 to M hexadecimal units (corresponding to actual displacements from 0 to D centimeters). To convert the resolution from millimeters to centimeters, divide by 10 because 1 cm = 10 mm. The scaling factor used to map the full range of hexadecimal values to the actual displacement range D centimeters depends on the specific values of M and D.
[0035] The scaling factor can be expressed as: ; Therefore, the complete conversion formula is: ; Taking a 3-meter displacement sensor as an example, R = 1 mm / unit, M = 65535 (hexadecimal FFFF), and D = 655.35 cm (the assumed maximum displacement), the scaling factor is For the hexadecimal value 0x1234 (decimal 4660): .
[0036] The tower crane monitoring execution logic of this application is: There are two execution logics for tower crane monitoring. The first is the step-skipping logic: the displacement in the current step is used as the condition for entering the next step. If the condition is met, it will enter the next step, otherwise it will stay in the current step until the condition is met. The second is the alarm logic, which sets different monitoring contents in the current step. If the monitoring value does not meet the current monitoring content, an alarm will be issued. Figure 2 shown.
[0037] The safety monitoring system of the method for safety monitoring of the whole process of tower crane top lifting section operation in this application is composed of hardware and software.
[0038] 1) The hardware includes real-time status perception device, edge-side intelligent host device, and cloud server.
[0039] a) Real-time status sensing device: It has the function of sensing the status of relevant indicators of the monitored object in real time and accurately, and can transmit the sensed real-time status information to the outside in the form of data; b) Edge-side intelligent host device: It is capable of receiving data from various front-end devices, aggregating data from multiple real-time status sensing devices, processing and analyzing real-time data, achieving edge intelligent judgment and early warning / decision-making, and uploading the received data, alarm and other information to the cloud server; c) Cloud server: It has the functions of storing uploaded data, implementing big data analysis and pushing safety information, receiving uploaded data from edge-side intelligent host devices, storing historical data, statistically analyzing the safety production situation and visualizing it; 2) The software includes the tower crane top lifting section operation safety monitoring cloud platform system software, mobile terminal monitoring program software, and embedded front-end hardware device software.
[0040] a) Embedded front-end hardware device software: implement the corresponding functions of the above hardware devices; b) Tower crane top lifting section operation safety monitoring cloud platform software: It has the functions of real-time analysis of the safety status of tower crane top lifting operations, prediction of tower crane safety situation and push of safety information.
[0041] c) The real-time monitoring period of safety monitoring parameters shall not exceed 10 seconds.
[0042] The real-time status data collection method in this application is as follows: Smart sensor technology is the key to automated data collection, and the relevant sensor technology and practice foundation are already very mature. The following table shows the details of the sensor types, deployment locations, data transmission methods, monitoring indicators, and parameter performance used in the system.
[0043]
[0044] The core of the software platform in this application is to accurately and timely calculate and judge the warning or alarm results when unsafe situations occur, triggering the push of alarm information and safety information. The core calculation logic is shown in 1.
[0045] During the process of lifting and lowering the tower crane, the focus is on monitoring the equipment status of key parts of the tower crane and the behavior of operators during the entire installation and disassembly process. The equipment status of key parts can be monitored by sensors, and the behavior of operators can be monitored by introducing AI cameras. High-definition cameras can be deployed at the tower crane installation and lowering site to ensure that the entire operation area is covered without blind spots. We can use AI technology to perform intelligent analysis of images collected by the camera to identify unsafe behaviors of operators during the installation and lowering of the tower crane. For example, whether the operator is wearing safety equipment. When the intelligent recognition algorithm detects an abnormal situation, the early warning system is immediately triggered to remind the on-site operators through sound, light, etc., and the early warning information is sent to the remote monitoring center at the same time.
[0046] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for safety monitoring of the entire process of tower crane top lifting section operation, characterized in that: The method is specifically as follows: Safety monitoring content and correct values are formulated for each step in the tower crane lifting process; safety monitoring content and correct values are formulated for each step in the tower crane lowering process; when the tower crane is at the top or bottom, the condition for step execution is identified based on the change in the displacement of the lifting cylinder, and the hexadecimal value collected by the displacement sensor is calculated through a conversion formula; there are two execution logics for tower crane monitoring, the first is the jump step logic: in the current step, the displacement will be used as the condition for entering the next step. If the condition is met, it will enter the next step, otherwise it will stay in this step until the condition is met; the second is the alarm logic, different monitoring contents are set in the current step, and an alarm will be issued if the monitoring value does not meet the current monitoring content.
2. The method for safety monitoring of the whole process of tower crane top lifting section operation according to claim 1 is characterized in that: Specific steps and safety monitoring contents are formulated for each step in the tower crane lifting process. The specific steps are differentiated according to the standard section height of the tower crane, as follows: S1. Preparation before jacking operation: Execution conditions are: personnel verification is completed and the system is started; safety monitoring content includes: (1) the connection status of the tower body and the support; (2) the connection status of the jacking beam pin shaft; (3) wind speed and tower crane balance status; S2, first jacking: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 11cm, the operation step automatically enters the first jacking from the pre-jacking operation preparation; the safety monitoring content includes: (1) displacement speed is not greater than 1cm / s; (2) climbing claw status; (3) wind speed and tower crane balance status; S3, first beam recovery: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 60cm, the operation step automatically enters the first beam recovery from the first jacking step; the safety monitoring content includes: (1) displacement speed is less than 1cm / s; (2) the state of the jacking beam pin; (3) wind speed and tower crane balance state; S4, second jacking: The execution condition is: when the current displacement meter value is less than the initial displacement meter value -40cm, the operation step automatically enters the second jacking from the first beam recovery; the safety monitoring content includes: (1) the displacement speed is not greater than 1cm / s; (2) the position status of the jacking beam pin shaft; (3) the wind speed and the balance status of the tower crane; S5, Second beam recovery: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 70cm, the operation step automatically changes from the second jacking to the second beam recovery; the safety monitoring content includes: (1) the displacement speed is not greater than 1cm / s; (2) the position status of the jacking beam pin shaft; (3) the wind speed and the balance status of the tower crane; S6, third jacking: The execution condition is: when the current displacement meter value is less than the initial displacement meter value -40cm, the operation step automatically enters the third jacking from the second beam recovery. The safety monitoring content includes: (1) displacement speed is not greater than 1cm / s; (2) the state of the climbing claw; (3) wind speed and tower crane balance state; S7, introduction of standard section: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 60cm, the operation step automatically enters the introduction of the standard section from the third jacking. The safety monitoring content includes: (1) displacement speed 1cm / s; (2) the position of the introduction trolley; (3) wind speed and tower crane balance status; S8. Safety check at the end of jacking: The execution condition is: when the current displacement meter value is less than the initial displacement meter value + 11 cm, the operation step automatically enters the safety check at the end of jacking from the introduction of the standard section. The safety monitoring content includes: (1) the connection status of the tower body and the support; (2) wind speed and tower crane balance status.
3. The method for safety monitoring of the whole process of tower crane top lifting section operation according to claim 1 is characterized in that: Specific steps and safety monitoring contents are formulated for each step in the tower crane lowering process. The specific steps are differentiated according to the standard tower crane section height, as follows: S1. Preparation before lowering: The execution conditions are: the verification of personnel and the system is started; the safety monitoring content includes: (1) the connection status of the tower body and the support; (2) the wind speed and the balance status of the tower crane; (3) the connection status of the pin shaft of the jacking beam; S2, first disassembly: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 60cm, the operation step automatically enters the first disassembly from the preparation before the lowering operation; the safety monitoring content includes: (1) the speed is not greater than 1cm / s; (2) the connection status of the pin shaft of the jacking beam; (3) the wind speed and the balance status of the tower crane; S3, first extension of the beam: The execution condition is: when the current displacement meter value is less than the initial displacement meter value -50cm, the operation step automatically enters the first extension of the beam from the first disassembly; the safety monitoring content includes: (1) speed 1cm / s; (2) the state of the climbing claw; (3) wind speed and tower crane balance state; S4, second lowering: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 70cm, the operation step automatically enters the second lowering from the first extension of the beam; the safety monitoring content includes: (1) speed not greater than 1cm / s; (2) the state of the pin shaft of the jacking beam; (3) wind speed and tower crane balance state; S5, second extension of the beam: The execution condition is: when the current displacement meter value is less than the initial displacement meter value -50cm, the operation step automatically changes from the second lowering to the second extension of the beam; the safety monitoring content includes: (1) the speed is not greater than 1cm / s; (2) the pin shaft of the jacking beam is connected correctly; (3) the wind speed and the balance state of the tower crane; S6, third lowering: The execution condition is: when the current displacement meter value is greater than or equal to the initial displacement meter value + 70cm, the operation step automatically enters the third lowering from the second extension of the beam; the safety monitoring content includes: (1) speed not greater than 1cm / s; (2) the state of the climbing claw; (3) wind speed and tower crane balance state; S7. Safety check at the end of jacking: The execution condition is: when the current displacement meter value is less than the initial displacement meter value + 20 cm, the operation step automatically enters the safety check at the end of jacking from the third step down. The safety monitoring content includes: (1) the connection status of the tower body and the support; (2) wind speed and tower crane balance status.
4. The method for safety monitoring of the whole process of tower crane top lifting section operation according to claim 1 is characterized in that: The conversion formula is as follows: ; The resolution of the sensor is R mm / unit, and the output range is 0 to M hexadecimal units, corresponding to actual displacements from 0 to D cm, where the resolution needs to be converted from mm to cm by dividing by 10; The scaling factor used to map the full range of hexadecimal values to the actual displacement range D cm depends on the specific values of M and D. The scaling factor is expressed as: ; Therefore, the complete conversion formula is: 。
Citation Information
Cited By
Tower crane height adjustment full-process monitoring method and device
CN119976641A