Rod lifting type structure of large-span simply-supported steel truss bridge and construction method
Through the method of dynamically adjusting the inclined rod with lifting structure and jack, the lifting complexity and splicing accuracy problems in cable lifting construction of large-span simple-supported steel truss bridges are solved, and an efficient and stable construction process is achieved, and the rigidity of the structure is improved. and construction efficiency.
Patent Information
- Application Number
- CN202411026052.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-08
AI Technical Summary
When dealing with the cable lifting construction of large-span simply supported steel truss bridges, the high lifting operation complexity and node splicing accuracy are difficult to ensure, resulting in low construction efficiency and insufficient structural stability, especially under specific geological and structural design requirements.
Using a lifting rod structure, the lower chord is lifted through the jack, so that the oblique rod gradually deflects from the free state to the inclined state, forming a triangle structure between the upper chord, the lower chord and the oblique rod, utilizing the stability of the triangle to disperse the load, and through Modular prefabrication and rapid assembly reduce the number of suspension cable lifting times and improve construction efficiency.
It improves the accuracy of node splicing and the stiffness of the overall structure, reduces the stress concentration problem caused by installation errors, shortens the construction cycle, reduces material waste and construction costs, and at the same time enhances the overall stability and durability of the bridge.
Smart Images

Figure CN118911018A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction engineering, and in particular to a lifting rod type structure of a large-span simply supported steel truss bridge and a construction method thereof. Background Art
[0002] In the field of steel truss bridge construction, commonly used construction methods include support construction method, floating and dragging method, and jacking method. However, in response to heavy traffic needs, steel truss bridges often need to be designed with a higher truss height, which directly leads to the challenges of slowing down construction speed and increasing difficulty when using traditional construction methods due to the heavy weight and significant height of the truss itself. Especially in canyon areas, deep and fast waters, or environments where it is necessary to ensure smooth passage of ships on navigable rivers, traditional construction methods are even more inadequate. At this time, cable hoisting construction, with its excellent spanning capacity, flexible horizontal and vertical transportation performance, wide adaptability, and stability and convenience during construction, has become the preferred solution for large-span simply supported steel truss bridges under specific geological and structural design requirements.
[0003] In order to overcome the above-mentioned construction difficulties, industry experts are actively seeking innovative solutions. For example, Chinese patent CN101525866A demonstrates an advanced method for forcing the closure of multiple truss steel beams by using temporary pier offset technology. This technology prefabricates precisely sized splicing plates and rod bolt holes in the factory, and uses the fine adjustment of the inclined cables and the clever offset of the temporary piers on site to accurately control the three-way posture of the closure mouth, thereby achieving fast, efficient and high-quality closure of steel truss beam members. Despite this, this method still faces the limitations of high complexity of hoisting operations and difficulty in ensuring node splicing accuracy when dealing with cable hoisting construction of large-span simply supported steel truss bridges. In summary, although the existing technology has promoted the advancement of steel truss bridge construction technology to a certain extent, for construction problems in specific scenarios, such as cable hoisting construction of large-span simply supported steel truss bridges, further exploration of more efficient and accurate solutions is still needed. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a lifting rod type structure and a construction method for a large-span simply supported steel truss bridge.
[0005] The technical solution adopted by the present invention is as follows: A lifting rod type structure of a long-span simply supported steel truss bridge comprises a working pier and a lifting rod type structure arranged on the working pier by a jack, wherein the lifting rod type structure comprises: The lower chord is arranged between the left and right jacks and is provided with a slide slot opening upward; The upper chord is hoisted above the lower chord, and a number of diagonal rods are freely hinged in the middle; The upper end of the diagonal rod is hinged to the upper chord rod, and the lower end of the diagonal rod is provided with a pulley through a mounting seat. The pulley falls into the slide groove of the lower chord rod and is used to adjust the relative distance between the lower chord rod and the upper chord rod; Among them, truss pedestals are set on both sides above the working pier, and the upper chord is fixed to the truss pedestal through fixing plate I; the lower chord is raised to the same height as the truss pedestal through a jack, and the diagonal rod is deflected from a free state to an inclined state; the lower chord is fixed to the truss pedestal through fixing plate II, and the diagonal rod is fixed to the lower chord through fixing plate III.
[0006] This technical solution uses a jack to lift the lower chord so that the diagonal bar gradually deflects from a free state to an inclined state. This dynamic adjustment process ensures that the diagonal bar can accurately reach its specified position, which not only improves the accuracy of node splicing, but also allows the entire structure to gradually stabilize during the assembly process, reducing stress concentration problems caused by installation errors; the triangular structure formed between the upper chord, the lower chord and the diagonal bar fully utilizes the stability advantage of the triangle in structural mechanics, effectively disperses the load borne by the bridge, and improves the rigidity of the overall structure; the steel truss is divided into the upper part of the truss (upper chord and diagonal bar), the lower part of the truss (lower chord) and the truss pedestal. The modular structure allows each part to be prefabricated independently and assembled quickly on site, which not only reduces the number of cable hoisting times, but also speeds up the construction progress and improves construction efficiency; after the truss steel plate is hoisted, it is used as a construction platform to carry out the construction of crossbeams, longitudinal beams, upper horizontal longitudinal joints, lower horizontal longitudinal joints and middle horizontal joints in turn. Make full use of the completed truss structure, reduce the need for additional construction scaffolds, and further improve construction efficiency; use a combination of bolt connection and repair welding to firmly connect the truss base, the upper part of the truss and the lower part of the truss into a whole. The multi-level consolidation structure not only enhances the overall stability of the structure, but also improves the bearing capacity of the nodes, ensuring the safety and durability of the bridge during long-term use; set a reinforcement strip at the bottom of the lower chord to increase the bearing capacity and stiffness of the lower chord by increasing the local material thickness or using high-strength materials, which helps to resist the bending deformation caused by the load and further enhance the stability of the structure; through the cooperation of the pulley and the slide, the diagonal rod can slide freely on the lower chord and adjust the relative distance between it and the upper chord, thereby improving the flexibility of the structure; the working pier and the jack on it are dismantled and recycled after the lifting and fixing of the lower chord, which not only reduces material waste during construction, but also reduces construction costs.
[0007] In addition, the above-mentioned long-span simply supported steel truss bridge lifting structure and construction method according to the present invention also have the following additional technical features: According to one embodiment of the present invention, the lower chord includes a main body I, which is in the shape of a long groove with a U-shaped cross-section, and a reinforcement strip is provided at the bottom of the slide groove of the main body I; mounting holes I that cooperate with the fixing plate II are provided at both ends of the main body I; the middle part of the main body I is connected to the lower end of the diagonal rod through the fixing plate III.
[0008] In the present technical solution, the web and flange of the U-shaped section of the lower chord can work together to effectively disperse stress when resisting bending deformation; the reinforcement strip is set at the bottom of the slide to enhance the local strength of the slide area. Since the slide is the area where the pulley moves and it is also the place where stress concentrates, the reinforcement strip can effectively resist the local compressive stress and shear stress generated by the sliding of the pulley and the action of the load, and prevent the bottom of the slide from cracking or deformation; the middle part of the main body I is connected to the lower end of the diagonal rod through the fixed plate III, ensuring that the diagonal rod can stably support the upper chord and effectively transfer the load to the lower chord; the fixed plate III also plays a role in dispersing stress and protecting the connection point of the diagonal rod, preventing connection failure due to stress concentration.
[0009] According to one embodiment of the present invention, the upper chord rod includes a body II, a hinge hole I hinged to the upper end of the diagonal rod is provided in the middle of the body II; and mounting holes II cooperating with the fixing plate I are provided at both ends of the body II.
[0010] In the technical solution, the diagonal rod and the upper chord are relatively hinged and rotated, so that the diagonal rod can serve as an effective supporting member to help the upper chord resist bending and shear forces, thereby more effectively distributing and transmitting forces when the bridge is under load.
[0011] According to one embodiment of the present invention, the inclined rod includes a main body III, the upper end of the main body III is provided with a hinge hole II, the hinge hole II and the hinge hole I are penetrated by a pin shaft and limited by a limit nut; the lower end of the main body III is provided with a mounting seat and a mounting hole III, the mounting seat is movably arranged in the slide groove through a pulley, and the mounting hole III is fixed to the lower chord rod through a fixing plate III.
[0012] In this technical solution, the diagonal rod is not only connected to the lower chord rod through the sliding connection between the pulley and the slide groove, but also fixed to the lower chord rod through the fixing plate III and the mounting hole III, which can effectively cooperate with the upper chord rod and the lower chord rod to jointly bear the load and deformation of the bridge, ensuring the safety, stability and long-term use of the bridge structure. Among them: the limit nut can prevent the pin shaft from slipping or loosening when subjected to force, ensuring the durability and safety of the connection; the mounting seat provides stable support for the pulley, avoiding the pulley from deflecting or shaking during the sliding process, and further enhancing the stability of the connection.
[0013] According to one embodiment of the present invention, the upper part of the truss pedestal is fixed to the upper chord through a fixing plate I, and the lower part of the truss pedestal is fixed to the lower chord through a fixing plate II; the truss pedestal and the upper chord and the lower chord together constitute a truss rigid plate; using the truss rigid plate as a support, the cross beam, longitudinal beam, upper horizontal longitudinal joint, lower horizontal longitudinal joint and middle cross joint are constructed in sequence to form a large-span simply supported steel truss bridge.
[0014] In this technical solution, the truss pedestal serves as the basic supporting part of the bridge structure. Its upper part is firmly connected to the upper chord through fixing plate I, and its lower part is tightly fixed to the lower chord through fixing plate II, so as to ensure that the truss pedestal can stably support the entire truss steel plate to prevent it from displacement or deformation during construction. The truss steel plate is hoisted and fixed as a whole to form a stable bracket, on which the cross beams, longitudinal beams, upper horizontal longitudinal joints, lower horizontal longitudinal joints and middle cross joints are constructed in sequence, which not only improves the construction efficiency but also reduces the difficulty and risk of on-site operations.
[0015] According to one embodiment of the present invention, a plurality of jacks are arranged on the working pier to form a beam lifting platform; the working pier is a temporary working platform, and after the fixing is completed, the working pier will be disassembled and recycled.
[0016] In this technical solution, the beam lifting platform composed of jacks can provide stable support and uniform force distribution during the lifting process, reducing the risk of damage or overturning of the structure due to uneven lifting or sudden situations. After the fixing work (such as segment splicing and fixing of the bridge) is completed, the working pier is disassembled and recycled. Temporary working piers help reduce construction costs because the working piers do not need to have complex structural and material requirements like permanent structures.
[0017] According to one embodiment of the present invention, the lower chord, upper chord, diagonal rods and truss pedestal are all prefabricated parts, and the upper chord, diagonal rods and truss pedestal are hoisted by hoisting systems located on both sides of the working pier.
[0018] In this technical solution, the lower chord, upper chord, diagonal rod and truss pedestal are all prefabricated parts. During on-site construction, it is only necessary to hoist these prefabricated parts to the designated position and connect them, which greatly shortens the construction period. The hoisting system includes components such as cranes, slings, and slings, which can ensure that the prefabricated parts remain stable and do not shake during the hoisting process, and are accurately aligned with the installation position. The bridge or other structure is decomposed into several prefabricated parts for production and hoisting to achieve modular construction. After the hoisting is completed, it is also necessary to inspect and accept the overall structure to ensure that the construction quality meets the specified standards.
[0019] To achieve the above object, the present invention also provides a rod-lifting construction method for a large-span simply supported steel truss bridge.
[0020] A rod-lifting construction method for a long-span simply supported steel truss bridge comprises the following steps: S1. Prefabrication: The long-span simply supported steel truss bridge is divided into a rising rod structure, a truss pedestal, a crossbeam, a longitudinal beam, an upper horizontal longitudinal link, a lower horizontal longitudinal link and an intermediate horizontal link; the upper chord and diagonal rod of the rising rod structure form the upper part of the truss, the lower chord forms the lower part of the truss, and the diagonal rod is a rod with a pulley and can be hinged, among which: S11. Prefabrication of lower chord: a reinforcement strip is set at the bottom of the body I to enhance the strength, installation holes I are reserved at both ends to connect the fixing plate II, and a connection point is reserved in the middle to fix it with the diagonal rod; S12, prefabrication of the upper chord: a hinge hole I is provided in the middle of the body II for hinge connection with the diagonal rod, and mounting holes II are provided at both ends for connection with the fixing plate I; S13, prefabrication of the diagonal rod: the upper end of the body III is provided with a hinge hole II for hinge connection with the upper chord rod, the lower end is provided with a mounting seat and a mounting hole III, and a pulley is installed in the mounting seat; S14. Prefabrication of truss pedestal: prefabricate the truss pedestal to ensure that the upper and lower parts of the truss pedestal can be fixed with the upper chord and the lower chord respectively; S2, pole erection: construct truss pedestals at the abutments on both sides, and construct working piers and hoisting systems near the abutments; use the hoisting system to hoist the lower chord onto the working pier; place several jacks on the working pier to form a beam lifting platform; the jacks will be used to subsequently lift the lower chord; at this time, the lower chord is in a non-fixed state, ready for subsequent lifting; S3, Hoisting: Use the hoisting system to splice the prefabricated upper chord with the truss pedestal, and the pulley of the free diagonal rod just falls into the slide groove of the lower chord, where: S31. Hoisting the truss pedestal: Use the hoisting system to hoist the truss pedestal to the predetermined position and initially fix it; S32. Hoist the upper chord: Hoist the upper chord above the lower chord. The pulley at the lower end of the diagonal rod should smoothly fall into the slide groove of the lower chord. S4, lifting rod: start the jack and gradually raise the lower chord until it reaches the same height as the truss base; during this process, the diagonal rod gradually deflects from a free state to an inclined state to support the upper chord and adjust the relative distance between it and the lower chord; S5. Consolidation: respectively fix the truss base to the upper chord and the lower chord, and fix the diagonal rod to the upper chord and the lower chord to form a truss rigid plate; using the truss rigid plate as a support, sequentially construct the cross beam, longitudinal beam, upper horizontal longitudinal joint, lower horizontal longitudinal joint and middle cross joint to form a long-span simply supported steel truss bridge.
[0021] In this technical solution, each module is prefabricated in the factory, including the reinforcement of the lower chord, the reservation of the installation holes, the installation of the pulleys of the diagonal rod, etc., to ensure the accuracy and consistency of the components. At the same time, prefabrication also reduces the complexity and uncertainty of on-site construction and improves construction safety; the lower chord is gradually lifted by the jack, so that the diagonal rod is gradually deflected and supports the upper chord to form a stable truss steel sheet. This method adjusts the lifting speed and height according to the actual situation to ensure the smoothness and accuracy of the construction process; strict quality control measures are carried out in key stages such as prefabrication, hoisting and consolidation. For example, in the prefabrication stage, the installation holes and connection points are reserved to ensure the precise docking between the components; in the hoisting stage, the hoisting system is used to ensure the smooth hoisting of the components; in the consolidation stage, a stable truss steel sheet is formed by fixed connection. These measures jointly ensure the construction quality and the safety of the bridge; after the construction is completed, some temporary components such as the working pier and the hoisting system are disassembled, recycled and reused in other engineering projects, improving the utilization efficiency of resources and reducing waste.
[0022] According to an embodiment of the present invention, after the consolidation in step S5 is completed, the working pier and the jack thereon are removed and recycled.
[0023] In this technical solution, temporary facilities are dismantled in a timely manner to make room for subsequent construction and reduce the complexity and interference factors of the construction site, thereby improving construction efficiency and shortening the construction period.
[0024] Compared with the prior art, the present invention has the following beneficial effects: (1) The lower chord is lifted by a jack, so that the diagonal rod is gradually deflected from a free state to an inclined state. This dynamic adjustment process ensures that the diagonal rod can accurately reach its specified position, which not only improves the accuracy of node splicing, but also enables the entire structure to gradually stabilize during the assembly process, reducing the stress concentration problem caused by installation errors; (2) The triangular structure formed by the upper chord, lower chord and diagonal bars fully utilizes the stability advantage of the triangle in structural mechanics, effectively disperses the load borne by the bridge, and improves the stiffness of the overall structure; (3) Each part is prefabricated independently and quickly assembled on site, which not only reduces the number of cable hoisting operations but also speeds up the construction progress and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a construction schematic diagram of the structure of the present invention.
[0026] Figure 2 It is a structural diagram of the working pier and jack.
[0027] Figure 3 It is one of the state diagrams of the upper chord and the diagonal rod.
[0028] Figure 4 This is the second schematic diagram of the status of the upper chord and the diagonal rod.
[0029] Figure 5 It is a structural diagram of the truss pedestal.
[0030] Figure 6 It is a schematic diagram of the structure of the lower chord.
[0031] Figure 7 It is a schematic diagram of the structure of the upper chord.
[0032] Figure 8 It is a structural diagram of the diagonal rod.
[0033] Fig. 9 is a flow chart of the method of the present invention.
[0034] In the figure: 1. working pier; 2. jack; 3. lower chord; 31. main body Ⅰ; 32. mounting hole Ⅰ; 33. reinforcement strip; 4. upper chord; 41. main body Ⅱ; 42. hinge hole Ⅰ; 43. mounting hole Ⅱ; 5. diagonal rod; 51. main body Ⅲ; 52. hinge hole Ⅱ; 53. mounting hole Ⅲ; 54. pin; 55. limit nut; 56. mounting seat; 57. pulley; 6. truss base; 7. fixing plate Ⅰ; 8. fixing plate Ⅱ; 9. fixing plate Ⅲ. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] Example 1 like Figures 1 to 5 As shown, this embodiment provides a lifting rod structure of a long-span simply supported steel truss bridge, including a working pier 1 and a lifting rod structure arranged on the working pier 1 through a jack 2, the lifting rod structure including: The lower chord rod 3 is arranged between the left and right jacks 2 and is provided with a slide groove opening upward; The upper chord bar 4 is hoisted above the lower chord bar 3, and a plurality of diagonal bars 5 are freely hinged in the middle thereof; The diagonal rod 5 has an upper end hinged with the upper chord rod 4 and a pulley 57 disposed at its lower end through a mounting seat 56. The pulley 57 falls into a slide groove of the lower chord rod 3 and is used to adjust the relative distance between the lower chord rod 3 and the upper chord rod 4. Among them, truss pedestals 6 are arranged on both sides above the working pier 1, and the upper chord 4 is fixed to the truss pedestal 6 through the fixing plate Ⅰ7; the lower chord 3 is raised to the same height as the truss pedestal 6 by the jack 2, and the diagonal rod 5 is deflected from a free state to an inclined state; the lower chord 3 is fixed to the truss pedestal 6 through the fixing plate Ⅱ8, and the diagonal rod 5 is fixed to the lower chord 3 through the fixing plate Ⅲ9.
[0037] like Figures 1 to 5 As shown, the technical solution lifts the lower chord 3 by the jack 2, so that the diagonal bar 5 gradually deflects from the free state to the inclined state. This dynamic adjustment process ensures that the diagonal bar 5 can accurately reach its specified position, which not only improves the accuracy of node splicing, but also enables the entire structure to gradually stabilize during the assembly process, reducing the stress concentration problem caused by installation errors; the triangular structure formed between the upper chord 4, the lower chord 3 and the diagonal bar 5 fully utilizes the stability advantage of the triangle in structural mechanics, effectively disperses the load borne by the bridge, and improves the rigidity of the overall structure; the steel truss is divided into the upper part of the truss (upper chord 4 and diagonal bar 5), the lower part of the truss (lower chord 3) and the truss base 6. The modular structure allows each part to be prefabricated independently and assembled quickly on site, which not only reduces the number of suspension cable hoisting, but also speeds up the construction progress and improves the construction efficiency; after the hoisting of the truss steel plate is completed, it is used as a construction platform to carry out the construction of the crossbeam, longitudinal beam, upper horizontal longitudinal joint, lower horizontal longitudinal joint and middle horizontal joint in turn. , make full use of the completed truss structure, reduce the need for additional construction supports, and further improve construction efficiency; adopt a combination of bolt connection and repair welding to firmly connect the truss base 6, the upper part of the truss and the lower part of the truss as a whole. The multi-level consolidation structure not only enhances the overall stability of the structure, but also improves the bearing capacity of the node, ensuring the safety and durability of the bridge during long-term use; a reinforcement strip 33 is set at the bottom of the lower chord 3, and the bearing capacity and rigidity of the lower chord 3 are improved by increasing the local material thickness or using high-strength materials, which helps to resist the bending deformation caused by the load and further enhance the stability of the structure; through the cooperation of the pulley 57 and the slide groove, the diagonal rod 5 can slide freely on the lower chord 3 and adjust the relative distance between it and the upper chord 4, thereby improving the flexibility of the structure; the working pier 1 and the jack 2 thereon are dismantled and recycled after the lifting and fixing of the lower chord 3 are completed, which not only reduces the waste of materials during the construction process, but also reduces the construction cost.
[0038] In addition, the above-mentioned long-span simply supported steel truss bridge lifting structure and construction method according to the present invention also have the following additional technical features: like Figure 6As shown, the lower chord rod 3 includes a main body Ⅰ31, which is in the shape of a long groove with a U-shaped cross-section, and a reinforcing strip 33 is provided at the bottom of the slide groove of the main body Ⅰ31; mounting holes Ⅰ32 matching with the fixing plate Ⅱ8 are provided at both ends of the main body Ⅰ31; the middle part of the main body Ⅰ31 is connected to the lower end of the diagonal rod 5 through the fixing plate Ⅲ9.
[0039] In the present technical solution, the web and flange of the U-shaped cross-section of the lower chord 3 can work together to effectively disperse stress when resisting bending deformation; the reinforcement strip 33 is set at the bottom of the slide to enhance the local strength of the slide area. Since the slide is the area where the pulley 57 moves and it is also the place where stress concentrates, the reinforcement strip 33 can effectively resist the local compressive stress and shear stress generated by the sliding of the pulley 57 and the load, and prevent the bottom of the slide from cracking or deformation; the middle part of the main body I31 is connected to the lower end of the diagonal rod 5 through the fixed plate III9, ensuring that the diagonal rod 5 can stably support the upper chord 4 and effectively transfer the load to the lower chord 3; the fixed plate III9 also plays a role in dispersing stress and protecting the connection point of the diagonal rod 5, preventing connection failure due to stress concentration.
[0040] like Figure 7 As shown, the upper chord rod 4 includes a main body II41, and a hinge hole I42 hinged to the upper end of the oblique rod 5 is provided in the middle of the main body II41; mounting holes II43 cooperating with the fixing plate I7 are provided at both ends of the main body II41.
[0041] In this technical solution, the diagonal rod 5 and the upper chord rod 4 are relatively hinged and rotated, so that the diagonal rod 5 can serve as an effective supporting member to help the upper chord rod 4 resist bending and shear forces, thereby more effectively distributing and transmitting forces when the bridge is under load.
[0042] like Figure 8 As shown, the inclined rod 5 includes a main body III51, and a hinge hole II52 is provided at the upper end of the main body III51. A pin shaft 54 is provided through the hinge hole II52 and the hinge hole I42 and is limited by a limit nut 55; a mounting seat 56 and a mounting hole III53 are provided at the lower end of the main body III51, and the mounting seat 56 is movably arranged in the slide groove through a pulley 57, and the mounting hole III53 is fixed to the lower chord rod 3 through a fixing plate III9.
[0043] In this technical solution, the diagonal rod 5 is not only connected to the lower chord rod 3 through the sliding connection of the pulley 57 and the slide groove, but also fixed to the lower chord rod 3 through the fixing plate III9 and the mounting hole III53, which can effectively cooperate with the upper chord rod 4 and the lower chord rod 3 to jointly bear the load and deformation of the bridge, ensuring the safety, stability and long-term use of the bridge structure. Among them: the limit nut 55 can prevent the pin shaft 54 from slipping or loosening when subjected to force, ensuring the durability and safety of the connection; the mounting seat 56 provides stable support for the pulley 57, avoiding the pulley 57 from deflecting or shaking during the sliding process, and further enhancing the stability of the connection.
[0044] According to one embodiment of the present invention, the upper part of the truss pedestal 6 is fixed to the upper chord 4 through a fixing plate Ⅰ7, and the lower part of the truss pedestal 6 is fixed to the lower chord 3 through a fixing plate Ⅱ8; the truss pedestal 6 and the upper chord 4 and the lower chord 3 together constitute a truss rigid plate; using the truss rigid plate as a support, the cross beam, longitudinal beam, upper horizontal longitudinal joint, lower horizontal longitudinal joint and middle cross joint are constructed in sequence to form a large-span simply supported steel truss bridge.
[0045] In the present technical solution, the truss pedestal 6 serves as the basic supporting part of the bridge structure, and its upper part is firmly connected to the upper chord 4 through the fixing plate Ⅰ7, and its lower part is tightly fixed to the lower chord 3 through the fixing plate Ⅱ8, so as to ensure that the truss pedestal 6 can stably support the entire truss steel plate to prevent it from displacement or deformation during the construction process; the truss steel plate is hoisted and fixed as a whole to form a stable bracket, and the construction of the cross beam, longitudinal beam, upper horizontal longitudinal joint, lower horizontal longitudinal joint and middle cross joint is carried out in sequence on this bracket, which not only improves the construction efficiency, but also reduces the difficulty and risk of on-site operations.
[0046] According to one embodiment of the present invention, a plurality of jacks 2 are arranged on the working pier 1 to form a beam lifting platform; the working pier 1 is a temporary working platform, and after the fixing is completed, the working pier 1 is disassembled and recycled.
[0047] In this technical solution, the beam lifting platform composed of jacks can provide stable support and uniform force distribution during the lifting process, reducing the risk of damage or overturning of the structure due to uneven lifting or sudden situations. After the fixing work (such as segment splicing and fixing of the bridge) is completed, the working pier 1 is disassembled and recycled. The temporary working pier 1 helps to reduce construction costs because the working pier 1 does not need to have complex structural and material requirements like permanent structures.
[0048] According to one embodiment of the present invention, the lower chord 3 , upper chord 4 , diagonal rods 5 and truss pedestal 6 are all prefabricated parts, and the upper chord 4 , diagonal rods 5 and truss pedestal 6 are hoisted by a hoisting system located on both sides of the working pier 1 .
[0049] In the present technical solution, the lower chord 3, the upper chord 4, the diagonal rod 5 and the truss pedestal 6 are all prefabricated parts. During on-site construction, it is only necessary to hoist these prefabricated parts to the designated positions and connect them, which greatly shortens the construction period. The hoisting system includes components such as cranes, slings, and slings, which can ensure that the prefabricated parts remain stable and do not shake during the hoisting process, and are accurately aligned with the installation position. The bridge or other structure is decomposed into several prefabricated parts for production and hoisting to achieve modular construction. After the hoisting is completed, it is also necessary to inspect and accept the overall structure to ensure that the construction quality meets the specified standards.
[0050] Example 2 Based on Example 1, Fig. 9 As shown, this embodiment provides a rod-lifting construction method for a long-span simply supported steel truss bridge, comprising the following steps: S1. Prefabrication: The long-span simply supported steel truss bridge is divided into a lifting rod structure, a truss pedestal 6, a crossbeam, a longitudinal beam, an upper horizontal longitudinal link, a lower horizontal longitudinal link and an intermediate crossbeam; the upper chord 4 and the diagonal rod 5 of the lifting rod structure form the upper part of the truss, the lower chord 3 forms the lower part of the truss, and the diagonal rod 5 is a rod with a pulley 57 and can be hinged, wherein: S11, prefabrication of the lower chord 3: a reinforcement strip 33 is set at the bottom of the body Ⅰ31 to enhance the strength, mounting holes Ⅰ32 are reserved at both ends to connect the fixing plate Ⅱ8, and a connection point is reserved in the middle to fix with the diagonal rod 5; S12, prefabrication of the upper chord 4: a hinge hole Ⅰ42 is provided in the middle of the body Ⅱ41 for hinge connection with the diagonal rod 5, and mounting holes Ⅱ43 are provided at both ends for connecting with the fixing plate Ⅰ7; S13, prefabrication of the diagonal rod 5: the upper end of the body III 51 is provided with a hinge hole II 52 to be hinged with the upper chord rod 4, the lower end is provided with a mounting seat 56 and a mounting hole III 53, and a pulley 57 is installed in the mounting seat 56; S14, prefabrication of the truss base 6: prefabricate the truss base 6, ensuring that the upper and lower parts thereof can respectively fix the upper chord 4 and the lower chord 3; S2, erecting the pole: construct the truss pedestal 6 at the abutments on both sides, construct the working pier 1 and the hoisting system near the abutments; use the hoisting system to hoist the lower chord 3 onto the working pier 1; place several jacks 2 on the working pier 1 to form a beam lifting platform; the jacks 2 will be used to subsequently lift the lower chord 3; at this time, the lower chord 3 is in a non-fixed state, ready for subsequent lifting; S3, hoisting: Use the hoisting system to splice the prefabricated upper chord 4 and the truss base 6, and the pulley 57 of the free diagonal rod 5 just falls into the slide groove of the lower chord 3, wherein: S31, hoisting the truss pedestal 6: hoisting the truss pedestal 6 to a predetermined position using a hoisting system and preliminarily fixing it; S32, hoisting the upper chord rod 4: hoisting the upper chord rod 4 to the top of the lower chord rod 3, the pulley 57 at the lower end of the diagonal rod 5 should smoothly fall into the chute of the lower chord rod 3; S4, lifting the rod: start the jack 2, gradually raise the lower chord 3 until it reaches the same height as the truss base 6; in this process, the diagonal rod 5 gradually deflects from a free state to an inclined state to support the upper chord 4 and adjust the relative distance between it and the lower chord 3; S5. Consolidation: respectively fix the truss base 6 to the upper chord 4 and the lower chord 3, and fix the diagonal rod 5 to the upper chord 4 and the lower chord 3 to form a truss rigid plate; using the truss rigid plate as a support, sequentially construct the cross beam, longitudinal beam, upper horizontal longitudinal joint, lower horizontal longitudinal joint and middle cross beam to form a long-span simply supported steel truss bridge.
[0051] In this technical solution, each module is prefabricated in the factory, including the reinforcement of the lower chord 3, the reservation of the installation holes, the installation of the pulley 57 of the diagonal rod 5, etc., to ensure the accuracy and consistency of the components. At the same time, prefabrication production also reduces the complexity and uncertainty of on-site construction and improves construction safety; the lower chord 3 is gradually lifted by the jack 2, so that the diagonal rod 5 gradually deflects and supports the upper chord 4 to form a stable truss steel sheet. This method adjusts the lifting speed and height according to the actual situation to ensure the smoothness and accuracy of the construction process; strict quality control measures are carried out in key stages such as prefabrication, hoisting and consolidation. For example, in the prefabrication stage, the installation holes and connection points are reserved to ensure the precise docking between the components; in the hoisting stage, the hoisting system is used to ensure the smooth hoisting of the components; in the consolidation stage, a stable truss steel sheet is formed by fixed connection. These measures jointly ensure the construction quality and the safety of the bridge; after the construction is completed, some temporary components such as the working pier 1 and the hoisting system are disassembled, recycled and reused in other engineering projects, improving the utilization efficiency of resources and reducing waste.
[0052] According to an embodiment of the present invention, after the consolidation in step S5 is completed, the working pier 1 and the jack 2 thereon are dismantled and recycled.
[0053] In this technical solution, temporary facilities are dismantled in a timely manner to make room for subsequent construction and reduce the complexity and interference factors of the construction site, thereby improving construction efficiency and shortening the construction period.
[0054] Although the present invention is described in detail by referring to the accompanying drawings and in combination with the preferred embodiments, the present invention is not limited thereto. Without departing from the spirit and essence of the present invention, a person of ordinary skill in the art may make various equivalent modifications or substitutions to the embodiments of the present invention, and these modifications or substitutions shall be within the scope of the present invention. Any person of ordinary skill in the art may easily think of changes or substitutions within the technical scope disclosed by the present invention, and these shall be within the scope of protection of the present invention. Therefore, the scope of protection of the present invention shall be subject to the scope of protection of the claims.
Claims
1. A long-span simply supported steel truss bridge with a lifting rod structure, characterized in that: The invention comprises a working pier (1) and a lifting rod type structure arranged on the working pier (1) via a jack (2), wherein the lifting rod type structure comprises: A lower chord rod (3) is arranged between the left and right jacks (2) and is provided with a sliding groove with an opening facing upward; An upper chord rod (4) is hoisted above the lower chord rod (3), and a plurality of diagonal rods (5) are freely hinged in the middle thereof; The upper end of the diagonal rod (5) is hinged to the upper chord rod (4), and the lower end of the diagonal rod (5) is provided with a pulley (57) through a mounting seat (56). The pulley (57) falls into the slide groove of the lower chord rod (3) and is used to adjust the relative distance between the lower chord rod (3) and the upper chord rod (4); Wherein, truss pedestals (6) are arranged on both sides above the working pier (1); the upper chord (4) is fixed to the truss pedestal (6) through a fixing plate I (7); the lower chord (3) is raised to the same height as the truss pedestal (6) through a jack (2), and the diagonal rod (5) is deflected from a free state to an inclined state; the lower chord (3) is fixed to the truss pedestal (6) through a fixing plate II (8), and the diagonal rod (5) is fixed to the lower chord (3) through a fixing plate III (9).
2. The long-span simply supported steel truss bridge lifting structure according to claim 1, characterized in that: The lower chord rod (3) comprises a main body I (31), which is in the shape of a long groove with a U-shaped cross section, and a reinforcing strip (33) is arranged at the bottom of the sliding groove of the main body I (31); both ends of the main body I (31) are provided with mounting holes I (32) matching with the fixing plate II (8); the middle part of the main body I (31) is connected to the lower end of the oblique rod (5) through the fixing plate III (9).
3. The long-span simply supported steel truss bridge lifting structure according to claim 2, characterized in that: The upper chord rod (4) comprises a body II (41), the middle of which is provided with a hinge hole I (42) hinged to the upper end of the oblique rod (5); and both ends of the body II (41) are provided with mounting holes II (43) matched with the fixing plate I (7).
4. The long-span simply supported steel truss bridge lifting structure according to claim 3, characterized in that: The inclined rod (5) comprises a body III (51), the upper end of the body III (51) is provided with a hinge hole II (52), the hinge hole II (52) and the hinge hole I (42) are penetrated by a pin shaft (54) and are limited by a limit nut (55); the lower end of the body III (51) is provided with a mounting seat (56) and a mounting hole III (53), the mounting seat (56) is movably arranged in a slide groove through a pulley (57), and the mounting hole III (53) is fixed to the lower chord rod (3) through a fixing plate III (9).
5. The long-span simply supported steel truss bridge lifting structure according to claim 4, characterized in that: The upper part of the truss pedestal (6) is fixed to the upper chord (4) via a fixing plate I (7), and the lower part of the truss pedestal (6) is fixed to the lower chord (3) via a fixing plate II (8); the truss pedestal (6), the upper chord (4) and the lower chord (3) together form a truss rigid plate; using the truss rigid plate as a support, the cross beam, the longitudinal beam, the upper horizontal longitudinal joint, the lower horizontal longitudinal joint and the middle cross beam are constructed in sequence to form a long-span simply supported steel truss bridge.
6. The long-span simply supported steel truss bridge lifting structure according to claim 1, characterized in that: The working pier (1) is provided with a plurality of jacks (2) to form a beam lifting platform; the working pier (1) is a temporary working platform, and after the fixing is completed, the working pier (1) is disassembled and recycled.
7. The long-span simply supported steel truss bridge lifting structure according to claim 1, characterized in that: The lower chord (3), upper chord (4), diagonal rod (5) and truss pedestal (6) are all prefabricated parts, and the upper chord (4), diagonal rod (5) and truss pedestal (6) are hoisted by hoisting systems located on both sides of the working pier (1).
8. A method for constructing a long-span simply supported steel truss bridge by means of a lifting rod, using the lifting rod structure of the long-span simply supported steel truss bridge according to any one of claims 1 to 7, characterized in that: The steps include: S1. Prefabrication: The long-span simply supported steel truss bridge is divided into a lifting rod structure, a truss pedestal (6), a crossbeam, a longitudinal beam, an upper horizontal longitudinal link, a lower horizontal longitudinal link and an intermediate horizontal link; the upper chord (4) and the diagonal rod (5) of the lifting rod structure form the upper part of the truss, the lower chord (3) forms the lower part of the truss, and the diagonal rod (5) is a rod with a pulley (57) and can be hinged, wherein: S11, prefabrication of the lower chord (3): a reinforcing strip (33) is provided at the bottom of the body I (31) to enhance the strength, mounting holes I (32) are reserved at both ends to connect to the fixing plate II (8), and a connection point is reserved in the middle to be fixed to the diagonal rod (5); S12, prefabrication of the upper chord (4): a hinge hole I (42) is provided in the middle of the body II (41) for hinge connection with the diagonal rod (5), and mounting holes II (43) are provided at both ends for connection with the fixing plate I (7); S13, prefabrication of the diagonal rod (5): the upper end of the body III (51) is provided with a hinge hole II (52) hinged to the upper chord rod (4), the lower end is provided with a mounting seat (56) and a mounting hole III (53), and a pulley (57) is installed in the mounting seat (56); S14, prefabrication of the truss base (6): prefabricate the truss base (6), ensuring that the upper and lower parts of the truss base (6) can respectively fix the upper chord (4) and the lower chord (3); S2, erecting the beam: constructing a truss pedestal (6) at the abutments on both sides, constructing a working pier (1) and a hoisting system near the abutments; hoisting the lower chord (3) onto the working pier (1) using the hoisting system; placing a number of jacks (2) on the working pier (1) to form a beam lifting platform; the jacks (2) will be used to subsequently lift the lower chord (3); at this time, the lower chord (3) is in a non-fixed state, ready for subsequent lifting; S3, hoisting: the prefabricated upper chord (4) is spliced with the truss pedestal (6) by means of a hoisting system, and the pulley (57) of the free diagonal rod (5) just falls into the slide groove of the lower chord (3), wherein: S31, hoisting the truss pedestal (6): hoisting the truss pedestal (6) to a predetermined position using a hoisting system and preliminarily fixing it; S32, hoisting the upper chord rod (4): hoisting the upper chord rod (4) above the lower chord rod (3), and the pulley (57) at the lower end of the diagonal rod (5) should smoothly fall into the slide groove of the lower chord rod (3); S4, raising the rod: start the jack (2) and gradually raise the lower chord (3) until it reaches the same height as the truss base (6); during this process, the diagonal rod (5) gradually deflects from a free state to an inclined state to support the upper chord (4) and adjust the relative distance between it and the lower chord (3); S5, consolidation: the truss base (6) is fixedly connected to the upper chord (4) and the lower chord (3), and the diagonal rod (5) is fixedly connected to the upper chord (4) and the lower chord (3) to form a truss rigid plate; using the truss rigid plate as a support, the cross beam, the longitudinal beam, the upper horizontal longitudinal joint, the lower horizontal longitudinal joint and the middle cross beam are sequentially constructed to form a long-span simply supported steel truss bridge.
9. The method for constructing a long-span simply supported steel truss bridge by lifting rods as claimed in claim 8, characterized in that: After the consolidation in step S5 is completed, the working pier (1) and the jack (2) thereon are removed and recycled.