Method for reclaiming land from sea
By employing a reverse construction method involving high containment, low weir construction, siltation promotion, stabilization and reinforcement, and lake excavation and water storage, the difficulties in land reclamation caused by tidal changes were resolved, achieving efficient and low-cost land expansion.
Patent Information
- Application Number
- CN202411234449.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-08
AI Technical Summary
Existing land reclamation technologies face difficulties in construction due to tidal changes, resulting in high costs and long cycles.
The construction method employs a reverse approach, combining high containment, low weir construction, siltation promotion, stabilization and reinforcement, local filling, and lake excavation for water storage. This is combined with segmentation and detour water intake and drainage measures to control seawater flow and sediment, reduce the amount of fill material, and optimize the construction process.
It reduced the impact of construction on tides, improved construction efficiency and speed, reduced costs, enriched land functions, and achieved rapid and efficient land creation.
Smart Images

Figure CN118911080A_ABST
Abstract
Description
Technical Field
[0001] The present invention not only relates to the technical field of building construction, but also relates to a method for reclaiming land from the sea, and in particular to an advanced siltation-promoting construction method in the method for reclaiming land from the sea. Background Art
[0002] The Earth is the home of all human beings. The land resources available for human survival only account for 1 / 10 of the Earth's total area, and most of it is ocean. Therefore, it is necessary to reclaim land from the sea to expand the habitable area.
[0003] The existing technology of reclamation is to first determine the scope of the sea area to be reclaimed by land, and then gradually carry out enclosure, siltation promotion and filling operations along the land range, and then gradually expand the reclamation area. Although this operation method relies on land to gradually fill and reclaim land, during the operation, with the erosion of seawater tides, such operation and construction are difficult, which greatly increases the cost of filling and reclaiming land and greatly prolongs the time period. Therefore, this plan proposes an advanced method of reclamation. Summary of the invention
[0004] The purpose of the present invention is to provide a new method for reclaiming land from the sea to solve the problems existing in the above-mentioned background technology.
[0005] To achieve the above object, the present invention provides the following technical solution: a method for reclaiming land by enclosing the sea, the method comprising the following steps:
[0006] S1, conduct high-level containment operations, first select the sea area to be reclaimed, then identify the gaps in high terrain around the sea area, and block the identified gaps;
[0007] S2, perform low weir construction operation, determine the lowest point of the enclosed area according to the reclaimed sea area selected in S1, and build a dam submerged in the water at that point;
[0008] S3, performing siltation promotion operations on the areas enclosed by S1 and S2, wherein the siltation promotion includes siltation promotion measures of segmentation and division and siltation promotion measures combining circuitous water inflow and drainage;
[0009] S4, conduct stabilization and reinforcement operations, after the siltation promotion in S3 is completed, the dike is reinforced and fully closed;
[0010] S5, local filling operation is carried out to fill the low-lying areas in the closed area stabilized in S4 to form a flat ground;
[0011] S6, digging lakes and storing water, and implementing the digging lakes and storing water construction in the low-lying areas in S5 that cannot be filled with soil.
[0012] Preferably, the method of selecting the sea area to be reclaimed is to first select the sea area far from the land, and then gradually approach the land according to the designated range, so as to achieve full coverage of the reclaimed sea area from far to near, so that the sea area can be turned into land. This method can also be called: reverse construction in the construction of sea reclamation, that is, breaking the traditional thinking of traditional land reclamation: from near to far.
[0013] Preferably, the scope of the sea area to be reclaimed is determined by measuring the sea area according to the area required for reclamation, and determining the direction of water flow and changes in terrain height.
[0014] Preferably, the design of the position, height, dam type and water flow channel of the low weir in S2 is determined based on the measurement parameters of the reclaimed sea area.
[0015] Preferably, the parameters required to be measured for the low weir include water depth parameters, flow velocity parameters, salinity parameters, temperature parameters, wave height parameters, seabed topography parameters, tidal parameters and seawater quality parameters.
[0016] Preferably, the siltation-promoting measures of segmentation and block division include the following steps:
[0017] A1, first divide the reclaimed sea area into several blocks;
[0018] A2: Build dikes or islands around each block to isolate the flow of seawater and promote the sedimentation of suspended matter;
[0019] A3, by adjusting the shape and position of the dike or island, the direction and speed of seawater flow can be controlled so that the suspended matter is deposited in the designated area;
[0020] A4. Regularly clean up the silt and debris deposited in the reclaimed area to promote the formation and stability of land.
[0021] Preferably, the detour water inlet and drainage combined siltation promoting measures include the following steps:
[0022] B1, first build a circuitous waterway around the reclaimed sea area to lengthen the flow path of seawater when it enters the reclamation area, slow down the flow rate, and deposit suspended matter;
[0023] B2, set up drainage facilities in the reclaimed sea area, and control the water level and flow rate in the reclamation area by adjusting the opening and closing of the drainage outlets to promote the deposition of sediment materials;
[0024] B3. Regularly clean up the silt and debris deposited in the reclamation area and keep the waterway unobstructed;
[0025] B4. According to the siltation situation in the reclaimed sea area, adjust the location and layout of the circuitous waterways and drainage facilities to maximize the water flow direction and velocity.
[0026] Preferably, the S4 stabilization and reinforcement operation includes reinforcing the surface of the dike, strengthening the internal structure of the dike, adding connecting parts, fully closing the dike and regular inspection and maintenance.
[0027] Preferably, the S5 filling operation is a low filling operation, including gradual filling, compacting and leveling of the ground.
[0028] Preferably, the earthwork generated by digging the lake in S6 is used for reclamation and filling.
[0029] Technical effects and advantages of the present invention:
[0030] When the present invention is carrying out reclamation operations and selecting the sea area for reclamation, a high containment operation is first carried out to contain the sea area. After the containment, the reclaimed sea area will no longer be affected by the large-scale influence of the tide. At the same time, a siltation-promoting operation is carried out in combination with a low weir operation mode. This reduces environmental interference in the sea reclamation operation of the present invention, and the operation is more convenient and quick. At the same time, the present invention digs lakes and stores water in areas where soil cannot be filled, which reduces the amount of filling and enriches the functions of the enclosed land, achieving fast speed, high efficiency, low cost and high output. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is an operation flow chart of the method for reclamation of land from the sea according to the present invention. DETAILED DESCRIPTION
[0032] The technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only a part of the embodiment of the present invention, not all of the embodiments. Based on the embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0033] The present invention provides Figure 1 A land reclamation method for sea reclamation shown in the figure includes the following steps:
[0034] S1, conduct high-level containment operations, first select the sea area to be reclaimed, then identify the gaps in high terrain around the sea area, and block the identified gaps;
[0035] Specifically, the method of selecting the sea area to be reclaimed is to first select the sea area far away from the land, and then gradually approach the land according to the designated scope.
[0036] Furthermore, the scope of the sea area to be reclaimed is determined by measuring the sea area according to the area required for reclamation, and at the same time determining the direction of the water flow and the changes in terrain height.
[0037] S2, perform low weir construction operation, determine the lowest point of the enclosed area according to the reclaimed sea area selected in S1, and build a dam submerged in the water at that point;
[0038] It should be noted that the operating principle of low weir technology mainly relies on the natural force of water flow. Specifically, low weir is a hydraulic engineering structure that utilizes the impact force of water flow downstream of the dam body. Its main feature is that through appropriate dam design and construction, the water flow forms a low drop on the dam body, thereby forming a certain water level difference downstream of the dam body, and using this water level difference to regulate and utilize water resources.
[0039] Specifically, the location, height, dam type and water flow channel design of the low weir in S2 are determined based on the measured parameters of the reclaimed sea area.
[0040] It should be noted that the materials used to build the low weir include stones, sand and concrete, and the layered stacking or pouring method is adopted during construction to ensure the tightness and solidity of each layer; and according to design requirements, appropriate water holes or flood discharge holes are set on the dam body to control the water flow and water level on the dam.
[0041] Furthermore, the parameters that need to be measured for the low weir include water depth parameters, flow velocity parameters, salinity parameters, temperature parameters, wave height parameters, seabed topography parameters, tidal parameters and seawater quality parameters.
[0042] It should be noted that the water depth parameter is to measure the water depth at various locations in the sea area to determine the change of water depth;
[0043] The current velocity parameter is to measure the speed and direction of water flow in the sea area to understand the situation of the sea current;
[0044] Salinity parameters measure the salinity in seawater to understand the saltiness of seawater;
[0045] Temperature parameters are used to measure the temperature of seawater in order to understand the temperature changes of seawater;
[0046] The wave height parameter measures the height of the waves to understand the conditions of the waves;
[0047] The seabed topography parameters are measured to understand the topography and structure of the seabed;
[0048] Tidal parameters are used to measure the rise and fall of tides in the sea to understand the period and amplitude of tides;
[0049] Seawater quality parameters are indicators that measure various pollutants and microorganisms in seawater to understand the quality of seawater.
[0050] S3, promote siltation in the areas that have been fenced off by S1 and S2. The promotion of siltation includes measures to promote siltation by dividing and dividing the areas and measures to promote siltation by combining circuitous water inflow and drainage. At the same time, according to the actual progress and situation of promoting siltation, timely adjust and increase the height of the low and high weirs, and reinforce them layer by layer until complete containment is successful;
[0051] Specifically, the measures to promote siltation by segmentation and division include the following steps:
[0052] A1, first divide the reclaimed sea area into several blocks, which facilitates management and control;
[0053] A2: Build dikes or islands around each block to isolate the flow of seawater, reduce the speed of water flow, and promote the sedimentation of suspended matter;
[0054] A3, by adjusting the shape and position of the dike or island, the direction and speed of seawater flow can be controlled so that the suspended matter is deposited in the designated area;
[0055] A4. Regularly clean up the silt and debris deposited in the reclamation area to keep the reclamation area unobstructed and clean, and promote the formation and stability of land.
[0056] Through the promotion of siltation measures of dividing and dividing, the sedimentation in the process of land reclamation can be effectively controlled, the efficiency and quality of land reclamation can be improved, and the stability and sustainable development of the land in the reclamation area can be ensured.
[0057] Specifically, the detour water inlet and drainage combined siltation promotion measures include the following steps:
[0058] B1, first build a circuitous waterway around the reclaimed sea area to lengthen the flow path of seawater when it enters the reclamation area, slow down the flow rate, and deposit suspended matter;
[0059] B2, set up drainage facilities in the reclaimed sea area, and control the water level and flow rate in the reclamation area by adjusting the opening and closing of the drainage outlets to promote the deposition of sediment materials;
[0060] B3. Regularly clean up the silt and debris deposited in the reclamation area and keep the waterway unobstructed to prevent siltation from affecting the reclamation effect;
[0061] B4. According to the siltation situation in the reclaimed sea area, adjust the location and layout of the circuitous waterways and drainage facilities to maximize the water flow direction and velocity.
[0062] Through the combination of circuitous water inflow and drainage, the suspended matter in the seawater can be effectively guided to settle in the reclamation area, accelerating the speed of land formation and improving the efficiency and quality of sea reclamation projects. At the same time, the reasonable design of water flow paths and drainage facilities can ensure that the soil in the reclamation area is clean and stable, ensuring the sustainability of reclamation projects.
[0063] S4, conduct stabilization and reinforcement operations, after the siltation promotion in S3 is completed, the dike is reinforced and fully closed;
[0064] Specifically, the S4 stabilization and reinforcement operations include strengthening the dike surface, strengthening the dike internal structure, adding connecting parts, fully closing the dike and regular inspection and maintenance.
[0065] It should be noted that reinforcing the surface of the embankment is to check whether there are any damage or cracks on the surface of the embankment, and timely repair and reinforcement are required. Anti-seepage membranes, concrete repair materials and other materials can be used for reinforcement; strengthening the internal structure of the embankment is to reinforce the internal structure of the embankment, and structural reinforcement materials such as reinforced beams and reinforced columns can be used to enhance the bearing capacity and stability of the embankment; adding connecting parts is to reinforce the connecting parts of the embankment to ensure that the connections are firm and reliable to prevent leakage or seepage; fully closing the embankment is to close all entrances and exits of the embankment to prevent external water from entering the interior and maintain the stability of the water body in the embankment. Closing operations can be carried out by blocking entrances and exits, setting up waterproof gates, etc.; regular inspection and maintenance means that after the reinforcement and closure are completed, the condition of the embankment needs to be checked regularly, problems are discovered in time, and maintenance and repairs are carried out to ensure the long-term stability and safety of the embankment.
[0066] S5, local filling operation, local filling of low-lying areas in the closed area after S4 stabilization to form a flat ground. This method can effectively improve the flatness and slope of the ground, making it suitable for subsequent construction or planting work;
[0067] Specifically, the S5 filling operation is a low fill operation, including gradual filling, compaction and leveling of the ground.
[0068] S6, digging lakes and storing water, and implementing the digging lakes and storing water construction in the low-lying areas in S5 that cannot be filled with soil.
[0069] Specifically, the earthwork generated by excavating the lake in S6 is used for reclamation and filling.
[0070] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for reclaiming land from the sea, characterized in that: The land reclamation method comprises the following steps: S1, conduct high-level containment operations, first select the sea area to be reclaimed, then identify the gaps in high terrain around the sea area, and block the identified gaps; S2, perform low weir construction operation, determine the lowest point of the enclosed area according to the reclaimed sea area selected in S1, and build a dam submerged in the water at that point; S3, performing siltation promotion operations on the areas enclosed by S1 and S2, wherein the siltation promotion includes siltation promotion measures of segmentation and division and siltation promotion measures combining circuitous water inflow and drainage; S4, conduct stabilization and reinforcement operations, after the siltation promotion in S3 is completed, the dike is reinforced and fully closed; S5, local filling operation is carried out to fill the low-lying areas in the closed area stabilized in S4 to form a flat ground; S6, digging lakes and storing water, and implementing the digging lakes and storing water construction in the low-lying areas in S5 that cannot be filled with soil.
2. A method for reclamation of land from the sea according to claim 1, characterized in that: The method for selecting the sea area to be reclaimed is to first select a sea area that is far away from the land, and then gradually approach the land according to the designated scope.
3. A method for reclamation of land from the sea according to claim 2, characterized in that: The scope of the sea area to be reclaimed is determined by measuring the sea area according to the area required for reclamation, and at the same time determining the direction of water flow and changes in terrain height.
4. A method for reclamation of land from the sea according to claim 1, characterized in that: The design of the position, height, dam type and water flow channel of the low weir in S2 is determined based on the measured parameters of the reclaimed sea area.
5. A method for reclamation of land from the sea according to claim 4, characterized in that: The parameters that need to be measured for the low weir include water depth parameters, flow velocity parameters, salinity parameters, temperature parameters, wave height parameters, seabed topography parameters, tidal parameters and seawater quality parameters.
6. A method for reclamation of land from the sea according to claim 1, characterized in that: The siltation-promoting measures of segmentation and division include the following steps: A1, first divide the reclaimed sea area into several blocks; A2: Build dikes or islands around each block to isolate the flow of seawater and promote the sedimentation of suspended matter; A3, by adjusting the shape and position of the dike or island, the direction and speed of seawater flow can be controlled so that the suspended matter is deposited in the designated area; A4. Regularly clean up the silt and debris deposited in the reclamation area to promote the accelerated formation and stabilization of land.
7. A method for reclamation of land from the sea according to claim 1, characterized in that: The detour water inlet and drainage combined siltation promoting measures include the following steps: B1, first build a circuitous waterway around the reclaimed sea area to lengthen the flow path of seawater when it enters the reclamation area, slow down the flow rate, and deposit suspended matter; B2, set up drainage facilities in the reclaimed sea area, and control the water level and flow rate in the reclamation area by adjusting the opening and closing of the drainage outlets to promote the deposition of sediment materials; B3. Regularly clean up the silt and debris deposited in the reclamation area and keep the waterway unobstructed; B4. According to the siltation situation in the reclaimed sea area, adjust the location and layout of the circuitous waterways and drainage facilities to maximize the water flow direction and velocity.
8. A method for reclamation of land from the sea according to claim 1, characterized in that: The S4 stabilization and reinforcement operation includes reinforcing the dike surface, strengthening the internal structure of the dike, adding connecting parts, fully closing the dike and regular inspection and maintenance.
9. A method for reclamation of land from the sea according to claim 1, characterized in that: The S5 filling operation is a low filling operation, including gradual filling, compaction and leveling of the ground.
10. The method for reclamation of land from the sea according to claim 1, characterized in that: The earthwork generated by digging the lake in S6 is used for reclamation and filling.