Unloading anchoring system for slope treatment and construction method thereof

By setting up an internal unloading anchor assembly and an external pulling anchor knot structure in the slope, the problem that the existing technology cannot effectively control landslides, and the stability of the slope and the reduction of landslide risks are achieved.

CN118911131APending Publication Date: 2024-11-08CHINA 19TH METALLURGICAL CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411136228.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing treatment methods such as anti-slip short piles and slope unloading cannot effectively solve the occurrence and development of landslides, resulting in huge losses to humans and the natural environment due to landslide geological disasters.

Method used

A unloading anchor system for slope treatment is designed, including an internal unloading anchor assembly and an external pulling anchor structure. By inlaiding an internal unloading anchor assembly in the upper soil in the middle and upper slopes, and using an external pulling anchor The junction structure consolidates it between the slope surface and the stable soil, reducing the pressure and dynamic loads of the soil in the middle and upper slopes, and discharges water seepage through the internal unloading anchor assembly to transfer gravity load to the stable soil. , reduce the pressure and load of the lower soil.

Benefits of technology

Effectively reduce or even eliminate the landslide image of the slope. By transferring gravity and dynamic loads, the stability of the slope is improved and the threat of landslide disasters to life and property is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911131A_ABST
    Figure CN118911131A_ABST
Patent Text Reader

Abstract

The invention discloses an unloading anchoring system, particularly discloses an unloading anchoring system for slope treatment and a construction method of the unloading anchoring system, and belongs to the technical field of design and construction of slope and foundation pit engineering structures. According to the unloading anchoring system for slope treatment and the construction method of the unloading anchoring system, the landslide phenomenon of the slope is effectively reduced or even eradicated. The unloading anchoring system comprises a stable soil body, and further comprises an inner unloading anchor row assembly and an outer pulling anchor knot structure, and the inner unloading anchor row assembly is embedded in the soil body on the upper middle portion of the side slope. The end, located outside the side slope soil body, of the inner unloading anchor row assembly is fixedly connected between the side slope surface and the stable soil body through an outer pulling anchor structure. The pressure load of the middle-upper soil body of the side slope on the lower soil body in the vertical direction and the dynamic load of the side slope are reduced through the inner unloading anchor row assembly, and seepage water in the middle-upper soil body of the side slope is discharged out of the side slope through the inner unloading anchor row assembly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a load-relief anchoring system, in particular to a load-relief anchoring system for slope management, belonging to the technical field of design and construction of slope and foundation pit engineering structures. The present invention also relates to a construction method for constructing the load-relief anchoring system for slope management. Background Art

[0002] Landslide geological disasters are one of the most common natural disasters in the world, which have a serious impact on human society and the natural environment. The causes of landslides are diverse, including natural factors such as rainfall and earthquakes, as well as human factors. In recent years, with the occurrence and development of landslides, they often cause huge losses to nearby industrial and agricultural production and people's lives and property, and some are even devastating disasters. The current anti-sliding short piles, slope cutting and unloading and other management methods cannot effectively solve the occurrence and development of landslides. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a load-relief anchoring system for slope management which can effectively reduce or even prevent landslides of the slope, and a construction method for constructing the load-relief anchoring system for slope management.

[0004] The technical solution adopted to solve the above technical problems is: a load-removing anchoring system for slope management, including a stable soil body, the load-removing anchoring system also includes an internal load-removing anchor row assembly and an external pull anchor structure, the internal load-removing anchor row assembly is embedded in the soil body in the middle and upper part of the slope, one end of the internal load-removing anchor row assembly located outside the soil body of the slope is fixed between the slope surface and the stable soil body through the external pull anchor structure; the vertical pressure load of the soil body in the middle and upper part of the slope on the lower soil body and the dynamic load of the slope are reduced by the internal load-removing anchor row assembly, and the seepage water in the soil body in the middle and upper part of the slope is discharged from the slope through the internal load-removing anchor row assembly.

[0005] Furthermore, the external tension anchor structure includes a supporting assembly and a tensioning assembly. The supporting assembly is arranged on the stable soil body along the slope upward. One end of the tensioning assembly is fixedly connected to one end of the internal unloading anchor row assembly extending out of the slope soil body, and the other end of the tensioning assembly is tensionedly connected to the supporting assembly.

[0006] A preferred embodiment of the above scheme is that the supporting assembly includes at least two groups of anchor piers and a plurality of groups of steering pulley blocks whose number is equal to the number of anchor piers, the connecting assembly includes a plurality of steel strands whose number is equal to the number of steering pulley blocks, a rope tightener is provided at one end of each steel strand connected to the anchor pier, each group of anchor piers is sequentially arranged along the length direction of the slope on the stable soil body along the slope upward, each group of steering pulley blocks is respectively and one by one corresponding to the position of each group of anchor piers and arranged at the corner of the slope, the lower end of each steel strand supported on each group of steering pulley blocks is respectively fixedly connected to the corresponding internal unloading anchor row assembly, and the upper end of each steel strand supported on each group of steering pulley blocks is respectively tightened and connected to the corresponding anchor pier through each rope tightener.

[0007] Furthermore, the internal unloading anchor assembly includes an unloading structure and an anchoring energy-absorbing structure. The unloading structure is arranged in the soil body in the middle and upper part of the slope through the anchoring energy-absorbing structure. One end of the anchoring energy-absorbing structure located inside the slope soil body extends into and is consolidated in the stable soil body. The other end of the anchoring energy-absorbing structure located outside the slope soil body is consolidated between the slope surface and the stable soil body through an external pull anchor structure.

[0008] The preferred embodiment of the above scheme is that a unloading pipe shed is constructed in the slope soil body through the unloading structure to enhance the strength of the slope soil body, and interception drainage ditches extending along the length direction of the slope are respectively provided at the top and bottom of the slope.

[0009] Furthermore, the anchoring energy-absorbing structure includes a plurality of energy-absorbing anchor rod groups, and the discharge structure includes a plurality of unloading self-draining steel pipe groups whose number is equal to the number of the energy-absorbing anchor rod groups. Each set of unloading self-draining steel pipe groups is respectively and one by one embedded in the soil body in the middle and upper part of the slope through each set of energy-absorbing anchor rod groups at a specified longitudinal and transverse spacing. One end of each set of energy-absorbing anchor rod groups located in the soil body of the slope extends into the adjacent stable soil body respectively, and one end of each set of energy-absorbing anchor rod groups located outside the soil body of the slope is respectively tied between the slope surface and the stable soil body through each steel hinge wire of the external tension anchor structure with the cooperation of the steering pulley group, the rope tightener and the anchor pier.

[0010] The preferred embodiment of the above scheme is that each set of energy-absorbing anchor rod groups includes an anchor cable, a pair of damping springs, at least six spherical balls and a T-shaped anchor, and each set of unloading self-draining steel pipe groups includes an outer sleeve, an inner sleeve, an end plate and a filter screen. A ball installation groove is provided on the outer wall of the T-shaped anchor, a water leakage hole is provided on the outer sleeve, a connecting groove is provided at the end of the outer sleeve located outside the slope soil body, a through hole extending in the axial direction is provided on the axial center line of the T-shaped anchor, and the inner sleeve is coaxially connected to the end plate through the end plate. The filter screen is sleeved in the outer sleeve, the T-shaped anchor is movably sleeved in the inner sleeve through the cooperation of the spherical balls in the ball mounting grooves, the damping spring is axially connected between the inner sleeve and the end of the T-shaped anchor located at one end of the inner sleeve, the inner sleeve is sleeved on the anchor cable through the T-shaped anchor in the cooperation of the through hole, the end of the anchor cable located in the slope soil body passes through the internal end plate and extends into the stable soil body at the corresponding position, the steel hinge wire is tightened and connected with the end of the outer sleeve located outside the slope soil body through the connecting groove.

[0011] Furthermore, a plurality of integrated mounting holes equal to the number of energy-absorbing anchor rod groups are drilled in the slope and the adjacent stable soil body, and the mounting holes include a mounting section at the middle and front end, a free section at the middle and rear end, and an anchoring section at the rear end. At least a portion of the outer sleeve arranged in the mounting section of the mounting hole by the energy-absorbing anchor rod group is located in the stable soil body. Each group of energy-absorbing anchor rod groups also includes a grouting plug, which is inserted into the middle and rear section anchor cable and is arranged at the boundary between the free section and the anchoring section of the mounting hole. The mounting hole of the anchoring section is filled with grouting, and the length of the free section mounting hole is 0.5 to 1.0 m.

[0012] A preferred embodiment of the above scheme is that at least one drainage hole between the outer sleeve and the inner sleeve is provided on the end plate at one end of the outer sleeve outside the mounting hole; a cement slurry consolidation body is poured into the slope soil outside each outer sleeve through the drainage holes on each outer sleeve, each cement slurry consolidation body is permeably connected to the corresponding outer sleeve as a whole, and the unloading pipe rack is composed of cement slurry consolidation bodies connected to the corresponding outer sleeve as a whole.

[0013] The construction method for constructing the unloading anchoring system for slope management includes the steps of manufacturing the unloading structure, the anchoring energy-consuming structure and the external anchoring structure, drilling the installation holes, installing the anchoring energy-consuming structure, installing the unloading structure, installing the external anchoring structure and pouring the permeable concrete slurry, and finally digging the intercepting drainage ditch at the top and bottom of the slope.

[0014] The drilling of the installation holes is carried out according to the following steps: according to the requirements of the engineering design, the installation position of the anchoring energy-consuming structure is measured and located by instruments, and the installation holes are drilled on the slope surface by drilling equipment. The diameter of the drilled hole is not less than the outer diameter of the outer casing, and the drilling depth is determined according to the total length of the anchoring energy-consuming structure. The angle is a specified angle upward with the horizontal plane.

[0015] The installation of the anchoring energy dissipation structure is carried out according to the following steps. First, the anchor cable of the anchoring energy dissipation structure is placed at the center of the hole in the drilled installation hole using a bracket, and pressure grouting is performed on the anchoring end of the anchoring energy dissipation structure. After the grouting section meets the length requirement of the anchoring section, the grouting plug is passed through the anchor cable and the grouting is blocked to prevent the grouting from flowing out.

[0016] The installation of the discharge structure is carried out according to the following steps. After the anchoring section of the anchored energy-consuming structure reaches the designed strength, the discharge structure is driven into the drilled installation hole, and the outer casing is rotated to position the drainage hole directly below the T-shaped anchor. Then, the anchor cable is passed through the two end plates, the damping spring and the inner cavity of the T-shaped anchor in sequence, and fixed on the outer surface of the slope with the T-shaped anchor. Finally, the permeable concrete slurry is pressure-injected into the anchored energy-consuming structure through the drainage hole.

[0017] The installation of the external anchor structure and the pouring of the permeable concrete slurry are carried out according to the following steps: at the top of the slope above the discharge structure, the installation position of the steering pulley block is located by using a measuring instrument, and the manufactured steering pulley block is fixed to the outer surface of the slope. In the stable soil layer behind the anchoring section in the anchoring energy-absorbing structure, the static pressure short pile equipment is used to construct the anchor pier, and the rope tightener is fixed to the top of the anchor pier. After the permeable concrete slurry injected into the discharge structure reaches the concrete design strength, the steel strand is fixed to the connecting groove at the end of the discharge structure extending out of the slope and with a connecting groove by using a wire rope clip, and then the other end of the steel strand is fixed to the anchor pier through the reserved hole on the steering fixed pulley and the anchor pier. Finally, the rope tightening effect of the rope tightener is used to tension the steel strand according to the design requirements.

[0018] The beneficial effects of the present invention are as follows: the technical solution provided by the present application is based on the stable soil on the existing slope, and the unloading anchoring system of the present application is formed by adding an internal unloading anchor row assembly and an external pull anchor structure, and then the internal unloading anchor row assembly is embedded in the soil in the middle and upper part of the slope, and one end of the internal unloading anchor row assembly located outside the soil of the slope is fixed between the slope surface and the stable soil through the external pull anchor structure; the vertical pressure load of the soil in the middle and upper part of the slope on the lower soil and the dynamic load of the slope are reduced by the internal unloading anchor row assembly, and the seepage water in the soil in the middle and upper part of the slope is discharged from the slope through the internal unloading anchor row assembly. Since the unloading anchor system provided in the present application transfers the gravity load of the soil in the middle and upper part of the slope and the dynamic load of the slope to the stable soil on the slope through the pulling action of the external pulling anchor structure in conjunction with the internal unloading anchor row assembly, the pressure load on the soil in the lower part of the slope can be effectively reduced, and the seepage water in the soil in the middle and upper part of the slope can be discharged from the slope itself as much as possible through the internal unloading anchor row assembly, thereby achieving the purpose of effectively reducing or even eliminating the occurrence of slope landslides. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a front view of the unloading anchoring system for slope management of the present invention;

[0020] Figure 2 for Figure 1 AA section view;

[0021] Figure 3 It is a structural schematic diagram of the internal unloading anchor row assembly involved in the unloading anchoring system for slope management of the present invention.

[0022] Marked in the figure are: stable soil 1, slope soil 2, anchor pier 3, steering pulley block 4, steel hinge wire 5, rope tightener 6, intercepting drainage ditch 7, anchor cable 8, damping spring 9, spherical ball 10, T-shaped anchor 11, outer sleeve 12, inner sleeve 13, end plate 14, filter screen 15, connecting groove 16, installation section 17, free section 18, anchoring section 19, slurry stop plug 20. DETAILED DESCRIPTION

[0023] like Figure 1 , Figure 2 as well as Figure 3The present invention provides a load-relief anchor system for slope management that effectively reduces or even eliminates the occurrence of landslides, and a construction method for constructing the load-relief anchor system for slope management. The load-relief anchor system includes a stable soil body 1, and the load-relief anchor system also includes an internal load-relief anchor assembly and an external pull anchor structure. The internal load-relief anchor assembly is embedded in the soil body in the middle and upper part of the slope, and one end of the internal load-relief anchor assembly located outside the soil body 2 of the slope is fixed between the surface of the slope and the stable soil body 1 through the external pull anchor structure; the vertical pressure load of the soil body in the middle and upper part of the slope on the lower soil body and the dynamic load of the slope are reduced by the internal load-relief anchor assembly, and the seepage water in the soil body in the middle and upper part of the slope is discharged from the slope through the internal load-relief anchor assembly. The technical solution provided by the present application is based on the stable soil on the existing slope. The unloading anchoring system of the present application is formed by adding an internal unloading anchor row assembly and an external pull anchor structure, and then the internal unloading anchor row assembly is embedded in the soil in the middle and upper part of the slope, and the end of the internal unloading anchor row assembly located outside the soil of the slope is fixed between the slope surface and the stable soil through the external pull anchor structure; the vertical pressure load of the soil in the middle and upper part of the slope on the lower soil and the dynamic load of the slope are reduced by the internal unloading anchor row assembly, and the seepage water in the soil in the middle and upper part of the slope is discharged from the slope through the internal unloading anchor row assembly. Since the unloading anchor system provided in the present application transfers the gravity load of the soil in the middle and upper part of the slope and the dynamic load of the slope to the stable soil on the slope through the pulling action of the external pulling anchor structure in conjunction with the internal unloading anchor row assembly, the pressure load on the soil in the lower part of the slope can be effectively reduced, and the seepage water in the soil in the middle and upper part of the slope can be discharged from the slope itself as much as possible through the internal unloading anchor row assembly, thereby achieving the purpose of effectively reducing or even eliminating the occurrence of slope landslides.

[0024] Accordingly, in combination with the actual production situation and the structural characteristics and property characteristics of the slope itself, in order to simplify the structure of each component of the present application as much as possible under the premise of ensuring effective unloading and anchoring of the slope, and to facilitate production and manufacturing in the factory, subsequent on-site installation, and repair and maintenance during use, the external pull anchor structure described in the present application includes a support assembly and a pull assembly. The support assembly is arranged on the stable soil 1 along the slope upward, one end of the pull assembly is fixedly connected to the end of the internal unloading anchor assembly extending out of the slope soil 2, and the other end of the pull assembly is tensionedly connected to the support assembly. The internal unloading anchor assembly described in the present application includes an unloading structure and an anchoring energy-consuming structure. The unloading structure is arranged in the soil in the middle and upper part of the slope through the anchoring energy-consuming structure. One end of the anchoring energy-consuming structure located in the slope soil 2 extends into and is fixedly fixed in the stable soil 1. One end of the anchoring energy-consuming structure located outside the slope soil 2 is fixedly ... At this time, in order to retain surface water to the maximum extent and to improve the stability of the slope as much as possible on the basis of the above structure, the present application also constructs a unloading pipe rack in the slope soil 2 through the unloading structure to enhance the strength of the slope soil, and interception drainage ditches 7 extending along the length direction of the slope are respectively arranged at the top and bottom of the slope.

[0025] Furthermore, the support assembly described in the present application includes at least two groups of anchor piers 3 and multiple groups of steering pulley blocks 4 whose number is equal to the number of anchor piers 3. The connection assembly described in the present application includes multiple steel strands 5 whose number is equal to the number of steering pulley blocks 4. A rope tightener 6 is provided at one end of each steel strand 5 connected to the anchor pier 3. In the specific arrangement, each group of anchor piers 3 of the present application is sequentially arranged along the length direction of the slope on the stable soil 1 along the slope upward. Each group of steering pulley blocks 4 of the present application is respectively arranged at the corner of the slope in correspondence with the position of each group of anchor piers 3. The lower ends of each steel strand 5 straddling each group of steering pulley blocks 4 are respectively fixedly connected to the corresponding internal unloading anchor row assembly. The upper ends of each steel strand 5 straddling each group of steering pulley blocks 4 are respectively tightened and connected to the corresponding anchor pier 3 through each rope tightener 6. The anchoring energy-absorbing structure described in the present application includes a plurality of energy-absorbing anchor rod groups, and the discharge structure described in the present application includes a plurality of unloading self-draining steel pipe groups whose number is equal to the number of energy-absorbing anchor rod groups. Each set of unloading self-draining steel pipe groups is respectively and one by one embedded in the soil body in the middle and upper part of the slope through each set of energy-absorbing anchor rod groups at a prescribed longitudinal and transverse spacing. One end of each set of energy-absorbing anchor rod groups located in the slope soil body 2 extends into the adjacent stable soil body 1 respectively, and one end of each set of energy-absorbing anchor rod groups located outside the slope soil body 2 is respectively tied between the slope surface and the stable soil body 1 through each steel hinge wire 5 of the external tension anchor structure with the cooperation of the steering pulley group 4, the rope tightener 6 and the anchor pier 3. At this time, the preferred structures of the components are as follows: each set of energy-absorbing anchor rod groups includes an anchor cable 8, a pair of damping springs 9, at least six spherical balls 10 and a T-shaped anchor 11, each set of unloading self-draining steel pipe groups includes an outer sleeve 12, an inner sleeve 13, an end plate 14 and a filter screen 15, a ball installation groove is provided on the outer side wall of the T-shaped anchor 11, a leak hole is provided on the outer sleeve 12, a connecting groove 16 is provided at the end of the outer sleeve 12 located at the outer end of the slope soil 2, a through hole extending in the axial direction is provided on the axial center line of the T-shaped anchor 11, and the inner sleeve 13 is coaxially sleeved through the end plate 14. It is connected to the outer sleeve 12, the filter screen 15 is sleeved on the outside of the outer sleeve 12, the T-shaped anchor 11 is movably sleeved in the inner sleeve 13 through the spherical balls 10 in cooperation with the ball mounting grooves, the damping spring 9 is axially connected between the inner sleeve 13 and the end of the T-shaped anchor 11 located at one end of the inner sleeve 13, the inner sleeve 13 is sleeved on the anchor cable 8 through the T-shaped anchor 11 in cooperation with the through hole, the end of the anchor cable 8 located in the slope soil 2 passes through the internal end plate 14 and then extends into the stable soil 1 at the corresponding position, the steel hinge wire 5 is tightened and connected with the end of the outer sleeve 12 located outside the slope soil 2 through the connecting groove 16.At the same time, in order to facilitate installation, a plurality of integrated mounting holes corresponding to the number of energy-absorbing anchor rod groups are drilled in the slope and the adjacent stable soil body 1, and the mounting holes include a mounting section 17 at the middle and front end, a free section 18 at the middle and rear end, and an anchoring section 19 at the rear end. At least a part of the outer sleeve 12 arranged in the mounting section 17 of the mounting hole through the energy-absorbing anchor rod group is located in the stable soil body 1. Each group of energy-absorbing anchor rod groups also includes a grouting plug 20, and the grouting plug 20 inserted into the middle and rear section anchor cable is arranged at the boundary between the free section 18 and the anchoring section 19 of the mounting hole. The mounting hole of the anchoring section 19 is filled with grouting, and the length of the free section mounting hole is 0.5 to 1.0 m. Furthermore, in order to better discharge the seepage in the slope, the present application also provides at least one drainage hole between the outer sleeve 12 and the inner sleeve 13 on the end plate 14 at one end of the outer sleeve 12 outside the mounting hole; a cement slurry consolidation body is poured into the slope soil 2 outside each outer sleeve through the drainage holes on each outer sleeve 12, and each cement slurry consolidation body is permeably connected to the corresponding outer sleeve 12 as a whole, and the unloading pipe rack is composed of each cement slurry consolidation body connected to the corresponding outer sleeve 12 as a whole.

[0026] In this way, the unloading anchoring system for slope management described in the present application can be constructed according to the following construction method, that is, the construction method includes the steps of manufacturing the unloading structure, the anchoring energy-consuming structure and the external anchoring structure, drilling the installation holes, installing the anchoring energy-consuming structure, installing the unloading structure, installing the external anchoring structure and pouring the permeable concrete slurry, and finally digging the intercepting drainage ditch at the top and bottom of the slope.

[0027] The drilling of the installation holes is carried out according to the following steps: according to the requirements of the engineering design, the installation position of the anchoring energy-consuming structure is measured and located by instruments, and the installation holes are drilled on the slope surface by drilling equipment. The diameter of the drilled hole is not less than the outer diameter of the outer casing, and the drilling depth is determined according to the total length of the anchoring energy-consuming structure. The angle is a specified angle upward with the horizontal plane.

[0028] The installation of the anchoring energy dissipation structure is carried out according to the following steps. First, the anchor cable of the anchoring energy dissipation structure is placed at the center of the hole in the drilled installation hole using a bracket, and pressure grouting is performed on the anchoring end of the anchoring energy dissipation structure. After the grouting section meets the length requirement of the anchoring section, the grouting plug is passed through the anchor cable and the grouting is blocked to prevent the grouting from flowing out.

[0029] The installation of the discharge structure is carried out according to the following steps. After the anchoring section of the anchored energy-consuming structure reaches the designed strength, the discharge structure is driven into the drilled installation hole, and the outer casing is rotated to position the drainage hole directly below the T-shaped anchor. Then, the anchor cable is passed through the two end plates, the damping spring and the inner cavity of the T-shaped anchor in sequence, and fixed on the outer surface of the slope with the T-shaped anchor. Finally, the permeable concrete slurry is pressure-injected into the anchored energy-consuming structure through the drainage hole.

[0030] The installation of the external anchor structure and the pouring of the permeable concrete slurry are carried out according to the following steps: at the top of the slope above the discharge structure, the installation position of the steering pulley block is located by using a measuring instrument, and the manufactured steering pulley block is fixed to the outer surface of the slope. In the stable soil layer behind the anchoring section in the anchoring energy-absorbing structure, the static pressure short pile equipment is used to construct the anchor pier, and the rope tightener is fixed to the top of the anchor pier. After the permeable concrete slurry injected into the discharge structure reaches the concrete design strength, the steel strand is fixed to the connecting groove at the end of the discharge structure extending out of the slope and with a connecting groove by using a wire rope clip, and then the other end of the steel strand is fixed to the anchor pier through the reserved hole on the steering fixed pulley and the anchor pier. Finally, the rope tightening effect of the rope tightener is used to tension the steel strand according to the design requirements.

[0031] In summary, the above technical solution provided by the present application effectively solves the problem of continuous occurrence and development of landslides in Northwest my country, reduces the threat of landslide disasters to people's lives and property, has a simple structure, strong practicality, and can be applied to various soil layers. Specifically, its advantages are mainly:

[0032] 1) By injecting permeable concrete slurry into the unloading drainage steel pipe under pressure, the rigidity of the steel pipe is enhanced, which can well bear the self-weight pressure of the surrounding soil to achieve the unloading effect, reducing the vertical soil pressure transmitted to the lower soil. At the same time, the concrete slurry of pressure grouting penetrates into the surrounding soil through the water inlet hole, reinforces the surrounding soil, improves the original soil conditions, forms a grouting reinforcement area, and increases the support range of the steel pipe. Each layer of unloading drainage steel pipe acts independently without affecting each other. Through the layer-by-layer unloading of each layer of unloading drainage anchor rod, the anchoring length of the anchor rod is reduced, and the project cost is reduced;

[0033] 2) The structure makes full use of the stable soil layer and the free section of the anchor rod. By pressure grouting into the unloading drainage steel pipe, a grouting reinforcement area is formed around the unloading drainage steel pipe. The grouting reinforcement areas of the unloading drainage steel pipes on the same layer overlap each other to eventually form an unloading pipe shed. By utilizing the lifting effect of the stable soil and the unloading pipe shed, the vertical pressure acting on the lower soil is gradually reduced, so that the failure slip surface of the soil changes, the length of the anchor rod anchoring section is reduced, and the un-grouted free section is increased to make full use of the stable soil layer and the free section of the anchor rod, so that the free section of the anchor rod participates in the support work; through the unloading and drainage effect of the unloading drainage steel pipe, the free water in the slope is discharged, the consolidation of the soil is accelerated, and the energy-consuming anchor rod consumes the adverse dynamic load transmitted from the stratum to ensure the stability of the slope, reduce the construction cost, and speed up the progress of the project;

[0034] 3) By pressure grouting into the unloading drainage steel pipe, a grouting reinforcement area is formed around the unloading drainage steel pipe, and finally an unloading pipe shed is formed. The unloading pipe shed intercepts the infiltration of surface water in the soil in layers, and the intercepted infiltration water is discharged from the soil through the drainage steel pipe, effectively controlling the rising height of groundwater, slowing down the landslide caused by static liquefaction of soil under high water pressure, and also accelerating the consolidation of soil, increasing the shear strength of soil, ensuring the stability of the slope, and providing a new support method for the support of slopes in water-rich areas;

[0035] 4) The use of energy-absorbing anchor rods can effectively consume the adverse dynamic loads transmitted from the strata and ensure the stability of the slope under the adverse dynamic loads.

[0036] The technical solution of the present application is further described below through specific embodiments:

[0037] like Figure 1 , Figure 2 as well as Figure 3As shown, a layered unloading energy-consuming self-draining anchor rod and a construction method provided by the present invention include an unloading self-draining steel pipe, an energy-consuming anchor rod, and an external anchor structure; the unloading self-draining steel pipe is composed of a first type of casing A, a second type of casing B, a drainage steel plate, and an annular steel plate. The first type of casing A is a seamless steel pipe with a circular water inlet hole on the outer surface and a filter screen wrapped around the body. A groove that does not penetrate the thickness of the steel pipe is provided at one end of the first type of casing A along the circumference direction. The second type of casing B is a circular steel pipe with a length equal to that of the first type of casing A and has no openings around the body. The first type of casing A and the second type of casing B are nested with each other, and the drainage steel plate and the annular steel plate are welded at both ends to connect them. A cavity is formed between the first and second casings, the outer diameters of the drainage steel plate and the circular steel plate are equal to the outer diameter of the first casing A, the inner diameter of the drainage steel plate is equal to the inner diameter of the second casing B, and a drainage hole is opened on the circular ring, the inner diameter of the circular steel plate is smaller than the inner diameter of the second casing B; the energy-absorbing anchor rod is composed of a free section, an anchoring section, a damping spring, a movable T-shaped anchor and a slurry stopper, the damping spring is a damping spring with a large stiffness coefficient placed in the inner cavity of the second casing B, its inner diameter is larger than the inner diameter of the circular steel plate, and its outer diameter is equal to the inner diameter of the second casing B, the movable T-shaped anchor rod is a hollow cylindrical anchor rod with an enlarged head, and its inner diameter is equal to the outer diameter of the free section of the energy-absorbing anchor rod The outer diameter is equal to the inner diameter of the second type casing B. The side of the cylinder is inlaid with spherical balls. The grouting plug is a truncated cone-shaped cork with a circular hole in the middle. It is set at the boundary between the anchoring section and the free section to control the pressure grouting length of the energy-absorbing anchor rod. One end of the energy-absorbing anchor rod is anchored in the stable soil layer, and the other end passes through the circular steel plate, the damping spring, the movable T-shaped anchor and is fixed to the outer surface of the slope; the external tension anchor structure consists of a steel strand, a fixed pulley, an anchor pier and a rope tightener. The fixed pulley is fixed on the slope surface directly above the unloading self-draining steel pipe. Each row of unloading self-draining steel pipes corresponds to a fixed pulley. The anchor pier is prefabricated in the prefabrication factory according to the pull-out requirements and short pile length required by the design. Prefabricated concrete short piles, rope tighteners and wire rope clips are common binding tools on the market. The rope tightener is fixed to the top of the anchor pier by reserving a hole on the top of the anchor pier. One end of the steel strand is fixed to the groove of the second type casing B outside the slope with a wire rope clip, and the other end passes through the fixed pulley and the reserved hole on the anchor pier upward along the outer surface of the slope and is fixed to the anchor pier. Finally, the steel strand is tightened by the tightening effect of the rope tightener. The steel strand, fixed pulley and rope tightener are all matched with the unloading self-draining steel pipe and are in the same plane; one end of the unloading self-draining steel pipe with a circular steel plate is placed in the stable soil layer, and the other end is fixed to the outer surface of the slope by an anchor. The energy-absorbing anchor rod and the unloading self-draining steel pipe are connected by a free section anchoring connection, and the unloading self-draining steel pipe and the external tension anchor structure are connected by a steel strand anchoring connection, and together they form a support system. The length of the unloading self-draining steel pipe is less than the free section length of the energy-absorbing anchor rod entering the soil from the slope surface, and an un-grouted section is reserved between the unloading self-draining steel pipe and the anchoring section of the energy-absorbing anchor rod.

[0038] The working principle of the layered unloading self-draining anchor rod of the present invention is:

[0039] 1) Anchoring principle: By drilling holes in the slope and inserting anchor cables and injecting grout to form anchor bolt anchoring sections, prestressing the anchor bolts is applied to generate anchoring force along the direction of the anchor bolts, increasing the normal stress on the sliding surface, increasing the anti-sliding moment of the sliding body by increasing the frictional resistance of the landslide surface, and ensuring the stability of the slope;

[0040] 2) Unloading principle: One end of the unloading drainage steel pipe is fixed in the stable soil layer, and the other end is placed on the outer surface of the slope. By pressure grouting the unloading drainage steel pipe, the slurry penetrates into the soil layer through the drainage holes around the unloading drainage steel pipe, forming a "grouting reinforcement area" around the steel pipe to reinforce the surrounding soil. The grouting reinforcement areas around the same row of unloading drainage steel pipes overlap each other to form an unloading pipe shed. The external anchor structure fixes the unloading drainage steel pipe located on the outer surface of the slope in the stable soil layer on the upper surface of the slope by using the tension of the steel strand and the rope tightener. Through the tensile effect of the stable soil and the external anchor structure, the vertical soil pressure acting on the lower soil is reduced, achieving the unloading effect. By analogy, each layer of the unloading pipe shed bears the upper soil pressure, thereby gradually reducing the soil pressure acting on the lower anchor rod, thereby reducing the length of the anchor rod anchoring section, saving materials, and accelerating the progress of the project.

[0041] 3) Drainage principle: The unloading pipe shed is formed by pressure grouting in the unloading drainage steel pipe. The interception effect of the unloading pipe shed blocks the infiltration of surface water in layers. The surface water that penetrates into the soil is intercepted at the position of the unloading pipe shed and then discharged through the drainage effect of the drainage steel pipe, which reduces the water content in the soil and accelerates the consolidation and stability of the soil.

[0042] 4) Energy dissipation effect: The existence of the damping spring can absorb the adverse dynamic load transmitted from the stratum through the compression deformation effect of the damping spring, ensuring the stability of the slope under the adverse dynamic load.

[0043] Embodiment 1

[0044] 1) Production of unloading self-draining steel pipes: Determine the size and quantity of unloading self-draining steel pipes according to the engineering design requirements, prefabricate the first type casing A, i.e. the outer casing mentioned above, the second type casing B, i.e. the inner casing mentioned above, the drainage steel plate and the circular ring steel plate, i.e. the end plate mentioned above, open a circular water inlet hole on the outer surface of the first type casing A and put a filter screen around it, and open a groove that does not penetrate the thickness of the steel pipe along the circumference direction at one end of the first type casing A, and nest the first type casing A and the second type casing B, and weld the drainage steel plate and the circular ring steel plate at both ends respectively;

[0045] 2) Make energy-absorbing anchor rods: according to the design pull-out force requirements, prepare steel strands, damping springs, and spherical balls of appropriate specifications, and embed the spherical balls in the side walls of the movable T-shaped anchors by opening grooves along the circumference direction around them. Put the damping springs and the movable T-shaped anchors into the unloading self-draining steel pipes made in step 1 in sequence and assemble them;

[0046] 3) Make external anchor structure: Determine the models and quantities of required steel strands, fixed pulleys, anchor piers and rope tighteners according to the engineering design requirements, ensure that the steel strands, fixed pulleys and rope tighteners match each other, select appropriate molds according to the pull-out resistance requirements and burial depth requirements of the anchor piers, and prefabricate the anchor piers in batches according to the designed quantity in the factory;

[0047] 4) Positioning and drilling: According to the requirements of the engineering design, use instruments to measure and locate the installation position of the energy-absorbing anchor bolt, and use drilling equipment to drill holes on the slope surface. The diameter of the hole is equal to the outer diameter of the first type casing A. The drilling depth is determined according to the total length of the energy-absorbing anchor bolt, and the angle is upward with the horizontal plane;

[0048] 5) Construction of energy-absorbing anchor bolts: After the steps are completed, firstly, the anchor cable of the energy-absorbing anchor bolt is placed in the center of the hole in the drilled hole by using a bracket, and pressure grouting is performed on the anchoring end of the energy-absorbing anchor bolt. After the grouting section meets the length requirement of the anchoring section, a grout stopper is passed through the anchor cable and the grout is blocked to prevent the grout from flowing out;

[0049] 6) Construction of unloading self-draining steel pipe: After the anchoring section of the energy-absorbing anchor rod reaches the design strength, the end of the unloading self-draining steel pipe assembled in step 2 with the circular steel plate welded thereon is driven into the drilled hole, and the unloading self-draining steel pipe is rotated to place the position with the drainage hole on the drainage steel plate directly below the movable T-shaped anchor, and then the anchor cable is passed through the circular steel plate, the damping spring and the inner cavity of the movable T-shaped anchor in sequence, and fixed to the outer surface of the slope by the movable T-shaped anchor, and finally the permeable concrete slurry is pressure-injected into the unloading drainage energy-absorbing anchor rod through the drainage hole on the drainage steel plate;

[0050] 7) Installing the external anchor structure: at the top of the slope on the upper part of the unloading self-draining steel pipe, the fixed pulley prepared in step 3 is positioned by using a measuring instrument, and the fixed pulley is fixed to the outer surface of the slope. In the stable soil layer at the rear of the anchoring section in the energy-absorbing anchor rod, a static pressure short pile device is used to construct an anchor pier, and a rope tightener is fixed to the top of the anchor pier. After the permeable concrete slurry finally injected into the unloading self-draining steel pipe in step 6 reaches the concrete design strength, the end of the unloading self-draining steel pipe extending out of the outer surface of the slope and having a groove is fixed to the groove with a steel wire rope clip, and then the other end of the steel strand is passed through the fixed pulley fixed on the slope and the reserved hole on the anchor pier and fixed to the anchor pier. Finally, the rope tightening effect of the rope tightener 19 is used to tension the steel strand according to the design requirements;

[0051] 8) According to steps 4), 5), 6), and 7), other unloading energy-consuming self-draining anchor rods are constructed in sequence;

[0052] 9) Set up intercepting drainage ditches at the top and bottom of the slope.

Claims

1. A load-relief anchoring system for slope management, comprising a soil stabilizer (1), Features: The unloading anchor system further comprises an internal unloading anchor assembly and an external anchor structure. The internal unloading anchor assembly is embedded in the soil in the middle and upper part of the slope. One end of the internal unloading anchor assembly located outside the slope soil (2) is fixed between the slope surface and the stable soil (1) through the external anchor structure. The vertical pressure load of the soil in the middle and upper part of the slope on the lower soil and the dynamic load of the slope are reduced by the internal unloading anchor assembly, and the seepage water in the soil in the middle and upper part of the slope is discharged from the slope through the internal unloading anchor assembly.

2. The unloading anchoring system for slope management according to claim 1, Features: The external tension anchor structure comprises a support assembly and a tension assembly. The support assembly is arranged on a stable soil body (1) along the slope upward. One end of the tension assembly is fixedly connected to one end of the internal unloading anchor row assembly extending out of the slope soil body (2). The other end of the tension assembly is tension-connected to the support assembly.

3. The unloading anchoring system for slope management according to claim 2, Features: The supporting assembly comprises at least two groups of anchor piers (3) and a plurality of groups of steering pulley blocks (4) whose number is equal to the number of the anchor piers (3); the connecting assembly comprises a plurality of steel strands (5) whose number is equal to the number of the steering pulley blocks (4); a rope tightener (6) is arranged at one end of each steel strand (5) connected to the anchor pier (3); each group of anchor piers (3) is arranged in sequence along the length direction of the slope on the stable soil (1) along the slope upward; each group of steering pulley blocks (4) is respectively arranged at the corner of the slope in correspondence with the position of each group of anchor piers (3); the lower end of each steel strand (5) straddling each group of steering pulley blocks (4) is respectively fixedly connected to the corresponding internal unloading anchor row assembly; the upper end of each steel strand (5) straddling each group of steering pulley blocks (4) is respectively tightened and connected to the corresponding anchor pier (3) through each rope tightener (6).

4. The unloading anchoring system for slope management according to claim 1, 2 or 3, Features: The internal unloading anchor assembly comprises an unloading structure and an anchoring energy-absorbing structure. The unloading structure is arranged in the soil body in the middle and upper part of the slope through the anchoring energy-absorbing structure. One end of the anchoring energy-absorbing structure located in the slope soil body (2) extends into and is fixed in the stable soil body (1). One end of the anchoring energy-absorbing structure located outside the slope soil body (2) is fixed between the slope surface and the stable soil body (1) through the external pull anchoring structure.

5. The unloading anchoring system for slope management according to claim 4, Features: A load-relief pipe shed for enhancing the strength of the slope soil (2) is constructed in the slope soil through the discharge and drainage structure, and interception drainage ditches (7) extending along the length direction of the slope are respectively arranged at the top and bottom of the slope.

6. The unloading anchoring system for slope management according to claim 5, Features: The anchoring energy dissipation structure comprises a plurality of energy dissipation anchor rod groups, and the discharge structure comprises a plurality of unloading self-draining steel pipe groups whose number is equal to the number of the energy dissipation anchor rod groups. Each unloading self-draining steel pipe group is respectively and one by one embedded in the soil body in the middle and upper part of the slope through each energy dissipation anchor rod group at a prescribed longitudinal and transverse spacing. One end of each energy dissipation anchor rod group located in the slope soil body (2) extends into the adjacent stable soil body (1), and one end of each energy dissipation anchor rod group located outside the slope soil body (2) is respectively tied between the slope surface and the stable soil body (1) through each steel hinge wire (5) of the external anchor structure in cooperation with the steering pulley group (4), the rope tightener (6) and the anchor pier (3).

7. The unloading anchoring system for slope management according to claim 6, Features: Each set of energy-absorbing anchor rod groups comprises an anchor cable (8), a pair of damping springs (9), at least six spherical balls (10) and a T-shaped anchor (11); each set of unloading self-draining steel pipe groups comprises an outer sleeve (12), an inner sleeve (13), an end plate (14) and a filter (15); a ball installation groove is arranged on the outer side wall of the T-shaped anchor (11); a water leakage hole is arranged on the outer sleeve (12); a connecting groove (16) is arranged at the end of the outer sleeve (12) located outside the slope soil (2); a through hole extending in the axial direction is arranged on the axial center line of the T-shaped anchor (11); the inner sleeve (13) is coaxially sleeved in the outer sleeve (12) through the end plate (14); and the filter (15) is provided on the outer side wall of the T-shaped anchor (11). The net (15) is sleeved on the outside of the outer sleeve (12); the T-shaped anchor (11) is movably sleeved in the inner sleeve (13) through the spherical balls (10) in cooperation with the ball mounting grooves; the damping spring (9) is axially connected between the inner sleeve (13) and the end of the T-shaped anchor (11) located at one end of the inner sleeve (13); the inner sleeve (13) is sleeved on the anchor cable (8) through the T-shaped anchor (11) in cooperation with the through hole; the end of the anchor cable (8) located in the slope soil (2) passes through the internal end plate (14) and then extends into the stable soil (1) at the corresponding position; the steel hinge wire (5) is tightened and connected to the end of the outer sleeve (12) located outside the slope soil (2) through the connecting groove (16).

8. The unloading anchoring system for slope management according to claim 7, Features: A plurality of integrated mounting holes equal in number to the number of energy-absorbing anchor rod groups are drilled in the slope and the adjacent stable soil (1), the mounting holes comprising a mounting section (17) at the middle front end, a free section (18) at the middle rear end, and an anchoring section (19) at the rear end. At least a portion of an outer sleeve (12) arranged in the mounting section (17) of the mounting hole through the energy-absorbing anchor rod group is located in the stable soil (1). Each group of energy-absorbing anchor rod groups also comprises a grouting plug (20), the grouting plug (20) sleeved on the middle rear anchor cable is arranged at the boundary between the free section (18) and the anchoring section (19) of the mounting hole, the mounting hole of the anchoring section (19) is filled with grouting, and the length of the free section mounting hole is 0.5 to 1.0 m.

9. The unloading anchoring system for slope management according to claim 8, Features: At least one drainage hole between the outer sleeve (12) and the inner sleeve (13) is also provided on the end plate (14) at one end of the outer sleeve (12) outside the installation hole; a cement slurry consolidation body is poured into the slope soil (2) outside each outer sleeve through the drainage hole on each outer sleeve (12); each cement slurry consolidation body is connected to the corresponding outer sleeve (12) in a water-permeable manner to form a whole; and the unloading pipe rack is composed of each cement slurry consolidation body connected to the corresponding outer sleeve (12) as a whole.

10. A construction method for constructing the unloading anchoring system for slope management according to claim 9, Features: The construction method includes the steps of manufacturing the discharge structure, the anchoring energy-consuming structure and the external anchoring structure, drilling the installation holes, installing the anchoring energy-consuming structure, installing the discharge structure, installing the external anchoring structure and pouring the permeable concrete slurry, and finally digging the intercepting drainage ditch at the top and bottom of the slope. The drilling of the installation holes is carried out according to the following steps: according to the requirements of the engineering design, the installation position of the anchoring energy-consuming structure is measured and located by instruments, and the installation holes are drilled on the slope surface by drilling equipment. The diameter of the drilled hole is not less than the outer diameter of the outer casing, and the drilling depth is determined according to the total length of the anchoring energy-consuming structure. The angle is a specified angle upward with the horizontal plane. The installation of the anchoring energy dissipation structure is carried out according to the following steps. First, the anchor cable of the anchoring energy dissipation structure is placed at the center of the hole in the drilled installation hole using a bracket, and pressure grouting is performed on the anchoring end of the anchoring energy dissipation structure. After the grouting section meets the length requirement of the anchoring section, the grouting plug is passed through the anchor cable and the grouting is blocked to prevent the grouting from flowing out. The installation of the discharge structure is carried out according to the following steps. After the anchoring section of the anchored energy-consuming structure reaches the designed strength, the discharge structure is driven into the drilled installation hole, and the outer casing is rotated to position the drainage hole directly below the T-shaped anchor. Then, the anchor cable is passed through the two end plates, the damping spring and the inner cavity of the T-shaped anchor in sequence, and fixed on the outer surface of the slope with the T-shaped anchor. Finally, the permeable concrete slurry is pressure-injected into the anchored energy-consuming structure through the drainage hole. The installation of the external anchor structure and the pouring of the permeable concrete slurry are carried out according to the following steps: at the top of the slope above the discharge structure, the installation position of the steering pulley block is located by using a measuring instrument, and the manufactured steering pulley block is fixed to the outer surface of the slope. In the stable soil layer behind the anchoring section in the anchoring energy-absorbing structure, the static pressure short pile equipment is used to construct the anchor pier, and the rope tightener is fixed to the top of the anchor pier. After the permeable concrete slurry injected into the discharge structure reaches the concrete design strength, the steel strand is fixed to the connecting groove at the end of the discharge structure extending out of the slope and with a connecting groove by using a wire rope clip, and then the other end of the steel strand is fixed to the anchor pier through the reserved hole on the steering fixed pulley and the anchor pier. Finally, the rope tightening effect of the rope tightener is used to tension the steel strand according to the design requirements.