Earth dam batholith blind ditch inverted filtration system and grouting plugging construction method
By using a blind drain reverse filtration system and grouting sealing method, the problem of seepage in the rock foundation during earth dam construction was solved, ensuring dry and safe construction conditions and improving the stability and construction efficiency of the earth dam.
Patent Information
- Application Number
- CN202410981374.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-08
AI Technical Summary
Earth dam construction is affected by winter and the rainy season, resulting in a short construction season. Complex fissures in the rock foundation lead to seepage channels, affecting the stability of the dam body. Existing technologies are difficult to effectively address this issue.
The blind drain reverse filter system and grouting sealing method are adopted, including blind drain layout, water collection well cutting, rock mass crushing, reverse filter material laying, grouting pipeline installation, geotextile laying, and capping concrete pouring, to form an efficient drainage system and perform grouting sealing.
This achieved dry-ground construction conditions for earth dams on rock foundations, ensuring construction quality and safety, shortening the construction period, saving costs, and improving the stability and safety of earth dams.
Smart Images

Figure CN118911168A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of earth dam engineering construction, and in particular relates to an earth dam rock foundation blind ditch anti-filtration system and a grouting plugging construction method. Background Art
[0002] The construction of earth filling of earth dams is greatly affected by winter and rainy seasons, and the effective construction season is short. In the process of earth dam construction, ensuring the construction of dry land of dam foundation and comprehensively and efficiently promoting the subsequent filling construction of the main earth dam project is one of the most critical construction links. However, the main building material for earth dam filling is earth. Due to the requirements of physical and mechanical performance indicators, the earth must be well prepared and have strict requirements for indicators such as moisture content. In view of the influence of water seepage in the complex fissures of the rock foundation of the earth dam, the rock foundation surface presents surface water, fissure seepage, spring water, etc., and earth filling cannot be carried out. If the dam foundation is not properly handled during the construction process, it is easy to form a shallow or deep permeable layer. Under the action of water pressure, these permeable layers may produce leakage channels, causing water to escape from the weak parts of the strata at the foot of the dam or outside the foot of the dam, forming leakage points. This situation will gradually make the back of the dam body swampy, seriously affecting the stability of the earth dam. Summary of the invention
[0003] The technical problem to be solved by the present invention is to overcome the deficiencies of the above-mentioned prior art, and to provide a system with high efficiency and quality and strength requirements for earth dam rock foundation blind ditch filtration system and grouting plugging construction method, which can make full use of the effective construction period with high quality and high efficiency, and solve the problems of earth dam rock foundation blind ditch drainage filtration system and plugging construction.
[0004] The technical solution adopted to solve the above technical problems is: a blind ditch anti-filtration system and grouting plugging construction method for earth dam rock foundation, comprising the following steps: Step 1: Layout of blind ditch anti-filtration system: Based on the principle of blocking up and draining down in earth dams, the upstream water collection wells of the dam curtain line are set in the main channel of the original riverbed and at the lower part of the confluence area according to the actual confluence conditions, springs and terrain; the water collection wells can be connected and set up according to the water potential and terrain. Depending on the actual conditions, each water collection well and its confluence blind ditch form a system. The size of the water collection wells and blind ditches is adjusted according to the actual confluence water volume; Step 2: Cutting of blind ditches and water collection wells: To reduce the impact of trenching and well construction on the rock foundation, the dam foundation blind ditches and water collection wells adopt a minimally invasive bedrock cutting construction method with small disturbance and controlled linear dimensions. Alloy steel cutting machines are used to cut and shape the side walls of the bedrock blind ditches and water collection wells. Step 3: Rock crushing and cleaning: After the blind ditch and the side wall of the water collection well are cut, a small hydraulic breaker is used to cut the bedrock between the wall cracks on both sides, and the bedrock is crushed and excavated by the retreat method, ditch by ditch and pit by pit; Step 4: Set up the water collection well pipe: The size of the water collection well is arranged according to the actual situation, but the base surface should be more than 20cm deeper than the blind ditch. The well pipe adopts a socket-and-spigot concrete pipe with the big end facing down and buried in the center of the water collection well; the well pipe extends into the filter material end and a water seepage hole is drilled; Step 5: Laying filter material: After the blind ditch and water collection well are cleaned and qualified, lay the filter material. The filter material is made of pebbles with a block diameter greater than 5cm; Step 6: Installation of grouting pipelines: When filling the filter material, in order to ensure the final grouting and plugging, PPR grouting pipelines are buried radially in the filter material along the outer wall of the well pipe, and the water is collected and led out along the wall of the water collection well; Step 7: Laying the top geotextile: After the blind ditch, pit filter material, and PPR grouting pipeline are laid, lay the geotextile along the top surface of the filter material and the bedrock of the well ditch wall; Step 8: pouring capping concrete: pouring dry hard capping concrete on the geotextile covering the water collection well and blind ditch; Step 9: Top soil filling and drainage: After the entire anti-filtration system is completed, the bedrock surface is dry and cleaned up, manually mix and apply 1:1 mud to the bedrock surface to facilitate the combination of fill and soil. The mud should be applied as the filling and soil are spread; Step 10: Sealing the water collection well pipe: Observe the water level during the well pipe dewatering process. The filling surface is more than 2m higher than the water surface in the pipe well. The water volume in the well pipe decreases. After the test, the water level does not change after stopping the pumping. In order to reduce the impact of the filling construction, the well pipe is sealed from high to low, from upstream to downstream, and at intervals according to the overall well pipe distribution, the water level in the well, and the flow rate. After sealing, the PPR grouting pipeline is protectively connected to the final sealing grouting filling surface elevation; Step 11, anti-filtration system plugging grouting: After all well pipes meet the requirements and are plugged, and the filling surface is more than 2m higher than the last plugged well, arrange from low wells to high wells, and use orifice plugging for the PPR grouting pipelines leading out of the filling surface one by one, and use the orifice sealing pure pressure grouting method.
[0005] In step 4 of the present invention, the well pipe is extended into the end of the filter material and water seepage holes are drilled to allow the collected water flow to fully penetrate into the well pipe through the crushed stone filter material.
[0006] In step six of the present invention, the PPR grouting pipeline is an L-shaped structure. The PPR grouting pipeline is located between the filter materials and is provided with horizontal flower tube holes and vertical flower tube holes. The horizontal flower tube holes and the vertical flower tube holes are cross-shaped holes, and the distance between adjacent flower tube holes is 30 to 50 cm to facilitate the outflow of grouting slurry. The PPR grouting pipeline leading out of the filter material is not drilled with flower tube holes.
[0007] In step 1 of the present invention, a total of six water collection wells are set up at the upstream dam foundation as needed, and the overall arrangement is based on the terrain, water potential, and pipe well layout principles. Among them, the 1~5# water collection wells are connected to the anti-filtration pipe network in combination with the actual water potential and terrain. The 6# water collection well and its confluence blind ditch are independently networked and form a self-contained drainage system. The 5# water collection well is set as a Φ800 large well due to its low terrain and large confluence water volume. The 1~4# water collection wells and the 6# water collection well are set as Φ500 small wells.
[0008] 1. The present invention covers the entire construction process before, during and after filling. Before filling, surface water is drained: the fissure water in the dam foundation must be treated to achieve dry land construction conditions to ensure the overall implementation of the subsequent main project dam body filling construction; during filling, the water collected in the water collection well is continuously pumped and drained: including the setting of water collection well pipes, the laying of filter materials, the installation of grouting pipelines, the laying of geotextiles, and the pouring of capping concrete, which can effectively prevent and control water seepage in the dam foundation and ensure the stability and safety of the earth dam throughout its life cycle; after filling, the reserved grouting pipeline is blocked: the dam foundation blind ditch filter system is grouted and blocked to ensure that the entire system achieves the overall effect of plugging leaks, preventing seepage, and safety. This method greatly improves the construction quality, shortens the construction period, and saves costs.
[0009] 2. The present invention reduces the seepage water from springs and fissures to the blind ditch and water collection well below the base surface through the blind ditch filtration system of the earth dam rock foundation, and collects it in the well pipe for drainage, thus quickly and efficiently ensuring the dry land construction conditions and laying the foundation for making full use of the subsequent effective construction period and carrying out comprehensive filling construction.
[0010] 3. The present invention uses pre-buried grouting pipelines to use cement slurry to grout and seal the cracks in the filter material at the end of the construction period. The system ensures the construction key to the tip and has a good effect on the project quality control. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a flow chart of the present invention.
[0012] Figure 2 It is a plan view of the layout of the blind ditch filtration system of the present invention.
[0013] Figure 3 It is a cross-sectional view of the anti-filtration system of the water collection well 6 of the present invention.
[0014] Figure 4 yes Figure 3 Top view of the .
[0015] Figure 5 yes Figure 3 Middle A large sample picture.
[0016] Figure 6 yes Figure 1 Schematic diagram of the structure of the PPR grouting pipeline 1.
[0017] In the figure: 1. PPR grouting pipeline; 2. Socket rubber ring; 3. Well pipe; 4. Capping concrete; 5. Filter material; 6. Water collection well; 7. Geotextile; 1-1. Horizontal flower pipe hole; 1-2. Vertical flower pipe hole. DETAILED DESCRIPTION
[0018] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments, but the present invention is not limited to these embodiments. Example 1
[0019] exist Figure 1 The present invention relates to a blind ditch anti-filtration system and grouting plugging construction method for a soil dam rock foundation, which comprises the following steps: Step 1. Layout of blind ditch filtration system: Based on the principle of blocking above and discharging below the earth dam, the upstream water collection well 6 of the dam curtain line is set in the main river channel of the original riverbed and at the lower part of the confluence area according to the springs and terrain in combination with the actual confluence situation; the water collection wells 6 can be connected and set depending on the water potential and terrain, and each water collection well 6 and its confluence blind ditch form a system according to the actual situation. The size of the water collection well 6 and the blind ditch is adjusted as needed in combination with the actual confluence water volume; the water collection well 6 should be concentrated as close as possible to reduce the number of well pipes 3, large wells are set at places with large confluence water volume, and small wells are set at places with small confluence water volume. Small wells use Φ500 socket-and-spigot concrete pipes, and large wells use Φ800 socket-and-spigot concrete pipes. The blind ditch is set up in combination with springs, seepage points and terrain conditions. The surrounding areas on both sides of the main riverbed try to divert and drain water along the fissures to the low-lying areas of the main river channel, and then divert and converge to the nearest collection well 6; the width and depth of the blind ditch are arranged according to the amount of water in the riverbed, flow direction, and the principle of easy convergence and drainage. Large blind ditches are set for large fissure water, and small blind ditches are set for small fissure water. Figure 2 In the middle, six water collection wells 6 are set up in the upstream dam foundation as needed. They are all set up according to the terrain, water potential and pipe well layout principles. Among them, 1~5# water collection wells 6 are connected with the anti-filtration pipe network in combination with the actual water potential and terrain. 6# water collection well 6 and its confluence blind ditch are independently networked and form a drainage system. 5# water collection well 6 is set up as a Φ800 large well due to its low terrain and large confluence water volume. 1~4# water collection wells 6 and 6# water collection well 6 are set up as Φ500 small wells.
[0020] Step 2: Cutting of blind ditches and water collection wells: To reduce the impact of trenching and well construction on the rock foundation, the dam foundation blind ditch and water collection well 6 adopt a minimally invasive bedrock cutting construction method with small disturbance and controlled linear dimensions. An alloy steel cutting machine is used to cut and shape the side walls of the bedrock blind ditch and water collection well 6. Figure 3 In the middle, the blind ditch is cut according to the size of 30cm deep and 20cm wide.
[0021] Step 3: Rock crushing and cleaning: After the blind ditch and the side wall of the water collection well 6 are cut, a small hydraulic breaker is used to cut the bedrock between the wall cracks on both sides, and the bedrock is crushed and excavated by retreat method, ditch by ditch and pit by pit; Step 4: Set up the water collection well pipe: The size of the water collection well 6 should be arranged according to the actual situation, but the base surface should be more than 20cm deeper than the blind ditch. Figure 3 , 4 In the process, the wellhead of the water collection well 6 and the rock foundation surface with a width of 110 cm around it are lowered by 60 cm to set up an anti-filtration water collection well 6. The well pipe 3 adopts a socket-and-spigot concrete pipe with the big end facing downward and is buried in the center of the water collection well 6. In order to ensure the anti-filtration water permeability at the bottom of the well pipe 3, the well pipe 3 is extended into the end of the anti-filter material 5 to drill a seepage hole 3-1, so that the collected water flow can fully penetrate into the well pipe 3 through the crushed stone anti-filter material 5.
[0022] Step 5, laying of filter material: after the blind ditch and the water collection well 6 are cleaned and qualified, lay the filter material 5, which is made of pebbles with a block diameter greater than 5 cm; the filter material 5 should be rinsed clean to prevent mud and dirt from clogging the filter channel, so as to achieve a good filter drainage effect.
[0023] Step 6: Grouting pipeline installation: Figure 6 When filling the filter material 5, in order to ensure the final grouting and plugging, the PPR grouting pipeline 1 is buried in the filter material 5 radially along the outer wall of the well pipe 3. The PPR grouting pipeline 1 forms a two-way grouting loop pipe along the blind ditch to the water collection well 6, and is collected and led out along the wall of the water collection well 6; after the well pipe 2 is plugged, the PPR grouting pipeline 1 still needs to be led upward along the filling surface to the plugging grouting. The PPR grouting pipeline 1 is an L-shaped structure. The PPR grouting pipeline 1 is provided with horizontal flower tube holes 1-1 and vertical flower tube holes 1-2 in the part between the filter materials 5. The horizontal flower tube holes 1-1 and the vertical flower tube holes 1-2 are cross-shaped holes. Specifically, the flower tube holes are spaced 30 to 50 cm apart to facilitate the outflow of the grouting slurry. A pistol drill is used to drill through holes in the horizontal and vertical directions with a hole diameter of 1 cm to facilitate the later blind ditch filter system plugging grouting cement slurry along the flower tube holes to be evenly poured into the filter material and the seepage cracks, and the blind ditch well network filter system is grouted and plugged densely. The PPR grouting pipeline 1 leading out of the filter material 5 is not provided with flower tube holes.
[0024] Step 7. Laying the capping geotextile: After the blind ditch, pit filter material 5 and PPR grouting pipeline 1 are laid, lay the geotextile 7 along the top surface of the filter material 5 and the bedrock of the ditch wall of the water collection well 6; the two ends of the top of the geotextile 7 are 10 cm wider than the ditch wall of the water collection well 6 to ensure that the ditch filter material and the capping dry hard concrete are completely separated.
[0025] Step 8, pouring capping concrete: pour dry hard capping concrete 4 on the water collection well 6 and the geotextile 7 covering the blind ditch. The capping concrete 4 at the blind ditch is 10 cm thick, and the capping concrete 4 at the water collection well 6 is 20 cm thick. During the pouring process, it is necessary to prevent the geotextile 7 from being misaligned or displaced due to the pouring, so that the concrete slurry will penetrate into the blind ditch and condense, causing blockage and siltation, affecting the water flow and the sealing grouting effect. At the same time, the top surface of the top-pressing dry hard concrete pouring should be smoothly connected with the bedrock on both sides, and it is forbidden to form edges and ridges, so as to facilitate the upper fill construction. After the concrete strength can meet the upper thin layer rolling standard, the subsequent upper fill construction can be carried out.
[0026] Step 9, top soil filling, drainage: After the entire anti-filtration system is completed, the bedrock surface is dry and cleaned up, manually mix and apply 1:1 mud to the bedrock surface to facilitate the combination of filling soil. The mud should be applied and spread as the filling is done. Use small machines to roll thin layers layer by layer, level the filling soil from low to high, and when the large surface is uniformly thick enough to meet the rolling requirements of heavy machines, use large rolling machines to roll the whole piece. Before filling the surrounding area of the well pipe 3, apply mud along the pipe wall according to the thickness of the soil layer, and fill the soil as it is applied. Use small machines such as vertical tamping and 1t self-propelled rollers to roll the thin layer of filling along the pipe wall. If the amount of water in the well pipe 3 continues to be large and the water level is still rising during the filling construction process, it is necessary to continue to use the socket-type concrete well pipe for sleeve connection and heightening. A socket rubber ring 2 is set between the well pipes 3. When taking over the pipe, pay attention to installing the socket rubber ring 2 securely. During the precipitation period, close attention should be paid to the water level in the well pipe 3. During the filling construction, it should be ensured that the two water pumps in the well pipe 3 can alternately and continuously pump out water normally (one of them is spare) to ensure the precipitation effect.
[0027] Step 10, plugging of water collection well pipe: Observe the water level during the dewatering process of well pipe 3. The filling surface is more than 2m higher than the water surface in the pipe well 3. The water volume in the well pipe 3 decreases. After the test, the water level does not change after stopping the pumping. In order to reduce the impact of filling construction, the well pipe 3 is plugged from high to low, from upstream to downstream, and at intervals according to the overall distribution of the well pipe 3, the water level in the well, and the flow rate. After plugging, the PPR grouting pipeline 1 is protectively connected to the final plugging grouting filling surface elevation; before plugging, a water pump should be used to assist in pumping out the silted water on the top of the filter material 5. The plugging string should be as close to the water surface in the well pipe 3 as possible, and the concrete should be poured along the string in layers, and vibrated and compacted in layers. The plugging concrete is cast with high-grade, secondary-grade, and low-water concrete.
[0028] Step 11, anti-filtration system plugging grouting: After all well pipes 3 meet the requirements and are plugged, and the filling surface is more than 2m higher than the last plugged well, arrange from low well to high well, and use orifice plugging for the PPR grouting pipeline 1 leading out of the filling surface one by one, and grouting by orifice sealing pure pressure method. The slurry water-cement ratio should be 1:1 and 0.6 (or 0.5):1 cement slurry, low pressure, one-time molding, grouting pressure of 0.2-0.3MPa, to avoid long-term and multiple grouting affecting the grouting quality. When the grouting grouting fluid is hydraulically injected into the filter material 5 of the blind ditch dam foundation, the grouting liquid should be alternately poured into the PPR grouting pipeline 1 led out from the well pipe 3. After the grouting is dense, the grouting liquid will flow back and overflow from the adjacent PPR grouting pipeline 1. The grouting hole stops absorbing grouting and continues to grout for 5 minutes. The grouting holes that flow outward and return upward are closed and waited for setting. The setting time is not less than 24 hours. After 48 hours of hole sealing, the grouting pipe exposed outside the concrete can be cut off and the hole mouth can be smoothed with 1:1 concrete mortar.
Claims
1. A blind ditch filtration system and grouting plugging construction method for earth dam rock foundation, characterized in that The following steps are involved: Step 1: Arrangement of blind ditch anti-filtration system: Based on the principle of blocking up and draining down in the earth dam, the upstream water collection well (6) of the dam curtain line is set in the main channel of the original riverbed and at the lower part of the confluence area according to the springs and terrain in combination with the actual confluence situation; the water collection wells (6) can be connected and set according to the water potential and terrain, and each water collection well (6) and its confluence blind ditch form a system according to the actual situation, and the size of the water collection well (6) and the blind ditch is adjusted according to the actual confluence water volume; Step 2: Cutting of blind ditches and water collection wells: In order to reduce the impact of trenching and well construction on the rock foundation, the dam foundation blind ditch and water collection well (6) adopt a minimally invasive bedrock cutting construction method with small disturbance and controlled linear dimensions, and use an alloy steel cutting machine to cut and shape the side walls of the bedrock blind ditch and water collection well (6); Step 3: Rock crushing and cleaning: After the side walls of the blind ditch and the water collection well (6) are cut, a small hydraulic breaker is used to cut the bedrock between the wall cracks on both sides, and the bedrock is crushed and excavated by retreating ditch by ditch and pit by pit; Step 4: Setting up the water collection well pipe: The size of the water collection well (6) is arranged according to the actual situation, but the base surface should be more than 20 cm deeper than the blind ditch. The well pipe (3) adopts a socket-type concrete pipe, and is vertically buried in the center of the water collection well (6) with the big end facing downward; a seepage hole (3-1) is drilled at the end of the well pipe (3) extending into the filter material (5); Step 5: Laying the filter material: After the blind ditch and the water collection well (6) are cleaned and qualified, the filter material (5) is laid. The filter material (5) is made of pebbles with a block diameter greater than 5 cm; Step 6: Installation of grouting pipelines: When filling the filter material (5), in order to ensure the final grouting plugging, PPR grouting pipelines (1) are buried radially in the filter material (5) along the outer wall of the well pipe (3), and are collected and led out along the wall of the water collection well (6); Step 7: Laying the top geotextile: After the blind ditch, pit filter material (5), and PPR grouting pipeline (1) are laid, the geotextile (7) is laid along the top surface of the filter material (5) and the bedrock of the well trench wall of the water collection well (6); Step 8: pouring capping concrete: pouring dry hard capping concrete (4) on the water collection well (6) and the geotextile covering the blind ditch (7); Step 9: Top soil filling and drainage: After the entire anti-filtration system is completed, the bedrock surface is dry and cleaned up, manually mix and apply 1:1 mud to the bedrock surface to facilitate the combination of fill and soil. The mud should be applied as the filling and soil are spread; Step 10, plugging of water collection well pipe: During the process of water reduction of the well pipe (3), the water level is carefully observed. The filling surface is higher than the water surface in the pipe well (3) by more than 2m. The water volume in the well pipe (3) decreases. After the test, the water level does not change after stopping the pumping. In order to reduce the impact of the filling construction, the well pipe (3) is plugged from high to low, from upstream to downstream, and at intervals, according to the overall distribution of the well pipe (3), the water level in the well, and the flow rate. After plugging, the PPR grouting pipeline (1) is protectively connected to the elevation of the final plugging grouting filling surface; Step 11, grouting for plugging the filtration system: After all well pipes (3) meet the requirements and are plugged, and the filling surface is more than 2m higher than the height of the last plugged well, arrange from low wells to high wells, and use the orifice plugging to plug the PPR grouting pipelines (1) leading out of the filling surface one by one, and the orifice is closed and grouting is carried out by pure pressure method.
2. The earth dam rock foundation blind ditch anti-filtration system and grouting plugging construction method according to claim 1 is characterized by: In the fourth step, the well pipe (3) is extended into the end of the filter material (5) to drill a water seepage hole (3-1), so that the collected water flow can fully penetrate into the well pipe (3) through the crushed stone filter material (5).
3. The earth dam rock foundation blind ditch anti-filtration system and grouting plugging construction method according to claim 1 is characterized by: In step six, the PPR grouting pipeline (1) is an L-shaped structure. The PPR grouting pipeline (1) is provided with horizontal flower tube holes (1-1) and vertical flower tube holes (1-2) in the part between the filter material (5). The horizontal flower tube holes (1-1) and the vertical flower tube holes (1-2) are both cross-shaped holes. The distance between adjacent flower tube holes is 30 to 50 cm to facilitate the outflow of grouting slurry. The part of the PPR grouting pipeline (1) leading out of the filter material (5) is not drilled with flower tube holes.
4. The earth dam rock foundation blind ditch anti-filtration system and grouting plugging construction method according to claim 1 is characterized by: In the step 1, a total of six water collection wells (6) are set up on the upstream dam foundation as needed, and the overall arrangement is based on the terrain water potential and the pipe well layout principle. Among them, the 1-5# water collection wells (6) are connected to the anti-filtration pipe network in combination with the actual water potential terrain. The 6# water collection well (6) and its confluence blind ditch are independently networked and form a drainage system. The 5# water collection well (6) is set as a Φ800 large well due to its low terrain and large confluence water volume. The 1-4# water collection wells (6) and the 6# water collection well (6) are set as Φ500 small wells.