Cutter suction dredger and dredging method

By renovating the stone separation device and preliminary cleaning measures of the crimping suction boat, the problem of pipe blocking and equipment wear in hard soil of the crimping suction boat is solved, automatic cleaning and treatment of the stone is realized, and dredging and blowing efficiency is improved.

CN118911221APending Publication Date: 2024-11-08CCCC FOURTH HARBOR ENG CO LTD

Patent Information

Application Number
CN202411294763.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In dredging projects, the crimped suction boat is prone to wear of pipes and equipment when dealing with hard or rock layers, and the existing mesh cover isolation methods have clay blockage and stone grid hanging, which affects construction efficiency.

Method used

The modified crimping suction boat is equipped with a stone separation device, including automatic opening and closing doors, one-way grilles and stone treatment mechanism. The surface stone is initially cleaned through the grab boat and the water excavator rake bucket, reducing the excavation resistance of the crimping suction boat, and using it The stone separation device automatically cleans and crushes the stone in the suction pipe to avoid blockage and realizes automatic collection and treatment of stones.

Benefits of technology

It effectively solves the problems of pipe blocking and pump blocking, reduces the frequency of stone cleaning of bridge lifting, improves dredging and blowing efficiency, reduces equipment wear, improves construction efficiency and effective utilization of stones.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911221A_ABST
    Figure CN118911221A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of dredging engineering, in particular to a cutter suction dredger and a dredging method. When dredging operation is carried out, stones in dredged objects enter the stone separating device along with slurry under the action of negative pressure suction force of the dredge pump, the stones can directly knock open a one-way grating to reach the position where the stone processing mechanism is located and are processed by the stone processing mechanism, such as interception and crushing, and the dredged objects entering the dredge pump can be normally pumped out; when the dredge pump is shut down, stones accumulated in the collecting bin have the tendency of sliding down under the action of gravity, the one-way grating arranged on the side, close to the reamer head, of the automatic opening and closing door can prevent the stones in the collecting bin from falling back, and meanwhile slurry is allowed to flow back; stones in the pipeline can be automatically discharged out of the pipeline through the automatic opening and closing door and temporarily stored in the deck bin, dredging operation of the next stage can be continued, the bridge does not need to be frequently lifted to clean the stones, and the construction efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of dredging engineering, in particular to a cutter suction vessel and a dredging method. Background Art

[0002] Cutter suction dredger (abbreviated as cutter suction dredger) is a kind of equipment widely used in dredging projects. It can complete the dredging process such as dredging, transporting and unloading at one time. Compared with other types of ships, it has the characteristics of long continuous operation time, high production efficiency, low construction cost and flexible operation. Figure 1 As shown, a bridge 1 is hingedly provided at the front end of the dredging suction ship, and a cutter head 3 is provided at the front end of the bridge 1. The cutter head 3 can rotate relative to the bridge 1, and the rotating shaft of the cutter head 3 is coaxially fixed with the output shaft of the motor fixed inside the bridge 1; a mud suction pipe 2 is also fixed on the bridge 1, one end of the mud suction pipe 2 is arranged toward the cutter head 3, and the other end is connected with the mud pump 4; when working, the bridge 1 at the front end of the bow is placed below the water surface, and the underwater mud surface is loosened by the rotation of the cutter head 3 at the front end of the bridge 1, and the centrifugal mud pump 3 on the ship generates negative pressure suction, and the mud obtained by excavation is sucked in through the mud suction pipe 2, and the mud is pumped out through the mud pump 4, and then discharged through the mud delivery pipeline on the ship. Existing dredger suction dredgers are suitable for excavation of most soft and medium-hard soils, but their performance will be significantly limited under rock conditions; when excavating hard or rocky layers, the efficiency of dredger suction dredgers will be significantly reduced, not only will pipe blockage problems easily occur, but the hull excavation resistance and equipment load will also be increased, resulting in severe wear of equipment (such as auger heads and teeth) and even possible damage.

[0003] During the dredging of a port basin of a certain project, a large number of 10-60cm boulders were found in the dredged soil. It took an average of 5-30 minutes to stop the pump and lift the bridge frame out of the water to clean the stones, which seriously affected the construction efficiency of the suction dredger and caused a huge obstacle to the dredging operation. Through shallow profiling of the dredged port basin geology, the results showed that the boulders were distributed throughout the port basin, and the top elevation range of the detectable buried boulders in the area was -5.0m~-17.5m; and according to the construction records of the suction dredger, there were not only boulders on the surface, but also many boulders at all depths below, which seriously affected the efficiency of dredging and filling, and caused too much damage to the equipment to make construction impossible. If this part of the sand and soil is thrown out for treatment, it will cause insufficient filling volume.

[0004] In the above situation, the project team tried to add a mesh cover at the suction port of the suction pipe in an attempt to exclude large stones and avoid clogging the pipe or the mud pump. However, during the experiment, it was found that the dredged soil from the project had a large viscosity and was easy to clog the mesh holes. Stones with a size close to the size of the grille gap were also easy to get stuck in the mesh and cause blockage, increasing the resistance to mud suction and resulting in poor mud transportation effect. Moreover, the use of this method of excluding stones to absorb mud resulted in a large amount of stones left in the harbor dredging, which would also create resistance to the underwater excavation of the hull. Structures such as the auger head would still come into contact with the remaining stones in the process of swinging back and moving forward, affecting the excavation of other areas or deeper mud surfaces.

[0005] Therefore, how to quickly clean the isolated rocks in the dredged soil of the harbor while reducing the frequency of removing the pump and lifting the bridge frame to clean the rocks so as to meet the dredging efficiency is a difficult problem that urgently needs to be studied and overcome. Summary of the invention

[0006] The purpose of the present invention is to: in view of the existing technology that a large number of boulders are found in harbor dredging, the stones are easily sucked into the mud pump and cause blockage during dredging by a dredger suction barge, and the pump needs to be frequently stopped to clean the stones, which seriously affects the construction efficiency of the dredger suction barge. However, if the stones are isolated outside by a mesh cover for soil transportation, there is a problem that clay and stones with a size close to the size of the mesh gap are hung on the mesh, causing blockage and bringing great resistance to construction. A dredger suction barge and a dredging method are provided.

[0007] In order to achieve the above object, the technical solution adopted by the present invention is: A dredging method comprises the following steps: S1: using a grab boat to grab stones in the overburden soil at a first preset depth on the surface, and / or using a water excavator bucket to screen stones in layers at a second preset depth in the dredged area; S2: Use a modified dredging vessel for dredging operations. The dredging vessel's suction pipe is provided with a stone separation device, and the stone separation device is a section of a pipeline structure connected to the dredging pipe, that is, the stone separation device is one section of the dredging pipeline at the front end of the mud pump, and can be connected between multiple sections of dredging pipes, or can be connected to the end of the entire section of dredging pipe; specifically, the stone separation device is provided with an automatic opening and closing door on the side wall, and the automatic opening and closing door is arranged downward, and the automatic opening and closing door is connected to the first driving device; a one-way grille is provided in the stone separation device, and the one-way grille is located on the side of the automatic opening and closing door close to the auger head, and the one-way grille is hingedly connected to the pipe wall of the stone separation device, and the one-way grille can be opened and closed from the side close to the auger head. The one-way grille is used to introduce stones into the dredger, and conversely, when the stones fall back from the mud pump side toward the cutter head side in the opposite direction, the one-way grille can prevent the stones from falling back; a stone processing mechanism is also provided in the stone separation device, and the stone processing mechanism is located on the side of the automatic opening and closing door close to the dredger mud pump, and the stone processing mechanism is used to process stones and allow mud to flow through, so as to ensure that the mud pump can work normally and avoid stones clogging the mud pump; the space between the stone processing mechanism and the one-way grille is used as a collecting bin for temporarily storing stones, and the stones in the collecting bin can be discharged through the opening at the automatic opening and closing door; a deck bin for storing stones is provided under the stone separation device, and the deck bin corresponds to the position of the automatic opening and closing door.

[0008] Specifically, dredging operations include the following steps: S21: driving the auger head to rotate, so as to loosen the underwater mud and gravel, and driving the mud pump to suck the dredged materials such as mud and gravel through the mud suction pipe; S22: when it is detected that the pressure in the mud suction pipe is a preset pressure value, the mud pump is turned off, the automatic opening and closing door is opened by the first driving device, the collecting bin and the deck bin are connected, and the material in the collecting bin is discharged into the deck bin; S23: close the automatic opening and closing door, restart the mud pump, and continue the dredging operation.

[0009] This solution first uses a grab boat to clean the stones in the first preset depth of the surface soil in the dredging area, and then uses the modified dredger suction dredging to reduce the excavation resistance of the dredger suction dredging ship; or first uses the water excavator bucket to screen the large stones larger than the suction port size in the dredging area according to the second preset depth, reducing the risk that there may be stones larger than the suction port in the dredging area that hinder the deep excavation of the dredger suction dredging ship, reducing the excavation resistance of the dredger suction dredging ship, and then uses the modified dredger suction dredging ship to carry out suction dredging, which is conducive to improving the subsequent construction efficiency of the dredger suction dredging ship; or, both use a grab boat to initially grab the stones in the surface soil, and use the water excavator bucket to screen out the stones larger than the suction port from top to bottom according to the second preset depth, and then use the modified dredger suction dredging ship to carry out suction dredging. This is conducive to reducing the power consumption of the dredger suction dredging ship and improving construction efficiency. In the process of dredging operations using the modified dredger suction barge, the stones in the dredged material enter the stone separation device along with the mud under the action of the negative pressure suction of the mud pump. The stones can directly knock open the one-way grid and reach the location of the stone processing mechanism, which will process them, such as interception and crushing, so that the dredged material entering the mud pump can be pumped out normally to avoid clogging the mud pump. During the operation, due to factors such as limited internal space in the pipeline and the presence of dredged materials with different hardness, when there are too many stones waiting to be processed at the stone processing mechanism, a vacuum will slowly form in the pipe, causing the mud suction pipe to be unable to perform its conveying function normally. At this time, it is necessary to stop the pump and clean up the stones to avoid the mud pump from doing useless work or even being damaged. When the mud pump stops, the stones accumulated in the collecting bin tend to slide down under the action of gravity. The one-way grille installed on the automatic opening and closing door near the auger head can prevent the stones in the collecting bin from falling back, while allowing the mud to flow back. At this time, the stones in the pipeline can be automatically discharged out of the pipeline through the automatic opening and closing door and temporarily stored in the deck bin. After the original flow rate of the pipeline is restored, the next stage of dredging operation can be continued without frequently lifting the bridge frame to clean the stones.

[0010] This solution uses a modified suction dredger to carry out dredging operations, which not only cleans the stones in the dredged material, reduces the accumulation of stones in the dredged harbor, and reduces the resistance of dredging excavation, but also automatically discharges the stones in the mud suction pipe out of the pipe underwater and collects them, solving the problems of pipe and pump blockage in real time, reducing the frequency of lifting the bridge frame to clean the stones, ensuring that the mud pump can work normally for a long time, thereby improving the efficiency of dredging and filling, and facilitating the centralized and unified treatment of stones, realizing the effective utilization of stones, and being environmentally friendly and economical. Compared with the prior art, in which the bridge frame is lifted out of the water after pipe or pump blockage occurs, and the stone removal operation needs to be carried out manually by entering the pipe from the mud suction port, the construction efficiency of this solution is high.

[0011] As a preferred embodiment of the present invention, the above-mentioned dredging operation also includes the steps of: when the deck bin reaches a preset bearing pressure, stopping the operation of the cutter head and the mud pump, lifting the bridge frame to move the cutter head and the mud suction pipe out of the water; lowering the deck bin and cleaning the deck bin.

[0012] As a preferred solution of the present invention, the first preset depth and / or the second preset depth is 1.5-3m.

[0013] As an optional preferred solution of the present invention, the stone processing mechanism includes a guide grid and two parallel tooth rollers, the tooth rollers are provided with a crushing cutter head for crushing stones, the tooth rollers are connected to a hydraulic motor, the guide grid is respectively arranged between the two tooth rollers and the pipe wall on the corresponding side, the guide grid is arranged obliquely, and the guide grid is used to guide the stones between the two tooth rollers and allow the mud to flow through; the cross-sectional area of ​​the stone separation device is larger than the cross-sectional area of ​​the mud suction pipe. Wherein, the guide grid is a grid structure, which has the function of guiding and filtering.

[0014] This solution uses the guide grid to separate large stones from the mud while passing the mud, and guides the stones into the space between the two tooth rollers for crushing, so that the stones are crushed into small stones that can pass through the gap between the mud pump impellers, and are directly blown ashore through the pump pipe, which not only realizes the reuse of stones, but also reduces blockage and downtime, and improves the blowing and filling efficiency; the tooth roller is driven by a hydraulic motor to rotate and can adapt to underwater operations. Correspondingly, in the case of a crushing structure, in order to ensure that the stone separation device has sufficient flow path to allow mud to pass through and adapt to the mud pump performance, the cross-section of the stone separation device should be increased.

[0015] As a further preferred embodiment of the present invention, the cross-sectional area of ​​the flow channel of the stone processing mechanism is greater than or equal to the cross-sectional area of ​​the mud suction pipe, and the cross-sectional area of ​​the flow channel = the inner cavity area of ​​the stone processing mechanism - the flat area of ​​the tooth roller - the flat area of ​​the crushing head.

[0016] As a further preferred embodiment of the present invention, the stone separation device is a section of variable diameter pipeline: the cross-sectional shape of the inner cavity of the stone processing mechanism is square, which is convenient for arranging tooth rollers of the same size and specification; the cross-sectional shape at the collecting bin is circular, which is adapted to the cross-sectional shape of the mud suction pipe and is convenient for processing; correspondingly, the collecting bin is inscribed in the inner cavity where the stone processing mechanism is located, that is, the inner cavity area where the stone processing mechanism is located is larger than the cross-sectional area of ​​the collecting bin; considering that the collecting bin is to store stones, its cross-sectional area should be slightly larger than the cross-sectional area of ​​the mud suction pipe, then: the inner cavity area where the stone processing mechanism is located>the cross-sectional area of ​​the collecting bin>the cross-sectional area of ​​the mud suction pipe, which meets the transportation requirements of the mud suction pipe and is adapted to the performance of the mud pump.

[0017] As a preferred solution of the present invention, a transverse gap is provided between the crushing cutter heads on the two toothed rollers, that is, the axial distance between the two toothed rollers is greater than the sum of the radii of the crushing cutter heads on the two toothed rollers. The gap should be smaller than the distance between the impellers of the mud pump and be adapted to the maximum allowable particle size of the stone. Compared with the prior art method of closely arranging the crushing cutter heads between the two toothed rollers (for example, the axial distance between the two toothed rollers is less than or equal to the sum of the radii of the crushing cutter heads on both sides), the present solution reserves a sufficiently large gap between the crushing cutter heads on both sides. On the one hand, it enables large stones to quickly enter the gap for crushing under the negative pressure suction of the mud pump. On the other hand, it can effectively prevent stones from slipping between the crushing cutter heads on both sides and stagnating in front of the crushing cutter heads and being unable to be effectively crushed, thereby improving crushing efficiency, reducing queued stones, and reducing the risk of stone blockage.

[0018] In addition, it should be noted that in order to ensure that the crushed stones can pass through the mud pump impeller gap smoothly, the arrangement spacing of the two tooth rollers should be smaller than the mud pump impeller gap selected by the cutter suction ship, which is compatible with the mud pump performance.

[0019] As a further preferred embodiment of the present invention, the crushing cutter head includes a first cutter head and a second cutter head, the diameter of the first cutter head is larger than the diameter of the second cutter head, and on each of the toothed rollers, the first cutter head and the second cutter head are arranged alternately and at intervals, and the crushing cutter heads between the two toothed rollers are arranged in a staggered manner. This scheme adopts a large and a small cutter head of different specifications to be arranged alternately and at intervals, which can leave a large access space between the cutter heads on both sides, and can effectively bite the stone for shearing and crushing through the crushing cutter heads at different positions, which is conducive to compact structural arrangement and good uniformity of stone crushing particle size.

[0020] As a preferred solution of the present invention, the two gear rollers are respectively connected to one hydraulic motor, and the two hydraulic motors are arranged on opposite sides. This is conducive to transmitting large torque. Compared with the arrangement of the hydraulic motors on the same side, the arrangement of this solution makes the crushing force along the axial direction of the gear roller during stone crushing more balanced, and the uniformity of the crushed stone particle size is good.

[0021] As a preferred solution of the present invention, the two ends of the stone separation device are respectively provided with a neck connection part, the neck connection part is conical, and the neck connection part is used to dock with the pipes at both ends; the neck connection part is provided with a flange plate flush with the end surface for easy positioning. This solution preferably adopts a gradual connection of the neck connection part, and the mud can fall back along the neck connection part. Compared with the structure of the boss style with a sudden change in size, the risk of mud accumulation at the inlet and outlet is small.

[0022] As a further preferred embodiment of the present invention, the necked connection portion has a large end and a small end, and the one-way grid is arranged on a side of the necked connection portion close to the large end to prevent stones from staying at the necked connection portion.

[0023] As another optional preferred solution of the present invention, the stone processing mechanism includes a movable grille and a second driving device, the movable grille is connected to the second driving device, the movable grille is used to intercept stones and allow mud to flow, and the movable grille is a movable grille structure; for example, it can move linearly along the pipe diameter direction, rotate around the pipe wall hole, move along the inner wall of the pipe, etc. By setting a movable grille on the mud pump side of the automatic opening and closing door to intercept stones, stones are prevented from entering the mud pump and causing pipe blockage; when stones accumulated at the movable grille cause pipe blockage, the movable grille is moved or rotated by the second driving device to loosen the stones blocked at the movable grille, preventing the stones from being stuck at the movable grille, so that the stones can slide down through the opening at the automatic opening and closing door under the action of gravity and roll into the deck bin to achieve stone cleaning in the pipe, thereby solving the problem of pipe vacuum caused by stone blockage.

[0024] For example, the movable grille loosens the blocked stones by moving along the pipe diameter direction. One possible implementation method may be: the movable grille may be provided with a blocking rod, and it is considered to use a blocking rod with a certain width or diameter or to set fixed blocks on both sides of the pipe wall, so that the distance between the fixed blocks on both sides and the single blocking rod is appropriate; or, a suitable number of blocking rods, such as two or three, are used to make the distance between the blocking rods and between the blocking rods and the pipe wall appropriate, and some or all of the blocking rods may be provided to be movable in the axial direction. In terms of the method of rotating the movable grille to loosen the stones, the movable grille may be a blocking rod with wider blades, which is inserted into the pipe wall and rotatably connected to the external second driving device, and there is an appropriate spacing between the blades or between the blades and the pipe wall for the mud to flow. When the pump is stopped due to stone blockage, the blocking rod is driven to rotate, so that the wider blades move the stones, so that the stuck stones are loosened and then fall along the opening of the automatic switch door. It is not limited to the above examples.

[0025] As a preferred solution of the present invention, the deck tank is arranged along the axial direction of the pipeline, one end of the deck tank is hingedly connected to the bridge or the hull, and the other end is detachably connected to the bridge. That is, the deck tank can be fixed to the bridge in the working state, and when the working state is released, the end (the end movably connected to the bridge) can rotate relative to the bridge around the hinge fulcrum.

[0026] As a preferred solution of the present invention, a plurality of baffles are provided on the deck bin, which are arranged in parallel and spaced apart along the length direction of the mud suction pipe, playing a certain buffering and blocking role to prevent stones from sliding straight down the inclined slope of the deck bin and accumulating in one place.

[0027] As a preferred embodiment of the present invention, the top of the one-way grille is hingedly connected to the stone separation device, so that the one-way grille can fall back by gravity, which has a better effect than being hinged on the side of the box wall.

[0028] As a preferred solution of the present invention, the automatic opening and closing door is hingedly connected to the stone separation device, and the automatic opening and closing door is connected to the pipe wall of the stone separation device through a first driving device. The first driving device is arranged outside the stone separation device to avoid the arrangement of the first driving device occupying the pipeline flow path, avoid stone collision, and facilitate control.

[0029] The present invention also provides a blowing filling method, comprising the following steps: Connect the mud blowing and filling pipeline to the mud pump on the above-mentioned cutter suction ship; The dredged materials discharged by the above dredging method are subjected to suction dredging, and the dredged materials are discharged to the designated cofferdam position through the suction pipe and mud pump on the suction dredger and through the blowing and filling mud pipeline.

[0030] The present invention also provides a dredger suction ship, comprising a bridge and a dredger suction pipe, wherein the bridge is connected to the dredger suction pipe, one end of the dredger suction pipe is connected to a dredger pump, and the other end is arranged toward a dredger head, wherein the dredger head is arranged at the front end of the bridge, and further comprising a stone separation device, wherein the stone separation device is a section of a pipeline structure arranged on the dredger suction pipe, and an automatic opening and closing door is arranged on the side wall of the stone separation device, wherein the automatic opening and closing door is arranged downward, and wherein the automatic opening and closing door is connected to a first driving device; A one-way grille is provided in the stone separation device, and the one-way grille is located on the side of the automatic opening and closing door close to the reamer head. The one-way grille is hingedly connected to the pipe wall of the stone separation device, and the one-way grille can introduce stones from the side close to the reamer head in one direction. On the contrary, when the stones fall back from the mud pump side to the reamer head side in the reverse direction, the one-way grille can prevent the stones from falling back. The stone separation device is also provided with a stone processing mechanism, which is located on the side of the automatic opening and closing door close to the dredger suction boat mud pump. The stone processing mechanism is used to process stones and allow mud to flow through, so as to ensure that the mud pump can work normally and avoid stones blocking the mud pump; between the stone processing mechanism and the one-way grid is a collection bin for temporarily storing stones, and the stones in the collection bin can be discharged through the opening at the automatic opening and closing door; A pressure detection device is provided on the stone separation device and / or the mud suction pipe, and the pressure detection device is used to detect the pressure in the pipeline; A deck bin for storing stones is provided below the stone separation device, and the deck bin corresponds to the position of the automatic opening and closing door.

[0031] This solution can not only clean up the stones in the dredged materials, reduce the accumulation of stones in the dredged harbor, and reduce the resistance of dredging excavation by modifying the suction pipe on the existing dredger, but also automatically discharge the stones in the suction pipe underwater and collect them out of the pipe, thus solving the problems of pipe and pump blockage, reducing the frequency of cleaning stones on the bridge lifting frame, and ensuring that the mud pump can work normally for a long time, thereby improving the efficiency of dredging and filling.

[0032] Compared with the prior art, the present invention has the following beneficial effects: The present invention can not only clean up the stones in the dredged materials, reduce the accumulation of stones, and reduce the resistance of dredging and excavation, but also can automatically discharge the stones in the pipeline out of the pipeline underwater and collect them, so as to facilitate the centralized and unified treatment of the stones and realize the effective utilization of the stones. At the same time, it can solve the problems of pipe blockage and pump blockage in real time, reduce the frequency of cleaning the stones by the bridge frame, and ensure that the mud pump can work normally for a long time. Compared with the prior art, when the bridge frame is moved out of the water after the pipe blockage or pump blockage occurs, it is necessary to manually enter the pipeline to carry out the stone removal operation, thereby improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a construction schematic diagram of a prior art cutter suction boat; Figure 2 is a schematic diagram of the structure of the cutter suction boat after modification in Example 1; Figure 3 This is a schematic diagram of the structure of the stone separation device Figure 1 (Drive device not shown); Figure 4 is a schematic diagram of the structure of the stone processing mechanism in Example 1; Figure 5 yes Figure 4 A cross-sectional view of Figure 6 It is a structural cross-sectional view of the stone separation device when the toothed rollers are arranged horizontally; Figure 7 This is a schematic diagram of the structure of the stone separation device Figure 2 (Drive device not shown); Figure 8 It is a schematic diagram of the cross-sectional structure of the stone processing mechanism in Example 2.

[0034] Icons: 1-bridge; 2-mud suction pipe; 3-cutter head; 4-mud pump; 5-deck bin; 51-baffle; 6-stone separation device; 61-one-way grid; 62-collection bin; 63-stone processing mechanism; 64-neck connection; 65-flange; 66-automatic opening and closing door; 67-first drive device; 631-guide grid; 632-tooth roller; 633-crushing cutter head; 634-hydraulic motor; 635-movable grid; 6351-stop rod; 636-second drive device. DETAILED DESCRIPTION

[0035] The present invention will be described in detail below in conjunction with the accompanying drawings.

[0036] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0037] Example 1 A cutter suction boat, such as Figure 2-Figure 6 As shown, it includes a bridge 1, a mud suction pipe 2, a mud pump 4, a cutter head 3 and a mud discharge pipe. The bridge 1 is connected to the mud suction pipe 2, one end of the mud suction pipe 2 is connected to the mud pump 4, and the other end is arranged toward the cutter head 3, the mud pump 4 is connected to the mud discharge pipe, and the cutter head 3 is arranged at the front end of the bridge 1. It also includes a stone separation device 6, the body of the stone separation device 6 is a section of the pipeline structure arranged between the mud suction pipe 2 and the mud pump 4, that is, the stone separation device 6 is one of the sections on the mud suction pipeline at the front end of the mud pump 4. The stone separation device 6 is used to temporarily store stones, and after the stones sucked into the mud suction pipe 2 block the pipe, they are separated from the pipe to solve the problem of stone blocking the pipe. Considering the storage function of the stone separator 6, the cross-sectional size of the stone separator 6 should be slightly larger than the cross-sectional size of the mud suction pipe 2; accordingly, in this embodiment, preferably, a necking connection part 64 is respectively provided at both ends of the stone separator 6, and the necking connection part 64 is conical, and the necking connection part 64 is used to smoothly dock with the circular cross-section pipeline. Furthermore, a flange 65 smoothly connected to the end surface is provided on the necking connection part 64 for easy positioning. The pipelines at both ends of the stone separator 6 are gradually connected by the necking connection part 64. After the pump is removed, the mud can fall back along the necking connection part 64. Compared with the structure with a sudden change in size of the boss style, the risk of mud accumulation at the inlet and outlet is small.

[0038] In this solution, in order to achieve a better connection between the new pipeline and the original pipeline, the end of the stone separation device 6 close to the reamer head 3 is first positioned by the flange 65 bolts, and then welded to the original pipeline, and the end of the stone separation device 6 close to the mud pump 4 is connected by the flange 65 bolts, and a sealing ring is used to achieve the sealing of the pipeline flange interface, thereby realizing the structural transformation of the mud suction pipe 2 on the existing dredging vessel. In this embodiment, the mud pump adopts a single-shell horizontal centrifugal pump model VOSTALGMHCD800 with a flow rate of 12600m 3 / h, head 37m, rated speed 276r / min; impeller diameter 1900*400mm; suction pipe diameter 800mm; mud discharge pipe diameter: 800mm.

[0039] In this embodiment, the stone separation device 6 includes an automatic opening and closing door 66, a one-way grid 61, a stone processing mechanism 63 and a first driving device 67 for driving the automatic opening and closing door 66 to operate.

[0040] Among them, the automatic opening and closing door 66 is arranged on the side wall of the stone separation device 6 and is arranged downward, so that the stones can slide down from the pipeline by gravity; one side of the automatic opening and closing door 66 is hingedly connected to the body of the stone separation device 6, and the side of the automatic opening and closing door 66 close to the reamer head 3 is connected to the first driving device 67, which is arranged outside the stone separation device 6 and fixedly connected to the stone separation device 6, so as to avoid the arrangement of the first driving device 67 occupying the pipeline flow path, and also avoid stone collision, which is convenient for control. The first driving device 67 is preferably a hydraulic cylinder.

[0041] like Figure 3 As shown, the one-way grille 61 is arranged inside the stone separation device 6 and is located on the side of the automatic switch door 66 close to the reamer head 3; the one-way grille 61 is a grille structure that allows mud to flow through. The one-way grille 61 is hingedly connected to the body of the stone separation device 6. The one-way grille 61 can introduce stones from the side close to the reamer head 3 in one direction. On the contrary, when the stones fall back from the mud pump 4 side to the reamer head 3 side, the one-way grille 61 can block the stones from falling back. To this end, the structure interference of the variable cross-section of the necking connection part 64 can be used, or a block can be directly set at the bottom of the stone separation device 6. Further, in this embodiment, the necking connection part 64 has a large end and a small end, and the one-way grille 61 is arranged on the side of the necking connection part 64 close to the large end to prevent the stones from staying at the necking connection part 64 after the pump is stopped. Furthermore, it is preferred that the one-way grille 61 is hingedly connected above the stone separation device 6, so that the one-way grille 61 can fall back by gravity, which has a better effect than being hingedly connected to the side of the box wall.

[0042] like Figure 3 As shown, the stone processing mechanism 63 is arranged inside the stone separation device 6 and is located on the side of the automatic opening and closing door 66 close to the dredger suction vessel mud pump 4. The stone processing mechanism 63 is used to process stones and make mud flow through to ensure that the mud pump 4 can work normally; accordingly, the pipeline space between the stone processing mechanism 63 and the one-way grid 61 is used as a collection bin 62 for temporarily storing stones. In this embodiment, as shown in FIG. Figure 4 , Figure 5As shown, the stone processing mechanism 63 includes a guide grid 631 and two parallel tooth rollers 632. The tooth rollers 632 are provided with crushing cutter heads 633 for crushing stones. Both ends of the tooth rollers 632 are rotatably connected to the body of the stone processing mechanism 63. The tooth rollers 632 are connected to the hydraulic motor 634. The guide grids 631 are respectively arranged between the two tooth rollers 632 and the pipe walls on the corresponding sides. The guide grids 631 are tilted to guide the stones between the two tooth rollers 632. By reasonably arranging the positions of the tooth rollers and adjusting the distance between the two tooth rollers 632, the stones can be crushed to a particle size of less than about 20 cm.

[0043] This solution uses a guide grid 631 to separate large stones from mud and sand, and guides the stones into the space between the two tooth rollers 632 for crushing, so that the stones are crushed into small stones that can pass through the gap between the impellers of the mud pump 4, and are directly blown ashore through the pump pipe, thereby reducing blockage and downtime; in addition, this solution sets a guide grid 631 in front of the gap between the tooth roller and the pipe wall to guide the stones between the two tooth rollers, which can not only maintain the continuous flow of materials, thereby avoiding local vacuum and pipe blockage in the mud suction pipe, but also reduce the impact of the materials on the stone processing mechanism, thereby increasing the service life of the stone processing mechanism.

[0044] The stones that exceed the predetermined limit are retained in the collection bin and discharged through the automatic opening and closing door. On the one hand, it can avoid the need to separate the stones from the materials before the subsequent filling operation, so that the filling operation can be carried out continuously with the continuous influx of materials, thereby greatly improving the continuity and efficiency of the filling operation; on the other hand, it can also facilitate the subsequent unified treatment of these stones, such as collecting them on board or abandoning them on the shore, so as to avoid these stones remaining on the bottom of the water and interfering with the subsequent dredging operation, thereby improving the construction efficiency of the subsequent dredging operation in the same area and further speeding up the construction speed of the entire dredging operation.

[0045] In this solution, the gear roller 632 is driven by a hydraulic motor 634 to rotate, which can adapt to underwater operations. In this embodiment, the gear roller 632 is preferably arranged horizontally, and the guide grille 631 is arranged up and down, so that the guide grille 631 can directly guide the automatic opening and closing door 66. Figure 6 As shown; as another possible implementation mode, the tooth roller 632 can also be set vertically or inclined, and the guide grille 631 can guide the stones on both sides to the position between the two tooth rollers 632.

[0046] Correspondingly, in the case of a crushing structure, in order to satisfy the requirement that the stone separation device 6 has a sufficient flow path to allow mud to pass through and to adapt to the performance of the mud pump 4, the cross-section of the stone separation device 6 should be increased. The cross-sectional area of ​​the flow passage at the location of the stone processing mechanism 63 is greater than or equal to the cross-sectional area of ​​the mud suction pipe 2, and the cross-sectional area of ​​the flow passage = the inner cavity area at the location of the stone processing mechanism 63 - the plane area of ​​the tooth roller 632 - the plane area of ​​the crushing cutter head 633.

[0047] The stone separation device 6 in this embodiment is a section of variable diameter pipeline. Specifically, the cross-sectional shape of the inner cavity where the stone processing mechanism 63 is located is square, which is convenient for arranging the tooth rollers 632 of the same size and specification, and the cross-sectional shape at the collecting bin 62 is circular, which is adapted to the cross-sectional shape of the mud suction pipe 2, and is convenient for processing. Correspondingly, the collecting bin 62 is inscribed in the inner cavity where the stone processing mechanism 63 is located, that is, the inner cavity area where the stone processing mechanism 63 is located is larger than the cross-sectional area of ​​the collecting bin 62; considering that the collecting bin 62 needs to store stones, its cross-sectional area should be slightly larger than the cross-sectional area of ​​the mud suction pipe 2, then: the inner cavity area where the stone processing mechanism 63 is located> the cross-sectional area of ​​the collecting bin 62> the cross-sectional area of ​​the mud suction pipe 2, which meets the transportation requirements of the mud suction pipe 2 and is adapted to the performance of the mud pump 4.

[0048] In this embodiment, a gap is provided between the crushing cutters 633 on the two toothed rollers 632, that is, the axial distance between the two toothed rollers is greater than the sum of the radii of the crushing cutters 633 on both sides. Compared with the prior art method of closely arranging the crushing cutters 633 between the two toothed rollers 632 (for example, the axial distance between the two toothed rollers 632 is less than or equal to the sum of the radii of the crushing cutters 633 on both sides), this solution reserves a sufficiently large gap between the crushing cutters 633 on both sides to form a larger crushing space, which can not only allow large stones to quickly enter the gap for crushing under the negative pressure suction of the mud pump 4, but also effectively prevent the stones from slipping on the crushing cutters 633 on both sides and stagnating in front of the crushing cutters 633 and unable to be effectively crushed, thereby improving the crushing efficiency, reducing the number of queued stones, reducing the risk of stone blockage, and also reducing the risk of excessive pressure of the fluid when passing through the stone processing mechanism due to the small flow area of ​​the effective crushing space, thereby impacting the toothed rollers, cutter teeth and other components to cause equipment damage. In addition, it should be noted that in order to ensure that the crushed stones can pass through the impeller gap of the mud pump 4 smoothly, the arrangement spacing of the two tooth rollers 632 should be reasonably arranged in combination with the size of the selected crushing cutter head, so that the diameter of the crushed stones can be smaller than the impeller gap of the mud pump 4 selected by the cutter suction ship, and is compatible with the performance of the mud pump 4.

[0049] Specifically, the crushing cutter head 633 includes a first cutter head and a second cutter head, the diameter of the first cutter head is larger than the diameter of the second cutter head, and on each tooth roller 632, the first cutter head and the second cutter head are alternately arranged and spaced apart, and the crushing cutter heads 633 between the two tooth rollers 632 are staggered, which can avoid the situation where strips of stone with a length greater than a predetermined limit but a width less than a predetermined limit pass through the gap between the two crushing cutter heads without being crushed, thereby improving the crushing rate. In this embodiment, the first cutter head has a diameter of 400 mm and a thickness of 60 mm, the second cutter head has a diameter of 340 mm and a thickness of 60 mm, the axial spacing between the two toothed rollers is 530 mm, the arrangement spacing between the two adjacent crushing cutter heads on the same toothed roller is 150 mm, and the distance between the crushing cutter heads on the two toothed rollers is 13 cm-19 cm, that is, the lateral spacing between the first cutter heads on both sides is 19 cm (less than 20 cm), and the lateral spacing between the second cutter heads on both sides is 13 cm (less than 20 cm). There is a large enough gap between the toothed rollers on both sides to filter small stones, to catch large stones with a particle size of about more than 20 cm and to crush them, so as to avoid stones being sucked into the mud pump and causing blockage. This scheme adopts a large and a small cutter head of different specifications to be arranged alternately at intervals, so that a large access space can be left between the cutter heads on both sides, and the crushing cutter heads 633 at different positions can effectively bite the stones for shearing and crushing, which is conducive to compact structural arrangement, good uniformity of stone crushing particle size, and adaptable to working environments with narrow space and low available power. The two gear rollers 632 are respectively connected to a hydraulic motor 634, and the two hydraulic motors 634 are arranged on opposite sides. This is conducive to the transmission of large torque. Compared with the arrangement of the hydraulic motors 634 on the same side, the arrangement of this scheme makes the crushing force along the axial direction of the gear roller 632 more balanced during the crushing of stones, and the uniformity of the crushed stone particle size is good. Both hydraulic motors 634 are installed outside the stone separation device 6.

[0050] In addition to directly blocking stones that exceed the predetermined limit (20 cm), the crushing device can also continuously crush stones that originally exceed the predetermined limit into stones that are smaller than the predetermined limit according to its working speed, so that these stones can pass through the crushing device and then be transported to other places through the mud pump, and no longer stay in the collection bin; that is, in addition to filtering, the crushing device can also continuously reduce the volume of stones retained in the collection bin, delaying or even eliminating the situation where the working efficiency of the entire system is reduced due to the continuous increase of stones, and improving the average mud suction efficiency of the entire system and the average flow rate of materials. The stone processing mechanism adopts the structural form of the above-mentioned crushing device, which is particularly suitable for the situation where there are a large number of stones.

[0051] Furthermore, a pressure detection device is provided on the stone separation device 6 and / or the mud suction pipe 2, and the pressure detection device is used to detect the pressure in the pipeline to facilitate the judgment of whether the pipe or pump is blocked. The pressure detection device preferably adopts a pressure transmitter, which can be connected to the control system for remote monitoring.

[0052] Furthermore, if Figure 2 As shown, a deck bin 5 for storing stones is provided below the stone separation device 6. The deck bin 5 is provided parallel to the axis of the stone separation device 6, and the position of the deck bin 5 corresponds to the automatic opening and closing door 66. By opening the automatic opening and closing door 66, the stone separation device 6 and the deck bin 5 are connected, and the stones in the collection bin are discharged into the deck bin 5. The deck bin 5 is provided along the axial direction of the pipeline, one end of the deck bin 5 is hingedly connected to the bridge frame 1 or the hull, and the other end is detachably connected to the bridge frame 1; a pulley is provided on the bridge frame 1, and the front end of the deck bin 5 is connected to the winch mechanism on the hull through the pulley through a steel wire rope, and the deck bin 5 is retracted and released by pulling or lowering the steel wire rope. In the working state, the deck bin 5 can be fixed with the bridge frame 1, and when the working state is released, the end (the end movably connected to the bridge frame 1) can rotate relative to the bridge frame 1 around the hinge fulcrum. The deck bin 5 is provided with a plurality of baffles 51, which are arranged in parallel and spaced apart along the length direction of the mud suction pipe 2, and play a certain buffering and blocking role to prevent stones from sliding straight down along the inclined slope of the deck bin 5 and accumulating in one place.

[0053] When the present solution is adopted for dredging operation, the stones in the dredged material enter the stone separation device 6 along with the mud under the action of the negative pressure suction of the mud pump 4, and the stones can directly knock open the one-way grid 61 and reach the position of the stone processing mechanism 63, and then be processed by the stone processing mechanism 63, such as interception and crushing, so that the dredged material entering the mud pump 4 can be pumped out normally to avoid clogging the mud pump; during the operation, due to the limited internal space of the pipeline and the different hardness materials of the dredged material, when there are too many stones waiting to be processed at the stone processing mechanism 63, a vacuum will be slowly formed in the pipe (specifically, the pipeline between the mud pump and the stone processing mechanism on the mud suction pipeline), resulting in the mud suction pipe 2 being unable to perform the conveying function normally. At this time, it is necessary to stop the pump and clean the stones to avoid the mud pump 4 from doing useless work or even being damaged. When the mud pump 4 is shut down, the stones accumulated in the collecting bin 62 tend to slide down under the action of gravity. The one-way grille 61 arranged on the automatic opening and closing door 66 near the auger head 3 can prevent the stones in the collecting bin 62 from falling back, while allowing the mud to flow back. The stones in the pipeline can be automatically discharged out of the pipeline through the automatic opening and closing door 66 and temporarily stored in the deck bin 5. After the original flow rate of the pipeline is restored, the next stage of dredging operation can be continued without frequently lifting the bridge frame 1 to clean the stones.

[0054] This scheme, by modifying the suction pipe on the existing suction vessel, can not only clean up the stones in the dredged material, reduce the accumulation of stones in the dredged harbor, and reduce the resistance of dredging and excavation, but also realize the automatic discharge of stones in the suction pipe under water and unified collection, which can not only solve the problems of pipe and pump blockage in real time, reduce the frequency of cleaning stones by the bridge frame 1, ensure that the mud pump 4 can work normally for a long time, but also facilitate the centralized and unified treatment of stones and realize the effective utilization of stones; and can also extend the single pump opening cycle through the crushing effect of the stone processing mechanism, avoid frequent pipe blockages and multiple pump stop cleaning, and improve the dredging and filling efficiency. Compared with the prior art, after the pipe or pump blockage problem occurs, the bridge frame 1 is moved out of the water, and it is necessary to manually enter the pipeline to carry out the stone removal operation. The use of this scheme for dredging not only improves the construction efficiency, but also helps to ensure the dredging and filling efficiency, and also has the characteristics of environmental protection and economy. In addition, this scheme adopts full hydraulic drive to adapt to the underwater working environment, avoiding the problem that the existing electrical components are prone to short circuits and other faults due to poor sealing underwater.

[0055] Example 2 Compared with the first embodiment, the difference of this embodiment mainly lies in the structure of the stone processing mechanism 63. Specifically, Figure 7 , Figure 8 As shown, in this embodiment, the stone processing mechanism 63 includes a movable grille 635, which is used to intercept stones and allow mud to pass normally. The movable grille 635 is connected to the second driving device 636, and the movable grille 635 can move relative to the pipe wall.

[0056] In this embodiment, the movable grille 635 includes two baffle rods 6351, and the baffle rods 6351 are made of steel bars with a diameter of 60 mm. The spacing between the baffle rods 6351 is set to 300 mm. The two baffle rods 6351 slide through the pipe wall and are welded and fixed to a fixed steel plate. The fixed steel plate is connected to the second driving device 636. The two baffle rods 6351 are movable, and fixed blocks or baffle rods 6351 are provided on both sides of the pipe wall. A gap of 300 mm is also reserved between the fixed blocks or baffle rods 6351 and the movable baffle rod 6351. The second driving device 636 in this embodiment adopts a hydraulic cylinder. When the pump is stopped due to stone blockage, the stone is no longer subjected to negative suction pressure. At this time, the second driving device 636 is driven to pull the movable grille 635 upward to loosen the stone blocked at the movable grille 635, preventing the stone from being stuck at the movable grille 635. Since the pipeline at the front end of the mud pump 4 is tilted in the working state, the stone can slide down naturally under the action of gravity and roll into the deck compartment 5 through the opening at the automatic switch door 66, avoiding the formation of vacuum in the pipeline. Among them, the outer wall of the pipeline is provided with a sleeve for guiding the two blocking rods 6351, and both sleeves are provided with sealing rings to achieve the sealing of the blocking rod 6351, avoiding pipeline pressure release and increasing the energy consumption of the mud pump 4.

[0057] Furthermore, the movable grille 635 can be arranged at one place or at two or more places along the axial direction, for example, the first movable grille 635 is arranged vertically, the second movable grille 635 is arranged horizontally, and the two movable grilles 635 are arranged at intervals, forming a tic-tac-toe shape when viewed from the cross-sectional direction.

[0058] This embodiment preferably uses the second driving device 636 to drive the blocking rod 6351 to make a linear motion along the axial direction to loosen the stone stuck at the position of the movable grid. Compared with other methods of rotation or translation on the same cross-section, the processing is simpler and the operation is more convenient, which has a labor-saving effect.

[0059] Example 3 Based on Example 1 or Example 2, this embodiment also provides a dredging method, comprising the following steps: S1: Use the water excavator bucket to screen the stones in layers from top to bottom in the dredging area, preferably at a preset depth of 2m, and screen out relatively large stones; in this embodiment, the bucket size is 3m×2m, and the sieve hole spacing is 25cm. For areas with a large number of stones distributed on the surface, two grab boats can also be used to clean the surface soil with a preset depth of about 2m where there are a lot of stones, and transfer the stones together with the surface covering soil to the transport barge to reduce the excavation resistance of the cutter suction boat and facilitate the subsequent work of the cutter suction boat.

[0060] S2: Using the modified dredger suction boat in any of the above embodiments to perform dredging operations, the dredging operations include the following steps: S21. Drive the auger head 3 to rotate, so that it loosens the underwater mud and gravel, and drive the mud pump 4 to suck the dredged materials such as mud and gravel through the mud suction pipe 2. At this time, the automatic switch door should be in the closed state. The mud pump sucks the materials containing mud and sand and stones of various sizes and materials into the mud suction pipe together. When the one-way grid is hit by the material (especially the stone), it rotates along the material introduction direction, and the material reaches the collection bin; wherein, the mud and sand, and the stones with a diameter smaller than the predetermined limit can directly pass through the crushing device or the movable grid, re-enter the mud suction pipe through the discharge port, and then be transported to other places through the mud pump, while the stones with a diameter larger than the predetermined limit cannot pass through the movable grid or the stone crushing device to reach the mud pump. When the total volume of the stones retained in the collection bin gradually increases, the available flow area in the collection bin will gradually decrease; when the available flow area in the collection bin is too small, the collection bin may be blocked, and a vacuum may be formed in the pipeline, and the negative suction pressure generated by the mud pump cannot be transmitted to the mud suction port for mud suction, which may easily cause damage to the mud suction pipe or even the mud pump.

[0061] S22. When it is detected that the pressure in the mud suction pipe 2 reaches the preset pressure value, it means that the total volume of the stones retained in the collection bin exceeds the acceptable predetermined threshold value, and the mud pump 4 is turned off at this time. After the mud pump 4 is shut down, negative suction pressure is no longer generated in the pipeline, and the material that has entered the mud suction pipe falls back under the action of gravity. The one-way grille falls back under the action of material flow and gravity to form a barrier; fluid materials such as mud and sand can flow back through the one-way grille, while the stones are intercepted in the collection bin. After that, the automatic switch door 66 is opened through the first drive device 67 to discharge the stones accumulated in the collection bin into the deck bin 5, restore the flow area in the collection bin, and ensure the normal operation of subsequent mud suction work. Among them, the preset pressure value is related to factors such as ship model and dredging spacing, and can be reasonably selected according to actual working conditions.

[0062] S23. Close the automatic switch door 66, restart the mud pump 4, and continue the dredging operation.

[0063] It should be noted that as long as the predetermined limit of the particle size allowed to pass through the stone is matched with the working performance of the mud pump (such as suction and blade clearance), this solution can reasonably arrange the tooth roller spacing in Example 1 or the grid size in Example 2, so that the stones whose size exceeds the working performance requirements of the mud pump are retained in the collection bin and cannot enter the mud suction pipe and mud pump of the next section, thereby avoiding the blockage of the mud pump and the damage of the mud pump, the blowing and filling equipment and even the suction boat. In the above scheme, since the flow area of ​​the collection bin is larger than the flow area of ​​the mud suction pipe, this scheme can accommodate a certain number of stones through the collection bin until the flow area of ​​the collection bin is reduced to below the original flow area of ​​the mud suction pipe, and the flow area of ​​the entire system including the mud suction pipe and the stone separation device will slowly decrease. Compared with the prior art in which the mud suction efficiency decreases with the increase of stones from the beginning, this solution can, on the one hand, delay the time when the working efficiency of the entire system drops to a certain value or is completely blocked, thereby reducing the maintenance and cleaning frequency of the entire system and the corresponding maintenance costs; on the other hand, it can also improve the average mud suction efficiency of the entire system during the working process and maintain a higher average flow rate of the material in the pipeline, thereby improving the operating efficiency of the mud suction operation and subsequent blowing and filling operations.

[0064] Furthermore, the above-mentioned dredging operation also includes step S24: when the stones in the deck bin 5 are full or reach the preset bearing pressure, the operation of the auger head 3 and the mud pump 4 is stopped, and the bridge frame 1 is pulled to move the auger head 3 and the mud suction pipe 2 out of the water; the deck bin 5 is lowered and the deck bin 5 is cleaned.

[0065] This solution first uses a grab boat to clean shallow stones or uses a water excavator bucket to screen stones in layers, and then uses a technologically modified dredger to dredge and transport, reducing the risk that stones in the surface covering soil that are larger than the suction port may hinder the dredger to dig deeper, which is beneficial to improving construction efficiency and reducing the power consumption of the dredger. The use of grab boats and / or water excavator bucket equipment can be flexibly selected according to the distribution of stones in actual working conditions. Later, in the process of dredging construction using the technologically modified dredger, the stones in the pipeline can be automatically discharged out of the pipeline through the automatic hydraulic door and temporarily collected in the deck warehouse, reducing the frequency of cleaning stones on the bridge frame 1. Although the efficiency has been significantly improved compared to before, the average daily effective operating time is only 4.5~6h, and the average output is 700m³ / h.

[0066] Example 4 Based on Example 3, this embodiment proposes a blowing filling method, comprising the following steps: S1: Connect the mud blowing pipeline to the mud pump on the above-mentioned cutter suction ship; S2: The dredged materials discharged by the above dredging method are subjected to suction dredging, and the dredged materials are discharged to the designated cofferdam position through the suction pipe and mud pump on the suction dredger and through the mud blowing and filling pipeline.

[0067] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A dredging method, characterized in that: Includes steps: S1: using a grab boat to grab stones in the overburden soil at a first preset depth on the surface, and / or using a water excavator bucket to screen stones in layers at a second preset depth in the dredged area; S2: A dredging operation is performed by using a dredging vessel, wherein a stone separation device (6) is provided on the dredging pipe (2) of the dredging vessel, wherein the stone separation device (6) is a section of a pipe structure connected to the dredging pipe (2), and an automatic opening and closing door (66) is provided on the side wall of the stone separation device (6), wherein the automatic opening and closing door (66) is arranged downward, and the automatic opening and closing door (66) is connected to a first driving device (67); a one-way grille (61) is provided inside the stone separation device (6), wherein the one-way grille (61) is located on a side of the automatic opening and closing door (66) close to the reamer head (3), and wherein the one-way grille (61) is hingedly connected to the pipe wall of the stone separation device (6) , the one-way grille (61) can introduce stones in one direction from the side close to the reamer head (3); the stone separation device (6) is further provided with a stone processing mechanism (63), the stone processing mechanism (63) is located on the side of the automatic opening and closing door (66) close to the mud pump (4), and the stone processing mechanism (63) is used to flow mud and prevent the mud pump (4) from being blocked by stones; the space between the stone processing mechanism (63) and the one-way grille (61) is used as a collection bin (62) for temporarily storing stones; a deck bin (5) for storing stones is provided below the stone separation device (6), and the deck bin (5) corresponds to the position of the automatic opening and closing door (66); Dredging operations include the following steps: S21: driving the auger head (3) to rotate, driving the mud pump (4), and sucking the dredged material through the mud suction pipe (2); S22: when it is detected that the pressure in the mud suction pipe (2) is a preset pressure value, the mud pump (4) is turned off, the automatic opening and closing door (66) is opened through the first driving device (67), the collection bin (62) and the deck bin (5) are connected, and the material in the collection bin (62) is discharged into the deck bin (5); S23: closing the automatic opening and closing door (66), restarting the mud pump (4), and continuing the dredging operation.

2. A dredging method according to claim 1, characterized in that: The method further comprises the following steps: when the deck bin (5) reaches a preset bearing pressure, stopping the operation of the auger head (3) and the mud pump (4), lifting the bridge frame (1) to move the auger head (3) and the mud suction pipe (2) out of the water; lowering the deck bin (5), and cleaning the deck bin (5).

3. A dredging method according to claim 1, characterized in that: The first preset depth is 1.5-3 m, and / or the second preset depth is 1.5-3 m.

4. A dredging method according to claim 1, characterized in that: The stone processing mechanism (63) comprises a guide grid (631) and two toothed rollers (632) arranged in parallel, the toothed rollers (632) being provided with a crushing cutter head (633), the toothed rollers (632) being connected to a hydraulic motor (634), the guide grids (631) being respectively arranged between the two toothed rollers (632) and the pipe wall on the corresponding side, the guide grids (631) being arranged at an angle to guide stones between the two toothed rollers (632); the cross-sectional area of ​​the stone separation device (6) is larger than the cross-sectional area of ​​the mud suction pipe (2).

5. A dredging method according to claim 4, characterized in that: The cross-sectional area of ​​the flow passage of the stone processing mechanism (63) is greater than or equal to the cross-sectional area of ​​the mud suction pipe (2), and the cross-sectional area of ​​the flow passage = the inner cavity area of ​​the stone processing mechanism (63) - the flat surface area of ​​the tooth roller (632) - the flat surface area of ​​the crushing cutter head (633).

6. A dredging method according to claim 5, characterized in that: The cross-sectional shape of the inner cavity of the stone processing mechanism (63) is square, and the cross-sectional shape at the collecting bin (62) is circular. The collecting bin (62) is inscribed in the inner cavity where the stone processing mechanism (63) is located, and the cross-sectional area of ​​the collecting bin (62) is greater than the cross-sectional area of ​​the mud suction pipe (2).

7. A dredging method according to claim 4, characterized in that: A transverse gap is provided between the crushing blades (633) on the two toothed rollers (632).

8. A dredging method according to claim 7, characterized in that: The crushing cutter head (633) comprises a first cutter head and a second cutter head, the diameter of the first cutter head is greater than the diameter of the second cutter head, and on each of the toothed rollers (632), the first cutter head and the second cutter head are arranged alternately and at intervals, and the crushing cutter heads (633) between the two toothed rollers (632) are arranged in a staggered manner.

9. A dredging method according to claim 4, characterized in that: The two gear rollers (632) are respectively connected to a hydraulic motor (634), and the two hydraulic motors (634) are arranged on opposite sides.

10. A dredging method according to claim 4, characterized in that: The two ends of the stone separation device (6) are respectively provided with a necked connection part (64), the necked connection part (64) is conical, and a flange plate (65) flush with the end surface is provided on the necked connection part (64).

11. A dredging method according to claim 10, characterized in that: The necked connection portion (64) has a large end and a small end, and the one-way grid (61) is arranged on a side of the necked connection portion (64) close to the large end.

12. A dredging method according to claim 1, characterized in that: The stone processing mechanism (63) comprises a movable grille (635) and a second driving device (636). The movable grille (635) is connected to the second driving device (636). The movable grille (635) is used to intercept stones and allow mud to flow through. The movable grille (635) is a movable grille structure.

13. A dredging method according to claim 12, characterized in that: The movable grille (635) comprises at least one blocking rod (635), wherein a grille structure for intercepting stones is formed between the blocking rod (635) and the tube walls on both sides, and one end of the blocking rod (635) extends out of the tube wall and is connected to the second driving device (636), and the second driving device (636) can drive the blocking rod (635) to perform linear motion along the axial direction.

14. A dredging method according to any one of claims 1 to 13, characterized in that: The deck compartment (5) is arranged along the axial direction of the pipeline, one end of the deck compartment (5) is hingedly connected to the bridge (1) or the hull, and the other end is detachably connected to the bridge (1).

15. A dredging method according to claim 14, characterized in that: A plurality of baffles (51) are provided on the deck compartment (5), and the plurality of baffles (51) are arranged in parallel and spaced apart along the axial direction of the pipeline.

16. A dredging method according to any one of claims 1 to 13, characterized in that: The top of the one-way grid (61) is hingedly connected to the stone separation device (6).

17. A dredging method according to any one of claims 1 to 13, characterized in that: The automatic opening and closing door (66) is hingedly connected to the stone separation device, and the first driving device (67) is arranged outside the stone separation device (6).

18. A filling method, characterized in that: The following steps are involved: Connect the mud blowing pipeline to the mud pump (4) on the cutter suction vessel; A dredging method according to any one of claims 1 to 17 is used for suction dredging, and the dredged materials are discharged to a designated cofferdam location through a suction pipe (2) and a mud pump (4) on a suction dredger and via the mud blowing pipeline.

19. A dredger suction vessel, comprising a bridge (1) and a dredger suction pipe (2), wherein the bridge (1) is connected to the dredger suction pipe (2), one end of the dredger suction pipe (2) is connected to a dredger pump (4), and the other end is arranged toward a dredger head (3), and the dredger head (3) is arranged at the front end of the bridge (1), characterized in that: It also includes a stone separation device (6), the stone separation device (6) is a section of a pipe structure arranged on the mud suction pipe (2), an automatic opening and closing door (66) is arranged on the side wall of the stone separation device (6), the automatic opening and closing door (66) is arranged downward, and the automatic opening and closing door (66) is connected to a first driving device (67); The stone separation device (6) is provided with a one-way grille (61), the one-way grille (61) is located on a side of the automatic opening and closing door (66) close to the reamer head (3), the one-way grille (61) is hingedly connected to the pipe wall of the stone separation device (6), and the one-way grille (61) can introduce stones in a one-way manner from the side close to the reamer head (3); The stone separation device (6) is further provided with a stone processing mechanism (63), which is located on a side of the automatic opening and closing door (66) close to the mud pump (4). The stone processing mechanism (63) is used to prevent stones from blocking the mud pump (4) and to allow mud to flow through. A collection bin (62) for temporarily storing stones is provided between the stone processing mechanism (63) and the one-way grid (61); A pressure detection device is provided on the stone separation device (6) and / or the mud suction pipe (2); A deck bin (5) for storing stones is provided below the stone separation device (6), and the deck bin (5) corresponds to the position of the automatic opening and closing door (66).

Citation Information

Patent Citations

  • River channel dredging, screening and mud-cleaning method and equipment

    CN110512674A

  • Dredge pump device for cutter suction dredger

    CN115853046A

  • Stone blocking device mounted on lower dredge pipe of cutter suction dredger bridge

    CN211735572U

  • Automatic slag removal water conservancy pipeline applied to water conservancy project

    CN213204374U

  • Sewage treatment device capable of recycling sewage

    CN214422433U

Cited By

  • Residue soil conveying pipeline crushing device for large-diameter slurry balance shield machine

    CN121066616A