Building construction enclosure structure and operation method thereof
By using self-lifting and unfolding enclosure structures in construction, the problem of cumbersome installation and adjustment is solved, resource consumption is reduced, construction efficiency is improved, and construction needs are adapted to the construction needs of different floor heights.
Patent Information
- Application Number
- CN202411164571.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-08
AI Technical Summary
During construction, manual installation and adjustment of the enclosure structure is complicated and consumes a lot of human and material resources. Buildings with different floors need to be frequently disassembled and adjusted, which seriously affects the construction efficiency.
Design a construction enclosure structure, including the main structure skeleton, drive device and auxiliary device, drive device and auxiliary device, drive the movement of the auxiliary device through the driving device, adjust the height of the main structure skeleton and enclosure, realize the self-lifting and unfolding function of the enclosure, and adapt to different Construction requirements for floor height.
It reduces the human and material resources required for installation of enclosure structures, improves the work efficiency of construction, can adapt to a variety of complex working conditions, and avoids repeated installation operations.
Smart Images

Figure CN118911457A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and in particular to a building construction enclosure structure and an operation method thereof. Background Art
[0002] In the field of construction, in order to ensure the safety of the construction process, assembled enclosure structures are usually installed around the construction site. The enclosure structures generally take the form of a frame combined with hanging panels, and the height of the enclosure structures needs to be adjusted through manual installation.
[0003] However, adjusting the enclosure structure by manual installation has the problem of complicated steps and consumes a lot of manpower and material resources. In addition, the heights of the floors of the building are different. During the installation process, the assembled enclosure structure needs to be manually split and adjusted according to the heights of each floor, which requires further consumption of more manpower and material resources, seriously affecting the work efficiency of the construction.
[0004] Therefore, how to reduce the manpower and material resources required for installing enclosure structures during construction and improve the work efficiency of construction is a technical problem that needs to be solved urgently. Summary of the invention
[0005] The purpose of the embodiments of the present invention is to provide a building construction enclosure structure and an operation method thereof, so as to solve the technical problem that the human and material resources required for installing the enclosure structure during the construction process are high, which affects the work efficiency of the construction.
[0006] In a first aspect, to achieve the above-mentioned purpose, an embodiment of the present invention provides a building construction enclosure structure, comprising: a main structure frame, a driving device, an auxiliary device, and a retractable enclosure;
[0007] The main structure skeleton is used to be installed around the construction operation layer and cover the construction operation layer, and the construction operation layer includes the operation layer to be constructed in the target building;
[0008] The driving device and the auxiliary device are mounted on the main structure frame, and the driving device is drivingly connected to a first end of the auxiliary device;
[0009] The enclosure is fixed to the outer side of the main structure frame, the upper end of the enclosure is fixedly connected to the top end of the main structure frame, and the lower end of the enclosure and the second end of the auxiliary device are respectively fixedly connected to the bottom end of the main structure frame;
[0010] The driving device is used to drive the second end of the auxiliary device to move upward and / or downward toward the first end, and to change the distribution and enclosure state of the main structure frame by lifting the bottom frame of the main structure frame to adjust the height range of the enclosure.
[0011] In some embodiments, the auxiliary device includes a transmission shaft and a cable, the transmission shaft is horizontally arranged at the top end of the main structure frame, and the transmission shaft serves as the first end;
[0012] One end of the cable is wound around the transmission shaft, and the other end is fixedly connected to the bottom end of the main structure frame as the second end;
[0013] The driving device is drivingly connected to the transmission shaft, and is used to drive the transmission shaft to rotate so as to wind and / or release the cable, and to enable the building construction enclosure structure to be unfolded and / or retracted.
[0014] In some embodiments, the main structural skeleton includes a plurality of movable skeletons;
[0015] The side surfaces of the enclosure are respectively connected to each of the movable frames, and the lower end of the enclosure and the other end of the cable are respectively fixedly connected to the movable frames at the lowermost end of the main structure frame.
[0016] In some embodiments, the auxiliary device further comprises a slide rail and a pulley;
[0017] The slide rail is fixed on the outer surface of the working layer of the building construction, one end of the pulley is fixed on the movable frame, and the other end of the pulley is slidably connected to the slide rail.
[0018] In some embodiments, the construction work layer also includes a work layer formed by a construction lifting platform, and the main structure skeleton is also used to move up and / or down along with the construction lifting platform rails.
[0019] In some embodiments, the driving device includes a winch and a reduction motor.
[0020] In some embodiments, the material of the enclosure includes a flexible material.
[0021] In some embodiments, the main structural skeleton includes a multi-layer structural skeleton in the horizontal direction, and each layer of the structural skeleton of the main structural skeleton is covered with the enclosure on all sides.
[0022] In a second aspect, in order to solve the same technical problem, an embodiment of the present invention provides an operation method of a building construction enclosure structure, comprising the following steps:
[0023] Installing a main structural frame around the construction operation layer, wherein the construction operation layer includes an operation layer to be constructed in the target building;
[0024] A driving device and an auxiliary device are installed on the main structure frame, wherein the driving device is drivingly connected to a first end of the auxiliary device;
[0025] A retractable enclosure is installed around the main structure frame, the upper end of the enclosure is fixedly connected to the top of the main structure frame, the lower end of the enclosure and the second end of the auxiliary device are respectively fixedly connected to the bottom end of the main structure frame, and the enclosure is distributed on the outer side of the main structure frame;
[0026] In response to the target control instruction, the driving device is controlled to drive the second end of the auxiliary device to move upward and / or downward toward the first end, so as to adjust the height range of the building construction enclosure structure to completely cover the building construction working layer.
[0027] The embodiment of the present invention provides a building construction enclosure structure and an operation method thereof, wherein a driving device, an auxiliary device and an enclosure are installed on a main structure frame, and the driving device is driven to connect with the first end of the auxiliary device, the upper end of the enclosure is fixedly connected to the top end of the main structure frame, and the lower end of the enclosure and the second end of the auxiliary device are respectively fixedly connected to the bottom end of the main structure frame, so that the second end of the auxiliary device can be driven by the driving device to move upward and / or downward toward the first end to change the distribution and enclosure state of the main structure frame, thereby achieving the purpose of adjusting the height range of the building construction enclosure structure, thereby avoiding repeated installation operations of the enclosure on the construction working floor to adapt to different floor heights, reducing the manpower and material resources required for installing the enclosure structure during the construction process, and increasing the self-lifting and unfolding function of the building construction enclosure structure to cope with various complex working conditions, thereby improving the work efficiency of the construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural schematic diagram of a building construction enclosure structure provided by an embodiment of the present invention;
[0029] Figure 2a It is a partial structural schematic diagram of a building construction enclosure structure provided by an embodiment of the present invention;
[0030] Figure 2b It is a partial enlarged schematic diagram of a building construction enclosure structure provided by an embodiment of the present invention;
[0031] Figure 3a is a schematic diagram of the minimum vertical height of a building construction enclosure structure provided by an embodiment of the present invention;
[0032] Figure 3b is a schematic diagram of the maximum vertical height of a building construction enclosure structure provided by an embodiment of the present invention;
[0033] Figure 4 is another structural schematic diagram of a building construction enclosure structure provided by an embodiment of the present invention;
[0034] Figure 5 is a schematic diagram of the installation position of the slide rail provided in an embodiment of the present invention;
[0035] Figure 6 It is a flow chart of an operation method of a building construction enclosure structure provided by an embodiment of the present invention;
[0036] The reference numerals in the accompanying drawings are as follows:
[0037] 10. Main structural frame; 11. Movable frame;
[0038] 20. Driving device;
[0039] 30. Auxiliary device; 31. Transmission shaft; 32. Cable; 33. Slide rail; 34. Pulley;
[0040] 40. Enclosure;
[0041] 50. Construction operation floor. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] It should be understood that the various steps described in the method embodiments of the present disclosure may be performed in different orders and / or in parallel. In addition, the method embodiments may include additional steps and / or omit the steps shown. The scope of the present disclosure is not limited in this respect.
[0044] The term "including" and its variations used herein are open inclusions, i.e., "including but not limited to". The term "based on" means "based at least in part on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one additional embodiment"; the term "some embodiments" means "at least some embodiments". The relevant definitions of other terms will be given in the following description.
[0045] In the related art, in order to ensure the safety of the construction process, an assembled enclosure structure is usually installed around the construction operation layer. The enclosure structure generally adopts the form of a frame combined with hanging panels, and the height of the enclosure structure needs to be adjusted through manual installation.
[0046] However, adjusting the enclosure structure by manual installation has the problem of complicated steps and consumes a lot of manpower and material resources. In addition, the heights of the floors of the building are different. During the installation process, the assembled enclosure structure needs to be manually split and adjusted according to the heights of each floor, which requires further consumption of more manpower and material resources, seriously affecting the work efficiency of the construction.
[0047] Therefore, how to reduce the manpower and material resources required for installing enclosure structures during construction and improve the work efficiency of construction is a technical problem that needs to be solved urgently.
[0048] In order to solve the technical problems existing in the related art, this embodiment provides a building construction enclosure structure, see Figure 1 , Figure 2a as well as Figure 2b , Figure 1 is a structural schematic diagram of a building construction enclosure structure provided by an embodiment of the present invention, Figure 2a is a partial structural schematic diagram of a building construction enclosure structure provided by an embodiment of the present invention, Figure 2b is a partial enlarged schematic diagram of a building construction enclosure structure provided by an embodiment of the present invention, such as Figure 1 , Figure 2a as well as Figure 2b As shown, the building construction enclosure structure provided by the embodiment of the present invention comprises: a main structure frame 10, a driving device 20, an auxiliary device 30, and a retractable enclosure 40;
[0049] Among them, the main structure skeleton 10 is used to be installed around the construction working layer 50 and cover the construction working layer 50, and the construction working layer 50 includes the working layer to be constructed in the target building; the driving device 20 and the auxiliary device 30 are installed on the main structure skeleton 10, and the driving device 20 is connected to the first end of the auxiliary device 30; the enclosure 40 is fixed to the outer side of the main structure skeleton 10, the upper end of the enclosure 40 is fixedly connected to the top of the main structure skeleton 10, and the lower end of the enclosure 40 and the second end of the auxiliary device 30 are respectively fixedly connected to the bottom end of the main structure skeleton 10; the driving device 20 is used to drive the second end of the auxiliary device 30 to move upward and / or downward toward the first end, so as to change the distribution of the main structure skeleton 10 and the state of the enclosure 40, and adjust the height range of the construction enclosure structure.
[0050] Specifically, each side of the building construction enclosure structure provided in this embodiment can be provided with the driving device 20, the auxiliary device 30 and the retractable enclosure 40, so that the building construction enclosure structure provided in this embodiment can be customized to adjust the vertical height of each side to adapt to different working conditions. Figure 1 , Figure 1 It shows that when the building construction enclosure structure provided by this embodiment is in a high position, the building construction enclosure structure is in a fully open coupled half-open working state, thereby satisfying Figure 1 The construction requirements for the building construction working layer are as follows: two sides are fully open and the other two sides are half open.
[0051] In this embodiment, the target building may include multiple construction work layers with different heights to be carried out. Therefore, in this embodiment, the driving device 20, the auxiliary device 30 and the retractable enclosure 40 can be directly installed on the main structure skeleton 10, and then according to the height of different construction work layers 50, the driving device 20 is controlled to drive the auxiliary device 30 to move to adjust the distribution of the main structure skeleton 10 and the height of the enclosure 40 to completely cover the corresponding construction work layer 50, so that a set of installed construction enclosure structures can be used to achieve the purpose of covering construction work layers 50 with different heights, avoiding the need to dismantle and reinstall construction enclosure structures of corresponding heights at construction work layers 50 with different heights, effectively reducing the manpower and material resources required for installing construction enclosure structures, and improving the work efficiency of construction.
[0052] In some embodiments, see Figure 1 , Figure 2a and Figure 2b The auxiliary device 30 provided in this embodiment may include a transmission shaft 31 and a cable 32, wherein the transmission shaft 31 is horizontally arranged at the top end of the main structure skeleton 10, and the transmission shaft 31 serves as the first end; one end of the cable 32 is wound around the transmission shaft 31, and the other end is fixedly connected to the bottom end of the main structure skeleton 10 as the second end; the driving device 20 is drivingly connected to the transmission shaft 31, and the driving device 20 is used to drive the transmission shaft 31 to rotate so as to wind and / or release the cable 32, and enable the building construction enclosure structure to be unfolded and / or retracted.
[0053] In this way, by driving the transmission shaft 31 to rotate in the first rotation direction through the driving device 20, the cable 32 can be further wound around the transmission shaft 31, so as to recover the cable 32 fixed at the lower end of the enclosure 40, thereby achieving the purpose of shrinking the enclosure 40 and the main structure skeleton 10 to reduce the height of the building construction enclosure structure; or, by driving the transmission shaft 31 to rotate in the second rotation direction through the driving device 20, the cable 32 is released from the transmission shaft 31, thereby increasing the vertical length of the cable 32, and then the enclosure 40 and the main structure skeleton 10 can be unfolded by themselves through their own gravitational potential energy, thereby achieving the purpose of increasing the height of the building construction enclosure structure.
[0054] Among them, the first rotation direction and the second rotation direction provided in this embodiment are determined according to the winding direction of the cable 32 on the transmission shaft 31. The first rotation direction refers to the winding direction of the cable 32 on the transmission shaft 31, and the second rotation direction refers to the release direction of the cable 32 on the transmission shaft 31.
[0055] As an optional embodiment, the driving device 20 provided in this embodiment may include a winch and a reduction motor, and the stability and safety of heavy object lifting work during construction can be effectively guaranteed by the winch or the reduction motor. The material of the enclosure 40 provided in this embodiment may include a flexible material. The flexible enclosure 40 composed of the flexible material can make the flexible enclosure 40 retractable and adjustable, thereby ensuring that the enclosure 40 can cover a variety of working layers of construction with different floor heights, reducing the human and material resources required for installing the enclosure structure during construction, and improving the work efficiency of construction.
[0056] In some embodiments, in order to ensure the stability of the enclosure 40 during operation, as Figure 2a As shown, the main structure skeleton 10 provided in this embodiment may include multiple movable skeletons 11; the side surfaces of the enclosure 40 are respectively connected to each of the movable skeletons 11, and the lower end of the enclosure 40 and the other end of the cable 32 are respectively fixedly connected to the movable skeleton 11 at the lowermost end of the main structure skeleton 10.
[0057] By connecting the side surfaces of the enclosure 40 to each of the movable frames 11 respectively, it is ensured that the enclosure 40 can perform directed movement according to the movable range of the movable frames 11 when performing expansion and / or contraction operations, thereby achieving uniform adjustment of the enclosure 40 in the vertical direction.
[0058] To further ensure the stability of enclosure 40 during operation, please continue to refer to Figure 2a, the auxiliary device 30 provided in this embodiment may also include a slide rail 33 and a pulley 34; the slide rail 33 is fixed to the outer surface of the working layer of the building construction, one end of the pulley 34 is fixed to the movable skeleton 11, and the other end of the pulley 34 is slidably connected to the slide rail 33. Specifically, the pulley 34 provided in this embodiment is arranged on each of the movable skeletons 11, and the setting position of the pulley 34 on the movable skeleton 11 can be set according to the actual application scenario, and no specific limitation is made here. When the main structure skeleton 10 is in a fully expanded state, the spacing between any two adjacent movable skeletons 11 is equal, so that the enclosure 40 can be evenly distributed on the outer side of the main structure skeleton 10, wherein the value of the spacing can be set according to the actual application scenario, and no specific limitation is made here.
[0059] In this way, by fixing the pulley 34 slidably connected to the slide rail 33 on the movable skeleton 11, it can be ensured that the enclosure 40 can be expanded and / or retracted in the direction of the movement trajectory of the pulley 34 in the slide rail 33, and at the same time, it can also avoid the jamming phenomenon that is easy to occur in the process of expansion and / or contraction of the movable skeleton 11, thereby effectively ensuring the stability of the enclosure 40 during operation.
[0060] In other embodiments, in order to ensure the safety of the enclosure 40 during operation, the cable 32 provided in this embodiment may be provided with a limiting mechanism (not shown in the figure); the limiting mechanism is used to limit the length of the extension and / or contraction of the cable 32. Specifically, the limiting mechanism may include a first limiting mechanism and a second limiting mechanism, the first limiting mechanism may be used to limit the extension length of the cable 32, and the second limiting mechanism may be used to limit the contraction length of the cable 32. In this way, the limiting mechanism may prevent the enclosure 40 from being damaged or broken due to excessive movement, thereby effectively ensuring the safety of the enclosure 40 during operation.
[0061] It should be noted that the position of the limiting mechanism can be determined according to the specific length to which the enclosure 40 can be retracted, thereby limiting the length of the stretching and / or retraction of the cable 32. Figure 3a and Figure 3b , Figure 3a is a schematic diagram of the minimum vertical height of a building construction enclosure structure provided by an embodiment of the present invention, Figure 3b is a schematic diagram of the maximum vertical height of the building construction enclosure structure provided by an embodiment of the present invention, such as Figure 3a and 3b As shown, the limiting mechanism can ensure that the vertical height range of the enclosure 40 remains within the working height range during normal operation, thereby effectively ensuring the safety of the enclosure 40 during operation.
[0062] As an optional embodiment, currently, construction generally adopts two methods: flip formwork construction and hydraulic climbing formwork casting. Among them, climbing formwork has advantages. Generally, climbing systems need to be arranged on the four sides of the square column. The number of climbing systems and auxiliary devices 30 required is large, which greatly increases the construction period and cost. In order to reduce the construction period and cost of construction, please refer to Figure 4 , Figure 4 is another structural schematic diagram of the building construction enclosure structure provided by an embodiment of the present invention, such as Figure 4 As shown, the construction work layer provided in this embodiment may also include a construction lifting platform constituted of the work layer, the main structure frame 10 is also used to move up and / or down with the construction lifting platform, at this time, the construction enclosure structure provided in this embodiment can be installed in the low position, and the construction enclosure structure is in a fully half-open state (such as Figure 4 The construction enclosure structure can be in any state, such as the fully open state or the fully expanded / contracted state, as long as it is convenient for the installation of the construction enclosure structure. After the installation is completed, the height range of the construction enclosure structure can be adjusted according to the construction operation layers of different heights to cover the construction operation layers under different working conditions.
[0063] In this way, by directly and rigidly connecting the construction enclosure structure provided by this embodiment to the construction lifting platform when it is in a low position, there is no need for lifting machinery when carrying out construction work on high floors, thereby reducing the lifting workload of transportation machinery during construction, thereby also reducing the number of lifting machinery, thereby improving the construction efficiency of the overall construction work.
[0064] In this embodiment, when the main structure frame 10 provided in this embodiment is installed on the working layer of the construction lifting platform, the slide rail 33 provided in this embodiment can be installed on the column of the construction lifting platform, and the pulley 34 on the main structure frame 10 is slidably connected with the slide rail 33 on the column. Among them, the number of guide rails installed on the column in this embodiment can be one or more. For details, please refer to Figure 5 , Figure 5 Schematic diagram of the installation position of the slide rail provided in an embodiment of the present invention. Figure 5 As shown, in this embodiment, at least one guide rail can be installed on each side of the column facing the building construction enclosure structure, so as to provide reliable support force for the main structure frame 10 on each side, effectively ensuring the stability and safety of the building construction enclosure structure provided by this embodiment.
[0065] As another optional embodiment, the construction enclosure structure commonly used in current construction is relatively thin and light, and usually cannot achieve the function of sound insulation and noise reduction during construction work. In order to achieve the purpose of sound insulation and noise reduction, the main structure skeleton 10 provided in this embodiment may include a multi-layer structure skeleton in the horizontal direction, and each layer of the main structure skeleton 10 is covered with the enclosure 40 on all sides. Furthermore, the enclosure 40 provided in this embodiment can also be arranged on the outer side and inner side of each layer of the structure skeleton, so as to achieve the purpose of more effective sound insulation and noise reduction through a multi-layer arrangement.
[0066] The number of layers of the structural skeleton provided in this embodiment can be 2 layers, 3 layers, 5 layers, etc., which can be set according to actual application requirements and are not limited here. In this way, by setting a multi-layer structural skeleton and setting the enclosure 40, the driving device 20, and the auxiliary device 30 provided in this embodiment on each layer of the structural skeleton, the sound insulation and noise reduction function of the construction operation layer 50 can be effectively achieved through the multi-layer retractable enclosure 40 and the air sound absorption layer between two adjacent layers of enclosure 40.
[0067] In summary, an embodiment of the present invention provides a building construction enclosure structure, comprising: a main structure frame, a driving device, an auxiliary device, and a retractable enclosure. The main structure frame is installed and covers the four sides of the building construction working layer. The driving device and the auxiliary device are installed on the main structure frame. The driving device is connected to the first end of the auxiliary device by driving. The enclosure is fixed to the outer side of the main structure frame, the upper end of the enclosure is fixedly connected to the top of the main structure frame, the lower end of the enclosure and the second end of the auxiliary device are fixedly connected to the bottom end of the main structure frame, and the driving device is used to drive the second end of the auxiliary device to move up and / or down toward the first end to change the distribution and enclosure state of the main structure frame and adjust the height range of the building construction enclosure structure. By adopting the embodiment of the present invention, a driving device, an auxiliary device and an enclosure are installed on the main structure frame, and the driving device is driven to connect with the first end of the auxiliary device, the upper end of the enclosure is fixedly connected to the top of the main structure frame, and the lower end of the enclosure and the second end of the auxiliary device are respectively fixedly connected to the bottom end of the main structure frame, so that the second end of the auxiliary device can be driven by the driving device to move up and / or down toward the first end to change the distribution and enclosure state of the main structure frame, thereby achieving the purpose of adjusting the height range of the building construction enclosure structure, thereby avoiding repeated installation operations of the enclosure on the construction working floor to adapt to different floor heights, reducing the manpower and material resources required for installing the enclosure structure during the construction process, and increasing the self-lifting and unfolding function of the construction enclosure structure to cope with various complex working conditions, and also improving the work efficiency of the construction.
[0068] In another embodiment, in order to solve the same technical problem, the embodiment of the present invention also provides an operation method of the building construction enclosure structure based on the above embodiment. For details, see Figure 6 , Figure 6 Schematic diagram of a flow chart of an operation method of a building construction enclosure structure provided by an embodiment of the present invention. Figure 6 As shown, the operation method of the building construction enclosure structure provided in this embodiment includes steps 601 to 604;
[0069] Step 601, installing a main structural frame around a construction operation layer, wherein the construction operation layer includes an operation layer to be constructed in a target building.
[0070] In one implementation, the main structure frame can be directly installed in the target building at the working layer where construction is to be carried out. Figure 1 As shown, the target building may be any building, which may include one or more working floors to be constructed with different heights.
[0071] In another embodiment, the construction operation layer provided in this embodiment may also include an operation layer composed of a construction lifting platform, that is, in this embodiment, the main structure frame may be installed on the construction lifting platform, specifically, Figure 4 shown.
[0072] In this way, this embodiment can directly install the driving device, auxiliary device and retractable enclosure on the main structure skeleton, and then control the driving device to drive the auxiliary device to move according to the floor height of different construction work layers to adjust the height of the enclosure to completely cover the corresponding construction work layer. In this way, a set of installed construction enclosure structures can be used to achieve the purpose of covering construction work layers of different heights, avoiding the need to dismantle and reinstall enclosures of corresponding heights on construction work layers of different heights, effectively reducing the manpower and material resources required for the installation of construction enclosure structures, and improving the work efficiency of construction.
[0073] Step 602: Install a driving device and an auxiliary device on the main structure frame, wherein the driving device is drivingly connected to a first end of the auxiliary device.
[0074] Step 603, install a retractable enclosure around the main structure frame, the upper end of the enclosure is fixedly connected to the top of the main structure frame, the lower end of the enclosure and the second end of the auxiliary device are respectively fixedly connected to the bottom end of the main structure frame, and the enclosure is distributed on the outer side of the main structure frame.
[0075] Specifically, the driving device provided in this embodiment may include a winch and a reduction motor, and the auxiliary device may include a transmission shaft and a cable. The transmission shaft is horizontally arranged at the top of the main structure frame, and the transmission shaft serves as the first end; one end of the cable is wound around the transmission shaft, and the other end is fixedly connected to the bottom end of the main structure frame as the second end; the driving device is drivingly connected to the transmission shaft, and the driving device is used to drive the transmission shaft to rotate so as to wind and / or release the cable, and to enable the enclosure to be expanded and / or retracted. Optionally, the material of the retractable enclosure provided in this embodiment may be a flexible material, so that the expansion and / or contraction of the enclosure can be achieved.
[0076] Step 604, in response to the target control instruction, controls the driving device to drive the second end of the auxiliary device to move upward and / or downward toward the first end, so as to adjust the height range of the building construction enclosure structure to completely cover the building construction working layer.
[0077] In this embodiment, after completing the installation of the main structure skeleton, driving device, auxiliary device and enclosure, the target control instruction can be sent to the construction enclosure structure according to the floor height of the construction operation layer. After receiving the target control instruction, the construction enclosure structure will control the driving device to drive the second end of the auxiliary device to move up and / or down toward the first end to adjust the height range of the enclosure to completely cover the four sides of the main structure skeleton. In this way, by controlling a set of installed construction enclosure structures, the purpose of covering construction operation layers of different heights can be achieved, avoiding the need to dismantle and reinstall enclosures of corresponding heights on construction operation layers of different heights, effectively reducing the manpower and material resources required for the installation of the construction enclosure structure, and improving the work efficiency of the construction.
[0078] At this point, the description of the operating method of the building construction enclosure structure provided by the embodiment of the present invention is completed.
[0079] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
[0080] In addition, it should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0081] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or schemes that A and B meet at the same time. In addition, in the embodiments of the present invention, "multiple" refers to more than two. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0082] The above is a detailed introduction to a building construction enclosure structure and its operation method provided by the embodiment of the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and its core idea of the present application. At the same time, for those skilled in the art, according to the idea of the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application. Moreover, for those of ordinary skill in the art, without departing from the principles of the present invention, several improvements and modifications can be made, and these improvements and modifications are also regarded as the protection scope of the present invention.
Claims
1. A building construction enclosure structure, characterized in that: include: Main structural frame, drive device, auxiliary device, retractable enclosure; The main structure skeleton is used to be installed around the construction operation layer and cover the construction operation layer, and the construction operation layer includes the operation layer to be constructed in the target building; The driving device and the auxiliary device are installed on the main structure frame, and the driving device is drivingly connected to the first end of the auxiliary device; The enclosure is fixed to the outer side of the main structure frame, the upper end of the enclosure is fixedly connected to the top end of the main structure frame, and the lower end of the enclosure and the second end of the auxiliary device are respectively fixedly connected to the bottom end of the main structure frame; The driving device is used to drive the second end of the auxiliary device to move upward and / or downward toward the first end, so as to change the distribution and enclosure state of the main structure skeleton and adjust the height range of the building construction enclosure structure.
2. The building construction enclosure structure according to claim 1, characterized in that: The auxiliary device includes a transmission shaft and a cable, wherein the transmission shaft is horizontally arranged at the top end of the main structure frame, and the transmission shaft serves as the first end; One end of the cable is wound around the transmission shaft, and the other end is fixedly connected to the bottom end of the main structure frame as the second end; The driving device is drivingly connected to the transmission shaft, and is used to drive the transmission shaft to rotate so as to wind and / or release the cable, and to enable the building construction enclosure structure to be unfolded and / or retracted.
3. The building construction enclosure structure according to claim 2, characterized in that: The main structural frame includes a plurality of movable frames; The side surfaces of the enclosure are respectively connected to each of the movable frames, and the lower end of the enclosure and the other end of the cable are respectively fixedly connected to the movable frames at the lowermost end of the main structure frame.
4. The building construction enclosure structure according to claim 3, characterized in that: The auxiliary device also includes a slide rail and a pulley; The slide rail is fixed on the outer surface of the working layer of the building construction, one end of the pulley is fixed on the movable frame, and the other end of the pulley is slidably connected to the slide rail.
5. The building construction enclosure structure according to claim 2, characterized in that: The cable is provided with a limiting mechanism; The limiting mechanism is used to limit the stretching and / or contraction length of the cable.
6. The building construction enclosure structure according to claim 1, characterized in that: The construction work layer also includes a work layer formed by a construction lifting platform, and the main structure skeleton is also used to move up and / or down with the construction lifting platform.
7. The building construction enclosure structure according to claim 1, characterized in that: The driving device comprises a winch and a reduction motor.
8. The building construction enclosure structure according to claim 1, characterized in that: The material of the enclosure includes a flexible material.
9. The building construction enclosure structure according to claim 1, characterized in that: The main structural frame includes a multi-layer structural frame in the horizontal direction, and each layer of the structural frame of the main structural frame is covered with the enclosure on all sides.
10. An operating method for a building construction enclosure structure according to any one of claims 1 to 9, characterized in that: The following steps are involved: Installing a main structural frame around the construction operation layer, wherein the construction operation layer includes an operation layer to be constructed in the target building; A driving device and an auxiliary device are installed on the main structure frame, wherein the driving device is drivingly connected to a first end of the auxiliary device; A retractable enclosure is installed around the main structure frame, the upper end of the enclosure is fixedly connected to the top of the main structure frame, the lower end of the enclosure and the second end of the auxiliary device are respectively fixedly connected to the bottom end of the main structure frame, and the enclosure is distributed on the outer side of the main structure frame; In response to the target control instruction, the driving device is controlled to drive the second end of the auxiliary device to move upward and / or downward toward the first end, so as to adjust the height range of the building construction enclosure structure to completely cover the building construction working layer.
Citation Information
Patent Citations
Maintenance hanging bracket
CN109025238A
Scaffold protective net capable of supporting and stabilizing scaffold and scaffold
CN117052113A
Building construction protecting screen
CN206128669U
Electric protective net device for manual hole digging pile
CN210067511U
AU2019204114A1