Vertical connection processing method for new and old concrete structures
By burying and carbon fiber arrangement on the surface of the old concrete structure, combined with stress detection and interface agent, the problem of insufficient vertical connection strength of new and old concrete structures is solved, and stable connection and overall structural strength improvement is achieved.
Patent Information
- Application Number
- CN202411225823.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-08
AI Technical Summary
The bonding performance of new and old concrete structures is insufficient when vertically connected, resulting in strength problems, which are difficult to effectively solve in the existing technology.
Chiseling treatment on the surface of the old concrete structure and install strain gauges, laying steel cages of carbon fiber and new concrete, casting concrete by vibration, and stress detection to ensure the strength of the bonding surface, and using an interface agent to enhance adhesion.
Through bidirectional stress detection and the layout and fixation of carbon fiber bundles, the stable connection between new and old concrete is ensured, the stress strength and safety coefficient of vertical connection are improved, and the treatment can be adjusted and strengthened in a timely manner to ensure the stability of the overall structure.
Smart Images

Figure CN118911468A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of new and old concrete structure processing, in particular to a vertical connection processing method for new and old concrete structures. Background Art
[0002] When reinforcing the original structure, the bonding performance between the new concrete and the old concrete is a key factor. When the new concrete is used to repair the old structure, a bonding surface will be formed between them, but the mode of this bonding failure is not single. There are many possible forms of failure. The magnitude of the destructive force determines whether the vertical treatment of the new and old concrete structures is successful. In terms of improving the bonding performance between the new and old concrete, interface agents can be used, but there are still some strength problems. Summary of the invention
[0003] The object of the present invention is to provide a method for vertically connecting new and old concrete structures to solve the existing problems raised in the above-mentioned background technology.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: A method for vertically connecting a new and old concrete structure, comprising arranging a new concrete structure outside the old concrete structure, comprising the following steps:
[0005] Step 1: Surface treatment of the old concrete structure. First, roughen the left and right, front and back vertical direct contact surfaces of the old concrete structure section with treatment, and dig out several evenly distributed pits on the front and back vertical direct contact surfaces as the filling and bonding surfaces of the new concrete;
[0006] Step 2: Install strain gauges, evenly distribute the first embedded strain gauges on the left and right vertical direct contact surfaces, and evenly distribute the second embedded strain gauges on the non-pit areas of the front and rear vertical direct contact surfaces, to detect the stress of the joint surface after filling and whether there is a difference between the front and rear and left and right vertical direct contact surfaces;
[0007] Step 3: Setting carbon fiber, evenly arranging carbon fiber on the left and right vertical direct contact surfaces, the carbon fiber arrangement form is that the length direction of the carbon fiber is consistent with the length direction of the left and right vertical direct contact surfaces, correspondingly opening perforations in the relative pits of the front and rear vertical direct contact surfaces, the perforations avoid the steel bars of the original concrete, and arranging bundled carbon fiber in the perforations, and fixing the arranging bundled carbon fiber material on the longitudinal steel bars of the newly installed concrete;
[0008] Step 3: Install the steel cage and formwork of the new concrete, set the longitudinal steel bars and stirrups according to the structural requirements, and then install the formwork. If the old concrete structure section to be processed is not full length, set the end formwork and side formwork. The side formwork is fixed as a whole by external iron hoops, and the end formwork is fixed with temporary support. It is set in a local position and needs to be set for fixing;
[0009] Step 4: pouring concrete and removing the formwork. During pouring, vibration is used to ensure the compactness of the concrete, avoiding the construction of bundled carbon fibers. The formwork is removed when the strength of the new concrete structure reaches 80% of the design value.
[0010] Step 5: Stress detection. Obtain the strain data of the wall through strain gauges. Start data collection from the demolding and record the stress values of the first embedded strain gauge and the second embedded strain gauge. By comparing the detected stress value with the initial design stress value, determine whether the new and old walls are firmly combined. If the detected stress value is greater than 120% of the initial design stress value, the bonding surface is considered to be stable. If it is insufficient, reinforcement treatment is required.
[0011] The calculation formula for the initial design stress value is:
[0012] V u =αF t bh+βF y A S +F x A X ;
[0013] Among them, V u is the shear design value of the interface between new and old concrete; α and β are unknown coefficients, F t The tensile strength of new concrete; b is the width of the interface between new and old concrete; h is the height of the interface between new and old concrete; F y The tensile strength of steel bars in new concrete; A S is the area of the longitudinal reinforcement of the new concrete; F x A is the tensile strength of the carbon fiber on the left and right vertical contact surfaces; X It is the area of carbon fiber on the left and right vertical direct contact surfaces.
[0014] When setting the initial design stress value, the bundled carbon fiber of the carbon fiber material is not considered, but the design value of the carbon fiber on the left and right vertical contact surfaces is considered; the detected stress value includes the stress value F1 of the first embedded strain gauge and the stress value F2 of the second embedded strain gauge. When the average values of the stress values F1 of the first embedded strain gauge and the stress values F2 of the second embedded strain gauge are both greater than V u When the stress value F1 of the first embedded strain gauge is less than V u 80% of the value of V, and the stress value F2 of the second embedded strain gauge is greater than V u When the average value of F1 and F2 is less than V u 120% and greater than V u , the interface is also considered to be stable; when the average value of F1 and F2 is less than V u 80% and both F1 and F2 are less than V uIf the stress on the bonding surface is insufficient, reinforcement treatment is required.
[0015] In addition, when paving the left and right vertical direct contact surfaces and arranging the carbon fiber evenly, an interface agent is set on the upper and lower surfaces of the carbon fiber cloth to ensure sufficient adhesion between the carbon fiber and the new and old concrete.
[0016] When the old concrete structure section to be treated is not full-length, due to local reinforcement, it is necessary to pay attention to the strength of the overall component, including the stress conditions of the local reinforced section and the non-reinforced section. For example, when the component to be treated is a beam, it is set to full-length reinforcement. If the component to be treated is a column and its vertical bearing capacity meets the requirements, a local reinforcement treatment design is performed.
[0017] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0018] (1) The technical solution of the present invention ensures the vertical connection stress strength of the bonding surface by arranging carbon fibers in different directions in two directions, and ensures its safety factor by the lateral tensile reserve of the carbon fiber bundle.
[0019] (2) The technical solution of the present invention sets up bidirectional stress detection. By calculating and comparing the values, it can be known whether the reinforced new concrete meets the engineering requirements based on the initial design value, and timely adjustments can be made.
[0020] (3) The arrangement and fixing method of the carbon fiber bundles of the present application ensures sufficient connection with the new and old concrete. The flexible effect of the carbon fiber bundles reduces the vertical force between the new and old concretes, and provides lateral tension, which is beneficial to the force layout between the new and old concretes and the stability of the overall combination. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0022] Figure 1 It is a schematic diagram of the old concrete structure of the present invention;
[0023] Figure 2 is a schematic diagram of a pit of the present invention;
[0024] Figure 3 is a schematic diagram of the carbon fiber of the present invention;
[0025] Figure 4 is a carbon fiber bundle connection diagram of the present invention;
[0026] Figure 5 It is a flow chart of the method of the present invention. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] A method for vertically connecting a new and old concrete structure comprises arranging a new concrete structure outside the old concrete structure, comprising the following steps:
[0029] Step 1: Surface treatment of the old concrete structure 1, firstly roughening the left and right, front and back vertical direct contact surfaces of the treated old concrete structure section, and digging a number of evenly distributed pits 3 on the front and back vertical direct contact surfaces as the filling and bonding surfaces of the new concrete 2;
[0030] Step 2: Install strain gauges, evenly distribute the first embedded strain gauges 4 on the left and right vertical direct contact surfaces, and evenly distribute the second embedded strain gauges 5 on the non-pit areas of the front and rear vertical direct contact surfaces, so as to detect the stress of the joint surface after filling and whether there is a difference between the front and rear and left and right vertical direct contact surfaces;
[0031] Step 3: Setting carbon fiber, evenly arranging carbon fiber 6 on the left and right vertical direct contact surfaces, the carbon fiber arrangement form is that the length direction of the carbon fiber is consistent with the length direction of the left and right vertical direct contact surfaces, correspondingly opening perforations in the relative pits of the front and rear vertical direct contact surfaces, the perforations avoid the steel bars of the original concrete, and arranging carbon fiber bundles 7 in the perforations, and fixing the perforated bundled carbon fiber materials on the longitudinal steel bars of the newly installed concrete later;
[0032] Step 3: Install the steel cage and formwork of the new concrete, set the longitudinal steel bars and stirrups according to the structural requirements, and then install the formwork. If the old concrete structure section to be processed is not full length, set the end formwork and side formwork. The side formwork is fixed as a whole by external iron hoops, and the end formwork is fixed with temporary support. It is set in a local position and needs to be set for fixing;
[0033] Step 4: pouring concrete and removing the formwork. During pouring, vibration is used to ensure the compactness of the concrete, avoiding the construction of bundled carbon fibers. The formwork is removed when the strength of the new concrete structure reaches 80% of the design value.
[0034] Step 5: Stress detection. Obtain the strain data of the wall through strain gauges. Start data collection from the demolding and record the stress values of the first embedded strain gauge and the second embedded strain gauge. By comparing the detected stress value with the initial design stress value, determine whether the new and old walls are firmly combined. If the detected stress value is greater than 120% of the initial design stress value, the bonding surface is considered to be stable. If it is insufficient, reinforcement treatment is required.
[0035] When inserting the bundled carbon fiber into the perforation in step three, the carbon fiber bundle is fixed at the perforation position by gaskets at both ends to ensure the fixation of the carbon fiber bundle. After the perforation and fixation are completed, the inorganic adhesive can be filled into the pores.
[0036] The calculation formula for the initial design stress value is:
[0037] V u =αF t bh+βF y A S +F x A X ;
[0038] Among them, V u is the shear design value of the interface between new and old concrete; α and β are unknown coefficients, F t The tensile strength of new concrete; b is the width of the interface between new and old concrete; h is the height of the interface between new and old concrete; F y The tensile strength of steel bars in new concrete; A S is the area of the longitudinal reinforcement of the new concrete; F x A is the tensile strength of the carbon fiber on the left and right vertical contact surfaces; X It is the area of carbon fiber on the left and right vertical direct contact surfaces.
[0039] When setting the initial design stress value, the bundled carbon fiber of the carbon fiber material is not considered, but the design value of the carbon fiber on the left and right vertical contact surfaces is considered; the detected stress value includes the stress value F1 of the first embedded strain gauge and the stress value F2 of the second embedded strain gauge. When the average values of the stress values F1 of the first embedded strain gauge and the stress values F2 of the second embedded strain gauge are both greater than V u When the stress value F1 of the first embedded strain gauge is less than V u 80% of the value of V, and the stress value F2 of the second embedded strain gauge is greater than V u When the average value of F1 and F2 is less than V u 120% and greater than V u , the interface is also considered to be stable; when the average value of F1 and F2 is less than V u 80% and both F1 and F2 are less than V u If the stress on the bonding surface is insufficient, reinforcement treatment is required.
[0040] During the specific construction, if it is determined that the strength of the joint surface is insufficient, it is necessary to chisel off part of the joint surface and strengthen it again, or change the local treatment method to the full-length treatment method.
[0041] In addition, when paving the left and right vertical direct contact surfaces and arranging the carbon fiber evenly, an interface agent is set on the upper and lower surfaces of the carbon fiber cloth to ensure sufficient adhesion between the carbon fiber and the new and old concrete.
[0042] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0043] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for vertically connecting a new and old concrete structure, comprising arranging a new concrete structure outside the old concrete structure, characterized in that: The following steps are involved: Step 1: Surface treatment of the old concrete structure. First, roughen the left and right, front and back vertical direct contact surfaces of the old concrete structure section with treatment, and dig out several evenly distributed pits on the front and back vertical direct contact surfaces as the filling and bonding surfaces of the new concrete; Step 2: Install strain gauges, evenly distribute the first embedded strain gauges on the left and right vertical direct contact surfaces, and evenly distribute the second embedded strain gauges on the non-pit areas of the front and rear vertical direct contact surfaces, to detect the stress of the joint surface after filling and whether there is a difference between the front and rear and left and right vertical direct contact surfaces; Step 3: Setting carbon fiber, evenly arranging carbon fiber on the left and right vertical direct contact surfaces, the carbon fiber arrangement form is that the length direction of the carbon fiber is consistent with the length direction of the left and right vertical direct contact surfaces, correspondingly opening perforations in the relative pits of the front and rear vertical direct contact surfaces, the perforations avoid the steel bars of the original concrete, and arranging bundled carbon fiber in the perforations, and fixing the arranging bundled carbon fiber material on the longitudinal steel bars of the newly installed concrete; Step 3: Install the steel cage and formwork of the new concrete, set the longitudinal steel bars and stirrups according to the structural requirements, and then install the formwork. If the old concrete structure section to be processed is not full length, set the end formwork and side formwork. The side formwork is fixed as a whole by external iron hoops, and the end formwork is fixed with temporary support. It is set in a local position and needs to be set for fixing; Step 4: pouring concrete and removing the formwork. During pouring, vibration is used to ensure the compactness of the concrete, avoiding the construction of bundled carbon fibers. The formwork is removed when the strength of the new concrete structure reaches 80% of the design value. Step 5: Stress detection. Obtain the strain data of the wall through strain gauges. Start data collection from the demolding and record the stress values of the first embedded strain gauge and the second embedded strain gauge. By comparing the detected stress value with the initial design stress value, determine whether the new and old walls are firmly combined. If the detected stress value is greater than 120% of the initial design stress value, the bonding surface is considered to be stable. If it is insufficient, reinforcement treatment is required.
2. A method for vertically connecting new and old concrete structures according to claim 1, characterized in that: The calculation formula for the initial design stress value is: V u =αF t bh+βF y A S +F x A x ; Among them, V u is the shear design value of the interface between new and old concrete; α and β are unknown coefficients, F t The tensile strength of new concrete; b is the width of the interface between new and old concrete; h is the height of the interface between new and old concrete; F y The tensile strength of steel bars in new concrete; A S is the area of the longitudinal reinforcement of the new concrete; F x A is the tensile strength of the carbon fiber on the left and right vertical contact surfaces; X It is the area of carbon fiber on the left and right vertical direct contact surfaces.
3. A method for vertically connecting new and old concrete structures according to claim 2, characterized in that: When setting the initial design stress value, the bundled carbon fiber of the carbon fiber material is not considered, but the design value of the carbon fiber on the left and right vertical contact surfaces is considered; the detected stress value includes the stress value F1 of the first embedded strain gauge and the stress value F2 of the second embedded strain gauge. When the average values of the stress values F1 of the first embedded strain gauge and the stress values F2 of the second embedded strain gauge are both greater than V u When the stress value F1 of the first embedded strain gauge is less than V u 80% of V, and the stress value F2 of the second embedded strain gauge is greater than V u When the average value of F1 and F2 is less than V u 120% and greater than V u , the interface is also considered to be stable; when the average value of F1 and F2 is less than V u 80% and both F1 and F2 are less than V u If the stress on the joint surface is insufficient, reinforcement treatment is required.