Longitudinal and transverse combined visual positioning device for MJS construction method pile near-wall joint gap

Through the combined technology of lateral acoustic wave detection and longitudinal conductivity measurement and combined with the camera device, the problem of difficulty in positioning the seam gap is solved, and the accurate positioning and visualization of the seam gap is achieved, ensuring the safety and stability of the structure.

CN118915185APending Publication Date: 2024-11-08NINGBO METRO GRP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410888268.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The prior art has problems in detecting and positioning the gap between the joints of the wall and the MJS piles, which have problems such as difficulty in accurately positioning, difficulty in deep burial detection, and media unevenness affecting the detection effect, resulting in insufficient structural connection strength and difficult to identify safety hazards.

Method used

The combined technology of acoustic wave lateral detection and longitudinal conductivity measurement needles is adopted, combined with the camera device, and the deep buried visual positioning of the seam gap is realized. Through acoustic waveform analysis and voltage change detection, the seam gap is accurately positioned and structural changes are monitored in real time.

Benefits of technology

It realizes accurate positioning and visualization of seam gaps, identify structural weaknesses and potential safety hazards, and provides targeted reinforcement and repair measures to ensure the safety and stability of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118915185A_ABST
    Figure CN118915185A_ABST
Patent Text Reader

Abstract

A longitudinal and transverse joint visual positioning device for an MJS construction method pile near-wall joint gap comprises a multi-layer long pipe, an electricity measuring system, a sound wave emitting system, a sound wave receiving system and a joint visual system, the upper end of the multi-layer long pipe is higher than the ground surface, and the lower end of the multi-layer long pipe is deeply buried in a joint area; the electricity measuring system is arranged in the joint area, the electricity measuring system is in contact with the gap of the joint, and the electricity measuring system and the multi-layer long pipe are spaced by a set distance; the sound wave emitting system is arranged on the multi-layer long pipe, and the sound wave receiving systems are arranged in a joint area and distributed on the periphery of the multi-layer long pipe; and the seam visualization system is arranged on the outer side of the electricity testing system. The device has the characteristics of sound wave transverse detection, electricity detection guide pin longitudinal detection, deep-buried gap visualization, accurate seam gap positioning and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of shield launching shaft construction, and relates to a vertical and horizontal combined visual positioning device for the gap of a wall joint of a MJS construction method pile. Background Art

[0002] As my country's subway tunnel construction gradually matures, more and more shield launch shaft construction projects have emerged. In the construction of shield launch shafts, MJS piles are often constructed on the outside of the ground-connected wall to enhance the bearing capacity of the foundation and improve the seismic performance of the structure. There are often gaps in the joints between the ground-connected wall and the MJS piles. The distribution and number of random and uncertain joint gaps lead to seepage, erosion, uneven settlement of the foundation soil, and insufficient structural connection strength. This is one of the problems encountered in the current construction of shield launch shafts.

[0003] The existing methods for detecting the gaps in the joints of ground-connected walls and MJS piles are mainly visual observation, ultrasonic detection, ground penetrating radar, etc. The above methods, such as visual observation, are often affected by the subjective judgment of the observer, and it is difficult to quantify the size of the gaps in the joints. In narrow or difficult-to-observe areas, its accuracy cannot be guaranteed; such as ultrasonic detection, it is difficult to detect deep-buried gaps in the joints from the surface, and it is also affected by the detection orientation and cannot accurately locate the gap position; such as ground penetrating radar detection, due to the unevenness of the joint surface medium, its detection effect will be reduced. Summary of the invention

[0004] In order to overcome the shortcomings of the existing technology, the present invention provides a device for visually locating the gaps in the joints of MJS piles against the wall in both vertical and horizontal directions, which has the characteristics of acoustic lateral detection, electrical conductivity needle longitudinal detection, visualization of deep buried gaps, and accurate positioning of joint gaps. Through the combination of lateral ultrasonic detection and longitudinal electrical conductivity needle detection, accurate positioning of joint gaps is achieved, thereby determining possible structural weaknesses and potential safety hazards, and promoting subsequent targeted repair and reinforcement work. At the same time, through the camera device, the visualization function inside the joint is achieved, and the changes in the structure are monitored in time, providing safety guarantees for maintenance and repair measures.

[0005] The technical solution adopted by the present invention to solve its technical problem is:

[0006] A device for vertically and horizontally visually locating gaps in joints of MJS construction method piles facing a wall, the device comprising a long composite tube, an electrical measurement system, an acoustic wave transmitting system, an acoustic wave receiving system and a joint visualization system, the upper end of the long composite tube being higher than the ground surface, the lower end of the long composite tube being deeply buried in a joint area, the electrical measurement system being arranged in the joint area, the electrical measurement system being in contact with a simulated joint gap, and the electrical measurement system being spaced a set distance from the long composite tube; the acoustic wave transmitting system being arranged in the long composite tube, the acoustic wave receiving system being arranged in the joint area, and the acoustic wave receiving system being distributed around the long composite tube; the joint visualization system being arranged outside the electrical measurement system.

[0007] Furthermore, the multi-layer long tube includes a long tube frame, a long tube center layer, a long tube interlayer, an observation groove and a long tube outer layer. The long tube interlayer is divided into two parts: injection and return liquid. The injection part is buried deeper than the return liquid part, and the bottom is connected to the joint area. The long tube outer layer is divided into four parts, which are symmetrical. The observation groove is arranged on the outer side of the upper end of the return liquid part of the long tube interlayer. The electrical measurement system includes conductive liquid, an electrification pile, an injection pipe, a wire, an electrical measurement needle and a voltage device. The upper end of the electrical measurement needle is higher than the ground surface and is connected to the voltage device through a wire. The voltage device is arranged on the outer side of the long tube interlayer, below the second motor. The injection pipe is arranged on the outer side of the upper end of the injection part of the long tube interlayer. The conductive liquid is injected into the long tube interlayer through the injection pipe so that the height of the conductive liquid is flush with the observation groove; the electrification pile is arranged on the top of the injection part of the long tube interlayer, and the lower end of the electrification pile is in full contact with the conductive liquid.

[0008] Preferably, the electrical measurement system is provided with at least two electrical measurement conductive needles, and the actual number and spacing between them can be adjusted according to actual conditions.

[0009] Furthermore, the sound wave emission system includes a sound wave emitter, a first sound wave absorbing cotton, a first traction belt, a first transmission shaft, a first support rod and a first motor. The emission port of the sound wave emitter is installed with the first sound wave absorbing cotton, which is connected to the first transmission shaft through the first traction belt, and the first motor is connected to the first transmission shaft. The sound wave emitter is arranged in the center layer of the long tube, and the first motor is arranged at the top of the long tube interlayer.

[0010] Furthermore, the sound wave receiving system includes a sound wave receiver, a second sound wave absorbing cotton, a second traction belt, a second transmission shaft, a second support rod, a second motor, and an acoustic detection tube. The acoustic detection tube is arranged in the joint area and distributed around the multi-layer long tube. The sound wave receiver is arranged in the acoustic detection tube and is connected to the second rotating shaft through the second traction belt. The second transmission shaft is connected to the second motor through the second support rod. The second motor is arranged on the outside of the long tube interlayer and is higher than the outer layer of the long tube.

[0011] The sound wave receiving system is provided with four groups of identical components, and the actual number can be adjusted according to actual conditions.

[0012] Furthermore, the seam visualization system includes a camera device, a crawler, a roller, a third transmission shaft and a third motor, wherein the camera device is arranged on the outer layer of the long tube, fixed to the crawler, and connected to the roller, and the roller is connected to the third motor through the third transmission shaft, wherein the roller, the third transmission shaft and the third motor are arranged at two upper and lower positions, forming a symmetrical structure;

[0013] Preferably, the camera device is provided with a camera, a transparent cover is installed on the outside, and a data transmission line is provided on the inside. The third motor is fixed on the outside of the long tube interlayer.

[0014] The joint visualization system is provided with four groups of identical components, and the actual number can be adjusted according to actual conditions.

[0015] The beneficial effects of the present invention are mainly manifested in:

[0016] 1. The device of the present application has the characteristic of transverse detection of acoustic waves. The device of the present application is equipped with an acoustic wave transmitter in the center layer of the long tube, and its longitudinal movement to the target height is controlled by an acoustic detection traction device. At the same time, an acoustic detection tube is buried within a certain distance around the multi-layer long tube, in which an acoustic wave receiver is installed to receive transverse acoustic waves. By analyzing the changes in the received acoustic wave waveform, the depth of the joint gap can be determined. At the same time, the volume of the proposed joint at different depths can be reflected according to the characteristics of the acoustic wave velocity, amplitude, etc., and the safety and quality of the joint area can be further evaluated.

[0017] 2. The device of the present application has the characteristic of accurately locating the pseudo-joint gap. The device of the present application injects a conductive liquid into the long tube interlayer, causing it to diffuse from the bottom end of the long tube interlayer to the joint area 1, and at the same time, the electrification pile energizes the conductive liquid. When the measuring conductive needle buried in the joint area contacts the pseudo-contact gap, the voltage meter will produce a voltage change, thereby determining that the position of the measuring conductive needle contains a pseudo-joint gap. Combined with the above characteristics, the function of accurately locating the joint gap is achieved through vertical and horizontal two-dimensional detection methods.

[0018] 3. The device of the present application has the characteristic of visualizing the joint gap in the joint area. The device of the present application is equipped with a visualization system on the outer layer of the long tube, and the camera device is vertically displaced by crawlers in all directions to monitor the joint gaps of different buried depths around the multi-layer long tube, thereby realizing the function of visualizing the joint gaps. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic longitudinal section diagram of the device for visually locating the gap between piles and walls in the MJS construction method used in this application.

[0020] Figure 2 It is a schematic diagram of the longitudinal section structure of a multi-layer long tube.

[0021] Figure 3 It is a three-dimensional schematic diagram of the sound wave emission system.

[0022] Figure 4 It is a three-dimensional schematic diagram of the sound wave receiving system.

[0023] Figure 5 Schematic diagram of the seam visualization system.

[0024] Figure 6 It is a schematic diagram of a longitudinal section of a camera device.

[0025] Figure 7 for Figure 1 AA cross-section diagram of .

[0026] Among them, 1 is the joint area, 2 is the multi-layer long tube, 201 is the long tube frame, 202 is the long tube center layer, 203 is the long tube interlayer, 204 is the observation slot, and 205 is the long tube outer layer; in the electrical measurement system, 301 is the conductive liquid, 302 is the energized pile, 303 is the injection tube, 304 is the wire, 305 is the electrical measurement needle, 306 is the voltage device, and 307 is the conductive liquid seepage direction; 4 is the sound wave emission system, in which 401 is the sound wave emitter, 402 is the first sound wave absorbing cotton, 403 is the first traction belt, 404 is the first transmission shaft, 405 is The first support rod and 406 are the first motor; 5 is the sound wave receiving system, in which 501 is the sound wave receiver, 502 is the second sound wave absorbing cotton, 503 is the second traction belt, 504 is the second transmission shaft, 505 is the second support rod, 506 is the second motor, and 507 is the sound detection tube; 6 is the joint visualization system, in which 601 is the camera device, 602 is the crawler, 603 is the roller, 604 is the third transmission shaft, 605 is the third motor, 606 is the transparent cover, 607 is the camera, and 608 is the data transmission line; 7 is the joint gap to be measured. DETAILED DESCRIPTION

[0027] The present invention will be further described below in conjunction with the accompanying drawings.

[0028] Reference Figure 1 to Figure 7 A device for vertically and horizontally visually locating gaps of MJS pile joints against walls, comprising a joint area 1, a long composite tube 2, an electrical measurement system, an acoustic wave transmitting system 4, an acoustic wave receiving system 5, a joint visualization system 6 and a pseudo-joint gap 7, wherein the upper end of the long composite tube 2 is higher than the ground surface, and the lower end of the long composite tube 2 is deeply buried in the joint area 1; the electrical measurement system is arranged in the joint area 1, the electrical measurement system is in contact with the pseudo-joint gap 7, and the electrical measurement system is spaced a set distance from the long composite tube 2; the acoustic wave transmitting system 4 is arranged in the long composite tube 2, the acoustic wave receiving system 5 is arranged in the joint area 1, and the acoustic wave receiving system 6 is distributed around the long composite tube; the joint visualization system 6 is arranged outside the electrical measurement system.

[0029] The relationship between this application and the installation position of the joint area 1 is as follows Figure 1 shown.

[0030] The multi-layer long tube 2 is a three-layer annular structure, with the upper end above the ground surface and the lower end deeply buried in the joint area 1, including a long tube frame 201, a long tube center layer 202, a long tube interlayer 203, an observation trough 204, and a long tube outer layer 205. The long tube interlayer 203 is divided into two parts: an injection part and a return part. The injection part is buried deeper than the return part, and the bottom is connected to the joint area 1. The long tube outer layer 205 is divided into four parts, presenting a symmetrical structure, such as Figure 7 The observation tank is arranged on the outer side of the upper end of the liquid return part of the long tube interlayer 203, as shown in FIG. Figure 2 shown.

[0031] The electrical measurement system includes a conductive liquid 301, an electrification pile 302, a liquid injection tube 303, a conductor 304, an electrical measurement needle 305 and a voltage meter 306. The electrical measurement needle 305 is arranged in the joint area 1, in contact with the proposed joint gap 7, and is spaced a certain distance from the long multi-layer tube 2. Figure 7 As shown, the electrical measurement system is provided with at least two electrical measurement conductive needles 305. The actual number and spacing can be adjusted according to actual conditions. Only one group is described here. The upper end of the electrical measurement conductive needle 305 is higher than the ground surface and is connected to the voltage device 306 through the wire 304. The voltage device 306 is arranged outside the long tube interlayer 203 and below the second motor 506. The injection pipe 303 is arranged outside the upper end of the injection part of the long tube interlayer 203. The conductive liquid 301 is injected into the long tube interlayer 203 through the injection pipe 303 so that the height of the conductive liquid is flush with the observation tank 204. The electrification pile 302 is arranged at the top of the injection part of the long tube interlayer 203. The lower end of the electrification pile 302 is in full contact with the conductive liquid 301, as shown in FIG. Figure 1 shown.

[0032] The sound wave emission system 4 includes a sound wave emitter 401, a first sound wave absorbent cotton 402, a first traction belt 403, a first transmission shaft 404, a first support rod 405 and a first motor 406. The emission port of the sound wave emitter 401 is equipped with the first sound wave absorbent cotton 402, which is connected to the first transmission shaft 404 through the first traction belt 403, and the first motor 406 is connected to the first transmission shaft 404. Figure 3 The acoustic wave transmitter 401 is arranged at the center layer 202 of the long tube, and the first motor 406 is arranged at the top of the long tube sandwich 203, as shown in FIG. Figure 1 shown.

[0033] The sound wave receiving system 5 includes a sound wave receiver 501, a second sound wave absorbing cotton 502, a second traction belt 503, a second transmission shaft 504, a second support rod 505, a second motor 506 and a sound detection tube 507. The sound detection tube 507 is arranged in the joint area 1 and distributed around the multi-layer long tube 2. Figure 7The sound wave receiver 501 is arranged in the sound detection tube 507, connected to the second rotating shaft 504 through the second traction belt 503, and the second transmission shaft is connected to the second motor 506 through the second support rod 505, as shown in FIG. Figure 4 The second motor 506 is disposed outside the long tube interlayer 203 and is higher than the long tube outer layer 205. Figure 1 As shown. Figure 7 In the figure, the sound wave receiving system 5 is provided with four groups of identical components, the actual number of which can be adjusted according to actual conditions, and only one group is described here.

[0034] The joint visualization system 6 includes a camera device 601, a crawler 602, a roller 603, a third transmission shaft 604 and a third motor 605. The camera device 601 is arranged on the outer layer 205 of the long tube, fixed to the crawler 602, and connected to the roller 603. The roller 603 is connected to the third motor 605 through the third transmission shaft 604. The roller 603, the third transmission shaft 604 and the third motor 605 are arranged at two upper and lower positions, forming a symmetrical structure, as shown in FIG. Figure 5 The camera device 601 is provided with a camera 607, a transparent cover plate 606 is installed on the outside, and a data transmission line 608 is provided on the inside. Figure 6 The third motor 605 is fixed to the outside of the long tube sandwich 203, as shown. Figure 1 As shown. Figure 7 In the figure, the joint visualization system 6 is provided with four groups of identical components, the actual number of which can be adjusted according to actual conditions, and only one group is described here.

[0035] The installation method and working principle of this application are:

[0036] The present application contains a plurality of identical and symmetrically installed components, only one group of which is described below.

[0037] (1) First, the relevant components of the joint visualization system 6 are installed in the long tube outer layer 205. Two third motors 605 are fixed to the outside of the long tube interlayer 203 above and below the long tube outer layer 205, respectively. The third motor 605 installed on the top is higher than the ground surface, and its height ensures that the camera device 601 is easy to disassemble and assemble. Next, two third transmission shafts 604 are installed on the upper and lower third motors 605, respectively, and the crawler 602 is installed on the third transmission shaft 604. The third motor 605 rotates the third transmission shaft 604 and the crawler 602.

[0038] (2) Then, the long composite tube 2 is buried in the joint area 1 with the upper end above the ground surface. Next, the first motor 406 is arranged at the top of the long tube sandwich 203, and the first support rod 405 and the first transmission shaft 404 are installed on the first motor 406.

[0039] (3) Next, the first sound wave absorbing cotton 402 is installed inside the emission port of the sound wave transmitter 401 to absorb non-lateral sound waves and reduce interference. Then, the sound wave transmitter 401 is connected to the first transmission shaft 404 through the first traction belt 403 and is set in the center layer 202 of the long tube to realize the function of the sound wave transmitter 401 moving up and down therein.

[0040] (4) Next, the second motor 506 is disposed outside the long tube interlayer 203 and is higher than the long tube outer layer 205 .

[0041] (5) Next, the acoustic detection tube 507 is set in the joint area 1 and distributed around the multi-layer long tube 2, with the upper end flush with the ground surface and the bottom flush with the center layer 202 of the long tube.

[0042] (6) Next, the second sound wave absorbing cotton 502 is installed inside the receiving port of the sound wave receiver 501 to absorb non-lateral sound waves and reduce interference. Then, the sound wave receiver 501 is connected and fixed to the second transmission shaft 504 through the second traction belt 503, and the second transmission shaft 504 is fixed to the second motor 506 through the second support rod 505, so that the sound wave receiver 501 can move up and down in the sound detection tube 507.

[0043] (7) Next, the voltage device 306 is installed outside the long tube interlayer 203 and below the second motor 506 , and then the current measuring needle 305 is connected to the voltage device 306 via the wire 304 .

[0044] (8) Next, the injection tube 303 is installed outside the upper end of the injection part of the long tube sandwich 203, and then the power supply pile 302 is installed on the top of the injection part of the long tube sandwich 203, so that the lower end of the power supply pile 302 is exposed inside the long tube sandwich 203.

[0045] (9) Then, the joint visualization system 6 is started, and the camera device is moved up and down to perform real-scene detection inside the joint area 1 and record the distribution of the internal gaps.

[0046] (10) Next, an acoustic wave transverse seam gap detection is performed. The acoustic wave transmitter 401 is started to emit sound waves in all directions, and the acoustic wave receiver 501 is started and moved up and down synchronously so that the two are kept at the same depth. The first and second acoustic wave absorbing cottons 402 and 502 are used to make the acoustic wave receiver 501 receive a single transverse sound wave. The obtained acoustic wave data is compared with the qualified seam to determine the depth of the proposed seam gap 7.

[0047] (11) Next, the measuring conductive needle 305 is buried in the joint area 1, and the conductive liquid 301 is injected into the long tube interlayer 203 through the injection tube 303, so that the conductive liquid 301 is kept at the same height as the upper edge of the observation groove 204, and at the same time, it is fully in contact with the lower end of the energizing pile 302. The injected conductive liquid 301 will diffuse to the surroundings along the conductive liquid seepage direction 307 until it fills the pseudo-joint gap 7 in the joint area 1.

[0048] (12) Next, the energizing pile 302 is started to energize the conductive liquid 301. When the voltage meter 306 detects a voltage change, it can be determined that the vertical area where the connected current measuring needle 305 is located contains a pseudo-joint gap 7. By combining the data obtained by the acoustic wave detection system, the location of the pseudo-joint gap 7 can be located.

[0049] The contents described in the embodiments of this specification are merely enumerations of implementation forms of the inventive concept and are for illustrative purposes only. The protection scope of the present invention should not be considered to be limited to the specific forms described in this embodiment, and the protection scope of the present invention also extends to equivalent technical means that can be thought of by ordinary technicians in this field based on the inventive concept.

Claims

1. A combined vertical and horizontal visual positioning device for MJS pile wall joint gap, characterized in that: The device comprises a long composite tube, an electrical measurement system, an acoustic wave transmitting system, an acoustic wave receiving system and a joint visualization system. The upper end of the long composite tube is higher than the ground surface, the lower end of the long composite tube is deeply buried in the joint area, the electrical measurement system is arranged in the joint area, the electrical measurement system is in contact with the simulated joint gap, and the electrical measurement system is spaced a set distance from the long composite tube; the acoustic wave transmitting system is arranged in the long composite tube, the acoustic wave receiving system is arranged in the joint area, and the acoustic wave receiving system is distributed around the long composite tube; the joint visualization system is arranged outside the electrical measurement system.

2. The device for visually locating the gap between the wall and the vertical joint of the MJS pile according to claim 1, characterized in that: The multi-layer long tube comprises a long tube frame, a long tube center layer, a long tube interlayer, an observation groove and a long tube outer layer. The long tube interlayer is divided into two parts, namely, a liquid injection part and a liquid return part. The liquid injection part is buried deeper than the liquid return part, and the bottom is communicated with the joint area. The long tube outer layer is divided into four parts with a symmetrical structure. The observation groove is arranged on the outer side of the upper end of the liquid return part of the long tube interlayer.

3. The device for visually locating the gap between the wall and the vertical joint of the MJS pile according to claim 1 or 2, characterized in that: The electrical measurement system includes a conductive liquid, an electrification pile, an injection pipe, a conductor, an electrical measuring needle and a voltage device. The upper end of the electrical measuring needle is higher than the ground surface and is connected to the voltage device through a conductor. The voltage device is arranged on the outside of the long tube interlayer and below the second motor. The injection pipe is arranged on the outside of the upper end of the injection part of the long tube interlayer. The conductive liquid is injected into the long tube interlayer through the injection pipe so that the height of the conductive liquid is flush with the observation groove. The electrification pile is arranged on the top of the injection part of the long tube interlayer, and the lower end of the electrification pile is in full contact with the conductive liquid.

4. The device for visually locating the gap between the wall and the vertical joint of the MJS pile according to claim 3, characterized in that: The electrical measurement system is provided with at least two electrical measurement conductive needles.

5. The device for visually locating the gap between the wall and the vertical joint of the MJS pile according to claim 1 or 2, characterized in that: The sound wave emission system includes a sound wave emitter, a first sound wave absorbing cotton, a first traction belt, a first transmission shaft, a first support rod and a first motor. The emission port of the sound wave emitter is installed with the first sound wave absorbing cotton, which is connected to the first transmission shaft through the first traction belt. The first motor is connected to the first transmission shaft. The sound wave emitter is arranged in the center layer of the long tube, and the first motor is arranged at the top of the long tube interlayer.

6. The device for visually locating the gap between the wall and the vertical joint of the MJS pile according to claim 1 or 2, characterized in that: The sound wave receiving system includes a sound wave receiver, a second sound wave absorbing cotton, a second traction belt, a second transmission shaft, a second support rod, a second motor, and a sound detection tube. The sound detection tube is arranged in the joint area and distributed around the multi-layer long tube. The sound wave receiver is arranged in the sound detection tube and is connected to the second rotating shaft through the second traction belt. The second transmission shaft is connected to the second motor through the second support rod. The second motor is arranged on the outside of the long tube interlayer and is higher than the outer layer of the long tube.

7. The device for visually locating the gap between the wall and the vertical joint of the MJS pile according to claim 6, characterized in that: The sound wave receiving system is provided with four groups of identical components.

8. The device for visually locating the gap between the wall and the vertical joint of the MJS pile according to claim 1 or 2, characterized in that: The seam visualization system includes a camera device, a crawler, a roller, a third transmission shaft and a third motor. The camera device is arranged on the outer layer of the long tube, fixed to the crawler, and connected to the roller. The roller is connected to the third motor through the third transmission shaft, wherein the roller, the third transmission shaft and the third motor are arranged in two upper and lower places, forming a symmetrical structure.

9. The device for visually locating the gap between the wall and the vertical joint of the MJS pile according to claim 8, characterized in that: The camera device is provided with a camera, a transparent cover is installed on the outside, and a data transmission line is arranged on the inside. The third motor is fixed on the outside of the long tube interlayer.

10. The device for visually locating the gap between the wall and the vertical joint of the MJS pile according to claim 8, characterized in that: The joint visualization system is provided with four groups of identical components.