Port simulation method, port simulation device and port simulation equipment

By building a simulation control system for multiple device control systems and accessing real device control systems, multiple systems collaborative simulation of port simulation is realized, and the problem of low simulation credibility in the existing technology is solved, and the accuracy and reality of simulation are improved. sex.

CN118915488APending Publication Date: 2024-11-08SHANGHAI HANRUN AUTOMOTIVE ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410956213.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The prior art cannot effectively perform collaborative simulation of multiple control systems, resulting in low reliability of port simulation.

Method used

By receiving scene information and physical simulation information, we build simulation scenarios and equipment for the target port, establish simulation control systems for multiple device control systems, realize the coordinated operation of operation machinery in the simulation scenario, and connect to the real-life equipment according to different test requirements. Control system, dispatching the coordinated operation of the operation machinery in the simulation scenario.

Benefits of technology

It improves the accuracy and authenticity of port simulation and enhances the simulation credibility under the coordinated control of multiple systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118915488A_ABST
    Figure CN118915488A_ABST
Patent Text Reader

Abstract

The invention discloses a port simulation method, a port simulation device and port simulation equipment. The port simulation method comprises the following steps: receiving scene information, and constructing a simulation scene corresponding to a target port according to the scene information; receiving entity simulation information, and constructing simulation equipment corresponding to the operation machinery in the target port according to the entity simulation information; first equipment control information is received, a first simulation control system corresponding to a first equipment control system of the target port is constructed according to the first equipment control information, and the first simulation control system is used for controlling the simulation equipment in the simulation scene to simulate cooperative operation of the operation machinery; and receiving control information sent by a second equipment control system of the target port, and scheduling the operation machinery in the simulation scene to operate cooperatively according to the control information. The port simulation method provided by the invention is high in simulation credibility.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of simulation models, and in particular to a port simulation method, a port simulation device and a port simulation equipment. Background Art

[0002] When analyzing port operations, a simulation model can be built for the control system related to port operations, and the simulation model can be used to test different scenarios to analyze port operation efficiency and optimize port operation strategies. Port operations involve multiple control systems. If a simulation model is built for a single control system for simulation analysis, multiple control systems cannot be collaboratively simulated, resulting in low simulation credibility. Summary of the invention

[0003] The embodiments of the present application provide a port simulation method, a port simulation device and a port simulation equipment, the purpose of which is to improve the credibility of port simulation.

[0004] The embodiment of the first aspect of the present application provides a port simulation method, the port simulation method comprising:

[0005] Receive scenario information, and build a simulation scenario corresponding to the target port according to the scenario information;

[0006] receiving entity simulation information, and constructing simulation equipment corresponding to the operating machinery in the target port according to the entity simulation information;

[0007] receiving first device control information, and constructing a first simulation control system corresponding to the first device control system of the target port according to the first device control information, wherein the first device control system is a control system for managing the operation of the operating machinery of the target port, and the first simulation control system is used to control the coordinated operation of the simulated equipment and the simulated operating machinery in the simulation scene;

[0008] Receive the control information sent by the second equipment control system of the target port, and schedule the operating machinery in the simulation scene to operate in coordination according to the control information.

[0009] According to an implementation of the first aspect of the present application, the port simulation method further includes:

[0010] Receive the second equipment control information, and construct a second simulation control system corresponding to the second equipment control system of the target port according to the second equipment control information, wherein the second simulation control system is used to schedule the working machinery in the simulation scene to operate in coordination.

[0011] According to an implementation of the first aspect of the present application, the second simulation control system simulates one or more production operation strategies in a terminal scheduling system and a horizontal scheduling system operating in a target port.

[0012] According to an implementation of the first aspect of the present application, after receiving the second device control information and constructing the second simulation control system corresponding to the second device control system of the target port according to the second device control information, the method includes:

[0013] Accepting a replacement operation strategy, generating at least one input parameter corresponding to a task requirement of the replacement operation strategy and an output parameter corresponding to the input parameter;

[0014] Accepting a user's selection input in at least one input parameter, and generating a replacement file according to the input parameter and output parameter corresponding to the selection input;

[0015] According to the replacement file, the operation strategy in the second simulation control system is replaced.

[0016] According to the implementation of the first aspect of the present application, the simulation scene includes a simulated ship, a simulated yard, and a simulated container; the simulation equipment includes a simulated quay crane and a simulated yard bridge crane; receiving the second device control information, and constructing a second simulation control system corresponding to the second device control system of the target port according to the second device control information includes:

[0017] Receive the second device control information, and construct one or more of a ship planning strategy, a yard planning strategy, a quay crane planning strategy, a loading planning strategy, a positioning strategy, and a yard crane allocation strategy corresponding to the terminal scheduling system of the target port according to the second device control information; and perform at least one of the following:

[0018] Scheduling simulated ship docking according to ship planning strategy;

[0019] Control the storage status of the simulated container in the simulated yard according to the yard plan simulation strategy;

[0020] According to the simulation strategy of the quay crane plan, the simulated quay crane is dispatched to load and unload the simulated containers on the simulated ship;

[0021] Control the simulated containers of the simulated ship according to the simulated loading plan strategy;

[0022] Dispatching the storage location of the simulated container in the simulated yard according to the location simulation strategy;

[0023] The simulated yard crane is dispatched to move the simulated container according to the yard crane allocation simulation strategy.

[0024] According to the implementation of the first aspect of the present application, the simulation scene includes a simulated ship, a simulated yard, and a simulated container; receiving the second device control information, and constructing a second simulation control system corresponding to the second device control system of the target port according to the second device control information includes:

[0025] Receive the second device control information, and construct one or more of a task allocation strategy, a path planning strategy, a signal light control strategy, and a gate control strategy corresponding to the horizontal scheduling system of the target port according to the second device control information; and perform at least one of the following:

[0026] According to the task allocation simulation strategy, the simulation container truck is dispatched to receive the transportation task;

[0027] Generate the moving path of the simulated container truck according to the path planning simulation strategy;

[0028] According to the signal light control simulation strategy, control the operation of the simulated signal light;

[0029] Control gate operation according to gate control simulation strategy.

[0030] According to an implementation of the first aspect of the present application, the simulation scene includes a simulated container; the simulated equipment includes a simulated quay crane and a simulated yard crane; receiving first equipment control information, and constructing a first simulation control system corresponding to the first equipment control system of the target port according to the first equipment control information includes:

[0031] receiving the first equipment control information, and constructing, according to the first equipment control information, a quay crane control strategy, a yard crane control strategy, and a tally strategy corresponding to the first equipment control system of the target port,

[0032] Control the operation of the simulated quay crane according to the quay crane control strategy;

[0033] Control the operation of the simulated field crane according to the field crane control strategy;

[0034] Monitor the status of simulated containers according to tally strategies.

[0035] According to an implementation of the first aspect of the present application, receiving scenario information, and constructing a simulation scenario corresponding to a target port according to the scenario information, includes:

[0036] Receiving static scene information, and constructing a simulation scene and simulation equipment corresponding to the target port according to the static scene information;

[0037] Receive dynamic scene information, and configure simulation device operation parameters in the simulation scene according to the dynamic scene information.

[0038] The embodiment of the first aspect of the present application provides a port simulation device, the device comprising:

[0039] A scenario simulation module, used for receiving scenario information and constructing a simulation scenario corresponding to the target port according to the scenario information;

[0040] The entity simulation module is used to receive entity simulation information and construct simulation equipment corresponding to the operating machinery in the target port according to the entity simulation information;

[0041] A first information simulation module is used to receive first equipment control information, and to construct a first simulation control system corresponding to the first equipment control system of the target port according to the first equipment control information. The first equipment control system is a control system for managing the operation of the operating machinery of the target port. The first simulation control system is used to control the simulation equipment in the simulation scene to simulate the coordinated operation of the operating machinery;

[0042] The communication module is used to receive control information sent by the second equipment control system of the target port, and schedule the working machinery in the simulation scene to operate in coordination according to the control information.

[0043] The third aspect of the present application provides a port simulation device, the device comprising: a processor and a memory storing computer program instructions,

[0044] When the processor executes the computer program instructions, the port simulation method as described above is implemented.

[0045] In the present application, the simulation results obtained by the port simulation method can be highly accurate by simulating the collaborative static scenes, dynamic scenes, and the first equipment control system that manages the work of the operating machinery in the target port; according to different test requirements, the second equipment control system that is actually operating in the target port is connected, and the operating machinery in the simulation scene is scheduled to operate collaboratively according to the control information sent by the second equipment control system to improve the authenticity of the simulation results. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Other features, objects and advantages of the present application will become more apparent by reading the following detailed description of non-limiting embodiments with reference to the accompanying drawings, in which the same or similar reference numerals represent the same or similar features and the accompanying drawings are not drawn to scale.

[0047] Figure 1 It is a flow chart of the port simulation method provided by the embodiment of the first aspect of the present application;

[0048] Figure 2 It is a schematic diagram of the structure of some modules of the port simulation device provided in the second aspect of the present application;

[0049] Figure 3 It is a schematic diagram of the structure of some modules of the port simulation device provided in the second aspect of the present application;

[0050] Figure 4 It is a schematic diagram of the structure of some modules of the port simulation device provided in the second aspect of the present application;

[0051] Figure 5 It is a structural schematic diagram of a port simulation device provided in one embodiment of the present application.

[0052] Description of reference numerals:

[0053] 1. Control module; 11. Storage unit; 12. Processing unit; 13. Synchronization unit;

[0054] 2. Scene simulation module; 21. Static scene simulation unit; 22. Dynamic scene simulation unit;

[0055] 3. Entity simulation module;

[0056] 4. First information simulation module;

[0057] 5. Second information simulation module; 51. Terminal dispatching system simulation module; 511. Ship planning simulation unit; 512. Yard planning simulation unit; 513. Quay crane planning simulation unit; 514. Loading plan simulation unit; 515. Positioning simulation unit; 516. Yard crane allocation simulation unit; 52. Horizontal dispatching system simulation module; 521. Task allocation simulation unit; 522. Path planning simulation unit; 523. Signal light control simulation unit; 524. Gate control simulation unit;

[0058] 6. Visual module;

[0059] 7. Simulation unit replacement module; 71. Parameter generation unit; 72. Input parameter confirmation unit; 73. Function declaration generation unit; 74. Replacement unit. DETAILED DESCRIPTION

[0060] The features and exemplary embodiments of various aspects of the present application will be described in detail below. In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only configured to explain the present application and are not configured to limit the present application. For those skilled in the art, the present application can be implemented without the need for some of these specific details. The following description of the embodiments is only to provide a better understanding of the present application by illustrating the examples of the present application.

[0061] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "include..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0062] It should be understood that when describing the structure of a component, when a layer or a region is referred to as being "on" or "over" another layer or another region, it may mean that it is directly on the other layer or another region, or that other layers or regions are included between it and the other layer or another region. Moreover, if the component is turned over, the layer or a region will be "below" or "beneath" another layer or another region.

[0063] When analyzing port operations, a simulation model can be built for the control system related to port operations, and the simulation model can be used to test different scenarios to analyze port operation efficiency and optimize port operation strategies. Port operations involve multiple control systems. If a simulation model is built for a single control system for simulation analysis, multiple control systems cannot be collaboratively simulated, resulting in low simulation credibility.

[0064] In order to solve the above problems, the embodiments of the present application provide a port simulation method, a port simulation device and a port simulation equipment. The various embodiments of the port simulation method will be described below in conjunction with the accompanying drawings.

[0065] Please refer to Figure 1 and Figure 2 In order to solve the above problems, the embodiment of the first aspect of the present application provides a port simulation method, the port simulation method comprising:

[0066] S100, receiving scene information, and constructing a simulation scene corresponding to the target port according to the scene information;

[0067] S200, receiving entity simulation information, and constructing a simulation device corresponding to the operating machinery in the target port according to the entity simulation information;

[0068] S300, receiving first device control information, and constructing a first simulation control system corresponding to the first device control system of the target port according to the first device control information, wherein the first device control system is a control system for managing the operation of the operating machinery of the target port, and the first simulation control system is used to control the simulation equipment in the simulation scene to simulate the coordinated operation of the operating machinery;

[0069] S400, receiving control information sent by the second equipment control system of the target port, and scheduling the operating machinery in the simulation scene to operate in coordination according to the control information.

[0070] The port simulation method provided by the present application can be implemented based on C++ computer language and UE (Unreal Engine) Unreal Engine. The port simulation method provided by the present application can be implemented by a port simulation device.

[0071] The port simulation device comprises: a control module 1, a scene simulation module 2, an entity simulation module 3, a first information simulation module 4 and a communication module.

[0072] The scene information is generated according to the actual situation or design scheme of the target port, and the scene simulation module 2 is used to construct static and dynamic scenes according to the actual situation or design scheme of the target port, so as to reproduce the static and dynamic scenes of the target port through the port simulation system. Static scenes can include elements such as shorelines, berths, yards, equipment operating areas, roads, traffic lights, gates, etc. in the simulated target port. Dynamic scenes can include various parameters for configuring each device and its operating strategy in the simulation scene. For example: the number, position and initial state of the operating machinery in the simulation scene, the speed, acceleration and other motion characteristics of the operating machinery and container trucks under different working conditions, etc. The scene simulation module 2 can build a simulation scene according to user instructions, and convert the simulation scene into a configuration file and structured parameters to provide to the control module 1.

[0073] It is understandable that the simulation scenario can be a replica of the target scenario, or the elements required for testing can be set based on the replica of the target scenario as needed.

[0074] The entity simulation information is generated according to the operation strategy of each operating machine in the target port. The entity simulation module 3 is used to simulate each operating machine in the target port. The entity simulation module 3 can be used to simulate the quay crane, yard crane, internal container truck, external container truck, front crane, overhead crane, signal light, gate, etc. in the target port. Programs can be written based on the C++ computer language to simulate the movement and operation rules of each real device. The operation parameters of each simulation device can be configured by the scene simulation module 2. Each simulation device can accept instructions in the corresponding format and complete the corresponding operation. Its operation process, interaction logic and characteristics can be kept consistent with the real operation equipment.

[0075] The first equipment control system is a control system actually running in the target port, and one or more equipment operations in the target port can be controlled by the control system.

[0076] One or more first information simulation modules 4 can be set as needed, and one first information simulation module 4 is used to simulate the control system that actually runs in the target port. The control system can be an automated stacking crane electronic control system (ECS), a yard crane automation system, a tally system, etc. The first information simulation module 4 can be set up based on real logic and strategy to generate a first simulation control system, and the first simulation control system can generate a control instruction and send it to the entity simulation module 3 through the control module 1 to control the corresponding simulation device to operate, and at the same time monitor the status of the simulation device through the control module 1 and make corresponding responses.

[0077] The second equipment control system is a control system that actually operates in the target port. The control system can be used to control the operation of one or more collaborative equipment in the target port. The communication module can be provided with one or more communication interfaces as required, and each communication interface is respectively connected to a different second equipment control system for communication.

[0078] In the port simulation method provided in the present application, the simulation results obtained by the port simulation method can be highly accurate by simulating the collaborative static scenes, dynamic scenes, and the first equipment control system that manages the work of the operating machinery in the target port; according to different testing requirements, the second equipment control system that is actually operating in the target port is connected, and the operating machinery in the simulation scene is scheduled to operate collaboratively according to the control information sent by the second equipment control system to improve the authenticity of the simulation results.

[0079] In some embodiments, the port simulation method further includes:

[0080] S500, receiving second equipment control information, and constructing a second simulation control system corresponding to the second equipment control system of the target port according to the second equipment control information, wherein the second simulation control system is used to schedule the coordinated operation of the operating machinery in the simulation scene.

[0081] The port simulation device also includes at least one second information simulation module 5, which is connected to the control module 1 by signal through a communication interface, and is used to construct a second simulation control system corresponding to the second equipment control system.

[0082] The second information simulation module 5 and the first information simulation module 4 are both used to simulate the equipment control system actually running in the target port. Compared with the second simulation control system, the equipment control system simulated by the first simulation control system can have fewer production operation algorithms and more fixed logic, and the first simulation control system can be a program that does not require secondary development by the test user.

[0083] The second information simulation module 5 can be connected to the control module 1 through the communication interface in the communication module to replace the real second equipment control system connected to the control module 1. Different operation strategies in the second simulation control system will have different effects on the operation progress and efficiency of the simulation results.

[0084] By constructing a second simulation control system corresponding to the second equipment control system of the target port, the second equipment control system in the access control module 1 can be replaced as needed, and different control logics and parameters can be set as needed to achieve richer simulation tests.

[0085] Please refer to Figure 3 In some embodiments, the second simulation control system simulates one or more production operation strategies in a terminal scheduling system and a horizontal scheduling system operating in a target port.

[0086] The Terminal Operating System (TOS) is a software system used to manage and optimize port terminal operations. The terminal operating system can be used to achieve container loading and unloading, storage, transportation, ship and land equipment scheduling, etc. The horizontal scheduling system (Fleet Management System, FMS) is used to manage and monitor the operation and use of container trucks to improve the efficiency, safety and cost control of container trucks. In the production operations of the port, the production operation strategy configuration is concentrated in the terminal scheduling system and the horizontal scheduling system. Whether the control logic in the terminal scheduling system and the horizontal scheduling system is reasonable seriously affects the operation efficiency of the port.

[0087] The terminal dispatching system simulation module 51 and the horizontal dispatching system simulation module 52 can be set in the port simulation device to simulate all or part of the production operation strategies in the real TOS system and FMS system. The communication interface can be connected to the real TOS system and FMS system respectively to receive the control information sent by the real TOS system and FMS system, and the part of the control information is generated according to the production operation strategies preset in the real TOS system and FMS system to test the simulation results corresponding to all or part of the production operation strategies in the real TOS system and FMS system.

[0088] By simulating one or more production operation strategies in the terminal scheduling system and horizontal scheduling system running in the target port, the simulatable strategies can be enriched and simulation under multi-system collaborative control can be realized.

[0089] In some embodiments, the simulation scene includes a simulated ship, a simulated yard, and a simulated container; the simulation equipment includes a simulated quay crane and a simulated yard crane; S500 includes:

[0090] Receive the second device control information, and construct one or more of a ship planning strategy, a yard planning strategy, a quay crane planning strategy, a loading planning strategy, a positioning strategy, and a yard crane allocation strategy corresponding to the terminal scheduling system of the target port according to the second device control information; and perform at least one of the following:

[0091] Scheduling simulated ship docking according to ship planning strategy;

[0092] Control the storage status of the simulated container in the simulated yard according to the yard plan simulation strategy;

[0093] According to the simulation strategy of the quay crane plan, the simulated quay crane is dispatched to load and unload the simulated containers on the simulated ship;

[0094] Control the simulated containers of the simulated ship according to the simulated loading plan strategy;

[0095] Dispatching the storage location of the simulated container in the simulated yard according to the location simulation strategy;

[0096] The simulated yard crane is dispatched to move the simulated container according to the yard crane allocation simulation strategy.

[0097] The terminal scheduling system simulation module 51 of the port simulation device may include at least one simulation unit, and the at least one simulation unit includes one or more of a ship planning simulation unit 511, a yard planning simulation unit 512, a quay crane planning simulation unit 513, a loading planning simulation unit 514, a positioning simulation unit 515 and a yard crane allocation simulation unit 516.

[0098] The ship planning simulation unit 511 is used to simulate the ship planning unit of the terminal scheduling system, and the ship planning simulation unit 511 is used to schedule the simulated ship to dock according to the ship information sent by the control module 1; the yard planning simulation unit 512 is used to simulate the yard planning unit of the terminal scheduling system, and the yard planning simulation unit 512 is used to control the storage status of the simulated container in the simulated yard according to the container information sent by the control module 1; the quay crane planning simulation unit 513 is used to simulate the quay crane planning unit of the terminal scheduling system, and the quay crane planning simulation unit 513 is used to schedule the simulated quay crane to load and unload the simulated container on the simulated ship according to the container information sent by the control module 1; The loading plan simulation unit 514 is used to simulate the loading plan unit of the terminal scheduling system, and the loading plan simulation unit 514 is used to control the simulated container of the simulated ship according to the container information and ship information sent by the control module 1; the positioning simulation unit 515 is used to simulate the positioning unit of the terminal scheduling system, and the yard plan simulation unit 512 is used to schedule the storage position of the simulated container in the simulated yard according to the container information sent by the control module 1; the yard crane allocation simulation unit 516 is used to simulate the yard crane allocation unit of the terminal scheduling system, and the yard plan simulation unit 512 is used to schedule the simulated yard crane to move the simulated container according to the container information sent by the control module 1.

[0099] The ship planning simulation unit 511, the yard planning simulation unit 512, the quay crane planning simulation unit 513, the stowage planning simulation unit 514, the location simulation unit 515 and the yard crane allocation simulation unit 516 can be connected to the control module 1 through different communication interfaces respectively, or can be connected to the control module 1 through the same communication interface. Different simulation units are set so that the terminal dispatching system simulation module 51 can simulate different algorithm strategies in the TOS system respectively. Different simulation units can also be configured as needed, and the strategies in the simulation units can be developed and replaced by themselves.

[0100] By building one or more of the ship planning strategy, yard planning strategy, quay crane planning strategy, loading planning strategy, positioning strategy, and yard crane allocation strategy corresponding to the terminal scheduling system of the target port, the ship's entry and exit plans can be coordinated and optimized; the loading and unloading, storage, stacking and retrieval of containers can be managed; the operation of quay cranes, stackers, trailers and other equipment can be coordinated; real-time monitoring of port operations can be carried out and analysis reports can be generated; the location and status of goods in the entire port process can be tracked.

[0101] In some embodiments, the simulation scene includes a simulated ship, a simulated yard, and a simulated container; S500 includes:

[0102] Receive the second device control information, and construct one or more of a task allocation strategy, a path planning strategy, a signal light control strategy, and a gate control strategy corresponding to the horizontal scheduling system of the target port according to the second device control information; and perform at least one of the following:

[0103] Generate the moving path of the simulated container truck according to the path planning simulation strategy;

[0104] According to the signal light control simulation strategy, control the operation of the simulated signal light;

[0105] Control gate operation according to gate control simulation strategy.

[0106] The horizontal dispatching system simulation module 52 of the port simulation device includes a task allocation simulation unit 521, a path planning simulation unit 522, a signal light control simulation unit 523 and a gate control simulation unit 524. The task allocation simulation unit 521 is used to simulate the task allocation unit of the horizontal dispatching system, and the task allocation simulation unit 521 is used to dispatch the simulated container truck to receive the carrying task according to the container truck information and container information sent by the control module 1; the path planning simulation unit 522 is used to simulate the path planning unit of the horizontal dispatching system, and the path planning simulation unit 522 is used to generate the moving path of the simulated container truck according to the position information of the simulated container truck and the received carrying task; the signal light control simulation unit 523 is used to simulate the signal light control unit of the horizontal dispatching system, and the signal light control simulation unit 523 is used to control the operation of the simulated signal light; the gate control simulation unit 524 is used to simulate the gate control unit of the horizontal dispatching system, and the gate control simulation unit 524 is used to control the gate operation according to the container truck information and container information sent by the control module 1.

[0107] The task allocation simulation unit 521 , the path planning simulation unit 522 , the traffic light control simulation unit 523 and the gate control simulation unit 524 may be connected to the control module 1 through different communication interfaces respectively, or may be connected to the control module 1 through the same communication interface.

[0108] The task allocation simulation unit 521, the path planning simulation unit 522, the traffic light control simulation unit 523 and the gate control simulation unit 524 can send control instructions to the control system to achieve container truck tracking and location monitoring, and monitor the operating status of the container truck, including vehicle speed, fuel consumption, mileage, engine status, etc.

[0109] Different simulation units are set up so that the horizontal scheduling system simulation module 52 can simulate different algorithm strategies in the TOS system respectively. Different simulation units can also be configured as needed to develop and replace strategies in the simulation units.

[0110] By building one or more of the task allocation strategy, path planning strategy, signal light control strategy, and gate control corresponding to the horizontal dispatching system of the target port, the horizontal dispatching of trucks, containers, etc. in the port can be coordinated and optimized.

[0111] In some embodiments, S500 includes:

[0112] S610, accepting a replacement operation strategy, generating at least one input parameter corresponding to a task requirement of the replacement operation strategy and an output parameter corresponding to the input parameter;

[0113] S620, accepting a selection input from a user in at least one input parameter, and generating a replacement file according to the input parameter and output parameter corresponding to the selection input;

[0114] S630: Replace the operation strategy in the second simulation control system according to the replacement file.

[0115] The port simulation device also includes a simulation unit replacement module 7, which includes: a parameter generation unit 71, an input parameter confirmation unit 72, a function declaration generation unit 73 and a replacement unit 74, wherein the parameter generation unit 71 is used to receive a replacement operation strategy, and generate at least one input parameter and at least one output parameter according to the replacement operation strategy; the input parameter confirmation unit 72 is used to receive a selection input, and set a required parameter in at least one input parameter according to the selection input; the function declaration generation unit 73 is used to generate a replacement file for the function declaration according to the input parameters and the output parameters; the replacement unit 74 is used to receive an execution file compiled according to the function declaration, and update the simulation unit corresponding to the replacement operation strategy according to the execution file, that is, replace the operation strategy in the second simulation control system.

[0116] Each simulation unit can be replaced according to the simulation requirements. The simulation unit to be replaced can be selected in the port simulation method. The parameter generation unit 71 will provide the input and output of the simulation unit according to the task requirements of the simulation unit. Among them, the output format is the fixed output format required by the port simulation method for the simulation unit, and the input is all the inputs that can be provided by the simulation production operation configuration to this stage. The user can provide all or part of the input to determine that the input provided is the required parameter in the input parameter confirmation unit 72.

[0117] The function declaration generating unit 73 can generate a function declaration according to the required parameter output given by the user. The user can refer to the function declaration and complete the execution file according to the production operation logic required by the user. The execution file can be a DLL file. The replacement unit 74 places the received execution file in the specified path to achieve the replacement of the simulation unit, that is, to achieve the replacement of the production operation strategy.

[0118] By providing the simulation unit replacement module 7, each simulation unit can be replaced individually, so that the simulation meets the user's needs and enriches the scenarios that can be realized by the simulation.

[0119] In some embodiments, S300 includes:

[0120] receiving the first equipment control information, and constructing, according to the first equipment control information, a quay crane control strategy, a yard crane control strategy, and a tally strategy corresponding to the first equipment control system of the target port,

[0121] Control the operation of the simulated quay crane according to the quay crane control strategy;

[0122] Control the operation of the simulated field crane according to the field crane control strategy;

[0123] Monitor the status of simulated containers according to tally strategies.

[0124] At least one first information simulation module 4 includes a quay crane control system, a yard crane control system and a tally system. The quay crane control system is used to generate a quay crane control strategy to control the operation of the simulated quay crane according to the control instructions sent by the control module 1; the yard crane control system is used to generate a yard crane control strategy to control the operation of the simulated yard crane according to the control instructions sent by the control module 1; the tally system is used to generate a tally strategy to monitor the status of the simulated container according to the control instructions sent by the control module 1.

[0125] By setting up the quay crane control system, yard crane control system and tallying system to control some operating machinery during the simulation process, users can save on secondary development and improve simulation efficiency.

[0126] In some embodiments, S100 includes:

[0127] Receiving static scene information, and constructing a simulation scene and simulation equipment corresponding to the target port according to the static scene information;

[0128] Receive dynamic scene information, and configure simulation device operation parameters in the simulation scene according to the dynamic scene information.

[0129] The scene simulation module 2 includes a static scene simulation unit 21 and a dynamic scene simulation unit 22. The static scene simulation unit 21 is used to construct static elements according to the target port. The dynamic scene simulation unit 22 is signal-connected to the static scene simulation unit 21. The dynamic scene simulation unit 22 is used to construct dynamic elements in the received static elements according to the target port.

[0130] The static scene simulation unit 21 is used to construct a static scene of the target port, including elements such as shoreline, berth, yard, equipment operation area, road, signal light, gate, etc. The static scene simulation unit 21 converts the scene constructed by the user into a configuration file and provides it to the dynamic scene simulation unit 22 and the control module 1.

[0131] The dynamic scene simulation unit 22 is used to configure various parameters of the port equipment and its operation strategy, including the initial number and distribution status of the port's on-site containers and on-board containers, the number, position and initial status of the port's operating machinery, the speed, acceleration and other motion characteristics of the operating machinery and container trucks under different working conditions, the task information corresponding to the current operating scene that needs to be simulated and its key parameters of the production operation strategy, the number of various mechanical equipment and container trucks that need to be invested in the current scene that needs to be simulated and their allocation strategy, etc. The configuration of the dynamic scene needs to rely on the configuration parameters passed in by the static scene simulation unit 21. After the dynamic scene simulation unit 22 completes the configuration, it will generate structured parameters and provide them to the control module 1. In the simulation initialization and parameter configuration stage, the user can configure the static scene in the static scene simulation unit 21 as needed, and then use the dynamic scene in the dynamic scene simulation unit 22 to configure the dynamic scene. After the configuration is completed, the information of the two modules is written into the control module 1, and the static scene simulation unit 21 and the dynamic scene simulation unit 22 can no longer participate in the subsequent program operation during the simulation operation.

[0132] In some embodiments, the port simulation device further includes a visual module 6 , which is used to generate a visual image showing the simulation scene and the simulation equipment according to the control instructions sent by the control module 1 .

[0133] The visual module 6 is used to display the three-dimensional animation in the simulation process and the statistical data of the simulation process and results. The visual module 6 can be developed based on the UE Unreal Engine. The visual module 6 obtains the specific information to be displayed from the control module 1, and transmits the user's operation at the front end to the control module 1. In the simulation operation stage, the control module 1 can schedule and communicate data for each simulation device and simulation control system, and graphically display it in the visual module 6 for the convenience of user viewing and control.

[0134] See also Figure 4 In some embodiments, the control module 1 includes:

[0135] The storage unit 11 is used to store the simulation scene sent by the scene simulation module 2;

[0136] A plurality of processing units 12, used for processing control information sent by the entity simulation module 3, the first information simulation module 4 and the second device control system;

[0137] The synchronization unit 13 is used to synchronize the time clocks of the multiple processing units 12 .

[0138] The storage unit 11 can store all the information of other modules interacting with each other during the initialization and simulation process. The initialization information includes all the structured parameters configured by the static scene simulation unit 21 and the dynamic scene simulation unit 22, i.e., the simulation scene. The module interaction information includes the status of each module (e.g., the position, speed, and status information of the container truck) and the information interaction between modules (e.g., the task instructions sent by the TOS system to the FMS system).

[0139] In order to improve the simulation efficiency and support high-speed simulation, the port simulation method can realize multi-thread mode through multiple processing units 12. The synchronization between each thread is completed by the synchronization unit 13 to ensure the stable and efficient operation of the discrete simulation. After each thread completes the calculation of this step, it notifies the synchronization unit 13. After the synchronization unit 13 confirms that all threads have completed the operation of this step, it notifies all threads to start the next step of calculation.

[0140] Based on the port simulation method provided in the above embodiment, the present application also provides a specific implementation of the port simulation device. Please refer to the following embodiment.

[0141] See first Figures 2 to 4 The port simulation device provided in the embodiment of the present application includes the following modules:

[0142] The scenario simulation module 2 is used to receive scenario information and construct a simulation scenario corresponding to the target port according to the scenario information;

[0143] The entity simulation module 3 is used to receive the entity simulation information and construct a simulation device corresponding to the operating machinery in the target port according to the entity simulation information;

[0144] The first information simulation module 4 is used to receive the first equipment control information, and to construct a first simulation control system corresponding to the first equipment control system of the target port according to the first equipment control information. The first equipment control system is a control system for managing the operation of the operating machinery of the target port. The first simulation control system is used to control the simulation equipment in the simulation scene to simulate the coordinated operation of the operating machinery;

[0145] The communication module is used to receive control information sent by the second equipment control system of the target port, and schedule the working machinery in the simulation scene to operate in coordination according to the control information.

[0146] As an implementation of the present application, the port simulation method further includes:

[0147] The second information simulation module 5 receives the second equipment control information, and constructs a second simulation control system corresponding to the second equipment control system of the target port according to the second equipment control information. The second simulation control system is used to schedule the coordinated operation of the operating machinery in the simulation scene.

[0148] As an implementation of the present application, the second simulation control system simulates one or more production operation strategies in a terminal scheduling system and a horizontal scheduling system running in a target port.

[0149] As an implementation of the present application, the port simulation device further includes a simulation unit replacement module 7, and the simulation unit replacement module 7 includes:

[0150] A parameter generating unit 71, configured to receive a replacement operation strategy and generate at least one input parameter corresponding to a task requirement of the replacement operation strategy and an output parameter corresponding to the input parameter;

[0151] An input parameter confirmation unit 72, used to accept a user's selection input of at least one input parameter;

[0152] A function declaration generating unit 73, used to generate a replacement file according to the input parameters and output parameters corresponding to the selected input;

[0153] The replacement unit 74 is used to replace the operation strategy in the second simulation control system according to the replacement file.

[0154] As an implementation method of the present application, the simulation scene includes a simulated ship, a simulated yard, and a simulated container; the simulation equipment includes a simulated quay crane and a simulated yard crane; the second information simulation module 5 includes a terminal scheduling system simulation module 51, which is used to receive the second device control information, and construct one or more of a ship planning strategy, a yard planning strategy, a quay crane planning strategy, a loading planning strategy, a location strategy, and a yard crane allocation strategy corresponding to the terminal scheduling system of the target port according to the second device control information; the terminal scheduling system simulation module 51 includes at least one of the following:

[0155] The ship planning simulation unit 511 is used to schedule and simulate ship berthing according to the ship planning strategy;

[0156] A yard planning simulation unit 512, used to control the storage state of the simulated container in the simulated yard according to the yard planning simulation strategy;

[0157] The quay crane planning simulation unit 513 is used to schedule the simulated quay crane to load and unload the simulated container on the simulated ship according to the quay crane planning simulation strategy;

[0158] A loading plan simulation unit 514, used to control the simulated containers of the simulated ship according to the loading plan simulation strategy;

[0159] A location simulation unit 515 is used to schedule the storage position of the simulated container in the simulated yard according to the location simulation strategy;

[0160] The yard crane allocation simulation unit 516 is used to schedule the simulated yard crane to move the simulated container according to the yard crane allocation simulation strategy.

[0161] As an implementation method of the present application, the simulation scene includes a simulated ship, a simulated yard, and a simulated container; the second information simulation module 5 includes a horizontal scheduling system simulation module 52, which is used to receive the second device control information, and build a task allocation strategy, a path planning strategy, a signal light control strategy, and a gate control corresponding to the horizontal scheduling system of the target port according to the second device control information; the horizontal scheduling system simulation module 52 includes at least one of the following:

[0162] The task allocation simulation unit 521 is used to schedule the simulated container truck to receive the transport task according to the task allocation simulation strategy;

[0163] A path planning simulation unit 522 is used to generate a moving path of a simulated container truck according to a path planning simulation strategy;

[0164] A signal light control simulation unit 523, used to control the operation of the simulated signal light according to the signal light control simulation strategy;

[0165] The gate control simulation unit 524 is used to control the gate operation according to the gate control simulation strategy.

[0166] As an implementation method of the present application, the first information simulation module 4 is used to receive the first equipment control information, and to construct a quay crane control strategy, a yard crane control strategy and a tally strategy corresponding to the first equipment control system of the target port according to the first equipment control information.

[0167] Control the operation of the simulated quay crane according to the quay crane control strategy;

[0168] Control the operation of the simulated field crane according to the field crane control strategy;

[0169] Monitor the status of simulated containers according to tally strategies.

[0170] As an implementation of the present application, the scene simulation module 2 includes:

[0171] A static scene simulation unit 21 is used to receive static scene information and construct a simulation scene and simulation equipment corresponding to the target port according to the static scene information;

[0172] The dynamic scene simulation unit 22 is used to receive dynamic scene information and configure simulation device operation parameters in the simulation scene according to the dynamic scene information.

[0173] Figure 5 A schematic diagram of the hardware structure of the port simulation device provided in an embodiment of the present application is shown.

[0174] The port simulation device may include a processor 1201 and a memory 1202 storing computer program instructions.

[0175] Specifically, the processor 1201 may include a central processing unit (CPU), or an application specific integrated circuit (ASIC), or may be configured to implement one or more integrated circuits of the embodiments of the present application.

[0176] The memory 1202 may include a large capacity memory for data or instructions. By way of example and not limitation, the memory 1202 may include a hard disk drive (HDD), a floppy disk drive, a flash memory, an optical disk, a magneto-optical disk, a magnetic tape, or a universal serial bus (USB) drive or a combination of two or more of these. In appropriate cases, the memory 1202 may include a removable or non-removable (or fixed) medium. In appropriate cases, the memory 1202 may be inside or outside the integrated gateway disaster recovery device. In a specific embodiment, the memory 1202 is a non-volatile solid-state memory.

[0177] The memory may include read-only memory (ROM), random access memory (RAM), magnetic disk storage media devices, optical storage media devices, flash memory devices, electrical, optical or other physical / tangible memory storage devices. Thus, typically, the memory includes one or more tangible (non-transitory) computer-readable storage media (e.g., memory devices) encoded with software including computer-executable instructions, and when the software is executed (e.g., by one or more processors), it is operable to perform the operations described with reference to the method according to an aspect of the present disclosure.

[0178] The processor 1201 implements any one of the port simulation methods in the above embodiments by reading and executing computer program instructions stored in the memory 1202 .

[0179] In one example, the port simulation device may further include a communication interface 1203 and a bus 1210. Figure 5 As shown, the processor 1201, the memory 1202, and the communication interface 1203 are connected via a bus 1210 and communicate with each other.

[0180] The communication interface 1203 is mainly used to implement communication between various modules, devices, units and / or equipment in the embodiments of the present application.

[0181] Bus 1210 includes hardware, software or both, and the parts of port simulation equipment are coupled to each other. For example, but not limitation, bus may include accelerated graphics port (AGP) or other graphics bus, enhanced industrial standard architecture (EISA) bus, front side bus (FSB), hypertransport (HT) interconnection, industrial standard architecture (ISA) bus, infinite bandwidth interconnection, low pin count (LPC) bus, memory bus, micro channel architecture (MCA) bus, peripheral component interconnection (PCI) bus, PCI-Express (PCI-X) bus, serial advanced technology attachment (SATA) bus, video electronics standard association local (VLB) bus or other suitable bus or two or more of these combinations. In suitable cases, bus 1210 may include one or more buses. Although the present application embodiment describes and shows a specific bus, the application considers any suitable bus or interconnection.

[0182] The port simulation device can be based on the above embodiment, thereby realizing the combination of the above port simulation method and port simulation device.

[0183] In addition, in combination with the port simulation method in the above embodiment, the embodiment of the present application may provide a computer storage medium for implementation. The computer storage medium stores computer program instructions, and when the computer program instructions are executed by the processor, any one of the port simulation methods in the above embodiment is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here. Among them, the above-mentioned computer-readable storage medium may include a non-transitory computer-readable storage medium, such as a read-only memory (Read-Only Memory, referred to as ROM), a random access memory (Random Access Memory, referred to as RAM), a disk or an optical disk, etc., which is not limited here.

[0184] In addition, an embodiment of the present application also provides a computer program product, including computer program instructions, which can implement the steps and corresponding contents of the aforementioned method embodiment when executed by a processor.

[0185] It should be clear that the present application is not limited to the specific configuration and processing described above and shown in the figures. For the sake of simplicity, a detailed description of the known method is omitted here. In the above embodiments, several specific steps are described and shown as examples. However, the method process of the present application is not limited to the specific steps described and shown, and those skilled in the art can make various changes, modifications and additions, or change the order between the steps after understanding the spirit of the present application.

[0186] The functional blocks shown in the above block diagram can be implemented as hardware, software, firmware or a combination thereof. When implemented in hardware, it can be, for example, an electronic circuit, an application specific integrated circuit (ASIC), appropriate firmware, a plug-in, a function card, etc. When implemented in software, the elements of the present application are programs or code segments that are used to perform the required tasks. The program or code segment can be stored in a machine-readable medium, or transmitted on a transmission medium or a communication link by a data signal carried in a carrier wave. "Machine-readable medium" can include any medium capable of storing or transmitting information. Examples of machine-readable media include electronic circuits, semiconductor memory devices, ROM, flash memory, erasable ROM (EROM), floppy disks, CD-ROMs, optical disks, hard disks, optical fiber media, radio frequency (RF) links, etc. The code segment can be downloaded via a computer network such as the Internet, an intranet, etc.

[0187] It should also be noted that the exemplary embodiments mentioned in this application describe some methods or systems based on a series of steps or devices. However, this application is not limited to the order of the above steps, that is, the steps can be performed in the order mentioned in the embodiment, or in a different order from the embodiment, or several steps can be performed simultaneously.

[0188] Aspects of the present disclosure are described above with reference to the flowchart and / or block diagram of the method, device and computer program product according to the embodiment of the present disclosure. It should be understood that each box in the flowchart and / or block diagram and the combination of each box in the flowchart and / or block diagram can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device to produce a machine so that these instructions executed by the processor of the computer or other programmable data processing device enable the implementation of the function / action specified in one or more boxes of the flowchart and / or block diagram. Such a processor can be, but is not limited to, a general-purpose processor, a special-purpose processor, a special application processor, or a field programmable logic circuit. It can also be understood that each box in the block diagram and / or flowchart and the combination of boxes in the block diagram and / or flowchart can also be implemented by dedicated hardware that performs a specified function or action, or can be implemented by a combination of dedicated hardware and computer instructions.

[0189] According to the embodiments of the present application as above, these embodiments do not describe all the details in detail, nor do they limit the invention to specific embodiments. Obviously, many modifications and changes can be made based on the above description. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present application, so that those skilled in the art can make good use of the present application and the modifications based on the present application. The present application is only limited by the claims and their full scope and equivalents.

Claims

1. A port simulation method, characterized in that: The port simulation method comprises: receiving scene information, and constructing a simulation scene corresponding to the target port according to the scene information; receiving entity simulation information, and constructing a simulation device corresponding to the operating machinery in the target port according to the entity simulation information; receiving first device control information, and constructing a first simulation control system corresponding to the first device control system of the target port according to the first device control information, wherein the first device control system is a control system for managing the operation of the operating machinery of the target port, and the first simulation control system is used to control the simulation devices in the simulation scene to simulate the coordinated operation of the operating machinery; Receive control information sent by the second equipment control system of the target port, and schedule the working machinery in the simulation scene to operate in coordination according to the control information.

2. The port simulation method according to claim 1, characterized in that: The port simulation method further comprises: Receive second equipment control information, and construct a second simulation control system corresponding to the second equipment control system of the target port according to the second equipment control information, wherein the second simulation control system is used to schedule the working machinery in the simulation scene to operate in coordination.

3. The port simulation method according to claim 2, characterized in that: The second simulation control system simulates one or more production operation strategies in a terminal scheduling system and a horizontal scheduling system running in the target port.

4. The port simulation method according to claim 3, characterized in that: The receiving of the second device control information and constructing a second simulation control system corresponding to the second device control system of the target port according to the second device control information comprises: Accepting a replacement operation strategy, generating at least one input parameter corresponding to a task requirement of the replacement operation strategy and an output parameter corresponding to the input parameter; Accepting a selection input from a user among the at least one input parameter, and generating a replacement file according to the input parameter and the output parameter corresponding to the selection input; The operation strategy in the second simulation control system is replaced according to the replacement file.

5. The port simulation method according to claim 2, characterized in that: The simulation scenes include simulated ships, simulated yards, simulated containers, simulated container trucks and simulated signal lights; the simulation equipment includes simulated quay cranes and simulated yard cranes; The receiving of the second device control information and constructing a second simulation control system corresponding to the second device control system of the target port according to the second device control information comprises: Receive the second device control information, and construct one or more of a ship planning strategy, a yard planning strategy, a quay crane planning strategy, a loading planning strategy, a positioning strategy, and a yard crane allocation strategy corresponding to the terminal scheduling system of the target port according to the second device control information; and perform at least one of the following: Dispatching the simulated ship to dock according to the ship planning strategy; Controlling the storage status of the simulated container in the simulated yard according to the yard plan simulation strategy; Scheduling the simulated quay crane to load and unload the simulated container on the simulated ship according to the quay crane planning simulation strategy; Controlling the simulated container of the simulated ship according to a loading plan simulation strategy; Dispatching the storage position of the simulated container in the simulated storage yard according to the location simulation strategy; The simulated yard crane is dispatched to move the simulated container according to the yard crane allocation simulation strategy.

6. The port simulation method according to claim 2, characterized in that: The simulation scene includes a simulated ship, a simulated yard, a simulated container, a simulated container truck and a simulated signal light; The receiving of the second device control information and constructing a second simulation control system corresponding to the second device control system of the target port according to the second device control information comprises: Receive the second device control information, and construct one or more of a task allocation strategy, a path planning strategy, a signal light control strategy, and a gate control strategy corresponding to the horizontal scheduling system of the target port according to the second device control information; and perform at least one of the following: According to the task allocation simulation strategy, the simulation container truck is scheduled to receive the transportation task; Generate a moving path for the simulated container truck according to a path planning simulation strategy; Controlling the operation of the simulated signal light according to the signal light control simulation strategy; According to the gate control simulation strategy, the gate operation is controlled.

7. The port simulation method according to claim 1, characterized in that: The simulation scene includes a simulation container; the simulation equipment includes a simulation quay crane and a simulation yard crane; The receiving of the first device control information and constructing a first simulation control system corresponding to the first device control system of the target port according to the first device control information comprises: receiving first equipment control information, and constructing, according to the first equipment control information, a quay crane control strategy, a yard crane control strategy, and a tally strategy corresponding to the first equipment control system of the target port; Controlling the operation of the simulated quay crane according to the quay crane control strategy; Controlling the operation of the simulated field bridge according to the field bridge control strategy; The status of the simulated container is monitored according to a tally strategy.

8. The port simulation method according to claim 1, characterized in that: The receiving scenario information and constructing a simulation scenario corresponding to the target port according to the scenario information includes: Receiving static scene information, and constructing a simulation scene and simulation equipment corresponding to the target port according to the static scene information; Dynamic scene information is received, and simulation device operation parameters in the simulation scene are configured according to the dynamic scene information.

9. A port simulation device, characterized in that: The device comprises: A scenario simulation module, used for receiving scenario information and constructing a simulation scenario corresponding to a target port according to the scenario information; A physical simulation module, used for receiving physical simulation information and constructing a simulation device corresponding to the operating machinery in the target port according to the physical simulation information; A first information simulation module is used to receive first equipment control information, and to construct a first simulation control system corresponding to the first equipment control system of the target port according to the first equipment control information, wherein the first equipment control system is a control system for managing the operation of the operating machinery of the target port, and the first simulation control system is used to control the simulation equipment in the simulation scene to simulate the coordinated operation of the operating machinery; The communication module is used to receive control information sent by the second equipment control system of the target port, and schedule the working machinery in the simulation scene to operate in coordination according to the control information.

10. A port simulation device, characterized in that: The device comprises: a processor and a memory storing computer program instructions, When the processor executes the computer program instructions, the port simulation method according to any one of claims 1 to 8 is implemented.