Processing equipment control method, system and equipment based on industrial internet of things and medium

Through the management platform of the industrial Internet of Things system, production tasks and deadlines are obtained, processing plans are determined, equipment progress and parameter consistency is judged, and management and control instructions are generated, which solves the problem of low production control efficiency in assembly lines and achieves efficient and accurate production supervision.

CN118915540APending Publication Date: 2024-11-08CHENGDU QINCHUAN IOT TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410991206.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The management and control efficiency of existing assembly line production is low, it is difficult to effectively supervise problems in the production process, and it is prone to errors.

Method used

Using the industrial Internet of Things processing equipment control method, the management platform obtains production tasks and deadlines, determines the processing plan, judges the equipment progress and parameter consistency, and generates equipment control instructions to adjust parameters to improve management efficiency and accuracy.

Benefits of technology

It improves the management efficiency and accuracy of assembly line production and realizes effective supervision of the production process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118915540A_ABST
    Figure CN118915540A_ABST
Patent Text Reader

Abstract

The invention discloses a processing equipment control method, system and equipment based on the industrial Internet of Things and a medium, and relates to the technical field of production management and control, and the method comprises the steps: obtaining a production task and a production period of a product; determining a processing plan of each processing device according to the production task and the production deadline; obtaining the current production progress of each piece of processing equipment, respectively judging whether the current production progress of each piece of processing equipment accords with the corresponding processing plan or not, and if not, obtaining each working parameter of the corresponding processing equipment; and judging whether each working parameter of the corresponding processing equipment is consistent with a corresponding preset parameter or not, and if not, generating an equipment management and control instruction according to each working parameter of the corresponding processing equipment and the preset parameter so as to adjust the parameter value of each working parameter of the processing equipment to the parameter value of the preset parameter. The method has the effect of improving the efficiency of production management and control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of production control, and in particular to a processing equipment control method, system, equipment and medium based on the industrial Internet of Things. Background Art

[0002] Assembly line production, also known as assembly line production, refers to a production organization form in which the labor object continuously passes through various work sites according to a certain process route and a unified production speed, and is processed and produced in sequence. It is a further development of the object specialization organization form, and is a production organization form with a finer division of labor and higher production efficiency.

[0003] At present, the control of assembly line production is mainly carried out through staff patrolling up and down. There are usually multiple staff members at the production site. These staff members will regularly check the status of each processing equipment and the product status of the assembly line to ensure the normal progress of production; but this method is time-consuming and labor-intensive, has low control efficiency, and is prone to errors, making it difficult to effectively supervise problems that arise during the production process. Summary of the invention

[0004] In order to improve the efficiency of production control, the present application provides a processing equipment control method, system, equipment and medium based on industrial Internet of Things.

[0005] In the first aspect, the present application provides a processing equipment control method based on the industrial Internet of Things, which adopts the following technical solutions:

[0006] A processing equipment control method based on industrial Internet of Things is used in an industrial Internet of Things system. The industrial Internet of Things system includes a management platform. The method is executed by the management platform and includes:

[0007] Obtain the production tasks and deadlines for products;

[0008] Determine the processing plan of each processing equipment according to the production task and the production deadline;

[0009] Obtain the current production progress of each processing equipment, and determine whether the current production progress of each processing equipment meets the corresponding processing plan. If not, obtain various working parameters of the corresponding processing equipment;

[0010] Determine whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters. If not, generate equipment control instructions based on the various working parameters of the corresponding processing equipment and the preset parameters to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters.

[0011] By adopting the above technical scheme, in order to effectively control the production process, the production task and production deadline of the product are first obtained, and then the processing plan of each processing equipment is determined according to the production task and production deadline, and then the current production progress of each processing equipment is obtained, and it is judged whether the current production progress of each processing equipment conforms to the corresponding processing plan. If the current production progress of a certain processing equipment does not conform to the corresponding processing plan, the various working parameters of the corresponding processing equipment are obtained, and then it is judged whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters. If the various working parameters of the corresponding processing equipment are inconsistent with the corresponding preset parameters, equipment control instructions are generated according to the various working parameters of the corresponding processing equipment and the preset parameters to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters, so as to control the production of the assembly line, improve the control efficiency, and improve the accuracy of production control, so as to effectively supervise the production process of the assembly line.

[0012] Optionally, determining a processing plan for each processing equipment according to the production task and the production deadline specifically includes:

[0013] Acquire historical processing data of each processing equipment, and establish an initial processing plan model based on the historical processing data; the historical processing data includes historical production tasks, historical production deadlines, historical processing quantities and historical processing times of the processing equipment;

[0014] Training the initial processing plan model according to the historical processing data to obtain a trained processing plan model;

[0015] The production task and the production deadline are input into the trained processing plan model to obtain the processing plan of each processing equipment; the processing plan includes the target processing quantity of the processing equipment in different time periods.

[0016] By adopting the above technical scheme, in order to determine the processing plan of each processing equipment, the historical processing data of each processing equipment is first obtained, and an initial processing plan model is established based on the historical processing data. The historical processing data includes the historical production tasks, historical production deadlines, historical processing quantities and historical processing times of the processing equipment. Then, the initial processing plan model is trained based on the historical processing data to obtain a trained processing plan model. Then, the production tasks and production deadlines are input into the trained processing plan model to obtain the processing plan of each processing equipment. The processing plan includes the target processing quantity of the processing equipment in different time periods.

[0017] Optionally, the current production progress includes the number of products processed by each processing equipment, and obtaining the current production progress of each processing equipment and respectively determining whether the current production progress of each processing equipment meets the corresponding processing plan, and if not, obtaining the corresponding working parameters of the processing equipment specifically includes:

[0018] Obtaining the quantity of the product processed by each processing equipment, and determining whether the quantity of the product processed by each processing equipment is greater than or equal to the corresponding target product quantity;

[0019] If not, then obtain the various working parameters of the corresponding processing equipment.

[0020] By adopting the above technical solution, the number of products processed by each processing equipment is obtained, and it is determined whether the number of products processed by each processing equipment is greater than or equal to the corresponding target product number. If the number of products processed by the processing equipment is less than the corresponding target product number, the various working parameters of the corresponding processing equipment are obtained.

[0021] Optionally, the processing equipment includes semi-automatic processing equipment, and the method further includes:

[0022] For each semi-automatic processing equipment, the initial processing time and the current processing time of the product by the current staff are obtained, and the processing time of the product by the current staff is calculated according to the initial processing time and the current processing time;

[0023] Determine whether the processing time is greater than a preset time. If so, generate rotation reminder information and display the rotation reminder information on the display screen of the semi-automatic processing equipment.

[0024] By adopting the above technical solution, for each semi-automatic processing equipment, the initial processing time and current processing time of the product by the current staff are obtained, and the processing time of the product by the current staff is calculated based on the initial processing time and the current processing time, and then it is determined whether the processing time is greater than the preset time. If the processing time is greater than the preset time, a rotation reminder information is generated and displayed on the display screen of the semi-automatic processing equipment.

[0025] For each semi-automatic processing equipment, the initial processing time and current processing time of the product by the current staff are obtained, and the processing time of the product by the current staff is calculated based on the initial processing time and the current processing time. Then, it is determined whether the processing time is greater than the preset time. If the processing time is greater than the preset time, a rotation reminder message is generated and displayed on the display screen of the semi-automatic processing equipment.

[0026] Optionally, the method further includes:

[0027] In the process of processing the products, obtaining product code scanning information of each of the products, and determining the processing order of each of the products according to the product code scanning information;

[0028] Obtaining a theoretical processing sequence for each of the products;

[0029] For each of the products, determine whether the processed sequence of the product conforms to the corresponding theoretical processing sequence. If not, generate a stop processing instruction based on the product code scanning information to stop the processing equipment from processing the product.

[0030] By adopting the above technical solution, during the process of processing products, the product code scanning information of each product is obtained, and the processed order of each product is determined based on the product code scanning information, and then the theoretical processing order of each product is obtained. For each product, it is determined whether the processed order of the product conforms to the theoretical processing order corresponding to the product. If the processed order of the product does not conform to the theoretical processing order corresponding to the product, a stop processing instruction is generated based on the product code scanning information to stop the processing equipment from processing the product.

[0031] Optionally, generating a stop processing instruction according to the product code scanning information to stop a processing device from processing the product specifically includes:

[0032] Extracting the ID information of the product from the product code scan information;

[0033] A stop processing instruction for stopping the processing equipment from processing the product is generated according to the ID information.

[0034] By adopting the above technical solution, the ID information of the product is firstly extracted from the product code scanning information, and then a stop processing instruction for stopping the processing equipment from processing the product is generated according to the ID information of the product.

[0035] Optionally, after generating a stop processing instruction according to the product code scanning information to stop the processing equipment from processing the product, the method further includes:

[0036] Determine the current location of the product according to the product scanning information;

[0037] A product movement instruction is generated according to the product code scanning information and the current position to control the processing equipment to move the product out of the production line.

[0038] By adopting the above technical solution, the current position of the product is determined according to the product scanning information, and then the product movement instruction is generated according to the product code scanning information and the current position, so as to control the processing equipment to move the product out of the production line.

[0039] In the second aspect, the present application also provides a processing equipment control system based on the industrial Internet of Things, which adopts the following technical solutions:

[0040] A processing equipment control system based on the industrial Internet of Things includes a management platform, wherein the management platform is configured with:

[0041] Data acquisition module, used to obtain the production tasks and production deadlines of products;

[0042] A processing plan generating module, used to determine the processing plan of each processing equipment according to the production task and the production deadline;

[0043] A working parameter acquisition module is used to acquire the current production progress of each processing equipment, and to determine whether the current production progress of each processing equipment complies with the corresponding processing plan. If not, the working parameters of the corresponding processing equipment are acquired;

[0044] The equipment control module is used to determine whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters. If not, an equipment control instruction is generated according to the various working parameters of the corresponding processing equipment and the preset parameters to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters.

[0045] In a third aspect, the present application also provides a computer device, which adopts the following technical solution:

[0046] A computer device comprises a memory and a processor, wherein the memory stores a computer program executable on the processor, and the processor implements the method described in the first aspect when executing the computer program.

[0047] In a fourth aspect, the present application further provides a computer-readable storage medium, which adopts the following technical solution:

[0048] A computer-readable storage medium stores a computer program that can be loaded by a processor and execute the method described in the first aspect.

[0049] To sum up, the present application includes at least the following beneficial technical effects: in order to effectively control the production process, first obtain the production task and production deadline of the product, then determine the processing plan of each processing equipment according to the production task and production deadline, then obtain the current production progress of each processing equipment, and judge whether the current production progress of each processing equipment conforms to the corresponding processing plan. If the current production progress of a certain processing equipment does not conform to the corresponding processing plan, obtain the various working parameters of the corresponding processing equipment, and then judge whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters. If the various working parameters of the corresponding processing equipment are inconsistent with the corresponding preset parameters, generate equipment control instructions according to the various working parameters of the corresponding processing equipment and the preset parameters to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters, so as to control the production of the assembly line, improve the control efficiency, and improve the accuracy of production control, so as to effectively supervise the production process of the assembly line. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 It is a schematic diagram of the overall process of an embodiment of the present application.

[0051] Figure 2 It is a schematic diagram of the structure of the system of the embodiment of the present application.

[0052] Figure 3 It is a schematic diagram of the overall process of the application scenario of the system of the embodiment of the present application.

[0053] Figure 4 It is a specific flow chart of the application scenario of the system in the embodiment of the present application.

[0054] Figure 5 It is a structural block diagram of a computer device according to an embodiment of the present application. DETAILED DESCRIPTION

[0055] In order to make the purpose, technical solutions and advantages of this application more clear, the following Figure 1-5 It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0056] The embodiment of the present application discloses a processing equipment control method based on industrial Internet of Things.

[0057] Reference Figure 1 , a processing equipment control method based on industrial Internet of Things is used in an industrial Internet of Things system, the industrial Internet of Things system includes a management platform, and the method is executed by the management platform, including the following steps:

[0058] S11, obtaining the production task and production deadline of the product.

[0059] It should be noted that the production period of a product includes the start time and end time of production of the product.

[0060] S12, determining the processing plan of each processing equipment according to the production task and production deadline.

[0061] S13, obtaining the current production progress of each processing equipment, and determining whether the current production progress of each processing equipment complies with the corresponding processing plan. If not, obtaining various working parameters of the corresponding processing equipment.

[0062] Specifically, the current production progress of each processing equipment is obtained, and it is determined whether the current production progress of each processing equipment meets the processing plan of the equipment. If the current production progress of the processing equipment does not meet the processing plan of the processing equipment, the various working parameters of the processing equipment are obtained.

[0063] It should be noted that the various working parameters of the processing equipment include the current working voltage, current working current, current power, working temperature and other parameters of the processing equipment.

[0064] S14, determine whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters. If not, generate equipment control instructions based on the various working parameters of the corresponding processing equipment and the preset parameters to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters.

[0065] Specifically, determine whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters. If the various working parameters of the corresponding processing equipment are inconsistent with the corresponding preset parameters, generate equipment control instructions based on the various working parameters of the corresponding processing equipment and the preset parameters to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters; if the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters, re-determination is made after a preset period of time.

[0066] In the above embodiment, in order to effectively control the production process, the production task and production deadline of the product are first obtained, and then the processing plan of each processing equipment is determined according to the production task and production deadline, and then the current production progress of each processing equipment is obtained, and it is judged whether the current production progress of each processing equipment conforms to the corresponding processing plan. If the current production progress of a certain processing equipment does not conform to the corresponding processing plan, the various working parameters of the corresponding processing equipment are obtained, and then it is judged whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters. If the various working parameters of the corresponding processing equipment are inconsistent with the corresponding preset parameters, then the equipment control instructions are generated according to the various working parameters of the corresponding processing equipment and the preset parameters to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters, so as to control the production of the assembly line, improve the control efficiency, and improve the accuracy of production control, so as to effectively supervise the production process of the assembly line.

[0067] As a further implementation method of the processing equipment control method, the processing plan of each processing equipment is determined according to the production task and the production deadline, which specifically includes the following steps:

[0068] Step S21, obtaining historical processing data of each processing equipment, and establishing an initial processing plan model based on the historical processing data.

[0069] Among them, the historical processing data includes the historical production tasks, historical production deadlines, historical processing quantities and historical processing times of the processing equipment.

[0070] Step S22, training the initial processing plan model according to the historical processing data to obtain a trained processing plan model.

[0071] Step S23, inputting the production tasks and production deadlines into the trained processing plan model to obtain the processing plan for each processing equipment.

[0072] Among them, the processing plan includes the target processing quantity of the processing equipment in different time periods.

[0073] In the above-mentioned embodiment, in order to determine the processing plan of each processing equipment, the historical processing data of each processing equipment is first obtained, and an initial processing plan model is established based on the historical processing data. The historical processing data includes the historical production tasks, historical production deadlines, historical processing quantities and historical processing times of the processing equipment. The initial processing plan model is then trained based on the historical processing data to obtain a trained processing plan model. The production tasks and production deadlines are then input into the trained processing plan model to obtain the processing plan of each processing equipment. The processing plan includes the target processing quantity of the processing equipment in different time periods.

[0074] As a further implementation method of the processing equipment control method, the current production progress includes the number of products processed by each processing equipment, the current production progress of each processing equipment is obtained, and it is judged whether the current production progress of each processing equipment meets the corresponding processing plan. If not, the working parameters of the corresponding processing equipment are obtained, which specifically includes the following steps:

[0075] Obtain the number of products processed by each processing equipment, and determine whether the number of products processed by each processing equipment is greater than or equal to the corresponding target product number;

[0076] If not, then obtain the various working parameters of the corresponding processing equipment.

[0077] Specifically, the number of products processed by each processing equipment is obtained, and it is determined whether the number of products processed by each processing equipment is greater than or equal to the corresponding target product number. If the number of products processed by the processing equipment is less than the corresponding target product number, the various working parameters of the corresponding processing equipment are obtained; if the number of products processed by the processing equipment is greater than or equal to the corresponding target product number, the judgment continues after a preset time period.

[0078] In the above embodiment, the number of products processed by each processing equipment is obtained, and it is determined whether the number of products processed by each processing equipment is greater than or equal to the corresponding target product number. If the number of products processed by the processing equipment is less than the corresponding target product number, the various working parameters of the corresponding processing equipment are obtained.

[0079] As a further embodiment of the processing equipment control method, the processing equipment includes semi-automatic processing equipment, and the method further includes the following steps:

[0080] Step S41, for each semi-automatic processing equipment, obtain the initial processing time and current processing time of the product by the current staff, and calculate the processing time of the product by the current staff based on the initial processing time and the current processing time.

[0081] It is understandable that the processing equipment includes automated processing equipment and semi-automated processing equipment. For automated processing equipment, workers are not required to perform relevant operations, while for semi-automated processing equipment, workers are required to perform relevant operations.

[0082] Step S42, determining whether the processing time is greater than a preset time, if so, generating rotation reminder information, and displaying the rotation reminder information on a display screen of the semi-automatic processing equipment.

[0083] Specifically, it is determined whether the processing time is greater than the preset time. If it is determined that the processing time is greater than the preset time, a rotation reminder message is generated, and the rotation reminder message is displayed on the display screen of the semi-automatic processing equipment; if the processing time is not greater than the preset time, the time difference is calculated based on the processing time and the preset time, and the time difference is displayed on the display screen of the semi-automatic processing equipment.

[0084] In the above embodiment, for each semi-automatic processing equipment, the initial processing time and current processing time of the product by the current staff are obtained, and the processing time of the product by the current staff is calculated based on the initial processing time and the current processing time, and then it is determined whether the processing time is greater than the preset time. If the processing time is greater than the preset time, a rotation reminder message is generated and displayed on the display screen of the semi-automatic processing equipment.

[0085] As a further implementation of the processing equipment control method, the processing equipment control method further includes the following steps:

[0086] Step S51, in the process of processing the products, obtain the product code scanning information of each product, and determine the processed order of each product according to the product code scanning information.

[0087] Specifically, during the process of processing products, the product code scanning information of each product is obtained; for each product, the processing information of each processing equipment on the product is extracted based on the product code scanning information; and the processed order of each product is determined based on the processing information of each processing equipment on the product.

[0088] It should be noted that a product code is affixed to the surface of each product that needs to be processed or is unformed, and each processing equipment can obtain product code scanning information by scanning the product code.

[0089] Step S52, obtaining the theoretical processing sequence of each product.

[0090] Step S53, for each product, determine whether the processed sequence of the product conforms to the corresponding theoretical processing sequence. If not, generate a stop processing instruction according to the product code scanning information to stop the processing equipment from processing the product.

[0091] Specifically, for each product, determine whether the processed sequence of the product conforms to the corresponding theoretical processing sequence. If the processed sequence of the product does not conform to the corresponding theoretical processing sequence, generate a stop processing instruction based on the product code scanning information to stop the processing equipment from processing the product; if the processed sequence of the product conforms to the corresponding theoretical processing sequence, continue to process the product.

[0092] In the above embodiment, during the process of processing the products, the product code scanning information of each product is obtained, and the processed order of each product is determined based on the product code scanning information, and then the theoretical processing order of each product is obtained. For each product, it is determined whether the processed order of the product is consistent with the theoretical processing order corresponding to the product. If the processed order of the product does not meet the theoretical processing order corresponding to the product, a stop processing instruction is generated based on the product code scanning information to stop the processing equipment from processing the product.

[0093] As a further implementation of the processing equipment control method, a stop processing instruction is generated according to the product code scanning information to stop the processing equipment from processing the product, which specifically includes the following steps:

[0094] Step S61, extracting product ID information from product code scanning information.

[0095] Step S62, generating a stop processing instruction for stopping the processing equipment from processing the product according to the ID information of the product.

[0096] In the above embodiment, the ID information of the product is firstly extracted from the product code scanning information, and then a stop processing instruction for stopping the processing equipment from processing the product is generated according to the ID information of the product.

[0097] As a further implementation of the processing equipment control method, after generating a stop processing instruction according to the product code scanning information to stop the processing equipment from processing the product, the method further includes the following steps:

[0098] Step S71, determining the current location of the product based on the product scanning information.

[0099] Step S72, generating a product moving instruction according to the product code scanning information and the current position to control the processing equipment to move the product out of the production line.

[0100] In the above embodiment, the current position of the product is determined based on the product scanning information, and then a product movement instruction is generated based on the product code scanning information and the current position, thereby controlling the processing equipment to move the product out of the production line.

[0101] The embodiments of the present application also disclose a processing equipment control system based on the industrial Internet of Things.

[0102] refer to Figure 2 , a processing equipment control system based on industrial Internet of Things, including a management platform, wherein the management platform is configured with:

[0103] Data acquisition module, used to obtain the production tasks and production deadlines of products;

[0104] A processing plan generating module, used to determine the processing plan of each processing equipment according to the production task and the production deadline;

[0105] A working parameter acquisition module is used to acquire the current production progress of each processing equipment, and to determine whether the current production progress of each processing equipment complies with the corresponding processing plan. If not, the working parameters of the corresponding processing equipment are acquired;

[0106] The equipment control module is used to determine whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters. If not, an equipment control instruction is generated according to the various working parameters of the corresponding processing equipment and the preset parameters to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters.

[0107] The overall framework of the application scenario of the industrial Internet of Things system provided by the processing equipment control system based on the industrial Internet of Things of this application is as shown in the attached Figure 3 As shown, it can include a user platform, a service platform, a management platform, a sensor network platform, and an object platform that interact in sequence, forming a basic five-platform architecture. Among them, the management platform includes a device management sub-platform and a data center, and the device management sub-platform can interact with the data center; the sensor network platform includes a device management module and a data transmission management module, and the device management module can interact with the data transmission management module. Through the interaction between the various functional platforms of the industrial Internet of Things system based on the above five platforms, a complete closed-loop information operation logic is established, which ensures the orderly operation of perception information and control information and realizes intelligent equipment management.

[0108] Specifically, the Internet of Things system of this embodiment includes an object platform for collecting the working parameters of processing equipment, a sensor network platform, a management platform, a smart service platform and a user platform. The device object platform is composed of a number of sensors, the smart service platform is composed of a number of application function entities, and the user platform is composed of a number of user terminals. The sensor network platform includes a device management module and a data transmission management module, and the device management platform includes a device management sub-platform and a data center. The device management platform is configured to: obtain the production tasks and production deadlines of the products; determine the processing plans of each processing equipment according to the production tasks and production deadlines; obtain the current production progress of each processing equipment, and judge whether the current production progress of each processing equipment meets the corresponding processing plan, if not, obtain the various working parameters of the corresponding processing equipment; judge whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters, if not, generate equipment control instructions according to the various working parameters of the corresponding processing equipment and the preset parameters, so as to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters. The user terminal in the user platform is configured to perform the functions of the user terminal in any of the above methods; the smart service platform is configured as an API server or other server used to establish communication between the device management platform and the user platform to realize the corresponding functions.

[0109] The specific framework of the application scenario of the industrial Internet of Things system of this application is as shown in the attached Figure 4 As shown, the service platform includes a service main database that communicates with the management platform, at least one service sub-platform that communicates with the service main database and the user platform, and the service sub-platform includes a service sub-database; each service sub-platform corresponds to an API function or an API server; specifically, the service platform includes a service main database that communicates with the management platform, n service sub-platforms that communicate with the service platform main database and the user platform, and each service sub-platform includes a service sub-database.

[0110] The processing equipment control system based on industrial Internet of Things of the present invention can implement any one of the processing equipment control methods based on industrial Internet of Things, and the specific working process of the processing equipment control system based on industrial Internet of Things of the present invention can refer to the corresponding process in the above-mentioned processing equipment control method based on industrial Internet of Things.

[0111] The embodiment of the present application also discloses a computer device.

[0112] refer to Figure 5 A computer device includes a memory and a processor, wherein the memory stores a computer program that can be run on the processor, and when the processor executes the computer program, any one of the above-mentioned industrial Internet of Things processing equipment control methods is implemented.

[0113] The embodiment of the present application also discloses a computer-readable storage medium.

[0114] A computer-readable storage medium stores a computer program that can be loaded by a processor and execute any one of the above-mentioned industrial Internet of Things processing equipment control methods.

[0115] Among them, computer-readable storage media can be any tangible medium that contains or stores a program, which can be used by or in conjunction with an instruction execution system, apparatus or device; the program code contained on the computer-readable medium can be transmitted using any appropriate medium, including but not limited to wireless, wire, optical cable, RF, etc., or any suitable combination of the above.

[0116] The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Any feature disclosed in this specification (including the abstract and drawings), unless otherwise stated, can be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.

Claims

1. Processing equipment control method based on industrial Internet of Things, It is characterized in that For an industrial Internet of Things system, the industrial Internet of Things system includes a management platform, and the method is executed by the management platform, including: Obtain the production tasks and deadlines for products; Determine the processing plan of each processing equipment according to the production task and the production deadline; Obtain the current production progress of each processing equipment, and determine whether the current production progress of each processing equipment meets the corresponding processing plan. If not, obtain various working parameters of the corresponding processing equipment; Determine whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters. If not, generate equipment control instructions based on the various working parameters of the corresponding processing equipment and the preset parameters to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters.

2. According to the processing equipment control method based on industrial Internet of Things according to claim 1, It is characterized in that Determining the processing plan of each processing equipment according to the production task and the production deadline specifically includes: Acquire historical processing data of each processing equipment, and establish an initial processing plan model based on the historical processing data; the historical processing data includes historical production tasks, historical production deadlines, historical processing quantities and historical processing times of the processing equipment; Training the initial processing plan model according to the historical processing data to obtain a trained processing plan model; The production task and the production deadline are input into the trained processing plan model to obtain the processing plan of each processing equipment; the processing plan includes the target processing quantity of the processing equipment in different time periods.

3. According to the processing equipment control method based on industrial Internet of Things according to claim 2, It is characterized in that The current production progress includes the number of products processed by each processing equipment. The current production progress of each processing equipment is obtained, and it is determined whether the current production progress of each processing equipment meets the corresponding processing plan. If not, the working parameters of the corresponding processing equipment are obtained, which specifically include: Obtaining the quantity of the product processed by each processing equipment, and determining whether the quantity of the product processed by each processing equipment is greater than or equal to the corresponding target product quantity; If not, then obtain the various working parameters of the corresponding processing equipment.

4. According to the processing equipment control method based on industrial Internet of Things according to claim 1, It is characterized in that The processing equipment includes semi-automatic processing equipment, and the method further includes: For each semi-automatic processing equipment, the initial processing time and the current processing time of the product by the current staff are obtained, and the processing time of the product by the current staff is calculated according to the initial processing time and the current processing time; Determine whether the processing time is greater than a preset time. If so, generate rotation reminder information and display the rotation reminder information on the display screen of the semi-automatic processing equipment.

5. According to the processing equipment control method based on industrial Internet of Things according to claim 1, It is characterized in that The method further comprises: In the process of processing the products, obtaining product code scanning information of each of the products, and determining the processing order of each of the products according to the product code scanning information; Obtaining a theoretical processing sequence for each of the products; For each of the products, determine whether the processed sequence of the product conforms to the corresponding theoretical processing sequence. If not, generate a stop processing instruction based on the product code scanning information to stop the processing equipment from processing the product.

6. According to the processing equipment control method based on industrial Internet of Things according to claim 5, It is characterized in that The step of generating a stop processing instruction according to the product code scanning information to stop the processing equipment from processing the product specifically includes: Extracting the ID information of the product from the product code scan information; A stop processing instruction for stopping the processing equipment from processing the product is generated according to the ID information.

7. The processing equipment control method based on industrial Internet of Things according to claim 6, It is characterized in that After generating a stop processing instruction according to the product code scanning information to stop the processing equipment from processing the product, the method further includes: Determine the current location of the product according to the product scanning information; A product movement instruction is generated according to the product code scanning information and the current position to control the processing equipment to move the product out of the production line.

8. Processing equipment control system based on industrial Internet of Things, It is characterized in that The system comprises a management platform, wherein the management platform is configured with: Data acquisition module, used to obtain the production tasks and production deadlines of products; A processing plan generating module, used to determine the processing plan of each processing equipment according to the production task and the production deadline; A working parameter acquisition module is used to acquire the current production progress of each processing equipment, and to determine whether the current production progress of each processing equipment complies with the corresponding processing plan. If not, the working parameters of the corresponding processing equipment are acquired; The equipment control module is used to determine whether the various working parameters of the corresponding processing equipment are consistent with the corresponding preset parameters. If not, an equipment control instruction is generated according to the various working parameters of the corresponding processing equipment and the preset parameters to adjust the parameter values ​​of the various working parameters of the processing equipment to the parameter values ​​of the preset parameters.

9. A computer device, It is characterized in that The method comprises a memory and a processor, wherein the memory stores a computer program executable on the processor, and the processor implements the method according to any one of claims 1 to 7 when executing the computer program.

10. A computer-readable storage medium, It is characterized in that A computer program is stored which can be loaded by a processor and execute the method according to any one of claims 1 to 7.