Centralized control system and method for live-action performance equipment
Through the centralized control system for real-life performance equipment, the stage equipment is managed by using the orchestration controller and timeline, and combined with the LORA communication protocol module, the problems of weak information perception ability and complicated control in the existing technology are solved, and the immersion and intelligence of real-life performance are improved. Integrated management achieves the rapidity and safety of real-life exhibitions.
Patent Information
- Application Number
- CN202410212376.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-27
- Publication Date
- 2024-11-08
AI Technical Summary
In the existing real-life performance technology, the information perception ability is weak, the integrated control is complicated, the artistic appeal is poor, and the personalized art creation method is lacking in a deep combination of virtual and real, which leads to the inability to deeply integrate exhibition services and tourism services, and the level of intelligent control equipment is insufficient. The speed and safety of the live performance cannot be guaranteed.
A centralized control system for real-life performance equipment is designed, and the computer and sub-controller of the workstation are electrically connected to the stage equipment through on-site control. The working status of all stage equipment is managed by using the orchestration controller and timeline, and integrated and intelligent management is achieved, and LORA is adopted. The communication protocol module performs data transmission, realizing centralized control and coordination of multiple devices.
Improve the immersion of real-life exhibitions and the intelligent level of equipment management, ensure the rapidity and security of real-life exhibitions, enhance the coordination and flexibility of the system, and realize the integrated management of multiple real-life exhibition equipment. .
Smart Images

Figure CN118915630A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of stage equipment control, and in particular to a centralized control system and method for live performance equipment. Background Art
[0002] Live performance is a modern and innovative cultural tourism product. It not only promotes the development of China's tourism industry, but also greatly promotes the inheritance and development of culture. The development of immersive live performance is an important way to improve the high-quality service capabilities of my country's cultural tourism and better meet the people's yearning for a better life. It helps to promote the inherent needs of Zhejiang's spiritual prosperity. Therefore, it is of great practical significance to carry out research on immersive live performance technology and scene innovation.
[0003] In the existing real-life performances, the construction of immersive performance systems around tourist attractions has the disadvantages of weak information perception, complicated integrated control, and poor artistic appeal. For example, in 2015, the large-scale immersive art work "Rain House" created by the London art group Random International adopted the sound, light, electromechanical centralized control system of the German SBS stage equipment company. The audience experienced the three interactive perception functions of sight, touch and hearing in the performance, but the sound and light were controlled separately from the stage machinery, and the level of intelligent control needs to be improved. In 2021, the large-scale immersive real-life performance work "The Table of Departure" created by Shaanxi Tourism Group used virtual reality technology, holographic projection technology, three-dimensional reality technology, mechanical numerical control devices and other means to realize the performance of three scenes in the air, on the ground, and in the water. However, the multimedia image presentation method is relatively single. Therefore, looking at the current immersive performance technology and application status, there is still a lack of personalized performance art creation methods that combine deep virtual and real under artificial intelligence technology. In the real-life immersive performance integrated solution under the integration of culture and tourism, there is also a dilemma that the performance service and tourism service cannot be deeply integrated.
[0004] In order to enhance the immersiveness of real-life performances, the extraction, processing and interaction technologies of space-ground fusion information in complex environments have received increasing research attention. With the help of various advanced information technologies and equipment, such as virtual augmented reality, holographic projection, and naked-eye 3D, the audience's inner experience and emotional identification can be enhanced. Virtual reality enhancement technology integrates virtual objects with actual physical scenes so that they coexist in a three-dimensional space, enhancing users' perception and understanding of the real world. Virtual reality enhancement technology that enhances the immersive experience is inseparable from the support of various hardware devices and software technologies. "Multimodal fusion" has become the mainstream of virtual augmented reality.
[0005] It should be pointed out that although many scholars and enterprises have proposed many intelligent equipment control technologies and developed a series of intelligent real-life performance equipment, the control objects are still relatively single and the intelligence level of the control equipment needs to be improved. There is still a lack of collaborative control technology for real-life performance equipment that integrates air and ground in cultural scenic spots, and the speed and safety of the real-life performance process cannot be guaranteed. Summary of the invention
[0006] The present invention solves the problem of poor integration capability and low intelligence level of existing live performance equipment, proposes a centralized control system and method for live performance equipment, and provides a scheduling controller to set the working status of all stage equipment on the same time axis to achieve integrated and intelligent management of live performance equipment.
[0007] In order to achieve the above objectives, the following technical solutions are proposed: A centralized control system for live performance equipment includes a field control workstation computer and a plurality of sub-controllers. The field control workstation computer is electrically connected to all stage equipment participating in the live performance through the sub-controllers. The field control workstation computer is connected to an arrangement controller through a server. The arrangement controller is provided with a time axis. The time axis is provided with a plurality of performance clips. The performance clips include ID information and working status of the stage equipment. The field control workstation computer controls the stage equipment with corresponding ID information to execute corresponding working status according to the time axis.
[0008] The sub-controller of the present invention is used to collect performance data and equipment data of stage equipment, and send the performance data and equipment data to the on-site control workstation computer, the on-site control workstation computer sends the equipment control signal to the sub-controller, and the sub-controller controls the operation of the stage equipment according to the equipment control signal. An arrangement controller is provided to set the working status of all stage equipment on the same time axis, thereby realizing integrated and intelligent management of live performance equipment.
[0009] Preferably, a sound track, a light and shadow track and a scene creation track are provided on the timeline; the performance clips include sound clips, light and shadow clips and scene creation clips; the sound clips are stored on the sound track; the light and shadow clips are stored on the light and shadow track; the scene creation clips are stored on the scene creation track; the stage equipment includes sound equipment, light and shadow equipment and scene creation equipment; the sound clips store the ID information and working status information of the sound equipment; the light and shadow clips store the ID information and working status information of the light and shadow equipment; the scene creation clips store the ID information and working status information of the scene creation equipment.
[0010] Preferably, the sound clip contains at least the ID information and working status information of one sound device, the light and shadow clip contains at least the ID information and working status information of one light and shadow device, and the environment creation clip contains at least the ID information and working status information of one environment creation device.
[0011] Preferably, the performance segment includes at least one of a sound segment, a light segment and an environment segment, or a performance segment group formed by a combination of multiple sound segments, light segments and environment segments.
[0012] Preferably, the field control workstation computer and several sub-controllers transmit data via an intelligent gateway, and the field control workstation is connected to the server via a VPN tunnel.
[0013] The present invention is specially used for real-life performances. The real-life performance venue is complex in structure. The audience can visit the performance venue in person, and the stage is not fixed. As the performance plot develops, the stage will also change. The positions of various performance equipment are not concentrated together, and the position of the on-site control center is generally fixed. At this time, a large number of cables need to be connected to the on-site control center. It is okay to lay them underground, but if they are laid on the ground, they may trip the audience. The complex terrain structure may include water networks, etc., and when laying them underground, factors such as avoiding water networks must be considered. The present invention sets up sub-controllers that match different real-life performance equipment, and then establishes a field control workstation computer that interacts with the self-controller, so as to realize centralized control of multiple real-life performance equipment and realize integrated and intelligent management of real-life performance equipment.
[0014] Preferably, the sub-controller and the intelligent gateway transmit data via the LORA communication protocol module. The group control function of the LORA communication protocol module can realize the centralized control of multiple real-life performance devices through low-power and long-distance communication, thereby improving the coordination and flexibility of the overall real-life performance system.
[0015] A centralized control method for live performance equipment, using the above-mentioned centralized control system for live performance equipment, comprises the following steps: S1, build a timeline on the arrangement controller, and create sound tracks, light and shadow tracks, and environment creation tracks on the timeline; S2, establishing a mapping relationship between the arrangement controller and all the stage equipment involved in the live performance, so that the arrangement controller defines the working status of the stage equipment according to the timing; S3, outputting the performance clips according to the performance script or directly inserting the existing performance clip group to obtain a performance sequence that records the working status of the equipment in the whole process; S4, performing a duplicate check and proofreading on the performance equipment in the performance sequence. If the performance sequence passes the duplicate check and proofreading, a device control signal is generated according to the performance sequence, and the device control signal is transmitted to the server.
[0016] As a preference, the method comprises the following steps: S5, the server saves the device control signal and transmits the device control signal to the on-site control workstation computer through the VPN tunnel; S6, the field control workstation computer uses the intelligent gateway to transmit the equipment control signal to the sub-controller; S7, the sub-controller controls the operation of the stage equipment according to the equipment control signal; S8, the sub-controller collects the performance data and equipment data of the stage equipment, and sends the performance data and equipment data to the on-site control workstation computer through the intelligent gateway; S9, the on-site control workstation computer transmits the performance data and equipment data to the server through the VPN tunnel; S10, the server stores the performance data and the equipment data.
[0017] Preferably, the duplicate checking and proofreading comprises the following steps: traversing the performance sequence along the time axis to find whether there is the same device in two working states at the same time; if so, calling out the performance segment where the device is located and marking the time node; if not, the performance sequence passes the duplicate checking and proofreading.
[0018] The beneficial effects of the present invention are as follows: the sub-controller of the present invention is used to collect performance data and equipment data of stage equipment, and send the performance data and equipment data to the on-site control workstation computer, the on-site control workstation computer sends the equipment control signal to the sub-controller, and the sub-controller controls the operation of the stage equipment according to the equipment control signal. An arrangement controller is provided to set the working status of all stage equipment on the same time axis, thereby realizing integrated and intelligent management of live performance equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a simplified structural diagram of the system of the present invention; Figure 2 It is a schematic diagram of the performance sequence of the present invention. DETAILED DESCRIPTION
[0020] Example: This embodiment proposes a centralized control system for live performance equipment. Figure 1 , including a field control workstation computer and several sub-controllers. The field control workstation computer is electrically connected to all stage equipment participating in the live performance through the sub-controllers. The field control workstation computer is connected to the arrangement controller through the server. The arrangement controller is provided with a timeline. The timeline is provided with several performance clips. The performance clips include the ID information and working status of the stage equipment. The field control workstation computer controls the stage equipment with corresponding ID information according to the timeline to execute the corresponding working status.
[0021] The sub-controller of the present invention is used to collect performance data and equipment data of stage equipment, and send the performance data and equipment data to the on-site control workstation computer. The on-site control workstation computer sends the equipment control signal to the sub-controller, and the sub-controller controls the operation of the stage equipment according to the equipment control signal. An arrangement controller is provided to set the working status of all stage equipment on the same time axis, thereby realizing integrated and intelligent management of real-life performance equipment.
[0022] The timeline is equipped with a sound track, a light and shadow track, and a scene creation track. The performance clips include sound clips, light and shadow clips, and scene creation clips. Sound clips are stored on the sound track, light and shadow clips are stored on the light and shadow track, and scene creation clips are stored on the scene creation track. The stage equipment includes sound equipment, light and shadow equipment, and scene creation equipment. Sound clips store the ID information and working status information of sound equipment, light and shadow clips store the ID information and working status information of light and shadow equipment, and scene creation clips store the ID information and working status information of scene creation equipment.
[0023] Sound equipment includes all kinds of equipment that make sounds, such as speakers, loudspeakers, etc. Light and shadow equipment includes all kinds of equipment that make lights and shadows, such as displays, projection lights, etc. Environment equipment includes all kinds of equipment that make environments, such as smoke generators, artificial rainfall equipment, etc.
[0024] The sound clip contains at least one sound device's ID information and working status information, the light clip contains at least one light and shadow device's ID information and working status information, and the environment clip contains at least one environment device's ID information and working status information. Each sound clip, light clip, or environment clip can be composed of multiple stage devices.
[0025] The performance clips include at least one of the sound clips, the light clips and the environment clips, or a performance clip group formed by combining multiple sound clips, light clips and environment clips. For specific reusable performance clips, they can be combined to form a performance clip group, and when they are needed, they can be directly inserted into the performance clip group for convenient use.
[0026] The field control workstation computer and several sub-controllers transmit data through the intelligent gateway, and the field control workstation is connected to the server through a VPN tunnel.
[0027] The present invention is specially used for real-life performances. The real-life performance venue is complex in structure. The audience can visit the performance venue in person, and the stage is not fixed. As the performance plot develops, the stage will also change. The positions of various performance equipment are not concentrated together, and the position of the on-site control center is generally fixed. At this time, a large number of cables need to be connected to the on-site control center. It is okay to lay them underground, but if they are laid on the ground, they may trip the audience. The complex terrain structure may include water networks, etc., and when laying them underground, factors such as avoiding water networks must be considered. The present invention sets up sub-controllers that match different real-life performance equipment, and then establishes a field control workstation computer that interacts with the self-controller, so as to realize centralized control of multiple real-life performance equipment and realize integrated and intelligent management of real-life performance equipment.
[0028] The sub-controller and the intelligent gateway transmit data through the LORA communication protocol module. The group control function of the LORA communication protocol module can realize the centralized control of multiple real-life performance equipment through low-power and long-distance communication, improving the coordination and flexibility of the overall real-life performance system.
[0029] A centralized control method for live performance equipment, using the above-mentioned centralized control system for live performance equipment, referring to Figure 2 , including the following steps: S1, build a timeline on the arrangement controller, and create sound tracks, light and shadow tracks, and environment creation tracks on the timeline; In this embodiment, the sound track, the light and shadow track, or the environment creation track includes a plurality of parallel sub-tracks.
[0030] S2, establishing a mapping relationship between the arrangement controller and all the stage equipment involved in the live performance, so that the arrangement controller defines the working status of the stage equipment according to the timing; The mapping relationship refers to the mapping between the working state of the stage equipment and its control instructions, that is, the control instructions can make the stage equipment reach the corresponding working state.
[0031] S3, outputting the performance clips according to the performance script or directly inserting the existing performance clip group to obtain a performance sequence that records the working status of the equipment in the whole process; In this embodiment, if sound clip 1 is inserted into sub-sound track 1 and sound clip 2 is inserted into sub-sound track n, optical film clip 1 is inserted into sub-light and shadow track 1 and optical film clip 3 is inserted into sub-light and shadow track 2, environment clip 1 is inserted into sub-environment track 1 and environment clip 3 is inserted into sub-environment track n, when inserting the performance clip group, the sound clip 3 of the performance clip group will be inserted into the new sound track 2 which does not interfere with the sound track 1 and the sound clip n, or it can be inserted into the optical film clip 2 of the performance clip group at a position on the same track but without interference.
[0032] S4, check and proofread the performance equipment in the performance sequence. If the performance sequence passes the check and proofreading, generate a device control signal according to the performance sequence and transmit the device control signal to the server. Check and proofreading includes the following steps: traverse the performance sequence along the time axis to find whether there are two working states of the same device at the same time. If so, call out the performance clip where the device is located and mark the time node. If not, the performance sequence passes the check and proofreading.
[0033] refer to Figure 2 , since the performance clips are set up in segments, conflicts in the use of stage equipment may occur when they are combined as a whole. For example, in sound clip 3, speaker A is used to play the first music, and in sound clip 2, speaker A is used to play the second music in the overlapping part of the timeline with sound clip 3. At this time, speaker A is in two working states and interference will occur. The performance clip where the device is located needs to be called out and modified. Or for example, in environment segment 2, a rainmaking device is used to make artificial rain with a first power, and in environment segment 2, the rainmaking device is used to make artificial rain with a first power in the overlapping part of the timeline with environment segment 3. At this time, the rainmaking device is still in the same working state, no interference will occur, and it can pass the duplicate check and proofreading.
[0034] S5, the server saves the device control signal and transmits the device control signal to the on-site control workstation computer through the VPN tunnel; S6, the field control workstation computer uses the intelligent gateway to transmit the equipment control signal to the sub-controller; S7, the sub-controller controls the operation of the stage equipment according to the equipment control signal; S8, the sub-controller collects the performance data and equipment data of the stage equipment, and sends the performance data and equipment data to the on-site control workstation computer through the intelligent gateway; S9, the on-site control workstation computer transmits the performance data and equipment data to the server through the VPN tunnel; S10, the server stores the performance data and the equipment data.
Claims
1. A centralized control system for live performance equipment. Its characteristics are: It includes a field control workstation computer and several sub-controllers. The field control workstation computer is electrically connected to all stage equipment participating in the live performance through the sub-controllers. The field control workstation computer is connected to an arrangement controller through a server. The arrangement controller is provided with a timeline. The timeline is provided with several performance clips. The performance clips include the ID information and working status of the stage equipment. The field control workstation computer controls the stage equipment with corresponding ID information according to the timeline to execute the corresponding working status.
2. A centralized control system for live performance equipment according to claim 1, Its characteristics are: The timeline is provided with a sound track, a light and shadow track and a scene creation track; the performance clips include sound clips, light and shadow clips and scene creation clips; the sound clips are stored on the sound track; the light and shadow clips are stored on the light and shadow track; the scene creation clips are stored on the scene creation track; the stage equipment includes sound equipment, light and shadow equipment and scene creation equipment; the sound clips store the ID information and working status information of the sound equipment; the light and shadow clips store the ID information and working status information of the light and shadow equipment; the scene creation clips store the ID information and working status information of the scene creation equipment.
3. A centralized control system for live performance equipment according to claim 2, Its characteristics are: The sound clip contains at least the ID information and working status information of one sound device, the light and shadow clip contains at least the ID information and working status information of one light and shadow device, and the environment creation clip contains at least the ID information and working status information of one environment creation device.
4. A centralized control system for live performance equipment according to claim 2, Its characteristics are: The performance segment includes at least one of the sound segment, the light segment and the environment segment, or a performance segment group formed by a combination of multiple sound segments, light segments and environment segments.
5. A centralized control system for live performance equipment according to any one of claims 1 to 4, Its characteristics are: The field control workstation computer and several sub-controllers transmit data through an intelligent gateway, and the field control workstation is connected to a server through a VPN tunnel.
6. A centralized control system for live performance equipment according to any one of claims 1 to 4, Its characteristics are: The sub-controller and the intelligent gateway perform data transmission via the LORA communication protocol module.
7. A method for centralized control of live performance equipment, using the centralized control system for live performance equipment according to claim 4, Its characteristics are: The following steps are involved: S1, build a timeline on the arrangement controller, and create sound tracks, light and shadow tracks, and environment creation tracks on the timeline; S2, establishing a mapping relationship between the arrangement controller and all the stage equipment involved in the live performance, so that the arrangement controller defines the working status of the stage equipment according to the timing; S3, outputting the performance clips according to the performance script or directly inserting the existing performance clip group to obtain a performance sequence that records the working status of the equipment in the whole process; S4, performing a duplicate check and proofreading on the performance equipment in the performance sequence. If the performance sequence passes the duplicate check and proofreading, a device control signal is generated according to the performance sequence, and the device control signal is transmitted to the server.
8. A centralized control method for live performance equipment according to claim 7, Its characteristics are: The following steps are involved: S5, the server saves the device control signal and transmits the device control signal to the on-site control workstation computer through the VPN tunnel; S6, the field control workstation computer uses the intelligent gateway to transmit the equipment control signal to the sub-controller; S7, the sub-controller controls the operation of the stage equipment according to the equipment control signal; S8, the sub-controller collects the performance data and equipment data of the stage equipment, and sends the performance data and equipment data to the on-site control workstation computer through the intelligent gateway; S9, the on-site control workstation computer transmits the performance data and equipment data to the server through the VPN tunnel; S10, the server stores the performance data and the equipment data.
9. A centralized control method for live performance equipment according to claim 7, Its characteristics are: The duplicate checking and proofreading comprises the following steps: traversing the performance sequence along the time axis to find whether there is the same device in two working states at the same time; if so, calling out the performance segment where the device is located and marking the time node; if not, the performance sequence passes the duplicate checking and proofreading.
Citation Information
Cited By
An interactive performance system
TWI945628B
