Distributed low-carbon resource scheduling method and device for multi-park integrated energy system
Through cooperative game theory and improved Shapley value method, combined with ADMM algorithm, the challenges of randomness and volatility of renewable energy in multi-park integrated energy systems are solved, low-carbon economic scheduling and energy sharing are realized, and system stability is improved. User satisfaction reduces carbon emissions and operating costs.
Patent Information
- Application Number
- CN202410922799.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-08
AI Technical Summary
The existing distributed low-carbon resource scheduling technology of multi-park integrated energy systems is difficult to effectively cope with the randomness and volatility of renewable energy, resulting in system stability challenges and additional costs, and the inability to achieve resource optimization scheduling.
Adopting cooperative game theory and improved Shapley value method, combined with alternating direction multiplication method (ADMM) algorithm, a distributed low-carbon scheduling model and benefit distribution model for multi-park comprehensive energy systems is established, and resource scheduling and benefit distribution are optimized to achieve low system Carbon economy dispatch and energy sharing.
It improves the flexibility of system operation and the effect of low-carbon economic scheduling, optimizes user satisfaction and system carbon emissions, reduces system operation costs, and protects the information privacy of various parks.
Smart Images

Figure CN118917048A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of multi-park integrated energy scheduling, and in particular relates to a distributed low-carbon resource scheduling method and device for a multi-park integrated energy system. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] Optimizing the use of renewable energy is an important way to achieve energy conservation and promote a low-carbon future. With the development of multi-energy coupling technology, the park-level integrated energy system (PIES) has become an important platform for absorbing renewable energy and promoting low-carbon development with its convenient operation management and high energy utilization efficiency. However, the rapid development of renewable energy has limited the flexibility of PIES and also brought challenges to the energy supply and demand balance of a single PIES. With the development of multi-agent joint scheduling technology, energy interaction between complementary PIES has become an effective way to solve the limitations of independent scheduling of PIES.
[0004] The existing distributed low-carbon resource scheduling technology for multi-park integrated energy systems, due to the inherent randomness and volatility of renewable energy, coupled with the potential deviations of the prediction methods, will pose a challenge to maintaining system stability, resulting in additional costs and potential risks, and unable to achieve optimal resource scheduling for multi-park integrated energy systems. Summary of the invention
[0005] In order to solve at least one of the technical problems existing in the above-mentioned background technology, the present invention provides a distributed low-carbon resource scheduling method and device for a multi-park integrated energy system, which can fully tap the flexible potential of demand-side resources and design an effective collaborative optimization framework for multiple PIES to improve the flexibility of system operation and achieve the goal of low carbon.
[0006] In order to achieve the above object, the present invention adopts the following technical solution:
[0007] A first aspect of the present invention provides a distributed low-carbon resource scheduling method for a multi-park integrated energy system.
[0008] A distributed low-carbon resource scheduling method for a multi-park integrated energy system, comprising:
[0009] Determine the typical output scenarios and cooperative game theory of each park's integrated energy system, and establish a distributed low-carbon dispatch model for multi-park integrated energy systems; analyze the prediction errors of renewable energy in each park's integrated energy system, and establish a benefit distribution model;
[0010] According to the distributed low-carbon scheduling model and benefit distribution model of the multi-park integrated energy system, distributed low-carbon scheduling and benefit distribution are carried out on the resources in the multi-park integrated energy system under corresponding constraints to obtain the operation resource scheduling plan of the integrated energy system.
[0011] A second aspect of the present invention provides a distributed low-carbon resource scheduling device for a multi-park integrated energy system.
[0012] A distributed low-carbon resource scheduling device for a multi-park integrated energy system, comprising:
[0013] Model building module, which is used to determine the typical output scenarios and cooperative game theory of each park's integrated energy system, establish a distributed low-carbon scheduling model for multi-park integrated energy systems; analyze the prediction error of renewable energy in each park's integrated energy system, and establish a benefit distribution model;
[0014] The resource scheduling scheme calculation module is used to perform distributed low-carbon scheduling and benefit distribution of resources within the multi-park integrated energy system under corresponding constraints based on the distributed low-carbon scheduling model and benefit distribution model of the multi-park integrated energy system, and obtain the operating resource scheduling plan of the integrated energy system.
[0015] A third aspect of the present invention provides a computer-readable storage medium.
[0016] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps in the distributed low-carbon resource scheduling method for a multi-park integrated energy system as described above.
[0017] A fourth aspect of the present invention provides a computer device.
[0018] A computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the steps in the distributed low-carbon resource scheduling method for a multi-park integrated energy system as described above are implemented.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] A low-carbon economic dispatch model of the present invention integrates the integrated demand response (IDR) mechanism and carbon trading mechanism (CTM) in PIES, and formulates a distributed energy sharing framework for the coordinated operation of multiple PIES, while improving the benefit distribution mechanism; each PIES adopts the IDR scheme to coordinate with the CTM to give full play to the potential of demand-side flexibility and promote low-carbon economic dispatch. The optimization goal takes into account the user satisfaction loss cost, thereby reducing system carbon emissions while ensuring the energy quality of terminal loads;
[0021] This paper proposes a low-carbon economic dispatch and energy sharing model based on cooperative game to promote energy transactions among multiple PIES and improve the utilization rate of distributed renewable energy. The alternating direction multiplier method (ADMM) algorithm is used to achieve distributed optimization dispatch while protecting the information privacy of multiple PIES.
[0022] The present invention introduces an improved Shapley value method for the benefit distribution of cooperative games, which solves the limitation of the traditional Shapley value method that only relies on marginal contribution for benefit distribution. Combined with the principle of probability theory, the potential impact of renewable energy prediction errors on stakeholders is considered.
[0023] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0025] Figure 1 It is a PIES structure;
[0026] Figure 2 It is a multi-PIES energy interaction framework;
[0027] Figure 3 It is the improved principle of Shapley value method;
[0028] Figure 4 It is a schematic diagram of the tie line decoupling method;
[0029] Figure 5 is the pre- and post-IDR electrical load of PIES_A in scenario 2.3;
[0030] Figure 6 is the air load before and after IDR of PIES_A in scenario 2.3;
[0031] Figure 7 is the energy interaction between PIES in Case 3;
[0032] Figure 8 is the energy supply of PIES_A in Case 2
[0033] Fig. 9 is the energy supply of PIES_A in Case 3;
[0034] Fig.10 is a sensitivity analysis of the probability of reward intervals;
[0035] Fig.11 It is a flow chart of a distributed low-carbon resource scheduling method for a multi-park integrated energy system according to an embodiment of the present invention;
[0036] Fig.12 It is a schematic diagram of the structure of a distributed low-carbon resource scheduling device for a multi-park integrated energy system according to an embodiment of the present invention. DETAILED DESCRIPTION
[0037] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0038] It should be noted that the following detailed descriptions are all illustrative and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in this embodiment have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0039] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0040] Embodiment 1
[0041] PIES Structure:
[0042] The PIES structure in this embodiment is as follows Figure 1 As shown in the figure. The system is equipped with wind turbines (WT) and photovoltaic units (PV) to realize the main energy supply within PIES. The configuration of gas turbines (GT), power-to-gas (P2G) and electric storage devices (ES) realizes energy conversion and storage. PIES operators purchase electricity and natural gas when there is energy shortage, and sell excess renewable energy to the distribution grid.
[0043] PIES operators guide users to participate in the IDR program, aiming to make full use of the flexibility of demand-side resources. In addition, in response to the low-carbon strategy, PIES also implements a carbon trading mechanism, through which PIES operators conduct transactions with the carbon trading market, thereby further reducing system carbon emissions. The models of IDR (Integrated Demand Response) and CTM (Carbon Trading Mechanism) are introduced as follows:
[0044] IDR (Integrated Demand Response) Model:
[0045] The loads in PIES can be divided into fixed loads and flexible loads. Flexible loads can participate in IDR in the form of transfer and reduction. The relevant constraints are shown in (1):
[0046]
[0047] In the formula, are the load values before and after comprehensive demand response, are the transferable load and the reducible load values, α L , β L are the load transfer rate and load reduction rate respectively, T is the low-carbon economic dispatch period of PIES; i represents the i-th PIES; t represents the low-carbon economic dispatch time of PIES. is the total load that can be reduced in the low-carbon economic dispatch cycle of PIES.
[0048] In addition to participating in IDR in the form of load shifting and reduction mentioned above, PIES also realizes alternative energy utilization through P2G and GT. Its mathematical model is shown in (2):
[0049]
[0050] Where η GT , η P2G are the conversion efficiencies of GT and P2G, respectively, GT,t , P P2G,t are the gas consumption of GT and the power consumption of P2G, respectively. g is the calorific value of natural gas. GT,t 、f P2G,t They are respectively the gas consumption of the gas turbine and the power consumption of the power-to-gas conversion of the corresponding park-level integrated energy system within the scheduling time t.
[0051] In order to control user satisfaction within a reasonable range, the “energy satisfaction parameter” is used to reflect the degree of change in user energy consumption behavior. The specific expression of this index is shown in (3):
[0052]
[0053] US t is the energy satisfaction parameter, P t before , P t after are the electric load values before and after the comprehensive demand response, f t before 、f t after are the gas load values before and after the comprehensive demand response, respectively. The subscript t represents the low-carbon economic dispatch time of PIES.
[0054] CTM (Carbon Trading Mechanism) Model:
[0055] Carbon trading is an effective means for PIES to achieve carbon emission reduction, which is conducive to the coordinated development of the system economy and the environment. Under the current carbon trading mechanism framework, the government allocates initial carbon emission quotas to enterprises based on their carbon emissions. Subsequently, enterprises that obtain quotas need to participate in the carbon trading market based on their actual carbon emissions. This embodiment aims to establish a PIES carbon emission trading model based on this regulatory framework.
[0056] Assume that the electricity purchased by PIES from the grid in this example is generated by thermal power units, so the carbon emission sources of PIES include electricity purchased from the grid and GT. Therefore, the initial carbon emission quota calculation of carbon trading is shown in (4):
[0057]
[0058] γ GT / Grid The carbon quota coefficient for electricity purchased by GT and the upper-level power grid, is the carbon quota of GT, E is the carbon quota for purchasing electricity from the upper grid. car,quo,t is the total carbon quota of PIES, P GT,t and P buy,t are the output of GT and the amount of electricity purchased from the upper grid, respectively. The subscript t represents the low-carbon economic dispatch time of PIES.
[0059] Since P2G consumes part of the CO2 generated by PIES during operation, the carbon reduction effect of P2G needs to be further considered when calculating the actual carbon emissions of PIES. Therefore, the calculation result of the actual total carbon emissions is shown in (5):
[0060]
[0061] χ GT , χ Grid , χ P2G They are the actual carbon emission coefficients of GT, power purchase from the upper grid, and P2G. E car,act,t They are the actual carbon emissions of GT, the actual carbon emissions of purchasing electricity from the upper grid, the actual carbon emissions of P2G and the total actual carbon emissions of PIES. GT,t , P buy,t , P P2G,t They are the output of GT, the power consumption of P2G and the power purchased from the upper grid. The subscript t represents the low-carbon economic dispatch time of PIES.
[0062] When the carbon emissions actually generated by PIES are lower than the carbon quota, the excess quota can be sold to the carbon trading market. Otherwise, it is necessary to purchase carbon quotas from the carbon trading market. The trading volume of PIES in the carbon trading market is expressed as (6):
[0063] E car,tra,t =E car,act,t -E car,quo,t (6)
[0064] E car,tra,t 、E car,act,t 、E car,quo,t They are the trading volume, actual carbon emissions and carbon quota of PIES in the carbon trading market. The subscript t represents the low-carbon economic dispatch time of PIES.
[0065] Among them, (1)-(6) and the following equations (29)-(38) are the constraints of the optimization model.
[0066] according to Fig.11 The embodiment of the present invention provides a distributed low-carbon resource scheduling method for a multi-park integrated energy system, which includes:
[0067] Step 1: Determine the typical output scenarios and cooperative game theory of the integrated energy system of each park, and establish a distributed low-carbon scheduling model for the integrated energy system of multiple parks; analyze the prediction error of renewable energy in the integrated energy system of each park, and establish a benefit distribution model;
[0068] Step 2: Based on the distributed low-carbon scheduling model and benefit distribution model of the multi-park integrated energy system, the resources in the multi-park integrated energy system are distributed low-carbon scheduling and benefit distribution are carried out under corresponding constraints to obtain the operation resource scheduling plan of the integrated energy system.
[0069] In the specific implementation process, the distributed low-carbon dispatch model of the multi-park integrated energy system in step 1 is:
[0070]
[0071] Among them, min represents the minimum value; C CG is the total cost of the cooperative alliance, C tot,m is the total operating cost of the mth park-level integrated energy system participating in the cooperative game; C net,m is the energy transmission cost of energy sharing between the mth park-level integrated energy system and other park-level integrated energy systems; M is the number of park-level integrated energy systems; C ope , C IDR and C car They represent the operating cost of the corresponding park-level integrated energy system during the corresponding dispatching time, the cost of participating in the integrated demand response, and the cost / income of carbon trading; t represents the low-carbon economic dispatching time of the park-level integrated energy system; and T is the low-carbon economic dispatching cycle of the park-level integrated energy system.
[0072]
[0073] The operating costs include the operation and maintenance costs of the equipment and the transaction costs with the upper energy network, as shown below:
[0074]
[0075] In the formula, C equ,m,t , C tra,m,t are the equipment cost and energy transaction cost of the mth park-level integrated energy system in the dispatching time t; c GT 、c P2G 、c ESin and c ESout They are the cost coefficient of the gas turbine, the cost coefficient of power-to-gas, the cost coefficient of charging the power storage device, and the cost coefficient of discharging the power storage device; p e,t 、p g,t 、p esell,t are time-of-use electricity price, time-of-use gas price and inter-park energy transaction price; P GT,m,t 、f P2G,m,t are the gas consumption and power consumption of the gas turbine of the mth park-level integrated energy system within the scheduling time t; P ESin,m,t , P ESout,m,t are the charging and discharging amounts of the power storage device of the mth park-level integrated energy system within the dispatching time t; P buy,m,t , P sell,m,t 、f buy,m,t are the amount of electricity purchased from the superior power grid, the amount of electricity sold to the superior power grid, and the amount of gas purchased from the superior gas grid by the mth park-level integrated energy system within the dispatch time t; N GT,m 、N P2G,m 、N ES,m are the total number of gas turbine units, the total number of power-to-gas units, and the total number of power storage devices in the mth park-level integrated energy system; n GT,m 、n P2G,m 、n ES,m They are the nth gas turbine unit, power-to-gas unit and power storage device in the mth park-level integrated energy system respectively.
[0076] The cost of participating in IDR is the difference between the cost of energy satisfaction loss and the incentive to participate in IDR. IDR As shown in (9):
[0077]
[0078] C IDR,t , C IDR,loss,t , C IDR,inc,t are the total cost of PIES participating in IDR, the energy satisfaction loss cost of IDR and the incentive of IDR, α loss , β loss, δ inc They are load reduction cost coefficient, load transfer cost coefficient and load incentive coefficient. are the load reduction and load transfer respectively, and the subscript t represents the low-carbon economic dispatch time of PIES.
[0079] The PIES transaction volume participating in the carbon market is shown in formula (6), and the calculation of carbon emission cost is shown in (10):
[0080] C car,t =λ car E car,tra,t (10)
[0081] C car,t is the carbon trading cost of PIES, λ car is the carbon transaction cost coefficient, E car,tra,t is the carbon market trading volume of PIES, and the subscript t represents the low-carbon economic dispatch time of PIES.
[0082] PIES achieves low-carbon economic dispatch of the system through IDR and CTM, and taps into the flexibility potential on the demand side. Figure 2 As shown in the figure, energy interaction can be achieved between PIES, and the remaining renewable energy can be further utilized, thereby improving the consumption of renewable energy and optimizing energy utilization. However, it is worth noting that when exchanging information between PIES, ensuring information privacy and security is a major challenge.
[0083] The cooperative game can maximize the overall interests of the participants and reflect the potential cooperative relationship between different entities. Therefore, an energy interaction model between PIES is established based on the cooperative game, and the objective function and constraints are as follows:
[0084]
[0085] Among them, C CG is the total cost of the cooperative alliance, C tot,m is the total system operation cost of PIES m participating in the cooperative game, as shown in formula (7). net,m is the energy transmission cost for energy sharing between PIES.
[0086] In this embodiment, the transmission channel for multiple PIES energy sharing belongs to the power distribution network, and corresponding fees need to be paid according to the transmitted power. The energy transmission fee is shown in (12):
[0087]
[0088] C net,mis the energy transmission cost, T is the scheduling period, M is the total number of participants in the cooperative alliance, m and n are the integrated energy systems of the parks participating in the cooperative alliance, ξ ele is the energy transmission cost coefficient, P mn,t is the energy transfer between PIESm (the mth PIES) and PIESn (the nth PIES).
[0089] In the process of energy sharing, the limitation of network transmission power between PIES must be considered. In order to maintain the efficiency and fairness of energy trading, the energy trading price between PIES must also meet the constraints, as shown in (13):
[0090]
[0091] ξ ele,mn , mn,min , mn,max are the energy transmission cost coefficient and the lower and upper limits of the cost coefficient, respectively. mn,t , P mn,min , P mn,max It is the energy transmission amount and the lower and upper limits of the transmission amount between PIESm and PIESn.
[0092] In addition, the optimization model also needs to satisfy the constraints of each PIES internal energy network and energy equipment described in (1)-(10).
[0093] In the specific implementation process, the construction process of the benefit distribution model in step 1 is:
[0094] In the above model, the design of the benefit redistribution mechanism is the key to developing a stable cooperative relationship and encouraging participants to actively cooperate. The Shapley value method distributes benefits based on the marginal contribution rate of alliance members to the alliance. The specific distribution formula is shown in (14):
[0095]
[0096] Among them, E m It is PIES m The redistribution benefit, W m It is PIES m The weight of the benefits that should be shared, n is the number of PIES participating in the cooperative alliance, s is the number of PIES in alliance S, v(s) is the additional profit of alliance S, and v(s / m) is the additional profit of alliance S without PIESm.
[0097] The traditional Shapley value method mainly considers the marginal economic contribution of alliance participants, ignoring the impact of unstable and uncertain factors on optimal scheduling. In the cooperative game optimization between multiple PIES, the wide access and complementarity of renewable energy promotes interactive energy sharing. However, in the cooperative game, the prediction error of a single PIES will have an adverse impact on the real-time scheduling of other PIES, so it is necessary to consider and define the responsibility for such impact. Therefore, this embodiment proposes an improved Shapley value method that considers RES uncertainty, such as Figure 3 shown.
[0098] The Shapley value in this embodiment is improved based on the probability density function (PDF) of the RES prediction error. The calculation of the prediction error is shown in (15). Assume that the PDF of the RES prediction error is known to be f(e res ). According to probability theory, the probability of a negative or positive prediction error can be calculated, and the corresponding positive and negative prediction error intervals are and As shown in (16):
[0099]
[0100] e res is the RES prediction error, P pre (t), P act (t) is the predicted value and actual value of RES, f(e res ) is the prediction error probability density function of RES, is the probability of negative and positive prediction errors.
[0101] In addition, from e res = 0, as the positive error increases, It will be divided into positive reward, no correction, and penalty intervals according to probability.
[0102] The prediction error values corresponding to each interval are shown in (17). As the negative error increases, the interval division method is also the same.
[0103]
[0104] are the interval probabilities of the punishment, no correction, and reward intervals, respectively. is the prediction error value divided into each interval, It is the punishment, no correction, and reward range.
[0105] Stakeholders may receive corresponding rewards or penalties, so the accuracy of renewable energy system prediction is directly related to the benefit distribution of each PIES. Considering the prediction error value of each interval, in order to quantify the improved benefit distribution results, a correction coefficient corresponding to the RES prediction error in each optimization scheduling cycle is defined. On this basis, the correction coefficient k is divided into two categories according to positive and negative, and the relative reward and penalty correction coefficients of each subject in the day-ahead optimization scheduling cycle are calculated respectively, as shown in (18):
[0106]
[0107] ζ re,m , pu,m They are all relative reward and punishment correction coefficients. are the correction coefficients for the distribution of benefits in the penalty / uncorrected / reward intervals, T is the scheduling period, and M is the number of participants in the cooperative alliance.
[0108] Based on this, the benefits finally distributed by each PIES under the improved benefit distribution mechanism are shown in formula (19):
[0109] E m,proved =E m +ζ m E
[0110] =E m +0.5(1 / M-ζ re,m )E+0.5(ζ pu,m -1 / M)E (19)
[0111] In the formula, E m,proved 、E m , E are the benefit allocation result of the improved Shapley value method of the m-th park-level integrated energy system, the allocation result of the basic Shapley value method of the m-th park-level integrated energy system and the total benefit to be allocated; ζ re,m , pu,m All are relative reward and punishment correction coefficients; F m is the benefit of independent scheduling of the mth park-level integrated energy system; M is the number of park-level integrated energy systems.
[0112] It should be noted that the improved benefit distribution mechanism needs to meet the judgment conditions of multi-agent benefit redistribution, as shown in formula (20):
[0113]
[0114] Among them, F m It is PIES mThe benefits of independent scheduling. The benefits obtained by each stakeholder in the cooperative alliance should be higher than the benefits of independent scheduling. Regardless of whether the improved benefit distribution mechanism is adopted, the sum of the benefits redistributed by each entity should be equal to the sum of the total benefits of the cooperative alliance.
[0115] In the specific implementation process, the distributed low-carbon scheduling and benefit distribution of resources in the multi-park integrated energy system under the corresponding constraints in step 2 are carried out to obtain the operation resource scheduling plan of the integrated energy system as follows:
[0116] In order to avoid the risk of information privacy leakage caused by centralized algorithms when solving multi-agent collaborative optimization problems, this embodiment uses the ADMM algorithm to decouple multiple agents and solve the optimization problem through iterative interaction. This embodiment introduces the decoupling mechanism of the system and the distributed optimization model based on the ADMM algorithm.
[0117] Due to the limitation of privacy protection, each PIES is an independent interest entity and no longer shares information such as local network architecture, unit equipment operation, load characteristics, and scheduling schemes. Therefore, it is necessary to establish a distributed optimization scheduling strategy based on boundary coupling information to achieve multi-PIES optimization scheduling.
[0118] like Figure 4 As shown, only PIES participating in the cooperative game m and PIES n Take the branch decomposition method as an example for analysis. The branch decomposition method adds virtual nodes to the interconnected coupling lines, thereby increasing the nodes and branches of the system. When the two interaction regions are optimized independently, the phase angle consistency constraints of the two virtual nodes and the power consistency constraints of the two lines must be met, as shown in (21):
[0119]
[0120] are the phase angle value of the virtual coupling node in park m and the electric power of the boundary coupling line in park m, respectively. The superscript n is park n, the nth PIES; the subscript t is the time in the scheduling cycle.
[0121] The general form of the optimization model can be expressed as (22). Its enhanced Lagrangian function can be written as (23). Its update iterative form is shown in (24). In the distributed solution, in order to ensure the consistency of the boundary decoupling variables during the iterative update process, the calculation process of ADMM also needs to meet the accuracy requirements of the original residual and the dual residual. According to this iterative process, the convergence criterion is shown in (25):
[0122]
[0123] In the formula, x and z are optimization variables, f(x) and g(z) are convex functions of variables x and z respectively, y is the Lagrange multiplier, ρ is the penalty coefficient and ρ>0, θ k+1 are the original residual and the dual residual, ε pri ,ε dual is the upper limit of convergence of the primal residual and the dual residual.
[0124] Combined with the above grid decoupling consistency constraints, the objective function of PIESm can be expressed as (26). The Lagrange multiplier update formula is shown in (27):
[0125]
[0126]
[0127] In the formula, C equ,m,t , C trade,m,t , C share,m,t are the equipment cost, energy transaction cost, and energy sharing cost of park m, respectively. y is the Lagrange multiplier and ρ is the penalty coefficient. They are the phase angle value of the PIESm virtual coupling node and the electric power of the PIESm boundary coupling line. k is the Lagrange multiplier of the kth iteration, They are respectively the virtual coupling node phase angle value of the k+1th iteration of park m and the boundary coupling line electric power of the k+1th iteration of park m.
[0128] In addition to the constraints in formulas (1)-(6) and (13), the constraints of the distributed optimization scheduling model also include constraints on the power grid and natural gas network, constraints on participating in upper-level energy network transactions, and constraints on energy storage equipment.
[0129] The constraints of the power grid include (28)-(30). The power balance constraint is (28). Formula (29) is the DC power flow equation of the power grid. Formula (30) is the upper and lower power limit constraints and the upper and lower phase angle limit constraints.
[0130]
[0131] Where P WT , P PV , P GT , P buy , P sell , P mn , P after , P ij , P P2G , P ES,in , P ES,outThey are wind power, photovoltaic power, GT power, power purchase power, power sales power, inter-park transaction power, power load after demand response, line power, P2G power consumption, energy storage charging power, and energy storage discharging power.
[0132]
[0133] Where P ij is the line power, x ij is the line reactance, θ i is the node phase angle.
[0134] The natural gas network constraints include (31)-(34). The gas network node flow balance is shown in formula (31):
[0135]
[0136] In the formula, f P2G 、f buy 、f after 、f GT They are P2G gas production, gas purchase volume, gas load after demand response, and gas turbine gas consumption.
[0137] The Weymouth equation is usually used in the modeling of the steady-state model of the natural gas network. The Weymouth equation, node pressure and pipeline flow upper and lower limit constraints are shown in (32):
[0138]
[0139] Where k is a constant related to the pipe length, inner diameter and operating temperature. The specific expression of k is shown in the above formula. line,mn is the natural gas flow rate of the natural gas pipeline mn, sgn(π m ,π n ) is the sign function, π m , π n is the air pressure value of node m and node n, D mn is the diameter of the pipe mn, Δx mn is the length of the pipe mn, F mn is the friction coefficient of the pipeline mn, R is the natural gas specific constant; T is the natural gas temperature; Z is the natural gas compression coefficient; ρ0 is the natural gas density under standard conditions; π m,min , π m,max is the lower and upper limits of the air pressure at node m, f mn,min 、f mn,max It is the lower limit and upper limit of pipeline mn gas flow rate.
[0140] The convergence guarantee of ADMM depends on the convexity of the model, but the pipeline flow equation is a non-convex nonlinear equation. This embodiment uses the second-order cone relaxation method to transform the pipeline flow constraint. First, ppm / ppn and Mmn are introduced to represent the square of the gas pressure at nodes m and n and the square of the pipeline mn pressure. The simplified expression is as follows:
[0141]
[0142] In addition, the first formula in formula (33) is subjected to second-order cone relaxation, as shown in the first formula in (34), and the fourth formula in (33) is transformed into the second to fifth formulas in inequality (34) using the McCormick method. The model transformation is shown in (34):
[0143]
[0144] In the formula, pp m ,pp n and M mn to represent the square of the gas pressure at nodes m and n and the square of the pressure at pipeline mn, a / b is a 0-1 variable, k is a constant related to the pipeline length, inner diameter and operating temperature; f line,mn is the pipeline natural gas flow rate, π m is the node pressure.
[0145] Energy interaction constraints:
[0146] In order to ensure the safe and reliable operation of the system, it is necessary to limit the transmission power between PIES and the upper energy network, as shown in formula (35):
[0147]
[0148] Where P buy,max , P sell,max is the upper limit of power purchase and power sales, f buy,max is the upper limit of gas purchase, P mn,max This is the upper limit for energy trading between parks.
[0149] ES constraints include energy storage balance constraints, upper and lower limit constraints of charge and discharge power, and energy storage capacity constraints, as shown in formula (36):
[0150]
[0151] P ESin,max , P ESout,max is the maximum charging power and maximum discharging power of ES, P ESin,min , P ESout,min is the minimum charging power and minimum discharging power of ES, S ES,max , SES,min is the upper limit of ES storage capacity and the lower limit of energy storage capacity, S ES (0), S ES (T) is the initial and final value of ES energy storage capacity within the dispatch period; Δt is the time difference between adjacent dispatches within the dispatch period.
[0152] Coupled device constraints:
[0153] Formula (37) represents the upper and lower output constraints of GT and P2G units and the unit output climbing constraints:
[0154]
[0155] Where P GT,max , P GT,min is the upper and lower limits of GT output, r GT,up 、r GT,down is the maximum upward climbing rate and the maximum downward climbing rate of GT, P P2G,max , P P2G,min is the upper and lower limits of P2G output, r P2G,up 、r P2G,down It is the maximum upward climbing rate and the maximum downward climbing rate of P2G.
[0156] At this point, a distributed optimization scheduling model based on cooperative game has been established, which can realize multi-PIES energy sharing, and an improved Shapley value method considering PIES renewable energy prediction error is proposed for the benefit distribution among multiple subjects. In order to verify the effectiveness of the above work, a case study was conducted.
[0157] Considering the differences of each PIES in actual application, this embodiment selects three PIES: residential area PIES_A, commercial area PIES_B and industrial area PIES_C. Each PIES purchases electricity and natural gas from the upper energy network according to the usage time price. The surplus electricity of PIES can be sold to the upper distribution network at a lower price. The system operates on a day cycle and one hour as the scheduling time interval.
[0158] Table I Case settings
[0159]
[0160] As shown in Table I, in order to analyze the rationality and effectiveness of the model proposed in this embodiment, the role of IDR and CTM in synergistically promoting the development of the system's low-carbon economy is analyzed by comparing Case 1 and Case 2; the improvement and enhancement of energy utilization and economic benefits by multi-PIES energy sharing based on cooperative game is analyzed by comparing Case 2 and Case 3; Case 3 and Case 4 are set up to verify the feasibility and effectiveness of the improved Shapley value benefit allocation mechanism considering renewable energy prediction errors proposed in this embodiment.
[0161] To verify the collaborative optimization effect of IDR and CTM on PIES low-carbon economic dispatch, Case 2 simulates the following three scenarios:
[0162] Scenario 2.1: PIES operation considering CTM but not IDR;
[0163] Scenario 2.2: PIES operation with IDR but without CTM;
[0164] Scenario 2.3: PIES operation considering IDR and CTM.
[0165] Take PIES_A as an example to analyze the following calculation results:
[0166] Cost and carbon emission analysis:
[0167] Table II Comparison of PIES_A system operation results under different conditions
[0168]
[0169] As shown in Table II, the total operating cost and carbon emissions of scenario 2.1 without considering CTM and IDR are higher. Compared with case 1, scenario 2.1 considers the system's participation in CTM. Due to participation in the carbon trading market, the total system operating cost is slightly higher by 9.30%, but the carbon emissions are reduced by 24.54%, indicating that the system's participation in CTM can reduce the system's carbon emissions, but some additional system operating costs need to be paid. Compared with case 1, scenario 2.2 considers the system's participation in IDR. Due to the full exploitation of the system's demand-side flexible resources through IDR, the total operating cost is reduced by 23.66%, and the carbon emissions are reduced by 14.06%. It can be seen that the system's participation in IDR not only optimizes the system's energy consumption and reduces the system's cost, but also reduces the system's carbon emission intensity to a certain extent.
[0170] Compared with scenario 1, scenario 2.3 considers the system's participation in CTM and IDR at the same time, verifies the synergistic optimization effect of CTM and IDR on the system, and reduces the total system operating cost by 15.89% and carbon emissions by 37.74%. Compared with considering only CTM, considering IDR can further reduce the total system operating cost and carbon emissions, thus verifying the effectiveness of PIES's participation in CTM and IDR synergistic optimization scheduling.
[0171] Comprehensive demand response analysis:
[0172] Figure 5 and Figure 6 The electric load and gas load curves of PIES_A before and after participating in IDR in scenario 2.3 are shown. Compared with not participating in IDR, the electric load participating in IDR has significant load changes in the two time periods of 7:00-13:00 and 19:00-22:00. Due to the sufficient photovoltaic output of PIES_A, the electric load can be transferred to the 7:00-13:00 period, which improves the system's ability to absorb renewable energy, reduces the cost of purchasing electricity, and achieves the effect of reducing PIES_A's overall carbon emissions. In the period of 19:00-22:00, due to the lack of photovoltaic output, the load is transferred and shifted. Compared with not participating in IDR, the gas load of PIES_A reduces the gas load cost by shifting and reducing the load. Under the effect of time-of-use gas prices, the gas load in the peak period is transferred to the valley period, realizing the load peak shaving and valley filling, reducing the system's energy purchase cost while reducing the peak-valley difference.
[0173] The participation of electric load and gas load in IDR can fully tap the flexible scheduling capability of demand-side load. While smoothing the system energy consumption curve, it can flexibly adjust the energy consumption curve according to the energy supply situation of the system in different time periods and the energy price of the upper energy network. While reducing the system energy consumption cost, it can also reduce dependence on upper-level high-carbon energy, thereby reducing the system's carbon emissions.
[0174] Cost and carbon emission analysis:
[0175] In order to analyze the situation in which each PIES further optimizes the low-carbon economic dispatch by participating in the cooperative game, Table III intuitively compares the dispatch results of each PIES before and after participating in the cooperative game, and takes the reduction of the total system operation cost brought by the cooperative game as an additional benefit redistribution.
[0176] Table III Comparison of PIES operation results before and after cooperative game
[0177]
[0178] As shown in Table III, compared with independent operation, after participating in cooperative games and using traditional Shapley values for benefit distribution, the total operating costs of each PIES were reduced by 30.25%, 17.41%, and 54.55%, respectively, and the carbon emissions of each PIES were reduced by 43.95%, 42.37%, and 2.39%, respectively. This is because energy sharing between PIES realizes energy interaction between entities, reduces dependence on the upper-level high-carbon energy network, and further absorbs the distributed renewable energy of each PIES. Therefore, energy sharing achieved through cooperative games improves the performance of the system in terms of economy and low carbon. The effectiveness of the energy trading mechanism proposed in this embodiment has also been verified.
[0179] Energy interaction analysis between PIES:
[0180] In order to further analyze the optimization results of the centralized algorithm and the distributed algorithm, the following two scenarios are set up in Case 3:
[0181] Scenario 3.1: Centralized Algorithms for Solving Optimization Problems
[0182] Scenario 3.2: ADMM distributed algorithm is used to solve optimization problems
[0183] Figure 7 The centralized algorithm and the distributed algorithm are compared to solve the PIES tie line interaction power. Figure 7 It can be seen that the results of the interconnection power using the distributed algorithm are basically consistent with those of the centralized algorithm. Further analysis of the energy interaction between PIES is as follows:
[0184] like Figure 7 As shown in , when the transmission power of the PIES_A-PIES_B tie line is positive, it means that the energy in the figure is transferred from PIES_A to PIES_B. Figure 7As shown in the figure, PIES_C transmits energy to PIES_A and PIES_B during the periods of 1:00-8:00 and 18:00-24:00, and PIES_A and PIES_B transmit energy to PIES_C during the period of 9:00-17:00. The reason why PIES_A and PIES_B receive electricity from PIES_C at night and supply electricity to PIES_C during the day is that the distributed photovoltaics in PIES_A and PIES_B only generate electricity during the day, and need to obtain electricity from the upper energy grid or other PIES at night to meet the load demand, while PIES_C has abundant wind power resources at night and transmits the remaining renewable energy to other PIES, thereby reducing the purchase of electricity from the upper energy grid by PIES_A and PIES_B, and increasing the renewable energy consumption of PIES_C. During the day, PIES_A and PIES_B simultaneously transmit excess photovoltaic output to PIES_C to meet the load demand that cannot be met by the wind power output of PIES_C.
[0185] System equipment output analysis:
[0186] In addition, taking PIES_A as an example, the system energy supply conditions under Case 2 and Case 3 are compared and analyzed. Figure 8 and Fig. 9 As shown. In Case 2, during the period of 8:00-17:00, the output of renewable energy is relatively high, and there are three ways to consume excess electricity: converting it into natural gas to supply gas load demand through P2G equipment, selling it to the upper energy grid at a low price, or storing it through energy storage equipment. During the periods of 1:00-5:00 and 19:00-24:00, renewable energy is in short supply, and PIES_A mainly meets the demand for electricity load through GT, purchasing electricity from the upper energy grid, and discharging energy storage equipment. Compared with independent operation, in Case 3, PIES_A can optimize the internal power configuration by sharing electricity with other PIES, transmit surplus electricity to other PIES, and receive electricity transmitted by other PIES when there is a shortage of electricity, so that PIES_A can reduce the amount of electricity purchased while meeting the internal load demand.
[0187] From the above analysis, it can be seen that the cooperative game between PIES realizes the optimal configuration of distributed renewable energy within PIES, which not only improves the economic efficiency of the overall cooperative alliance and the operation of each PIES system, but also optimizes the output of coupling equipment, reduces the energy transaction between PIES and the upper energy network, and further reduces the carbon emissions of the system.
[0188] When PIES participates in a cooperative alliance, since this embodiment takes the minimization of the total system operating cost as the objective function of system optimization scheduling, the sum of the costs reduced by each PIES due to participating in the cooperative game is the income of the joint operation of multiple PIES. The income redistribution problem of the cooperative game is to redistribute the sum of the reduced costs. The costs and benefits of each alliance under various cooperation schemes are shown in Table IV.
[0189] Table IV Comparison of operating costs and additional benefits of different cooperative alliances
[0190]
[0191] In order to analyze the effectiveness and feasibility of the improved Shapley value method proposed in this embodiment, the traditional Shapley value and the improved Shapley value are used to redistribute the alliance benefits. Combined with the actual RES historical data, the parameter distribution of the RES prediction error obeys the normal distribution, with a mean of 0 and a standard deviation of 10% of the predicted value. The feasibility and effectiveness of the improved mechanism are reflected through example analysis, and the benefit distribution is analyzed as follows:
[0192] Benefit distribution analysis:
[0193] In order to compare and analyze the profit distribution of the two methods, the reward coefficient and penalty coefficient are set to 0.1 and -0.1, the probability of positive and negative reward intervals and positive and negative uncorrected intervals is set to 0.15, and the probability of positive and negative penalty intervals is set to 0.2. The profit distribution results of the two methods are shown in Table V.
[0194] Table V Comparative analysis of benefit distribution results under different methods
[0195]
[0196] The traditional Shapley value method does not consider the RES prediction error level of each participant, and the profit distribution of each PIES is determined only by the marginal contribution rate in energy sharing. The specific distribution results are shown in Table V. According to the distribution results calculated by the traditional Shapley value, compared with before redistribution, the operating cost of PIES_A increased by 10.63%, the operating cost of PIES_B increased by 36.99%, and the operating cost of PIES_C decreased by 44.30%. This shows that the traditional Shapley value method can achieve benefit distribution according to the degree of energy sharing contribution of each PIES. PIES_C mainly plays a supply role in the alliance, so its operating cost is reduced. PIES_A and PIES_B mainly obtain energy from other PIES, so their operating costs increase. However, compared with the independent operation of each PIES, the operating costs of PIES_A, PIES_B and PIES_C are reduced by 30.25%, 17.41% and 54.55% respectively. This shows that in the cooperative game, both energy suppliers and energy demanders have reduced their operating costs compared with independent operation, which also meets the prerequisite for the normal operation of the cooperative alliance.
[0197] When distributing benefits according to the improved Shapley value, the RES prediction level of each PIES in the optimized scheduling is considered, and the specific distribution results are shown in Table V. Compared with the traditional Shapley value method, under the improved Shapley value method, the operating cost of PIES_A increased by 1381.32 yuan, the operating cost of PIES_B decreased by 1634.24 yuan, and the operating cost of PIES_C increased by 257.92 yuan. The reason is that considering the reward and punishment coefficients corresponding to the prediction errors of each PIES at each scheduling time, the relative values of the reward and punishment coefficients of each PIES are calculated respectively, and the final improvement coefficients are 0.0687, -0.0813 and 0.0126 respectively after comprehensive analysis. PIES_A and PIES_C are punished by the alliance to varying degrees due to their relatively low prediction accuracy. PIES_B is rewarded by the alliance because its prediction accuracy is relatively higher than that of PIES_A and PIES_C. Although each PIES will be rewarded or punished for prediction errors, the operating costs are reduced compared with the independent operation of each PIES.
[0198] In summary, both methods achieve effective benefit distribution in cooperative games. The improved Shapley value method changes the benefit distribution results according to the prediction accuracy of each participant, making the benefit distribution results more fair and reasonable, which is conducive to maintaining the stability of the cooperative alliance.
[0199] Improved sensitivity analysis of Shapley value method:
[0200] In order to further verify the effectiveness and sensitivity of the proposed improved Shapley value method, the results of benefit redistribution using the improved mechanism and the changing trends of the corresponding parameters are analyzed respectively. In the following analysis, the change in benefit distribution for a given PIES is the change in the operating cost after the improved Shapley value allocation compared with the operating cost after the traditional Shapley value allocation.
[0201] like Fig.10 As shown, when The change in benefit distribution for each PIES when the value increases from 0.2 to 0.8 in increments of 0.05. Fig.10 It can be seen that when When , the result of benefit distribution fluctuates as its value increases. When , the operating costs of PIES_A and PIES_C increase compared with the traditional Shapley value allocation, while the operating costs of PIES_B decrease compared with the traditional Shapley value allocation, and their overall fluctuation range is within (-2000 yuan, 1500 yuan).
[0202] In summary, in the improved benefit distribution mechanism, as the probability of the reward interval or the penalty interval changes, the change in the benefit distribution of each PIES fluctuates, but the fluctuation range remains within a controllable range, and there will be no excessive reward or punishment. It can be seen that as the interval probability changes, the rewards and punishments of each PIES will also change, because in the improved
[0203]
[0204] Under the Shapley value method, the prediction error of each PIES and the relativity of the errors of different PIES in the alliance are taken into account. Therefore, when each PIES engages in cooperative games and uses the improved Shapley value to distribute benefits, the probability of being rewarded or punished needs to be determined based on the prediction error of RES and the operating preferences of each PIES. Different risk preferences will lead to different reward and punishment results, thus forming a cooperative alliance with different benefit redistribution characteristics.
[0205] Embodiment 2
[0206] like Fig.12 As shown, this embodiment provides a distributed low-carbon resource scheduling device for a multi-park integrated energy system, which includes:
[0207] Model building module, which is used to determine the typical output scenarios and cooperative game theory of each park's integrated energy system, establish a distributed low-carbon scheduling model for multi-park integrated energy systems; analyze the prediction error of renewable energy in each park's integrated energy system, and establish a benefit distribution model;
[0208] The resource scheduling scheme calculation module is used to perform distributed low-carbon scheduling and benefit distribution of resources within the multi-park integrated energy system under corresponding constraints based on the distributed low-carbon scheduling model and benefit distribution model of the multi-park integrated energy system, and obtain the operating resource scheduling plan of the integrated energy system.
[0209] In this embodiment, the distributed low-carbon scheduling model of the multi-park integrated energy system is:
[0210]
[0211] Among them, min represents the minimum value; C CG is the total cost of the cooperative alliance, C tot,m is the total operating cost of the mth park-level integrated energy system participating in the cooperative game; C net,m is the energy transmission cost of energy sharing between the mth park-level integrated energy system and other park-level integrated energy systems; M is the number of park-level integrated energy systems; C ope , C IDR and C car They respectively represent the operating cost of the corresponding park-level integrated energy system during the corresponding scheduling time, the cost of participating in the comprehensive demand response, and the cost / income of carbon trading; t represents the low-carbon economic scheduling time of the park-level integrated energy system; T is the low-carbon economic scheduling cycle of the park-level integrated energy system.
[0212] Among them, the operating cost C of the mth park-level integrated energy system within the dispatch time t is ope,m,t The calculation formula is:
[0213]
[0214] In the formula, C equ,m,t , C tra,m,t are the equipment cost and energy transaction cost of the mth park-level integrated energy system in the dispatching time t; c GT 、c P2G 、c ESin and c ESout They are the cost coefficient of the gas turbine, the cost coefficient of power-to-gas, the cost coefficient of charging the power storage device, and the cost coefficient of discharging the power storage device; p e,t 、p g,t 、p esell,t are time-of-use electricity price, time-of-use gas price and inter-park energy transaction price; P GT,m,t 、f P2G,m,t are the gas consumption and power consumption of the gas turbine of the mth park-level integrated energy system within the scheduling time t; P ESin,m,t , P ESout,m,tare the charging and discharging amounts of the power storage device of the mth park-level integrated energy system within the dispatching time t; P buy,m,t , P sell,m,t 、f buy,m,t are the amount of electricity purchased from the superior power grid, the amount of electricity sold to the superior power grid, and the amount of gas purchased from the superior gas grid by the mth park-level integrated energy system within the dispatch time t; N GT,m 、N P2G,m 、N ES,m are the total number of gas turbine units, the total number of power-to-gas units, and the total number of power storage devices in the mth park-level integrated energy system; n GT,m 、n P2G,m 、n ES,m They are the nth gas turbine unit, power-to-gas unit and power storage device in the mth park-level integrated energy system respectively.
[0215] The profit distribution model is:
[0216] E m,proved =E m +ζ m E
[0217] =E m +0.5(1 / M-ζ re,m )E+0.5(ζ pu,m -1 / M)E
[0218]
[0219] In the formula, E m,proved 、E m , E are the benefit allocation result of the improved Shapley value method of the m-th park-level integrated energy system, the allocation result of the basic Shapley value method of the m-th park-level integrated energy system and the total benefit to be allocated; ζ re,m , pu,m All are relative reward and punishment correction coefficients; F m is the benefit of independent scheduling of the mth park-level integrated energy system; M is the number of park-level integrated energy systems.
[0220] In the specific implementation process, the constraints include:
[0221] Load value constraints before and after comprehensive demand response
[0222] The carbon quota constraint condition is: when the actual carbon emissions generated by the park-level integrated energy system are lower than the carbon quota, the excess carbon quota is sold to the carbon trading market; otherwise, the carbon quota is purchased from the carbon trading market;
[0223] Network transmission power constraints between park-level integrated energy systems;
[0224] Energy transaction price constraints between park-level integrated energy systems;
[0225] Constraints on the electricity and gas networks;
[0226] Constraints for participating in upper-level energy network transactions;
[0227] Constraints of energy storage devices.
[0228] It should be noted here that the various modules in this embodiment correspond one-to-one to the various steps in Example 1, and the specific implementation process is the same, which will not be described in detail here.
[0229] Embodiment 3
[0230] This embodiment provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps in the distributed low-carbon resource scheduling method for a multi-park integrated energy system as described above.
[0231] Embodiment 4
[0232] This embodiment provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the steps in the distributed low-carbon resource scheduling method for a multi-park integrated energy system as described above are implemented.
[0233] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of hardware embodiments, software embodiments, or embodiments combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage and optical storage, etc.) containing computer-usable program code.
[0234] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0235] A person skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. The storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc.
[0236] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A distributed low-carbon resource scheduling method for a multi-park integrated energy system, characterized in that: include: Determine the typical output scenarios and cooperative game theory of each park's integrated energy system, and establish a distributed low-carbon scheduling model for multi-park integrated energy systems; Analyze the forecast errors of renewable energy in each park's integrated energy system and establish a benefit distribution model; According to the distributed low-carbon scheduling model and benefit distribution model of the multi-park integrated energy system, distributed low-carbon scheduling and benefit distribution are carried out on the resources in the multi-park integrated energy system under corresponding constraints to obtain the operation resource scheduling plan of the integrated energy system.
2. The distributed low-carbon resource scheduling method for a multi-park integrated energy system according to claim 1, characterized in that: The distributed low-carbon dispatch model of multi-park integrated energy system is: Among them, min represents the minimum value; C CG is the total cost of the cooperative alliance, C tot,m is the total operating cost of the mth park-level integrated energy system participating in the cooperative game; C net,m is the energy transmission cost of energy sharing between the mth park-level integrated energy system and other park-level integrated energy systems; M is the number of park-level integrated energy systems; C ope , C IDR and C car They respectively represent the operating cost of the corresponding park-level integrated energy system during the corresponding scheduling time, the cost of participating in the comprehensive demand response, and the cost / income of carbon trading; t represents the low-carbon economic scheduling time of the park-level integrated energy system; T is the low-carbon economic scheduling cycle of the park-level integrated energy system.
3. The distributed low-carbon resource scheduling method for a multi-park integrated energy system according to claim 2, characterized in that: The operating cost C of the mth park-level integrated energy system in the dispatch time t ope,m,t The calculation formula is: In the formula, C equ,m,t , C tra,m,t are the equipment cost and energy transaction cost of the mth park-level integrated energy system in the dispatching time t; c GT 、c P2G 、c ESin and c ESout They are the cost coefficient of the gas turbine, the cost coefficient of power-to-gas, the cost coefficient of charging the power storage device, and the cost coefficient of discharging the power storage device; p e,t 、p g,t 、p esell,t are time-of-use electricity price, time-of-use gas price and inter-park energy transaction price; P GT,m,t 、f P2G,m,t are the gas consumption and power consumption of the gas turbine of the mth park-level integrated energy system within the scheduling time t; P ESin,m,t , P ESout,m,t are the charging and discharging amounts of the power storage device of the mth park-level integrated energy system within the dispatching time t; P buy,m,t , P sell,m,t 、f buy,m,t are the amount of electricity purchased from the superior power grid, the amount of electricity sold to the superior power grid, and the amount of gas purchased from the superior gas grid by the mth park-level integrated energy system within the dispatch time t; N GT,m 、N P2G,m 、N ES,m are the total number of gas turbine units, the total number of power-to-gas units, and the total number of power storage devices in the mth park-level integrated energy system; n GT,m 、n P2G,m 、n ES,m They are the nth gas turbine unit, power-to-gas unit and power storage device in the mth park-level integrated energy system respectively.
4. The distributed low-carbon resource scheduling method for a multi-park integrated energy system according to claim 1, characterized in that: The profit distribution model is: AND m,proved =And m +ζ m AND =E m +0.5(1 / M-ζ re,m )E+0.5(ζ pu,m -1 / M)E In the formula, E m,proved 、E m , E are the benefit allocation result of the improved Shapley value method of the m-th park-level integrated energy system, the allocation result of the basic Shapley value method of the m-th park-level integrated energy system and the total benefit to be allocated; ζ re,m , pu,m All are relative reward and punishment correction coefficients; F m is the benefit of independent scheduling of the mth park-level integrated energy system; M is the number of park-level integrated energy systems.
5. The distributed low-carbon resource scheduling method for a multi-park integrated energy system according to claim 1, characterized in that: The constraints include: Load value constraints before and after comprehensive demand response The carbon quota constraint condition is: when the actual carbon emissions generated by the park-level integrated energy system are lower than the carbon quota, the excess carbon quota is sold to the carbon trading market; otherwise, the carbon quota is purchased from the carbon trading market; Network transmission power constraints between park-level integrated energy systems; Energy transaction price constraints between park-level integrated energy systems; Constraints on the electricity and gas networks; Constraints for participating in upper-level energy network transactions; Constraints of energy storage devices.
6. A distributed low-carbon resource scheduling device for a multi-park integrated energy system, characterized in that: include: Model building module, which is used to determine the typical output scenarios and cooperative game theory of each park's integrated energy system, and establish a distributed low-carbon scheduling model for multi-park integrated energy systems; Analyze the forecast errors of renewable energy in each park's integrated energy system and establish a benefit distribution model; The resource scheduling scheme calculation module is used to perform distributed low-carbon scheduling and benefit distribution of resources within the multi-park integrated energy system under corresponding constraints based on the distributed low-carbon scheduling model and benefit distribution model of the multi-park integrated energy system, and obtain the operating resource scheduling plan of the integrated energy system.
7. The distributed low-carbon resource scheduling device for a multi-park integrated energy system according to claim 6, characterized in that: The distributed low-carbon dispatch model of multi-park integrated energy system is: Among them, min represents the minimum value; C CG is the total cost of the cooperative alliance, C tot,m is the total operating cost of the mth park-level integrated energy system participating in the cooperative game; C net,m is the energy transmission cost of energy sharing between the mth park-level integrated energy system and other park-level integrated energy systems; M is the number of park-level integrated energy systems; C ope , C IDR and C car They respectively represent the operating cost of the corresponding park-level integrated energy system during the corresponding scheduling time, the cost of participating in the comprehensive demand response, and the cost / income of carbon trading; t represents the low-carbon economic scheduling time of the park-level integrated energy system; T is the low-carbon economic scheduling cycle of the park-level integrated energy system.
8. The distributed low-carbon resource scheduling device for a multi-park integrated energy system according to claim 6, characterized in that: The profit distribution model is: AND m,proved =And m +ζ m AND =E m +0.5(1 / M-ζ re,m )E+0.5(ζ pu,m -1 / M)E In the formula, E m,proved 、E m , E are the benefit allocation result of the improved Shapley value method of the m-th park-level integrated energy system, the allocation result of the basic Shapley value method of the m-th park-level integrated energy system and the total benefit to be allocated; ζ re,m , pu,m All are relative reward and punishment correction coefficients; F m is the benefit of independent scheduling of the mth park-level integrated energy system; M is the number of park-level integrated energy systems.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps in the distributed low-carbon resource scheduling method for a multi-park integrated energy system as described in any one of claims 1-5 are implemented.
10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, it implements the steps in the distributed low-carbon resource scheduling method for a multi-park integrated energy system as described in any one of claims 1-5.
Citation Information
Cited By
Park multi-energy resource scheduling method, system, equipment and medium
CN120069462A
