Method for monitoring, predicting and early warning various disasters
Through geographic information system and hydrodynamic numerical analysis, a hydrodynamic model was established to conduct disaster warnings, which solved the problem of insufficient monitoring accuracy and timeliness in the existing technology, achieved accurate forecast and early warning for floods, droughts and other disasters, and improved the Disaster prevention and mitigation capabilities.
Patent Information
- Application Number
- CN202410935758.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-11-08
AI Technical Summary
The existing technology has problems such as low monitoring accuracy and insufficient timeliness in the monitoring and early warning of disasters such as floods, droughts, landslides, mudslides and avalanches, resulting in insufficient warning time or delayed information release, and timely preventive measures cannot be taken.
Using the Geographic Information System (GIS) combined with ground observation satellite data or drone data, obtain geographic elevation models, establish valley-ridge and river network geometric models, and convert them into hydrodynamic models, combine real-time precipitation data and future precipitation predictions, through Hydraulic numerical analysis carried out runoff hydrodynamic simulation, and predicted and early warnings for floods, droughts, landslides, mudslides and avalanches.
Accurate analysis and forecast of floods, droughts and other disasters has been achieved, and a long-term warning time has been provided to help the government and the public take precautions in advance, reduce losses, and improve disaster response capabilities.
Smart Images

Figure CN118917058A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of disaster early warning, and in particular to a method for monitoring, predicting and warning of multiple types of disasters. Background Art
[0002] With the intensification of global climate change, extreme meteorological disasters have become more and more frequent, causing serious casualties and huge economic losses to countries around the world. In particular, my country is a country prone to floods and droughts. In recent years alone, severe floods have occurred in river basins in many densely populated areas, and regional rainstorms have occurred 35 times. Among them, affected by the residual cloud system of Typhoon Dusurui, extreme rainstorms occurred in North China and Northeast China; a basin-wide flood occurred in the Haihe River, causing heavy casualties and property losses in Beijing, Tianjin and Hebei; a serious flood disaster occurred in the Songhua River Basin, causing serious damage to Heilongjiang, Jilin and other places. Local mountain torrents and geological disasters in the southwest and northwest have been scattered in multiple points, and casualties in Sichuan, Chongqing, Shaanxi and other places are relatively large. These losses are all related to the inability to achieve early (or long-term) accurate flood prediction and warning. Similar to the monitoring and prediction and warning of flood disasters, droughts, landslides, mudslides and avalanches in natural disasters are also difficult to be accurately monitored or warned.
[0003] By achieving scientific monitoring of precipitation and floods, and early warning of floods and droughts, the above-mentioned disasters can be effectively dealt with, loss of life can be avoided, and the impact of disasters can be minimized, which will have significant economic and social benefits.
[0004] Flood disasters account for more than half of global natural disasters and are the most harmful and frequent disasters to human society. Although space meteorological satellite monitoring technology has made great progress, it is still limited to short-term weather forecasting and monitoring. Traditional flood monitoring and prediction and early warning methods often rely on manual observation and simple meteorological data analysis, and have problems such as low monitoring accuracy and poor quantification ability. Under traditional monitoring methods, flood monitoring and early warning are not timely enough. Often, more accurate early warnings can only be issued after heavy rains and floods occur, resulting in insufficient early warning time or delayed information release. The public and relevant departments do not have enough time to take preventive and preparation measures, and cannot take correct actions in time, missing opportunities, and still cannot accurately analyze and forecast flood disasters. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a method for monitoring, predicting and warning of multiple types of disasters, which solves the problem that the prior art still cannot accurately analyze and predict disasters including floods.
[0006] At least one embodiment of the present invention provides a method for monitoring, predicting and warning of multiple types of disasters, including:
[0007] Using Earth observation satellite data or UAV-derived geographic information systems to obtain geographic elevation models of pre-set areas;
[0008] Analyze the spatial relationship of the geographic elevation model and extract the surface geographic information model of the preset area;
[0009] Based on the surface geographic information model, establishing a valley-ridge geometry model and a river network geometry model;
[0010] The geometric nodes and geometric units in the valley-ridge geometric model are respectively converted into hydrodynamic nodes and hydrodynamic units to obtain a valley-ridge hydrodynamic model, and the geometric nodes and geometric units in the river network geometric model are respectively converted into hydrodynamic nodes and hydrodynamic units to obtain a river network hydrodynamic model;
[0011] Real-time acquisition of precipitation data at the current moment in a preset area and precipitation forecasts at future moments, combining the valley-ridge hydrodynamic model, river network hydrodynamic model and hydraulic numerical analysis method, taking the water level and flow / flow velocity of each hydrodynamic node or hydrodynamic unit as independent variables, performing runoff hydrodynamic simulation on the water level fluctuations around the valley and river network, and obtaining simulation data and forecast data reflecting water level changes;
[0012] Based on the simulation data and the prediction data, the corresponding submerged area is obtained to predict and warn of floods in the submerged area.
[0013] The technical solution disclosed in the present invention has at least the following beneficial effects:
[0014] By using the geographic elevation model obtained from the geographic information system, extracting the surface geographic information model, and establishing the valley-ridge geometry model and river network geometry model, the hydrodynamic model of the corresponding area can be accurately converted to facilitate subsequent flood analysis;
[0015] After converting the valley-ridge hydrodynamic model and the river network hydrodynamic model respectively, combined with the local real-time precipitation data and future precipitation forecasts, the numerical analysis method of hydraulics is used, and the water level and flow of each hydrodynamic node or hydrodynamic unit are used as independent variables to simulate the runoff hydrodynamics of the water level fluctuations in the valley and around the river network;
[0016] Data reflecting water level changes can then be obtained. Using the above data, forecasts and warnings can be made for areas that may be flooded or in danger in the short and medium term, and further used for the formulation of government-led disaster prevention, mitigation, and flood control and risk avoidance measures.
[0017] The short term refers to 1 day to several days, shorter than 1 week; the medium term refers to 1 week to several weeks, shorter than 1 month; the long term refers to 1 month to several months, or even years. Medium-term and long-term forecasts are sometimes referred to as early and ultra-early forecasts, respectively.
[0018] The valley-ridge hydrodynamic model and simulation method can be extended and applied to the monitoring or early warning of drought, landslide, mud-rock flow and avalanche in natural disasters by changing or supplementing the corresponding parameters and variables and the related characteristic descriptions.
[0019] In a method for monitoring, predicting and warning of multiple types of disasters provided in one embodiment of the present invention, the spatial relationship of the geographic elevation model is analyzed to extract the surface geographic information model of the preset area, including:
[0020] A plurality of surface contour lines are obtained through the geographic elevation model, and a set of the surface contour lines is used as the surface geographic information model.
[0021] In a method for monitoring, predicting and warning of multiple types of disasters provided by one of the embodiments of the present invention, the valley-ridge geometric model is composed of valley lines and ridge lines. The valley lines are generated by the lowest points of all adjacent surface contour lines in the non-river area of the preset area, or the geometric connecting lines of the lowest points of the local vertical sections of all adjacent surface contour lines. The ridge lines are generated by the highest points of all adjacent surface contour lines, or the geometric connecting lines of the highest points of the local vertical sections of all adjacent surface contour lines.
[0022] In a method for monitoring, predicting and warning of multiple types of disasters provided by one of the embodiments of the present invention, the river network geometric model is composed of river bank ridges and river network center lines, the river bank ridges are generated by the highest points of all adjacent surface contour lines in the river area of the preset area, or the geometric connecting lines of the highest points of the local vertical sections of all adjacent surface contour lines, and the river network center line is the center line of the river in the river area.
[0023] In a method for monitoring, predicting and warning of multiple types of disasters provided in one of the embodiments of the present invention, the valley-ridge hydrodynamic model also includes the hydrodynamic nodes along the valley line, the hydrodynamic units composed of the hydrodynamic nodes, and a vertical cross-section perpendicular to the valley line.
[0024] In a method for monitoring, predicting and warning of multiple types of disasters provided in one embodiment of the present invention, the river bank cross section is the river bank cross section at the lowest water level in a river area in a preset area.
[0025] In a method for monitoring, predicting and warning of multiple types of disasters provided in one of the embodiments of the present invention, the precipitation, snowfall, temperature and air humidity data required for the prediction and warning may also be simulation variables of another model.
[0026] In a method for monitoring, predicting and warning of multiple types of disasters provided in one embodiment of the present invention, the method further includes:
[0027] Establish soil and water vapor evaporation models in the preset areas for monitoring and early warning;
[0028] Real-time acquisition of the temperature-humidity data of the preset area at the current moment and the temperature-humidity forecast for the future moment, and combined with the precipitation data and precipitation forecast, as well as the valley-ridge hydrodynamic model, river network hydrodynamic model, soil and water vapor evaporation model and hydrodynamic numerical analysis method, taking the water level and flow of each hydrodynamic node or hydrodynamic unit as independent variables, taking the average air humidity and average soil moisture content of multiple points preset between the valley, ridge or river network as dependent variables, performing runoff hydrodynamic simulation on the water level fluctuations in the valley and around the river network, obtaining second simulation data and second prediction data reflecting the water level change, so as to obtain the change curve of the average air humidity and average soil moisture content with the water level and temperature;
[0029] Based on the second simulation data, the second prediction data and the change curve, a comprehensive assessment of drought disasters in the corresponding area is obtained to predict and warn of drought disasters in the drought-affected area.
[0030] In a method for monitoring, predicting and warning of multiple types of disasters provided in one embodiment of the present invention, the method further includes:
[0031] The geometric nodes and geometric units in the valley-ridge geometric model are converted into ice and snow dynamic nodes and ice and snow dynamic units respectively to obtain a valley-ridge ice and snow dynamic model;
[0032] Real-time acquisition of snowfall data at the current moment in a preset area and snowfall forecasts at future moments, combining the valley-ridge ice and snow dynamics model and the numerical analysis method of ice and snow dynamics, taking the snow level and ice and snow flow of each ice and snow dynamic node or ice and snow dynamic unit as independent variables, performing ice and snow dynamics simulation on the snow level fluctuation around the valley, and obtaining third simulation data and third prediction data reflecting the movement changes of ice and snow levels;
[0033] Based on the third simulation data and the third prediction data, a corresponding avalanche disaster area is obtained to predict and warn of avalanche-glacier disasters in the area involved in the avalanche disaster.
[0034] In a method for monitoring, predicting and warning of multiple types of disasters provided in one embodiment of the present invention, the method further includes:
[0035] According to the precipitation data and precipitation forecast, in combination with the valley-ridge hydrodynamic model, soil seepage simulation, landslide-mud flow numerical analysis method and hydrodynamic numerical analysis method, taking the water level and water-mud flow mixed flow of each hydrodynamic node or hydrodynamic unit as independent variables, hydrodynamics, landslide dynamics and water-mud flow simulation are performed on the water level fluctuation around the valley to obtain fourth simulation data and fourth prediction data reflecting the change of water level movement;
[0036] A corresponding landslide-mud flow disaster area is obtained based on the fourth simulation data and the fourth prediction data, so as to predict and warn the landslide-mud flow disaster in the landslide-mud flow disaster area.
[0037] At least one embodiment of the present invention provides a disaster prediction and early warning system, including:
[0038] The initial model acquisition module uses the geographic information system from earth observation satellite data or drones to obtain the geographic elevation model of the preset area;
[0039] Model extraction module, which analyzes the spatial relationship of the geographic elevation model and extracts the surface geographic information model of the preset area;
[0040] A geometric model building module, based on the surface geographic information model, builds a valley-ridge geometric model and a river network geometric model;
[0041] A hydrological and hydraulic model building module converts the geometric nodes and geometric units in the valley-ridge geometric model into hydrodynamic nodes and hydrodynamic units to obtain a valley-ridge hydrodynamic model, and converts the geometric nodes and geometric units in the river network geometric model into hydrodynamic nodes and hydrodynamic units to obtain a river network hydrodynamic model;
[0042] The simulation module obtains the current precipitation data of the preset area and the precipitation forecast for the future in real time, combines the valley-ridge hydrodynamic model, the river network hydrodynamic model and the hydraulic numerical analysis method, takes the water level and flow of each hydrodynamic node or hydrodynamic unit as independent variables, performs runoff hydrodynamic simulation on the water level fluctuation around the valley and the river network, and obtains the first simulation data and the first prediction data reflecting the water level change;
[0043] The prediction and warning module obtains the corresponding submerged area based on the first simulation data and the first prediction data to perform flood prediction and warning on the submerged area; the module can also be used for prediction and warning of drought under the condition of reduced precipitation.
[0044] In a disaster prediction and early warning system provided by one embodiment of the present invention, the model extraction module includes:
[0045] A plurality of surface contour lines are obtained through the geographic elevation model, and a set of the surface contour lines is used as the surface geographic information model.
[0046] The present invention also provides an electronic device, comprising a memory, a processor, and a program stored in the memory and running on the processor, wherein when the processor executes the program, the steps of a method for monitoring, predicting and warning of multiple types of disasters as described above are implemented. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 It is a flow chart of a method for monitoring, predicting and warning of multiple types of disasters according to the present invention;
[0048] Figure 2 This is a schematic diagram of the geographic elevation model;
[0049] Figure 3 It is a schematic diagram of the valley-ridge geometric model and the river network geometric model extracted based on the geographic elevation model of the present invention;
[0050] Figure 4 This is a schematic diagram of flood monitoring for a preset area according to the present invention;
[0051] Figure 5 The present invention is a schematic diagram of a process flow of a disaster prediction and early warning system. DETAILED DESCRIPTION
[0052] The principles and features of the present invention are described below. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0053] Furthermore, those skilled in the art may combine and associate different embodiments or examples and features of different embodiments or examples described in this specification without mutual contradiction.
[0054] This patent uses Internet technology and numerical modeling and simulation technology to develop the first large-scale (even nationwide), intelligent flood and drought early monitoring and warning system to solve the problem of accurate flood and drought risk warning in human society and eliminate the threat of floods to people's lives and property.
[0055] For specific preset areas, such as potential landslides, debris flows, and avalanche areas, on the basis of the valley-ridge hydrodynamic model and simulation method, the corresponding parameters and variables are changed or supplemented, as well as the conditions of related characteristic descriptions, such as the stress-strain constitutive relationship of ice and snow, the seepage of soil, the stress-strain constitutive relationship of soil with different water contents, and the water vapor evaporation model of soil. The valley-ridge hydrodynamic model, simulation and prediction and early warning method can be applied to the monitoring or prediction and early warning of droughts, landslides, debris flows, and avalanches in natural disasters.
[0056] Traditional flood monitoring and forecasting and early warning methods often rely on manual observation and simple meteorological data analysis, and have problems with low monitoring accuracy and poor quantification capabilities.
[0057] Early and ultra-early forecast and warning: Under traditional monitoring methods, the monitoring, forecast and warning of flood and drought disasters lack timeliness. Often, more accurate warnings can only be issued after heavy rains and floods occur, resulting in insufficient warning time or delayed information release. The public and relevant departments do not have enough time to take preventive and preparation measures, and are unable to take correct actions in time, thus missing opportunities. Similarly, disasters such as landslides, mudslides and avalanches are highly sudden and traditionally difficult to predict, and often catch people off guard.
[0058] Traditional flood monitoring and forecasting and early warning methods have limited coverage, and can often only monitor and warn specific areas, and cannot fully cover areas that may be affected, especially in areas with poor equipment and staffing. This project will make comprehensive use of geographic information systems (GIS) with remote sensing, meteorological data, computers, and hydrology and hydrodynamics to improve the accuracy and prediction accuracy of flood and drought monitoring and early warning, provide timely and effective forecast and warning information to relevant government departments and the public, minimize the losses caused by floods and droughts, protect people's lives and property, and create higher social and economic benefits. Based on this, the present invention can eventually be promoted and applied to cover the territory of a country, or even the world.
[0059] Based on this, the present invention provides a method for monitoring and predicting and warning of multiple types of disasters. Figure 1 As shown, including:
[0060] Use the geographic information system from earth observation satellite data or drones to obtain the digital elevation model (DEM) of the preset area. The specific schematic diagram of the geographic elevation model can be found in Figure 2 As shown;
[0061] Applying geographic information technology (GIS) to analyze the spatial relationship of the geographic elevation model, extracting the surface geographic information model of the preset area, the geographic information model includes the river network and ridge model in the preset area, that is, a series of high-precision models including valley-ridge model, river valley profile model and river network model;
[0062] Based on the surface geographic information model, the valley-ridge geometry model and the river network geometry model are established. The specific schematic diagrams of the valley-ridge geometry model and the river network geometry model can be referred to Figure 3As shown, the valley-ridge geometry model and the river network geometry model are composed of all their geometry nodes and geometry units. The geometry nodes are defined by their three-dimensional geographic coordinates, and the geometry units are defined by their corresponding first and last nodes.
[0063] Converting geometric nodes in the valley-ridge geometric model into hydrodynamic nodes, converting geometric units in the valley-ridge geometric model into hydrodynamic units to obtain a valley-ridge hydrodynamic model, converting geometric nodes in the river network geometric model into hydrodynamic nodes, converting geometric units in the river network geometric model into hydrodynamic units to obtain a river network hydrodynamic model. It should be understood that according to the simulation of runoff hydrodynamics, it is necessary to establish corresponding valley-ridge hydrodynamic models and river network hydrodynamic models. The hydrodynamic model is composed of hydrodynamic nodes and hydrodynamic units. Its hydrodynamic nodes are converted from geometric nodes or interpolated within the range of geometric units. The process includes appropriate interpolation within the geometric units.
[0064] The hydrodynamic unit is also defined by the hydrodynamic head node and the end node, and finally a hydrodynamic model with a reasonable hydrodynamic unit length is obtained, which is conducive to fast and high-precision simulation of hydrodynamics.
[0065] Real-time acquisition of precipitation data for the current time in a preset area and precipitation forecasts for future times, such as early, medium and long-term precipitation forecasts. It should be understood that the short-term (or near-term) refers to 1 day to several days, shorter than 1 week; the medium-term refers to 1 week to several weeks, shorter than 1 month; the long-term refers to 1 month to several months, or even years. The medium-term and long-term forecasts are sometimes referred to as early and ultra-early forecasts, respectively. The precipitation is distributed to the corresponding valleys or river networks according to the ridge lines or river bank ridge lines in the area to which the precipitation data belongs;
[0066] Combining precipitation data, precipitation forecasts, valley-ridge hydrodynamic models, river network hydrodynamic models and hydraulic numerical analysis methods, the water level and flow (or flow velocity) of each hydrodynamic node or hydrodynamic unit are used as independent variables to simulate the runoff hydrodynamics of the water level fluctuations in the valley and around the river network, and obtain simulation data and prediction data reflecting the water level changes;
[0067] The corresponding inundation area is obtained based on the simulation data and prediction data, so as to make short-term, medium-term and long-term flood prediction and warning for the inundation area.
[0068] By using the geographic elevation model obtained from the geographic information system, extracting the surface geographic information model, and establishing the valley-ridge geometry model and river network geometry model, the hydrodynamic model of the corresponding area can be accurately converted to facilitate subsequent flood analysis;
[0069] After converting the valley-ridge hydrodynamic model and the river network hydrodynamic model, the local real-time precipitation data and future precipitation forecasts, including the range and intensity of precipitation, as well as its changes over time, are obtained respectively. The numerical analysis method of hydraulics is used to simulate the runoff hydrodynamics of the water level fluctuations in the valley and around the river network, taking the water level and flow of each hydrodynamic node or hydrodynamic unit as independent variables.
[0070] Then we can get the data reflecting the water level change. Using the above data, we can predict and warn the areas that may be flooded or dangerous in the near and medium to long term. The specific data used for prediction and warning can be found in Figure 4 As shown, Figure 4 The lighter spots and strips, originally blue, are used to indicate areas covered with water, and are further used in the formulation of government-led disaster prevention, mitigation, and flood control and risk avoidance measures.
[0071] Furthermore, the spatial relationship of the geographic elevation model is analyzed to extract the surface geographic information model of the preset area, including:
[0072] A plurality of surface contour lines are obtained through the geographic elevation model, and the collection of each surface contour line is used as the surface geographic information model. The valley-ridge geometric model is composed of valley lines and ridge lines. The valley line is generated by the lowest point of all adjacent surface contour lines in the non-river area of the preset area, or the geometric connection line of the lowest point of the local vertical section of all adjacent surface contour lines. The ridge line is generated by the highest point of all adjacent surface contour lines, or the geometric connection line of the highest point of the local vertical section of all adjacent surface contour lines.
[0073] Furthermore, the river network geometric model is composed of river bank ridges and river network center lines. The river bank ridges are generated by the highest points of all adjacent surface contour lines in the river area of the preset area, or the geometric connection lines of the highest points of the local vertical sections of all adjacent surface contour lines. The river network center line is the center line of the river in the river area.
[0074] Based on the geographic elevation model and the characteristics of the water surface in the preset area, the location of the water surface is identified, and the lakes and rivers with water surfaces are regarded as river areas;
[0075] Furthermore, in the identified non-river area, the valley-ridge hydrodynamic model also includes each hydrodynamic node along the valley line and the vertical section of the local contour line or the vertical cross section of the valley line at its location.
[0076] Furthermore, in the identified river area, the river network hydrodynamic model also includes hydrodynamic nodes located on the center line of the river, hydrodynamic units composed of hydrodynamic nodes, and riverbank cross-sections perpendicular to the center line of the river. In this embodiment, the riverbank cross-section is especially the riverbank cross-section at the lowest water level in the river area of the preset area.
[0077] It should be understood that the river network hydrodynamic model referred to in this embodiment also includes elements such as reservoirs, lakes, dams and related pumps, drainage ditches and pipes, and some elements can be added based on actual conditions or needs.
[0078] The prediction of flood water levels also includes, but is not limited to, the use of short-term, medium-term and long-term weather forecasts or precipitation information and statistical precipitation information, including statistical data and extreme conditions, to achieve corresponding short-term, medium-term and long-term flood forecasts and warnings (if there is no clear explanation for medium-term and long-term flood forecasts and warnings, they are collectively referred to as "early flood forecasts and warnings" below), statistically based extreme flood water levels and inundation areas, such as extreme water levels of flood water levels that return once in 100 years or once in 1,000 years, to guide regional economic development and planning.
[0079] Furthermore, the present invention may also include establishing a precipitation-evaporation-seepage model for a preset area, so as to consider the local hydraulic runoff influence during the simulation calculation of the above model, so as to further improve the accuracy of flood monitoring and prediction.
[0080] Furthermore, the present invention can also establish an erosion model, a soil water vapor evaporation model, a seepage model and a geotechnical mechanics model for a preset area, and combine the predicted data of water level changes in the submerged area and the corresponding water flow data to conduct a risk assessment of soil erosion and landslides in the preset area, as well as a precipitation-evaporation-seepage model to achieve drought monitoring and prediction and early warning in the preset area.
[0081] Based on the above method, the model covers a complete river network or a wide area, and establishes hydrological boundary conditions corresponding to the river network and ridges on the model boundary. The boundary conditions can also be simulated and predicted in real time using a similar upstream model to form a high-precision global model.
[0082] Furthermore, the method can also predict and warn of drought, that is, the method also includes:
[0083] Establish soil and water vapor evaporation models in the preset areas for monitoring and early warning;
[0084] Real-time acquisition of the temperature-humidity data of the preset area at the current moment and the temperature-humidity forecast for the future moment, and combined with the precipitation data and precipitation forecast, as well as the valley-ridge hydrodynamic model, river network hydrodynamic model, soil and water vapor evaporation model and hydrodynamic numerical analysis method, taking the water level and flow of each hydrodynamic node or hydrodynamic unit as independent variables, taking the average air humidity and average soil moisture content of multiple points preset between the valley, ridge or river network as dependent variables, performing runoff hydrodynamic simulation on the water level fluctuations in the valley and around the river network, obtaining second simulation data and second prediction data reflecting the water level change, so as to obtain the change curve of the average air humidity and average soil moisture content with the water level and temperature;
[0085] Based on the second simulation data, the second prediction data and the change curve, a comprehensive assessment of drought disasters in the corresponding area is obtained to predict and warn of drought disasters in the drought-affected area in the short, medium and long term.
[0086] Furthermore, the method can also predict and warn of avalanche-ice bed disasters, that is, the method also includes:
[0087] The geometric nodes and geometric units in the valley-ridge geometric model are converted into ice and snow dynamic nodes and ice and snow dynamic units respectively to obtain a valley-ridge ice and snow dynamic model;
[0088] Real-time acquisition of snowfall data at the current moment in a preset area and snowfall forecasts at future moments, combining the valley-ridge ice and snow dynamics model and the numerical analysis method of ice and snow dynamics, taking the snow level and ice and snow flow of each ice and snow dynamic node or ice and snow dynamic unit as independent variables, performing ice and snow dynamics simulation on the snow level fluctuation around the valley, and obtaining third simulation data and third prediction data reflecting the movement changes of ice and snow levels;
[0089] Based on the third simulation data and the third prediction data, the corresponding avalanche disaster area is obtained to predict and warn of short-term, medium-term and long-term avalanche-glacier disasters in the area involved in the avalanche disaster.
[0090] Furthermore, the method can also predict and warn landslide and debris flow disasters, that is, the method also includes:
[0091] According to the precipitation data and precipitation forecast, in combination with the valley-ridge hydrodynamic model, soil seepage simulation, landslide-mud flow numerical analysis method and hydrodynamic numerical analysis method, taking the water level and water-mud flow mixed flow of each hydrodynamic node or hydrodynamic unit as independent variables, hydrodynamics, landslide dynamics and water-mud flow simulation are performed on the water level fluctuation around the valley to obtain fourth simulation data and fourth prediction data reflecting the change of water level movement;
[0092] Based on the fourth simulation data and the fourth prediction data, the corresponding landslide-mud flow disaster area is obtained to provide early warning of landslide-mud flow disasters in the landslide-mud flow disaster area in the short, medium and long term.
[0093] The present invention also provides a disaster prediction and early warning system, please refer to Figure 5 As shown, including:
[0094] The initial model acquisition module uses the geographic information system from earth observation satellite data or drones to obtain the geographic elevation model of the preset area;
[0095] Model extraction module, which analyzes the spatial relationship of the geographic elevation model and extracts the surface geographic information model of the preset area;
[0096] A geometric model building module, based on the surface geographic information model, builds a valley-ridge geometric model and a river network geometric model;
[0097] A hydrological and hydraulic model building module converts the geometric nodes and geometric units in the valley-ridge geometric model into hydrodynamic nodes and hydrodynamic units to obtain a valley-ridge hydrodynamic model, and converts the geometric nodes and geometric units in the river network geometric model into hydrodynamic nodes and hydrodynamic units to obtain a river network hydrodynamic model;
[0098] The simulation module obtains the current precipitation data of the preset area and the precipitation forecast for the future in real time, combines the valley-ridge hydrodynamic model, the river network hydrodynamic model and the hydraulic numerical analysis method, takes the water level and flow of each hydrodynamic node or hydrodynamic unit as independent variables, performs runoff hydrodynamic simulation on the water level fluctuation around the valley and the river network, and obtains the first simulation data and the first prediction data reflecting the water level change;
[0099] The prediction and warning module obtains the corresponding submerged area based on the first simulation data and the first prediction data to perform flood prediction and warning on the submerged area; the module can also be used for prediction and warning of drought under the condition of reduced precipitation.
[0100] Furthermore, the model extraction module includes:
[0101] A plurality of surface contour lines are obtained through the geographic elevation model, and a collection of the surface contour lines is used as a surface geographic information model.
[0102] Furthermore, the valley-ridge geometric model in the geometric model building module is composed of valley lines and ridge lines. The valley line is generated by the lowest point of all adjacent surface contour lines in the non-river area of the preset area, or the geometric connection line of the lowest point of the local vertical section of all adjacent surface contour lines. The ridge line is generated by the highest point of all adjacent surface contour lines, or the geometric connection line of the highest point of the local vertical section of all adjacent surface contour lines.
[0103] Furthermore, the river network geometric model in the geometric model building module is composed of river bank ridges and river network center lines. The river bank ridges are generated by the highest points of all adjacent surface contour lines in the river area of the preset area, or the geometric connecting lines of the highest points of the local vertical sections of all adjacent surface contour lines. The river network center line is the center line of the river in the river area.
[0104] Furthermore, the valley-ridge hydrodynamic model in the hydrological and hydraulic model building module also includes each hydrodynamic node along the valley line and the vertical section of the local contour line at its location or the vertical cross section of the valley line.
[0105] Furthermore, the river network hydrodynamic model in the hydrological and water conservancy model building module also includes hydrodynamic nodes located at the center line of the river, hydrodynamic units composed of the hydrodynamic nodes, and riverbank cross sections perpendicular to the center line of the river.
[0106] Furthermore, the riverbank cross section in the hydrological and water conservancy model building module is the riverbank cross section at the lowest water level in the river area of the preset area.
[0107] Furthermore, the description of monitoring, forecasting and warning for floods and droughts may also be similar to the description of monitoring, forecasting and warning for landslides, mud-rock flows and avalanches in a preset area as described above.
[0108] The present invention also provides an electronic device, including a memory, a processor, and a program stored in the memory and running on the processor. When the processor executes the program, the steps of the above-mentioned method for monitoring, predicting and warning of multiple types of disasters are implemented.
[0109] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A method for monitoring, predicting and warning of multiple types of disasters, characterized in that: include: Using Earth observation satellite data or UAV-derived geographic information systems to obtain geographic elevation models of pre-set areas; Analyze the spatial relationship of the geographic elevation model and extract the surface geographic information model of the preset area; Based on the surface geographic information model, a valley-ridge geometry model and a river network geometry model are established; The geometric nodes and geometric units in the valley-ridge geometric model are respectively converted into hydrodynamic nodes and hydrodynamic units to obtain a valley-ridge hydrodynamic model, and the geometric nodes and geometric units in the river network geometric model are respectively converted into hydrodynamic nodes and hydrodynamic units to obtain a river network hydrodynamic model; Real-time acquisition of precipitation data of a preset area at the current moment and precipitation forecasts at future moments, the precipitation data of the preset area is combined with the valley-ridge hydrodynamic model, the river network hydrodynamic model and the hydraulic numerical analysis method, the water level and flow / flow velocity of each hydrodynamic node or hydrodynamic unit are used as independent variables, and runoff hydrodynamic simulation is performed on the water level fluctuations around the valley and the river network to obtain first simulation data and first prediction data reflecting the water level change; A corresponding submerged area is obtained based on the first simulation data and the first prediction data, so as to predict and warn of floods in the submerged area.
2. A method for monitoring, predicting and warning of multiple types of disasters according to claim 1, characterized in that: Analyze the spatial relationship of the geographic elevation model and extract the surface geographic information model of the preset area, including: A plurality of surface contour lines are obtained through the geographic elevation model, and a set of the surface contour lines is used as the surface geographic information model.
3. A method for monitoring, predicting and warning of multiple types of disasters according to claim 2, characterized in that: The valley-ridge geometric model is composed of valley lines and ridge lines. The valley lines are generated by the lowest points of all adjacent surface contour lines in the non-river area of the preset area, or the geometric connecting lines of the lowest points of the local vertical sections of all adjacent surface contour lines. The ridge lines are generated by the highest points of all adjacent surface contour lines, or the geometric connecting lines of the highest points of the local vertical sections of all adjacent surface contour lines.
4. A method for monitoring, predicting and warning of multiple types of disasters according to claim 3, characterized in that: The river network geometric model is composed of river bank ridges and river network center lines. The river bank ridges are generated by the highest points of all adjacent surface contour lines in the river area of the preset area, or the geometric connecting lines of the highest points of the local vertical sections of all adjacent surface contour lines. The river network center line is the center line of the river in the river area.
5. A method for monitoring, predicting and warning of multiple types of disasters according to claim 4, characterized in that: The valley-ridge hydrodynamic model also includes each of the hydrodynamic nodes on the valley line and a vertical section of a local contour line at the location thereof or a vertical cross section of the valley line.
6. A method for monitoring, predicting and warning of multiple types of disasters according to claim 4, characterized in that: The river network hydrodynamic model also includes the hydrodynamic nodes located on the center line of the river, the hydrodynamic units composed of the hydrodynamic nodes, and the river bank cross section perpendicular to the center line of the river.
7. A method for monitoring, predicting and warning of multiple types of disasters according to claim 6, characterized in that: The river bank cross section is the river bank cross section at the lowest water level in the river area of the preset area.
8. A method for monitoring, predicting and warning of multiple types of disasters according to claim 7, characterized in that: Also includes: Establish soil and water vapor evaporation models in the preset areas for monitoring and early warning; Real-time acquisition of the temperature-humidity data of the preset area at the current moment and the temperature-humidity forecast for the future moment, and combined with the precipitation data and precipitation forecast, as well as the valley-ridge hydrodynamic model, river network hydrodynamic model, soil and water vapor evaporation model and hydrodynamic numerical analysis method, taking the water level and flow of each hydrodynamic node or hydrodynamic unit as independent variables, taking the average air humidity and average soil moisture content of multiple points preset between the valley, ridge or river network as dependent variables, performing runoff hydrodynamic simulation on the water level fluctuations in the valley and around the river network, obtaining second simulation data and second prediction data reflecting the water level change, so as to obtain the change curve of the average air humidity and average soil moisture content with the water level and temperature; Based on the second simulation data, the second prediction data and the change curve, a comprehensive assessment of drought disasters in the corresponding area is obtained to predict and warn of drought disasters in the drought-affected area.
9. A method for monitoring, predicting and warning of multiple types of disasters according to claim 7, characterized in that: Also includes: The geometric nodes and geometric units in the valley-ridge geometric model are converted into ice and snow dynamic nodes and ice and snow dynamic units respectively to obtain a valley-ridge ice and snow dynamic model; Real-time acquisition of snowfall data at the current moment in a preset area and snowfall forecasts at future moments, combining the valley-ridge ice and snow dynamics model and the numerical analysis method of ice and snow dynamics, taking the snow level and ice and snow flow of each ice and snow dynamic node or ice and snow dynamic unit as independent variables, performing ice and snow dynamics simulation on the snow level fluctuation around the valley, and obtaining third simulation data and third prediction data reflecting the movement changes of ice and snow levels; Based on the third simulation data and the third prediction data, a corresponding avalanche disaster area is obtained to predict and warn of avalanche-glacier disasters in the area involved in the avalanche disaster.
10. A method for monitoring, predicting and warning of multiple types of disasters according to claim 7, characterized in that: Also includes: According to the precipitation data and precipitation forecast, in combination with the valley-ridge hydrodynamic model, soil seepage simulation, landslide-mud flow numerical analysis method and hydrodynamic numerical analysis method, taking the water level and water-mud flow mixed flow of each hydrodynamic node or hydrodynamic unit as independent variables, hydrodynamics, landslide dynamics and water-mud flow simulation are performed on the water level fluctuation around the valley to obtain fourth simulation data and fourth prediction data reflecting the change of water level movement; A corresponding landslide-mud flow disaster area is obtained based on the fourth simulation data and the fourth prediction data, so as to predict and warn the landslide-mud flow disaster in the landslide-mud flow disaster area.
Citation Information
Cited By
Landslide surge induced glacial lake outburst flood disaster chain numerical simulation method
CN119885960A
Method for analyzing internal correlation among disaster-inducing factors of multiple types of disasters
CN121389781A
Regional flood control dispatching system and method based on flood model and reinforcement learning
CN121936835A
