Combined optimization method and device for jointly clearing problems in electric energy market and auxiliary service market of virtual power plant

Through the combination optimization method of virtual power plants in the electric energy market and auxiliary service market, combined with multiple time scales and load constraints, the problem of joint clearing of virtual power plants in the electric energy market and auxiliary service market is solved, and the resource allocation efficiency and newness are improved Energy consumption capacity avoids operational risks.

CN118917491APending Publication Date: 2024-11-08南方电网能源发展研究院有限责任公司 +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411168236.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the prior art, the joint clearance of virtual power plants in the power energy market and auxiliary service market has not been effectively discussed, resulting in low resource allocation efficiency and difficulty in absorbing new energy.

Method used

Provide a combination optimization method for joint clearing of virtual power plants in the electricity energy market and auxiliary service market. By obtaining a dynamic planning model of multi-time scales, combining the constraints of air conditioning load and electric vehicle load, dynamic planning and solution are carried out to obtain the best Optimal decision variables and global optimal solutions.

Benefits of technology

It realizes the optimal decision-making of virtual power plants under different time scales, improves resource allocation efficiency, enhances the joint clearing capacity of the electricity energy market and the auxiliary service market, and avoids the insufficient output of distributed energy and the problem of "wind and light abandonment" , improves operational economics.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917491A_ABST
    Figure CN118917491A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of clearing calculation, and provides a combined optimization method and device for a combined clearing problem of a virtual power plant in an electric energy market and an auxiliary service market, which can be used for carrying out combined optimization solution on the combined clearing problem of the virtual power plant participating in the electric energy market and the auxiliary service market at the same time. The method comprises the following steps: obtaining dynamic planning models of a virtual power plant participating in an electric energy market and an auxiliary service market at three different time scales; obtaining a constraint condition of air conditioner load capacity and a constraint condition of electric vehicle load; and under the constraint condition of the air conditioner load capacity and the constraint condition of the electric vehicle load, solving the dynamic planning model under the three different time scales to obtain the optimal decision variable solution and the global optimal solution of the time nodes of the virtual power plant under the different time scales.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of clearing computing technology, and in particular to a combined optimization method, apparatus, computer equipment, storage medium and computer program product for the joint clearing problem of a virtual power plant in an electric energy market and ancillary service market. Background Art

[0002] Virtual power plants (VPPs) aggregate multiple types of resources and are considered important participants in the electricity spot market. As a comprehensive energy aggregation solution that integrates control and communication technology, data analysis technology, and resource aggregation models, virtual power plants can not only promote the market-oriented allocation of resources, but also alleviate the huge pressure brought by the large-scale grid connection of new energy. They can play a huge role in coordinating the peak load and valley filling of the power grid and promoting the consumption of new energy. At present, there is little discussion on the issue of virtual power plants participating in the joint clearing of the electricity energy market and the ancillary service market at the same time. Summary of the invention

[0003] Based on this, it is necessary to provide a combined optimization method, device, computer equipment, storage medium and computer program product for the joint clearing problem of virtual power plants in the electric energy market and ancillary service market in response to the above technical problems.

[0004] The present application provides a combined optimization method for the joint clearing problem of a virtual power plant in an electric energy market and ancillary service market, the method comprising:

[0005] Obtain dynamic programming models of virtual power plants participating in the electric energy market and ancillary service market at three different time scales;

[0006] Obtain constraints on air conditioning load capacity and electric vehicle load;

[0007] Under the constraints of the air-conditioning load capacity and the electric vehicle load, the dynamic programming models at three different time scales are solved to obtain the optimal decision variable solutions and the global optimal solution of the time nodes of the virtual power plant at different time scales.

[0008] In one embodiment, under the constraints of the air conditioning load capacity and the electric vehicle load, three dynamic programming models of different time scales are solved, including:

[0009] The largest time scale among the three time scales is taken as the first time scale;

[0010] Obtaining the decision variable constraints of the virtual power plant at the time nodes of the first time scale;

[0011] Under the constraints of the air-conditioning load capacity, the electric vehicle load and the decision variable constraints, a dynamic programming model of the first time scale is solved.

[0012] In one embodiment, obtaining the constraint condition of the air conditioning load capacity includes:

[0013] Determine the capacity portion of air conditioning load that can participate in demand response;

[0014] According to the capacity part of air-conditioning load that can participate in demand response, the constraint condition of air-conditioning load capacity is obtained.

[0015] In one embodiment, obtaining the constraint condition of the electric vehicle load includes:

[0016] According to the total capacity of electric vehicles covered by the virtual power plant and the capacity of the electric vehicle load, the constraints of the electric vehicle load are obtained.

[0017] In one embodiment, the method further comprises:

[0018] The capacity of the electric vehicle load is obtained according to the charging power, discharging power, charging time and discharging time of the electric vehicle load.

[0019] In one embodiment, the three different time scales include: 60 minutes, 15 minutes, and 4 seconds.

[0020] The present application provides a combined optimization device for the joint clearing problem of a virtual power plant in an electric energy market and ancillary service market, the device comprising:

[0021] A model acquisition module is used to obtain dynamic programming models of virtual power plants participating in the electric energy market and ancillary service market at three different time scales;

[0022] A constraint condition acquisition module, used to acquire the constraint conditions of the air conditioning load capacity and the constraint conditions of the electric vehicle load;

[0023] The solution module is used to solve the dynamic programming model at three different time scales under the constraints of the air conditioning load capacity and the electric vehicle load, and obtain the optimal decision variable solution and the global optimal solution of the time nodes of the virtual power plant at different time scales.

[0024] The present application provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the above method.

[0025] The present application provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program is executed by a processor to execute the above method.

[0026] The present application provides a computer program product, on which a computer program is stored, and the computer program is executed by a processor to perform the above method.

[0027] The above-mentioned combined optimization method, device, computer equipment, storage medium and computer program product for the joint clearing problem of virtual power plants in the electric energy market and ancillary service market obtain the dynamic programming model of the virtual power plant participating in the electric energy market and ancillary service market at three different time scales; obtain the constraints of air-conditioning load capacity and electric vehicle load; under the constraints of the air-conditioning load capacity and electric vehicle load, solve the dynamic programming model at three different time scales to obtain the optimal decision variable solution and the global optimal solution of the time nodes of the virtual power plant at different time scales, and realize the joint clearing of the virtual power plant in the electric energy market and ancillary service market and maximize the benefits through the dynamic programming method; and in terms of resource modeling, the present application can provide more sophisticated modeling, distinguish different types of resources (such as air-conditioning load and electric vehicle load) according to their characteristics, introduce corresponding constraints, and refine the evaluation of energy state changes and frequency regulation quality to improve decision-making accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments or the related technical descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0029] Figure 1 A flow chart of a combined optimization method for a virtual power plant in an electric energy market and ancillary service market joint clearing problem in one embodiment;

[0030] Figure 2 A schematic diagram of a flow chart for obtaining constraint conditions for air conditioning load capacity in one embodiment;

[0031] Figure 3 A schematic diagram of a solution process of a dynamic programming model of maximum time scale in one embodiment;

[0032] Figure 4 It is a structural block diagram of a combined optimization device for a virtual power plant in an electric energy market and ancillary service market joint clearing problem in one embodiment;

[0033] Figure 5 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0035] The combined optimization method for the joint clearing problem of virtual power plants in the electric energy market and the ancillary service market provided in this application considers a virtual power plant that includes energy storage, distributed energy, and controllable loads, where the controllable loads include air-conditioning components and electric vehicles. Through the dynamic programming model of the virtual power plant at different time scales, the joint clearing of the virtual power plant in the electric energy market and the ancillary service market is achieved to maximize the benefits.

[0036] First, this application provides a multi-timescale strategy framework for virtual power plants:

[0037] In order to construct a dynamic programming model of a virtual power plant at multiple time scales, the behavior decision of the virtual power plant can be set as follows:

[0038] (1) The virtual power plant predicts the electricity price in the day-ahead market and submits a bidding price, and determines the charging and discharging time within the virtual power plant based on the predicted electricity price. The virtual power plant can receive and analyze load disturbance data during the day and adjust the output of each unit in real time.

[0039] (2) The virtual power plant participates in the energy market independently during its internal charging and discharging time; at other times, it participates in both the electricity energy market and the ancillary service market.

[0040] (3) The decision-making objective of a virtual power plant is to maximize daily operating benefits and pursue joint clearing of the electricity energy market and ancillary service market.

[0041] (4) According to the trading rules of the electricity spot market, the electricity spot market generates a real-time transaction price on a time scale of 15 minutes; in the ancillary service market, a frequency modulation signal response cycle is formed in 4 seconds; and the virtual power plant conducts a node inspection of its own capacity status and frequency modulation actions every 60 minutes.

[0042] According to the above settings, the dynamic response strategy of the virtual power plant needs to be carried out on three time scales of 4s, 15min and 60min, and its decision is expressed as a time series. The decision factors of the virtual power plant can be represented by the state under the time series. As a price receiver, the market marginal electricity price is not within the decision factors. The decision factors to be considered by the virtual power plant include adjustable capacity and frequency regulation signals. Then the specific adjustment instructions for the adjustable capacity and frequency regulation signals are the decision variables of this application. The decision variables include the time-series output of the virtual power plant participating in the electric energy market, the frequency regulation power participating in the ancillary service market, and the internal unit capacity to be determined at the internal assessment node.

[0043] In one embodiment, Figure 1 As shown, a combined optimization method for the joint clearing problem of a virtual power plant in the electric energy market and the ancillary service market is provided, comprising the following steps:

[0044] Step S101, obtaining dynamic programming models of virtual power plants participating in the electric energy market and ancillary service market at three different time scales;

[0045] This step is mainly to establish a dynamic programming model for the virtual power plant. Specifically:

[0046] The daily operation of the virtual power plant must participate in the electricity energy market and the ancillary service market on three time scales. Therefore, the corresponding decision variable solutions must be given under the condition of maximizing benefits.

[0047] First, the state transfer equation is introduced to express the state variables of the virtual power plant at time t as , since the input decision variables At time t+1, the state variables change to:

[0048] (1)

[0049] In formula (1), F() represents the state transfer function. The specific value of the state variable at the next moment is determined by the value at the previous moment and the input decision variable.

[0050] The goal of the decision is to maximize the overall benefits of the virtual power plant, which include the benefits of the virtual power plant participating in the electricity market transaction and the compensation benefits of participating in the ancillary service market. The benefits of the former depend on the node electricity price on the one hand, and on the actual daily output of the virtual power plant on the other hand. When the actual output of the virtual power plant exceeds the daily demand, the virtual power plant can sell the surplus to the power grid. At this time, the virtual power plant calls its energy storage to discharge, and the controllable load operates normally; when the actual output of the virtual power plant cannot meet the daily demand, the virtual power plant purchases electricity from the power grid. At this time, the virtual power plant calls its energy storage to charge, and the controllable load responds to demand. The benefits of the latter depend on the real-time price and frequency regulation quality of the virtual power plant's frequency regulation service, among which the frequency regulation quality depends on the tracking accuracy of its signal. Then the objective function of VPP's daily operation is:

[0051] (2)

[0052] in, Represents the total revenue of VPP participating in the electric energy market and ancillary service market; It represents the total benefit when the power output of VPP to the grid is in the incremental state (at this time, the output power of distributed energy is increased / energy storage is discharged to the main grid); It represents the total benefit when the power output of VPP to the grid is in a reduced state (at this time, the output power of distributed energy is reduced / energy storage is charged to the main grid). and The expression is:

[0053] (3)

[0054] In formula (3), represents the node electricity price in the market at time t; It represents the power adjustment variable applied by VPP to the unit. Indicates power increase. Indicates a decrease in power; Indicates the cumulative duration of VPP power increase and decrease throughout the day; Indicates the compensation income of participating in frequency regulation service when VPP power is increased. It represents the compensation income from participating in frequency regulation service when the VPP power decreases.

[0055] In some embodiments, the three different time scales include: 60 minutes, 15 minutes and 4 seconds. Accordingly, a dynamic programming model under the time scale of 60 minutes, a dynamic programming model under the time scale of 15 minutes and a dynamic programming model under the time scale of 4 seconds can be constructed.

[0056] Take the construction of a dynamic programming model at a 60-minute time scale as an example: In the dynamic programming model of this time scale, in order to participate in the electric energy market and ancillary service market, the VPP will confirm its own adjustable capacity and frequency regulation quality every 60 minutes as the initial state for participating in the market in the next stage. At the beginning of the day, the VPP will examine the overall capacity change state of the last 60-minute node yesterday as the decision-making basis for the first 60-minute node of the day. At this time, the state of the VPP can be expressed as:

[0057] (4)

[0058] In formula (4), Indicates the state variable of yesterday's end node that the initial 60-minute node needs to examine; Represents the state variable of VPP at the 60min node; represents the total capacity of VPP at time t; , , They represent the capacities of controllable load, distributed generation and energy storage at time t respectively; Indicates the load capacity of the air conditioner. Indicates the load capacity of electric vehicles.

[0059] Then, from t to t+Δt, the capacity change of VPP is:

[0060] (5)

[0061] represents the power adjustment decision made by VPP at the 60-minute node. At this time, the benefit function of VPP can be expressed as:

[0062] (6)

[0063] Using the dynamic programming method, the Bellman equation in equation (6) is expressed as:

[0064] (7)

[0065] In formula (7), It represents the total profit obtained by VPP in the 60-minute node decision throughout the day. It represents the optimal solution of the Bellman equation of the profit function with respect to the state transition variable from time t to time t+Δt.

[0066] Step S102, obtaining constraints on air conditioning load capacity and electric vehicle load.

[0067] Among them, the constraints for obtaining the air conditioning load capacity may include Figure 2 The steps shown are: step S201, determining the capacity portion of the air-conditioning load that can participate in the demand response; step S202, obtaining the constraint conditions of the air-conditioning load capacity according to the capacity portion of the air-conditioning load that can participate in the demand response.

[0068] Specifically, the air conditioning load capacity changes as follows:

[0069] (8)

[0070] in, It represents the part of the capacity of the air conditioner that can participate in demand response. The constraint condition of the air conditioner load capacity is:

[0071] (9)

[0072] In the above formula, Indicates the total air conditioning capacity covered by VPP.

[0073] Among them, obtaining the constraint conditions of the electric vehicle load may specifically include: obtaining the constraint conditions of the electric vehicle load according to the total capacity of electric vehicles covered by the virtual power plant and the capacity of the electric vehicle load.

[0074] Furthermore, the capacity of the electric vehicle load may be obtained according to the charging power, discharging power, charging time and discharging time of the electric vehicle load.

[0075] Specifically, the load capacity of electric vehicles changes as follows:

[0076] (10)

[0077] In the above formula, Indicates the charging power of the electric vehicle, Indicates the discharge power of the electric vehicle; Indicates the charging time. Indicates the discharge duration; Indicates the power loss rate of electric vehicle charging and discharging; is a virtual variable. When it is 1, the electric vehicle is in a discharging state, and when it is 0, the electric vehicle is in a charging state. The constraints of the electric vehicle load are:

[0078] (11)

[0079] In the above formula, Represents the total capacity of electric vehicles covered by VPP.

[0080] Step S103, under the constraints of air conditioning load capacity and electric vehicle load, solve the dynamic programming models at three different time scales to obtain the optimal decision variable solutions and the global optimal solution of the time nodes of the virtual power plant at different time scales.

[0081] Under the constraints of equations (9) and (11), the dynamic programming model at the time scale of 60 minutes, the dynamic programming model at the time scale of 15 minutes, and the dynamic programming model at the time scale of 4 seconds can be solved to obtain the optimal decision variable solutions and the global optimal solution of the time nodes of the virtual power plant at different time scales.

[0082] Specifically, the first step is to solve the 60-minute dynamic programming model, mainly based on the node electricity price, to solve the optimal decision variable solution (referred to as strategy A) made by the controllable load, distributed power source and energy storage resources in the virtual power plant under the condition of the benefits in the next 60 minutes, and then to deduce the optimal decision variable solutions for the remaining 23 60-minute periods within the day, forming the global optimal solution for the whole day on the time scale of 60 minutes;

[0083] The second step is to adjust Strategy A to form the optimal decision variable solution for 15 minutes (referred to as Strategy B) at the latest transaction price within 15 minutes. This is followed by 96 optimal decision variable solutions for 15 minutes, forming the global optimal solution for the whole day on the time scale of 15 minutes.

[0084] The third step is to optimize the FM power under strategy B at the time scale of 4s to form the optimal decision variable solution for 4s, thereby forming the global optimal solution for the time scale of 4s throughout the day.

[0085] In the combinatorial optimization method for the joint clearing problem of the above-mentioned virtual power plant in the electric energy market and the ancillary service market, the dynamic programming models of the virtual power plants participating in the electric energy market and the ancillary service market at three different time scales are obtained; the constraints of the air-conditioning load capacity and the electric vehicle load are obtained; under the constraints of the air-conditioning load capacity and the electric vehicle load, the dynamic programming models at three different time scales are solved to obtain the optimal decision variable solutions and the global optimal solutions of the time nodes of the virtual power plant at different time scales, and the virtual power plant is jointly cleared in the electric energy market and the ancillary service market and the benefits are maximized through the dynamic programming method; and in terms of resource modeling, the present application can provide more sophisticated modeling, distinguish different types of resources (such as air-conditioning load and electric vehicle load) according to their characteristics, introduce corresponding constraints, and refine the evaluation of energy state changes and frequency regulation quality to improve decision-making accuracy.

[0086] In some embodiments, under the constraints of air conditioning load capacity and electric vehicle load, dynamic programming models of three different time scales are solved, which may specifically include the following: Figure 3 The steps shown are: step S301, taking the maximum time scale among the three time scales as the first time scale; step S302, obtaining the decision variable constraints of the virtual power plant at the time node of the first time scale; step S303, solving the dynamic programming model of the first time scale under the constraints of air conditioning load capacity, electric vehicle load and decision variable constraints.

[0087] If the three different time scales include: 60 minutes, 15 minutes and 4 seconds, the first time scale is 60 minutes. Under the 60-minute time scale, according to the standard, the state of charge of the energy storage must be in the range of 10% to 90% of the rated power to extend the service life. Therefore, the decision variable constraints of the VPP at the time node of the 60-minute time scale are:

[0088] (12)

[0089] In the above formula, Indicates the total rated capacity of each unit in the VPP. Indicates the total rated power of each unit in the VPP; , , Indicates the corresponding power adjustment of energy storage, controllable load and distributed generation under this decision; and Represent the power conversion rate of energy storage discharging and charging respectively.

[0090] Under the constraints of equations (9), (11), and (12), the dynamic programming model of the 60-minute time scale, that is, equation (7), is solved to obtain the optimal decision solution and global optimal solution of VPP at the 60-minute node.

[0091] In one embodiment, a dynamic programming model can be constructed at a time scale of 15 minutes. Specifically:

[0092] In the 15-minute time scale, VPP participates in the market based on the latest transaction price given by the market, and the actual output of each unit is the main decision variable considered by VPP. The state of VPP can be expressed as:

[0093] (13)

[0094] From t to t+Δt, the VPP adjusts its output power according to the frequency modulation signal of the power grid, and its capacity changes as follows:

[0095] (14)

[0096] In the above formula, Indicates the unit output decision of VPP at the 15min node; Indicates the power increase capacity of the VPP in response to the grid frequency modulation signal; Indicates the power reduction capacity of the VPP in response to the grid frequency modulation signal.

[0097] The grid determines the compensation benefit based on the accuracy of the VPP response frequency modulation signal. It represents the preset value of the accuracy of VPP responding to the frequency modulation signal in the period from t to t+Δt. , whose size indicates the strength of the VPP tracking FM signal within five minutes The output decision needs to meet the following constraints:

[0098] (15)

[0099] In the above formula, represents the winning bid power of VPP in the day-ahead market DA. At this time, the daily profit function of VPP participating in the electric energy market and ancillary service market at the 15-minute scale is:

[0100] (16)

[0101] Among them, VPP's daily income from participating in frequency modulation services and The expression is:

[0102] (17)

[0103] In the above formula, The unit price for frequency regulation services for the market; Indicates the change in the overall capacity of the VPP during the frequency regulation process on that day.

[0104] Using the dynamic programming method, the Bellman equation expression of formula (16) is:

[0105] (18)

[0106] In the above formula, It represents the total profit obtained by VPP in the 15-minute node decision throughout the day. It represents the optimal solution of the Bellman equation of the profit function with respect to the state transition variable from time t to time t+Δt.

[0107] The other constraints of VPP at the 15-min scale are the same as (9) and (11).

[0108] Under the constraints of equations (9), (11) and (15), the 15-minute dynamic programming model is solved, that is, equation (18) is solved, and the optimal decision solution and the global optimal solution of each 15-minute time node of VPP in the 15-minute time scale can be obtained.

[0109] In one embodiment, a dynamic programming model can be constructed at a time scale of 4 seconds. Specifically:

[0110] At the 4-second time scale, the VPP unit output decision has been determined by the 15-minute node decision, so the only decision variable is the frequency regulation power. At this time, the state of the VPP is:

[0111] (19)

[0112] In the above formula, represents the state variable of VPP at the 4s time scale; represents the frequency modulation signal sent by the power grid at time t. Then the state change of the VPP capacity from t to t+Δt is:

[0113] (20)

[0114] In the above formula, It represents the power regulation decision of VPP at time t in the 4s scale.

[0115] The constraints are:

[0116] (twenty one)

[0117] In the above formula, It means that the power regulation amplitude cannot be lower than the required frequency modulation signal tracking accuracy. According to formula (20), the benefit function of VPP participating in frequency modulation service at the 4s scale is:

[0118] (twenty two)

[0119] In the above formula, It represents the performance compensation given by the power grid according to the quality of VPP frequency regulation service. At this time, at the 4s scale, the Bellman equation expression of the VPP frequency regulation benefit function is:

[0120] (twenty three)

[0121] In the above formula, It represents the total benefit obtained by VPP from the 4s scale frequency modulation decision throughout the day. It represents the optimal solution of the Bellman equation of the profit function with respect to the state transition variable from time t to time t+Δt.

[0122] The other constraints of VPP at the 4s scale are the same as (9) and (11).

[0123] Under the constraints of equations (9), (11) and (21), the dynamic programming model of the 4 s time scale is solved, that is, equation (23) is solved, and the optimal decision solution and global optimal solution of VPP at the 4 s scale can be obtained.

[0124] The above solutions can be achieved through the dynamic programming module of mathematical analysis software. By solving the model under the above three time scales, the optimal strategy for VPP to participate in the electricity energy market and ancillary service market on the same day can be obtained.

[0125] The solution provided in this application has the following advantages: Under the current market conditions, it is more practical to study the strategy optimization of VPP's simultaneous participation in the electric energy market and the ancillary service market, because VPP cannot reduce its operating risk by participating in a single market, which may lead to difficulties in the absorption of new energy and the problem of "abandoning light and wind". The solution provided in this application can fill the defects of only examining VPP's participation in a single market in past studies. In addition to its practical significance at the application level, the solution provided in this application also has flexible applicability. The model of three time scales can cover most of the application scenarios of VPP's participation in the ancillary service market of the energy market on the same day. VPP can determine the global optimization strategy of the day through this method, and can also solve the optimal strategy for specific time periods according to local conditions and characteristic goals. Through the solution provided in this application, the problem of insufficient output of distributed energy and "abandonment of wind and light" in VPP can be significantly improved, and the economy of VPP operation can be improved.

[0126] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0127] Based on the same inventive concept, the embodiment of the present application also provides a combined optimization device for the joint clearing problem of a virtual power plant in the electric energy market and the ancillary service market, which is used to implement the combined optimization method for the joint clearing problem of a virtual power plant in the electric energy market and the ancillary service market involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in the embodiments of the combined optimization device for the joint clearing problem of one or more virtual power plants in the electric energy market and the ancillary service market provided below can be found in the above limitations on the combined optimization method for the joint clearing problem of a virtual power plant in the electric energy market and the ancillary service market, which will not be repeated here.

[0128] In one embodiment, Figure 4 As shown, a combined optimization device for the joint clearing problem of a virtual power plant in an electric energy market and ancillary service market is provided, comprising:

[0129] A model acquisition module 401 is used to acquire dynamic programming models of virtual power plants participating in the electric energy market and the ancillary service market at three different time scales;

[0130] The constraint condition acquisition module 402 is used to acquire the constraint conditions of the air conditioning load capacity and the constraint conditions of the electric vehicle load;

[0131] The solution module 403 is used to solve the dynamic programming model at three different time scales under the constraints of the air conditioning load capacity and the electric vehicle load, and obtain the optimal decision variable solution and the global optimal solution of the time nodes of the virtual power plant at different time scales.

[0132] In one embodiment, the solution module 403 is also used to: take the maximum time scale among the three time scales as the first time scale; obtain the decision variable constraints of the virtual power plant at the time node of the first time scale; and solve the dynamic programming model of the first time scale under the constraints of the air-conditioning load capacity, the constraints of the electric vehicle load and the decision variable constraints.

[0133] In one embodiment, the constraint condition acquisition module 402 is further used to: determine the capacity portion of the air conditioning load that can participate in the demand response; and obtain the constraint condition of the air conditioning load capacity according to the capacity portion of the air conditioning load that can participate in the demand response.

[0134] In one embodiment, the constraint condition acquisition module 402 is further used to obtain the constraint condition of the electric vehicle load according to the total capacity of electric vehicles covered by the virtual power plant and the capacity of the electric vehicle load.

[0135] In one embodiment, the constraint condition acquisition module 402 is further used to obtain the capacity of the electric vehicle load according to the charging power, discharging power, charging time and discharging time of the electric vehicle load.

[0136] In one embodiment, the three different time scales include: 60 minutes, 15 minutes, and 4 seconds.

[0137] Each module in the combined optimization device for the joint clearing problem of the virtual power plant in the electric energy market and the ancillary service market can be implemented in whole or in part by software, hardware, and a combination thereof. Each of the above modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.

[0138] In an exemplary embodiment, a computer device is provided, the internal structure of which can be shown as follows: Figure 5As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data involved in the above method. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a combined optimization method for the joint clearing problem of a virtual power plant in the electric energy market and the ancillary service market is implemented.

[0139] Those skilled in the art will understand that Figure 5 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0140] In one embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps in the above-mentioned various method embodiments when executing the computer program.

[0141] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0142] In one embodiment, a computer program product is provided, on which a computer program is stored, and the computer program is used by a processor to execute the steps in the above-mentioned various method embodiments.

[0143] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0144] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.

[0145] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0146] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A combined optimization method for the joint clearing problem of virtual power plants in the electricity market and ancillary service market. It is characterized in that The method comprises: Obtain dynamic programming models of virtual power plants participating in the electric energy market and ancillary service market at three different time scales; Obtain constraints on air conditioning load capacity and electric vehicle load; Under the constraints of the air-conditioning load capacity and the electric vehicle load, the dynamic programming models at three different time scales are solved to obtain the optimal decision variable solutions and the global optimal solution of the time nodes of the virtual power plant at different time scales.

2. The method according to claim 1, It is characterized in that Under the constraints of the air conditioning load capacity and the electric vehicle load, three dynamic programming models of different time scales are solved, including: The largest time scale among the three time scales is taken as the first time scale; Obtaining the decision variable constraints of the virtual power plant at the time nodes of the first time scale; Under the constraints of the air-conditioning load capacity, the electric vehicle load and the decision variable constraints, a dynamic programming model of the first time scale is solved.

3. The method according to claim 1, It is characterized in that Obtain the constraints of air conditioning load capacity, including: Determine the capacity portion of air conditioning load that can participate in demand response; According to the capacity part of air-conditioning load that can participate in demand response, the constraint condition of air-conditioning load capacity is obtained.

4. The method according to claim 1, It is characterized in that Obtain constraints on electric vehicle loads, including: According to the total capacity of electric vehicles covered by the virtual power plant and the capacity of the electric vehicle load, the constraints of the electric vehicle load are obtained.

5. The method according to claim 4, It is characterized in that The method further comprises: The capacity of the electric vehicle load is obtained according to the charging power, discharging power, charging time and discharging time of the electric vehicle load.

6. The method according to claim 1, It is characterized in that Three different time scales are included: 60 minutes, 15 minutes and 4 seconds.

7. A combined optimization device for virtual power plants in the joint clearing of the electricity market and ancillary service market. It is characterized in that The device comprises: A model acquisition module is used to obtain dynamic programming models of virtual power plants participating in the electric energy market and ancillary service market at three different time scales; A constraint condition acquisition module, used to acquire the constraint conditions of the air conditioning load capacity and the constraint conditions of the electric vehicle load; The solution module is used to solve the dynamic programming model at three different time scales under the constraints of the air conditioning load capacity and the electric vehicle load, and obtain the optimal decision variable solution and the global optimal solution of the time nodes of the virtual power plant at different time scales.

8. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the method according to any one of claims 1 to 6 is implemented.

9. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.

10. A computer program product comprising a computer program, It is characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.

Citation Information

Cited By

  • Virtual power plant-oriented multi-objective optimization model construction, regulation and control method and system

    CN120069148A