Intelligent traffic and data analysis method based on gravity energy storage of bullet train and related equipment
By obtaining data from EMUs and stations in real time, analyzing the operating routes and loads of EMUs, generating dynamic adjustment instructions to optimize EMUs operation and scheduling, solving the problem of EMUsing the inability to perform EMUs based on real-time data in the existing technology, and improving transportation Efficiency and reduce resource waste.
Patent Information
- Application Number
- CN202410812827.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-22
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-06-22
AI Technical Summary
The existing EMU dispatching system cannot perform operational EMUs based on real-time data, resulting in traffic abnormalities such as delayed arrival at the station.
By obtaining data from EMUs and stations in real time, analyzing the operating routes and load conditions of EMUs, generating dynamic adjustment instructions to optimize the operation scheduling of EMUs, and reducing passenger waiting time and waste of energy resources.
Real-time response and optimization of EMU operations is achieved, transportation efficiency is improved, passenger waiting time is reduced, and energy resources are avoided and traffic congestion is avoided.
Smart Images

Figure CN118917570A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of motor vehicle transportation, and in particular to an intelligent transportation and data analysis method and related equipment based on motor vehicle gravity energy storage. Background Art
[0002] As a high-speed electric vehicle, EMU trains are usually used on intercity and high-speed routes. They can provide higher operating speeds and travel cost-effectiveness than traditional internal combustion vehicles, making them the preferred means of transportation for most intercity and long-distance passengers.
[0003] At present, the EMU dispatching system that has been used obtains the operation data of the EMU through sensors, so as to dispatch the EMUs entering the same station and avoid congestion of EMUs on the same track entering the station. However, the existing dispatching system does not combine the operation data between EMUs with passenger data to dispatch the operation of EMUs. Therefore, the existing EMUs still rely on the preset departure timetable for entering and exiting the station and planning the operation route. It is impossible to perform intelligent transportation and data analysis based on EMU gravity energy storage according to real-time data, and traffic anomalies such as EMUs arriving late will occur. Summary of the invention
[0004] In view of this, the present application provides an intelligent transportation and data analysis method and related equipment based on EMU gravity energy storage to solve the problems of intelligent transportation and data analysis based on EMU gravity energy storage.
[0005] The first aspect of the present application provides an intelligent transportation and data analysis method based on vehicle gravity energy storage, the method comprising: Acquire in real time the first target data of each EMU in the target area and the second target data of each station in the target area; According to a preset EMU operation analysis method and the first target data, an operation analysis is performed on each EMU in the target area to obtain a stop data set; According to the preset entry and exit time threshold and the stop data set, the overlapping information of the running routes between each EMU in the target area is obtained; generating load adjustment instructions for each site in the target area according to the overlap information and the second target data; Generate an operation dispatch instruction for each EMU in the target area according to the load adjustment instruction and the first target data; The load adjustment instruction and the operation scheduling instruction are sent to the corresponding station and the EMU respectively, so that the station and the EMU are dynamically adjusted according to the corresponding instructions.
[0006] In an optional implementation, the step of performing operation analysis on each EMU in the target area to obtain a stop data set according to a preset EMU operation analysis method and the first target data includes: Acquire the planned route of the EMU according to the train number marked by the first target data; According to the EMU operation analysis mode, the speed of the EMU and the current positioning information of the EMU, the coordinates of the current position of the EMU are marked on the planned route, and the entry and exit times of the stations to be passed along the route are marked, so as to generate the stop data of the EMU at each station in the target area, wherein the first target data includes the speed of the EMU and the current positioning information of the EMU; The stop data corresponding to each EMU in the target area are synthesized into the stop data set.
[0007] In an optional implementation, the obtaining, according to the preset entry and exit time threshold and the stop data set, the overlap information of the running routes between each EMU in the target area includes: According to the coordinate mark and speed direction of each EMU, the information of the station that each EMU will enter is obtained, wherein the stop data set includes the coordinate mark and the speed direction; Classifying the stop data set according to the station information and a preset entry and exit time threshold to obtain a stop data set associated with the same station; The overlapping information of the running routes between the EMUs in the target area is obtained according to the same-station associated stop data set.
[0008] In an optional implementation, generating a load adjustment instruction for each site in the target area according to the overlap information and the second target data includes: According to a preset boarding time threshold and travel information of a waiting load, classifying the second target data by destination station to obtain adjustment target information, wherein the second target data includes the travel information; A load adjustment instruction for each site in the target area is generated according to the overlap information and the adjustment target information.
[0009] In an optional implementation, the scheduling target information includes the number of sites along the line. When the number of sites along the line is greater than 1, generating a load adjustment instruction for each site in the target area according to the overlap information and the adjustment target information includes: Acquire historical throughput information of the stations along the route according to the current time; According to the preset adjustment model, the adjustment target information and the overlap information, a load adjustment instruction for each site in the target area is generated.
[0010] In an optional implementation, generating the operation dispatching instruction of each EMU in the target area according to the load adjustment instruction and the first target data includes: generating station stop information according to the load adjustment instruction; According to the station stop information and the first target data, an operation dispatch instruction for each EMU in the target area is generated.
[0011] In an optional embodiment, the method further comprises: Acquire the energy recovery point on the planned route according to the operation scheduling instruction; Energy recovery instructions for each EMU in the target area are generated according to the energy recovery points.
[0012] The second aspect of the present application provides an intelligent transportation and data analysis device based on vehicle gravity energy storage, the device comprising: A data acquisition module, used for acquiring in real time the first target data of each EMU in the target area and the second target data of each station in the target area; An operation analysis module, used for performing operation analysis on each EMU in the target area according to a preset EMU operation analysis method and the first target data, so as to obtain a stop data set; A route matching module, used to obtain the overlap information of the running routes between each EMU in the target area according to the preset entry and exit time threshold and the stop data set; A load adjustment module, configured to generate a load adjustment instruction for each site in the target area according to the overlap information and the second target data; An operation scheduling module, used for generating an operation scheduling instruction for each EMU in the target area according to the load adjustment instruction and the first target data; The instruction sending module is used to send the load adjustment instruction and the operation scheduling instruction to the corresponding station and the EMU respectively, so that the station and the EMU are dynamically adjusted according to the corresponding instructions.
[0013] A third aspect of the present application provides a server, which includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and when the processor executes the computer program, the steps of the intelligent transportation and data analysis method based on vehicle gravity energy storage as described above are implemented.
[0014] A fourth aspect of the present application is a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the intelligent transportation and data analysis method based on vehicle gravity energy storage as described above.
[0015] In summary, this application at least includes the following beneficial technical effects: 1. By collecting data in real time and generating dynamic adjustment instructions, it can quickly respond to changes in EMUs and stations in the target area, thereby improving operational efficiency.
[0016] 2. By analyzing the overlap of running routes and generating load adjustment instructions, the transportation efficiency of EMUs can be optimized, which can reduce the waiting time of passengers and optimize the travel experience of passengers.
[0017] 3. Generate reasonable operation dispatch instructions according to the load demand of the station and the operating status of the EMU, avoid waste of energy resources and EMU traffic congestion, and improve the operating efficiency of the EMU.
[0018] 5. Respond to various emergencies and abnormal situations in real time, such as delays, failures, etc., and ensure the stable operation of the entire EMU transportation network through dynamic adjustments. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 It is a flow chart of an intelligent transportation and data analysis method based on vehicle gravity energy storage provided by an embodiment of the present application; Figure 2 It is a functional module diagram of an intelligent transportation and data analysis device based on vehicle gravity energy storage provided by an embodiment of the present application; Figure 3 It is a schematic diagram of the structure of the server provided in the embodiment of the present application. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0022] The intelligent transportation and data analysis method based on the gravity energy storage of electric vehicles provided in the embodiment of the present application is executed by a server, and accordingly, the intelligent transportation and data analysis device based on the gravity energy storage of electric vehicles runs in the server. When the server implements the intelligent transportation and data analysis method based on the gravity energy storage of electric vehicles of the present application, the transportation deployment of passengers and / or goods can be realized. The intelligent transportation and data analysis method based on the gravity energy storage of electric vehicles provided in the embodiment of the present application is described below from the perspective of the server in combination with the process of adjusting the transportation network of the freight train group.
[0023] like Figure 1 The figure is a flow chart of the intelligent transportation and data analysis method based on the gravity energy storage of electric vehicles provided in the embodiment of the present application. The intelligent transportation and data analysis method based on the gravity energy storage of electric vehicles provided in the embodiment of the present application includes the following steps.
[0024] Step S11, acquiring in real time the first target data of each EMU in the target area and the second target data of each station in the target area.
[0025] It should be understood that in order to cope with the huge scale of the EMU route network and the complexity of the transportation situation, improve the efficiency of EMU use, optimize resource allocation, facilitate inspection and maintenance, and meet the travel needs of passengers, the EMU transportation network is managed in a zoned management manner, and each server is responsible for the EMU dispatching of a target area.
[0026] The first target data is used to display the operation and transportation data of each EMU, including but not limited to the speed, current positioning information, load status and load loading and unloading information of the EMU; the second target data is used to display the facilities and waiting data of each station, including but not limited to travel information, station waiting information, station coordinate information and station entry and exit planning route information. When the second target data is passenger information, the station waiting information includes but is not limited to ticket information and station entry waiting information in the current time period.
[0027] The server of the present application uses wired communication and / or wireless communication to obtain the first target data through the sensor on the EMU (for example, Beidou satellite locator), and obtains the second target data through the monitoring system, ticket checking system and ticket selling system on the site. In order to distinguish the data between each EMU and the data between each site in the target area, the data of the same EMU is marked with the train number of the corresponding EMU, and the data of the same site is marked with the positioning coordinates corresponding to the site.
[0028] Step S12, performing operation analysis on each EMU in the target area according to a preset EMU operation analysis method and the first target data to obtain a stop data set.
[0029] The stop data set is composed of various stop data, and the stop data is the entry and exit time of the corresponding planned route predicted by the server based on the real-time operation status (for example, speed) of the EMU.
[0030] The server of the present application obtains the corresponding train number by identifying the first target data, and then obtains the planned route from the information management system or database of the railway system according to the train number and the current time. The planned route records the detailed information and operation plan of the EMU, including but not limited to the planned route, starting and ending stations, passing stations, and the arrival time and departure time of each station.
[0031] After obtaining the planned route of the EMU, in order to reduce the complexity of data processing, the server of the present application filters the information of the planned route according to the coordinate threshold of the managed target area to obtain a planned route that only contains the route and station-related information within the target area. At the same time, the real-time speed data and current positioning information of the EMU are obtained by parsing the first target data, and the coordinates of the current position of the EMU are marked on the planned route. The running status of the EMU is analyzed in real time through a preset operation analysis method, so that according to the speed and distance information of the EMU, the entry and exit time of the stations to be passed along the way is predicted and the predicted entry and exit time is marked on the planned route. By integrating the current coordinate mark and the entry and exit time mark of the EMU on the planned route, the stop data of the EMU at each station in the target area is generated, and the stop data corresponding to all EMUs in the target area are integrated into a unified stop data set.
[0032] By adopting the above implementation mode, by acquiring the operation data of the EMU in real time and combining it with the preset operation analysis method, the entry and exit time of the EMU can be accurately predicted, ensuring the high real-time and accuracy of the stop data set, while providing important data support for the intelligent operation system.
[0033] Step S13, obtaining the overlap information of the running routes between each EMU in the target area according to the preset entry and exit time threshold and the stop data set.
[0034] Among them, the overlapping information includes but is not limited to the list of EMUs stopping at the same station, the expected entry time range, and the overlapping parts of the routes after leaving the station.
[0035] According to the coordinate marks and speed direction in the stop data set, the station information that each EMU will enter is determined. Therefore, the stop data set is classified according to the station information and the preset entry and exit time threshold. Specifically, the stop data of the EMUs that are expected to arrive at the same station and within the time threshold are classified into one category to form the same-station associated stop data set. Finally, by analyzing the running routes of each EMU in the same-station associated stop data set, the overlapped parts of the running routes between the EMUs are determined.
[0036] Exemplarily, the target area includes multiple stations such as station A, station B, station C, and 10 minutes is preset as the entry and exit time threshold. There are three EMUs, namely EMU 1, EMU 2, and EMU 3. The server obtains the following data based on the analysis of the stop data set containing the three EMUs: EMU 1: The estimated entry time at station A is 10:00, and it goes to station B after leaving the station; EMU 2: The estimated entry time at station A is 10:05, and it goes to station C after leaving the station; EMU 3: The estimated entry time at station A is 10:12, and it also goes to station B after leaving the station. Since the estimated entry time of EMU 1 and EMU 3 at station A is between 10:00 and 10:10 (i.e., 10:00±10 minutes), they are classified into one category to form a stop data set associated with the same station. The entry time of EMU 2 is not within the time threshold, so the overlap with EMU 1 and EMU 3 is not considered for the time being. After leaving the station, EMU 1 and EMU 3 both go to station B, so they overlap on the running route from station A to station B. Therefore, the first target data of EMU 1 and EMU 3 are obtained and the overlap of the first target data on the running route is captured to obtain the overlap information.
[0037] By adopting the above implementation method, the EMUs can be reasonably dispatched according to the overlapping information of the running routes, so as to avoid too many EMUs arriving or departing at the same station or on the same section of the running route at the same time, thereby reducing possible conflicts and delays. By analyzing the overlap of the EMU running routes, the passenger flow of each station can be predicted more accurately, so as to reasonably allocate resources such as platforms and waiting rooms and improve resource utilization efficiency. The overlapping information of the running routes can provide data support for the intelligent operation system. For example, based on this information, the system can automatically adjust the train schedule, optimize the passenger transfer plan, etc., and promote the development of the railway system towards intelligence and automation.
[0038] Step S14: generating load adjustment instructions for each site in the target area according to the overlap information and the second target data.
[0039] The server of the present application classifies the second target data based on the preset boarding time threshold (for example, cargo assembly time) and the travel information of the waiting load (for example, the destination station of cargo transportation). The load groups that are expected to arrive at the same station in the same time period are identified according to the boarding time threshold, and their destination stations are determined. Therefore, according to the overlap information associated with the classified load groups and the EMUs corresponding to the load groups, the second target data is screened to obtain the adjustment target information. Among them, the scheduling target information includes but is not limited to the number of stations along the line.
[0040] After obtaining the dispatch target information, the server determines whether the capacity of the EMU has excess carrying capacity to transport all load groups at the station based on the overlap information. After determining the EMU that meets the carrying requirements, the server determines which loads can be adjusted to the same EMU, as well as the adjusted EMU running route and stop stations based on the target information and overlap information. Based on the determined adjustment plan, the server generates specific load adjustment instructions. Among them, the load adjustment instructions include but are not limited to the load information that needs to be adjusted, the EMUs and stations involved, the time and method of adjustment, etc.
[0041] Exemplarily, there is a transport route in the target area, which includes station A, station B, station C and station D in the order of arrival of the current EMU. The server collects the second target data in station A, including that the destination of cargo A is station C, and the estimated boarding time is XX:XX; the destination of cargo B is station C, and the estimated boarding time is XX:XX+5 minutes (i.e., 5 minutes after cargo A). The server classifies the second target data based on the preset 10-minute boarding time threshold and the destination station of the cargo, and classifies cargo A and cargo B into one category to obtain their related adjustment target information. At the same time, the server finds two EMUs (i.e., EMU 1 and EMU 2) that are about to enter station A based on the overlapping information. Among them, EMU 1 goes directly to station C from station A, while EMU 2 goes from station A through station B and finally to station C. EMU 1 has sufficient carrying capacity to transport cargo A and cargo B at the same time, and EMU 2 does not need to unload the cargo at station A. The server determines the following adjustment plan: Cargo B, which was originally required to be transported by EMU 2, is adjusted to EMU 1, and EMU 2 does not need to stop at station A and goes directly to station B. Based on the above adjustment plan, the server generates a specific load adjustment instruction, which includes: load information to be adjusted: Cargo B; EMUs and stations involved: Cargo B is adjusted to EMU 1, from station A directly to station C; adjustment time: before the expected boarding time of Cargo A.
[0042] In summary, the above implementations at least have the following beneficial effects: 1. By classifying and screening the second target data and combining it with the overlapping information, the server can accurately determine which loads can be adjusted to the same EMU, thereby reducing the waiting time and idle time of the EMU and improving the overall transportation efficiency.
[0043] 2. After confirming that the EMU has sufficient carrying capacity, the server can reasonably distribute the load to avoid wasting resources. At the same time, it also ensures that each load can reach the destination in the shortest time.
[0044] 3. By optimizing the EMU's operating routes and stopovers, unnecessary stops and trips are reduced, thereby reducing fuel consumption and vehicle wear and tear, and reducing operating costs.
[0045] 4. The server can dynamically adjust the transportation plan according to the real-time load information and EMU status, thus enhancing the flexibility and adaptability of transportation.
[0046] In an optional implementation, when the number of sites along the line is greater than 1, generating a load adjustment instruction for each site in the target area according to the overlap information and the adjustment target information includes: Acquire historical throughput information of the stations along the route according to the current time; According to the preset adjustment model, the adjustment target information and the overlap information, a load adjustment instruction for each site in the target area is generated.
[0047] Exemplarily, if in the embodiment of step S14, the server determines an adjustment plan to adjust cargo A to EMU 2. Since the number of stations along the line that cargo A and cargo B need to pass through is 2, the server needs to obtain the historical throughput information of station B on the same date last year from the database according to the current date, and filter out the predicted number of cargoes that need to be transported from station B to station C by EMU 2 from the historical throughput information according to the predicted arrival time of EMU 2 at station B. The adjustment model preset in the server makes a judgment based on the predicted number of cargoes, the number of cargoes A and cargoes B in the adjustment target information, and the remaining carrying capacity of the current EMU 2 in the overlap information. When the remaining carrying capacity meets the sum of the number of cargoes A, cargo, and predicted cargo, the server generates a load adjustment instruction for station A according to the adjustment plan; when the remaining carrying capacity does not meet the sum of the number of cargoes A, cargo, and predicted cargo, the server interrupts the generation of the load adjustment instruction for station A.
[0048] In summary, the above implementations at least have the following beneficial effects: 1. By considering the historical throughput information of stations along the route, the server can more accurately predict and evaluate the load conditions that each station may face in the future. This helps the server generate more precise load adjustment instructions to ensure that goods can be transported at the right time and on the right train, reducing resource waste or transportation delays caused by inaccurate predictions.
[0049] 2. When the remaining carrying capacity does not meet the total quantity of cargo A, cargo B and predicted cargo, the server can interrupt the generation of load adjustment instructions for station A, avoiding transportation safety hazards caused by overloading. This helps to improve the reliability and safety of the entire transportation system.
[0050] Step S15: generating operation dispatching instructions for each EMU in the target area according to the load adjustment instruction and the first target data.
[0051] After the server generates a load adjustment instruction for adjusting the station, it captures the target information according to the load adjustment instruction to obtain the relevant information of the EMU that needs to be scheduled, and generates new station entry and stop information for the scheduled EMU. Among them, the station entry and stop information includes but is not limited to the train number that needs to be scheduled, the station that needs to stop and the corresponding stop time, and the load information that needs to be loaded or unloaded at the corresponding station. Exemplarily, according to the load adjustment instruction generated in the example of step S14, the server generates the following station entry and stop information: vehicle information entering the station: EMU 1; station information entered: station A; station entry and stop time: from the time when EMU 1 is expected to enter station A to the time when the original EMU 2 departs from station A.
[0052] After obtaining the stop information, the server generates an operation dispatch instruction according to the stop information and the first target data of the corresponding EMU. The first target data includes but is not limited to the original operation plan, speed limit, signal control and other basic information of the EMU. Exemplarily, according to the stop information generated in the example of step S15, the server obtains the stop information and captures the estimated time point of stop A, the original operation plan, speed limit, signal control and other basic information from the first target information of EMU 1. At the same time, the server captures the speed, current positioning information and the departure time point of the original station A from the first target information of EMU 2, and generates the operation dispatch instruction of the EMU.
[0053] The dispatching instructions are used to guide the basic equipment of the EMU transportation network to dispatch the EMUs, including but not limited to detailed information such as the specific actions of the EMUs at each station and the time requirements.
[0054] Step S16, sending the load adjustment instruction and the operation scheduling instruction to the corresponding station and EMU respectively, so that the station and the EMU are dynamically adjusted according to the corresponding instructions.
[0055] For example, station A receives a load adjustment instruction to transport cargo A and cargo B to the loading and unloading point of EMU 1. EMU 1 receives an operation dispatch instruction and decelerates to establish a station according to the instruction, and sends an entry code to station A at the same time, and performs the entry action of station A according to the guidance of the signal light of station A and the change of the driving track. EMU 2 receives an operation dispatch instruction and transports or accelerates according to the instruction to drive on the current road to achieve a deviation from the entry track direction of station A.
[0056] In an optional embodiment, the method further comprises: Acquire the energy recovery point on the planned route according to the operation scheduling instruction; Energy recovery instructions for each EMU in the target area are generated according to the energy recovery points.
[0057] Among them, the energy recovery point is the coordinate point of braking deceleration in the EMU operation plan and the coordinate point where gravitational potential energy is released (i.e., downhill section).
[0058] The server obtains the corresponding adjustment route of the EMU by running the dispatching instruction, and generates an energy recovery instruction containing the corresponding coordinate points according to the energy recovery points included in the adjustment route, and sends it to the corresponding EMU. However, when the EMU detects that the current positioning information contains the coordinate points in the energy recovery instruction, it controls the generator to connect to the transmission device of the wheel, or adjusts the motor to the generator mode. In this way, the energy recovery of kinetic energy and / or gravitational potential energy during driving is realized by converting it into electrical energy.
[0059] The present application is applied to the field of EMU transportation technology, by acquiring the first target data of the EMU and the second target data of the station in real time, analyzing the first target data according to the EMU operation analysis method to obtain the EMU stop data set; obtaining the overlap information of the operation routes between the EMUs that will enter the same station according to the entry and exit time threshold and the stop data set; generating the load adjustment instructions for the stations in the corresponding operation path according to the overlap information and the second target data; generating the operation dispatching instructions of the EMU according to the load adjustment instructions and the first target data, and finally sending the instructions to the corresponding stations and EMUs respectively, so that the stations and EMUs are dynamically adjusted according to the instructions. The present application performs operation analysis based on real-time data, so as to respond quickly according to the actual situation, so as to realize the dynamic adjustment of the transportation network.
[0060] like Figure 2As shown, it is a functional module diagram of an intelligent transportation and data analysis device based on vehicle gravity energy storage provided in an embodiment of the present application.
[0061] In some embodiments, the intelligent transportation and data analysis device 2 based on motor vehicle gravity energy storage may include multiple functional modules composed of computer program segments. The computer program of each program segment in the intelligent transportation and data analysis device 2 based on motor vehicle gravity energy storage may be stored in the memory of the server and executed by at least one processor to execute (see Figure 1 Description) The functions of intelligent transportation and data analysis methods based on EMU gravity energy storage.
[0062] In this embodiment, the intelligent transportation and data analysis device 2 based on the gravity energy storage of the motor vehicle can be divided into multiple functional modules according to the functions it performs. The functional modules may include: a data acquisition module 21, an operation analysis module 22, a route matching module 23, a load adjustment module 24, an operation scheduling module 25, an instruction sending module 26 and an energy recovery module 27. The module referred to in the present invention refers to a series of computer program segments that can be executed by at least one processor and can complete fixed functions, which are stored in a memory. In this embodiment, the functions of each module will be described in detail in subsequent embodiments.
[0063] The data acquisition module 21 is used to acquire the first target data of each EMU in the target area and the second target data of each station in the target area in real time.
[0064] The operation analysis module 22 is used to perform operation analysis on each EMU in the target area according to a preset EMU operation analysis method and the first target data to obtain a stop data set.
[0065] In an optional embodiment, the operation analysis module 22 is specifically used for: Acquire the planned route of the EMU according to the train number marked by the first target data; According to the EMU operation analysis mode, the speed of the EMU and the current positioning information of the EMU, the coordinates of the current position of the EMU are marked on the planned route, and the entry and exit times of the stations to be passed along the route are marked, so as to generate the stop data of the EMU at each station in the target area, wherein the first target data includes the speed of the EMU and the current positioning information of the EMU; The stop data corresponding to each EMU in the target area are synthesized into the stop data set.
[0066] The route matching module 23 is used to obtain the overlapping information of the running routes between each EMU in the target area according to the preset entry and exit time threshold and the stop data set.
[0067] In an optional implementation, the route matching module 23 is specifically used for: According to the coordinate mark and speed direction of each EMU, the information of the station that each EMU will enter is obtained, wherein the stop data set includes the coordinate mark and the speed direction; Classifying the stop data set according to the station information and a preset entry and exit time threshold to obtain a stop data set associated with the same station; The overlapping information of the running routes between the EMUs in the target area is obtained according to the same-station associated stop data set.
[0068] The load adjustment module 24 is used to generate a load adjustment instruction for each site in the target area according to the overlap information and the second target data.
[0069] In an optional implementation, the load adjustment module 24 is specifically configured to: According to a preset boarding time threshold and travel information of a waiting load, classifying the second target data by destination station to obtain adjustment target information, wherein the second target data includes the travel information; A load adjustment instruction for each site in the target area is generated according to the overlap information and the adjustment target information.
[0070] In an optional implementation, the scheduling target information includes the number of sites along the line. When the number of sites along the line is greater than 1, the load adjustment module 24 is specifically configured to: Acquire historical throughput information of the stations along the route according to the current time; According to the preset adjustment model, the adjustment target information and the overlap information, a load adjustment instruction for each site in the target area is generated.
[0071] The operation scheduling module 25 is used to generate the operation scheduling instructions for each EMU in the target area according to the load adjustment instruction and the first target data.
[0072] In an optional implementation, the operation scheduling module 25 is specifically used to: generating station stop information according to the load adjustment instruction; According to the station stop information and the first target data, an operation dispatch instruction for each EMU in the target area is generated.
[0073] The instruction sending module 26 is used to send the load adjustment instruction and the operation scheduling instruction to the corresponding station and the EMU respectively, so that the station and the EMU are dynamically adjusted according to the corresponding instructions.
[0074] In an optional embodiment, the intelligent transportation and data analysis device 2 based on vehicle gravity energy storage further includes an energy recovery module 27, and the energy recovery module 27 is used to: Acquire the energy recovery point on the planned route according to the operation scheduling instruction; Energy recovery instructions for each EMU in the target area are generated according to the energy recovery points.
[0075] It should be understood that the various variations and specific embodiments of the methods provided in the above embodiments are also applicable to the intelligent transportation and data analysis device based on EMU gravity energy storage in the present embodiment. Through the above detailed description of the intelligent transportation and data analysis method based on EMU gravity energy storage, those skilled in the art can clearly understand the implementation method of the intelligent transportation and data analysis device based on EMU gravity energy storage in the present embodiment. For the sake of brevity of the specification, it will not be described in detail here.
[0076] like Figure 3 , which is a schematic diagram of the structure of the server provided in an embodiment of the present application.
[0077] In a preferred embodiment of the present invention, the server 3 may include, but is not limited to: a memory 31 , at least one processor 32 and at least one communication bus 33 .
[0078] Those skilled in the art should understand that Figure 3 The structure of the server 3 shown does not constitute a limitation of the embodiment of the present invention, and the server 3 may also include more or less other hardware or software than shown in the figure, or a different arrangement of components.
[0079] In some embodiments, the server 3 is a device that can automatically perform numerical calculations and / or information processing according to pre-set or stored instructions, and its hardware includes but is not limited to microprocessors, application-specific integrated circuits, programmable gate arrays, digital processors, and embedded devices.
[0080] It should be noted that the server 3 is only an example, and other existing or future electronic products that are suitable for the present application should also be included in the protection scope of the present application and included here by reference.
[0081] In some embodiments, a computer program is stored in the memory 31, and when the computer program is executed by the at least one processor 32, all or part of the steps in the intelligent transportation and data analysis method based on the gravity energy storage of the motor vehicle are implemented. The memory 31 includes a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable rewritable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data. Further, the computer-readable storage medium may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function, and the like.
[0082] In some embodiments, the at least one processor 32 is the control core (ControlUnit) of the server 3, and uses various interfaces and lines to connect the various components of the entire server 3, and executes various functions and processes data of the server 3 by running or executing the program or module stored in the memory 31, and calling the data stored in the memory 31. For example, when the at least one processor 32 executes the computer program stored in the memory 31, it implements all or part of the steps of the intelligent transportation and data analysis method based on the gravity energy storage of the motor vehicle described in the embodiment of the present application; or implements all or part of the functions of the intelligent transportation and data analysis device based on the gravity energy storage of the motor vehicle. The at least one processor 32 can be composed of an integrated circuit, for example, it can be composed of a single packaged integrated circuit, or it can be composed of multiple integrated circuits with the same function or different functions, including one or more central processing units (CPU), microprocessors, digital processing chips, graphics processors, and various control chips.
[0083] In some embodiments, the at least one communication bus 33 is configured to realize the connection and communication between the memory 31 and the at least one processor 32, etc. Although not shown, the server 3 may also include a power supply (such as a battery) for powering each component. Preferably, the power supply may be logically connected to the at least one processor 32 through a power management device, so as to realize the functions of managing charging, discharging, and power consumption management through the power management device. The power supply may also include any components such as one or more DC or AC power supplies, recharging devices, power failure detection circuits, power converters or inverters, power status indicators, etc. The server 3 may also include a variety of sensors, Bluetooth modules, Wi-Fi modules, etc., which will not be repeated here.
[0084] The above-mentioned integrated unit implemented in the form of a software function module can be stored in a computer-readable storage medium. The above-mentioned software function module is stored in a storage medium, including a number of instructions for enabling a server (which can be a personal computer, electronic device, or network device, etc.) or a processor to execute part of the method described in each embodiment of the present application.
[0085] In the several embodiments provided in this application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only illustrative, for example, the division of the modules is only a logical function division, and there may be other division methods in actual implementation.
[0086] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, and may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0087] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An intelligent transportation and data analysis method based on vehicle gravity energy storage, characterized in that: The method comprises: Acquire in real time the first target data of each EMU in the target area and the second target data of each station in the target area; According to a preset EMU operation analysis method and the first target data, an operation analysis is performed on each EMU in the target area to obtain a stop data set; According to the preset entry and exit time threshold and the stop data set, the overlapping information of the running routes between each EMU in the target area is obtained; generating load adjustment instructions for each site in the target area according to the overlap information and the second target data; Generate an operation dispatch instruction for each EMU in the target area according to the load adjustment instruction and the first target data; The load adjustment instruction and the operation scheduling instruction are sent to the corresponding station and the EMU respectively, so that the station and the EMU are dynamically adjusted according to the corresponding instructions.
2. The intelligent transportation and data analysis method based on vehicle gravity energy storage according to claim 1 is characterized in that: The performing operation analysis on each EMU in the target area to obtain a stop data set according to the preset EMU operation analysis method and the first target data includes: Acquire the planned route of the EMU according to the train number marked by the first target data; According to the EMU operation analysis mode, the speed of the EMU and the current positioning information of the EMU, the coordinates of the current position of the EMU are marked on the planned route, and the entry and exit times of the stations to be passed along the route are marked, so as to generate the stop data of the EMU at each station in the target area, wherein the first target data includes the speed of the EMU and the current positioning information of the EMU; The stop data corresponding to each EMU in the target area are synthesized into the stop data set.
3. The intelligent transportation and data analysis method based on vehicle gravity energy storage according to claim 2 is characterized in that: The obtaining, according to the preset entry and exit time threshold and the stop data set, the overlapping information of the running routes between the EMUs in the target area comprises: According to the coordinate mark and speed direction of each EMU, the information of the station that each EMU will enter is obtained, wherein the stop data set includes the coordinate mark and the speed direction; Classifying the stop data set according to the station information and a preset entry and exit time threshold to obtain a stop data set associated with the same station; The overlapping information of the running routes between the EMUs in the target area is obtained according to the same-station associated stop data set.
4. The intelligent transportation and data analysis method based on vehicle gravity energy storage according to claim 3 is characterized in that: Generating load adjustment instructions for each site in the target area according to the overlap information and the second target data includes: According to a preset boarding time threshold and travel information of a waiting load, classifying the second target data by destination station to obtain adjustment target information, wherein the second target data includes the travel information; A load adjustment instruction for each site in the target area is generated according to the overlap information and the adjustment target information.
5. The intelligent transportation and data analysis method based on vehicle gravity energy storage according to claim 4 is characterized in that: The scheduling target information includes the number of sites along the line. When the number of sites along the line is greater than 1, generating a load adjustment instruction for each site in the target area according to the overlap information and the adjustment target information includes: Acquire historical throughput information of the stations along the route according to the current time; According to the preset adjustment model, the adjustment target information and the overlap information, a load adjustment instruction for each site in the target area is generated.
6. The intelligent transportation and data analysis method based on vehicle gravity energy storage according to claim 3 is characterized in that: The generating, according to the load adjustment instruction and the first target data, the operation dispatching instruction of each EMU in the target area comprises: generating station stop information according to the load adjustment instruction; According to the station stop information and the first target data, an operation dispatch instruction for each EMU in the target area is generated.
7. The intelligent transportation and data analysis method based on vehicle gravity energy storage according to claim 2 is characterized in that: The method further comprises: Acquire the energy recovery point on the planned route according to the operation scheduling instruction; Energy recovery instructions for each EMU in the target area are generated according to the energy recovery points.
8. An intelligent transportation and data analysis device based on vehicle gravity energy storage, characterized in that: The device comprises: A data acquisition module, used for acquiring in real time the first target data of each EMU in the target area and the second target data of each station in the target area; An operation analysis module, used for performing operation analysis on each EMU in the target area according to a preset EMU operation analysis method and the first target data, so as to obtain a stop data set; A route matching module, used to obtain the overlap information of the running routes between each EMU in the target area according to the preset entry and exit time threshold and the stop data set; A load adjustment module, configured to generate a load adjustment instruction for each site in the target area according to the overlap information and the second target data; An operation scheduling module, used for generating an operation scheduling instruction for each EMU in the target area according to the load adjustment instruction and the first target data; The instruction sending module is used to send the load adjustment instruction and the operation scheduling instruction to the corresponding station and the EMU respectively, so that the station and the EMU are dynamically adjusted according to the corresponding instructions.
9. A server, characterized in that: The server includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the intelligent transportation and data analysis method based on vehicle gravity energy storage are implemented according to any one of claims 1 to 7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the intelligent transportation and data analysis method based on vehicle gravity energy storage according to any one of claims 1 to 7 are implemented.
Citation Information
Patent Citations
High-speed railway scheduling method and system realizing station dwell time change accurate to second
CN104590323A
Energy-saving optimization operation method of urban rail transit trains
CN109344996A
An intelligent scheduling system and method rapidly recovering the on-schedule operation of a high-speed rail
CN110341763A
Intelligent dispatching method and system for high-speed train in uncertain environment
CN113536692A
High-speed railway dispatching control mutual cooperation method and high-speed railway dispatching control mutual cooperation system
CN113830141A