Multi-energy complementary hydroelectric generating set low-load area operation risk assessment method and system

By establishing a low-load area operation risk assessment index system for hydropower units based on vibration characteristics, swing characteristics and pressure pulsation characteristics, the passive problem of operating risk assessment in low-load areas of hydropower units in the existing technology is solved, and the accuracy of risks is achieved Identification and partitioning have improved the operation and management level of multi-energy complementary systems.

CN118917661APending Publication Date: 2024-11-08WUHAN UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410949838.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing technology has defects in the operation risk assessment of low-load areas of hydropower units from a passive perspective, overestimating or underestimating the flexible operating range of hydropower units, resulting in the power generation plan of multi-energy complementary system that cannot balance the interests of each entity and has a risk of safe operation. .

Method used

Adopt a low-load area operating risk assessment index system for hydropower units based on vibration characteristics, swing characteristics and pressure pulsation characteristics. The risk zone is divided through weighted evaluation models, accurately identify and evaluate the operating risks of the low-load area of ​​the hydropower units, and provide accurate operating areas. boundary.

Benefits of technology

It realizes accurate identification and partitioning of the risks in the low-load area of ​​the hydropower unit, avoids overestimation or underestimation of operation flexibility, improves the operation management level of the multi-energy complementary system, and ensures the safe and efficient operation of the hydropower unit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917661A_ABST
    Figure CN118917661A_ABST
Patent Text Reader

Abstract

The invention provides a multi-energy complementary hydroelectric generating set low-load area operation risk assessment method and system, and the method comprises the steps: building a hydroelectric generating set low-load area operation risk assessment index system based on a vibration characteristic, a throw characteristic and a pressure pulsation characteristic, and obtaining all index values of a hydroelectric generating set in a low-load operation state; the method comprises the following steps: establishing an index weighted evaluation model based on a hydroelectric generating set low-load area operation risk evaluation index system, obtaining the weight of each index, dividing a risk area of hydroelectric generating set operation, obtaining an index weighted evaluation model value based on the weight of each index, and determining the risk area where the index weighted evaluation model value is located. And comprehensively evaluating the operation risk of the hydroelectric generating set in the low-load area based on the risk area where the index weighted evaluation model value is located. According to the method, the operation risk of the low-load area of the hydroelectric generating set can be accurately identified and evaluated, the subarea is carried out, an accurate ideal operation area can be provided for a multi-energy complementary dispatching center, and support is provided for dispatching operation of a multi-energy complementary system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of power system operation, and in particular relates to a method and system for assessing the operating risks of a multi-energy complementary hydropower unit in a low-load zone. Background Art

[0002] Clean energy such as wind and solar is the direction of national development. If wind and solar are developed on a large scale, it is very likely that hydropower units will be forced to frequently enter the low-load area for operation. For example, the Lijiaxia Hydropower Station in the multi-energy complementary base in the upper reaches of the Yellow River was forced to enter the low-load area for up to 5 hours a day due to the large-scale grid connection of wind and solar in Qinghai Province. This will lead to low turbine operation efficiency, deterioration of flow state, increased pressure pulsation amplitude, intensified vibration, and even cracks in the runner, which seriously threatens the safe and efficient operation of hydropower units. This means that the water-wind-solar multi-energy complementary system that relies on the flexible regulation of hydropower has a safety operation risk when operating in the low-load area.

[0003] Summarizing the existing background technology, the research on the operation risk of hydropower units in low load areas has the following shortcomings: 1) In the field of hydraulic machinery: The existing research on the operation of hydropower units in low load areas mainly studies the fatigue damage analysis and damage prediction of hydropower units in low load areas from the perspective of hydraulic machinery. Most of the existing research analyzes what problems will be caused by hydropower units being forced to enter the low load area and how to predict these problems from a passive perspective, and rarely identifies and quantifies the operation risks in low load areas from the perspective of operation; 2) In the field of dispatching and operation: However, the existing research on formulating power generation plans all believes that once the hydropower unit avoids the vibration area, other areas are ideal operation areas, but ignores that the impact of the hydropower unit on the hydraulic machinery of the hydropower unit when operating in steady state and low load areas is different, which overestimates the ideal flexible operation range of the hydropower unit. In addition, a small number of studies only restrict the operation of hydropower units in stable operation areas and do not allow them to operate in low load areas. This seriously underestimates the flexible operation range of hydropower units and is not conducive to the absorption of wind-light, which is also unacceptable to managers of multi-energy complementary systems. In general, existing studies have overestimated or underestimated the flexible operating range of hydropower units, which in turn leads to the failure of the formulated multi-energy complementary system power generation plan to balance the interests of various entities in the multi-energy complementary system. Summary of the invention

[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a method and system for assessing the operating risks of hydropower units in low load areas with multi-energy complementarity, which can accurately identify and assess the operating risks of hydropower units in low load areas and divide them into zones, and can provide an accurate ideal operating area for the multi-energy complementary dispatching center, thereby providing support for the dispatching and operation of the multi-energy complementary system.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0006] The method for risk assessment of low-load operation of multi-energy complementary hydropower units includes the following steps:

[0007] Establish a risk assessment index system for low-load operation of hydropower units based on vibration characteristics, swing characteristics and pressure pulsation characteristics, and obtain the values ​​of various indicators under low-load operation of hydropower units;

[0008] An index weighted assessment model is established based on the risk assessment index system for hydropower units operating in low-load areas;

[0009] Get the weight of each indicator;

[0010] Divide the operation of hydropower units into multiple risk zones, obtain the indicator weighted evaluation model value based on the weight of each indicator, and determine the risk zone where the hydropower unit is located based on the indicator weighted evaluation model value;

[0011] The operation risk of hydropower units in low load areas is comprehensively assessed based on the risk areas where the indicator weighted assessment model values ​​are located.

[0012] The vibration characteristics, swing characteristics and pressure pulsation characteristics are obtained through sensor measurement, specifically:

[0013] A first displacement sensor and a second displacement sensor are respectively arranged on the frame to measure horizontal and vertical vibration characteristics of the upper frame respectively;

[0014] The third displacement sensor and the fourth displacement sensor are respectively arranged on the stator base to measure the horizontal and vertical vibration characteristics of the stator base;

[0015] A fifth displacement sensor and a sixth displacement sensor are respectively arranged on the lower frame to measure horizontal and vertical vibration characteristics of the lower frame;

[0016] The seventh displacement sensor and the eighth displacement sensor are respectively arranged on the top cover to measure the horizontal and vertical vibration characteristics of the top cover;

[0017] A ninth displacement sensor and a tenth displacement sensor are respectively arranged on the guide bearing of the generator to measure the swing characteristics of the guide bearing in the X direction and the Y direction;

[0018] An eleventh displacement sensor and a twelfth displacement sensor are arranged on the lower guide bearing of the generator to measure the swing characteristics of the lower guide bearing of the generator in the X direction and the Y direction;

[0019] The thirteenth displacement sensor and the fourteenth displacement sensor are arranged at the water guide bearing of the water turbine to measure the swing characteristics of the water guide bearing of the water turbine in the X direction and the Y direction;

[0020] Arrange a first pressure sensor and a second pressure sensor on the inner and outer circles of the turbine top cover to measure the pressure pulsation characteristics of the inner and outer circles of the turbine top cover;

[0021] A third pressure sensor is arranged in the bladeless area of ​​the turbine to measure the pressure pulsation characteristics of the bladeless area of ​​the turbine;

[0022] A fourth pressure sensor and a fifth pressure sensor are arranged on the upper and lower sides of the tailwater pipe to measure the pressure pulsation characteristics upstream and downstream of the tailwater pipe;

[0023] A sixth pressure sensor is arranged at the turbine volute inlet to measure the pressure pulsation characteristics of the turbine volute inlet.

[0024] The method of obtaining the values ​​of various indicators under the low-load operation state of the hydropower unit and establishing an indicator weighted evaluation model based on the low-load operation risk assessment indicator system of the hydropower unit is as follows:

[0025] The stability index L of the mth eigenvalue of hydropower unit u is calculated by the threshold setting method u,m :

[0026]

[0027] Where V u,m is the measured value of the mth indicator of hydropower unit u; is the maximum allowable value of the mth indicator of hydropower unit u in operation. If the measured value exceeds the maximum allowable value, then L u,m is 0, otherwise it is 1;

[0028] After calculating and obtaining the M eigenvalue stability indices of the hydropower unit u, it is necessary to weight them to obtain the comprehensive stability index of the hydropower unit u, and obtain the comprehensive stability index L of the hydropower unit u. u :

[0029]

[0030] Among them, W u,m is the measured value of the mth indicator of hydropower unit u, and M is the total number of indicators.

[0031] The analytic hierarchy process is used to obtain the weights of each indicator.

[0032] The method of dividing the operation of hydropower units into multiple risk zones, obtaining the indicator weighted evaluation model value based on the weight of each indicator, and determining the risk zone where the hydropower unit is located based on the indicator weighted evaluation model value is as follows:

[0033] Set the first threshold L u,min and the second threshold L u,max , based on the weight of each index, the comprehensive stability index L of the hydropower unit u is obtained u , the comprehensive stability index L u As an indicator weighted evaluation model value;

[0034] According to the comprehensive stability index L uThe value of determines the risk area where the hydropower unit is located, specifically:

[0035] When the comprehensive stability index L u The value is in [0,L u,min ) in the area, the hydropower unit is operating in a high-risk area and the operation of the hydropower unit should be prohibited; when the comprehensive stability index L u The value of [L u,min ,L u,max ) in the area, the hydropower unit is operating in the medium risk area, indicating that it can operate but there is a medium risk; when the comprehensive stability index L u The value of [L u,max ,100), the hydropower unit is operating in the low-risk area, indicating that it can operate but with low risk; when the comprehensive stability index L u If the value is 100, it means that the hydropower unit is operating in the stable operation area.

[0036] The method for comprehensively evaluating the operation risk of hydropower units in low load areas based on the risk area where the index weighted assessment model value is located is:

[0037] The multiple risk areas for the operation of hydropower units include high-risk areas, medium-risk areas and low-risk areas. The high-risk area and weighted method are used to comprehensively evaluate the operation risk of hydropower units in low-load areas. The expression is:

[0038]

[0039] In the formula, R PL is the safe operation risk index of the low-load area of ​​the hydropower station within one day, R PL The smaller the better; S is the total number of uncertain scenarios of wind and / or light, s is the sth uncertain scenario; J is the number of time periods in a day, j is the jth time period; NU is the total number of hydropower units, u is the uth hydropower unit; I j,u is the operating status of the u-th hydropower unit in the j-th period; are the judgment indicators of whether the u-th hydropower unit is operating in the high-risk area, medium-risk area and low-risk area in the j-th period, respectively. The value is 0 in the corresponding risk area, otherwise it is 1; α, β, γ are the weights of the hydropower unit in the high-, medium- and low-risk areas, respectively, where α is ∞ and β+γ=1; ρ s is the occurrence probability corresponding to the sth uncertain scenario.

[0040] The low-load operation risk assessment system for multi-energy complementary hydropower units includes:

[0041] The index acquisition module is used to establish a risk assessment index system for the low-load operation of hydropower units based on vibration characteristics, swing characteristics and pressure pulsation characteristics, and to obtain the values ​​of various indicators under the low-load operation state of the hydropower units;

[0042] An index weighted evaluation model establishment module is used to establish an index weighted evaluation model based on the risk assessment index system for operation of hydropower units in low load areas;

[0043] The weight acquisition module is used to obtain the weights of various indicators;

[0044] A risk zone determination module is used to divide the operation of the hydropower unit into multiple risk zones, obtain the indicator weighted evaluation model value based on the weight of each indicator, and determine the risk zone where the hydropower unit is located based on the indicator weighted evaluation model value;

[0045] The operation risk assessment module comprehensively assesses the operation risk of the hydropower unit in the low load area based on the risk area where the indicator weighted assessment model value is located.

[0046] An electronic device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned method for assessing the operating risk in the low-load zone of a multi-energy complementary hydropower unit when executing the program.

[0047] A non-transitory computer-readable storage medium stores a computer program, which, when executed by a processor, implements the above-mentioned multi-energy complementary hydropower unit low-load zone operation risk assessment method.

[0048] A computer program product comprises a computer program, which, when executed by a processor, implements the above-mentioned method for assessing the risk of operation in a low-load zone of a multi-energy complementary hydropower unit.

[0049] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0050] The method for assessing the operation risk in the low-load area of ​​a multi-energy complementary hydropower unit provided by the present invention firstly provides an index system for assessing the operation risk in the low-load area of ​​a hydropower unit based on vibration characteristics, swing characteristics and pressure pulsation characteristics; then, an index weighted assessment model is established through weighted assessment to obtain a comprehensive stability index of the hydropower unit; further, multiple risk areas for the operation of the hydropower unit are divided, and the index weighted assessment model values ​​are obtained based on the weights of each index, and the risk area where the hydropower unit is located is determined based on the index weighted assessment model values; finally, the operation risk of the hydropower unit in the low-load area is comprehensively assessed based on the risk area where the index weighted assessment model values ​​are located. Compared with the prior art, this method can accurately identify the risk division of the low-load area of ​​the hydropower unit, avoid overestimating or underestimating the operational flexibility of the hydropower unit, and can provide accurate boundary constraints for scheduling and operation, which is helpful to improve the operation and management level of the multi-energy complementary system. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0052] Figure 1 It is a flow chart of the risk assessment method for low-load area operation of a multi-energy complementary hydropower unit of the present invention;

[0053] Figure 2 The distribution diagram of the measuring points corresponding to the low-load area operation risk assessment index of the present invention;

[0054] Figure 3 It is the low load area operation risk assessment index system of the present invention;

[0055] FIG4( a ) is a graph showing the relationship between the peak-to-peak value of the vibration characteristic quantity and the output of the test unit operation monitoring according to a specific embodiment of the present invention;

[0056] FIG4( b ) is a graph showing the relationship between the peak-to-peak value of the swing characteristic value and the output of the test unit operation monitoring according to a specific embodiment of the present invention;

[0057] FIG4(c) is a graph showing the relationship between the peak-to-peak value of the pressure pulsation characteristic quantity and the output of the test unit operation monitoring according to a specific embodiment of the present invention;

[0058] FIG5(a) is a risk zoning diagram of low load zone operation of a unit according to a specific embodiment of the present invention;

[0059] FIG5( b ) is a risk scoring diagram for operation in the low load zone of a unit according to a specific embodiment of the present invention. DETAILED DESCRIPTION

[0060] The technical solution in this embodiment will be clearly and completely described below in conjunction with the drawings in this embodiment.

[0061] In order to make the purpose, technical solution and advantages of this embodiment more clear, this embodiment is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain this embodiment and are not used to limit this embodiment. In addition, the technical features involved in each implementation method of this embodiment described below can be combined with each other as long as they do not conflict with each other.

[0062] Example 1

[0063] Example 1 provides a method for assessing the operating risk of a multi-energy complementary hydropower unit in a low-load zone, such as Figure 1 FIG. 1 is a flow chart of a method for assessing the operating risk of a multi-energy complementary hydropower unit in a low load zone according to the present invention. The method for assessing the operating risk of a multi-energy complementary hydropower unit in a low load zone provided in this embodiment includes the following steps:

[0064] Step S1: Establishing a risk assessment index system for low-load operation of hydropower units based on vibration characteristics, swing characteristics and pressure pulsation characteristics, and obtaining various index values ​​under low-load operation of hydropower units;

[0065] Step S2: establishing an index weighted assessment model based on the risk assessment index system for operation of hydropower units in low load areas;

[0066] Step S3: Obtain the weight of each indicator;

[0067] Step S4: dividing the operation of the hydropower unit into multiple risk zones, obtaining an indicator weighted evaluation model value based on the weight of each indicator, and determining the risk zone where the hydropower unit is located based on the indicator weighted evaluation model value;

[0068] Step S5: Comprehensively assess the operation risk of the hydropower unit in the low load area based on the risk area where the indicator weighted assessment model value is located.

[0069] This embodiment discloses a method for assessing the operation risk in the low-load area of ​​a hydropower unit for multi-energy complementarity. The method firstly establishes an index system for assessing the operation risk in the low-load area of ​​a hydropower unit based on vibration characteristics, swing characteristics and pressure pulsation characteristics; then, an index weighted assessment model is established through weighted assessment to obtain a comprehensive stability index of the hydropower unit; further, multiple risk areas for the operation of the hydropower unit are divided, and the index weighted assessment model value is obtained based on the weight of each index, and the risk area where the hydropower unit is located is determined based on the index weighted assessment model value; finally, the operation risk of the hydropower unit in the low-load area is comprehensively assessed based on the risk area where the index weighted assessment model value is located. Compared with the prior art, this method can accurately identify the risk division of the low-load area of ​​the hydropower unit, avoid overestimating or underestimating the operational flexibility of the hydropower unit, provide accurate boundary constraints for scheduling and operation, and help improve the operation and management level of the multi-energy complementarity system.

[0070] In step S1 of this embodiment, based on the standards of "Vibration and Pulsation Field Test Procedure for Hydraulic Machinery (Turbine, Storage Pump and Pump Turbine) (GB / T 17189-2017)" and "GB / T 32584-2016 Evaluation of Mechanical Vibration of Hydropower Units in Hydropower Plants and Storage Pump Stations (GB / T 32584-2016)", vibration characteristics, swing characteristics and pressure pulsation characteristics are obtained, and then a low-load area operation risk assessment index system for hydropower units based on vibration characteristics, swing characteristics and pressure pulsation characteristics is established. Specifically, the vibration characteristics, swing characteristics and pressure pulsation characteristics include 20 indicators in three aspects of hydropower unit vibration, swing and pressure pulsation.

[0071] In step S1 of this embodiment, Figure 2As shown, it is a distribution diagram of the corresponding measuring points of the low-load area operation risk assessment index of this embodiment. In this embodiment, the vibration characteristics, swing characteristics and pressure pulsation characteristics are obtained by sensor measurement, specifically:

[0072] The first displacement sensors C are arranged on the racks. 1 and the second displacement sensor C 2 , to measure the horizontal and vertical vibration characteristics of the upper frame respectively;

[0073] The third displacement sensor C is arranged on the stator frame. 3 and the fourth displacement sensor C 4 , to measure the horizontal and vertical vibration characteristics of the stator frame;

[0074] The fifth displacement sensor C is arranged on the lower frame. 5 and the sixth displacement sensor C 6 , to measure the horizontal and vertical vibration characteristics of the lower frame;

[0075] The seventh displacement sensor C is arranged on the top cover. 7 and the eighth displacement sensor C 8 , to measure the horizontal and vertical vibration characteristics of the top cover;

[0076] The ninth displacement sensor C is arranged on the guide bearing of the generator. 9 and the tenth displacement sensor C 10 , to measure the X- and Y-axis swing characteristics of the guide bearing on the generator;

[0077] The eleventh displacement sensor C is arranged on the lower guide bearing of the generator 11 and the twelfth displacement sensor C 12 , to measure the X- and Y-axis swing characteristics of the generator lower guide bearing;

[0078] Arrange the thirteenth displacement sensor C on the turbine water guide bearing 13 and the fourteenth displacement sensor C 14 , to measure the X- and Y-axis swing characteristics of the turbine water guide bearing;

[0079] The first pressure sensor C is arranged on the inner and outer circles of the turbine top cover 15 and the second pressure sensor C 16 , to measure the pressure pulsation characteristics of the inner and outer circles of the turbine top cover;

[0080] Arrange the third pressure sensor C in the turbine bladeless area 17 , to measure the pressure pulsation characteristics of the turbine bladeless area;

[0081] The fourth pressure sensor C is arranged on the upper and lower sides of the tailwater pipe 18 and the fifth pressure sensor C 19, to measure the pressure pulsation characteristics upstream and downstream of the tailrace;

[0082] Arrange the sixth pressure sensor C at the turbine volute inlet 20 , to measure the pressure pulsation characteristics at the turbine volute inlet.

[0083] In step S2 of this embodiment, the values ​​of various indicators under the low-load operation state of the hydropower unit are obtained, and the method for establishing an indicator weighted evaluation model based on the low-load area operation risk evaluation indicator system of the hydropower unit is as follows:

[0084] According to national and industry standards, the stability index L of the mth characteristic value of the hydropower unit u is calculated by the threshold setting method. u,m :

[0085]

[0086] Where V u,m is the measured value of the mth indicator of hydropower unit u; is the maximum allowable value (threshold) of the mth indicator of the operating hydropower unit u. If the measured value exceeds the maximum allowable value (threshold), then L u,m is 0 if yes, otherwise it is 1.

[0087] After calculating and obtaining the M eigenvalue stability indices of the hydropower unit u, it is necessary to weight them to obtain the comprehensive stability index of the hydropower unit u, and obtain the comprehensive stability index L of the hydropower unit u. u , the comprehensive stability index L u of:

[0088]

[0089] Among them, W u,m It is the measured value of the mth indicator of hydropower unit u.

[0090] In step S3 of this embodiment, the analytic hierarchy process (AHP) is used to obtain the weights of various indicators.

[0091] (1) Establishing a hierarchical model

[0092] The decision-making goals, influencing factors and decision-making objects are divided into the highest level, middle level and lowest level according to their mutual relationships, namely the goal level, criterion level and indicator level.

[0093] like Figure 3 As shown in the figure, the low load zone operation risk assessment index system of the present invention is shown. In this embodiment, the target layer is the low load operation risk zoning assessment system of the hydropower unit, the criterion layer is the vibration characteristics, swing characteristics and pressure pulsation characteristics, and the index layer is the first displacement sensor C 1 , the second displacement sensor C 2 , the third displacement sensor C 3, the fourth displacement sensor C 4 、Fifth displacement sensor C 5 , the sixth displacement sensor C 6 、The seventh displacement sensor C 7 、The eighth displacement sensor C 8 、Ninth displacement sensor C 9 、10th displacement sensor C 10 、11th displacement sensor C 11 12 displacement sensors C 12 、Thirteenth displacement sensor C 13 14. Displacement Sensor C 14 , first pressure sensor C 15 , the second pressure sensor C 16 , the third pressure sensor C 17 , the fourth pressure sensor C 18 、Fifth pressure sensor C 19 , the sixth pressure sensor C 20 Measured data.

[0094] (2) Constructing a judgment matrix

[0095] As shown in Table 1, for indicators at the same level, the corresponding judgment matrix A is constructed:

[0096] A={a ij} n*n

[0097] a ij =1 / a ji

[0098] In the formula, a ij is the importance of the ith indicator relative to the jth indicator; n is the total number of indicators to be evaluated.

[0099] Table 1 Matrix scale arrangement table

[0100]

[0101] (3)Consistency test

[0102] Calculate the largest eigenvalue λ of matrix A max And the eigenvector E, through the consistency test to verify whether the results obtained by the AHP method are consistent, the verification method is:

[0103] Calculate the consistency ratio CR. If CR < 0.10, A is consistent. Otherwise, continue to improve until A passes the consistency test. The consistency ratio calculation formula is:

[0104]

[0105] In the formula, CI is the consistency index; n is the order of A; RI is related to n, as shown in the table.

[0106] Table 2 Random consistency index values ​​of the mean values ​​of the judgment matrix

[0107]

[0108] (4) Calculate indicator weights

[0109] The eigenvectors corresponding to the eigenvalues ​​of each judgment matrix after the consistency test are the corresponding weight vectors, and the weights of each indicator can be obtained by normalizing them.

[0110] In step S4 of this embodiment, multiple risk areas for the operation of the hydropower unit are divided, and the multiple risk areas include a high-risk area (prohibited operation area), a medium-risk area, a low-risk area and a stable operation area. The indicator weighted evaluation model value is obtained based on the weight of each indicator, and the method for determining the risk area where the hydropower unit is located based on the indicator weighted evaluation model value is a risk division type based on threshold judgment. The threshold judgment is based on the score obtained after the comprehensive weighted evaluation of the indicator. The threshold is obtained by comparing with the historical data, and is specifically:

[0111] Step S401: Setting the first threshold L u,min and the second threshold L u,max , based on the weight of each index, the comprehensive stability index L of the hydropower unit u is obtained u , the comprehensive stability index L u As an indicator weighted evaluation model value;

[0112] Step S402: According to the comprehensive stability index L u The value of determines the risk area where the hydropower unit is located, specifically:

[0113] When the comprehensive stability index L u The value is in [0,L u,min ) in the area, the hydropower unit is operating in a high-risk area and the operation of the hydropower unit should be prohibited; when the comprehensive stability index L u The value of [L u,min ,L u,max ) in the area, the hydropower unit is operating in the medium risk area, indicating that it can operate but there is a medium risk; when the comprehensive stability index L u The value of [L u,max ,100), the hydropower unit is operating in the low-risk area, indicating that it can operate but with low risk; when the comprehensive stability index L u If the value is 100, it means that the hydropower unit is operating in the stable operation area.

[0114] In this specific embodiment, the hydropower unit is operating in a low load area, which means there is a risk of safe operation. u is the comprehensive stability index of the hydropower unit u (percentage system), and the safety and stability of the hydropower unit operation is positively correlated with it. 100 points means that the hydropower unit is in the stable operation area. The risk areas are divided as follows:

[0115] 1) High risk area: This example considers that L u Less than the first threshold L u,min When the hydropower unit is considered to be in a high-risk area, such as the first threshold L u,min When L u <60, that is, the hydropower unit is in a high-risk area and the operation of the hydropower unit should be prohibited.

[0116] 2) Medium risk area: When L u Between the first threshold L u,min and the second threshold L u,max The area between is the medium risk area, such as the second threshold L u,max When L u When the value is in [60,75), the hydropower unit is in the medium risk area and can be operated but there are risks.

[0117] 3) Low risk area: When L u Between the second threshold L u,max The area between 100 and 100 is a low risk area. u When the value is in [75,100), the hydropower unit is in a low-risk area and can be operated but there are risks.

[0118] 4) Stable operation area, when L u When it is 100, it indicates that the hydropower unit is operating in the stable operation area.

[0119] In step S5 of this embodiment, the comprehensive assessment refers to a comprehensive risk indicator that couples and quantifies high risk, medium risk and low risk.

[0120] For large hydropower stations, the change in water level during short-term dispatch (one day or even several days) is negligible, that is, within a certain day, although the head of the hydropower unit changes slightly, the risk range of the prohibited operation area and low load area of ​​the hydropower unit participating in the day-ahead dispatch can be regarded as fixed. In other words, in the time domain (time-hydropower unit output) relationship, different risk areas are parallel to the X-axis, which to a certain extent reduces the operational complexity of the hydropower station dispatcher during short-term dispatch.

[0121] The method for comprehensively evaluating the operation risk of hydropower units in low load areas based on the risk area where the index weighted assessment model value is located is:

[0122] The multiple risk areas for the operation of hydropower units include high-risk areas, medium-risk areas and low-risk areas. Considering that there are risks when the hydropower units operate in the low-load area, but the degree of risk is different, the weighted method of high-risk areas, medium-risk areas and low-risk areas is used to comprehensively evaluate the operation risk of the hydropower units in the low-load area. The expression is:

[0123]

[0124] In the formula, R PL is the safe operation risk index of the low-load area of ​​the hydropower station within one day, R PL The smaller the better; S is the total number of uncertain scenarios of wind and / or light, s is the sth uncertain scenario; J is the number of time periods in a day, j is the jth time period; NU is the total number of hydropower units, u is the uth hydropower unit; I j,u is the operating status of the u-th hydropower unit in the j-th period; are the judgment indicators of whether the u-th hydropower unit is operating in the high-risk area, medium-risk area and low-risk area in the j-th period, respectively. The value is 0 in the corresponding risk area, otherwise it is 1; α, β, γ are the weights of the hydropower unit in the high-, medium- and low-risk areas, respectively, where α is ∞ and β+γ=1; ρ s is the occurrence probability corresponding to the sth uncertain scenario.

[0125] In summary, this embodiment can accurately identify the risk distribution of hydropower units in low load areas and realize risk zoning, thereby preventing multi-energy complementary system scheduling decision makers from overestimating or underestimating the ideal operating range of hydropower units, and providing support for the scheduling and operation of the multi-energy complementary system.

[0126] To illustrate the effect of this embodiment, the measured data of a hydropower station under variable operating conditions in 2017 (working head: 67.38m, 70.74m and 76.23m) are used as the implementation object, and the model and method proposed in this embodiment are used for detailed description:

[0127] The basic parameters and test results of a hydropower unit in the test hydropower station are shown in Table 3. Taking the low head test measurement results as an example, Figure 3 The relationship between the monitoring quantity of the hydropower unit operation and the load is shown. Then, according to the national / industry standards (such as "GB / T15468-2006 Basic Technical Conditions for Hydraulic Turbines"), the stability index L is obtained. u,m .

[0128] As shown in Figure 4(a), it is a curve diagram showing the relationship between the peak-to-peak value of the vibration characteristic quantity and the output of the test unit operation monitoring according to a specific embodiment of the present invention; as shown in Figure 4(b), it is a curve diagram showing the relationship between the peak-to-peak value of the swing characteristic quantity and the output of the test unit operation monitoring according to a specific embodiment of the present invention; and as shown in Figure 4(c), it is a curve diagram showing the relationship between the peak-to-peak value of the pressure pulsation characteristic quantity and the output of the test unit operation monitoring according to a specific embodiment of the present invention.

[0129] Table 3 Basic parameters and test results of a unit in the test hydropower station

[0130]

[0131] According to step S4, the risk zoning for high (Hhigh), medium (Hmedium), and low (Hlow) head can be obtained, and the risk zoning can be extended to the entire head section through the following assumptions: (1) The risk area of ​​the head section from the minimum head (Hmin) to (Hmedium+Hlow) / 2 is consistent with the low head measurement point zoning; (2) The risk area of ​​the head section from (Hmedium+Hlow) / 2 to Hhigh is consistent with the medium head measurement point zoning; (3) The risk area of ​​the head section from Hhigh to the maximum head (Hmax) is consistent with the high head measurement point zoning.

[0132] Finally, the unit low load area operation risk zoning can be obtained, as shown in FIG5( b ), which is a unit low load area operation risk zoning diagram according to a specific embodiment of the present invention.

[0133] Results Analysis

[0134] As shown in Figure 5(a), it is a risk score diagram of low-load operation of the unit in a specific embodiment of the present invention. The risk score diagram of low-load operation of the unit shows that the risk of low-load operation of the hydropower unit does not increase with the decrease of power output, but shows a trend of first increasing, then decreasing, and then increasing. This is different from the assumption of existing studies, that is, the safe operation performance of the hydropower unit decreases with the decrease of power output, and all areas except the vibration area are ideal operating ranges.

[0135] Therefore, the proposed risk identification method provides a fine identification of the risk distribution in the partial load area of ​​the unit. This can prevent managers of multi-energy complementary systems from overestimating or underestimating the ideal operating range of the unit and improve the hydropower station managers' understanding of the flexible adjustment range of the unit.

[0136] In summary, the following conclusions can be drawn from this embodiment:

[0137] A certain experimental hydropower station in Zhejiang Province of my country was taken as the evaluation object, and the evaluation method proposed in this embodiment was applied to evaluate the safe operation performance of the hydropower unit. Compared with the existing research, it was found that the advantages and effects of this embodiment are as follows: the risk identification and quantification method proposed in this embodiment accurately identifies the risk distribution in the low-load area of ​​the hydropower unit, which prevents the managers of the multi-energy complementary system from overestimating or underestimating the ideal operating range of the hydropower unit, and can provide support for the flexible scheduling of the multi-energy complementary system.

[0138] Example 2

[0139] Embodiment 2 provides a multi-energy complementary hydropower unit low load area operation risk assessment system, including:

[0140] The index acquisition module is used to establish a risk assessment index system for the low-load operation of hydropower units based on vibration characteristics, swing characteristics and pressure pulsation characteristics, and to obtain the values ​​of various indicators under the low-load operation state of the hydropower units;

[0141] An index weighted evaluation model establishment module is used to establish an index weighted evaluation model based on the risk assessment index system for operation in the low-load area of ​​hydropower units;

[0142] The weight acquisition module is used to obtain the weights of various indicators;

[0143] A risk zone determination module is used to divide the operation of the hydropower unit into multiple risk zones, obtain the indicator weighted evaluation model value based on the weight of each indicator, and determine the risk zone where the hydropower unit is located based on the indicator weighted evaluation model value;

[0144] The operation risk assessment module comprehensively assesses the operation risk of the hydropower unit in the low load area based on the risk area where the indicator weighted assessment model value is located.

[0145] Example 3

[0146] Embodiment 3 provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned method for assessing the operating risk of a multi-energy complementary hydropower unit in a low-load zone when executing the program.

[0147] Example 4

[0148] Embodiment 4 provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method for assessing the operating risk of a multi-energy complementary hydropower unit in a low-load zone is implemented.

[0149] Example 5

[0150] Embodiment 5 provides a computer program product, including a computer program, which, when executed by a processor, implements the above-mentioned method for assessing the risk of operation in the low-load zone of a multi-energy complementary hydropower unit.

[0151] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory or optical memory, etc. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).

[0152] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0153] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A method for assessing the operating risk of a multi-energy complementary hydropower unit in a low-load zone, characterized in that: The following steps are involved: Establish a risk assessment index system for hydropower units operating in low-load areas based on vibration characteristics, swing characteristics and pressure pulsation characteristics; Obtain the values ​​of various indicators under the low-load operation state of the hydropower unit, and establish an indicator weighted evaluation model based on the risk assessment indicator system for the low-load operation of the hydropower unit; Get the weight of each indicator; Divide the operation of hydropower units into multiple risk zones, obtain the indicator weighted evaluation model value based on the weight of each indicator, and determine the risk zone where the hydropower unit is located based on the indicator weighted evaluation model value; The operation risk of hydropower units in low load areas is comprehensively assessed based on the risk areas where the indicator weighted assessment model values ​​are located.

2. The method for assessing the operating risk of a multi-energy complementary hydropower unit in a low-load zone according to claim 1 is characterized in that: The vibration characteristics, swing characteristics and pressure pulsation characteristics are obtained through sensor measurement, specifically: A first displacement sensor and a second displacement sensor are respectively arranged on the frame to measure horizontal and vertical vibration characteristics of the upper frame respectively; The third displacement sensor and the fourth displacement sensor are respectively arranged on the stator base to measure the horizontal and vertical vibration characteristics of the stator base; A fifth displacement sensor and a sixth displacement sensor are respectively arranged on the lower frame to measure horizontal and vertical vibration characteristics of the lower frame; The seventh displacement sensor and the eighth displacement sensor are respectively arranged on the top cover to measure the horizontal and vertical vibration characteristics of the top cover; A ninth displacement sensor and a tenth displacement sensor are respectively arranged on the guide bearing of the generator to measure the swing characteristics of the guide bearing in the X direction and the Y direction; An eleventh displacement sensor and a twelfth displacement sensor are arranged on the lower guide bearing of the generator to measure the swing characteristics of the lower guide bearing of the generator in the X direction and the Y direction; The thirteenth displacement sensor and the fourteenth displacement sensor are arranged at the water guide bearing of the water turbine to measure the swing characteristics of the water guide bearing of the water turbine in the X direction and the Y direction; Arrange a first pressure sensor and a second pressure sensor on the inner and outer circles of the turbine top cover to measure the pressure pulsation characteristics of the inner and outer circles of the turbine top cover; A third pressure sensor is arranged in the bladeless area of ​​the turbine to measure the pressure pulsation characteristics of the bladeless area of ​​the turbine; A fourth pressure sensor and a fifth pressure sensor are arranged on the upper and lower sides of the tailwater pipe to measure the pressure pulsation characteristics upstream and downstream of the tailwater pipe; A sixth pressure sensor is arranged at the turbine volute inlet to measure the pressure pulsation characteristics of the turbine volute inlet.

3. The method for assessing the operating risk of a multi-energy complementary hydropower unit in a low-load zone according to claim 1 is characterized in that: The method of obtaining the values ​​of various indicators under the low-load operation state of the hydropower unit and establishing an indicator weighted evaluation model based on the low-load operation risk assessment indicator system of the hydropower unit is as follows: The stability index L of the mth eigenvalue of hydropower unit u is calculated by the threshold setting method u,m : Where V u,m is the measured value of the mth indicator of hydropower unit u; is the maximum allowable value of the mth indicator of hydropower unit u in operation. If the measured value exceeds the maximum allowable value, then L u,m is 0, otherwise it is 1; Obtain the comprehensive stability index L of the hydropower unit u u : Among them, W u,m is the measured value of the mth indicator of hydropower unit u, and M is the total number of indicators.

4. The method for assessing the operating risk of a multi-energy complementary hydropower unit in a low-load zone according to claim 1 is characterized in that: The analytic hierarchy process is used to obtain the weights of each indicator.

5. The method for assessing the operating risk of a multi-energy complementary hydropower unit in a low-load zone according to claim 3 is characterized in that: The method of dividing the operation of hydropower units into multiple risk zones, obtaining the indicator weighted evaluation model value based on the weight of each indicator, and determining the risk zone where the hydropower unit is located based on the indicator weighted evaluation model value is as follows: Set the first threshold L u,min and the second threshold L u,max , based on the weight of each index, the comprehensive stability index L of the hydropower unit u is obtained u , the comprehensive stability index L u As an indicator weighted evaluation model value; According to the comprehensive stability index L u The value of determines the risk area where the hydropower unit is located, specifically: When the comprehensive stability index L u The value is in [0,L u,min ) in the area, the hydropower unit is operating in a high-risk area and the operation of the hydropower unit should be prohibited; when the comprehensive stability index L u The value of [L u,min ,L u,max ) in the area, the hydropower unit is operating in the medium risk area, indicating that it can operate but there is a medium risk; when the comprehensive stability index L u The value of [L u,max ,100), the hydropower unit is operating in the low-risk area, indicating that it can operate but with low risk; when the comprehensive stability index L u If the value is 100, it means that the hydropower unit is operating in the stable operation area.

6. The method for risk assessment of low-load operation of multi-energy complementary hydropower units according to claim 1 is characterized in that: The method for comprehensively evaluating the operation risk of hydropower units in low load areas based on the risk area where the index weighted assessment model value is located is: The multiple risk areas for the operation of hydropower units include high-risk areas, medium-risk areas and low-risk areas. The high-risk area and weighted method are used to comprehensively evaluate the operation risk of hydropower units in low-load areas. The expression is: In the formula, R PL is the safe operation risk index of the low-load area of ​​the hydropower station within one day, R PL The smaller the better; S is the total number of uncertain scenarios of wind and / or light, s is the sth uncertain scenario; J is the number of time periods in a day, j is the jth time period; NU is the total number of hydropower units, u is the uth hydropower unit; I j,u is the operating status of the u-th hydropower unit in the j-th period; are the judgment indicators of whether the u-th hydropower unit is operating in the high-risk area, medium-risk area and low-risk area in the j-th period, respectively. The value is 0 in the corresponding risk area, otherwise it is 1; α, β, γ are the weights of the hydropower unit in the high-, medium- and low-risk areas, respectively, where α is ∞ and β+γ=1; ρ s is the occurrence probability corresponding to the sth uncertain scenario.

7. The multi-energy complementary hydropower unit low load area operation risk assessment system is characterized by: include: The index acquisition module is used to establish a risk assessment index system for the low-load operation of hydropower units based on vibration characteristics, swing characteristics and pressure pulsation characteristics, and to obtain the values ​​of various indicators under the low-load operation state of the hydropower units; An index weighted evaluation model establishment module is used to establish an index weighted evaluation model based on the risk assessment index system for operation of hydropower units in low load areas; The weight acquisition module is used to obtain the weights of various indicators; A risk zone determination module is used to divide the operation of the hydropower unit into multiple risk zones, obtain the indicator weighted evaluation model value based on the weight of each indicator, and determine the risk zone where the hydropower unit is located based on the indicator weighted evaluation model value; The operation risk assessment module comprehensively assesses the operation risk of the hydropower unit in the low load area based on the risk area where the indicator weighted assessment model value is located.

8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the low-load area operation risk assessment method for a multi-energy complementary hydropower unit as described in any one of claims 1 to 6 is implemented.

9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for assessing the risk of operation in a low-load area of ​​a multi-energy complementary hydropower unit as claimed in any one of claims 1 to 6 is implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method for assessing the risk of operation in a low-load area of ​​a multi-energy complementary hydropower unit as claimed in any one of claims 1 to 6 is implemented.