Method and device for determining total electricity charge value in production cycle, method and system for determining production cycle, and electronic equipment
By obtaining and expanding the electrical power and peak-to-valley information during the production cycle, the accuracy of determining the total electricity bill value in the existing technology is solved, and more accurate electricity bill calculation is achieved, and the electricity bill cost is reduced.
Patent Information
- Application Number
- CN202411184234.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-08
AI Technical Summary
The prior art has low accuracy when determining the total electricity bill value during the production cycle, and cannot effectively match the actual production, resulting in inaccurate calculation of electricity bills.
By obtaining the digital characterization information of electrical power and peak-to-valley level information during the production cycle, and combining process production constraints, it expands in the time domain to obtain more accurate digital characterization and peak-to-valley level information, thereby determining the total electricity bill in the production cycle at the target analysis time. value.
It improves the accuracy of the total electricity bill value during the production cycle, makes the electricity bill calculation more realistic and reduces the electricity bill cost.
Smart Images

Figure CN118917906A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of new energy technology, and specifically relates to a method and device for determining the total electricity cost value within a production cycle, a method and system for determining the production cycle, and electronic equipment. Background Art
[0002] The National Development and Reform Commission has been actively reforming and continuously formulating different peak, valley and flat electricity price strategies for the power grid, actively guiding the load side to respond to the peak, valley and flat strategies, encouraging load-side users to achieve peak shaving and valley filling by adjusting electricity consumption periods or electricity consumption strategies in different periods, and reducing electricity costs based on the electricity price differences in different periods.
[0003] In September 2023, the National Development and Reform Commission announced the "Electricity Demand Side Management Measures" (Development and Reform Operation Regulations
[2023] No. 1283) and the "Electricity Load Management Measures (2023 Edition)" (Reform Operation Regulations
[2023] No. 1261). According to the latest electricity price policy, the peak and valley price difference in relevant months is 0.5752-0.5832 (yuan / KWh), and the electricity price difference is very large. Under the same total electricity consumption, try to use more electricity during the valley period and use as little electricity as possible during the peak period. In this way, the peak power and electricity price can be staggered, achieving the total electricity price savings (more electricity consumption in the valley period, corresponding to lower electricity prices, less electricity consumption in the peak period, and corresponding lower electricity charges, thereby reducing the total electricity charges).
[0004] Most of the production of high-purity polysilicon used as photovoltaic raw materials adopts the Siemens method. The most critical and core process in the Siemens method is the reduction production process, which is also the production link with the largest power consumption. 70% of the power consumption of polysilicon production is in the reduction link. At the same time, the polysilicon reduction production process is an intermittent operation process. Each production process is about 100 hours, and the single production process is a furnace. During the reduction production of a single furnace, the electric power value of each time period is also different. There are low power segments, high power segments and medium power segments (flat power segments), which are similar to the peaks and valleys of power grid electricity prices.
[0005] Polysilicon reduction production consumes 70% of the electricity consumption of the entire polysilicon production process. At the same time, the polysilicon reduction production link is a periodic intermittent production process, and the production process characteristics have peak-valley-flat (high power, general power and low power segments) characteristics in the time domain. The national policy has been deepening the time-divided electricity price strategy, dividing the electricity price into different peak-valley-flat (high electricity price, general electricity price and low electricity price) electricity prices in the time domain, and the electricity price also has peak-valley-flat characteristics in the time domain.
[0006] In the prior art, the total electricity cost value in the production cycle is usually determined by the usage time periods and electricity values corresponding to the peak time period, the flat time period and the valley time period. However, the above method does not fit the actual production, resulting in low accuracy in determining the total electricity cost value in the production cycle. Summary of the invention
[0007] The technical problem to be solved by the present application is to provide a method and device for determining the total electricity cost value within a production cycle, a method and system for determining the production cycle, and electronic equipment in response to the above-mentioned deficiencies in the prior art. By using the method for determining the total electricity cost value within a production cycle, the accuracy of the total electricity cost value within the production cycle can be improved.
[0008] In a first aspect, an embodiment of the present application provides a method for determining the total electricity cost value within a production cycle, including: obtaining first digital representation information, first peak-valley-average information, and process production constraints within the production cycle of electric power within the production cycle, the first digital representation information including N precise power values corresponding one to one to N analysis time periods, where N is a positive integer; in the time domain, according to the process production constraints within the production cycle, the first digital representation information is expanded to obtain second digital representation information, and the first peak-valley-average information is expanded to obtain second peak-valley-average information; according to the second digital representation information and the second peak-valley-average information, the total electricity cost value within the production cycle corresponding to the target analysis moment is determined.
[0009] Based on the same inventive concept, in the second aspect, the embodiment of the present application also provides a production cycle determination method, including: according to the method for determining the total electricity cost value within the production cycle of any one of the first aspects, determining a plurality of total electricity cost values within the production cycle corresponding one-to-one to a plurality of different target analysis moments; according to the total electricity cost values within the multiple production cycles, dividing the multiple different target analysis moments to obtain a first interval, a second interval and a third interval, the total electricity cost value within the production cycle corresponding to any target analysis moment in the first interval is less than the total electricity cost value within the entire production cycle corresponding one-to-one to all target analysis moments in the second interval; the total electricity cost value within the production cycle corresponding to any target analysis moment in the second interval is less than the total electricity cost value within the entire production cycle corresponding one-to-one to all target analysis moments in the third interval; taking any target analysis moment in the first interval or the second interval as the start time of the production cycle to determine the production cycle.
[0010] Based on the same inventive concept, in the third aspect, an embodiment of the present application also provides a device for determining the total electricity cost value within a production cycle, including: an acquisition module, used to obtain first digital representation information, first peak-valley-average information of electric power within the production cycle, and process production constraints within the production cycle, the first digital representation information including N precise power values corresponding to N analysis time periods, where N is a positive integer; an expansion module, used to expand the first digital representation information in the time domain to obtain second digital representation information, and to expand the first peak-valley-average information to obtain second peak-valley-average information; a first determination module, used to determine the total electricity cost value within the production cycle corresponding to the target analysis moment according to the second digital representation information and the second peak-valley-average information.
[0011] Based on the same inventive concept, in the fourth aspect, the embodiment of the present application also provides a production cycle determination system, including: a device for determining the total electricity cost value within the production cycle according to any one of the third aspects, used to determine a plurality of total electricity cost values within the production cycle corresponding one-to-one to a plurality of different target analysis moments; a production cycle determination device, connected to the device for determining the total electricity cost value within the production cycle, the production cycle determination device including: a division module, used to divide a plurality of different target analysis moments according to the total electricity cost values within the production cycles, to obtain a first interval, a second interval and a third interval, the total electricity cost value within the production cycle corresponding to any target analysis moment within the first interval is less than the total electricity cost value within all production cycles corresponding one-to-one to all target analysis moments within the second interval; the total electricity cost value within the production cycle corresponding to any target analysis moment within the second interval is less than the total electricity cost value within all production cycles corresponding one-to-one to all target analysis moments within the third interval; as a module, used to take any target analysis moment within the first interval or the second interval as the start time of the production cycle to determine the production cycle.
[0012] Based on the same inventive concept, in the fifth aspect, an embodiment of the present application also provides an electronic device, comprising a processor and a memory storing computer program instructions. When the processor executes the computer program instructions, it implements a method for determining the total electricity cost value within a production cycle as in any one of the first aspects, or a method for determining a production cycle as in any one of the second aspects.
[0013] According to the method and device for determining the total electricity cost value within a production cycle, the method and system for determining the production cycle, and the electronic device provided in the embodiments of the present application, the first digital characterization information of the electric power within the production cycle, and the first peak-valley-average information are expanded in the time domain according to the process production constraints within the production cycle to obtain the second digital characterization information and the second peak-valley-average information. Since the process production constraints within the production cycle are in line with the actual production, the second digital characterization information is more accurate and in line with the actual production, and the second peak-valley-average information is easier to calculate, thereby making the total electricity cost value within the production cycle corresponding to the target analysis moment determined according to the second digital characterization information and the second peak-valley-average information more accurate, that is, the accuracy of the total electricity cost value within the production cycle can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A schematic diagram showing a flow chart of a method for determining a total electricity cost value within a production cycle provided in an embodiment of the present application;
[0015] Figure 2 A schematic diagram showing a flow chart of a method for determining a production cycle provided in an embodiment of the present application;
[0016] Figure 3 Another schematic diagram showing a flow chart of a method for determining a production cycle provided in an embodiment of the present application;
[0017] Figure 4 A schematic diagram showing a structure of a device for determining a total electricity cost value within a production cycle provided by an embodiment of the present application;
[0018] Figure 5 A schematic diagram showing a process of a production cycle determination system provided in an embodiment of the present application is shown;
[0019] Figure 6 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application is shown. DETAILED DESCRIPTION
[0020] In order to enable those skilled in the art to better understand the technical solution of the present application, the present application is further described in detail below with reference to the accompanying drawings and embodiments.
[0021] The features and exemplary embodiments of various aspects of the present application will be described in detail below. In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only configured to explain the present application and are not configured to limit the present application. For those skilled in the art, the present application can be implemented without the need for some of these specific details. The following description of the embodiments is only to provide a better understanding of the present application by illustrating the examples of the present application.
[0022] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "include..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0023] Example 1
[0024] The method for determining the total electricity cost value within a production cycle provided in the embodiment of the present application can be executed by a method for determining the total electricity cost value within a production cycle and an electronic device, etc. The following takes the method for determining the total electricity cost value within a production cycle executed by an electronic device as an example for explanation.
[0025] like Figure 1 As shown, the method for determining the total electricity cost value within a production cycle provided in an embodiment of the present application may include steps S110 to S130.
[0026] S110, obtaining first digital characterization information of electric power within a production cycle, first peak-valley-average information, and process generation constraints within the production cycle, wherein the first digital characterization information includes N precise power values corresponding to N analysis time periods, where N is a positive integer.
[0027] S120. In the time domain, according to the process production constraints within the production cycle, the first digital representation information is expanded to obtain the second digital representation information, and the first peak-valley-average information is expanded to obtain the second peak-valley-average information.
[0028] S130. Determine a total electricity cost value in a production cycle corresponding to a target analysis time according to the second digital representation information and the second peak-valley-average information.
[0029] According to the method for determining the total electricity cost within a production cycle provided in an embodiment of the present application, the first digital characterization information of the electric power within the production cycle and the first peak-valley-average information are expanded in the time domain according to the process production constraints within the production cycle to obtain the second digital characterization information and the second peak-valley-average information. Since the process production constraints within the production cycle are in line with the actual production, the second digital characterization information is more accurate and in line with the actual production, and the second peak-valley-average information is easier to calculate, thereby making the total electricity cost within the production cycle corresponding to the target analysis moment determined according to the second digital characterization information and the second peak-valley-average information more accurate, that is, the accuracy of the total electricity cost within the production cycle can be improved.
[0030] The specific implementation methods of the above steps are introduced below.
[0031] In step S110, the production cycle may be any reduction production cycle of polysilicon, etc. The actual operating time RT0 of the production cycle may include N analysis time periods, and the actual operating time RT0 satisfies: RT0 = N*T, where N represents the number of analysis time periods, and T represents the duration of the analysis time period. Each of the N analysis time periods corresponds to an accurate power value. Each of the N analysis time periods may be an electric energy consumption analysis time unit value required or desired by the user or production control personnel, which is an integer multiple of the minimum time unit of the material table baseline, usually 5-20 minimum time units of the material table baseline. The value of N can be set according to the time situation and is not limited here. For example, the value of N may be 12, 24, 48, etc.
[0032] The process production constraints within the production cycle can be determined based on actual on-site production. The process production constraints within the production cycle may include the actual operating time RT0 in actual production, the real-time value of electric power control throughout the production process, the real-time value of material control throughout the production process, and the analysis time AT0, etc.
[0033] For example, the electronic device may pre-store process production constraints within the production cycle, so that the analysis time AT0 and the actual operation time RT0 in the process production constraints within the production cycle can be directly called later. In some embodiments, obtaining the first digital representation information of the electric power within the production cycle includes:
[0034] Obtaining the restored production process control baseline information corresponding to the production cycle, the restored production process control baseline information including n minimum time units corresponding to each analysis time period in N analysis time periods, and n power values corresponding to the n minimum time units, where n is a positive integer;
[0035] For any analysis time period i among the N analysis time periods, substitute the n power values corresponding to the analysis time period i into formula (1) for calculation to obtain the precise power value corresponding to the analysis time period i, where i is less than or equal to N and is a positive integer;
[0036] Formula (1) includes:
[0037]
[0038] Wherein, PAcci represents the precise power value corresponding to the analysis time period i; PSx represents the x-th power value corresponding to the analysis time period i.
[0039] In some examples, obtaining reduction production process control baseline information corresponding to a production cycle includes:
[0040] Obtain process control equipment information corresponding to the production cycle;
[0041] The restored production process control baseline information corresponding to the production cycle is extracted from the process control equipment information.
[0042] Process control equipment information may include basic production information such as equipment model and production line information.
[0043] Exemplarily, the process control equipment information corresponding to the production cycle can be obtained in response to the user's input operation based on the electronic device. The output operation is an operation of inputting the process control equipment information corresponding to the production cycle, such as an operation of inputting the process control equipment information corresponding to the production cycle in a text box displayed by the electronic device.
[0044] Exemplarily, the control object equipment information is extracted from the process control equipment information, and then the initial reduction production process control baseline information corresponding to the production cycle is extracted from the control object equipment information, and then the initial reduction production process control basic information is analyzed and extracted to obtain the reduction production process control basic information. Among them, the control object equipment information may include equipment model, equipment process control baseline information during production, and silicon core information used by the equipment during production, etc.; the initial reduction production process control baseline information may also include the target control values of the electric heating power value, feed amount (TCS, H2, etc.) at each time point in the polysilicon reduction production process, and various parameters are controlled according to the above target control values to complete the entire polysilicon production process; the reduction production process control basic information may include production time information, power information (i.e., n power values corresponding to n minimum time units), and power change information, etc.
[0045] It should be noted that each analysis time period T0 in the N analysis time periods includes n minimum time units TS0, and the analysis time period T0 satisfies: T0 = n*TS0. The minimum time unit can be the minimum time unit of the material table baseline. x is greater than or equal to 1, and less than or equal to n, that is, the value of x can be 1, 2, 3...n. The value of the precise power value PAcci corresponding to the analysis time period i can retain 2 decimal places. Different control object devices can correspond to different first digital representation information.
[0046] For example, the first digital representation information may include a precise power value of 3500 KW corresponding to the analysis time period T0, a precise power value of 4500 KW corresponding to the analysis time period T1, and the like.
[0047] Exemplarily, the first peak-valley-flat information includes first peak-valley-flat electricity price information and first flag information.
[0048] In some examples, the first peak-valley-flat information may include initial electricity values corresponding to a peak time period, a valley time period, and a flat time period.
[0049] In some other examples, the first peak-valley-average information may also include an initial electricity value that corresponds one-to-one to at least one of a peak time period and a valley time period.
[0050] In some examples, the first flag information may include first high peak flag information, first valley flag information, and first flat flag information.
[0051] In some other examples, the first flag information may also include at least one of the first peak flag information and the first deep valley flag information. For example, the first flag information of a single day in January may include the first peak flag information, the first valley flag information, the first flat flag information, and the first peak flag information; the first flag information of a single day in July may include the first peak flag information, the first valley flag information, the first flat flag information, the first peak flag information, and the first deep valley flag information.
[0052] Among them, the first peak mark information, the first valley mark information, the first flat mark information, the first sharp peak mark information and the first deep valley mark information all include arrays composed of 0 and 1, and the size is 24, "0" is used to represent that there is no corresponding mark, and "1" is used to represent that there is a corresponding mark.
[0053] Exemplarily, the first peak flag information FlgPeak24'=[0,0,0,0,0,0,0,0,0,1,1,1,0,0,0,0,0,0,0,0,0,1,1,1,1,1], where "0" is used to represent the non-peak time period, and "1" is used to represent the peak time period. The above 24 values correspond one by one to the representation information of the 24 times of a day (i.e., 0-23 o'clock). If the corresponding position is "1", it means that the moment is a peak moment, and if the corresponding position is "0", it means that the moment is a non-peak moment. In other words, 8 o'clock, 9 o'clock, 10 o'clock, 19 o'clock, 20 o'clock, 21 o'clock, 22 o'clock, and 23 o'clock are all peak times, and 8 o'clock to 11 o'clock and 19 o'clock to 24 o'clock are peak time periods.
[0054] Similarly, the "1" in the first valley mark information is used to represent the valley time period, and "0" is used to represent the non-valley time period; the "1" in the first flat mark information is used to represent the flat time period, and "0" is used to represent the non-flat time period; the "1" in the first peak mark information is used to represent the peak time period, and "0" is used to represent the non-peak time period; the "1" in the first deep valley mark information is used to represent the deep valley time period, and "0" is used to represent the non-deep valley time period.
[0055] For example, taking the first flag information including the first peak flag information, the first valley flag information and the first flat flag information at time 1 to time 9 as an example, the first flag information can be expressed as:
[0056]
[0057] Among them, peak represents the first high peak mark information, valley represents the first valley mark information, and flat represents the first flat peak mark information.
[0058] In some implementations, obtaining first peak-to-valley level information may include:
[0059] According to the peak, valley and flat electricity price policy of the State Grid, the peak time period, valley time period and flat time period are extracted daily, as well as the initial electricity value corresponding to the peak time period, valley time period and flat time period;
[0060] Dimension expansion and assignment are performed on the peak time period, valley time period, and flat time period to obtain first flag information, where the first flag information includes first peak flag information, first valley flag information, and first flat flag information. The first peak flag information, the first valley flag information, and the first flat flag information all include arrays composed of 0 and 1, and the size is 24, where "0" is used to represent a corresponding flag, and "1" is used to represent a non-corresponding flag;
[0061] The entire initial electricity value is used as the first peak-valley-average electricity price information;
[0062] The first peak-valley-flat electricity price information and the first flag information are combined into the first peak-valley-flat information.
[0063] In other words, the peak time period, valley time period, and normal time period are dimensionally expanded to obtain an array of size 24 corresponding to each time period, and then the corresponding array is assigned a value according to each time period to obtain an array composed of 0 and 1.
[0064] In some other implementations, the first peak-valley-average information includes at least one of a peak time period and a valley time period, as well as a peak time period, a valley time period, and a flat time period. Acquiring the first peak-valley-average information may include:
[0065] According to the peak-valley-flat electricity price policy of the State Grid, the peak time period and / or deep valley time period, the peak time period, the valley time period and the flat time period, and the initial electricity value corresponding to the peak time period and / or deep valley time period, the peak time period, the valley time period and the flat time period are extracted on a daily basis;
[0066] Dimension expansion and assignment are performed on the peak time period and / or the deep valley time period, the peak time period, the valley time period and the flat time period to obtain first flag information, where the first flag information includes at least one of the first peak flag information and the first deep valley flag information, as well as the first peak flag information, the first valley flag information and the first flat flag information; the first peak flag information and / or the first deep valley flag information, the first peak flag information, the first valley flag information and the first flat flag information all include an array composed of 0 and 1, and the size is 24, "0" is used to represent the presence of a corresponding flag, and "1" is used to represent the absence of a corresponding flag;
[0067] The entire initial electricity value is used as the first peak-valley-average electricity price information;
[0068] The first peak-valley-flat electricity price information and the first flag information are combined into the first peak-valley-flat information.
[0069] In step S120, after acquiring the first digital representation information and the first peak-to-valley average information, the electronic device may further expand the first digital representation information and the first peak-to-valley average information in the time domain to obtain the second digital representation information and the second peak-to-valley average information.
[0070] In some embodiments, the first digital representation information includes [PAcc0, PAcc1, ..., PAccN], where PAcc0 represents a first precise power value corresponding to a first analysis time period, PAcc1 represents a second precise power value corresponding to a second analysis time period, and PAccN represents an N+1th precise power value corresponding to an N+1th analysis time period;
[0071] Before expanding the first digital representation information according to the process production constraint conditions within the production cycle to obtain the second digital representation information, the method further includes:
[0072] Correcting the first digital representation information to obtain third digital representation information;
[0073] According to the process production constraints within the production cycle, the first digital representation information is expanded to obtain the second digital representation information, including:
[0074] According to the process production constraints within the production cycle, the third digital representation information is expanded to obtain the second digital representation information.
[0075] In this embodiment, by correcting the first digital representation information, the obtained third digital representation information is made more accurate and more in line with production practice, providing a basis for subsequently improving the accuracy of determining the total electricity cost value within the production cycle.
[0076] In some examples, modifying the first digital representation information to obtain the third digital representation information includes:
[0077] Obtaining a first correction coefficient, a second correction coefficient, a third correction coefficient, a first correction constant, and a second correction constant;
[0078] Substitute the first correction coefficient and the first precise power value into formula (2) to calculate and obtain the first target power value;
[0079] Formula (2) includes:
[0080] AdjPAccS0=K1 * PAcc0 (2)
[0081] Wherein, AdjPAccS0 represents the first target power value; K1 represents the first correction coefficient; PAcc0 represents the first accurate power value;
[0082] Substitute the second correction coefficient, the first correction constant and the N+1th precise power value into formula (3) to calculate and obtain the second target power value;
[0083] Formula (3) includes:
[0084] AdjPAccE0=K2 * PAccN + B2 (3)
[0085] Wherein, AdjPAccE0 represents the second target power value; K2 represents the second correction coefficient; PAccN represents the N+1th precise power value;
[0086] Substitute the third correction coefficient, the second correction constant and the N+1th precise power value into formula (4) to calculate and obtain the third target power value;
[0087] Formula (4) includes:
[0088] AdjPAccE1=K3 * PAccN + B3 (4)
[0089] Wherein, AdjPAccE1 represents the third target power value; K3 represents the third correction coefficient;
[0090] The third digital representation information is determined according to the first target power value, the second target power value, the third target power value and the first digital representation information, and the third digital representation information includes [AdjPAccS0, PAcc1, ... PAccN, AdjPAccE0, AdjPAccE1].
[0091] The first correction coefficient may be a correction coefficient corresponding to the power value of the first analysis time period at the start of production. The second correction coefficient may be a correction coefficient corresponding to the power value of the first analysis time period after the end of production. The third correction coefficient may be a correction coefficient corresponding to the power value of the second analysis time period after the end of production. The first correction constant may be a correction constant corresponding to the power value of the first analysis time period after the end of production. The second correction constant may be a correction constant corresponding to the power value of the second analysis time period after the end of production. The first correction coefficient, the second correction coefficient and the third correction coefficient may all be set fixed proportional coefficients, which may be floating-point constants less than 2.00, with two decimal places reserved; the first correction constant and the second correction constant may be set fixed correction constants, usually floating-point values between 100-1000, with two decimal places reserved. Any two of the first correction coefficient, the second correction coefficient and the third correction coefficient may be equal or unequal; the first correction constant and the second correction constant may be equal or unequal. The first correction coefficient, the second correction coefficient, the third correction coefficient, the first correction constant and the second correction constant may all be set according to actual conditions, and are not limited here.
[0092] The first accurate power value may be the power value in the first analysis time period after the start of production. The second accurate power value may be the power value in the second analysis time period after the start of production. The N+1th accurate power value may be the power value at the end of production.
[0093] The first target power value may be the corrected power value in the first analysis time period at the start of production. The second target power value may be the power value in the first analysis time period after the end of production. The third target power value may be the power value in the second analysis time period after the end of production.
[0094] Exemplarily, the electronic device pre-stores the first correction coefficient, the second correction coefficient, the third correction coefficient, the first correction constant and the second correction constant for subsequent direct call. Of course, the first correction coefficient, the second correction coefficient and the third correction coefficient can all be determined according to the production process.
[0095] That is, PAcc0 in the first digital representation information is updated to the first target power value AdjPAccS0, and the second target power value AdjPAccE0 and the third target power value AdjPAccE1 are added after PAccN in the first digital representation information to obtain the third digital representation information.
[0096] In some examples, the third digital representation information includes [AdjPAccS0, PAcc1, ... PAccN, AdjPAccE0, AdjPAccE1];
[0097] According to the process production constraint conditions within the production cycle, the third digital representation information is expanded to obtain the second digital representation information, which may include:
[0098] Determine the target analysis time p according to the process production constraints within the production cycle;
[0099] Obtaining a first electric power value corresponding to a target analysis time p, an extension quantity q, and a second electric power value corresponding to the extension quantity;
[0100] According to the target analysis time p, the first electric power value, the extension number q and the second electric power value, the third digital characterization information is expanded to obtain the second digital characterization information, the second digital characterization information PAccAdj = [PreExt, AdjPAccS0, PAcc1, ...PAccN, AdjPAccE0, AdjPAccE1, Ext], PreExt includes p first electric power values, and Ext includes q second electric power values.
[0101] The first electric power value may be the electric power value corresponding to the target analysis time p, and the second electric power value may be the electric power value corresponding to the extension number. The first electric power value and the second electric power value may be the same or different, and the first electric power value and the second electric power value may be set according to actual conditions, which are not limited here. For example, the first electric power value and the second electric power value are both 0.
[0102] In some examples, determining the target analysis time p according to the process production constraints within the production cycle may include: obtaining the analysis time AT0 in the process production constraints within the production cycle, and determining the target analysis time p according to the analysis time AT0. For example, AT0 = 24h, the target analysis time p may be 0, 1, 2, 3 ... 24.
[0103] That is, p first electric power values are added before AdjPAccS0 in the second digital representation information, and q second electric power values are added after AdjPAccE1 in the second digital representation information to obtain the third digital representation information.
[0104] It should be noted that the extension number q can be set according to actual conditions and is not limited here. For example, the extension number q is 24.
[0105] Exemplarily, the target analysis time is 3, the extension number q is 24, the first electric power value and the second electric power value are both 0, then the second digital representation information PAccAdj = [0, 0, 0, AdjPAccS0, PAcc1, … PAccN, AdjPAccE0, AdjPAccE1, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0].
[0106] In some embodiments, the first peak-valley-flat information includes first peak-valley-flat electricity price information Pric24, first peak flag information FlgPeak24, first flat flag information FlgNormal24, and first valley flag information FlgValley24;
[0107] According to the process production constraints within the production cycle, the first peak-valley-level information is expanded to obtain the second peak-valley-level information, including:
[0108] Obtain the actual operation time RT0 and analysis time AT0 from the process production constraints within the production cycle;
[0109] Taking the analysis time AT0 as the unit, according to the actual operation time RT0, the first peak-valley-level information is expanded in the time domain to obtain the second peak-valley-level information;
[0110] Among them, the second peak-valley-flat information includes the second peak-valley-flat electricity price information PricExt, the second peak flag information FlgPeak, the second valley flag information FlgValley, and the second flat flag information FlgNormal;
[0111] The second peak-valley-flat electricity price information PricExt = [Pric241, Pric242,..., Pric24N, Pric24], where Pric241 represents the specific electricity price value of each time period of the first complete analysis duration AT0 in the time domain, Pric242 represents the specific electricity price value of each time period of the second complete analysis duration AT0 in the time domain,..., Pric24N represents the specific electricity price value of each time period of the Nth complete analysis duration AT0 in the time domain, (N - 1)*24 < RT0 and 24N > RT0;
[0112] The second peak flag information FlgPeak = [FlgPeak241, FlgPeak242,..., FlgPeak24N, FlgPeak24], where FlgPeak241 represents the peak period flag information of each time period of the first complete analysis duration AT0 in the time domain, FlgPeak242 represents the peak period flag information of each time period of the second complete analysis duration AT0 in the time domain,..., FlgPeak24N represents the peak period flag information of each time period of the Nth complete analysis duration AT0 in the time domain;
[0113] The second valley flag information FlgValley = [FlgValley241, FlgValley242,..., FlgValley24N, FlgNormal24], where FlgValley241 represents the valley period flag information of each time period of the first complete analysis duration AT0 in the time domain, FlgValley242 represents the valley period flag information of each time period of the second complete analysis duration AT0 in the time domain,..., FlgValley24N represents the valley period flag information of each time period of the Nth complete analysis duration AT0 in the time domain;
[0114] The second flat flag information FlgNormal = [FlgNormal241, FlgNormal242,..., FlgNormal24N, FlgNormal24], where FlgNormal241 represents the normal period flag information of each time period of the first complete analysis duration AT0 in the time domain, FlgNormal242 represents the normal period flag information of each time period of the second complete analysis duration AT0 in the time domain,..., FlgNormal24N represents the normal period flag information of each time period of the Nth complete analysis duration AT0 in the time domain.
[0115] It should be noted that the total duration included in the first peak-valley-average information is the actual operation duration RT0, and the total duration included in the second peak-valley-average information is the actual operation duration RT0+analysis duration AT0.
[0116] The first peak-valley-flat electricity price information Pric24 can represent the specific initial electricity value of each period within 24 hours of a single day. For example, taking the latest electricity value of Xinjiang Uygur Autonomous Region as an example, Pric24 = [0.3389, 0.3389, 0.3389, 0.088125, 0.088125, 0.088125, 0.088125, 0.6888, 0.6888, 0.6888, 0.3389, 0.3389, 0.088125, 0.03525, 0.03525, 0.088125, 0.3389, 0.3389, 0.705, 0.705, 0.6888, 0.6888, 0.6888], the unit is yuan.
[0117] Illustratively, the first peak flag information FlgPeak24=[0,0,0,0,0,0,0,0,1,1,1,0,0,0,0,0,0,0,0,0,1,1,1,1,1,1].
[0118] In some other embodiments, the first peak-valley level information further includes at least one of first peak flag information Flgspike24 and first deep valley flag information FlgDeepvalley24;
[0119] The second peak-valley information also includes at least one of the second peak flag information Flgspike and the second deep valley flag information FlgDeepvalley;
[0120] The second peak mark information Flgspike=[Flgspike241, Flgspike242, ..., Flgspike24N, Flgspike24], wherein Flgspike241 represents the peak period mark information of each period of the first complete analysis duration AT0 in the time domain, Flgspike242 represents the peak period mark information of each period of the second complete analysis duration AT0 in the time domain, ..., Flgspike24N represents the peak period mark information of each period of the Nth complete analysis duration AT0 in the time domain;
[0121] The second deep valley mark information FlgDeepvalley = [FlgDeepvalley241, FlgDeepvalley242, ..., FlgDeepvalley24N, FlgDeepvalley24], wherein FlgDeepvalley241 represents the deep valley period mark information of each time period of the first complete analysis duration AT0 in the time domain, FlgDeepvalley242 represents the deep valley period mark information of each time period of the second complete analysis duration AT0 in the time domain, ..., FlgDeepvalley24N represents the deep valley period mark information of each time period of the Nth complete analysis duration AT0 in the time domain.
[0122] In step S130, after obtaining the second digital representation information and the second peak-valley-average information, the electronic device may also determine the total electricity cost value in the production cycle corresponding to the target analysis time according to the second digital representation information and the second peak-valley-average information.
[0123] In some embodiments, determining the total electricity cost value in the production cycle corresponding to the target analysis time according to the second digital representation information and the second peak-valley-average information includes:
[0124] Determine an electricity rate value set corresponding to a target analysis time according to the second digital representation information and the second peak-valley-average information, the electricity rate value set including N first electricity rate values, N second electricity rate values, and N third electricity rate values;
[0125] According to the N first electricity cost values, the N second electricity cost values and the N third electricity cost values, a total electricity cost value in a production cycle corresponding to a target analysis time is determined.
[0126] In some examples, the second digital representation information PAccAdj=[PreExt, AdjPAccS0, PAcc1, ... PAccN, AdjPAccE0, AdjPAccE1, Ext], PreExt includes p first electric power values, and Ext includes q second electric power values;
[0127] The second peak-valley-normal information includes the second peak-valley-normal electricity price information PricExt, the second peak mark information FlgPeak, the second valley mark information FlgValley, and the second normal mark information FlgNormal;
[0128] Determining an electricity charge value set corresponding to a target analysis time according to the second digital representation information and the second peak-valley-average information, including:
[0129] For any analysis time period X among the N analysis time periods starting from the target analysis time, the first electricity value PricExt[X] corresponding to the second peak-valley-flat electricity price information PricExt, the peak time period flag information FlgPeak[X] corresponding to the second peak flag information FlgPeak, and the power value PAccAdj[X] corresponding to the third digital representation information are substituted into formula (5) for calculation to obtain the first electricity charge value MoneyAccPeak[X] of the peak time period, so as to obtain N first electricity charge values;
[0130] Formula (5) includes:
[0131] MoneyAccPeak[X]=PricExt[X]*FlgPeak[X]*PAccAdj[X] (5)
[0132] For any analysis time period X among the N analysis time periods starting from the target analysis time, the first electricity value PricExt[X] corresponding to the second peak-valley-flat electricity price information PricExt, the peak time period flag information FlgNormal[X] corresponding to the second flat flag information FlgNormal, and the power value PAccAdj[X] corresponding to the third digital representation information are substituted into formula (6) for calculation to obtain the second electricity charge value MoneyAccNormal[X] of the flat time period, so as to obtain N second electricity charge values;
[0133] Formula (6) includes:
[0134] MoneyAccNormal[X]=PricExt[X]*FlgNormal[X]*PAccAdj[X] (6)
[0135] For any analysis time period X among the N analysis time periods starting from the target analysis time, the first electricity value PricExt[X] corresponding to the second peak-valley-flat electricity price information PricExt, the peak time period flag information FlgValley[X] corresponding to the second valley flag information FlgValley, and the power value PAccAdj[X] corresponding to the third digital representation information are substituted into formula (7) for calculation to obtain the third electricity charge value MoneyAccValley[X] of the valley time period, so as to obtain N third electricity charge values;
[0136] Formula (7) includes:
[0137] MoneyAccValley[X]=PricExt[X]*FlgValley[X]*PAccAdj[X] (7).
[0138] For example, the first electricity cost value MoneyAccPeak[X] may be the electricity cost value of the peak time period of the analysis time period X. The second electricity cost value MoneyAccNormal[X] may be the electricity cost value of the normal time period of the analysis time period X. The third electricity cost value MoneyAccValley[X] may be the electricity cost value of the valley time period of the analysis time period X.
[0139] In some other embodiments, the second peak-valley information further includes at least one of second peak flag information Flgspike and second deep valley flag information FlgDeepvalley;
[0140] Determining the electricity charge value set corresponding to the target analysis time according to the second digital representation information and the second peak-valley-average information, further comprising:
[0141] For any analysis time period X among the N analysis time periods starting from the target analysis time, the first electricity value PricExt[X] corresponding to the second peak-valley-flat electricity price information PricExt, the peak time period flag information Flgspike[X] corresponding to the second peak flag information Flgspike, and the power value PAccAdj[X] corresponding to the third digital representation information are substituted into formula (12) for calculation to obtain the fourth electricity charge value MoneyAccspike[X] of the peak time period, so as to obtain N fourth electricity charge values;
[0142] Formula (12) includes:
[0143] MoneyAccspike[X]=PricExt[X]*Flgspike[X]*PAccAdj[X] (12);
[0144] and / or;
[0145] For any analysis time period X among the N analysis time periods starting from the target analysis time, the first electricity value PricExt[X] corresponding to the second peak-valley-flat electricity price information PricExt, the deep valley time period flag information FlgDeepvalley[X] corresponding to the second deep valley flag information FlgDeepvalley, and the power value PAccAdj[X] corresponding to the third digital representation information are substituted into formula (13) for calculation to obtain the fifth electricity charge value MoneyAccDeepvalley[X] of the deep valley time period, so as to obtain N fifth electricity charge values;
[0146] Formula (13) includes:
[0147] MoneyAccDeepvalley[X]=PricExt[X]*FlgDeepvalley[X]*PAccAdj[X](13).
[0148] For example, the fourth electricity cost value MoneyAccspike[X] may be the electricity cost value of the peak time period of the analysis time period X. The fifth electricity cost value MoneyAccDeepvalley[X] may be the electricity cost value of the deep valley time period of the analysis time period X.
[0149] In some examples, determining a total electricity cost value in a production cycle corresponding to a target analysis time according to the N first electricity cost values, the N second electricity cost values, and the N third electricity cost values includes:
[0150] Substitute the N first electricity fee values into formula (8) to calculate and obtain the total first electricity fee value:
[0151] Formula (8) includes:
[0152]
[0153] Wherein, MoneyAnayTmPeak represents the total value of the first electricity fee, and MoneyAccPeak[X] represents the Xth first electricity fee value;
[0154] Substitute the N second electricity fee values into formula (9) to calculate and obtain the total second electricity fee value:
[0155] Formula (9) includes:
[0156]
[0157] Wherein, MoneyAnayNormal represents the total value of the second electricity fee, and MoneyAccNormal[X] represents the Xth second electricity fee value;
[0158] Substitute the N third electricity fee values into formula (10) to calculate and obtain the total third electricity fee value:
[0159] Formula (10) includes:
[0160]
[0161] Among them, MoneyAnayTmValley represents the total value of the third electricity fee, and MoneyAccValley[X] represents the Xth third electricity fee value;
[0162] Substitute the first electricity fee total value, the second electricity fee total value, and the third electricity fee total value into formula (11) to calculate and obtain the total electricity fee value within the production cycle;
[0163] Formula (11) includes:
[0164] MoneyAnayTmAll=MoneyAnayTmPeak+MoneyAnayTmNormal+MoneyAnayTmNor mal(11)
[0165] Among them, MoneyAnayTmAll represents the total electricity cost value.
[0166] Exemplarily, the first total electricity cost may be the total electricity cost of all peak time periods in a single production cycle; the second total electricity cost may be the total electricity cost of all normal time periods in a single production cycle; and the third total electricity cost may be the total electricity cost of all valley time periods in a single production cycle.
[0167] That is to say, the total value of the first electricity charge is the sum of N first electricity charge values; the total value of the second electricity charge is the sum of N second electricity charge values; and the total value of the third electricity charge is the sum of N third electricity charge values.
[0168] In some other implementations, determining the total electricity cost value in the production cycle corresponding to the target analysis time according to the N first electricity cost values, the N second electricity cost values, and the N third electricity cost values includes:
[0169] Substitute the N first electricity fee values into formula (8) to calculate and obtain the total first electricity fee value:
[0170] Formula (8) includes:
[0171]
[0172] Wherein, MoneyAnayTmPeak represents the total value of the first electricity fee, and MoneyAccPeak[X] represents the Xth first electricity fee value;
[0173] Substitute the N second electricity fee values into formula (9) to calculate and obtain the total second electricity fee value:
[0174] Formula (9) includes:
[0175]
[0176] Wherein, MoneyAnayNormal represents the total value of the second electricity fee, and MoneyAccNormal[X] represents the Xth second electricity fee value;
[0177] Substitute the N third electricity fee values into formula (10) to calculate and obtain the total third electricity fee value:
[0178] Formula (10) includes:
[0179]
[0180] Among them, MoneyAnayTmValley represents the total value of the third electricity fee, and MoneyAccValley[X] represents the Xth third electricity fee value;
[0181] Substitute the N fourth electricity fee values into formula (14) to calculate and obtain the total value of the fourth electricity fee:
[0182] Formula (14) includes:
[0183]
[0184] Wherein, MoneyAnayTmspike represents the fourth electricity fee total value, and MoneyAccspike[X] represents the Xth fourth electricity fee value;
[0185] And / or, substitute the N fifth electricity fee values into formula (15) to calculate and obtain the total value of the fifth electricity fee:
[0186] Formula (15) includes:
[0187]
[0188] Among them, MoneyAnayTmDeepvalley represents the fifth electricity fee total value, and MoneyAccDeepvalley[X] represents the Xth fifth electricity fee value;
[0189] At least one of the N fourth electricity cost values and the N fifth electricity cost values, and the sum of the N first electricity cost values, the N second electricity cost values, and the N third electricity cost values are determined as the total electricity cost value in the production cycle corresponding to the target analysis time.
[0190] That is, the total electricity cost value MoneyAnayTmAll satisfies: MoneyAnayTmAll=MoneyAnayTmPeak+MoneyAnayTmNormal+MoneyAnayTmNormal+MoneyAnayTmspike;
[0191] or,
[0192] MoneyAnayTmAll=MoneyAnayTmPeak+MoneyAnayTmNormal+MoneyAnayTmNormal+MoneyAnayTmDeepvalley;
[0193] or,
[0194] MoneyAnayTmAll=MoneyAnayTmPeak+MoneyAnayTmNormal+MoneyAnayTmNormal+MoneyAnayTmspike+MoneyAnayTmDeepvalley.
[0195] Exemplarily, the fourth total electricity cost may be the total electricity cost of all peak time periods in a single production cycle; and the fifth total electricity cost may be the total electricity cost of all valley time periods in a single production cycle.
[0196] That is to say, the fourth electricity charge total value is the sum of N fourth electricity charge values; the fifth electricity charge total value is the sum of N fifth electricity charge values.
[0197] Based on the same inventive concept, an embodiment of the present application also provides a method for determining a production cycle. The method for determining a production cycle provided by an embodiment of the present application is described below in conjunction with the accompanying drawings.
[0198] Example 2
[0199] Based on the analysis in the background technology, the different start times of single-furnace polysilicon production will form different electric power peak, valley and flat (high and low) waveforms in the time domain. According to national policies, the same time domain corresponds to fixed peak, valley and flat electricity prices. The superposition of the two waveforms will make the peak electricity price period, valley electricity price period and flat electricity price period occupied by the single-furnace reduction production process different. The different production power in each period of the superimposed reduction production will result in different final single-furnace electricity prices (the total electricity consumption has not changed).
[0200] The production cycle determination method provided in the embodiment of the present application can be executed by a production cycle determination system and an electronic device, etc. The production cycle determination method is described below by taking the execution of the electronic device as an example.
[0201] like Figure 2 As shown, the production cycle determination method provided in the embodiment of the present application may include steps S210 to S230.
[0202] S210. According to the method for determining the total electricity cost value within a production cycle of any one of Embodiment 1, determine the total electricity cost values within a plurality of production cycles corresponding to a plurality of different target analysis moments.
[0203] S220. According to the total electricity cost values within multiple production cycles, multiple different target analysis moments are divided to obtain a first interval, a second interval and a third interval. The total electricity cost value within the production cycle corresponding to any target analysis moment in the first interval is smaller than the total electricity cost value within all production cycles corresponding to all target analysis moments in the second interval; the total electricity cost value within the production cycle corresponding to any target analysis moment in the second interval is smaller than the total electricity cost value within all production cycles corresponding to all target analysis moments in the third interval.
[0204] S230. Taking any target analysis time in the first interval or the second interval as the start time of the production cycle to determine the production cycle.
[0205] According to the production cycle determination method provided in the embodiments of the present application, through the method for determining the total electricity cost value within the production cycle of any one of Embodiment 1, the total electricity cost values within multiple production cycles corresponding to multiple different target analysis moments can be accurately determined; since the total electricity cost value within the production cycle corresponding to any target analysis moment in the first interval is less than the total electricity cost value within the entire production cycle corresponding to all target analysis moments in the second interval; the total electricity cost value within the production cycle corresponding to any target analysis moment in the second interval is less than the total electricity cost value within the entire production cycle corresponding to all target analysis moments in the third interval, therefore, taking any target analysis moment in the first interval or the second interval as the starting moment of the production cycle to determine the production cycle, relative to taking any target analysis moment in the third interval as the starting moment of the production cycle to determine the production cycle, can reduce the total electricity cost value of the production cycle, that is, can reduce the electricity consumption cost of the restoration production link.
[0206] In step S210, the process of determining the total electricity cost values in multiple production cycles corresponding to multiple different target analysis moments is described in Example 1 and will not be repeated here.
[0207] In some examples, after determining the total electricity cost values in multiple production cycles corresponding to multiple different target analysis moments, the multiple different target analysis moments can be sorted in ascending or descending order according to the numerical values of the total electricity cost values in the multiple production cycles, and the changes in the total electricity cost values in the production cycles corresponding to the different target analysis moments are analyzed to obtain difference information of the total electricity cost values. The difference information includes the maximum total electricity cost value and its corresponding target analysis moment, the minimum total electricity cost value and its corresponding target analysis moment, the extreme value of the total electricity cost values corresponding to different analysis moments (that is, the difference between the maximum and minimum values), etc.
[0208] In other examples, after determining the total electricity cost values in multiple production cycles corresponding to multiple different target analysis moments, the total electricity cost values corresponding to all target analysis moments and the electricity cost values for each time period can also be calculated and analyzed to obtain calculation and analysis results, which include the proportion of electricity costs in peak time periods in the total electricity cost values at different target analysis moments, the proportion of electricity costs in normal time periods in the total electricity cost values, and the proportion of electricity costs in valley-peak time periods in the total electricity cost values; the cumulative number of peak time periods, the cumulative number of valley-peak time periods, and the cumulative number of normal time periods in the actual operating time RT0 at different target analysis moments; the difference in the cumulative number of peak time periods, the difference in the cumulative number of valley-peak time periods, the difference in the cumulative number of normal time periods, the difference in the proportion of electricity costs in peak time periods, the difference in the proportion of electricity costs in normal time periods in the total electricity cost values, and the difference in the proportion of electricity costs in valley-peak time periods in the total electricity cost values under the maximum total electricity cost value and the minimum total electricity cost value, etc.
[0209] In step S220, the first interval may be a preferred interval with a very small total electricity cost value in the production cycle. The first interval may be a plurality of continuous or discontinuous time points or time periods, and the time points or time periods correspond to the target analysis time. Specifically, when the production is executed, the polysilicon reduction production is started at the time point or time period, and the production is ended after the actual production time RT0 hours. The total electricity cost value in the entire polysilicon reduction production cycle is relatively small. For example, 6 o'clock, 17-20 o'clock, that is, the polysilicon reduction production is started at 6 o'clock, or between 17 o'clock and 20 o'clock, and the production is ended after RT0 hours. The total electricity cost value in the entire polysilicon reduction production cycle is relatively small.
[0210] The second interval can be a recommended interval with a lower total electricity cost value during the production cycle. The second interval can be multiple continuous or discontinuous time points or time periods, and the time points or time periods correspond to the target analysis time. Specifically, when the production is executed, the polysilicon reduction production starts at this time point or time period, and the production ends after the actual production time RT0 hours. The total electricity cost value during the entire polysilicon reduction production cycle is relatively small. For example, 2 o'clock, 15-17 o'clock, that is, the polysilicon reduction production starts at 2 o'clock, or between 15 o'clock and 17 o'clock, and the production ends after RT0 hours. The total electricity cost value during the entire polysilicon reduction production cycle is relatively small.
[0211] The third interval may be a limit interval in which the total electricity cost value is very high during the production cycle. The third interval may be multiple continuous or discontinuous time points or time periods, and the time points or time periods correspond to the target analysis time. Specifically, when the production is executed, the polysilicon reduction production starts at this time point or time period, and the production ends after the actual production time RT0 hours. The total electricity cost value during the entire polysilicon reduction production cycle is relatively high. For example, 10 o'clock, 6-8 o'clock, that is, the polysilicon reduction production starts at 10 o'clock, or between 6 o'clock and 8 o'clock, and the production ends after RT0 hours. The total electricity cost value during the entire polysilicon reduction production cycle is relatively high.
[0212] For example, when the total electricity cost value in the production cycle is less than the first preset value, the total electricity cost value in the production cycle is classified into the first interval; when the total electricity cost value in the production cycle is greater than or equal to the first preset value and less than the second preset value, the total electricity cost value in the production cycle is classified into the second interval; when the total electricity cost value in the production cycle is greater than or equal to the second preset value, the total electricity cost value in the production cycle is classified into the third interval. The second preset value is greater than the first preset value, and the specific values of the two can be set according to actual conditions, and are not limited here.
[0213] In step S230, in some embodiments, any target analysis time in the first interval or the second interval is used as the start time of the production cycle, including:
[0214] The target analysis time corresponding to the total electricity cost value in the production cycle with the smallest value in the first interval is used as the start time of the production cycle.
[0215] In this embodiment, the target analysis time corresponding to the total electricity cost value in the production cycle with the smallest value in the first interval is used as the start time of the production cycle, which can further reduce the total electricity cost value of the production cycle, that is, it can further reduce the electricity consumption cost of the restoration production link.
[0216] In order to better understand the production cycle determination method provided in the embodiment of the present application, it is explained below in conjunction with specific application scenarios.
[0217] like Figure 3 As shown, the production cycle determination method provided in the embodiment of the present application may include steps S310 to S360.
[0218] S310, restore production power information extraction:
[0219] 1) First, based on the input process control equipment information (including but not limited to equipment model, production line information and other basic production information), extract the information of the control object equipment (as the identification of the model object, including but not limited to equipment model, equipment process control baseline information during production, silicon core information used by the equipment during production, etc.), so as to distinguish different equipment and construct different restored equipment electric power characterization data (i.e., first digital characterization information)
[0220] 2) The reduction production process control baseline information (i.e., the initial reduction production process control baseline information) mainly includes the target control values of the electric heating power value, feed amount (TCS, H2, etc.) at each time point in the polysilicon reduction production process. Various parameters are controlled according to the above values to complete the entire polysilicon production process, and analysis and extraction are performed. The results of the analysis and extraction (i.e., the reduction production process control baseline information) include but are not limited to production time information, power information, power change information, etc. Taking the set analysis time period T0 as the unit, the precise electric power value PAcc (i.e., precise power value) within the unit analysis time is calculated.
[0221] Specifically, analyze time period T0:
[0222] T0=n*TS0, n is an integer, TS0 is the minimum time unit of the material table baseline
[0223] The power value at each minimum time unit (TS0) is PSx, where x = 0, 1, 2...n;
[0224] The precise power value (meter is PAcc) for each analysis period is:
[0225] (i.e. formula (1)) PAcc retains 2 decimal places
[0226] After the above software algorithm process, the restored production electric power digital representation information (i.e., the first digital representation information) identified by the equipment information is constructed, which includes but is not limited to the precise power value of each analysis time period, i.e., at time T0, the power value is 3500KW, at time T1, the power value is 4500KW, etc. Different equipment corresponds to different electric power digital representation information.
[0227] S320, peak, valley and flat electricity price information extraction
[0228] 1) According to the peak-valley-flat electricity price policy of the State Grid, the peak, valley, flat, peak, deep valley and other time periods are extracted by month (the peak-valley-flat price and time division of each month are different), and the different electric power prices corresponding to each time period are obtained, and the basic peak-valley-flat electricity price information (i.e. the first peak-valley-flat electricity price information) is obtained.
[0229] 2) According to the peak, valley and flat time periods, the above basic information of electricity price is expanded in dimension (one division segment corresponds to one dimension) and corresponding flags are set (to mark peak, valley, flat, sharp peak, deep valley and other information). In the corresponding dimension, the value 1 is used to mark the presence of the time period information, and the value 0 is used to mark the absence of the time period information.
[0230] The peak-valley-flat electricity price characterization information (i.e., the second peak-valley-flat information) is constructed through the above algorithm process, and the characterization information includes but is not limited to the following information: peak-valley-flat policy identification information (policy implementation time information, i.e., the implementation time information of the peak-valley-flat electricity price policy of the State Grid mentioned above), monthly division information (division information of peak, valley, flat, spike, and deep valley segments contained in each month, only some months contain peaks, and some months contain both peaks and deep valleys, and the division information of each month is different; for example, the division information for January is: peak, valley, flat, and peak, and the division information for July is: peak, valley, flat, spike, and deep valley.), division information of each time period (peak, valley, and flat) within a single day, electricity price information of each time period (peak, valley, and flat), and independent dimensional mark information of peak, valley, flat, spike, deep valley, etc.
[0231] Specifically, the dimensions added by the algorithm of the present invention to the peak, valley and flat electricity price information are peak time period, valley time period, flat time period, peak time period and deep valley time period.
[0232] The corresponding sign information matrix (i.e., the first sign information) is: (Taking peak hours, valley hours, and normal hours as an example, only the 1-9 times are shown in the figure, and the other times are analogous)
[0233]
[0234] Specifically, the column corresponding to the peak in the above-mentioned sign information matrix (i.e., the first peak sign information) is (marked as FlgPeak24):
[0235] FlgPeak24=[0,0,0,0,0,0,0,0,1,1,1,0,0,0,0,0,0,0,0,1,1,1,1,1]
[0236] (The above position value is 0, and there are 8 moments of 1 every day)
[0237] The above matrix has a total of 24 values, corresponding to the identification information of 24 times of the day (0-23 o'clock). If the corresponding position is 1, it indicates that the corresponding time is a peak time, and if the corresponding position is 0, it indicates that the corresponding time is a non-peak time.
[0238] The first 1 position in the above matrix is 8 (starting from 0), which means 8 o'clock is the peak period.
[0239] S330, extraction of process production constraints (i.e. process production constraints within the production cycle)
[0240] 1) According to the actual application site of the extracted process production constraints, the specific process requirements of the production are restored (operating time, real-time value of electric power control in the actual production process, etc.). The process constraints are determined by communicating with the on-site production process responsible personnel based on the actual production on site. The constraints include but are not limited to the actual operating time, real-time value of electric power control in the entire production process, real-time value of material control in the entire production process, and required or desired time unit value of electric energy consumption analysis. The digital characterization information of the restored production electric power in 1 (i.e., the first digital characterization information) is optimized and corrected. The optimization and correction includes but is not limited to the optimization of the electric power characterization information in the initial production stage and the optimization of the electric power characterization information in the end production stage, so that the digital characterization information of the restored production electric power is more in line with the actual application production site.
[0241] A. Power value correction for the first hour of production:
[0242] AdjPAccS0=K1*PAcc0;
[0243] AdjPAccS0: corrected power value (i.e., the first target power value);
[0244] PAcc0 is the power value in the first analysis time unit after the start of production (i.e., the first accurate power value). The analysis time unit is the power consumption analysis time unit value required or desired by the user or production control personnel, which is an integer multiple of the minimum time unit TS0 of the material table baseline, usually 5-20 minimum time units of the material table baseline;
[0245] K1 is a correction coefficient determined according to the production process (ie, the first correction coefficient).
[0246] B. Power value correction within the first analysis time unit after the end of production:
[0247] AdjPAccE0=K2*PAccn+B2;
[0248] Wherein AdjPAccE0 is the power value within the first analysis time unit after the end of production (i.e., the second target power value), K2 is the correction coefficient determined according to the production process (i.e., the second correction coefficient), B2 is the correction constant (i.e., the first correction constant), and PAccn is the power value at the end of production (i.e., PAccN, the N+1th precise power value).
[0249] Specific power value correction within the second analysis time unit after the end of production:
[0250] AdjPAccE1=K3*PAccn+B3;
[0251] Among them, AdjPAccE1 is the power value within the second analysis time unit after the end of production (i.e., the third target power value), K3 is the correction coefficient determined according to the production process (i.e., the third correction coefficient), B3 is the correction constant (i.e., the second correction constant), and PAccn is the power value at the end of production.
[0252] After the above adjustments and optimizations, the accurate restoration of the production power characterization information in the time domain (i.e. the third digital characterization information) is obtained:
[0253] PAccAdj=[AdjPAccS0,PAcc1,...PAccn,AdjPAccE0,AdjPAccE1]
[0254] 2) According to the actual operating time RT0 extracted from the process production constraints and the required analysis time parameter (the parameter is AT0, usually 24 hours), the above-mentioned corrected electric power characterization information is extended forward and backward in the time domain (taking the analysis time period T0 as the unit, shifting backward and extending backward respectively), and the electric power characterization information is shifted with the analysis time AnayTx (i.e. the target analysis time) as the starting point (AnayTx=0, 1, 2...N, N=AT0), the electric power value of the shifted section is set to P1 (i.e. the first electric power value), and the electric power value corresponding to the delayed time period is set to P0 (i.e. the second electric power value), for example T0=30 minutes, P0=0KW, P1=0KW.
[0255] Specifically, the aligned and expanded electric power characterization information data (i.e., the second digital characterization information) consists of the following three parts:
[0256] [PreExt,PAcc,Ext],
[0257] Where PreExt = 0, PreExt is the data filled after alignment with the analysis time AnayTx (before), and the number of PreExt data is AnayTx;
[0258] PAcc is the power value in each analysis time period (T0). The total number of PAcc data, N, must satisfy N*T0=RT0, where RT0 is the total operating time.
[0259] Ext=0, Ext is the electric power value after the restored production electric power characterization information data is extended backward, and the number of Ext data is usually 24.
[0260] Specifically, for example, RT0=96, AT0=24, when the analysis time AnayTx=3, the following data information can be obtained by aligning and postponing the restored production power guarantee information data at the analysis time 3 as the starting point:
[0261] [0,0,0,AdjPAccS0,PAcc0,PAcc1,...PAccn,AdjPAccE0,AdjPAccE1PAcc0,PAcc1,Pacc2,...Paccn,0,0....0].
[0262] Wherein AdjPAccS0 (corrected value) is the power value in the first analysis time period (T0) (after optimization and adjustment in step S330), PAcc1 (corrected value) is the power value in the second analysis time period (T0), and PAccn (corrected value) is the power value in the nth analysis time period (T0), where n satisfies:
[0263] n*T0=RT0, where n=96;
[0264] The first three zeros in the upper matrix are the above-mentioned PreExt, which are the three power values P0 filled after alignment at time 3, P0=0;
[0265] The last 0 in the upper matrix is the above-mentioned Ext, that is, the 24 power values P1 filled in after the electric power model, P1=0.
[0266] 3) According to the actual operating time RT0 extracted from the process production constraints and the required analysis time parameter (the parameter is AT0, usually 24 hours), the peak, valley and flat electricity price characterization information is expanded in the time domain (with the analysis time period AT0 as the unit, the total time after expansion is RT0+AT0, and expanded backward), and the peak, valley and flat electricity price characterization information (electricity price, time period information, multi-dimensional peak, valley and flat signs) is expanded to RT0+AT0 hours of extended information.
[0267] Based on the restored production power information and peak-valley-flat electricity price information, combined with the extracted production process constraints,
[0268] Through the above algorithm process, accurate electric power information and peak, valley and flat electricity price information are obtained and organized in the time domain dimension.
[0269] Specifically, the peak-valley-flat electricity price information expanded in the time domain dimension (i.e., the second peak-valley-flat electricity price information) is:
[0270] PricExt=[Pric241,Pric242,. . . Pric24n,Pric24]
[0271] Pric24 is the specific price value for each period within 24 hours of a single day (taking the latest electricity price in Xinjiang Uygur Autonomous Region as an example):
[0272] [0.3389,0.3389,0.3389,0.3389,0.088125,0.088125,0.088125,0.088125,0.6888,0.6888,0.6888,0.3389,0.3389,0.088125,0.03525,0.03525,0.088125,0.3389,0.3389,0.705,0.705,0.6888,0.6888,0.6888]
[0273] The above 24 decimal values respectively correspond to the electricity values at different times of a single day (unit: yuan).
[0274] Pric241 = Pric24, representing the specific electricity values of each period in the first complete 24 hours in the time domain,
[0275] Pric242 = Pric24, representing the specific electricity values of each period in the second complete 24 hours in the time domain,
[0276] Pric24n = Pric24, representing the specific electricity values of each period in the nth complete 24 hours in the time domain,
[0277] Among them:
[0278] (n - 1) * 24 < RT0 and (n - 0) * 24 > RT0 (here n is equivalent to N in Embodiments 1 and 2).
[0279] Specifically, the peak-valley-flat flag information (i.e., the second peak flag information) expanded in the time domain dimension is (a column in the multi-dimensional array):
[0280] FlgPeak = [FlgPeak241, FlgPeak242,..., FlgPeak24n, FlgPeak24]
[0281] Among them, FlgPeak24 is the peak period identification information within 24 hours.
[0282] Specifically, for the peak period flag, the specific data (a column in the multi-dimensional data) is:
[0283] FlgPeak24 = [0,0,0,0,0,0,0,0,1,1,1,0,0,0,0,0,0,0,0,1,1,1,1,1]
[0284] FlgPeak1 = FlgPeak24, representing the peak period flag information of each period within the first complete 24 hours in the time domain,
[0285] FgPeak2 = FlgPeak24, representing the peak period flag information for each period within the second complete 24-hour period in the time domain.
[0286] FlgPeakn = FlgPeak24, representing the peak period flag information for each period within the nth complete 24-hour period in the time domain.
[0287] Where n must satisfy the following conditions:
[0288] (n - 1) * 24 < RT0 and (n - 0) * 24 > RT0.
[0289] S340, Analysis of the total electricity cost difference for a single furnace
[0290] 1) Align the reduced production electric power characterization information and the peak-valley-flat electricity price information obtained by expanding in step S330 at the analysis time point according to the electricity cost analysis point (specific production start time), and then calculate the electricity cost values for each analysis time period.
[0291] 2) Use the electricity price model (i.e., the peak-valley-flat flag expanded in step S330) to cumulatively calculate the electricity cost values for each period in the above steps to obtain the cumulative electricity costs for different electricity price periods (the electricity cost MoneyAnayTmPeak during the electricity price peak period in the whole production process, the electricity cost MoneyAnayTmNormal during the electricity price normal period in the whole production process, the electricity cost MoneyAnayTmValley during the electricity price valley period in the whole production process, etc.) and the total electricity cost (the sum of the electricity costs for all periods, MoneyAnayTmAll).
[0292] The specific calculation is as follows:
[0293] Calculation of the electricity cost at the peak moment for a single time point:
[0294] MoneyAccPeak[X] = PricExt[X] * FlgPeak[X] * PAccAdjExt[X] (i.e., PAccAdj[X]);
[0295] MoneyAccPeak[X] is the electricity cost value during the peak period at the Xth moment (X = 0, 1, 2,... etc. integer values, the Xth analysis time period).
[0296] PricExt[X] is the electricity price value during the peak period at the Xth moment (derived from the expanded peak-valley-flat electricity price characterization information);
[0297] FlgPeak[X] is the peak period flag information at the Xth moment (derived from the expanded peak-valley-flat electricity price characterization information);
[0298] PAccAdjExt[X] is the accurate restored electric power value at the Xth moment (derived from the expanded and corrected restored production electric power characterization information); the electric power information here is: when X=1, PAcc[X] is [0,0,0,AdjPAccS0,PAcc1,Pacc2,...Paccn,AdjPAccE0,AdjPAccE1,0,0....0].
[0299] Furthermore, when production starts at the analysis point AnayTm, the total electricity cost for all peak hours in a single production cycle is (calculated as MoneyAnayTmPeak):
[0300] (equivalent to formula (8))
[0301] In the formula, n=RT0 / T0, T0 is the analysis time period, RT0 is the total running time,
[0302] AnayTm is the analysis time point, AnayTm = 0, 1, 2, ... 23, corresponding to the value in the analysis duration parameter.
[0303] Similarly, when production starts at the analysis point AnayTm, the total electricity cost for all normal periods in a single production cycle (calculated as MoneyAnayTmNormal) is:
[0304] (equivalent to formula (9))
[0305] Similarly, when production starts at the analysis point AnayTm, the total electricity cost for all valley periods in a single production cycle (calculated as MoneyAnayTmValley) is:
[0306] (equivalent to formula (10))
[0307] The final calculation is that when production starts at the analysis point AnayTm, the total electricity cost in a single production cycle is (taking the time period as an example, divided into three time periods: peak, valley, and average):
[0308] MoneyAnayTmAll=MoneyAnayTmPeak+MoneyAnayTmNormal+MoneyAnayTmNormal
[0309] 3) Repeat the above process to calculate the accumulated electricity charges and the total electricity charges for all electricity charge analysis points in different time periods at the analysis time point.
[0310] 4) Sort the total electricity charges corresponding to all analysis time points (in ascending or descending order), analyze the changes in the total electricity charges at different analysis time points, and obtain the difference information of the electricity charges, which includes but is not limited to: the maximum total electricity charge and the corresponding analysis time point, the minimum total electricity charge and the corresponding analysis time point, the extreme difference value of the total electricity charges corresponding to different analysis time points (the difference between the maximum and minimum values), etc.
[0311] 5) Based on the actual production execution experience (many modifications and improvements have been made in actual applications and can be conveniently executed in production), the algorithm of the present invention ingeniously divides different analysis time points into intervals based on the difference in total electricity charges, so as to provide convenient and executable guidance suggestions for optimizing the reduction of production electricity consumption.
[0312] S350, analysis of total electricity cost for a single furnace
[0313] 1) The algorithm of the present invention is used to calculate and analyze the total electricity charges and electricity charges for each time period corresponding to all analysis time points obtained in the above process 3. The calculation and analysis include but are not limited to: the proportion of peak time period electricity charges in the total electricity charges (electricity prices) at different analysis time points, the proportion of normal time period electricity charges in the total electricity charges (electricity prices), and the proportion of valley time period electricity charges in the total electricity charges (electricity prices); the cumulative number of peak time periods in the whole production process (RT0 hours) at different analysis time points, the cumulative number of valley time periods in the whole production process (RT0 hours), the cumulative number of normal time periods in the whole production process (RT0 hours), and the difference between the above-mentioned items, that is, the difference in the proportion of electricity charges for each time period under the maximum total electricity charge and the minimum total electricity charge (3 items), the difference in the cumulative number of each time period under the maximum total electricity charge and the minimum total electricity charge (3 items), etc.
[0314] S360, energy consumption optimization guidance output
[0315] 1) Through the above 4 and 5 processes, the difference in total electricity costs at different analysis times and the analysis of the composition of the total electricity costs are analyzed, especially the interval division of different analysis time points in 4-5), which is divided into N intervals, where N is a value greater than or equal to 3. The interval division represents the difference in the total electricity costs of the entire production process when the polysilicon reduction production starts at different analysis time points and the production ends after RT0 hours.
[0316] 2) The intervals divided by different analysis time points (production start time points) have the characteristics described in 1) above, and the intervals include but are not limited to:
[0317] A. Preferred interval (i.e., first interval) (grouping with very low total electricity cost of production): multiple continuous or discontinuous time points or time periods, which correspond to the time point of starting production (analysis time point). Specifically, when production is executed, polysilicon reduction production starts at this time point or time period, and production ends after RT0 hours. The total electricity cost of the entire production process is relatively low (compared with the highest electricity cost). For example, 6 o'clock, 17-20 o'clock, that is, starting reduction production at 6 o'clock, or between 17 o'clock and 20 o'clock, and ending production after RT0 hours, the total electricity cost of the entire production process will be very low.
[0318] B. Recommended interval (i.e., the second interval) (grouping with lower total electricity cost): multiple continuous or discontinuous time points or time periods, which correspond to the time point at which production starts (analysis time point). Specifically, when production is executed, polysilicon reduction production starts at this time point or time period, and production ends after RT0 hours. The total electricity cost of the entire production process is relatively low (compared with the highest electricity cost). For example, 2 o'clock, 15-17 o'clock, that is, starting reduction production at 2 o'clock, or between 15 o'clock and 17 o'clock, the corresponding electricity cost will be relatively low.
[0319] C. Restricted interval (i.e., the third interval) (grouping with high total electricity cost): multiple continuous or discontinuous time points or time periods, which correspond to the time point at which production starts (analysis time point). Specifically, when production is executed, polysilicon reduction production starts at this time point or time period, and production ends after RT0 hours. The total electricity cost of the entire production process is relatively high (compared with the lowest electricity cost). For example, 10 o'clock, 6-8 o'clock, that is, starting reduction production at 10 o'clock, or between 6 and 8 o'clock, the corresponding electricity cost will be very high.
[0320] The embodiment of the present application automatically outputs production guidance opinions through detailed calculation and analysis of the electricity cost of reduction production. The guidance suggests dividing the production start time into (intervals). During production execution, according to the guidance opinions, production is scheduled at time points in the preferred interval or recommended interval as much as possible, and production is scheduled at time points in the restricted interval as little as possible, thereby optimizing the electricity consumption of polysilicon reduction production (reducing electricity costs).
[0321] It should be noted that the embodiments of the present application have at least the following beneficial effects:
[0322] 1. Using different equipment information as a marker, based on the restored production control baseline, etc., the software algorithm of this application is used to extract accurate digital representation information of restored production electric power. This information represents the accurate electric power value information and electric power change information at different production moments in the entire production process, providing a basis for calculation and analysis of restored production electric power.
[0323] 2. Use the algorithm of this application to analyze the peak, valley and flat information and policies of the power grid electricity price, and creatively expand the peak, valley and flat period representation vector in the peak, valley and flat electricity price representation information, so as to construct detailed peak, valley and flat electricity price information. This information represents the segmentation information of the electricity price (segment name, time, etc.), specific price information, identification information on the electricity price segmentation dimension, etc., providing a basis for subsequent reduction of production power analysis.
[0324] 3. Based on the digital characterization information of restored production electric power and the digital characterization information of peak-valley and flat electricity prices developed and constructed fully independently, on the basis of the above information, this algorithm further extracts the production process constraint information (requirements for the start and stop stages of restored production, actual operating time requirements, etc.) to correct and expand the above restored electric power characterization information in the time domain, so as to obtain more accurate and actual restored production power consumption digital characterization information and peak-valley and flat electricity price information that is easy to analyze and calculate.
[0325] 4. Based on the above-mentioned corrected reduction electric power characterization information and peak, valley and flat electricity price digital characterization information, the above-mentioned characterization information is expanded and aligned in the time domain in accordance with the process and operation period, and the calculation method of the present application is used to realize a detailed analysis of the power consumption of a single furnace of reduction production, including but not limited to: 1. Analysis of the difference in total electricity costs of a single furnace of reduction production; 2. Analysis of the composition of the total electricity costs of a single furnace, etc.
[0326] 5. Based on the above detailed analysis of the electricity cost of a single furnace in reduction production, the embodiment of the present application automatically outputs reduction production guidance, that is, the furnace start-up production time information divided into different intervals, optimizes the intervention reduction production plan schedule, thereby achieving peak shifting of reduction production and grid electricity prices, and reducing the electricity consumption cost of the reduction production link.
[0327] 6. Through the analysis of polysilicon reduction production data and the analysis of the power grid electricity price policy, the peak and valley levels of electricity consumption in the reduction production process and the peak and valley levels of power grid electricity prices can be staggered, thereby achieving a significant reduction in the overall electricity price under the condition of unchanged total power consumption. The software algorithm of this application conducts a detailed analysis of the differences in the total electricity costs of a single furnace production and a detailed analysis of the composition of the total electricity costs of a single furnace. The algorithm automatically outputs production scheduling guidance opinions that can be directly executed on site, and achieves the peak and valley levels of electric power and the peak and valley levels of electricity prices in production by adjusting the production plan, thereby achieving the purpose of substantial savings in production electricity costs. Based on the national peak and valley electricity price strategy and specific reduction production process parameters, it is possible to analyze the differences in the total electricity costs of a single furnace at different production start times and the differences in the composition of electricity costs, and automatically output production guidance opinions, optimize the intervention reduction production start time, and schedule the reduction production according to the strategy output by this algorithm, so as to achieve the peak-shifting of reduction production and power grid electricity prices, and achieve the purpose of reducing the power consumption cost in the reduction production link.
[0328] 7. By adjusting (providing production arrangement guidance) the time arrangement of polysilicon reduction production, without consuming other manpower and material resources, and without affecting any process and the entire process of reduction production, the peak of production electricity consumption and electricity prices is achieved in a simple and economical form, achieving the goal of saving total electricity costs, which has great promotion and application value.
[0329] Through software algorithms, the detailed information on power consumption in the restored production is calculated, analyzed and output as production guidance suggestions (software independently developed based on the algorithm of the present invention), thereby achieving the reduction of power consumption costs in the restored production process. This is an almost zero-cost cost-cutting and efficiency-enhancing measure with great use value and promotion significance.
[0330] It should be noted that the methods described in the embodiments of the present application are all fully independently developed executable software algorithms. All software algorithms are implemented with the help of general high-level languages, such as C++ language, Python language, etc. The development environments Visual Studio Community Edition, Pycharm Community Edition, etc. are all free and open software, and do not involve software licensing and other intellectual property issues.
[0331] Based on the same inventive concept, an embodiment of the present application also provides a device for determining the total electricity cost value within a production cycle. The device for determining the total electricity cost value within a production cycle provided by the embodiment of the present application is described below in conjunction with the accompanying drawings.
[0332] Example 3
[0333] like Figure 4 As shown, the device 400 for determining the total electricity cost value within a production cycle provided in the embodiment of the present application may include an acquisition module 410 , an expansion module 420 and a first determination module 430 .
[0334] The acquisition module 410 is used to acquire first digital representation information of electric power in a production cycle, first peak-valley-average information, and process production constraints in the production cycle, wherein the first digital representation information includes N precise power values corresponding to N analysis time periods, where N is a positive integer;
[0335] An expansion module 420 is used to expand the first digital representation information in the time domain according to the process production constraint conditions in the production cycle to obtain the second digital representation information, and to expand the first peak-valley-average information to obtain the second peak-valley-average information;
[0336] The first determination module 430 is used to determine the total electricity cost value in the production cycle corresponding to the target analysis time according to the second digital representation information and the second peak-valley-average information.
[0337] In some implementations, the acquisition module 410 is specifically configured to:
[0338] Obtaining the restored production process control baseline information corresponding to the production cycle, the restored production process control baseline information including n minimum time units corresponding to each analysis time period in N analysis time periods, and n power values corresponding to the n minimum time units, where n is a positive integer;
[0339] For any analysis time period i among the N analysis time periods, substitute the n power values corresponding to the analysis time period i into formula (1) for calculation to obtain the precise power value corresponding to the analysis time period i, where i is less than or equal to N and is a positive integer;
[0340] Formula (1) includes:
[0341]
[0342] Wherein, PAcci represents the precise power value corresponding to the analysis time period i; PSx represents the x-th power value corresponding to the analysis time period i.
[0343] In some implementations, the acquisition module 410 is specifically configured to:
[0344] According to the peak, valley and flat electricity price policy of the State Grid, the peak time period, valley time period and flat time period are extracted daily, as well as the initial electricity value corresponding to the peak time period, valley time period and flat time period;
[0345] Dimension expansion and assignment are performed on the peak time period, valley time period, and flat time period to obtain first flag information, where the first flag information includes first peak flag information, first valley flag information, and first flat flag information. The first peak flag information, the first valley flag information, and the first flat flag information all include arrays composed of 0 and 1, and the size is 24, where "0" is used to represent a corresponding flag, and "1" is used to represent a non-corresponding flag;
[0346] The entire initial electricity value is used as the first peak-valley-average electricity price information;
[0347] The first peak-valley-flat electricity price information and the first flag information are combined into the first peak-valley-flat information.
[0348] In some embodiments, the first digital representation information includes [PAcc0, PAcc1, ..., PAccN], where PAcc0 represents a first precise power value corresponding to a first analysis time period, PAcc1 represents a second precise power value corresponding to a second analysis time period, and PAccN represents an N+1th precise power value corresponding to an N+1th analysis time period;
[0349] The device 400 for determining the total electricity cost value within the production cycle also includes:
[0350] A correction module, used for correcting the first digital representation information to obtain third digital representation information;
[0351] The expansion module is specifically used to expand the third digital representation information according to the process production constraints within the production cycle to obtain the second digital representation information.
[0352] The device for determining the total electricity cost value within a production cycle provided in the embodiment of the present application can be used to execute the method for determining the total electricity cost value within a production cycle, that is, it has the beneficial effects and implementation methods of the method for determining the total electricity cost value within a production cycle provided in Example 1 of the present application. For details, please refer to the specific description of the method for determining the total electricity cost value within the production cycle in the above Example 1, and this embodiment will not be repeated here.
[0353] Based on the same inventive concept, an embodiment of the present application also provides a production cycle determination system. The production cycle determination system in the embodiment of the present application is introduced below with reference to the accompanying drawings.
[0354] Example 4
[0355] like Figure 5 As shown, the production cycle determination system 100 provided in the embodiment of the present application may include a device 400 for determining the total electricity cost value within the production cycle and a device 500 for determining the production cycle as in any one of the third embodiments.
[0356] The total electricity cost value determination device 400 in the production cycle is used to determine the total electricity cost values in a plurality of production cycles corresponding to a plurality of different target analysis moments;
[0357] The production cycle determining device 500 is connected to the total electricity cost value determining device 400 within the production cycle, and the production cycle determining device 500 includes:
[0358] The division module 510 is used to divide a plurality of different target analysis moments according to the total electricity cost values in a plurality of production cycles to obtain a first interval, a second interval and a third interval, wherein the total electricity cost value in the production cycle corresponding to any target analysis moment in the first interval is less than the total electricity cost value in all production cycles corresponding to all target analysis moments in the second interval; the total electricity cost value in the production cycle corresponding to any target analysis moment in the second interval is less than the total electricity cost value in all production cycles corresponding to all target analysis moments in the third interval;
[0359] As module 520, it is used to take any target analysis time in the first interval or the second interval as the start time of the production cycle to determine the production cycle.
[0360] In some implementations, the module 520 may be specifically used to:
[0361] The target analysis time corresponding to the total electricity cost value in the production cycle with the smallest value in the first interval is used as the start time of the production cycle.
[0362] The production cycle determination system provided in the embodiment of the present application can be used to execute the production cycle determination method, that is, it has the beneficial effects and implementation methods of the production cycle determination method provided in Example 2 of the present application. For details, please refer to the specific description of the production cycle determination method in the above Example 2, and this embodiment will not be repeated here.
[0363] Example 5
[0364] like Figure 6 As shown, the electronic device may include a processor 601 and a memory 602 storing computer program instructions.
[0365] Specifically, the processor 601 may include a central processing unit (CPU), or an application specific integrated circuit (ASIC), or may be configured to implement one or more integrated circuits of the embodiments of the present application.
[0366] The memory 602 may include a large capacity memory for data or instructions. By way of example and not limitation, the memory 602 may include a hard disk drive (HDD), a floppy disk drive, a flash memory, an optical disk, a magneto-optical disk, a magnetic tape, or a universal serial bus (USB) drive or a combination of two or more of these. In appropriate cases, the memory 602 may include a removable or non-removable (or fixed) medium. In appropriate cases, the memory 602 may be inside or outside the integrated gateway disaster recovery device. In a specific embodiment, the memory 602 is a non-volatile solid-state memory.
[0367] The memory may include read-only memory (ROM), random access memory (RAM), magnetic disk storage media devices, optical storage media devices, flash memory devices, electrical, optical or other physical / tangible memory storage devices. Thus, typically, the memory includes one or more tangible (non-transitory) computer-readable storage media (e.g., memory devices) encoded with software including computer-executable instructions, and when the software is executed (e.g., by one or more processors), it is operable to perform the operations described with reference to the method according to an aspect of the present disclosure.
[0368] The processor 601 reads and executes the computer program instructions stored in the memory 602 to implement any method for determining the total electricity cost value within the production cycle in Example 1 or any method for determining the production cycle in Example 2.
[0369] In one example, the electronic device may further include an image processing interface 603 and a bus 610. Figure 6As shown, the processor 601, the memory 602, and the image processing interface 603 are connected via a bus 610 and perform image processing among each other.
[0370] The image processing interface 603 is mainly used to implement image processing between various modules, devices, units and / or equipment in the embodiments of the present application.
[0371] Bus 610 includes hardware, software or both, and the parts of online data flow billing equipment are coupled to each other. For example, but not limitation, bus may include accelerated graphics port (AGP) or other graphics bus, enhanced industrial standard architecture (EISA) bus, front-end bus (FSB), hypertransport (HT) interconnection, industrial standard architecture (ISA) bus, infinite bandwidth interconnection, low pin count (LPC) bus, memory bus, micro channel architecture (MCA) bus, peripheral component interconnection (PCI) bus, PCI-Express (PCI-X) bus, serial advanced technology attachment (SATA) bus, video electronics standard association local (VLB) bus or other suitable bus or two or more of these combinations. In appropriate cases, bus 610 may include one or more buses. Although the present application embodiment describes and shows a specific bus, the present application considers any suitable bus or interconnection.
[0372] In addition, in combination with any method for determining the total electricity cost value within a production cycle in Example 1 or any method for determining the production cycle in Example 2, the present application embodiment may provide a computer storage medium for implementation. The computer storage medium stores computer program instructions; when the computer program instructions are executed by the processor, the method for determining the total electricity cost value within a production cycle in Example 1 or any method for determining the production cycle in Example 2 is implemented.
[0373] It should be clear that the present application is not limited to the specific configuration and processing described above and shown in the figures. For the sake of simplicity, a detailed description of the known method is omitted here. In the above embodiments, several specific steps are described and shown as examples. However, the method process of the present application is not limited to the specific steps described and shown, and those skilled in the art can make various changes, modifications and additions, or change the order between the steps after understanding the spirit of the present application.
[0374] The functional blocks shown in the above structured block diagram can be implemented as hardware, software, firmware or a combination thereof. When implemented in hardware, it can be, for example, an electronic circuit, an application specific integrated circuit (ASIC), appropriate firmware, a plug-in, a function card, etc. When implemented in software, the elements of the present application are programs or code segments that are used to perform the required tasks. The program or code segment can be stored in a machine-readable medium, or transmitted on a transmission medium or an image processing link by a data signal carried in a carrier wave. "Machine-readable medium" can include any medium capable of storing or transmitting information. Examples of machine-readable media include electronic circuits, semiconductor memory devices, ROM, flash memory, erasable ROM (EROM), floppy disks, CD-ROMs, optical disks, hard disks, optical fiber media, radio frequency (RF) links, etc. The code segment can be downloaded via a computer network such as the Internet, an intranet, etc.
[0375] It should also be noted that the exemplary embodiments mentioned in this application describe some methods or systems based on a series of steps or devices. However, this application is not limited to the order of the above steps, that is, the steps can be performed in the order mentioned in the embodiment, or in a different order from the embodiment, or several steps can be performed simultaneously.
[0376] Aspects of the present disclosure are described above with reference to the flowchart and / or block diagram of the method, device (system) and computer program product according to the embodiment of the present disclosure. It should be understood that each box in the flowchart and / or block diagram and the combination of each box in the flowchart and / or block diagram can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device to produce a machine so that these instructions executed by the processor of the computer or other programmable data processing device enable the implementation of the function / action specified in one or more boxes of the flowchart and / or block diagram. Such a processor can be, but is not limited to, a general-purpose processor, a special-purpose processor, a special application processor, or a field programmable logic circuit. It can also be understood that each box in the block diagram and / or flowchart and the combination of boxes in the block diagram and / or flowchart can also be implemented by dedicated hardware that performs a specified function or action, or can be implemented by a combination of dedicated hardware and computer instructions.
[0377] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present application, but the present application is not limited thereto. For those skilled in the art, various modifications and improvements can be made without departing from the spirit and substance of the present application, and these modifications and improvements are also considered to be within the scope of protection of the present application.
Claims
1. A method for determining the total electricity cost value within a production cycle, It is characterized in that include: Acquire first digital representation information of electric power in a production cycle, first peak-valley-average information, and process production constraints in the production cycle, wherein the first digital representation information includes N precise power values corresponding to N analysis time periods, where N is a positive integer; In the time domain, according to the process production constraint conditions within the production cycle, the first digital representation information is expanded to obtain second digital representation information, and the first peak-valley-average information is expanded to obtain second peak-valley-average information; The total electricity cost value in the production cycle corresponding to the target analysis time is determined according to the second digital representation information and the second peak-valley-average information.
2. The method according to claim 1, It is characterized in that Obtaining first digital representation information of electric power during a production cycle, including: Obtaining reduction production process control baseline information corresponding to the production cycle, wherein the reduction production process control baseline information includes n minimum time units corresponding to each analysis time period in N analysis time periods, and n power values corresponding to the n minimum time units, where n is a positive integer; For any analysis time period i among the N analysis time periods, substitute the n power values corresponding to the analysis time period i into formula (1) for calculation to obtain the precise power value corresponding to the analysis time period i, where i is less than or equal to N and is a positive integer; The formula (1) includes: Wherein, PAcci represents the precise power value corresponding to the analysis time period i; PSx represents the x-th power value corresponding to the analysis time period i.
3. The method according to claim 2, It is characterized in that The obtaining of the reduction production process control baseline information corresponding to the production cycle includes: Obtain process control equipment information corresponding to the production cycle; The restored production process control baseline information corresponding to the production cycle is extracted from the process control equipment information.
4. The method according to claim 1, It is characterized in that Get the first peak-to-valley level information, including: According to the peak-valley-flat electricity price policy of the State Grid, the peak time period, the valley time period and the flat time period are extracted daily, as well as the initial electricity values corresponding to the peak time period, the valley time period and the flat time period; Performing dimension expansion and value assignment on the peak time period, the valley time period, and the flat time period to obtain first flag information, wherein the first flag information includes first peak flag information, first valley flag information, and first flat flag information, wherein the first peak flag information, the first valley flag information, and the first flat flag information all include an array consisting of 0 and 1, and the size of which is 24, where "0" is used to represent that there is no corresponding flag, and "1" is used to represent that there is a corresponding flag; The entire initial electricity value is used as the first peak-valley-average electricity price information; The first peak-valley-flat electricity price information and the first flag information are combined into first peak-valley-flat information.
5. The method according to any one of claims 1 to 4, It is characterized in that The first digital representation information includes [PAcc0, PAcc1, ..., PAccN], wherein PAcc0 represents a first precise power value corresponding to a first analysis time period, PAcc1 represents a second precise power value corresponding to a second analysis time period, and PAccN represents an N+1th precise power value corresponding to an N+1th analysis time period; According to the process production constraint conditions within the production cycle, before expanding the first digital representation information to obtain the second digital representation information, the method further includes: Correcting the first digital representation information to obtain third digital representation information; According to the process production constraint conditions within the production cycle, the first digital representation information is expanded to obtain second digital representation information, including: The third digital representation information is expanded according to the process production constraint conditions within the production cycle to obtain the second digital representation information.
6. The method according to claim 5, It is characterized in that The step of correcting the first digital representation information to obtain third digital representation information includes: Obtaining a first correction coefficient, a second correction coefficient, a third correction coefficient, a first correction constant, and a second correction constant; Substituting the first correction coefficient and the first precise power value into formula (2) for calculation, a first target power value is obtained; The formula (2) includes: AdjPAccS0=K1 * PAcc0 (2) Wherein, AdjPAccS0 represents the first target power value; K1 represents the first correction coefficient; PAcc0 represents the first accurate power value; Substituting the second correction coefficient, the first correction constant and the N+1th precise power value into formula (3) for calculation, a second target power value is obtained; The formula (3) includes: AdjPAccE0=K2 * PAccN + B2 (3) Wherein, AdjPAccE0 represents the second target power value; K2 represents the second correction coefficient; PAccN represents the N+1th precise power value; Substituting the third correction coefficient, the second correction constant and the N+1th precise power value into formula (4) for calculation, a third target power value is obtained; The formula (4) includes: AdjPAccE1=K3 * PAccN + B3 (4) Wherein, AdjPAccE1 represents the third target power value; K3 represents the third correction coefficient; Determine third digital representation information according to the first target power value, the second target power value, the third target power value and the first digital representation information, the third digital representation information comprising [AdjPAccS0, PAcc1, ...PAccN, AdjPAccE0, AdjPAccE1].
7. The method according to claim 5, It is characterized in that The third digital representation information includes [AdjPAccS0, PAcc1, ...PAccN, AdjPAccE0, AdjPAccE1]; Expand the third digital representation information according to the process production constraint conditions within the production cycle to obtain second digital representation information, including: Determine the target analysis time point p according to the process production constraint conditions within the production cycle; Obtain the first electric power value, the extension quantity q corresponding to the target analysis time point p, and the second electric power value corresponding to the extension quantity; Expand the third digital representation information according to the target analysis time point p, the first electric power value, the extension quantity q, and the second electric power value to obtain second digital representation information. The second digital representation information PAccAdj = [PreExt, AdjPAccS0, PAcc1,... PAccN, AdjPAccE0, AdjPAccE1, Ext], where PreExt includes p first electric power values and Ext includes q second electric power values.
8. The method according to any one of claims 1 to 4, wherein, the first peak-valley-flat information includes first peak-valley-flat electricity price information Pric24, first peak flag information FlgPeak24, first flat flag information FlgNormal24, and first valley flag information FlgValley24; Expand the first peak-valley-flat information according to the process production constraint conditions within the production cycle to obtain second peak-valley-flat information, including: Obtain the actual operation duration RT0 and the analysis duration AT0 from the process production constraint conditions within the production cycle; Expand the first peak-valley-flat information in the time domain according to the actual operation duration RT0 with the analysis duration AT0 as the unit to obtain second peak-valley-flat information; wherein, the second peak-valley-flat information includes second peak-valley-flat electricity price information PricExt, second peak flag information FlgPeak, second valley flag information FlgValley, and second flat flag information FlgNormal; The second peak-valley-flat electricity price information PricExt = [Pric241, Pric242,..., Pric24N, Pric24], where Pric241 represents the specific electricity price values of each time period of the first complete analysis duration AT0 in the time domain, Pric242 represents the specific electricity price values of each time period of the second complete analysis duration AT0 in the time domain,..., Pric24N represents the specific electricity price values of each time period of the Nth complete analysis duration AT0 in the time domain, (N - 1)*24 < RT0 and 24N > RT0; The second peak flag information FlgPeak = [FlgPeak241, FlgPeak242,..., FlgPeak24N, FlgPeak24], where FlgPeak241 represents the peak period flag information of each time period of the first complete analysis duration AT0 in the time domain, FlgPeak242 represents the peak period flag information of each time period of the second complete analysis duration AT0 in the time domain,..., FlgPeak24N represents the peak period flag information of each time period of the Nth complete analysis duration AT0 in the time domain; The second valley mark information FlgValley=[FlgValley241, FlgValley242, ..., FlgValley24N, FlgNormal24], wherein FlgValley241 represents the valley time period mark information of each time period of the first complete analysis duration AT0 in the time domain, FlgValley242 represents the valley time period mark information of each time period of the second complete analysis duration AT0 in the time domain, ..., FlgValley24N represents the valley time period mark information of each time period of the Nth complete analysis duration AT0 in the time domain; The second flat mark information FlgNormal = [FlgNormal241, FlgNormal242, ..., FlgNormal24N, FlgNormal24], wherein FlgNormal241 represents the flat period mark information of each time period of the first complete analysis duration AT0 in the time domain, FlgNormal242 represents the flat period mark information of each time period of the second complete analysis duration AT0 in the time domain, ..., FlgNormal24N represents the flat period mark information of each time period of the Nth complete analysis duration AT0 in the time domain.
9. The method according to claim 1, It is characterized in that Determining a total electricity cost value in a production cycle corresponding to a target analysis time according to the second digital representation information and the second peak-valley-average information, including: Determine an electricity cost value set corresponding to a target analysis time according to the second digital representation information and the second peak-valley-average information, wherein the electricity cost value set includes N first electricity cost values, N second electricity cost values, and N third electricity cost values; According to the N first electricity cost values, the N second electricity cost values and the N third electricity cost values, a total electricity cost value in a production cycle corresponding to a target analysis time is determined.
10. The method according to claim 9, It is characterized in that The second digital representation information PAccAdj=[PreExt, AdjPAccS0, PAcc1, ... PAccN, AdjPAccE0, AdjPAccE1, Ext], PreExt includes p first electric power values, and Ext includes q second electric power values; The second peak-valley-normal information includes second peak-valley-normal electricity price information PricExt, second peak mark information FlgPeak, second valley mark information FlgValley, and second normal mark information FlgNormal; Determining an electricity charge value set corresponding to a target analysis time according to the second digital representation information and the second peak-valley-average information includes: For any analysis time period X among the N analysis time periods starting from the target analysis time, the first electricity value PricExt[X] corresponding to the second peak-valley-flat electricity price information PricExt, the peak time period flag information FlgPeak[X] corresponding to the second peak flag information FlgPeak, and the power value PAccAdj[X] corresponding to the third digital representation information are substituted into formula (5) for calculation to obtain the first electricity charge value MoneyAccPeak[X] of the peak time period, so as to obtain N first electricity charge values; The formula (5) includes: MoneyAccPeak[X]=PricExt[X]*FlgPeak[X]*PAccAdj[X] (5) For any analysis time period X among the N analysis time periods starting from the target analysis time, the first electricity value PricExt[X] corresponding to the second peak-valley-flat electricity price information PricExt, the peak time period flag information FlgNormal[X] corresponding to the second flat flag information FlgNormal, and the power value PAccAdj[X] corresponding to the third digital representation information are substituted into formula (6) for calculation to obtain the second electricity charge value MoneyAccNormal[X] of the flat time period, so as to obtain N second electricity charge values; The formula (6) includes: MoneyAccNormal[X]=PricExt[X]*FlgNormal[X]*PAccAdj[X] (6) For any analysis time period X among the N analysis time periods starting from the target analysis time, the first electricity value PricExt[X] corresponding to the second peak-valley-flat electricity price information PricExt, the peak time period flag information FlgValley[X] corresponding to the second valley flag information FlgValley, and the power value PAccAdj[X] corresponding to the third digital representation information are substituted into formula (7) for calculation to obtain the third electricity charge value MoneyAccValley[X] of the valley time period, so as to obtain N third electricity charge values; The formula (7) includes: MoneyAccValley[X]=PricExt[X]*FlgValley[X]*PAccAdj[X] (7).
11. The method according to claim 9 or 10, It is characterized in that According to the N first electricity cost values, the N second electricity cost values, and the N third electricity cost values, a total electricity cost value in a production cycle corresponding to a target analysis time is determined, including: Substitute the N first electricity fee values into formula (8) to calculate and obtain the total first electricity fee value: The formula (8) includes: Wherein, MoneyAnayTmPeak represents the total value of the first electricity fee, and MoneyAccPeak[X] represents the Xth first electricity fee value; Substitute the N second electricity fee values into formula (9) to calculate and obtain the total second electricity fee value: The formula (9) includes: Wherein, MoneyAnayNormal represents the total value of the second electricity fee, and MoneyAccNormal[X] represents the Xth second electricity fee value; Substitute the N third electricity fee values into formula (10) to calculate and obtain the total third electricity fee value: The formula (10) includes: Among them, MoneyAnayTmValley represents the total value of the third electricity fee, and MoneyAccValley[X] represents the Xth third electricity fee value; Substituting the first total electricity cost value, the second total electricity cost value, and the third total electricity cost value into formula (11) for calculation, the total electricity cost value within the production cycle is obtained; The formula (11) includes: MoneyAnayTmAll=MoneyAnayTmPeak+MoneyAnayTmNormal+MoneyAnayTmNormal (11) Among them, MoneyAnayTmAll represents the total electricity cost value.
12. A method for determining a production cycle, It is characterized in that include: According to the method for determining the total electricity cost value within a production cycle according to any one of claims 1 to 11, a plurality of total electricity cost values within a production cycle corresponding to a plurality of different target analysis moments are determined; According to the total electricity cost values in multiple production cycles, multiple different target analysis moments are divided to obtain a first interval, a second interval, and a third interval, and the total electricity cost value in the production cycle corresponding to any target analysis moment in the first interval is less than the total electricity cost value in all production cycles corresponding to all target analysis moments in the second interval; The total electricity cost value in the production cycle corresponding to any target analysis moment in the second interval is less than the total electricity cost value in the entire production cycle corresponding to all target analysis moments in the third interval; Any target analysis time in the first interval or the second interval is used as the start time of the production cycle to determine the production cycle.
13. The method according to claim 12, It is characterized in that Any target analysis time in the first interval or the second interval is used as the start time of the production cycle, including: The target analysis time corresponding to the total electricity cost value in the production cycle with the smallest value in the first interval is used as the start time of the production cycle.
14. A device for determining the total electricity cost value within a production cycle, It is characterized in that include: An acquisition module, used to acquire first digital representation information of electric power in a production cycle, first peak-valley-average information, and process production constraints in the production cycle, wherein the first digital representation information includes N precise power values corresponding to N analysis time periods, where N is a positive integer; An expansion module, configured to expand the first digital representation information in the time domain according to the process production constraint conditions within the production cycle to obtain second digital representation information, and to expand the first peak-valley-average information to obtain second peak-valley-average information; The first determination module is used to determine the total electricity cost value in the production cycle corresponding to the target analysis time according to the second digital representation information and the second peak-valley-average information.
15. The device according to claim 14, It is characterized in that The acquisition module is specifically used for: Obtaining reduction production process control baseline information corresponding to the production cycle, wherein the reduction production process control baseline information includes n minimum time units corresponding to each analysis time period in N analysis time periods, and n power values corresponding to the n minimum time units, where n is a positive integer; For any analysis time period i among the N analysis time periods, substitute the n power values corresponding to the analysis time period i into formula (1) for calculation to obtain the precise power value corresponding to the analysis time period i, where i is less than or equal to N and is a positive integer; The formula (1) includes: Wherein, PAcci represents the precise power value corresponding to the analysis time period i; PSx represents the x-th power value corresponding to the analysis time period i.
16. The device according to claim 14, It is characterized in that The acquisition module is specifically used for: According to the peak-valley-flat electricity price policy of the State Grid, the peak time period, the valley time period and the flat time period are extracted daily, as well as the initial electricity values corresponding to the peak time period, the valley time period and the flat time period; Performing dimension expansion and value assignment on the peak time period, the valley time period, and the flat time period to obtain first flag information, wherein the first flag information includes first peak flag information, first valley flag information, and first flat flag information, wherein the first peak flag information, the first valley flag information, and the first flat flag information all include an array consisting of 0 and 1, and the size of which is 24, where "0" is used to represent that there is no corresponding flag, and "1" is used to represent that there is a corresponding flag; The entire initial electricity value is used as the first peak-valley-average electricity price information; The first peak-valley-flat electricity price information and the first flag information are combined into first peak-valley-flat information.
17. The device according to claim 14, It is characterized in that The first digital representation information includes [PAcc0, PAcc1, ..., PAccN], wherein PAcc0 represents a first precise power value corresponding to a first analysis time period, PAcc1 represents a second precise power value corresponding to a second analysis time period, and PAccN represents an N+1th precise power value corresponding to an N+1th analysis time period; The device also includes: A correction module, used for correcting the first digital representation information to obtain third digital representation information; The expansion module is specifically used to expand the third digital representation information according to the process production constraint conditions within the production cycle to obtain the second digital representation information.
18. A production cycle determination system, It is characterized in that include: The device for determining the total electricity cost value within a production cycle as claimed in any one of claims 14 to 17, used to determine the total electricity cost values within a plurality of production cycles corresponding to a plurality of different target analysis moments; The production cycle determining device is connected to the device for determining the total electricity cost value within the production cycle, and the production cycle determining device includes: A division module is used to divide multiple different target analysis moments according to the total electricity cost values in multiple production cycles to obtain a first interval, a second interval and a third interval, wherein the total electricity cost value in the production cycle corresponding to any target analysis moment in the first interval is less than the total electricity cost value in all production cycles corresponding to all target analysis moments in the second interval; the total electricity cost value in the production cycle corresponding to any target analysis moment in the second interval is less than the total electricity cost value in all production cycles corresponding to all target analysis moments in the third interval; As a module, it is used to take any target analysis time in the first interval or the second interval as the start time of the production cycle to determine the production cycle.
19. The system according to claim 18, It is characterized in that As a module, it is specifically used for: The target analysis time corresponding to the total electricity cost value in the production cycle with the smallest value in the first interval is used as the start time of the production cycle.
20. An electronic device, It is characterized in that It comprises a processor and a memory storing computer program instructions, wherein when the processor executes the computer program instructions, it implements the method for determining the total electricity cost value within a production cycle as described in any one of claims 1 to 11, or the method for determining the production cycle as described in claim 12 or 13.