Multi-energy complementary electric power day-ahead optimization scheduling method and system

By constructing monthly and day-ahead optimized scheduling models and combining the regulation characteristics of resources such as hydropower, thermal power, and energy storage, the problem of new energy volatility in multi-energy complementary power systems has been solved, achieving optimized scheduling of medium- and long-term power balance and short-term power balance, and improving the grid's ability to absorb and regulate new energy.

CN118920446APending Publication Date: 2024-11-08NARI NANJING CONTROL SYSTEM CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410912951.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Existing technologies are insufficient to effectively address the diurnal fluctuations of new energy sources in multi-energy complementary power systems, leading to increased pressure on grid balance and new energy consumption, and failing to fully utilize the regulation potential on medium- and long-term time scales.

Method used

A monthly power optimization dispatch model is constructed, which combines the regulation characteristics of resources such as hydropower, thermal power, and energy storage. Through monthly and day-ahead two-stage optimization dispatch, multi-energy complementarity at different time scales is achieved. This includes constructing a monthly optimization dispatch model and a day-ahead power optimization dispatch model, and optimizing power dispatch through the energy transfer and rapid regulation characteristics of energy storage.

Benefits of technology

It has improved the grid's capacity for renewable energy absorption and overall regulation, alleviated the pressure caused by the fluctuation of renewable energy output, and enhanced the grid's balancing capacity and resource optimization capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920446A_ABST
    Figure CN118920446A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-energy complementary electric power day-ahead optimization scheduling method and system, and the method comprises the steps: firstly solving a monthly optimization scheduling result from a monthly electric power optimization scheduling model, and enabling the monthly optimization scheduling result to comprise a hydroelectric generating unit power plan and a thermal power generating unit power plan of each time period; then, according to a monthly optimization scheduling result, calculating the daily total power generation capacity of hydropower and the daily total power generation capacity of thermal power; and finally, constructing a day-ahead power optimization scheduling model, and solving day-ahead optimization scheduling results including a power generation plan of a hydroelectric generating set, a power generation plan of a thermal power generating set and a charging and discharging plan of stored energy by taking the daily total power generation amount of the hydroelectric power and the daily total power generation amount of the thermal power as boundary conditions. According to the method, medium-and-long-term electric quantity balance and short-time electric power balance are considered at the same time, a monthly-day-ahead multi-time-scale optimization scheduling model is established, the pressure brought by fluctuation of high-proportion new energy output to system balance can be relieved, and the new energy consumption level and the overall adjustment capacity of a power grid are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a method and system for optimizing and dispatching electric power before the day, and in particular to a method and system for optimizing and dispatching electric power before the day with multiple energy complementation. Background Art

[0002] With the continuous advancement of the construction of new power systems, the proportion of renewable energy has gradually increased. Its randomness and volatility have brought great challenges to the operation of the power system, and the pressure on the power grid to ensure supply and promote consumption has increased. At the same time, there are flexible power sources such as water, fire, and storage in the power grid, which are complementary to wind and solar renewable energy at different time scales. Regulating hydropower stations can use reservoirs to regulate runoff, and use reservoirs to store water or generate electricity according to electricity requirements, which can be divided into daily regulation, monthly regulation, and seasonal regulation; energy storage can also release the electricity stored in the valley period through short-term energy transfer characteristics, thereby meeting the electricity demand during peak hours. With the help of the regulation characteristics of flexible power sources such as water, fire, and storage, the synergistic and complementary potential between different resources can be fully utilized, which can alleviate the pressure on the system balance caused by the volatility of high-proportion renewable energy output and improve the new energy consumption level and overall regulation capacity of the power grid.

[0003] The current day-ahead optimization scheduling for multi-energy complementarity mainly uses a single day as the decision-making cycle, which is difficult to fully cope with the daily fluctuations of new energy and increase the pressure on grid balance and new energy consumption. At the same time, it does not take into account the regulation potential of hydropower on medium- and long-term time scales such as months and weeks, and the scope of optimal resource allocation is limited. Summary of the invention

[0004] Purpose of the invention: The purpose of the present invention is to provide a method and system for optimizing the dispatch of electricity with multiple energy complementarity on the day before, taking into account both the medium- and long-term electricity balance and the short-term electricity balance, realizing the multiple energy complementarity of wind, solar, water, fire and storage at different time scales, and helping to improve the balancing ability of the power grid and the optimization configuration ability of multiple resources.

[0005] Technical solution: The multi-energy complementary power day-ahead optimization dispatching method of the present invention comprises the following steps:

[0006] Construct a monthly power optimization dispatch model and solve it to obtain the monthly optimization dispatch results, including the power plan of hydropower units and thermal power units in each period;

[0007] Calculate the total daily power generation of hydropower and thermal power based on the monthly optimization dispatch results;

[0008] A day-ahead power optimization dispatching model is constructed, and the daily total power generation of hydropower and thermal power is used as boundary conditions to obtain the day-ahead optimization dispatching results, including the power generation plan of the hydropower units, the power generation plan of the thermal power units, and the charging and discharging plan of the energy storage.

[0009] Furthermore, before constructing the monthly power optimization dispatch model, it also includes daily calculation period merging;

[0010] The net load change rate in adjacent time periods t and t+1 is:

[0011] ΔL t =|L t -L t+1 | / L t ;

[0012] Calculate the net load change rate for all periods of the day and find the minimum change rate minΔL t The corresponding time period t, merges time periods t and t+1 into a new time period;

[0013] The net load change rate is calculated repeatedly until the minimum change rate is greater than the threshold, or the number of merged time periods reaches a preset number, thereby obtaining the merged time period.

[0014] Furthermore, the objective function of the monthly power optimization dispatch model is:

[0015]

[0016] Among them, F is the monthly power optimization dispatch target, NT M is the number of time periods included in the monthly optimal scheduling after time period merging, NI is the total number of thermal power units, C i is the power generation cost of thermal power unit i, P M,i,t is the monthly active power output of thermal power unit i in period t, NW is the total number of new energy units including wind power and photovoltaic power, C w is the power abandonment cost of new energy unit w, P M,w,t is the monthly power abandonment of the new energy unit w in period t;

[0017] The constraints of the monthly power optimization scheduling model include system power balance constraints, system reserve constraints, thermal power unit operation constraints, hydropower unit constraints, new energy unit operation constraints, transmission section flow constraints, thermal power unit coal inventory constraints, and hydropower unit reservoir water volume constraints.

[0018] Furthermore, the constraints of the monthly power optimization dispatch model include:

[0019]

[0020]

[0021] P i,min ≤P M,i,t ≤P i,max ;

[0022] 0≤PM,w,t ≤P M0,w,t ;

[0023] P g,min ≤P M,g,t ≤P g,max ;

[0024]

[0025]

[0026]

[0027]

[0028]

[0029] E M,g,t =e g *P M,g,t ;

[0030]

[0031] Among them, NG is the total number of hydropower units, P M,g,t is the monthly active power output of hydropower unit g in period t, P M0,w,t is the monthly predicted power of the new energy unit w in period t, L M,t is the monthly load demand of the system in period t, R M,t is the monthly reserve demand of the system in period t, P i,max and P i,min are the upper and lower limits of the output power of thermal power unit i, P g,max and P g,min are the upper and lower limits of the output power of hydropower unit g, u M,i,t is the monthly start-stop status of thermal power unit i in period t, y M,i,τ is the flag indicating whether the thermal power unit i changes from shutdown to startup in the monthly period τ, z M,i,τ It is the sign of whether the thermal power unit i changes from the start-up state to the shutdown state in the monthly period τ, UT i and DT i are the minimum start-up time and minimum shutdown time of thermal power unit i, p l , are the lower and upper limits of the power flow of the lth transmission section, N is the set of grid computing nodes, P M,n,t is the monthly power generation of node n in the power grid during period t, l M,n,t is the monthly load power of the grid calculation node n in period t, S n,l,t is the sensitivity of the injected power of the grid calculation node n to the lth transmission section in time period t; EM,i,t is the coal consumption of thermal power unit i in monthly period t, a i , b i 、c i is the coal energy consumption coefficient of thermal power unit i, E i,max and E i,min are the upper and lower limits of the total monthly coal inventory of thermal power unit i, h M,t is the total number of hours included in the monthly period t, E M,g,t is the water consumption of hydropower unit g in monthly period t, e g is the water consumption coefficient of hydropower unit g, E g,max and E g,min They are the upper and lower limits of the monthly reservoir water volume of hydropower unit g respectively.

[0032] Furthermore, the calculation formulas for the total daily power generation of hydropower and thermal power are as follows:

[0033]

[0034]

[0035] Among them, DT is the monthly optimization scheduling period set included in date D, E D,g is the total power generation of hydropower unit g on date D, E D,i is the total power generation of thermal power unit i on date D, P M,g,t is the monthly active power output of hydropower unit g in period t, P M,w,t is the monthly power abandonment of the new energy unit w in period t, h M,t is the total number of hours included in the monthly period t.

[0036] Furthermore, the objective function of the day-ahead power optimization dispatching model is:

[0037]

[0038] Among them, F D is the day-ahead optimization scheduling target, NT D is the number of time periods included in the day-ahead optimal dispatch, NI is the total number of thermal power units, C i is the power generation cost of thermal power unit i, P D,i,t is the day-ahead active output of thermal power unit i in period t, NS is the total number of energy storage units, C s is the dispatch cost of energy storage unit s, P D,s,t is the day-ahead active power of energy storage unit s in period t, NW is the total number of new energy units including wind power and photovoltaic power, C w is the power abandonment cost of new energy unit w, P D,w,t is the day-ahead power abandonment of the renewable energy unit w in time period t;

[0039] The constraints of the day-ahead optimization scheduling model include: system power balance constraints, system reserve constraints, thermal power unit operation constraints, hydropower unit constraints, new energy unit operation constraints, energy storage unit operation constraints, transmission section flow constraints, thermal power unit daily power generation constraints, and hydropower unit daily power generation constraints.

[0040] Furthermore, the constraints of the day-ahead optimization scheduling model include:

[0041]

[0042]

[0043] P i,min ≤P D,i,t ≤P i,max

[0044] 0≤P D,w,t ≤P D0,w,t ;

[0045] P g,min ≤P D,g,t ≤P g,max ;

[0046] 0≤P D,s,t ≤P s,up ;

[0047] P s,down ≤P D,s,t ≤0;

[0048]

[0049]

[0050]

[0051] Among them, P D,g,t is the active power output of hydropower unit g in time period t, P D0,w,t is the day-ahead predicted power of the renewable energy unit w in period t, L D,t is the day-ahead load demand of the system in period t, R D,t is the system's day-ahead reserve demand in period t, P s,up and P s,down are the upper limits of the discharge power and charging power of the energy storage unit s, P D,n,t is the day-ahead power generation of node n in the power grid at time period t, l D,n,t is the day-ahead load power of node n calculated by the power grid at time period t, h D,t is the number of hours included in the day-ahead period t.

[0052] The multi-energy complementary power day-ahead optimization dispatching system of the present invention comprises:

[0053] Monthly optimization dispatch module is used to build a monthly power optimization dispatch model and solve the monthly optimization dispatch results, including the power plan of hydropower units and thermal power units in each period;

[0054] The monthly and day-ahead connection module is used to calculate the daily total power generation of hydropower and thermal power according to the monthly optimization scheduling results;

[0055] The day-ahead optimization scheduling module is used to construct a day-ahead power optimization scheduling model, taking the total daily hydropower generation and the total daily thermal power generation as boundary conditions, and solving the day-ahead optimization scheduling results, including the power generation plan of the hydropower unit, the power generation plan of the thermal power unit, and the charging and discharging plan of the energy storage.

[0056] The electronic device described in the present invention includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and is characterized in that when the computer program is loaded into the processor, the multi-energy complementary power day-ahead optimization scheduling method is implemented.

[0057] The computer-readable storage medium of the present invention stores a computer program, and when the computer program is executed by a processor, the multi-energy complementary power day-ahead optimization scheduling method is implemented.

[0058] Beneficial effects: Compared with the prior art, the present invention helps to make full use of the regulation characteristics of multiple resources, realize multi-energy complementarity at different time scales, alleviate the pressure on system balance caused by the volatility of high-proportion new energy output, and improve the new energy consumption level and overall regulation capacity of the power grid. Specifically, the advantages include the following:

[0059] 1) Considering both the medium- and long-term electricity balance and the short-term electricity balance, a multi-time scale optimization dispatching model from month to day is established to analyze the future power grid balance situation to improve predictability.

[0060] 2) Based on the time response characteristics of various resources, considering the resource requirements such as reservoir water volume and power coal inventory, make full use of the cross-day adjustment capabilities of resources, and improve the dispatching ability to respond to cross-day fluctuations in new energy.

[0061] 3) Utilize the energy transfer and rapid regulation characteristics of energy storage to improve the ability to cope with the randomness and volatility of renewable energy output. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] Figure 1 is a flow chart of the method of the present invention;

[0063] Figure 2 It is a system architecture diagram of the present invention. DETAILED DESCRIPTION

[0064] The technical solution of the present invention is further described below in conjunction with the accompanying drawings.

[0065] like Figure 1 As shown, the multi-energy complementary electricity day-ahead optimization scheduling method includes the following steps.

[0066] Step 1: Considering the water volume of the reservoir and the coal inventory, a monthly power optimization scheduling model is constructed by merging the daily calculation periods to obtain the power plans of the hydropower and thermal power units in each period of the month.

[0067] Further, in one embodiment, the method for merging daily calculation periods specifically includes:

[0068] Let L t is the system load in period t, then the net load change rate of the system in adjacent periods t and t+1 is:

[0069] ΔL t =|L t -L t+1 | / L t ;

[0070] Calculate the net load change rate for all time periods of the day and find the minimum change rate minΔL t The corresponding time period;

[0071] Merge time periods t and t+1 into a new time period;

[0072] According to the change rate of the system load on that day, the time period merging is repeated until the minimum change rate minΔL is reached. t is greater than the set threshold, or the number of time periods remaining after merging reaches the preset number.

[0073] Furthermore, in one embodiment, the monthly power optimization dispatch model specifically includes:

[0074] The objective function of the monthly power optimization dispatch model is:

[0075]

[0076] Among them, F is the monthly power optimization dispatch target, NT M is the number of time periods included in the monthly power optimization dispatch after time period merging, NI is the total number of thermal power units, C i is the power generation cost of thermal power unit i, P M,i,t is the monthly active power output of thermal power unit i in period t, NW is the total number of new energy units including wind power and photovoltaic power, C w is the power abandonment cost of the new energy unit w, P M,w,tis the monthly power abandonment of the renewable energy unit w in period t.

[0077] The constraints of the monthly power optimization scheduling model include: system power balance constraints, system reserve constraints, thermal power unit operation constraints, hydropower unit constraints, new energy unit operation constraints, transmission section flow constraints, thermal power unit coal inventory constraints, and hydropower unit reservoir water volume constraints.

[0078]

[0079]

[0080] P i,min ≤P M,i,t ≤P i,max ;

[0081] 0≤P M,w,t ≤P M0,w,t ;

[0082] P g,min ≤P M,g,t ≤P g,max ;

[0083]

[0084]

[0085]

[0086]

[0087]

[0088] E M,g,t =e g *P M,g,t ;

[0089]

[0090] Among them, NG is the total number of hydropower units, P M,g,t is the monthly active power output of hydropower unit g in period t, P M0,w,t is the monthly predicted power of the new energy unit w in period t, L M,t is the monthly load demand of the system in period t, R M,t is the monthly reserve demand of the system in period t, P i,max and P i,min are the upper and lower limits of the output power of thermal power unit i, P g,max and P g,min are the upper and lower limits of the output power of hydropower unit g, u M,i,tis the monthly start-stop status of thermal power unit i in period t, y M,i,τ is the flag indicating whether the thermal power unit i changes from shutdown to startup in the monthly period τ, z M,i,τ It is the sign of whether the thermal power unit i changes from the start-up state to the shutdown state in the monthly period τ, UT i and DT i are the minimum start-up time and minimum shutdown time of thermal power unit i, p l , are the lower and upper limits of the power flow of the lth transmission section, N is the set of grid computing nodes, P M,n,t is the monthly power generation of node n in the power grid during period t, l M,n,t is the monthly load power of the grid calculation node n in period t, S n,l,t is the sensitivity of the injected power of the grid calculation node n to the lth transmission section in time period t; E M,i,t is the coal consumption of thermal power unit i in monthly period t, a i , b i 、c i is the coal energy consumption coefficient of thermal power unit i, E i,max and E i,min are the upper and lower limits of the total monthly coal inventory of thermal power unit i, h M,t is the total number of hours included in the monthly period t, E M,g,t is the water consumption of hydropower unit g in monthly period t, e g is the water consumption coefficient of hydropower unit g, E g,max and E g,min They are the upper and lower limits of the monthly reservoir water volume of hydropower unit g respectively.

[0091] Step 2: Based on the monthly optimization scheduling results, calculate the total daily power generation of hydropower and thermal power as the boundary of the day-ahead power optimization scheduling.

[0092] Further, in one embodiment, the calculation of the total daily power generation of hydropower and thermal power specifically includes:

[0093] The formula for calculating the total daily hydropower generation is as follows:

[0094]

[0095] The formula for calculating the total daily thermal power generation is as follows:

[0096]

[0097] Among them, DT is the monthly optimization scheduling period set included in date D, E D,g is the total power generation of hydropower unit g on date D, E D,iis the total power generation of thermal power unit i on date D.

[0098] Step 3: Taking the total daily power generation of hydropower and thermal power as boundary conditions, considering the participation of energy storage in regulation, construct a day-ahead power optimization dispatching model, solve the day-ahead power optimization dispatching model, and obtain a power dispatching operation plan that considers multi-energy complementarity.

[0099] Furthermore, in one embodiment, the day-ahead power optimization dispatching model specifically includes:

[0100] The objective function of the day-ahead power optimization dispatch model is:

[0101]

[0102] Among them, F D is the day-ahead optimization scheduling target, NT D is the number of time periods included in the day-ahead optimal scheduling, P D,i,t is the day-ahead active output of thermal power unit i in period t, NS is the total number of energy storage units, C s is the dispatch cost of energy storage unit s, P D,s,t is the day-ahead active power of energy storage unit s in period t, P D,w,t is the day-ahead power abandonment of the renewable energy unit w in time period t.

[0103] The constraints of the day-ahead optimization scheduling model include: system power balance constraints, system reserve constraints, thermal power unit operation constraints, hydropower unit constraints, new energy unit operation constraints, energy storage unit operation constraints, transmission section flow constraints, thermal power unit daily power generation constraints, and hydropower unit daily power generation constraints.

[0104]

[0105]

[0106] P i,min ≤P D,i,t ≤P i,max ;

[0107] 0≤P D,w,t ≤P D0,w,t ;

[0108] P g,min ≤P D,g,t ≤P g,max ;

[0109] 0≤P D,s,t ≤P s,up ;

[0110] P s,down ≤P D,s,t ≤0;

[0111]

[0112]

[0113]

[0114] Among them, P D,g,t is the active power output of hydropower unit g in time period t, P D0,w,t is the day-ahead predicted power of the renewable energy unit w in period t, L D,t is the day-ahead load demand of the system in period t, R D,t is the system's day-ahead reserve demand in period t, P s,up and P s,down are the upper limits of the discharge power and charging power of the energy storage unit s, P D,n,t is the day-ahead power generation of node n in the power grid at time period t, l D,n,t is the day-ahead load power of node n calculated by the power grid at time period t, h D,t is the number of hours included in the day-ahead period t.

[0115] Step 4: Publish the optimized dispatching results of multi-energy complementarity, including the power generation plans of hydropower and thermal power units and the charging and discharging plans of energy storage.

[0116] Taking the multi-resource planning of the provincial power grid as an example, considering wind and solar new energy as well as adjustable resources such as hydropower, thermal power, and energy storage, an optimized scheduling of multi-energy complementarity is carried out through a two-stage modeling calculation from monthly to day-ahead.

[0117] First, on a monthly time scale, considering the peak, flat and valley characteristics of each day, the merged data includes 4 time periods each day, and a total of 120 time periods in 30 days of a month. Wind power is the predicted wind power divided by the number of hours in a month to obtain the average wind power output; photovoltaic power generation is based on the predicted photovoltaic power generation, and is similarly generated with reference to the typical photovoltaic power generation daily curve. Based on the load demand and new energy forecasts for 30 days (120 time periods) of the month, and considering the water volume of the reservoir and the coal inventory, the power generation plan results of hydropower and thermal power units in the four typical time periods of each day of the month are obtained through optimization calculation.

[0118] Secondly, based on the planned power generation results of hydropower and thermal power units in each typical time period obtained from the monthly optimal scheduling calculation, the power of the included time period is accumulated on a daily basis, and the daily total power generation of hydropower and thermal power is calculated as the boundary of the day-ahead optimal scheduling.

[0119] Finally, in the day-ahead time scale, 15 minutes is used as an optimization period, and each day includes 96 periods. The day-ahead system load, wind power, and photovoltaic power generation are all based on short-term forecast curve data. According to the short-term load demand and new energy forecast data of the 96 periods a day, the total daily power generation of hydropower and thermal power is used as constraints, and the short-cycle rapid charging and discharging regulation of energy storage is considered. The power generation plan results of hydropower and thermal power units in the 96 periods a day, as well as the charging and discharging operation plan of energy storage, are obtained through optimization calculation.

[0120] Analyzing the results of multi-energy complementary optimization scheduling, under the constraints of water storage and total amount of electric coal, the monthly daily hydropower and thermal power generation show corresponding changes with the daily load demand. The hydropower and thermal power generation allocated on the days with high load is relatively large, while the hydropower and thermal power generation allocated on the days with low load is relatively small. Through the overall optimization scheduling of the whole month, the total amount of hydropower and thermal power generation is optimally allocated on the daily basis of the month. According to the monthly optimization scheduling, the usage of hydropower and thermal power generation in each period is calculated, and the total daily hydropower and thermal power generation is summarized as the boundary condition of the day-ahead optimization scheduling. Through the reasonable allocation of monthly hydropower and thermal power generation, the boundary of the day-ahead optimization can be made more reasonable, reducing the load loss caused by the day-ahead power supply and the new energy abandonment caused by excessive power supply, thereby reducing the operating cost and further improving the economy of the system.

[0121] like Figure 2 As shown, the multi-energy complementary power day-ahead optimization dispatching system described in the present invention includes the following contents.

[0122] The monthly optimization scheduling module is used to consider the water volume of reservoirs and the inventory of power coal. By merging daily calculation periods, a monthly optimization scheduling model is constructed to obtain the power plan of hydropower and thermal power units in each period of the month.

[0123] The monthly and day-ahead connection module is used to calculate the total daily hydropower generation and the total daily thermal power generation according to the monthly optimal scheduling results as the boundary of the day-ahead optimal scheduling.

[0124] The day-ahead optimization dispatching module is used to construct a day-ahead optimization dispatching model with the daily total power generation of hydropower and thermal power as boundary conditions, consider the participation of energy storage in regulation, solve the day-ahead optimization dispatching model, and obtain a power dispatching operation plan that considers multi-energy complementarity.

[0125] The result publishing module is used to publish the optimization scheduling results of multi-energy complementarity, including the power generation plans of hydropower and thermal power units and the charging and discharging plans of energy storage.

[0126] The multi-energy complementary power day-ahead optimization dispatching system of the present invention comprises:

[0127] Monthly optimization dispatch module is used to build a monthly power optimization dispatch model and solve the monthly optimization dispatch results, including the power plan of hydropower units and thermal power units in each period;

[0128] The monthly and day-ahead connection module is used to calculate the daily total power generation of hydropower and thermal power according to the monthly optimization scheduling results;

[0129] The day-ahead optimization scheduling module is used to construct a day-ahead power optimization scheduling model, taking the total daily hydropower generation and the total daily thermal power generation as boundary conditions, and solving the day-ahead optimization scheduling results, including the power generation plan of the hydropower unit, the power generation plan of the thermal power unit, and the charging and discharging plan of the energy storage.

[0130] The electronic device described in the present invention includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and is characterized in that when the computer program is loaded into the processor, the multi-energy complementary power day-ahead optimization scheduling method is implemented.

[0131] The computer-readable storage medium of the present invention stores a computer program, and when the computer program is executed by a processor, the multi-energy complementary power day-ahead optimization scheduling method is implemented.

[0132] The computer-readable storage media may include RAM, ROM, EEPROM, CD-ROM or other optical disk storage, magnetic disk storage or other magnetic storage devices, flash memory, or any other medium that can be used to store the desired program code in the form of instructions or data structures and that can be accessed by a computer.

[0133] The processor is used to execute the computer program stored in the memory to implement each step of the method involved in the above embodiment.

Claims

1. A multi-energy complementary power day-ahead optimization dispatching method, characterized in that: The steps include: Construct a monthly power optimization dispatch model and solve it to obtain the monthly optimization dispatch results, including the power plan of hydropower units and thermal power units in each period; Calculate the total daily power generation of hydropower and thermal power based on the monthly optimization dispatch results; A day-ahead power optimization dispatching model is constructed, and the daily total power generation of hydropower and thermal power is used as boundary conditions to obtain the day-ahead optimization dispatching results, including the power generation plan of the hydropower units, the power generation plan of the thermal power units, and the charging and discharging plan of the energy storage.

2. The multi-energy complementary power day-ahead optimization dispatching method according to claim 1 is characterized in that: Before constructing the monthly power optimization dispatch model, it also includes daily calculation period merging; The net load change rate in adjacent time periods t and t+1 is: ΔL t =L t -L t+1 L t ; Calculate the net load change rate for all periods of the day and find the minimum change rate minΔL t The corresponding time period t, merges time periods t and t+1 into a new time period; The net load change rate is calculated repeatedly until the minimum change rate is greater than the threshold, or the number of merged time periods reaches a preset number, thereby obtaining the merged time period.

3. The multi-energy complementary power day-ahead optimization dispatching method according to claim 1 is characterized in that: The objective function of the monthly power optimization dispatch model is: Among them, F is the monthly power optimization dispatch target, NT M is the number of time periods included in the monthly optimal scheduling after time period merging, NI is the total number of thermal power units, C i is the power generation cost of thermal power unit i, P M,i,t is the monthly active power output of thermal power unit i in period t, NW is the total number of new energy units including wind power and photovoltaic power, C w is the power abandonment cost of the new energy unit w, P M,w,t is the monthly power abandonment of the new energy unit w in period t; The constraints of the monthly power optimization scheduling model include system power balance constraints, system reserve constraints, thermal power unit operation constraints, hydropower unit constraints, new energy unit operation constraints, transmission section flow constraints, thermal power unit coal inventory constraints, and hydropower unit reservoir water volume constraints.

4. The multi-energy complementary power day-ahead optimization dispatching method according to claim 3 is characterized in that: The constraints of the monthly power optimization dispatch model include: P i,min ≤P M,i,t ≤P i,max ; 0≤P M,w,t ≤P M0,w,t ; P g,min ≤P M,g,t ≤P g,max ; AND M,g,t =and g *P M,g,t ; Among them, NG is the total number of hydropower units, P M,g,t is the monthly active power output of hydropower unit g in period t, P M0,w,t is the monthly predicted power of the new energy unit w in period t, L M,t is the monthly load demand of the system in period t, R M,t is the monthly reserve demand of the system in period t, P i,max and P i,min are the upper and lower limits of the output power of thermal power unit i, P g,max and P g,min are the upper and lower limits of the output power of hydropower unit g, u M,i,t is the monthly start-stop status of thermal power unit i in period t, y M,i,τ is the flag indicating whether the thermal power unit i changes from shutdown to startup in the monthly period τ, z M,i,τ It is the sign of whether the thermal power unit i changes from the start-up state to the shutdown state in the monthly period τ, UT i and DT i are the minimum start-up time and minimum shutdown time of thermal power unit i, p l , are the lower and upper limits of the power flow of the lth transmission section, N is the set of grid computing nodes, P M,n,t is the monthly power generation of node n in the power grid during period t, l M,n,t is the monthly load power of the grid calculation node n in period t, S n,l,t is the sensitivity of the injected power of the grid calculation node n to the lth transmission section in time period t; E M,i,t is the coal consumption of thermal power unit i in monthly period t, a i 、b i 、c i is the coal energy consumption coefficient of thermal power unit i, E i,max and E i,min are the upper and lower limits of the total monthly coal inventory of thermal power unit i, h M,t is the total number of hours included in the monthly period t, E M,g,t is the water consumption of hydropower unit g in monthly period t, e g is the water consumption coefficient of hydropower unit g, E g,max and E g,min They are the upper and lower limits of the monthly reservoir water volume of hydropower unit g respectively.

5. The multi-energy complementary power day-ahead optimization dispatching method according to claim 1 is characterized in that: The calculation formula for the total daily hydropower generation and the total daily thermal power generation is: Among them, DT is the monthly optimization scheduling period set included in date D, E D,g is the total power generation of hydropower unit g on date D, E D,i is the total power generation of thermal power unit i on date D, P M,g,t is the monthly active power output of hydropower unit g in period t, P M,w,t is the monthly power abandonment of the new energy unit w in period t, h M,t is the total number of hours included in the monthly period t.

6. The multi-energy complementary power day-ahead optimization dispatching method according to claim 1 is characterized in that: The objective function of the day-ahead power optimization dispatch model is: Among them, F D is the day-ahead optimization scheduling target, NT D is the number of time periods included in the day-ahead optimal dispatch, NI is the total number of thermal power units, C i is the power generation cost of thermal power unit i, P D,i,t is the day-ahead active output of thermal power unit i in period t, NS is the total number of energy storage units, C s is the dispatch cost of energy storage unit s, P D,s,t is the day-ahead active power of energy storage unit s in period t, NW is the total number of new energy units including wind power and photovoltaic power, C w is the power abandonment cost of the new energy unit w, P D,w,t is the day-ahead power abandonment of the renewable energy unit w in time period t; The constraints of the day-ahead optimization scheduling model include: system power balance constraints, system reserve constraints, thermal power unit operation constraints, hydropower unit constraints, new energy unit operation constraints, energy storage unit operation constraints, transmission section flow constraints, thermal power unit daily power generation constraints, and hydropower unit daily power generation constraints.

7. The multi-energy complementary power day-ahead optimization dispatching method according to claim 6 is characterized in that: The constraints of the day-ahead optimization scheduling model include: P i,min ≤P D,i,t ≤P i,max 0≤P D,w,t ≤P D0,w,t ; P g,min ≤P D,g,t ≤P g,max ; 0≤P D,s,t ≤P s,up ; P s,down ≤P D,s,t ≤0; Among them, P D,g,t is the active power output of hydropower unit g in time period t, P D0,w,t is the day-ahead predicted power of the renewable energy unit w in period t, L D,t is the day-ahead load demand of the system in period t, R D,t is the system's day-ahead reserve demand in period t, P s,up and P s,down are the upper limits of the discharge power and charging power of the energy storage unit s, P D,n,t is the day-ahead power generation of node n in the power grid at time period t, l D,n,t is the day-ahead load power of node n calculated by the power grid at time period t, h D,t is the number of hours included in the day-ahead period t.

8. A multi-energy complementary power day-ahead optimization dispatching system, characterized in that: include: Monthly optimization dispatch module is used to build a monthly power optimization dispatch model and solve the monthly optimization dispatch results, including the power plan of hydropower units and thermal power units in each period; The monthly and day-ahead connection module is used to calculate the daily total power generation of hydropower and thermal power according to the monthly optimization scheduling results; The day-ahead optimization scheduling module is used to construct a day-ahead power optimization scheduling model, taking the total daily hydropower generation and the total daily thermal power generation as boundary conditions, and solving the day-ahead optimization scheduling results, including the power generation plan of the hydropower unit, the power generation plan of the thermal power unit, and the charging and discharging plan of the energy storage.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the computer program is loaded into the processor, the multi-energy complementary power day-ahead optimization scheduling method according to any one of claims 1 to 7 is implemented.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the multi-energy complementary power day-ahead optimization scheduling method according to any one of claims 1 to 7 is implemented.