New energy collection area reactive voltage control method considering power factor

By adjusting the reactive power output of the station units and transformers in the new energy grid, the problems of unreasonable reactive distribution and circulation in the new energy gathering area are solved, and the overall reactive voltage of the power grid is safe and stable, and large-scale new energy is supported. Power consumption and delivery.

CN118920496AActive Publication Date: 2024-11-08FOSHAN GUYUXUAN BRAND MANAGEMENT CO LTD

Patent Information

Application Number
CN202410956607.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-08
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

In the new energy gathering area, due to the randomness and uncertainty of new energy power generation, conventional automatic voltage control is difficult to achieve bus voltage optimization, resulting in unreasonable reactive distribution between new energy stations and even internal circulation, affecting the safety and stability of voltage.

Method used

By obtaining the new energy grid coordination control area model, calculating reactive voltage sensitivity information, adjusting the reactive output of the new energy station unit, generating a bus voltage control strategy, and adjusting the transformer reactive control strategy according to the power factor to ensure the stability of the power grid.

Benefits of technology

The central bus voltage of the new energy gathering area is optimized, while taking into account the power factor equalization of each new energy station, avoiding unreasonable reactive distribution and circulation problems, and improving the safety and stability of the reactive voltage of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920496A_ABST
    Figure CN118920496A_ABST
Patent Text Reader

Abstract

The invention discloses a new energy convergence area reactive voltage control method considering a power factor, and the method comprises the steps: achieving the reactive voltage coordination control of a new energy power grid considering the power factor, on one hand, adjusting the reactive power output of a new energy station unit, and affecting the voltage value of a pilot bus (a bus of a centralized networking transformer substation in a new energy convergence area); the voltage optimization target value of the pilot bus is tracked in real time; and on the other hand, in the process of preferentially tracking to realize the pilot bus voltage optimization target value, the requirement of power factor balance of the new energy stations is considered, the problem of unreasonable reactive power distribution and even circulating current between the new energy stations is avoided, and thus the automatic voltage control level of the new energy power grid is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid dispatching, and in particular to a reactive voltage control method for a new energy collection area taking power factor into consideration. Background Art

[0002] By the end of 2023, my country's installed power generation capacity will reach 2.92 billion kilowatts, and the total installed capacity of renewable energy such as hydropower, wind power, and solar power generation will reach 1.47 billion kilowatts, accounting for more than 50% of the total installed power generation capacity, historically exceeding the installed capacity of thermal power. Among them, the installed capacity of wind power and solar power generation has increased by about 5 times and 40 times respectively compared with 2013. Continuously improve the grid structure and strengthen the "main artery" of the power grid. By the end of 2023, the State Grid has completed 35 UHV projects in China, with a cumulative power transmission of more than 2.9 trillion kilowatt-hours, which has effectively promoted the optimal allocation of power resources across the country.

[0003] With the advancement of the construction of new power systems, the installed capacity of renewable energy in the power grid is increasing day by day. In some areas rich in wind and light resources, renewable energy station gathering areas have been formed, and the problem of reactive voltage control in renewable energy gathering areas has begun to emerge. Due to the randomness and uncertainty of renewable energy power generation, conventional automatic voltage control often encounters unreasonable reactive power distribution and even internal circulation problems between renewable energy stations in the process of optimizing bus voltage in renewable energy gathering areas, which reduces the available reactive power reserve margin of stations in renewable energy gathering areas and affects the voltage safety and stability level in renewable energy gathering areas to a certain extent. Summary of the invention

[0004] The purpose of the present invention is to provide a reactive voltage control method for a new energy collection area taking power factor into consideration.

[0005] To achieve the above object, the present invention is implemented according to the following technical solutions:

[0006] The present invention comprises the following steps:

[0007] S1: Obtain the model of the coordinated control area of ​​the new energy power grid: read the power grid model and perform topological analysis to identify the substations and their subordinate new energy stations within the coordinated control area;

[0008] S2: Calculate reactive voltage sensitivity information: Use the power grid flow calculation method to obtain the sensitivity information of transformers and new energy units to bus voltage;

[0009] S3: Obtaining initial section operation status information: Based on the sensitivity information, determining the power grid operation status of the current control cycle;

[0010] S4: Determine whether the central bus voltage needs to be optimized: calculate the deviation between the sampled value of the bus voltage and the optimized target value, and determine whether the reactive output needs to be adjusted;

[0011] S5: Generate the bus voltage control strategy of the new energy station: adjust the reactive power output of the new energy station units to meet the optimization target of the central bus voltage;

[0012] S6: Determine the power factor: If bus voltage optimization has been achieved, adjust the reactive power output based on the power factor of the new energy station;

[0013] S7: Generate transformer reactive power control strategy: adjust the reactive power output of the transformer of the new energy station according to the power factor to ensure reasonable distribution;

[0014] S8: Coordinate the reactive power output of renewable energy stations and transformers: Ensure that the adjusted reactive power output is reasonably distributed between renewable energy stations and transformers to maintain grid stability.

[0015] The beneficial effects of the present invention are:

[0016] The present invention is a reactive voltage control method for a new energy collection area that takes power factor into consideration. Compared with the prior art, the present invention can track the optimization target of the central bus voltage in the new energy collection area while taking into account the realization of power factor balance of each new energy station in the new energy collection area, avoiding the problem of unreasonable reactive distribution or even circulation between new energy stations in the same coordinated control area. This ensures the safe and stable operation of the reactive voltage of the entire power grid in the new energy collection area, and provides strong support for the large-scale consumption and delivery of new energy power in the new energy collection area. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a flow chart of the method of the present invention. DETAILED DESCRIPTION

[0018] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. The illustrative embodiments and descriptions of the present invention are used to explain the present invention but are not intended to limit the present invention.

[0019] An embodiment of the present invention proposes a reactive voltage control method for a new energy collection area taking power factor into consideration, comprising: obtaining a new energy power grid coordinated control area model; calculating reactive voltage sensitivity information of transformers and units in each of the new energy power grid coordinated control areas to the bus voltage at the start of the current control cycle; based on the reactive voltage sensitivity information, obtaining the initial section operation status information of the new energy power grid at the start of the current control cycle; based on the operation status information, determining whether the new energy power grid coordinated control area needs to track and achieve the optimization target value of the central bus voltage: wherein, if it is necessary to track and achieve the optimization target value of the central bus voltage, the reactive output of the new energy station units is coordinated and controlled according to the central bus voltage situation, and a corresponding new energy station bus voltage control strategy is generated; if the optimization target value of the central bus voltage has been tracked and achieved, the reactive output of the new energy station units is coordinated and controlled according to the power factor situation of the new energy station, and a corresponding new energy station transformer reactive power control strategy is generated.

[0020] The overall process of the present invention is as follows Figure 1 As shown, the following steps are included:

[0021] S1: Obtain the current day's renewable energy grid (referred to as renewable energy grid) model and perform topological analysis to obtain a renewable energy grid coordinated control model for automatic voltage control. The specific steps are as follows:

[0022] S1.1: Let the current day be D m , read the current day's power grid model G m And perform topological analysis:

[0023] For the power grid model G m Perform topological analysis on any 500kV substation (new energy centralized grid-connected substation, regional central station) in the new energy gathering area, retrieve the new energy field station that has electrical connection with the 220kV busbar on the medium voltage side of the substation, and mark the 500kV substation with a lower-level 220kV new energy field station as a new energy grid 220kV coordinated control area, recorded as

[0024]

[0025] in, is the 220kV bus information of the pth 500kV substation in the kth coordinated control area, is the 220kV bus information of the i-th new energy station in the k-th coordinated control area, is the 220kV transformer information of the t-th new energy station in the k-th coordinated control area, It is the unit information of the g-th renewable energy station in the k-th coordinated control area.

[0026] In the automatic voltage control of the new energy power grid, the 220kV bus on the medium voltage side of the 500kV substation is generally selected as the central bus, and the 220kV bus at the new energy station is selected as the control bus.

[0027] S1.2: Traverse the power grid model G m All 500kV substations in the new energy collection area form K new energy grid 220kV coordinated control areas (referred to as coordinated control areas), and finally the coordinated control area model Z of the new energy grid is obtained. m for:

[0028]

[0029] Among them, K represents the total number of 220kV coordinated control areas in the new energy power grid.

[0030] S2: According to the new energy grid coordinated control area model of step S1, the sensitivity information of the 220kV transformer and the new energy unit to the bus voltage in each new energy grid coordinated control area at the start time of the current control cycle is obtained.

[0031] In this embodiment, the time when the current control cycle starts in the automatic voltage control of the new energy grid is T c , set the serial number of the 220kV transformer in the kth coordinated control area to t, t=1,...T, T represents the total number of 220kV transformers in the coordinated control area, and the serial number of the new energy unit in the kth coordinated control area to g, g=1,...G, G represents the total number of new energy units in the coordinated control area.

[0032] Through the power grid flow calculation, we can obtain the sensitivity information of the t-th 220kV transformer and the g-th new energy unit to the voltage of any bus (including the 220kV central bus and the 220kV control bus) in the k-th coordinated control area at different times. c As an example, assume that the kth coordinated control area in the new energy grid is at the Tth c Sensitivity information of 220kV transformer and new energy unit to bus voltage at the moment k,c for:

[0033]

[0034] in, For the T c The sensitivity information of the t-th transformer to the bus voltage in the k-th coordinated control area at the moment, For the T c The sensitivity information of the g-th renewable energy unit to the bus voltage in the k-th coordinated control area at the moment;

[0035] S2.1: Transformer sensitivity information to bus voltage

[0036]

[0037] in, For the T c The sensitivity information of the t-th transformer in the k-th coordinated control area to the 220kV central bus voltage of the p-th substation; For the T c The sensitivity information of the t-th transformer in the k-th coordinated control area to the 220kV control bus voltage of the i-th new energy station.

[0038] S2.2: Sensitivity information of new energy units to bus voltage

[0039]

[0040] in, For the T c The sensitivity information of the g-th renewable energy unit in the k-th coordinated control area to the 220kV central bus voltage of the p-th substation; For the T c The sensitivity information of the g-th renewable energy unit in the k-th coordinated control area to the 220kV control bus voltage of the i-th renewable energy station.

[0041] S3: Based on the new energy grid coordinated control area model of step S1 and the sensitivity information of 220kV transformers and new energy units to bus voltage in each new energy grid coordinated control area of ​​step S2, the initial section operation status information of the new energy grid at the beginning of the current control cycle is obtained. The specific steps are as follows:

[0042] S3.1: According to the new energy grid coordinated control area model of step S1 and the voltage sensitivity information of 220kV transformers and new energy units in each new energy grid coordinated control area of ​​step S2 to the bus voltage, obtain the voltage sensitivity information of the new energy grid in the first T c Initial cross-sectional information at time F m,c :

[0043]

[0044] Where subscript m corresponds to date D m , subscript c corresponds to the Tth c At time , the subscript k corresponds to the kth coordinated control area of ​​the new energy grid. For the T c The k-th coordinated control area model at time, Sens k,c For the T cSensitivity information of 220kV transformers and new energy units to bus voltage in the kth coordinated control area at time.

[0045] Among them, the T c Model of the kth coordinated control area at time for:

[0046]

[0047] in, In the regional model In the T c Status information at all times.

[0048] It should be noted that since the collected values ​​of the power grid model are changing in real time, the subscript c is marked as corresponding to the Tth c The status at different moments is not completely consistent. When each control cycle arrives, the regional model operating status information corresponding to that moment needs to be updated (without re-analyzing the model topology).

[0049] S3.2: According to Section T c Initial section information at time T, check the new energy grid c The operating status at the moment. For the kth new energy grid coordination control area, it includes:

[0050] S3.2.1: Set the serial number of the 220kV central bus in the kth coordinated control area to p, where p = 1, ... P, where P represents the total number of 220kV central bus in the kth coordinated control area, and c Initial state information of 220kV central bus in the kth coordinated control area at time for:

[0051]

[0052] in, The pth central bus is at the Tth c The voltage sampling value at the moment, The pth central bus is at the Tth c The voltage control lower limit at time, The pth central bus is at the Tth c The voltage control upper limit at the moment, The pth central bus is at the Tth c The optimized voltage target value at the moment.

[0053] in:

[0054]

[0055] S3.2.2: Set the serial number of the 220 kV control bus in the kth coordinated control area to i, i = 1, ... I, I represents the total number of 220 kV control buses in the kth coordinated control area, Tth c Initial state information of 220kV control bus in the kth coordinated control area at time for:

[0056]

[0057] in, is the i-th control bus at the T c The voltage sampling value at the moment, is the i-th control bus at the T c The voltage control lower limit at time, is the i-th control bus at the T c The voltage control upper limit at the moment.

[0058] It should be noted that the 220kV control bus of the new energy station in the new energy grid coordinated control area is a control quantity. There is no voltage optimization target value. It only needs to keep the voltage within the control upper and lower limits of the bus voltage, that is, to meet:

[0059] S3.2.3: Obtain the number of new energy units in the kth coordinated control area in the Tth c Initial state information at the moment for:

[0060]

[0061] in, For the T c The reactive output sampling value of the g-th renewable energy unit in the k-th coordinated control area at time, The minimum available reactive power output of the g-th renewable energy unit, is the maximum available reactive power output of the g-th renewable energy unit, Xf g Bs is the subscript of the 220kV transformer corresponding to the g-th renewable energy unit. g It is the subscript of the 220kV control bus corresponding to the g-th new energy unit.

[0062] S3.2.4: Get the Tth position of 220kV transformer in kth coordinated control area c Initial state information at the moment for:

[0063]

[0064] in, For the T cThe active sampling value of the high-voltage side of the t-th 220kV transformer in the k-th coordinated control area at time, For the T c The reactive sampling value of the high-voltage side of the t-th 220kV transformer in the k-th coordinated control area at time, is the minimum value of the available reactive power of the t-th transformer, is the maximum value of the available reactive power of the tth transformer.

[0065] The minimum and maximum available reactive power of the t-th transformer can be obtained by accumulating the available reactive power output information of the new energy units in step (3-2-3):

[0066]

[0067] S3.3: Calculate the change in bus voltage during reactive power adjustment of each transformer and renewable energy unit in each coordinated control area.

[0068] According to the sensitivity information of the transformer to the bus voltage in step 2-1), the change in bus voltage when the t-th transformer in the k-th coordinated control area is adjusted in reactive power is calculated as follows:

[0069] Set T c The reactive power adjustment of the transformer at time t is ΔQ t,c , then:

[0070]

[0071] Where, ΔV p,c is the reactive power adjustment ΔQ of the t-th transformer in the k-th coordinated control area t,c When , the voltage change of the pth 220kV central busbar.

[0072]

[0073] Where, ΔV i,c is the reactive power adjustment ΔQ of the t-th transformer in the k-th coordinated control area t,c When , the voltage change of the i-th 220kV control bus.

[0074] According to the sensitivity information of the new energy generating unit to the bus voltage in step 2-2), the change in bus voltage during reactive power adjustment of the g-th new energy generating unit in the k-th coordinated control area is calculated as follows:

[0075] Set T c The reactive power adjustment of the g-th renewable energy unit at the moment is ΔQ g,c , then:

[0076]

[0077] Where, ΔV p,c is the reactive power adjustment ΔQ of the g-th renewable energy unit in the k-th coordinated control area g,c When , the voltage change of the pth 220kV central busbar.

[0078]

[0079] Where, ΔV i,c is the reactive power adjustment ΔQ of the g-th renewable energy unit in the k-th coordinated control area g,c When , the voltage change of the i-th 220kV control bus.

[0080] S4: Based on the operation status information, determine whether the coordinated control area of ​​the current new energy grid needs to track and achieve the central bus voltage optimization target value. In this embodiment, the current coordinated control area of ​​the new energy grid is the kth coordinated control area.

[0081] S4.1: Section T c The operating status information of the 220kV central bus in the kth coordinated control area at time is:

[0082]

[0083] Calculate the deviation between the voltage sampling value of each 220kV central bus in the kth coordinated control area and the voltage optimization target value information:

[0084]

[0085] S4.2: Section T c The operating status information of the 220kV transformer in the kth coordinated control area at time is:

[0086]

[0087] Calculate the power factor cscθ on the high voltage side of each 220kV transformer in the kth coordinated control area t,c information:

[0088]

[0089] Calculate the average power factor of the high-voltage side of T 220kV transformers in the kth coordinated control area information:

[0090]

[0091] in, is the accumulated active value of the high-voltage side of T 220kV transformers in the kth coordinated control area, It is the accumulated reactive power on the high-voltage side of T 220kV transformers in the kth coordinated control area.

[0092]

[0093] Calculate the deviation Δcscθ between the high-voltage side power factor and the average power factor of each 220kV transformer in the kth coordinated control area t,c information:

[0094]

[0095] S4.3: Determine the control operation status of the kth coordinated control area of ​​the new energy grid

[0096] First, detect the total P in the kth coordinated control area Is there a value greater than the optimization dead zone threshold? If there is a situation, it is marked that the coordinated control area needs to start voltage optimization control, and the process goes to step 5) to perform voltage optimization control in the coordinated control area, otherwise it goes to step 6) to perform power factor balancing control in the coordinated control area.

[0097] Then, a total of T Δcscθ in the kth coordinated control area are detected t,c Is there a value greater than the power factor balance dead zone threshold Δcscθ? dead If it exists, it is marked that the coordinated control area needs to start the power factor balancing control, and the step 6) is continued to perform the power factor balancing control of the coordinated control area, otherwise it goes to step 7) to scan the operation status of the next coordinated control area of ​​the new energy grid.

[0098] S5: Perform voltage optimization control on the new energy grid coordination control area where the central bus voltage deviates from the optimization dead zone.

[0099] If the first c At the moment, the voltage of the pth 220kV central bus in the kth coordinated control area deviates from the optimization dead zone. At this time, it is necessary to adjust the reactive output of the new energy units in the coordinated control area, and make the 220kV central bus voltage of the substation close to the voltage optimization target value while ensuring that the 220kV control bus voltage of the new energy station is qualified (the control bus voltage operates within the upper and lower limits). In this embodiment, the method of constructing the CSVC coordinated secondary voltage optimization model is used to illustrate the process of voltage optimization control in the coordinated control area of ​​the new energy power grid.

[0100] S5.1: In order to make the central bus voltage as close to the voltage optimization target value as possible, a central bus voltage deviation can be constructed. To optimize the target, the objective function of the quadratic programming model is adopted:

[0101]

[0102] Among them, ΔQ g is the reactive power adjustment of the new energy unit, which is the optimization variable of the function; Indicates the absolute value of the deviation between the central bus voltage optimization target value and the voltage sampling value; is the sensitivity of the reactive power of the new energy unit to the bus voltage in step 2-2); θ g is the reactive power balance index of the new energy unit; W p and W q are the two weight coefficients of the function.

[0103] S5.1.1: θ g As a reactive power balance indicator for new energy units, its meaning is:

[0104]

[0105] in, and They respectively represent the current reactive power sampling value of the new energy unit, the upper limit of available reactive power and the lower limit of available reactive power.

[0106] S5.1.2: The constraints on the optimization function include:

[0107] Central / control bus voltage maximum adjustment step:

[0108] Central bus voltage is qualified:

[0109] Control bus voltage qualified:

[0110] Reactive power regulation range of new energy units:

[0111] The first part of the objective function is minimized by ΔQ g Adjust the reactive power output of the new energy unit to make the voltage of the central bus Try to get as close to the optimization target value as possible The second part is to transform ‖θ g ‖ 2 Introducing it into the objective function, on the one hand, ensures the increase of reactive power regulation margin of new energy units, and on the other hand, promotes the reactive power output of each new energy unit in the region to develop in a balanced direction, which reflects the goal of achieving voltage optimization. At the same time, try to ensure the goal of balanced reactive power output of new energy units.

[0112] S5.2: By solving this quadratic programming objective function, we can obtain the Tth c The reactive power adjustment value ΔQ of the g-th renewable energy unit at the momentg,c According to the sensitivity information of the new energy unit to the bus voltage in step 2-2), the Tth c The set value of the 220kV control bus voltage of the i-th new energy station in the k-th coordinated control area at time Information for:

[0113]

[0114] Where, ΔV i,c For the T c The voltage regulation of the ith control bus in the kth coordinated control area at the moment is calculated by the reactive power adjustment and voltage sensitivity of the new energy units topologically associated with the control bus:

[0115]

[0116] S5.3: Set the sequence number of the 220kV control bus strategy for generating new energy stations in the kth coordinated control area to i strg ,i strg =1,……I strg , I strg represents the total number of 220kV control bus strategies in the kth coordinated control area, forming the Tth c The strategy information for controlling bus voltage adjustment in the kth coordinated control area at time as follows:

[0117]

[0118] When the new energy station is tracking the bus voltage setting target, the control mode When the new energy station is tracking the transformer reactive power setting target, the control mode

[0119] The strategy number of the control strategy information and the subscript of the control bus are in correspondence; the control bus strategy information Including the voltage setting value of the control bus and the current control mode, namely:

[0120]

[0121] in, For the T c The set value of the i-th control bus voltage at the moment, For the T c The control mode of the new energy station where the i-th control bus is located at the moment

[0122] S5.4: The power grid automatic voltage control master station sends the T c Time istrg The voltage setting value instruction of the 220kV control bus and the control mode instruction of the new energy station are realized. c The control strategy for adjusting the i-th control bus voltage in the k-th coordinated control area at time; after the new energy station automatic voltage control substation receives the new energy station control mode and the i-th control bus voltage adjustment target value, it adjusts the reactive output of the new energy unit to make the 220kV bus voltage as close as possible to the bus voltage set value issued by the master station.

[0123] In general, by adjusting the T c At time k, the reactive power output of the new energy units in the coordinated control area is used to adjust the voltage of each control bus, so that the voltage of the 220kV central bus in the area gradually approaches its voltage optimization target value, thereby achieving the Tth c The goal of optimizing the voltage control of the 220kV central bus in the kth coordinated control area at time.

[0124] After completing T c After the central busbar of the kth coordinated control area is optimized at time, step 7 is entered to scan the operation status of the next coordinated control area of ​​the new energy power grid.

[0125] S6: Perform power factor balancing control on the new energy grid coordination control area where the central bus voltage has been optimized.

[0126] If the first c At the moment, the power factor on the high-voltage side of the t-th 220kV transformer in the k-th coordinated control area deviates from the power factor balance dead zone. At this time, it is necessary to adjust the reactive output on the high-voltage side of the 220kV transformer in the coordinated control area, and ensure that the 220kV central bus voltage of the substation is optimized and the 220kV control bus voltage of the new energy station is qualified (the control bus voltage operates within the upper and lower limits), so that the power factor on the high-voltage side of the 220kV transformer is close to the average power factor of the coordinated control area. In this embodiment, the method of constructing a CQSVC coordinated secondary reactive optimization model is used to illustrate the process of power factor balance control in the coordinated control area of ​​the new energy power grid.

[0127] S6.1: In order to make the power factor of the high-voltage side of the 220kV transformer as close as possible to the average power factor of the coordinated control area, a reactive deviation value of the high-voltage side of the 220kV transformer can be constructed. To optimize the target, the objective function of the quadratic programming model is adopted:

[0128]

[0129] Among them, ΔQ t is the reactive power adjustment on the high voltage side of the 220kV transformer, which is the optimization variable of the function; It indicates the absolute value of the deviation between the reactive power optimization target value and the reactive power sampling value on the high-voltage side of the 220kV transformer; is the sensitivity of transformer reactive power to bus voltage in step 2-1); θ i W is the voltage balance index of 220kV busbar in new energy station; p and W q are the two weight coefficients of the function.

[0130] S6.1.1: As the reactive power optimization target value of the high-voltage side of the 220kV transformer, its meaning is:

[0131]

[0132] For the T c The reactive power optimization target value of the high-voltage side of the 220kV transformer at time t is calculated as follows:

[0133]

[0134] in, The sign direction and Consistent.

[0135] S6.1.2: θ i As a 220kV bus voltage balance indicator for new energy stations, its meaning is:

[0136]

[0137] in, and They respectively represent the current voltage sampling value, upper control limit and lower control limit of the 220kV busbar of the new energy station.

[0138] S6.1.3: The constraints on the optimization function include:

[0139] The maximum step length of reactive power adjustment of 220kV transformer: ‖ΔQ t ‖<ΔQ step ;

[0140] Central bus voltage optimization:

[0141] Control bus voltage qualified:

[0142] Reactive power regulation range of 220kV transformer:

[0143] The first part of the objective function is minimized by ΔQ tAdjust the reactive power output on the high voltage side of the transformer to make the reactive power on the high voltage side of the 220kV transformer Try to get as close to the optimization target value as possible The second part is to transform ‖θ i ‖ 2 Introducing it into the objective function not only ensures the increase of the regulation margin of the new energy bus voltage, but also promotes the voltage of each new energy station in the region to develop in a balanced direction, which reflects the goal of achieving reactive power optimization. At the same time, try to ensure the voltage balance of new energy stations.

[0144] S6.2: By solving this quadratic programming objective function, we can obtain the Tth c The reactive adjustment ΔQ of the high voltage side of the 220kV transformer at time t t,c , further calculate to get the T c The setting value of reactive power on the high-voltage side of the t-th 220kV transformer in the k-th coordinated control area at time Information for:

[0145]

[0146] S6.3: Set the sequence number of the reactive power control strategy for the high-voltage side of the 220kV transformer generated in the kth coordinated control area to t strg , t strg =1,……T strg , T strg represents the total number of reactive power control strategies on the high-voltage side of 220 kV transformers in the kth coordinated control area, thus forming the Tth c The strategy information of reactive power adjustment of 220kV transformer in the kth coordinated control area at time as follows:

[0147]

[0148] The strategy number of the control strategy information and the subscript of the transformer are in correspondence; 220kV transformer control strategy information Including the reactive power setting value and current control mode of the high-voltage side of the 220kV transformer, namely:

[0149]

[0150] in, For the T c The setting value of reactive power on the high-voltage side of the 220kV transformer at time t is: For the T c Control mode of the new energy station where the t-th 220kV transformer is located

[0151] S6.4: The new energy grid automatic voltage control master station sends the T c Time t strg The reactive power setting value instruction of the high-voltage side of the 220kV transformer and the control mode instruction of the new energy station are realized. c Control strategy for reactive power adjustment on the high-voltage side of the t-th 220kV transformer in the k-th coordinated control area at time; after the new energy station substation receives the new energy station control mode and the reactive power adjustment target value of the t-th 220kV transformer high-voltage side, it adjusts the reactive power output of the new energy unit to make the reactive power on the high-voltage side of the 220kV transformer as close as possible to the reactive power setting value of the transformer issued by the master station.

[0152] In general, by adjusting the T c At the kth moment, the reactive power output of the new energy units in the coordinated control area is used to adjust the reactive power on the high-voltage side of each 220kV transformer, so that the power factor on the high-voltage side of the 220kV transformer in the area gradually approaches the regional power factor average value, thereby achieving the Tth moment. c The goal of power factor balancing control of 220kV transformer in the kth coordinated control area at time.

[0153] After completing T c After the central busbar of the kth coordinated control area is optimized at time, step 7 is entered to scan the operation status of the next coordinated control area of ​​the new energy power grid.

[0154] S7: Select the next new energy grid coordinated control area as the new current coordinated control area, and then return to step S4 until the reactive voltage control process of the K coordinated control areas of the new energy grid is completed. After the control is completed, the new current time is recorded as T' c , then we get the new energy grid at the first T′ c The cross-section status information F′ at the moment m,c :

[0155]

[0156] Among them, the superscript ' corresponds to the T' c time, The control partition model of the new energy grid is in the T′ c The state of the moment.

[0157] S7.1: Section T′ c The information of 220kV central bus and 220kV control bus in the kth coordinated control area at the moment is:

[0158]

[0159] in, For T′ cThe 220kV central bus information in the kth coordinated control area at the moment, For T′ c 220kV control bus information in the kth coordinated control area at time.

[0160] In the T′ c The sampling value information of the voltage of the 220kV central bus at the time for:

[0161]

[0162] In the T′ c The voltage sampling value information of the 220kV control bus at time i for:

[0163]

[0164] S7.2: Section T′ c The information of the new energy unit in the kth coordinated control area at time is:

[0165]

[0166] in, For T′ c Reactive power information of new energy units in the kth coordinated control area at time.

[0167] In the T′ c Reactive sampling value information of the g-th renewable energy unit at time for:

[0168]

[0169] S7.3: Section T′ c The information of 220kV transformer in the kth coordinated control area at time is:

[0170]

[0171] in, For T′ c Reactive power information on the high-voltage side of the 220kV transformer in the kth coordinated control area at time.

[0172] In the T′ c Reactive sampling value information of the high-voltage side of the 220kV transformer at time t for:

[0173]

[0174] S8: At the next control cycle of the new energy grid automatic voltage control, c+1At this moment, c+1 Time as T c At time T′, first return to step 2) to calculate the sensitivity, and then use the new energy grid obtained in step 7) to calculate the sensitivity of the new energy grid at time T′ c The cross-section operation status information at time T is used as the new c The initial section operation status information at time D is obtained, and then the process of step 4) to step 7) is repeated to complete a new round of automatic voltage control of the new energy grid until the new energy grid is realized on date D m Automatic voltage control process at each control cycle.

[0175] Due to the differences in regulation capabilities and response speeds of new energy stations, when the central bus voltage in the new energy collection area reaches the optimized target value, there may be problems with unreasonable reactive power distribution or even reactive circulating current between new energy stations. The present invention uses a coordinated control strategy that considers power factor in the reactive voltage control of the new energy power grid, while ensuring the optimization of the central bus voltage, and coordinates the control of the reactive output of the new energy station units, eliminating the problem of unreasonable reactive power distribution between new energy stations.

[0176] The present invention realizes coordinated reactive power and voltage control of new energy power grids taking power factor into consideration. On the one hand, it adjusts the reactive output of new energy station units to affect the voltage value of the central bus (the bus of the centralized grid-connected substation in the new energy collection area) to track the voltage optimization target value of the central bus in real time. On the other hand, in the process of giving priority to tracking and achieving the central bus voltage optimization target value, it takes into account the requirement of power factor balance of new energy stations to avoid unreasonable reactive power distribution or even circulating current problems between new energy stations, thereby improving the automatic voltage control level of the new energy power grid.

[0177] The technical solution of the present invention is not limited to the above-mentioned specific embodiments. All technical variations made according to the technical solution of the present invention fall within the protection scope of the present invention.

Claims

1. A reactive voltage control method for a new energy collection area considering power factor, characterized in that: The following steps are involved: S1: Obtain the model of the coordinated control area of ​​the new energy power grid: read the power grid model and perform topological analysis to identify the substations and their subordinate new energy stations within the coordinated control area; S2: Calculate reactive voltage sensitivity information: Use the power grid flow calculation method to obtain the sensitivity information of transformers and new energy units to bus voltage; S3: Obtaining initial section operation status information: Based on the sensitivity information, determining the power grid operation status of the current control cycle; S4: Determine whether the central bus voltage needs to be optimized: calculate the deviation between the sampled value of the bus voltage and the optimized target value, and determine whether the reactive output needs to be adjusted; S5: Generate the bus voltage control strategy of the new energy station: adjust the reactive power output of the new energy station units to meet the optimization target of the central bus voltage; S6: Determine the power factor: If bus voltage optimization has been achieved, adjust the reactive power output based on the power factor of the new energy station; S7: Generate transformer reactive power control strategy: adjust the reactive power output of the transformer of the new energy station according to the power factor to ensure reasonable distribution; S8: Coordinate the reactive power output of renewable energy stations and transformers: Ensure that the adjusted reactive power output is reasonably distributed between renewable energy stations and transformers to maintain grid stability.

2. The reactive voltage control method of a new energy collection area considering power factor according to claim 1 is characterized in that: The step S1 is specifically as follows: S1.1: Let the current day be D m , read the current day's power grid model G m And perform topological analysis: For the power grid model G m Perform topological analysis on any 500kV substation in the new energy gathering area, retrieve the new energy stations that are electrically connected to the 220kV busbar on the medium voltage side of the substation, and mark the 500kV substation with the lower 220kV new energy stations as a new energy grid 220kV coordinated control area, recorded as in, is the 220kV bus information of the pth 500kV substation in the kth coordinated control area, is the 220kV bus information of the i-th new energy station in the k-th coordinated control area, is the 220kV transformer information of the t-th new energy station in the k-th coordinated control area, The unit information of the g-th renewable energy station in the k-th coordinated control area; S1.2: Traverse the power grid model G m All 500kV substations in the new energy collection area form K new energy grid 220kV coordinated control areas, and finally the coordinated control area model Z of the new energy grid is obtained. m for: Among them, K represents the total number of 220kV coordinated control areas in the new energy power grid.

3. The reactive voltage control method of a new energy collection area considering power factor according to claim 2 is characterized in that: The step S2 is specifically as follows: let the time when the current control cycle in the automatic voltage control of the new energy grid starts be T c , set the serial number of the 220kV transformer in the kth coordinated control area to t, t = 1, ... T, T represents the total number of 220kV transformers in the coordinated control area, the serial number of the new energy unit in the kth coordinated control area is g, g = 1, ... G, G represents the total number of new energy units in the coordinated control area, set the kth coordinated control area in the new energy grid in the Tth c Sensitivity information of 220kV transformer and new energy unit to bus voltage at the moment k,c for: in, For the T c The sensitivity information of the t-th transformer to the bus voltage in the k-th coordinated control area at the moment, For the T c The sensitivity information of the g-th renewable energy unit to the bus voltage in the k-th coordinated control area at the moment; Transformer sensitivity information to bus voltage: in, For the T c The sensitivity information of the t-th transformer in the k-th coordinated control area to the 220kV central bus voltage of the p-th substation; For the T c The sensitivity information of the t-th transformer in the k-th coordinated control area to the 220kV control bus voltage of the i-th new energy station; Sensitivity information of new energy units to bus voltage: in, For the T c The sensitivity information of the g-th renewable energy unit in the k-th coordinated control area to the 220kV central bus voltage of the p-th substation; For the T c The sensitivity information of the g-th renewable energy unit in the k-th coordinated control area to the 220kV control bus voltage of the i-th renewable energy station.

4. The reactive voltage control method for a new energy collection area considering power factor according to claim 3 is characterized in that: The step S3 specifically comprises the following steps: S3.1: Obtain the new energy grid at T according to steps S1 and S2 c Initial cross-sectional information at time F m,c : Where subscript m corresponds to date D m , subscript c corresponds to the Tth c At time , the subscript k corresponds to the kth coordinated control area of ​​the new energy grid. For the T c The k-th coordinated control area model at time, Sens k,c For the T c The sensitivity information of 220kV transformers and new energy units to bus voltage in the kth coordinated control area at time; Among them, the T c Model of the kth coordinated control area at time for: in, In the regional model In the T c Status information at all times; S3.2: According to Section T c Initial section information at time T, check the new energy grid c The operating status at the moment; for the k-th new energy grid coordination control area, the specific steps include: S3.2.1: Set the serial number of the 220kV central bus in the kth coordinated control area to p, where p = 1, ... P, where P represents the total number of 220kV central bus in the kth coordinated control area, and c Initial state information of 220kV central bus in the kth coordinated control area at time for: in, The pth central bus is at the Tth c The voltage sampling value at the moment, The pth central bus is at the Tth c The voltage control lower limit at time, The pth central bus is at the Tth c The voltage control upper limit at the moment, The pth central bus is at the Tth c The optimized voltage target value at the moment; in: S3.2.2: Set the serial number of the 220 kV control bus in the kth coordinated control area to i, i = 1, ... I, I represents the total number of 220 kV control buses in the kth coordinated control area, Tth c Initial state information of 220kV control bus in the kth coordinated control area at time for: in, is the i-th control bus at the T c The voltage sampling value at the moment, is the i-th control bus at the T c The voltage control lower limit at time, is the i-th control bus at the T c The voltage control upper limit at the moment; S3.2.3: Obtain the number of new energy units in the kth coordinated control area in the Tth c Initial state information at the moment for: in, For the T c The reactive output sampling value of the g-th renewable energy unit in the k-th coordinated control area at time, The minimum available reactive power output of the g-th renewable energy unit, is the maximum available reactive power output of the g-th renewable energy unit, Xf g Bs is the subscript of the 220kV transformer corresponding to the g-th renewable energy unit. g It is the subscript of the 220kV control busbar corresponding to the g-th renewable energy unit; S3.2.4: Get the Tth position of 220kV transformer in kth coordinated control area c Initial state information at the moment for: in, For the T c The active sampling value of the high-voltage side of the t-th 220kV transformer in the k-th coordinated control area at time, For the T c The reactive sampling value of the high-voltage side of the t-th 220kV transformer in the k-th coordinated control area at time, is the minimum value of the available reactive power of the t-th transformer, is the maximum value of the available reactive power of the tth transformer; The minimum and maximum values ​​of the available reactive power of the t-th transformer can be obtained by accumulating the available reactive power output information of the new energy units in step S3.2.3: S3.3: Calculate the change in bus voltage during reactive power adjustment of each transformer and new energy unit in each coordinated control area: According to the sensitivity information of the transformer to the bus voltage in step S2, the change in bus voltage when the t-th transformer in the k-th coordinated control area is reactively adjusted is calculated as follows: Set T c The reactive power adjustment of the transformer at time t is ΔQ t,c , then: Where, ΔV p,c is the reactive power adjustment ΔQ of the t-th transformer in the k-th coordinated control area t,c When , the voltage change of the pth 220kV central busbar; Where, ΔV i,c is the reactive power adjustment ΔQ of the t-th transformer in the k-th coordinated control area t,c When , the voltage change of the ith 220kV control bus; According to the sensitivity information of the new energy generating unit to the bus voltage in step S2, the change in bus voltage during reactive power adjustment of the g-th new energy generating unit in the k-th coordinated control area is calculated as follows: Set T c The reactive power adjustment of the g-th renewable energy unit at the moment is ΔQ g,c , then: Where, ΔV p,c is the reactive power adjustment ΔQ of the g-th renewable energy unit in the k-th coordinated control area g,c When , the voltage change of the pth 220kV central busbar; Where, ΔV i,c is the reactive power adjustment ΔQ of the g-th renewable energy unit in the k-th coordinated control area g,c When , the voltage change of the i-th 220kV control bus.

5. The reactive voltage control method of a new energy collection area considering power factor according to claim 4 is characterized in that: The step S4 is specifically as follows: S4.1: Section T c The operating status information of the 220kV central bus in the kth coordinated control area at time is: Calculate the deviation between the voltage sampling value of each 220kV central bus in the kth coordinated control area and the voltage optimization target value information: S4.2: Section T c The operating status information of the 220kV transformer in the kth coordinated control area at time is: Calculate the power factor cscθ on the high voltage side of each 220kV transformer in the kth coordinated control area t,c information: Calculate the average power factor of the high-voltage side of T 220kV transformers in the kth coordinated control area information: in, is the accumulated active value of the high-voltage side of T 220kV transformers in the kth coordinated control area, is the accumulated reactive power value of the high-voltage side of T 220kV transformers in the kth coordinated control area; Calculate the deviation Δcscθ between the high-voltage side power factor and the average power factor of each 220kV transformer in the kth coordinated control area t,c information: S4.3: Determine the control operation status of the kth coordinated control area of ​​the new energy grid: First, detect the total P in the kth coordinated control area Is there a value greater than the optimization dead zone threshold? If there is a situation, it is marked that the coordinated control area needs to start voltage optimization control, and the process goes to step S5 to perform voltage optimization control in the coordinated control area. Otherwise, it goes to step S6 to perform power factor balancing control in the coordinated control area. Then, a total of T Δcscθ in the kth coordinated control area are detected t,c Is there a value greater than the power factor balance dead zone threshold Δcscθ? dead if it exists, the coordinated control area is marked to start power factor balancing control, and the coordinated control area power factor balancing control is continued to step S6, otherwise the process proceeds to step S7 to scan the operation of the next coordinated control area of ​​the new energy grid.

6. The reactive voltage control method of a new energy collection area considering power factor according to claim 5 is characterized in that: The step S5 comprises the following steps: S5.1: Construct a voltage deviation value based on the central bus voltage To optimize the target, the objective function of the quadratic programming model is adopted: Among them, ΔQ g is the reactive power adjustment of the new energy unit, which is the optimization variable of the function; Indicates the absolute value of the deviation between the central bus voltage optimization target value and the voltage sampling value; is the sensitivity of the reactive power of the new energy unit to the bus voltage in step S2; θ g is the reactive power balance index of the new energy unit; W p and W q are the two weight coefficients of the function; S5.1.1: θ g As a reactive power balance indicator for new energy units, its meaning is: in, and Respectively represent the current reactive power sampling value of the new energy unit S5.1.2: The constraints on the optimization function include: Central / control bus voltage maximum adjustment step: Central bus voltage is qualified: Control bus voltage qualified: Reactive power regulation range of new energy units: S5.2: By solving the quadratic programming objective function, we can obtain the Tth c The reactive power adjustment value ΔQ of the g-th renewable energy unit at the moment g,c According to the sensitivity information of the new energy unit to the bus voltage in step S2, the T c The set value of the 220kV control bus voltage of the i-th new energy station in the k-th coordinated control area at time Information for: Where, ΔV i,c For the T c The voltage regulation of the ith control bus in the kth coordinated control area at the moment is calculated by the reactive power adjustment and voltage sensitivity of the new energy units topologically associated with the control bus: S5.3: Set the sequence number of the 220kV control bus strategy for generating new energy stations in the kth coordinated control area to i strg ,i strg =1,……I strg , I strg represents the total number of 220kV control bus strategies in the kth coordinated control area, forming the Tth c The strategy information for controlling bus voltage adjustment in the kth coordinated control area at time as follows: When the new energy station is tracking the bus voltage setting target, the control mode When the new energy station is tracking the transformer reactive power setting target, the control mode Control bus strategy information Including the voltage setting value of the control bus and the current control mode, namely: in, For the T c The set value of the i-th control bus voltage at the moment, For the T c The control mode of the new energy station where the i-th control bus is located at the moment S5.4: The new energy grid automatic voltage control master station sends the T c Time i strg The voltage setting value instruction of the 220kV control bus and the control mode instruction of the new energy station are realized. c The control strategy for adjusting the i-th control bus voltage in the k-th coordinated control area at time; after the new energy station automatic voltage control substation receives the new energy station control mode and the i-th control bus voltage adjustment target value, it adjusts the reactive output of the new energy unit to make the 220kV bus voltage as close as possible to the bus voltage set value issued by the master station.

7. The reactive voltage control method of a new energy collection area considering power factor according to claim 6 is characterized in that: The step S6 comprises the following steps: S6.1: Construct a reactive deviation value based on the high voltage side of the 220 kV transformer To optimize the target, the objective function of the quadratic programming model is adopted: Among them, ΔQ t is the reactive power adjustment on the high voltage side of the 220kV transformer, which is the optimization variable of the function; It indicates the absolute value of the deviation between the reactive power optimization target value and the reactive power sampling value on the high-voltage side of the 220kV transformer; is the sensitivity of the transformer reactive power to the bus voltage in step S2; θ i W is the voltage balance index of 220kV busbar in new energy station; p and W q are the two weight coefficients of the function; S6.1.1: As the reactive power optimization target value of the high-voltage side of the 220kV transformer, its meaning is: For the T c The reactive power optimization target value of the high-voltage side of the 220kV transformer at time t is calculated as follows: in, The sign direction and Consistent. S6.1.2: θ i As a 220kV bus voltage balance indicator for new energy stations, its meaning is: in, and They represent the current voltage sampling value, upper control limit and lower control limit of the 220kV busbar of the new energy station respectively; S6.1.3: The constraints on the optimization function include: The maximum step length of reactive power adjustment of 220kV transformer: ‖ΔQ t ‖<ΔQ step ; Central bus voltage optimization: Control bus voltage qualified: Reactive power regulation range of 220kV transformer: S6.2: By solving the quadratic programming objective function, we get the Tth c The reactive adjustment ΔQ of the high voltage side of the 220kV transformer at time t t,c , further calculate the T c The setting value of reactive power on the high-voltage side of the t-th 220kV transformer in the k-th coordinated control area at time Information for: S6.3: Set the sequence number of the reactive power control strategy for the high-voltage side of the 220kV transformer generated in the kth coordinated control area to t strg , t strg =1,……T strg , T strg represents the total number of reactive power control strategies on the high-voltage side of 220 kV transformers in the kth coordinated control area, thus forming the Tth c The strategy information of reactive power adjustment of 220kV transformer in the kth coordinated control area at time as follows: The strategy number of the control strategy information and the subscript of the transformer are in correspondence; 220kV transformer control strategy information Including the reactive power setting value and current control mode of the high-voltage side of the 220kV transformer, namely: in, For the T c The setting value of reactive power on the high-voltage side of the 220kV transformer at time t is: For the T c Control mode of the new energy station where the t-th 220kV transformer is located S6.4: The power grid automatic voltage control master station sends the T c Time t strg The reactive power setting value instruction of the high-voltage side of the 220kV transformer and the control mode instruction of the new energy station are realized. c The control strategy for reactive power adjustment of the t-th 220kV transformer high-voltage side in the k-th coordinated control area at time; after receiving the control mode of the new energy station and the reactive power adjustment target value of the t-th 220kV transformer high-voltage side, the new energy station substation adjusts the reactive power output of the new energy unit to make the reactive power of the 220kV transformer high-voltage side as close as possible to the transformer reactive setting value issued by the master station; After completing T c After the central busbar of the kth coordinated control area is optimized and controlled, the process proceeds to step S7 to scan the operation status of the next coordinated control area of ​​the new energy power grid.

8. The reactive voltage control method of a new energy collection area considering power factor according to claim 7 is characterized in that: The step S7 is specifically as follows: selecting the next new energy grid coordinated control area as the new current coordinated control area, and then returning to step S4 until the reactive voltage control process of the K coordinated control areas of the new energy grid is completed; after the control is completed, the new current time is recorded as T c ′ , then we get the new energy grid at the T c ′ The cross-section status information at the moment F ′ m,c : Among them, the superscript ' corresponds to the T c ′ time, For the new energy grid control partition model, in the T c ′ The state of the moment. S7.1: Section T c ′ The information of 220kV central bus and 220kV control bus in the kth coordinated control area at the moment is: in, For the T c ′ The 220kV central bus information in the kth coordinated control area at the moment, For the T c ′ 220kV control bus information in the kth coordinated control area at the moment; In the T c ′ The sampling value information of the voltage of the 220kV central bus at the time for: In the T c ′ The voltage sampling value information of the 220kV control bus at time i for: S7.2: Section T c ′ The information of the new energy unit in the kth coordinated control area at time is: in, For the T c ′ Reactive power information of the new energy units in the kth coordinated control area at time; In the T c ′ Reactive sampling value information of the g-th renewable energy unit at time for: S7.3: Section T c ′ The information of 220kV transformer in the kth coordinated control area at time is: in, For the T c ′ The reactive power information of the high-voltage side of the 220kV transformer in the kth coordinated control area at time; c ′ Reactive sampling value information of the high-voltage side of the 220kV transformer at time t for:

9. The reactive voltage control method of a new energy collection area considering power factor according to claim 8 is characterized in that: The step S8 is specifically as follows: at the next control cycle of the new energy grid automatic voltage control, c+1 At this moment, c+1 Time as T c At time T, first return to step S2 to calculate the sensitivity, and then use the new energy grid obtained in step S7 to calculate the sensitivity of the new energy grid at time T. c ′ The cross-section operation status information at time T is used as the new c The initial section operation status information at time D is obtained, and then the process of step S4 to step S7 is repeated to complete a new round of automatic voltage control of the new energy grid until the new energy grid is realized on date D. m Automatic voltage control process at each control cycle.

Citation Information

Patent Citations

  • AVC (automatic voltage control) system-based reactive voltage optimization method and device

    CN103151784A

  • Coordinated secondary voltage control method considering reactive power regulating capability of wind farm

    CN103532150A

  • Intelligent substation load automatically-distributing method based on distributed electric connection

    CN103904644A

Cited By

  • Reactive circulation suppression method and device for new energy station

    CN121261308A

  • A reactive current loop suppression method and device for a new energy station

    CN121261308B

  • Construction method of power distribution network multi-scene combined voltage control model, voltage control method and system, electronic equipment and storage medium

    CN122456545A