Method for identifying weak link of steady-state voltage of new energy multi-infeed alternating current system

By collecting and analyzing data from the new energy multi-feeding system, combining voltage sensitivity and power balance theory, calculating MRSVE quantization indicators, identifying the weak links of the steady-state voltage of the new energy multi-feeding AC system, solving the problem of system safety and stability assessment , improves evaluation accuracy and security, and provides targeted optimization measures.

CN118920497APending Publication Date: 2024-11-08UNIV OF ELECTRONICS SCI & TECH OF CHINA
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410966893.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The identification of the weak links of the steady-state voltage of the multi-feeding AC system in new energy is lacking effective quantitative evaluation methods, which makes it difficult to assess the safety and stability of the system and poses a risk of disconnection.

Method used

By collecting the active power, impedance, short-circuit capacity and voltage data of new energy stations, combining voltage sensitivity constraints and power balance theory, the active power limit under steady-state voltage safety is calculated, and the grid connection points with unstable steady-state voltage are screened. And use the hierarchical analysis method to calculate MRSVE quantitative indicators and identify weak links.

Benefits of technology

A rapid quantitative evaluation of the weak links of the steady-state voltage of the multi-feeding AC system in new energy has been achieved, which improves the evaluation accuracy and the safety and stability of the system, provides targeted optimization measures for reactive power compensation, and reduces the risk of disconnection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920497A_ABST
    Figure CN118920497A_ABST
Patent Text Reader

Abstract

The invention discloses a steady-state voltage weak link identification method for a new energy multi-infeed alternating current system, which is used for identifying a weak link of the new energy multi-infeed system by using a steady-state voltage safety evaluation index MRSVE after a fault as an evaluation standard, and specifically comprises the following steps: firstly, collecting basic data of the new energy multi-infeed system; on the basis of voltage sensitivity constraint and a power balance theory, an error is corrected by combining a correction factor, and an active power limit of each grid-connected point under steady-state voltage safety is calculated; grid-connected point out-of-limit judgment is carried out on the basis of the power limit value, and grid-connected points with unstable steady-state voltage are screened out; and finally, an evaluation index MRSVE of each grid-connected point is calculated through an analytic hierarchy process in an empowerment manner, the grid-connected points lower than a threshold value are ignored, and the remaining grid-connected points are used as weak links of identification.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power systems, and more specifically, relates to a method for identifying weak links in steady-state voltage of a renewable energy multi-feed AC system. Background Art

[0002] With the development of power technology, the installed capacity of new energy has grown by leaps and bounds. In some local areas, the penetration rate of new energy has exceeded 50%, and the structure and operating characteristics of the power system have changed significantly.

[0003] Affected by the distribution characteristics of new energy resources, wind and solar power plants mostly adopt a new energy multi-feed strategy to integrate into the power grid, that is, multiple new energy sources are centrally fed in, and then collected by the collection station for long-distance transmission. This type of new energy multi-feed system has insufficient flexible adjustment capabilities, extremely low moment of inertia, low resistance to disturbances, and a large-scale risk of disconnection from the grid, which can easily trigger a chain reaction. This safety hazard of the new energy power system has brought new challenges to the safe and stable operation of the power grid.

[0004] The strength level of the new energy access AC system is evaluated using the new energy multi-station short-circuit ratio index (MRSCR) as the evaluation standard. The system with a quantitative value greater than 3.0 is evaluated as a strong system. For the system with MRSCR less than 3.0, it is necessary to conduct electromagnetic and electromechanical transient time domain simulation to further verify its safety and stability level. The grid structure of the new energy multi-feed system is weak, and most of them are weak systems with relatively low short circuits in multiple stations. Therefore, many new energy power plants need to adopt optimization strategies to improve MRSCR to meet the mandatory requirement of 3.0. However, the current quantitative system lacks effective means to quantitatively evaluate the safety and stability level of new energy power systems. Therefore, it is urgent to study the corresponding quantitative evaluation strategies for different representation forms of the safety and stability of new energy power systems.

[0005] For multi-feed renewable energy power systems that centrally feed in renewable energy and then transmit it over long distances, it is usually necessary to install reactive power compensation devices to improve support capabilities. After a power grid failure, dynamic reactive power compensation equipment may be disconnected from the grid due to weak ride-through capability, causing serious steady-state voltage safety issues. Summary of the invention

[0006] The purpose of the present invention is to overcome the deficiencies of the prior art and provide a method for identifying weak links in steady-state voltage of a renewable energy multi-infeed AC system, which can quickly and quantitatively evaluate weak links in steady-state voltage of a renewable energy multi-infeed AC system.

[0007] To achieve the above-mentioned purpose of the invention, the present invention provides a method for identifying weak links in steady-state voltage of a renewable energy multi-feed AC system, characterized in that it comprises the following steps:

[0008] (1) Initialization of the topology of the renewable energy multi-input AC system;

[0009] Assume that there are n new energy branches in the AC system topology, which are fed into the AC system through n grid connection points at the same time. After the n new energy branches are collected by the collection station, they are centrally transmitted to the AC system by the collection point O, where each new energy branch corresponds to a grid connection point.

[0010] (2) Data collection;

[0011] Collect the active power P input from each new energy station to the AC system i , the total active power collected at the collection point P o ; Collect the impedance x between each grid connection point i and the collection point O i , and the impedance x between the AC system and the collection point O o ; Collect the short-circuit capacity S at each grid connection point i ac,i And the short-circuit capacity S at the collection point O ac,o ; Collect the voltage U at the collection point O o ; Collect the potential of the AC system Collect the switching capacity Q and nominal voltage U of a single group of reactive compensation capacitors at the collection point O N ; Collect the short-circuit ratio MRSCR of new energy multi-station at each grid connection point i i ; Where i = 1, 2, ..., n;

[0012] (3) Calculate the output active power extremes at the collection point and each grid connection point;

[0013] (3.1) Calculate the theoretical maximum value of the active power output at the collection point

[0014] Set the voltage variation amplitude limit α that can be controlled in steady-state voltage operation;

[0015] According to the voltage sensitivity safety constraint, the extreme value of the active power at the collection point within the controllable range of steady-state voltage operation is calculated, that is: P o When the maximum value is taken, the following formula is established, P o The maximum value is

[0016]

[0017] (3.2) Calculate the theoretical maximum active power output of each renewable energy source at the grid connection point

[0018] (3.2.1) Calculate the impedance ratio k between any two grid connection points ij ;

[0019]

[0020] Among them, i,j∈[1,n], and i≠j;

[0021] (3.2.2) According to the active power balance theory, based on P j =k ij P i The power of each grid-connected point of renewable energy is balanced and distributed so that the voltage change amplitude of each grid-connected point is the same. The distribution principle is as follows: U i Represents the voltage at each grid-connected point i:

[0022]

[0023] (3.2.3) According to the steady-state voltage safety constraint of new energy low voltage ride-through, that is, the grid connection point voltage U after the fault i ≥0.9pu; therefore, when U i =0.9pu, the theoretical maximum active power output of each renewable energy source at the grid connection point is obtained.

[0024]

[0025] (3.3), calculate the correction coefficient δ by fixed-point iteration method;

[0026] Given the initial value of the correction coefficient δ;

[0027] The theoretical maximum active power of each grid-connected point Multiply by the correction factor δ:

[0028] by As the active power parameter of the new energy station at each grid connection point, the time domain simulation is carried out, and the value of δ is continuously corrected by the fixed-point iteration method until the simulation result is the voltage amplitude U of each grid connection point. i =0.9pu, then recorded as the correction coefficient δ at this time;

[0029] (3.4), Corrected theoretical maximum The error is calculated to calculate the output active power extreme value at the collection point and each grid connection point;

[0030] (3.4.1) Calculate the correction value;

[0031]

[0032] (3.4.2) Solve the extreme value of the active power output at the collection point under the following constraints, denoted as P O,M , the output active power extreme value at each grid connection point is recorded as P i,M ;

[0033]

[0034] (4) Calculate the quantitative index of steady-state voltage of each unstable grid-connected point;

[0035] (4.1) The output active power extreme value P at each grid connection point i,M Based on this, the steady-state voltage of each grid-connected point is judged to be over-limit. If the active power P at the grid-connected point is i Exceeding the maximum active power output value P i,M , then it is determined that there is a potential safety hazard of steady-state voltage at the grid connection point i, otherwise, it is determined to be normal;

[0036] Record all grid-connected points with potential safety hazards of steady-state voltage and store them in the set of unstable steady-state voltage points. Assume that there are a total of h grid-connected points.

[0037] (4.2) Add reactive devices at each grid-connected point i, and then simulate the AC system with multiple renewable energy feeds to obtain the renewable energy multi-station short-circuit ratio MRSCR′ after adding reactive devices at each grid-connected point i , i=1,2,…,h;

[0038] (4.3) Calculate the voltage amplitude variation M of each unstable grid connection point i ;

[0039]

[0040] Among them, i,j∈[1,h], and i≠j;

[0041] (4.4) Calculate the weighted station short-circuit ratio change η of each unstable grid connection point i ;

[0042]

[0043] Among them, ΔS i It indicates the apparent power added at the grid connection point i after the reactive power compensation device is adopted;

[0044] (4.4) and the voltage amplitude change M i and weighted station short-circuit ratio change S i Normalize them respectively and change the voltage amplitude M i The normalized result is recorded as the voltage amplitude influence factor V i , the weighted station short-circuit ratio change S i The normalized result is recorded as the short circuit ratio sensitivity factor R i ;

[0045] (4.5) Calculate the steady-state voltage quantitative index MRSVE of each unstable grid-connected point;

[0046]

[0047] Among them, w 1 V i The corresponding weight, w 2 For R i The corresponding weighted weights;

[0048] (5) Identify the weak links of steady-state voltage in AC systems with multiple feeds of renewable energy;

[0049] Ignore MRSVE i Below max(MRSVE i ) / 5 of the grid connection points, and the remaining grid connection points are regarded as the weak links of the new energy multi-feed AC system.

[0050] The object of the invention of the present invention is achieved in this way:

[0051] The invention discloses a method for identifying weak links of steady-state voltage of a new energy multi-feed AC system. The method uses a steady-state voltage safety evaluation index MRSVE after a fault as an evaluation standard to identify weak links of the new energy multi-feed system. Specifically, basic data of the new energy multi-feed system is firstly collected. Then, based on voltage sensitivity constraint and power balance theory, the error is corrected in combination with a correction factor to calculate the active power limit of each grid-connected point under steady-state voltage safety. Then, the grid-connected point over-limit judgment is performed based on the power limit value, and the grid-connected points with unstable steady-state voltage are screened out. Finally, the evaluation index MRSVE of each grid-connected point is weighted and calculated by an analytic hierarchy process, and the grid-connected points below the threshold are ignored, and the remaining grid-connected points are used as the identified weak links.

[0052] At the same time, the method for identifying weak links in steady-state voltage of a renewable energy multi-feed AC system of the present invention also has the following beneficial effects:

[0053] (1) The quantitative index MRSVE of the present invention not only considers the direct influencing factors of the steady-state voltage amplitude, but also fully accounts for the mutual influence between the feeding branches. Compared with the traditional method of directly measuring the safety and stability of the steady-state voltage with MRSCR, it has higher accuracy and can better quantitatively evaluate the safety and stability of the node steady-state voltage.

[0054] (2) The weak link identification method adopted by the present invention only needs to collect part of the data of the renewable energy multi-feed AC system, and then systematic calculation and analysis can draw conclusions. It is simple and fast, easy to operate and the calculation is not complicated. It can also be applied to complex renewable energy multi-feed AC systems with many nodes, and has engineering practice value.

[0055] (3) The MRSVE quantitative index of the grid connection point in the calculation result of the present invention has guiding significance for the system to take reactive power optimization measures. Reactive power compensation is taken in the weak links with high MRSVE in a targeted manner, which can achieve economic optimization and effect optimization of the optimization measures. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] Figure 1 It is a flow chart of a method for identifying weak links in steady-state voltage of a new energy multi-feed AC system of the present invention;

[0057] Figure 2 It is the topology diagram of the renewable energy multi-input AC system. DETAILED DESCRIPTION

[0058] The specific implementation of the present invention is described below in conjunction with the accompanying drawings so that those skilled in the art can better understand the present invention. It should be noted that in the following description, when the detailed description of known functions and designs may dilute the main content of the present invention, these descriptions will be omitted here.

[0059] Example

[0060] Figure 1 It is a flow chart of a method for identifying weak links in steady-state voltage of a new energy multi-feed AC system of the present invention.

[0061] In this embodiment, if Figure 1 As shown, the present invention provides a method for identifying weak links in steady-state voltage of a renewable energy multi-feed AC system, comprising the following steps:

[0062] S1, new energy multi-feed AC system topology initialization;

[0063] like Figure 2 As shown, suppose there are n new energy branches in the AC system topology that are fed into the AC system through n grid connection points at the same time. After the n new energy branches are collected by the collection station, they are centrally transmitted to the AC system by the collection point O, where each new energy branch corresponds to a grid connection point;

[0064] In this embodiment, Figure 2 The three-feed model of the renewable energy multi-feed system shown in the figure is simulated and verified. The system has three photovoltaic stations, each of which is connected to a 30Mvar phase regulator at an unstable grid-connected point for reactive power compensation.

[0065] S2, data collection;

[0066] Collect the active power P input from each new energy station to the AC system i , the total active power collected at the collection point P o ; Collect the impedance x between each grid connection point i and the collection point O i, and the impedance x between the AC system and the collection point O o ; Collect the short-circuit capacity S at each grid connection point i ac,i And the short-circuit capacity S at the collection point O ac,o ; Collect the voltage U at the collection point O o ; Collect the potential of the AC system Collect the switching capacity Q and nominal voltage U of a single group of reactive compensation capacitors at the collection point O N ; Collect the short-circuit ratio MRSCR of new energy multi-station at each grid connection point i i ; Where i = 1, 2, ..., n;

[0067] In this embodiment, the base capacity is 100MW, U o , E, U N The per-unit values ​​are all 1; the per-unit value of Q is 0.462; S ac,o The per unit value is 1.176, x o =0.0505; P o The per unit value is 3.7; the relevant data at the grid connection point are shown in Table 1:

[0068]

[0069] Table 1

[0070] S3, calculating the output active power extreme value at the collection point and each grid connection point;

[0071] S3.1. Calculate the theoretical maximum value of the active power output at the collection point

[0072] A controllable voltage variation amplitude limit α is set for steady-state voltage operation; in this embodiment, α=2.5%.

[0073] According to the voltage sensitivity safety constraint, the extreme value of the active power at the collection point within the controllable range of steady-state voltage operation is calculated, that is: P o When the maximum value is taken, the following formula is established, P o The maximum value is

[0074]

[0075] In power grid dispatching, it is necessary not only to prevent the system grid-connected operation point from reaching the steady-state voltage stability limit, but also to control the active power scale to ensure that the voltage sensitivity is within a controllable range. Otherwise, if the system active power exceeds a certain limit, the voltage sensitivity amplitude is too large, and a slight change in the operation point will cause the system steady-state voltage to collapse. It is generally required that the bus voltage change caused by the switching of the largest single group of reactive devices in the system does not exceed α = 2.5%, that is, the voltage change amplitude limit α = 2.5% that can be controlled in steady-state voltage operation is generally controlled.

[0076] In this embodiment, combined with Table 1, it can be calculated The per unit value of is 4.15;

[0077] S3.2. Calculate the theoretical maximum active power output of each renewable energy source at the grid connection point

[0078] S3.2.1. Calculate the impedance ratio k between any two grid connection points ij ;

[0079]

[0080] Among them, i,j∈[1,n], and i≠j;

[0081] S3.2.2, According to the active power balance theory, based on P j =k ij P i The power of each grid connection point of new energy is balanced and distributed so that the voltage change range of each grid connection point is the same, so that there will be no prominent problem of steady-state voltage safety caused by the excessive scale of a certain grid connection point. The distribution principles are as follows:

[0082]

[0083] S3.2.3, according to the steady-state voltage safety constraints of new energy low voltage ride-through, that is, the grid connection point voltage U after the fault i ≥0.9pu; therefore, when U i =0.9pu, the theoretical maximum active power output of each renewable energy source at the grid connection point is obtained.

[0084]

[0085] In this embodiment, The calculation results of per unit value are shown in Table 2;

[0086]

[0087] Table 2

[0088] S3.3, calculating the correction coefficient δ by fixed-point iteration method;

[0089] Given the initial value of the correction coefficient δ;

[0090] The theoretical maximum active power of each grid-connected point Multiply by the correction factor δ:

[0091] by As the active power parameter of the new energy station at each grid connection point, the time domain simulation is carried out, and the value of δ is continuously corrected by the fixed-point iteration method until the simulation result is the voltage amplitude U of each grid connection point. i =0.9pu, then recorded as the correction coefficient δ at this time;

[0092] S3.4. Correction of the theoretical maximum value The error is calculated to calculate the output active power extreme value at the collection point and each grid connection point;

[0093] S3.4.1. Taking into account the influence of transformer characteristics, line resistance, reactive power of generator sets and other factors, the actual maximum limit of active power scale at the grid operation point still deviates from the theoretical maximum scale and needs to be corrected. The correction value is;

[0094]

[0095] S3.4.2. Find the maximum active power output at the collection point under the following constraints, denoted as P O,M , the output active power extreme value at each grid connection point is recorded as P i,M ;

[0096]

[0097] In this embodiment, δ is set to 1.02, P i,M The calculation results of per unit value are shown in Table 3;

[0098] <![CDATA[P 1,M ]]> <![CDATA[P 2,M ]]> <![CDATA[P 3,M ]]> 0.876 1.281 1.381

[0099] Table 3

[0100] S4. Calculate the steady-state voltage quantitative index of each unstable grid connection point;

[0101] S4.1, the output active power extreme value P at each grid connection point i,M Based on this, the steady-state voltage of each grid-connected point is judged to be over-limit. If the active power P at the grid-connected point is i Exceeding the maximum active power output value P i,M , then it is determined that there is a potential safety hazard of steady-state voltage at the grid connection point i, otherwise, it is determined to be normal;

[0102] All grid connection points with potential safety hazards of steady-state voltage are recorded and stored in a set of unstable steady-state voltage points. Assume that there are a total of h grid connection points. In this embodiment, the unstable steady-state voltage points are grid connection points 1 and grid connection points 2.

[0103] S4.2. Add reactive devices at each grid-connected point i, and then simulate the AC system with multiple renewable energy feeds to obtain the renewable energy multi-station short-circuit ratio MRSCR′ after adding reactive devices at each grid-connected point i, i=1,2,…,h;

[0104] S4.3. Calculate the voltage amplitude variation M of each unstable grid connection point i ; Stable point M i Recorded as 0:

[0105]

[0106] Among them, i,j∈[1,h], and i≠j;

[0107] S4.4. Calculate the weighted station short-circuit ratio change η of the grid connection point i ;

[0108]

[0109] Among them, ΔS i It indicates the apparent power added at the grid connection point i after the reactive power compensation device is adopted;

[0110] S4.4, voltage amplitude change range M i and weighted station short-circuit ratio change S i Normalize them respectively and change the voltage amplitude M i The normalized result is recorded as the voltage amplitude influence factor V i , the weighted station short-circuit ratio change S i The normalized result is recorded as the short circuit ratio sensitivity factor R i ;

[0111] S4.5, calculate the steady-state voltage quantitative index MRSVE of each unstable grid connection point;

[0112]

[0113] Among them, w 1 V i The corresponding weight, w 2 For R i The corresponding weighted weights;

[0114] The quantitative indicators and related parameters of the grid connection points are shown in Table 4:

[0115] Grid connection point <![CDATA[M i ]]> <![CDATA[η i ]]> <![CDATA[V i ]]> <![CDATA[R i ]]> <![CDATA[MRSVE i ]]> 1 0.581 5.337 1 1 1 2 0.173 5.299 0.298 0.962 0.696 3 0 4.330 0 0 0

[0116] Table 4

[0117] S5. Identify the weak links of steady-state voltage in AC systems with multiple feeds of renewable energy;

[0118] Ignore MRSVEi below max(MRSVE i) / 5 of the grid connection points, and the remaining grid connection points are regarded as the weak links of the new energy multi-feed AC system.

[0119] In this embodiment, both the grid connection point 1 and the grid connection point 2 are weak links, and MRSVE 1 >MRSVE 2 .

[0120] Although the above describes the illustrative specific embodiments of the present invention to facilitate those skilled in the art to understand the present invention, it should be clear that the present invention is not limited to the scope of the specific embodiments. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations using the concept of the present invention are protected.

Claims

1. A method for identifying weak links in steady-state voltage of a renewable energy multi-feed AC system, characterized in that: The following steps are involved: (1) Initialization of the topology of the renewable energy multi-input AC system; Assume that there are n new energy branches in the AC system topology, which are fed into the AC system through n grid connection points at the same time. After the n new energy branches are collected by the collection station, they are centrally transmitted to the AC system by the collection point O, where each new energy branch corresponds to a grid connection point. (2) Data collection; Collect the active power P input from each new energy station to the AC system i , the total active power collected at the collection point P o ; Collect the impedance x between each grid connection point i and the collection point O i , and the impedance x between the AC system and the collection point O o ; Collect the short-circuit capacity S at each grid connection point i ac,i And the short-circuit capacity S at the collection point O ac,o ; Collect the voltage U at the collection point O o ; Collect the potential of the AC system Collect the switching capacity Q and nominal voltage U of a single group of reactive compensation capacitors at the collection point O N ; Collect the short-circuit ratio MRSCR of new energy multi-station at each grid connection point i i ; Where i = 1, 2, ..., n; (3) Calculate the output active power extremes at the collection point and each grid connection point; (3.1) Calculate the theoretical maximum value of the active power output at the collection point Set the voltage variation amplitude limit α that can be controlled in steady-state voltage operation; According to the voltage sensitivity safety constraint, the extreme value of the active power at the collection point within the controllable range of steady-state voltage operation is calculated, that is: P o When the maximum value is taken, the following formula is established, P o The maximum value is (3.2) Calculate the theoretical maximum active power output of each renewable energy source at the grid connection point (3.2.1) Calculate the impedance ratio k between any two grid connection points ij ; Among them, i,j∈[1,n], and i≠j; (3.2.2) According to the active power balance theory, based on P j =k ij P i The power of each grid-connected point of new energy is balanced and distributed so that the voltage change range of each grid-connected point is the same. The distribution principles are as follows: (3.2.3) According to the steady-state voltage safety constraint of new energy low voltage ride-through, that is, the grid connection point voltage U after the fault i ≥0.9pu; therefore, when U i =0.9pu, the theoretical maximum active power output of each renewable energy source at the grid connection point is obtained. (3.3), calculate the correction coefficient δ by fixed-point iteration method; Given the initial value of the correction coefficient δ; The theoretical maximum active power of each grid-connected point Multiply by the correction factor δ: by As the active power parameter of the new energy station at each grid connection point, the time domain simulation is carried out, and the value of δ is continuously corrected by the fixed-point iteration method until the simulation result is the voltage amplitude U of each grid connection point. i =0.9pu, then record it as the correction coefficient δ; (3.4), Corrected theoretical maximum The error is calculated to calculate the output active power extreme value at the collection point and each grid connection point; (3.4.1) Calculate the correction value; (3.4.2) Solve the extreme value of the active power output at the collection point under the following constraints, denoted as P O,M , the output active power extreme value at each grid connection point is recorded as P i,M ; (4) Calculate the quantitative index of steady-state voltage of each unstable grid-connected point; (4.1) The output active power extreme value P at each grid connection point i,M Based on this, the steady-state voltage of each grid-connected point is judged to be over-limit. If the active power P at the grid-connected point is i Exceeding the maximum active output value P i,M , then it is determined that there is a potential safety hazard of steady-state voltage at the grid connection point i, otherwise, it is determined to be normal; Record all grid-connected points with potential safety hazards of steady-state voltage and store them in the set of unstable steady-state voltage points. Assume that there are a total of h grid-connected points. (4.2) Add reactive devices at each grid-connected point i, and then simulate the AC system with multiple renewable energy feeds to obtain the renewable energy multi-station short-circuit ratio MRSCR′ after adding reactive devices at each grid-connected point i , i=1,2,…,h; (4.3) Calculate the voltage amplitude variation M of each unstable grid connection point i ; Among them, i,j∈[1,h], and i≠j; (4.4) Calculate the weighted station short-circuit ratio change η of each unstable grid connection point i ; Among them, ΔS i It indicates the apparent power added at the grid connection point i after the reactive power compensation device is adopted; (4.4) and the voltage amplitude change M i and weighted station short-circuit ratio change S i Normalize them respectively and change the voltage amplitude M i The normalized result is recorded as the voltage amplitude influence factor V i , the weighted station short-circuit ratio change S i The normalized result is recorded as the short circuit ratio sensitivity factor R i ; (4.5) Calculate the steady-state voltage quantitative index MRSVE of each unstable grid-connected point; Where w1 is V i The corresponding weighted weight, w2 is R i The corresponding weighted weights; (5) Identify the weak links of steady-state voltage in AC systems with multiple feeds of renewable energy; Ignore MRSVE i Below max(MRSVE i ) / 5 of the grid connection points, and the remaining grid connection points are regarded as the weak links of the new energy multi-feed AC system.

Citation Information

Cited By

  • Method and device for evaluating voltage supporting capability of high-proportion new energy system

    CN119813241A