Method, device and equipment for drawing up direct-current power transmission curve of water-light storage clean energy

By analyzing and adjusting the power supply information, power grid information and power consumption information of the hydropower station, generating a DC power transmission curve for the coordinated delivery end and the receiving end, the problem of coordination difficulty in the existing technology is solved and accurate power supply.

CN118920555APending Publication Date: 2024-11-08GUO JIA DIAN WANG YOU XIAN GONG SI XI NAN FEN BU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410446896.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-04-15
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

How to accurately formulate the DC power transmission curve of clean energy in water and photoelectric storage, coordinate the requirements of the sending end and the receiving end, and solve the problem of difficult coordination in the existing technology.

Method used

By analyzing the production time of the delivery hydropower station at the sending end, determining the planning research level year, analyzing local power supply information, power grid information and power consumption information, determining the initial DC transmission information, obtaining constraints, adjusting the object until the constraints are met, and generating water and light storage Clean energy DC power transmission curve.

Benefits of technology

It realizes an accurate water photo storage clean energy DC power transmission curve that coordinates the requirements of the sending end and the receiving end, meets the requirements of all sending ends and receiving ends, and improves the reliability and efficiency of power supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920555A_ABST
    Figure CN118920555A_ABST
Patent Text Reader

Abstract

The invention discloses a method, a device and equipment for drawing up a direct-current power transmission curve of water-light storage clean energy, relates to the field of power grid planning and design, and can solve the technical problem of how to accurately draw up the direct-current power transmission curve of the water-light storage clean energy. The method comprises the following steps: determining a planning research level year, according to the local power supply information, the power grid information and the local power utilization information, determining the water and electricity delivery information of a delivery end delivery hydropower station, the photoelectric delivery information of all delivery end local photovoltaic power stations and the delivery information of delivery end local photovoltaic energy storage of delivery end local photovoltaic energy storage, and obtaining the initial direct current delivery information of the water and light storage clean energy, the local power supply information comprises a transmitting-end local photovoltaic power station and transmitting-end local photovoltaic energy storage; and calculating whether a constraint condition is met or not according to the initial direct current delivery information, if not, adjusting the adjustment object until the constraint condition is met, obtaining updated direct current delivery information, and generating a water-light storage clean energy direct current power transmission curve.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power grid planning and design, and in particular to a method, device and equipment for formulating a direct current power transmission curve for clean energy from water, photovoltaic and storage. Background Art

[0002] For the sending-end hydropower station group, it is not only necessary to supply local electricity demand, but also to transmit it over long distances to the receiving-end load center through high-voltage DC lines.

[0003] However, how to coordinate the requirements of the sending and receiving ends and accurately formulate the DC transmission curve of clean energy from hydropower, photovoltaic and storage has become a technical problem that needs to be solved urgently. Summary of the invention

[0004] In view of this, the present invention provides a method, device and equipment for formulating a DC power transmission curve for clean energy from water, photovoltaic and storage, which can solve the technical problem of how to accurately formulate a DC power transmission curve for clean energy from water, photovoltaic and storage.

[0005] According to a first aspect of the present invention, a method for drawing up a direct current transmission curve of clean energy from water, photovoltaic and storage is provided, the method comprising:

[0006] Determine the planning research level year according to the commissioning time of the sending-end external transmission hydropower station, and analyze the local power source information, power grid information and local electricity consumption information of the target research province where the sending-end external transmission hydropower station is located in the planning research level year;

[0007] According to the local power supply information, the power grid information and the local power consumption information, the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all the sending-end local photovoltaic power stations and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage are determined, and the initial DC transmission information of the hydro-photovoltaic storage clean energy of all the target research provinces is obtained, wherein the local power supply information includes the sending-end local photovoltaic power station and the sending-end local photovoltaic energy storage;

[0008] Obtain constraint conditions, calculate whether the constraint conditions are met based on the initial DC transmission information, and if not, determine an adjustment object, adjust the adjustment object until the constraint conditions are met, obtain updated DC transmission information, and generate a hydro-solar-storage clean energy DC transmission curve based on the updated DC transmission information.

[0009] Preferably, the analysis, in the planning research year, of the local power source information, power grid information and local power consumption information of the target research province where the sending-end external transmission hydropower station is located, includes:

[0010] Determine the local power information corresponding to the target research province in the planned research year according to the current power structure of each target research province and the power development plan in the planned research year;

[0011] According to the current status of the power grid of each target research province and the power grid development plan in the planned research level year, determine the power grid information corresponding to the target research province in the planned research level year;

[0012] Based on the current status of total social electricity consumption in each of the target research provinces and the forecast of electricity demand in the planned research year, the local electricity consumption information corresponding to the target research province in the planned research year is determined.

[0013] Preferably, the determining, according to the local power source information, the power grid information and the local power consumption information, the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage includes:

[0014] Determine the local high-water season power and electricity participation balancing strategy corresponding to the high-water season and the local low-water season power and electricity participation balancing strategy corresponding to the low-water season;

[0015] Perform local flood season power balance calculation based on the local power supply information, the local power consumption information and the local flood season power and electricity participation balancing strategy to obtain the flood season power and electricity profit and loss of each of the target research provinces; perform local dry season power and electricity balance calculation based on the local power supply information, the local power consumption information and the local dry season power and electricity participation balancing strategy to obtain the dry season power and electricity profit and loss of each of the target research provinces;

[0016] Determine a local power supply guarantee plan based on the power supply profit or loss during the flood season and the power supply profit or loss during the dry season;

[0017] According to the local power supply guarantee plan, the maximum load of the transmission channel and the preset power abandonment rate, the hydropower transmission information of the sending-end hydropower station, the photovoltaic transmission information of all local photovoltaic power stations at the sending end and the local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage are determined.

[0018] Preferably, the local electric power guarantee plan includes a mapping ratio interval relationship between the retention information and the electric power profit and loss in the flood season and the electric power profit and loss in the dry season, wherein the retention information includes: the hydropower retention information in the flood season and the hydropower retention information in the dry season of the sending-end transmission hydropower station, the photovoltaic retention information of each of the sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage retention information of each of the sending-end local photovoltaic energy storage.

[0019] Preferably, the determining of the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage according to the local power supply guarantee plan, the maximum load of the transmission channel, and the preset power abandonment rate includes:

[0020] According to the local power guarantee plan, the power surplus and deficit in the flood season and the power surplus and deficit in the dry season are adjusted, and it is determined whether the adjusted outbound information meets the maximum load requirement of the outbound channel and the preset power abandonment rate requirement;

[0021] If not, continue adjusting until it is satisfied, and obtain the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage from the adjusted transmission information.

[0022] Preferably, the constraint conditions include whether the water energy utilization rate at the sending end is greater than a first threshold, whether the DC channel utilization hours are greater than a second threshold, and whether the thermal power utilization hours at the receiving end are greater than a third threshold and less than a fourth threshold, the fourth threshold is greater than the third threshold, and whether the new energy utilization rate at the sending end is greater than or equal to a fifth threshold;

[0023] The obtaining of the constraint condition, calculating whether the constraint condition is satisfied according to the initial DC transmission information, and if not, determining an adjustment object, adjusting the adjustment object until the constraint condition is satisfied, and obtaining updated DC transmission information, includes:

[0024] Calculate the water energy utilization rate at the sending end, the new energy utilization rate at the sending end, and the utilization hours of the DC channel according to the initial DC transmission information, and calculate the thermal power utilization hours at the receiving end;

[0025] Determine whether the water energy utilization rate at the sending end is greater than the first threshold value and whether the thermal power utilization hours at the receiving end is greater than the third threshold value. If at least one of the above conditions is not satisfied, determine that the photovoltaic configuration capacity and the hydropower configuration capacity with a priority order are the adjustment objects, and adjust the photovoltaic configuration capacity and the hydropower configuration capacity based on the priority order.

[0026] Determine whether the DC channel utilization hours are greater than the second threshold and whether the receiving-end thermal power utilization hours are less than the fourth threshold. If at least one of the conditions is not satisfied, determine that the adjustment object is the photovoltaic configuration capacity, and increase the photovoltaic configuration capacity until the DC channel utilization hours are greater than the second threshold and the receiving-end thermal power utilization hours are less than the fourth threshold.

[0027] Determine whether the new energy utilization rate at the sending end is greater than or equal to the fifth threshold value. If the new energy utilization rate at the sending end is less than the fifth threshold value, determine whether the new energy utilization rate is greater than the energy storage configuration adjustment threshold value. If so, determine that the adjustment object is the photovoltaic energy storage configuration ratio, and increase the photovoltaic energy storage configuration ratio. If not, determine that the adjustment object is the photovoltaic configuration capacity and the hydropower configuration capacity with a priority order, and adjust the photovoltaic configuration capacity and the hydropower configuration capacity based on the priority order.

[0028] Until all the constraints are met, the updated DC transmission information is obtained.

[0029] Preferably, the adjusting the photovoltaic configuration capacity and the hydropower configuration capacity based on the priority order includes:

[0030] If the priority order is that the photovoltaic configuration capacity is higher than the hydropower configuration capacity, then

[0031] If the water energy utilization rate at the sending end is less than or equal to the first threshold, the photovoltaic configuration capacity is reduced until the photovoltaic minimum configuration value is reached; if the water energy utilization rate at the sending end is still less than or equal to the first threshold, the hydropower configuration capacity is reduced until the water energy utilization rate at the sending end is greater than the first threshold;

[0032] If the utilization hours of the thermal power at the receiving end is less than or equal to the third threshold, the photovoltaic configuration capacity is reduced until the photovoltaic minimum configuration value is reached. If the utilization hours of the thermal power at the receiving end is still less than or equal to the third threshold, the hydropower configuration capacity is reduced until the utilization hours of the thermal power at the receiving end is greater than the third threshold.

[0033] According to a second aspect of the present invention, a device for drawing up a direct current transmission curve for clean energy from water, photovoltaic and storage is provided, the device comprising:

[0034] An analysis module is used to determine a planned research level year according to the commissioning time of the sending-end external transmission hydropower station, and analyze the local power supply information, power grid information and local electricity consumption information of the target research province where the sending-end external transmission hydropower station is located in the planned research level year;

[0035] A determination module is used to determine the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage according to the local power supply information, the power grid information, and the local electricity consumption information, and obtain the initial DC transmission information of the hydropower storage clean energy of all the target research provinces, wherein the local power supply information includes the sending-end local photovoltaic power station and the sending-end local photovoltaic energy storage;

[0036] A generation module is used to obtain constraint conditions, calculate whether the constraint conditions are met based on the initial DC transmission information, and if not, determine an adjustment object, adjust the adjustment object until the constraint conditions are met, obtain updated DC transmission information, and generate a hydro-photovoltaic storage clean energy DC transmission curve based on the updated DC transmission information.

[0037] According to the third aspect of the present application, a storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned method for formulating a direct current transmission curve for clean energy from water, photovoltaic and energy storage is implemented.

[0038] According to the fourth aspect of the present application, a computer device is provided, including a storage medium, a processor, and a computer program stored on the storage medium and executable on the processor, wherein the processor implements the above-mentioned method for formulating a direct current transmission curve for clean energy from water, photovoltaic and energy storage when executing the program.

[0039] By means of the above technical scheme, the present invention provides a method, device and equipment for formulating a direct current transmission curve of clean energy from water, photovoltaic and storage. The present invention can first determine the planned research level year according to the commissioning time of the sending-end transmission hydropower station, and analyze the local power supply information, power grid information and local electricity consumption information of the target research province where the sending-end transmission hydropower station is located in the planned research level year; then determine the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all local photovoltaic power stations at the sending end, and the sending-end local photovoltaic energy storage transmission information of the local photovoltaic energy storage at the sending end according to the local power supply information, the power grid information and the local electricity consumption information, and obtain the initial direct current transmission information of the clean energy from water, photovoltaic and storage in all the target research provinces, wherein the local power supply information includes the local photovoltaic power station at the sending end and the local photovoltaic energy storage at the sending end; finally, obtain the constraint condition, calculate whether the constraint condition is met according to the initial direct current transmission information, if not, determine the adjustment object, adjust the adjustment object until the constraint condition is met, obtain the updated direct current transmission information, and generate the direct current transmission curve of the clean energy from water, photovoltaic and storage according to the updated direct current transmission information. Through the technical solution of the present invention, the initial DC transmission information of the hydro-photovoltaic storage clean energy that meets some sending-end requirements is first determined, and then it is judged whether the constraints under the initial DC transmission information (including all other sending-end requirements and all receiving-end requirements) are met. If not, the adjustment object is determined and adjusted until the constraints are met (that is, all other sending-end requirements and all receiving-end requirements are met), thereby meeting all sending-end requirements and all receiving-end requirements. Accordingly, the initial DC transmission information is updated to the updated DC transmission information that coordinates the sending-end and receiving-end requirements, thereby obtaining an accurate DC transmission curve of the hydro-photovoltaic storage clean energy that coordinates the sending-end and receiving-end requirements.

[0040] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the local application. In the drawings:

[0042] Figure 1 A schematic flow chart of a method for drafting a direct current power transmission curve for clean energy from water, photovoltaic and storage provided by an embodiment of the present invention is shown;

[0043] Figure 2 A schematic flow chart of another method for drafting a direct current power transmission curve for clean energy from water, photovoltaic and storage provided by an embodiment of the present invention is shown;

[0044] Figure 3 A schematic structural diagram of a device for drawing up a direct current power transmission curve for clean energy from water, photovoltaic and storage provided by an embodiment of the present invention is shown;

[0045] Figure 4 A schematic structural diagram of another device for drawing up a direct current power transmission curve for clean energy from water, photovoltaic and energy storage provided by an embodiment of the present invention is shown;

[0046] Figure 5 An example diagram of a process for drafting a DC power transmission curve for clean energy using hydropower, photovoltaic and energy storage provided by an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0047] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.

[0048] This embodiment provides a method for drawing up a direct current transmission curve for clean energy from water, photovoltaic and storage, such as Figure 1 As shown, the method includes:

[0049] 101. Determine the planning research level year according to the commissioning time of the sending-end external transmission hydropower station, and analyze the local power supply information, power grid information and local electricity consumption information of the target research province where the sending-end external transmission hydropower station is located in the planning research level year.

[0050] Among them, the sending-end transmission hydropower station refers to the hydropower generated by it is mainly used for transmission, and multiple planning research levels can be determined according to the commissioning time of the sending-end transmission hydropower station. The implementation steps 101-103 are the corresponding methods for formulating the water-solar-storage clean energy DC transmission curve in each planning research level year.

[0051] The reason why the hydropower generated by the sending-end transmission hydropower station is mainly used for transmission instead of all for transmission is that one of the functions of the sending-end transmission hydropower station is that when the result of the local power profit and loss calculation is negative, a part of the hydropower generated by the sending-end transmission hydropower station can be retained to ensure local electricity demand. Therefore, it is necessary to determine the target study province where the sending-end transmission hydropower station is located (the target study province where the sending-end transmission hydropower station is located is the local area). After the local power profit and loss calculation is performed for each target study province, it can be determined how much hydropower the sending-end transmission hydropower station retains in each target study province, and then how much hydropower is retained in all target study provinces, so as to determine how much hydropower is transmitted. It should be noted that there is at least one target study province. For example, if there is a sending-end transmission hydropower station that belongs to a boundary river hydropower station, it generally spans two provinces, and these two provinces are the target study provinces.

[0052] For this embodiment, as an implementation method, the local power supply information, power grid information and local electricity consumption information of the target research province where the sending-end transmission hydropower station is located in the planned research level year are analyzed. Specifically, the local power supply information, power grid information and local electricity consumption information in the planned research level year can be determined through the current status information and planning information of the target research province on the source, network and load.

[0053] 102. Determine the hydropower transmission information of the sending-end hydropower station, the photovoltaic transmission information of all local photovoltaic power stations, and the sending-end local photovoltaic energy storage transmission information of the local photovoltaic energy storage according to the local power supply information, the power grid information, and the local electricity consumption information, and obtain the initial DC transmission information of the hydropower, photovoltaic and energy storage clean energy of all the target research provinces, wherein the local power supply information includes the local photovoltaic power station at the sending end and the local photovoltaic energy storage at the sending end.

[0054] Among them, the local power supply information includes local hydropower stations, local photovoltaic power stations at the sending end, local thermal power stations, local wind power stations, etc., wherein, in the embodiment steps 102 and 103, the local hydropower station, local thermal power station and local wind power station are only used for local electricity demand, and the local power supply information also includes the local photovoltaic energy storage at the sending end, and the excess part generated by photovoltaics is stored in the local photovoltaic energy storage at the sending end for use during peak electricity consumption. Therefore, part of the local photovoltaic energy storage at the sending end is used for local electricity demand, and the other part is used for external transmission, while the local photovoltaic power station at the sending end is partly used for local electricity demand and partly for external transmission, and the sending end external transmission hydropower station is mainly used for external transmission, and a water-photovoltaic storage clean energy DC transmission curve is formulated. It should be noted that due to the requirement of the reserve rate, the use of power for local electricity demand does not mean that it participates in the local electricity profit and loss calculation. Generally, a preset proportion of local electricity demand is reserved, and the rest participates in the local electricity profit and loss calculation. In dry years, local hydropower stations and renewable energy output (such as local wind power stations, local photovoltaic power stations at the sending end, and local photovoltaic energy storage at the sending end) are used for local electricity profit and loss balance calculation, and local hydropower stations in normal years are used for local electricity profit and loss calculation.

[0055] For this embodiment, the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage are determined according to the local power supply information, the power grid information, and the local electricity consumption information, including:

[0056] The information on local power supply information and the preset proportion of reserve power in each target research province is used to determine the information on local power profit and loss. Then, the local power profit and loss (including power profit and loss and power profit and loss at each power profit and loss calculation moment) can be calculated based on the local electricity consumption information of each target research province. When the local power profit and loss is within a preset range, for example, it is negative, the retention is increased (there are three ways to increase the retention: a hydropower station at the sending end, a local photovoltaic power station at the sending end, and a local photovoltaic energy storage at the sending end) to ensure local electricity demand. When the local power profit and loss is within another preset range, for example, it is positive, the retention is reduced (there are three ways to reduce the retention: a hydropower station at the sending end, a local photovoltaic power station at the sending end, and a local photovoltaic energy storage at the sending end). On the basis of being less than or equal to the maximum load of the sending channel (the maximum load of the sending channel is obtained through the power grid information), the retention is reduced. Power abandonment, thereby obtaining the transmission information that guarantees local electricity demand and meets the requirements of the maximum load and power abandonment rate of the transmission channel. This transmission information includes the initial DC transmission power of hydropower, photovoltaic and storage clean energy and the initial DC transmission power of hydropower, photovoltaic and storage clean energy at each power profit and loss calculation moment. It should be noted that the transmission includes the hydropower transmission information of the sending-end transmission hydropower station (the hydropower transmission information includes the hydropower transmission power and the hydropower transmission power at each power profit and loss calculation moment), the photovoltaic transmission information of the local photovoltaic power station at the sending end (the photovoltaic transmission information includes the photovoltaic transmission power and the photovoltaic transmission power at each power profit and loss calculation moment), and the local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage (the local photovoltaic energy storage transmission information at the sending end includes the local photovoltaic energy storage transmission power and the local photovoltaic energy storage transmission power at the sending end at each power profit and loss calculation moment).

[0057] It should be noted that the requirements on the sending end include: 1. meeting local electricity demand; 2. the initial DC transmission power of the clean energy of water, light and storage must be less than or equal to the maximum load of the transmission channel; 3. meeting the requirements of power abandonment rate. The initial DC transmission information of the clean energy of water, light and storage obtained in step 102 of the embodiment is obtained after meeting the requirements 1, 2 and 3 on the sending end.

[0058] 103. Obtain constraint conditions, calculate whether the constraint conditions are met based on the initial DC transmission information, and if not, determine an adjustment object, adjust the adjustment object until the constraint conditions are met, obtain updated DC transmission information, and generate a hydro-solar-storage clean energy DC transmission curve based on the updated DC transmission information.

[0059] It should be noted that step 102 of the embodiment only meets part of the sending end requirements, so the initial DC transmission information obtained may not meet the constraint conditions (the constraint conditions include the remaining sending end requirements and the receiving end requirements), wherein the receiving end requirements include the energy utilization rate specified by the receiving end policy planning, etc. Therefore, step 103 of the embodiment discloses that it is also necessary to calculate whether the constraint conditions are met under the initial DC transmission information. If not, an adjustment object is determined and the adjustment object is adjusted until it is met. At this time, the initial DC transmission information is updated to obtain updated DC transmission information, and the updated DC transmission information can be used as a power transmission plan.

[0060] Among them, the updated DC transmission information includes the updated DC transmission power at each power profit and loss calculation moment. With the updated DC transmission power as the vertical coordinate and the power profit and loss calculation moment as the horizontal coordinate, the hydro-solar-storage clean energy DC transmission curve can be generated.

[0061] The present invention provides a method, device and equipment for formulating a DC transmission curve for clean energy from water, photovoltaic and storage. Through the technical solution of the present invention, the initial DC transmission information of the clean energy from water, photovoltaic and storage that meets some sending end requirements is first determined, and then it is judged whether the constraints under the initial DC transmission information (including all other sending end requirements and all receiving end requirements) are met. If not, an adjustment object is determined, and the adjustment object is adjusted until the constraints are met (that is, all other sending end requirements and all receiving end requirements are met), thereby meeting all sending end requirements and all receiving end requirements. Accordingly, the initial DC transmission information is updated to the updated DC transmission information that coordinates the sending end and the receiving end requirements, thereby obtaining an accurate DC transmission curve for clean energy from water, photovoltaic and storage that coordinates the sending end and the receiving end requirements.

[0062] Further, as a refinement and expansion of the specific implementation of the above embodiment, in order to fully illustrate the specific implementation process of this embodiment, another method for drawing up a DC transmission curve of clean energy from water, light and storage is provided, such as Figure 2 As shown, the method includes:

[0063] 201. Determine a planning research level year according to the commissioning time of the sending-end external transmission hydropower station, and analyze the local power supply information, power grid information and local electricity consumption information of the target research province where the sending-end external transmission hydropower station is located in the planning research level year.

[0064] For example, the DC project will be put into operation in m years, and the supporting hydropower sources of the DC project will be put into operation in n years. Therefore, the planning research horizon can be selected as m and n years, without any limitation here.

[0065] For this embodiment, as an implementation method, the analysis includes, in the planned research level year, the local power supply information, power grid information and local electricity consumption information of the target research province where the sending-end transmission hydropower station is located, including: determining the local power supply information corresponding to the target research province in the planned research level year according to the current power supply structure of each target research province and the power supply development plan in the planned research level year; determining the power grid information corresponding to the target research province in the planned research level year according to the current power grid of each target research province and the power grid development plan in the planned research level year; determining the local electricity consumption information corresponding to the target research province in the planned research level year according to the current social electricity consumption of each target research province and the electricity demand forecast (including electricity demand forecast and electricity demand forecast) in the planned research level year.

[0066] Specifically, the current status of the power structure of the target research province A includes: the full-caliber installed capacity of the target research province A, and the proportion of local hydropower, local thermal power, local wind power, and local photovoltaic power (i.e., the local photovoltaic power station at the sending end) in the total capacity.

[0067] Analyze the power development plan of the target research province A in the planning research level year, including: hydropower construction plan, thermal power construction plan, new energy power generation capacity (including wind power and solar power generation) and total installed capacity.

[0068] Analyze the current status of total social electricity consumption in the target research province A, including: total social electricity consumption and maximum load in the target research province A.

[0069] Analyze the electricity demand forecast of the target study province A in the planning study level year, and determine the local electricity consumption information in the planning study level year, including: the total social electricity consumption and maximum load of the power grid in the target study province A in year m; the total social electricity consumption and maximum load in year n.

[0070] Until the local power source information, power grid information and local power consumption information of all target research provinces are determined, wherein step 201 of the embodiment corresponds to Figure 5 Before the analysis of the basin development plan where the sending-end power station is located (excluding the analysis of the basin development plan where the sending-end power station is located), it should be noted that: Figure 5 The sending province in is the target research province in step 201 of the embodiment. Figure 5 The power demand forecast in step 201 of the embodiment is the power demand forecast in step 201 of the embodiment.

[0071] Then, analyze the basin development plan where the sending-end external transmission hydropower station is located; analyze the development plan and commissioning progress of the sending-end external transmission hydropower station; analyze the wet season and dry season of the planning research level year; analyze the output characteristics of each commissioned sending-end external transmission hydropower station when operating alone in the dry year and the normal year of the planning research level year, and the output characteristics of all the sending-end external transmission hydropower stations when operating together. Among them, this step is as follows Figure 5 The analysis of the watershed development plan of the power station at the sending end is shown to see whether there are any unanalyzed planning horizon years. It should be noted that: Figure 5 The sending-end power station is the sending-end external transmission hydropower station. Figure 5 The hydropower station in the figure is a sending-end hydropower station. Figure 5 The planning level year in the text refers to the planning research level year.

[0072] Specifically, the output characteristics of each sent-end transmission hydropower station put into operation when operating alone and the output characteristics of all sent-end transmission hydropower stations when operating jointly are analyzed in the dry year and the normal year of the planning research level year. Among them, if the sending-end transmission hydropower station that can be jointly dispatched has not been put into operation in the planning research level year, then each sent-end transmission hydropower station put into operation can only be operated alone, and the output characteristics when operating alone are analyzed. If the sending-end transmission hydropower station that can be jointly dispatched is put into operation in the planning research level year, the output characteristics in each hydrological year are optimized. Therefore, the output characteristics of all sending-end transmission hydropower stations when operating jointly are analyzed.

[0073] 202. Determine the local high-water season power and electricity participation balancing strategy corresponding to the high-water season and the local low-water season power and electricity participation balancing strategy corresponding to the low-water season.

[0074] 203. Perform local flood season power balance calculation based on the local power supply information, the local power consumption information and the local flood season power and electricity balancing strategy to obtain the flood season power profit and loss of each of the target research provinces. Perform local dry season power balance calculation based on the local power supply information, the local power consumption information and the local dry season power and electricity balancing strategy to obtain the dry season power profit and loss of each of the target research provinces.

[0075] It should be noted that the power participation balancing strategy of step 202 of the embodiment is used to calculate the power profit and loss, while the local power guarantee plan of step 203 of the embodiment is a strategy range for guaranteeing local electricity demand based on the power profit and loss calculation results. Within this strategy range, the initial DC transmission information that meets the maximum load of the transmission channel and the preset power abandonment rate requirements is calculated, so that the initial DC transmission information can be adjusted in steps 206-207 of the embodiment. The adjustment goal is to update the DC transmission information to meet the constraints (the constraints include the requirements of the remaining sending ends and all receiving ends), so that the updated DC transmission information can be used to generate DC transmission information of clean energy from water, light and storage.

[0076] Among them, the power and electricity participation balance strategy is how much of the local various power generation methods correspond to the external transmission and the initial retention. Among them, the initial retention is reserved according to the preset ratio, and the rest participates in the local power and electricity profit and loss calculation. Among them, which power generation methods participate in the local power balance calculation and which power generation methods participate in the local electricity balance calculation are described in detail below:

[0077] The local power and electricity participation balance strategy corresponding to the flood season and the local power and electricity participation balance strategy corresponding to the dry season are as follows (the power and electricity participation balance strategy is Figure 5 Determine the power balance boundary conditions of the sending province as shown):

[0078] 1) Determine the planned research level year: m year, n year (the following takes m year as an example).

[0079] 2) Select the local maximum power demand in the dry year for power balance (select the local maximum power demand in the dry year so that the retained power can meet the local maximum power demand in the dry year, then this retained power can definitely meet the local maximum power demand in the normal and wet years), select the local required electricity in the normal year for power balance (if the local required electricity in the dry year is used for local power balance, the local area will need to retain more electricity, which cannot be consumed in the normal and wet years, which will increase the amount of abandoned electricity and fail to meet the preset requirements for abandoned electricity. Therefore, the local required electricity in the normal year is used for power balance), and balance calculations are performed month by month throughout the year. The balance results list the wet and dry control months of August and December.

[0080] 3) Local hydropower retention plan: During the balance between the dry season and the normal water season (November each year to May of the following year), 30% of the electricity is retained and does not participate in the electricity balance calculation, and the rest is all included in the electricity balance calculation; if more than the preset electricity and corresponding capacity is retained during the dry season, it will not participate in the electricity balance calculation.

[0081] 4) Reserve rate: A reserve rate of 12% is retained but does not participate in the calculation of power balance.

[0082] 5) New energy output: Since the power generation of wind power and photovoltaic power is affected by many factors and has a large uncertainty, a small proportion of wind power and photovoltaic power participate in the power balance calculation, and the rest is retained but not involved in the power balance calculation. Regardless of the flood season or the dry season, photovoltaic power participates in the power balance calculation according to 20% of the typical curve of each month, and the remaining 80% is used for external transmission. In addition, the local photovoltaic energy storage at the sending end also participates in the power balance calculation with a small proportion, and the rest is used for external transmission.

[0083] 6) Demand-side response: Since some loads can be transferred from peak to off-peak periods, 3% of the respective maximum loads during the wet and dry seasons are not considered as peak electricity demand, but as off-peak electricity demand.

[0084] 7) The hydropower stations not included in the balancing process, i.e., the hydropower stations at the sending end, do not participate in the balancing process in steps 202 and 203 of the embodiment.

[0085] Under the above-mentioned local flood season power and electricity participation balance strategy, the local flood season power and electricity balance calculation can be performed (corresponding to Figure 5 As shown in the figure, the power spatial analysis calculation of the sending provinces and the power balance analysis of the sending provinces are carried out), and the same applies to the dry season.

[0086] 204. Determine a local power supply guarantee plan based on the power supply profit or deficit during the flood season and the power supply profit or deficit during the dry season.

[0087] Among them, this embodiment corresponds to Figure 5 The analysis of the sending-end power retention scheme is shown.

[0088] 205. According to the local electric power guarantee plan, the maximum load of the transmission channel and the preset power abandonment rate, the hydropower transmission information of the sending-end hydropower station, the photovoltaic transmission information of all local photovoltaic power stations and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage are determined to obtain the initial DC transmission information of the hydro-photovoltaic-storage clean energy of all the target research provinces.

[0089] The local power supply information includes the local photovoltaic power station at the sending end and the local photovoltaic energy storage at the sending end.

[0090] For the example steps 204-205, as an implementation method, the local electric power guarantee plan includes a mapping ratio interval relationship between the retention information and the power profit and loss in the flood season and the power profit and loss in the dry season, wherein the retention information includes: the hydropower retention information in the flood season and the hydropower retention information in the dry season of the sending-end external transmission hydropower station, the photovoltaic retention information of each of the sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage retention information of each of the sending-end local photovoltaic energy storage; the hydropower retention information of the sending-end external transmission hydropower station is determined according to the local electric power guarantee plan, the maximum load of the transmission channel and the preset power abandonment rate The transmission information, the photovoltaic transmission information of all local photovoltaic power stations at the sending end, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage, include: adjusting the power and electricity profit and loss in the flood season and the power and electricity profit and loss in the dry season according to the local electric power guarantee plan, and judging whether the adjusted transmission information meets the maximum load requirement of the transmission channel and the preset power abandonment rate requirement; if not, continue to adjust until it is met, and obtain the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all local photovoltaic power stations at the sending end, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage from the adjusted transmission information.

[0091] Specifically, the flood season hydropower retention information (including the flood season hydropower retention and the flood season hydropower retention at each power profit and loss calculation moment), the dry season hydropower retention information (including the dry season hydropower retention and the dry season hydropower retention at each power profit and loss calculation moment), the photovoltaic retention information (including the photovoltaic retention and the photovoltaic retention at each power profit and loss calculation moment), and the sending-end local photovoltaic energy storage retention information (including the sending-end local photovoltaic energy storage retention and the sending-end local photovoltaic energy storage retention at each power profit and loss calculation moment) in the local power supply guarantee plan are all preset according to the power profit and loss calculation results (for example, the results are in a certain interval, corresponding to the hydropower retention percentage, the photovoltaic retention percentage, the sending-end local photovoltaic energy storage retention percentage, etc.).

[0092] It should be noted that the requirements on the sending end include: 1. meeting local electricity demand; 2. the initial DC transmission power of the clean energy of water, light and storage must be less than or equal to the maximum load of the transmission channel; 3. meeting the preset power abandonment rate requirements. The initial DC transmission information of the clean energy of water, light and storage obtained in steps 204 and 205 of the embodiment is obtained after meeting the requirements 1, 2 and 3 on the sending end.

[0093] 206. Obtain constraint conditions, which include whether the hydropower utilization rate at the sending end is greater than a first threshold, whether the utilization hours of the DC channel is greater than a second threshold, and whether the utilization hours of thermal power at the receiving end is greater than a third threshold and less than a fourth threshold, the fourth threshold is greater than the third threshold, and whether the utilization rate of new energy at the sending end is greater than or equal to a fifth threshold.

[0094] 207. Calculate whether the constraint condition is satisfied according to the initial DC transmission information; if not, determine an adjustment object, and adjust the adjustment object until the constraint condition is satisfied, thereby obtaining updated DC transmission information.

[0095] For this embodiment, it includes: calculating the water energy utilization rate of the sending end, the new energy utilization rate of the sending end and the utilization hours of the DC channel according to the initial DC transmission information, and calculating the utilization hours of the thermal power at the receiving end; judging whether the water energy utilization rate of the sending end is greater than the first threshold, whether the utilization hours of the thermal power at the receiving end is greater than the third threshold, if at least one of them is not satisfied, determining that the adjustment object is the photovoltaic configuration capacity and the hydropower configuration capacity with a priority order, and adjusting the photovoltaic configuration capacity and the hydropower configuration capacity based on the priority order; judging whether the utilization hours of the DC channel is greater than the second threshold, whether the utilization hours of the thermal power at the receiving end is less than the fourth threshold, if at least one of them is not satisfied, determining that the adjustment object is the photovoltaic configuration capacity and the hydropower configuration capacity with a priority order. volt configuration capacity, increase the photovoltaic configuration capacity until the number of hours of utilization of the DC channel is greater than the second threshold, and the number of hours of utilization of thermal power at the receiving end is less than the fourth threshold; determine whether the utilization rate of new energy at the sending end is greater than or equal to the fifth threshold, if the utilization rate of new energy at the sending end is less than the fifth threshold, then determine whether the utilization rate of new energy is greater than the energy storage configuration adjustment threshold, if so, determine that the adjustment object is the photovoltaic energy storage configuration ratio, and increase the photovoltaic energy storage configuration ratio, if not, determine that the adjustment object is the photovoltaic configuration capacity and the hydropower configuration capacity with a priority order, and adjust the photovoltaic configuration capacity and the hydropower configuration capacity based on the priority order; until all the constraints are met, the updated DC transmission information is obtained.

[0096] The adjusting of the photovoltaic configuration capacity and the hydropower configuration capacity based on the priority order includes: if the priority order is that the photovoltaic configuration capacity is higher than the hydropower configuration capacity, then if the water energy utilization rate at the sending end is less than or equal to the first threshold, then reducing the photovoltaic configuration capacity until the photovoltaic minimum configuration value is reached; if the water energy utilization rate at the sending end is still less than or equal to the first threshold, then reducing the hydropower configuration capacity until the water energy utilization rate at the sending end is greater than the first threshold; if the thermal power utilization hours at the receiving end are less than or equal to the third threshold, then reducing the photovoltaic configuration capacity until the photovoltaic minimum configuration value; if the thermal power utilization hours at the receiving end are still less than or equal to the third threshold, then reducing the hydropower configuration capacity until the thermal power utilization hours at the receiving end are greater than the third threshold.

[0097] For steps 206 and 207 of the embodiment, the formulation of the DC transmission curve of clean energy from hydropower, photovoltaic and storage must take into account the power supply characteristics of the sending end and the load characteristics of the receiving end, and make full use of the hydropower regulation capacity. If supporting new energy sources, the utilization rates of various new energy sources must meet the preset requirements. For example: (1) It is necessary to take into account the power supply characteristics of the sending end and the load characteristics of the receiving end, and make full use of the hydropower regulation capacity. (2) The receiving end meets the requirements of power supply security and peak load regulation, and the number of hours of thermal power utilization at the receiving end is at a reasonable level. (3) The sending end takes into account the power output characteristics, and the photovoltaic power abandonment rate does not exceed 5%. (4) Make full use of the DC channel transmission capacity, improve the DC utilization hours and consider seasonal differences, and formulate the DC transmission curve of clean energy from hydropower, photovoltaic and storage on a monthly basis. The constraints of step 206 of the embodiment are thus determined.

[0098] For step 207 of the embodiment, determine the utilization hours of the DC channel: if the channel hours are 5000h, the space for supporting photovoltaic power is small, and the hydropower regulation capacity is not fully utilized. When the channel hours are 5500-6000h, the utilization hours of thermal power at the receiving end are more reasonable. When the channel hours are 6500h, the minimum thermal power hours at the receiving end reach 3370h, which is slightly lower overall. On the basis of considering the full absorption of hydropower, supporting photovoltaics will increase the utilization rate of DC, especially the power transmission level during the dry season, while reducing the utilization hours of thermal power at the receiving end. In order to reasonably configure and utilize photovoltaics and ensure a certain level of thermal power utilization at the receiving end, the utilization hours of the DC channel should not be too high or too low, so it is initially set at 5000-6000h.

[0099] Among them, the DC utilization hours are tentatively proposed as shown in Table 1:

[0100] Table 1:

[0101]

[0102] It should be noted that if Figure 5 As shown in the figure, 1. If the water energy utilization rate at the sending end is low (the water energy utilization rate at the sending end is calculated based on the ratio of the actual use of the sending end hydropower station to the generated amount), it means that there is a lot of power abandonment. Therefore, it is necessary to reduce the photovoltaic configuration capacity (is Figure 5 In the case of reducing the proportion of photovoltaic configuration in the sending end), that is, reducing the configuration of the local photovoltaic power station at the sending end, the water energy at the sending end can be more externally transmitted, so the utilization rate of water energy at the sending end is improved. When it is reduced to the minimum ( Figure 5 2. If the number of hours of DC channel utilization is low, it means that the DC channel is not fully utilized. Therefore, more electricity can be transmitted. Therefore, increase the photovoltaic configuration capacity (is Figure 53. If the utilization hours of thermal power at the receiving end are low, it means that the thermal power at the receiving end is not fully utilized, that is, the receiving end receives too much power from the sending end and the thermal power at the receiving end itself, and the receiving end cannot effectively absorb it. Therefore, the amount of power generated by the sending end is reduced, that is, the proportion of photovoltaic configuration is reduced. When it is reduced to the minimum ( Figure 5 (0 in the figure), then the hydropower configuration capacity is reduced, that is, the electricity generated by the hydropower station at the sending end is reduced, and the power generated by the sending end is also reduced. Therefore, the utilization hours of thermal power at the receiving end are increased. 4. It should be noted that the utilization rate of new energy at the sending end includes the photovoltaic utilization rate of the local photovoltaic power station at the sending end (the photovoltaic utilization rate is calculated based on the ratio of the actual use of the local photovoltaic power station at the sending end to the generated power). For the photovoltaic energy storage configuration ratio (the photovoltaic energy storage configuration ratio is Figure 5 The adjustment of the energy storage configuration ratio in the energy storage configuration ratio is to adjust the local photovoltaic energy storage at the sending end, wherein the energy storage configuration adjustment threshold refers to when the utilization rate of new energy is greater than the energy storage configuration adjustment threshold, the photovoltaic energy storage configuration ratio is required to adjust the utilization rate of new energy. Specifically, the photovoltaic energy storage configuration ratio is increased, and the photovoltaic energy generated by the local photovoltaic power station at the sending end is stored more and then consumed, thereby improving the photovoltaic utilization rate, that is, improving the utilization rate of new energy at the sending end. For example, according to the requirements of the national energy authorities, the fifth threshold is 95%, that is, the utilization rate of new energy at the sending end must be greater than or equal to 95%. If the utilization rate of new energy at the sending end is less than 95%, it is continued to be determined whether the utilization rate of new energy at the sending end is greater than the energy storage configuration adjustment threshold, and the energy storage configuration adjustment threshold is set to 90% of the utilization rate of new energy at the sending end, that is, when the utilization rate of new energy at the sending end is greater than 90% and less than 95%, the energy storage configuration ratio is increased, that is, the local photovoltaic energy storage at the sending end is increased. When the utilization rate of new energy at the sending end is less than or equal to 90%, the photovoltaic configuration ratio is reduced. When it is reduced to the minimum ( Figure 5 When it is zero), the hydropower configuration capacity is reduced.

[0103] Among them, since the photovoltaic information of the local photovoltaic power station at the sending end participates in the local power balance, the local photovoltaic energy storage information of the local photovoltaic energy storage at the sending end also participates in the local power balance. Therefore, increasing or decreasing the photovoltaic configuration capacity and increasing or decreasing the photovoltaic energy storage configuration ratio will affect the participation in the local power balance, and it is necessary to recalculate the local power profit and loss. This process is the same as steps 203-205 of the embodiment, and will not be repeated here. Then, steps 206-207 of the embodiment are performed until the updated DC transmission information meets all constraints. The updated DC transmission information is shown in Table 2. The updated DC transmission information is displayed on the coordinate system to generate the water-photovoltaic storage clean energy DC transmission curve:

[0104] Table 2: Updated DC transmission information in year n (hydropower 9.136 million kW)

[0105]

[0106] The present invention provides a method, device and equipment for formulating a DC transmission curve for clean energy from water, photovoltaic and storage. Through the technical solution of the present invention, the initial DC transmission information of the clean energy from water, photovoltaic and storage that meets some sending end requirements is first determined, and then it is judged whether the constraints under the initial DC transmission information (including all other sending end requirements and all receiving end requirements) are met. If not, an adjustment object is determined and the adjustment object is adjusted until the constraints are met (that is, all other sending end requirements and all receiving end requirements are met), thereby meeting all sending end requirements and all receiving end requirements. Accordingly, the initial DC transmission information is updated to the updated DC transmission information that coordinates the sending end and the receiving end requirements, thereby obtaining an accurate DC transmission curve for clean energy from water, photovoltaic and storage that coordinates the sending end and the receiving end requirements.

[0107] Further, as Figure 1 and Figure 2 The specific implementation of the method shown in the figure, the embodiment of the present invention provides a device for drawing up a direct current transmission curve of clean energy from water, light and storage, such as Figure 3 As shown, the device includes: an analysis module 31, a determination module 32, and a generation module 33;

[0108] An analysis module 31 is used to determine a planned research level year according to the commissioning time of the sending-end external transmission hydropower station, and analyze the local power source information, power grid information and local electricity consumption information of the target research province where the sending-end external transmission hydropower station is located in the planned research level year;

[0109] A determination module 32 is used to determine the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage according to the local power supply information, the power grid information, and the local power consumption information, and obtain the initial DC transmission information of the hydropower storage clean energy of all the target research provinces, wherein the local power supply information includes the sending-end local photovoltaic power station and the sending-end local photovoltaic energy storage;

[0110] The generation module 33 is used to obtain constraint conditions, calculate whether the constraint conditions are met based on the initial DC transmission information, and if not, determine the adjustment object, adjust the adjustment object until the constraint conditions are met, obtain updated DC transmission information, and generate a hydro-solar-storage clean energy DC transmission curve based on the updated DC transmission information.

[0111] Accordingly, in order to analyze the local power supply information, power grid information and local electricity consumption information of the target study province where the sending-end transmission hydropower station is located in the planned study level year, the analysis module 31 can be specifically used to determine the local power supply information corresponding to the target study province in the planned study level year according to the current power supply structure of each target study province and the power supply development plan in the planned study level year; determine the power grid information corresponding to the target study province in the planned study level year according to the current power grid of each target study province and the power grid development plan in the planned study level year; determine the local electricity consumption information corresponding to the target study province in the planned study level year according to the current social electricity consumption of each target study province and the electricity demand forecast in the planned study level year.

[0112] Accordingly, in order to determine the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage according to the local power source information, the power grid information, and the local electricity consumption information, the determination module 32 may specifically include: a first determination unit 321, a calculation unit 322, a second determination unit 323, and a third determination unit 324;

[0113] The first determination unit 321 may be used to determine a local high-water season power and electricity balancing strategy corresponding to the high-water season and a local low-water season power and electricity balancing strategy corresponding to the low-water season;

[0114] The calculation unit 322 may be used to perform a local flood season power balance calculation according to the local power supply information, the local power consumption information, and the local flood season power and electricity participation balancing strategy to obtain the flood season power and electricity profit and loss of each of the target research provinces, and perform a local dry season power and electricity balance calculation according to the local power supply information, the local power consumption information, and the local dry season power and electricity participation balancing strategy to obtain the dry season power and electricity profit and loss of each of the target research provinces;

[0115] The second determining unit 323 may be used to determine a local power supply guarantee plan according to the power supply profit or loss in the flood season and the power supply profit or loss in the dry season;

[0116] The third determination unit 324 can be used to determine the hydropower transmission information of the sending-end hydropower station, the photovoltaic transmission information of all local photovoltaic power stations at the sending end, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage according to the local power supply guarantee plan, the maximum load of the transmission channel and the preset power abandonment rate.

[0117] Correspondingly, the local power supply guarantee plan of the second determination unit 323 may specifically include a mapping ratio interval relationship between the retention information and the power supply profit and loss in the flood season and the power supply profit and loss in the dry season, wherein the retention information includes: the flood season hydropower retention information and the dry season hydropower retention information of the sending-end transmission hydropower station, the photovoltaic retention information of each of the sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage retention information of each of the sending-end local photovoltaic energy storage.

[0118] Correspondingly, in order to determine the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all local photovoltaic power stations at the sending end, and the sending-end local photovoltaic energy storage transmission information of the local photovoltaic energy storage at the sending end according to the local electric power guarantee plan, the maximum load of the transmission channel, and the preset power abandonment rate, the third determination unit 324 can be specifically used to adjust the power profit and loss in the flood season and the power profit and loss in the dry season according to the local electric power guarantee plan, and determine whether the adjusted transmission information meets the maximum load requirements of the transmission channel and the preset power abandonment rate requirements; if not, continue to adjust until they are met, and obtain the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all local photovoltaic power stations at the sending end, and the sending-end local photovoltaic energy storage transmission information of the local photovoltaic energy storage at the sending end from the adjusted transmission information.

[0119] Correspondingly, the constraint conditions include whether the water energy utilization rate at the sending end is greater than the first threshold, whether the utilization hours of the DC channel is greater than the second threshold, and whether the utilization hours of the thermal power at the receiving end is greater than the third threshold and less than the fourth threshold, the fourth threshold is greater than the third threshold, and whether the utilization rate of the new energy at the sending end is greater than or equal to the fifth threshold; in order to obtain the constraint conditions, calculate whether the constraint conditions are met according to the initial DC transmission information, if not, determine the adjustment object, adjust the adjustment object until the constraint conditions are met, and obtain updated DC transmission information, and generate a module 33, which can be specifically used to calculate the water energy utilization rate at the sending end, the new energy utilization rate at the sending end, and the utilization hours of the DC channel according to the initial DC transmission information, and calculate the utilization hours of the thermal power at the receiving end; judge whether the water energy utilization rate at the sending end is greater than the first threshold, whether the utilization hours of the thermal power at the receiving end is greater than the third threshold, if at least one of them is not met, determine the adjustment object as the photovoltaic configuration capacity and the hydropower configuration capacity with a priority order, based on the priority The photovoltaic configuration capacity and the hydropower configuration capacity are adjusted in order of priority; whether the utilization hours of the DC channel are greater than the second threshold and whether the utilization hours of the thermal power at the receiving end are less than the fourth threshold is determined; if at least one of them is not satisfied, the adjustment object is determined to be the photovoltaic configuration capacity, and the photovoltaic configuration capacity is increased until the utilization hours of the DC channel are greater than the second threshold and the utilization hours of the thermal power at the receiving end are less than the fourth threshold; whether the utilization rate of the new energy at the sending end is greater than or equal to the fifth threshold is determined; if the utilization rate of the new energy at the sending end is less than the fifth threshold, whether the utilization rate of the new energy at the sending end is greater than the energy storage configuration adjustment threshold is determined; if so, the adjustment object is determined to be the photovoltaic energy storage configuration ratio, and the photovoltaic energy storage configuration ratio is increased; if not, the adjustment object is determined to be the photovoltaic configuration capacity and the hydropower configuration capacity with a priority order, and the photovoltaic configuration capacity and the hydropower configuration capacity are adjusted based on the priority order; until all the constraints are satisfied, the updated DC transmission information is obtained.

[0120] Correspondingly, in order to adjust the photovoltaic configuration capacity and the hydropower configuration capacity based on the priority order, the generation module 33 can also be specifically used for if the priority order is that the photovoltaic configuration capacity is higher than the hydropower configuration capacity, then if the water energy utilization rate at the sending end is less than or equal to the first threshold, then reduce the photovoltaic configuration capacity until the photovoltaic minimum configuration value; if the water energy utilization rate at the sending end is still less than or equal to the first threshold, then reduce the hydropower configuration capacity until the water energy utilization rate at the sending end is greater than the first threshold; if the number of thermal power utilization hours at the receiving end is less than or equal to the third threshold, then reduce the photovoltaic configuration capacity until the photovoltaic minimum configuration value; if the number of thermal power utilization hours at the receiving end is still less than or equal to the third threshold, then reduce the hydropower configuration capacity until the number of thermal power utilization hours at the receiving end is greater than the third threshold.

[0121] It should be noted that for other corresponding descriptions of the functional units involved in the device for drawing up a DC transmission curve for clean energy from water and photovoltaic storage provided in this embodiment, reference can be made to Figure 1 to Figure 2 The corresponding description will not be repeated here.

[0122] Based on the above Figure 1 to Figure 2 The method shown in the embodiment, accordingly, also provides a storage medium, which can be volatile or non-volatile, and stores a computer program, which is executed by a processor to implement the above-mentioned Figure 1 to Figure 2 The method for formulating the DC transmission curve of clean energy from hydropower, photovoltaic and energy storage is shown.

[0123] Based on this understanding, the technical solution of the present invention can be embodied in the form of a software product, which can be stored in a storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.), and includes a number of instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods of various implementation scenarios of the present invention.

[0124] Based on the above Figure 1 to Figure 2 The method shown and Figure 3 , Figure 4 In order to achieve the above-mentioned purpose, the present embodiment further provides a computer device, which includes a storage medium and a processor; the storage medium is used to store a computer program; the processor is used to execute the computer program to achieve the above-mentioned Figure 1 to Figure 2 The method for formulating the DC transmission curve of clean energy from hydropower, photovoltaic and energy storage is shown.

[0125] Optionally, the computer device may further include a user interface, a network interface, a camera, a radio frequency (RF) circuit, a sensor, an audio circuit, a WI-FI module, etc. The user interface may include a display, an input unit such as a keyboard, etc., and the optional user interface may also include a USB interface, a card reader interface, etc. The network interface may optionally include a standard wired interface, a wireless interface (such as a WI-FI interface), etc.

[0126] Those skilled in the art will appreciate that the computer device structure provided in this embodiment does not constitute a limitation on the physical device, and may include more or fewer components, or a combination of certain components, or different component arrangements.

[0127] The storage medium may also include an operating network communication module. The operating is a program that manages the hardware and software resources of the above-mentioned computer device, supporting the operation of the information processing program and other software and / or programs. The network communication module is used to communicate between the components inside the storage medium, and to communicate with other hardware and software in the information processing entity device.

[0128] Through the description of the above implementation modes, those skilled in the art can clearly understand that the present invention can be implemented by means of software plus a necessary general hardware platform, or by hardware.

[0129] The present invention provides a method, device and equipment for formulating a DC transmission curve for clean energy from water, photovoltaic and storage. Through the technical solution of the present invention, the initial DC transmission information of the clean energy from water, photovoltaic and storage that meets some sending end requirements is first determined, and then it is judged whether the constraints under the initial DC transmission information (including all other sending end requirements and all receiving end requirements) are met. If not, an adjustment object is determined and the adjustment object is adjusted until the constraints are met (that is, all other sending end requirements and all receiving end requirements are met), thereby meeting all sending end requirements and all receiving end requirements. Accordingly, the initial DC transmission information is updated to the updated DC transmission information that coordinates the sending end and the receiving end requirements, thereby obtaining an accurate DC transmission curve for clean energy from water, photovoltaic and storage that coordinates the sending end and the receiving end requirements.

[0130] Those skilled in the art will appreciate that the accompanying drawings are only schematic diagrams of a preferred implementation scenario, and the modules or processes in the accompanying drawings are not necessarily necessary for implementing the present invention. Those skilled in the art will appreciate that the modules in the devices in the implementation scenario can be distributed in the devices of the implementation scenario according to the description of the implementation scenario, or can be changed accordingly and located in one or more devices different from the present implementation scenario. The modules of the above-mentioned implementation scenario can be combined into one module, or can be further split into multiple modules.

[0131] The above serial numbers of the present invention are only for description and do not represent the advantages and disadvantages of the implementation scenarios. The above disclosure is only a few specific implementation scenarios of the present invention, but the present invention is not limited thereto, and any changes that can be thought of by those skilled in the art should fall within the protection scope of the present invention.

Claims

1. A method for formulating a DC power transmission curve for clean energy from water, light and energy storage, characterized in that: The method comprises: Determine the planning research level year according to the commissioning time of the sending-end external transmission hydropower station, and analyze the local power source information, power grid information and local electricity consumption information of the target research province where the sending-end external transmission hydropower station is located in the planning research level year; According to the local power supply information, the power grid information and the local power consumption information, the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all the sending-end local photovoltaic power stations and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage are determined, and the initial DC transmission information of the hydro-photovoltaic storage clean energy of all the target research provinces is obtained, wherein the local power supply information includes the sending-end local photovoltaic power station and the sending-end local photovoltaic energy storage; Obtain constraint conditions, calculate whether the constraint conditions are met based on the initial DC transmission information, and if not, determine an adjustment object, adjust the adjustment object until the constraint conditions are met, obtain updated DC transmission information, and generate a hydro-solar-storage clean energy DC transmission curve based on the updated DC transmission information.

2. The method according to claim 1, characterized in that The analysis includes the local power source information, power grid information and local power consumption information of the target research province where the sending-end hydropower station is located in the planning research level year, including: Determine the local power information corresponding to the target research province in the planned research year according to the current power structure of each target research province and the power development plan in the planned research year; According to the current status of the power grid of each target research province and the power grid development plan in the planned research level year, determine the power grid information corresponding to the target research province in the planned research level year; Based on the current status of total social electricity consumption in each of the target research provinces and the forecast of electricity demand in the planned research year, the local electricity consumption information corresponding to the target research province in the planned research year is determined.

3. The method according to claim 1, characterized in that The determining, according to the local power source information, the power grid information and the local power consumption information, the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage comprises: Determine the local high-water season power and electricity participation balancing strategy corresponding to the high-water season and the local low-water season power and electricity participation balancing strategy corresponding to the low-water season; Perform local flood season power balance calculation based on the local power supply information, the local power consumption information and the local flood season power and electricity participation balancing strategy to obtain the flood season power and electricity profit and loss of each of the target research provinces; perform local dry season power and electricity balance calculation based on the local power supply information, the local power consumption information and the local dry season power and electricity participation balancing strategy to obtain the dry season power and electricity profit and loss of each of the target research provinces; Determine a local power supply guarantee plan based on the power supply profit or loss during the flood season and the power supply profit or loss during the dry season; According to the local power supply guarantee plan, the maximum load of the transmission channel and the preset power abandonment rate, the hydropower transmission information of the sending-end hydropower station, the photovoltaic transmission information of all local photovoltaic power stations at the sending end and the local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage are determined.

4. The method according to claim 3, characterized in that The local electric power guarantee plan includes a mapping ratio interval relationship between the retention information and the electric power profit and loss in the flood season and the electric power profit and loss in the dry season, wherein the retention information includes: the hydropower retention information in the flood season and the hydropower retention information in the dry season of the sending-end transmission hydropower station, the photovoltaic retention information of each of the sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage retention information of each of the sending-end local photovoltaic energy storage.

5. The method according to claim 3 or 4, characterized in that: The method of determining the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage according to the local power supply guarantee plan, the maximum load of the transmission channel, and the preset power abandonment rate includes: According to the local power guarantee plan, the power surplus and deficit in the flood season and the power surplus and deficit in the dry season are adjusted, and it is determined whether the adjusted outbound information meets the maximum load requirement of the outbound channel and the preset power abandonment rate requirement; If not, continue adjusting until it is satisfied, and obtain the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage from the adjusted transmission information.

6. The method according to claim 1, characterized in that The constraint conditions include whether the water energy utilization rate at the sending end is greater than the first threshold, whether the DC channel utilization hours are greater than the second threshold, and whether the thermal power utilization hours at the receiving end are greater than the third threshold and less than the fourth threshold, the fourth threshold is greater than the third threshold, and whether the new energy utilization rate at the sending end is greater than or equal to the fifth threshold; The obtaining of the constraint condition, calculating whether the constraint condition is satisfied according to the initial DC transmission information, and if not, determining an adjustment object, adjusting the adjustment object until the constraint condition is satisfied, and obtaining updated DC transmission information, includes: Calculate the water energy utilization rate at the sending end, the new energy utilization rate at the sending end, and the utilization hours of the DC channel according to the initial DC transmission information, and calculate the thermal power utilization hours at the receiving end; Determine whether the water energy utilization rate at the sending end is greater than the first threshold value and whether the thermal power utilization hours at the receiving end is greater than the third threshold value. If at least one of the above conditions is not satisfied, determine that the photovoltaic configuration capacity and the hydropower configuration capacity with a priority order are the adjustment objects, and adjust the photovoltaic configuration capacity and the hydropower configuration capacity based on the priority order. Determine whether the DC channel utilization hours are greater than the second threshold and whether the receiving-end thermal power utilization hours are less than the fourth threshold. If at least one of the conditions is not satisfied, determine that the adjustment object is the photovoltaic configuration capacity, and increase the photovoltaic configuration capacity until the DC channel utilization hours are greater than the second threshold and the receiving-end thermal power utilization hours are less than the fourth threshold. Determine whether the new energy utilization rate at the sending end is greater than or equal to the fifth threshold value. If the new energy utilization rate at the sending end is less than the fifth threshold value, determine whether the new energy utilization rate is greater than the energy storage configuration adjustment threshold value. If so, determine that the adjustment object is the photovoltaic energy storage configuration ratio, and increase the photovoltaic energy storage configuration ratio. If not, determine that the adjustment object is the photovoltaic configuration capacity and the hydropower configuration capacity with a priority order, and adjust the photovoltaic configuration capacity and the hydropower configuration capacity based on the priority order. Until all the constraints are met, the updated DC transmission information is obtained.

7. The method according to claim 6, characterized in that The adjusting the photovoltaic configuration capacity and the hydropower configuration capacity based on the priority order includes: If the priority order is that the photovoltaic configuration capacity is higher than the hydropower configuration capacity, then If the water energy utilization rate at the sending end is less than or equal to the first threshold, the photovoltaic configuration capacity is reduced until the photovoltaic minimum configuration value is reached; if the water energy utilization rate at the sending end is still less than or equal to the first threshold, the hydropower configuration capacity is reduced until the water energy utilization rate at the sending end is greater than the first threshold; If the utilization hours of the thermal power at the receiving end is less than or equal to the third threshold, the photovoltaic configuration capacity is reduced until the photovoltaic minimum configuration value is reached. If the utilization hours of the thermal power at the receiving end is still less than or equal to the third threshold, the hydropower configuration capacity is reduced until the utilization hours of the thermal power at the receiving end is greater than the third threshold.

8. A device for drawing up a direct current transmission curve for clean energy from water, light and energy storage, characterized in that: The device comprises: An analysis module is used to determine a planned research level year according to the commissioning time of the sending-end external transmission hydropower station, and analyze the local power supply information, power grid information and local electricity consumption information of the target research province where the sending-end external transmission hydropower station is located in the planned research level year; A determination module is used to determine the hydropower transmission information of the sending-end transmission hydropower station, the photovoltaic transmission information of all sending-end local photovoltaic power stations, and the sending-end local photovoltaic energy storage transmission information of the sending-end local photovoltaic energy storage according to the local power supply information, the power grid information, and the local electricity consumption information, and obtain the initial DC transmission information of the hydropower storage clean energy of all the target research provinces, wherein the local power supply information includes the sending-end local photovoltaic power station and the sending-end local photovoltaic energy storage; A generation module is used to obtain constraint conditions, calculate whether the constraint conditions are met based on the initial DC transmission information, and if not, determine an adjustment object, adjust the adjustment object until the constraint conditions are met, obtain updated DC transmission information, and generate a hydro-photovoltaic storage clean energy DC transmission curve based on the updated DC transmission information.

9. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, it implements the method for formulating a direct current transmission curve for clean energy from water, photovoltaic and energy storage as described in any one of claims 1 to 7.

10. A computer device comprising a storage medium, a processor, and a computer program stored in the storage medium and executable on the processor, characterized in that: When the processor executes the computer program, it implements the method for formulating a direct current power transmission curve for clean energy from water, photovoltaic and energy storage as described in any one of claims 1 to 7.