Decoupling control method and system for three-active-bridge converter under emergency power supply

Through the Gaussian-Newton optimization algorithm, the phase shift duty cycle of the three active bridge converter is iteratively optimized, which solves the problems of large port decoupling and high storage cost in the existing technology, and realizes the three active bridge converter The power decoupling and dynamic response of the online port ensure efficient and stable energy transmission in emergency power supply scenarios.

CN118920813AInactive Publication Date: 2024-11-08EMERGENCY MANAGEMENT CENT OF STATE GRID SHANDONG ELECTRIC POWER

Patent Information

Application Number
CN202410960521.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing three-active bridge converter port decoupling continuous set model prediction control scheme has high computational cost and high storage costs. It is only suitable for specific voltage and current conditions, and cannot achieve fast port power decoupling during dynamic response.

Method used

The Gaussian-Newtonian optimization algorithm is used to iteratively optimize the phase shift duty cycle in the cost function, realizing the power decoupling of the online port of the three active bridge converter, with extremely short dynamic response time, suitable for different working conditions, and no additional requirements are required. storage space.

Benefits of technology

The power decoupling of the three active bridge converter is realized, which suppresses the transmission of port voltage fluctuations, ensures efficient and stable energy transmission of mobile energy storage during microgrid access, simplifies control logic, and reduces storage requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920813A_ABST
    Figure CN118920813A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of converter control, and provides a three-active-bridge converter decoupling control method and system under emergency power supply, and the method comprises the steps: obtaining a voltage sampling value and a current sampling value of a current control period; based on the voltage sampling value and the current sampling value, combining the reference voltage of each port, and adopting a Gaussian-Newton optimization algorithm to carry out iterative optimization on the phase shift duty ratio of the next control period, so that the value of a cost function is minimum; converting the phase shift duty ratio of the next control period obtained by iterative optimization into a switch driving signal for controlling a power switch device; wherein the cost function is the square of the difference value between the output voltage predicted value of each port in the next control period and the reference voltage. On-line port power decoupling of the TAB converter can be realized, and meanwhile, the dynamic response time is extremely short.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of converter control, and in particular relates to a decoupling control method and system for a three-active bridge converter under emergency power supply. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] As an ideal energy router in the new power system, the triple-active-bridge (TAB) converter has the advantages of high power density, modular structure, flexible energy flow, and electrical isolation. Since the volume of mobile energy storage (emergency power generation) is limited, the use of a high-power-density three-port converter can reduce its occupied volume and increase the battery capacity. At the same time, multiple input ports can achieve instantaneous high-power output of the converter and speed up the recovery of emergency power supply. In the process of mobile energy storage (emergency power generation) connected to the microgrid to realize microgrid reconstruction, when a voltage fluctuation occurs at one output port of the TAB converter, due to the port power coupling effect, the voltage fluctuation will also occur at the other port, thereby affecting the energy transmission quality. Using the online continuous set model predictive control method, the output port can be quickly decoupled, and the transmission of voltage fluctuations between ports can be effectively suppressed.

[0004] At present, the continuous set model predictive control of the TAB converter realizes port decoupling by establishing voltage and current prediction models, constructing cost functions, and calculating the optimal solution of the cost function offline according to specific working conditions.

[0005] For the existing continuous set model predictive control scheme for port decoupling of TAB converters, it is necessary to calculate the optimal solution of the cost function offline under the limited conditions of duty cycle, store the result as a lookup table, and finally interpolate and approximate the solution online. This method is only applicable to specific voltage and current conditions. When the reference value of current or voltage changes, it is necessary to calculate offline again. Therefore, the optimal solution for different conditions needs to be stored in a table, but when the number of conditions is large, the amount of stored data will increase greatly, and the storage space occupied by data will increase. Therefore, the above-mentioned port power decoupling scheme has a large amount of calculation, high storage cost, and complex implementation. Summary of the invention

[0006] In order to solve the technical problems existing in the above-mentioned background technology, the present invention provides a decoupling control method and system for a three-active bridge converter under emergency power supply, which adopts a Gauss-Newton optimization algorithm to optimize the phase shift duty cycle in the cost function so that the value of the cost function is minimized, thereby realizing online port power decoupling of the TAB converter, and at the same time, the dynamic response time is extremely short.

[0007] In order to achieve the above object, the present invention adopts the following technical solution:

[0008] A first aspect of the present invention provides a decoupling control method for a three-active bridge converter under emergency power supply, comprising:

[0009] Obtain the voltage sampling value and current sampling value of the current control cycle;

[0010] Based on the voltage sampling value and the current sampling value, combined with the reference voltage of each port, the Gauss-Newton optimization algorithm is used to iteratively optimize the phase shift duty cycle of the next control cycle so that the value of the cost function is minimized;

[0011] Converting the phase shift duty ratio of the next control cycle obtained by the iterative optimization into a switch drive signal for controlling the power switch device;

[0012] The cost function is the square of the difference between the output voltage prediction value of each port in the next control cycle and the reference voltage.

[0013] Furthermore, the phase-shift duty cycle of the next control period is converted into a switch drive signal for controlling the power switch device through pulse width modulation.

[0014] Furthermore, the stopping condition of the iterative optimization is that the absolute value of the difference between the phase-shift duty ratio of the next control cycle obtained in this iteration and the phase-shift duty ratio of the next control cycle obtained in the previous iteration is less than a first threshold.

[0015] Furthermore, the steps of the Gauss-Newton optimization algorithm include: based on the voltage sampling value and the current sampling value, combined with the reference voltage of each port, the Jacobi matrix is ​​calculated through the output voltage prediction model equation group of the three active bridge converters; based on the Jacobi matrix, the Hessian matrix and the gradient matrix are calculated; based on the Hessian matrix and the gradient matrix, the incremental equation of the Gauss-Newton method is used to solve the incremental value of the phase-shift duty cycle, and after updating the phase-shift duty cycle of the next control cycle, it is determined whether the stop condition of the iterative optimization is met. If not, it returns to recalculate the Jacobi matrix.

[0016] Furthermore, the incremental value of the phase shift duty cycle is the ratio of the gradient matrix to the Hessian matrix.

[0017] Furthermore, the phase-shift duty cycle of the next control cycle is updated by taking the sum of the incremental value of the phase-shift duty cycle and the phase-shift duty cycle of the next control cycle obtained in the previous iteration as the updated phase-shift duty cycle of the next control cycle.

[0018] Furthermore, the output voltage prediction model equation group of the three active bridge converter is:

[0019]

[0020] The Jacobian matrix is ​​expressed as:

[0021] Among them, the phase shift duty ratio x of the next control cycle = (x1, x2) T , D 12 =x1,D 13 =x2,D 12 and D 13 are the phase shift duty ratio between the first port and the second port and the phase shift duty ratio between the first port and the third port respectively; U1(k), U2(k) and U3(k) are the voltage sampling values ​​of the current control cycle; I2(k) and I3(k) are the current sampling values ​​of the current control cycle; and is the reference voltage of each port; the winding ratio of the three H bridges in the three-active bridge converter is 1:n2:n3; T s Indicates the switching period, switching frequency f s =1 / T s ; L 12 , L 23 and L 13 are the equivalent parameters of the Δ-type equivalent circuit; C1, C2 and C3 are the supporting capacitors of the three-active bridge converter.

[0022] A second aspect of the present invention provides a three-active bridge converter decoupling control system under emergency power supply, comprising:

[0023] The data acquisition module is configured to: acquire the voltage sampling value and the current sampling value of the current control cycle;

[0024] The phase shift duty cycle iteration update module is configured as follows: based on the voltage sampling value and the current sampling value, in combination with the reference voltage of each port, the phase shift duty cycle of the next control cycle is iteratively optimized using the Gauss-Newton optimization algorithm to minimize the value of the cost function;

[0025] A conversion module, configured to: convert the phase shift duty ratio of the next control cycle obtained by the iterative optimization into a switch drive signal for controlling the power switch device;

[0026] The cost function is the square of the difference between the output voltage prediction value of each port in the next control cycle and the reference voltage.

[0027] A third aspect of the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps in the decoupling control method for a three-active bridge converter under emergency power supply as described above.

[0028] The fourth aspect of the present invention provides a computer device, comprising a computer-readable storage medium, a processor, and a computer program stored on the computer-readable storage medium and executable on the processor, wherein when the processor executes the program, the steps in the decoupling control method of a three-active bridge converter under emergency power supply as described above are implemented.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] The present invention adopts the Gauss-Newton optimization algorithm to optimize the phase-shift duty cycle in the cost function, so that the value of the cost function is minimized, and the online port power decoupling of the TAB converter can be realized. At the same time, the dynamic response time is extremely short, and it can be applied to the emergency power supply scenario. When the voltage and current conditions change, the optimization process of the cost function does not need to occupy additional storage space, ensuring efficient and stable energy transmission of the converter when the mobile energy storage (emergency power generation) is connected to the microgrid, thereby realizing high-performance control of the converter.

[0031] The present invention adopts Gauss-Newton optimization algorithm to optimize the phase shift duty cycle in the cost function, and realizes port power decoupling when the TAB converter transmits instantaneous high power through a continuous set model predictive control method based on Gauss-Newton, thereby suppressing the transmission of port voltage fluctuations. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0033] Figure 1 It is a flow chart of a decoupling control method of a three-active bridge converter under emergency power supply according to Embodiment 1 of the present invention;

[0034] Figure 2 This is a topological structure diagram of a TAB converter according to the first embodiment of the present invention.

[0035] Figure 3 is a Y-type equivalent circuit diagram of a TAB converter according to a first embodiment of the present invention;

[0036] Figure 4 is a delta-type equivalent circuit diagram of a TAB converter according to a first embodiment of the present invention;

[0037] Figure 5 This is a Gauss-Newton method optimization flow chart of the first embodiment of the present invention. DETAILED DESCRIPTION

[0038] To make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0039] It should be noted that the following detailed descriptions are all illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0040] Embodiment 1

[0041] This embodiment provides a decoupling control method for a three-active bridge converter under emergency power supply.

[0042] This embodiment provides a decoupling control method for a three-active bridge converter under emergency power supply, which belongs to high-power density multi-port converter control in an emergency power supply scenario.

[0043] The present embodiment provides a decoupling control method for a triple-active-bridge converter under emergency power supply, which mainly solves the port power coupling problem of a triple-active-bridge (TAB) converter to achieve instantaneous high-power transmission. It can ensure efficient and stable energy transmission of the converter and realize high-performance control of the converter during the process of connecting mobile energy storage (emergency power generation) to a microgrid to realize microgrid reconstruction.

[0044] The present embodiment provides a decoupling control method for a three-active bridge converter under emergency power supply, which adopts continuous set model predictive control and solves the optimal solution of the function online. It is applicable to different working conditions and does not require the storage of offline lookup tables, thus not occupying additional storage space.

[0045] The present embodiment provides a decoupling control method for a three-active bridge converter under emergency power supply, which can achieve effective power decoupling of the output port, suppress the transmission of voltage fluctuations at the output port, and ensure efficient and stable energy transmission.

[0046] This embodiment provides a decoupling control method for a three-active bridge converter under emergency power supply, which uses a continuous set model predictive control to realize online control of the power decoupling of the TAB port, such as Figure 1 As shown, the following steps are included:

[0047] Step 1: Set the reference voltage of ports 2 and 3 to The voltage and current sampling values ​​U1(k), U2(k), U3(k), I1(k), I2(k), and I3(k) of the current control cycle k are obtained.

[0048] Step 2: Update the sampling values ​​in the voltage prediction model equation group to be solved, and calculate the Jacobi matrix, gradient matrix and Hessian matrix respectively according to the voltage prediction model equation group and the least squares function; according to the incremental equation of the Gauss-Newton method, input the Hessian matrix and gradient matrix to obtain the incremental value of the phase-shift duty cycle, and obtain the optimal phase-shift duty cycle for the next control cycle through iteration.

[0049] Step 3: Perform PWM modulation (pulse width modulation) on the obtained optimal phase-shift duty cycle for the next control cycle k+1, convert it into a switch drive signal for controlling the power switching device, transmit it to the power switching device, and realize the online continuous set model predictive control of the TAB converter in the current cycle.

[0050] Step 4: Repeat the above steps to obtain the switch drive signal of the power switch device in the next control cycle.

[0051] In this embodiment, a TAB converter is modeled.

[0052] like Figure 2 As shown in the figure, the topology of the TAB converter is shown, in which three H bridges are coupled through a three-winding high-frequency transformer with a winding ratio of 1:n2:n3, L1-L3 is the equivalent inductance, u H1 、u H2 、u H3 is a square wave voltage, U1, U2, and U3 are the voltages of the DC ports of each H-bridge (i.e., the voltage sampling values ​​of the current control cycle). The TAB converter adopts a single-phase shift modulation method. In order to establish the power transmission model of the TAB converter, it is necessary to convert the electrical parameters of the secondary and tertiary sides of the transformer to the primary side, which can be obtained. Figure 3 For the Y-type equivalent circuit shown, the calculation of equivalent parameters is as follows:

[0053]

[0054] In order to intuitively represent the power flow relationship between ports, Y-Δ transformation is performed, and the Δ-type equivalent circuit is as follows: Figure 4 As shown, the equivalent parameters are as follows:

[0055]

[0056] Referring to the DAB transmission power expression, the transmission power between each port can be obtained as follows:

[0057]

[0058] Among them, T s Indicates the switching period, switching frequency f s =1 / T s , D 12 , D 13 , D 23 It represents the phase shift duty ratio between port 1 and port 2, port 1 and port 3, and port 2 and port 3, respectively. 23 =D 13 -D 12 The transmission power of ports 1, 2, and 3 can be expressed by adding the power of the two branches connected to them:

[0059]

[0060] According to the simplified state space average model of TAB, the differential equation of the output voltage can be expressed as:

[0061]

[0062] Among them, I2(k) and I3(k) are the current sampling values ​​of the current control cycle, and C1, C2 and C3 are the supporting capacitors of the three-active bridge converter.

[0063] The prediction equation of the output voltage is obtained by discretizing the differential equation in (5) using the forward Euler method:

[0064]

[0065] In step 2, the TAB converter predictive control online decoupling method is adopted. The control target is to achieve constant voltage output of ports 2 and 3, so the cost function is constructed as:

[0066]

[0067] in, They are the reference voltages for ports 2 and 3 respectively.

[0068] The Gauss-Newton optimization algorithm is used to optimize the phase shift duty cycle in the cost function, that is, to find a set of suitable phase shift duty cycle combinations to minimize the value of the cost function to achieve power decoupling of the output port.

[0069] Let D 12 =x1,D 13 =x2, the output voltage prediction model equations of the TAB converter are obtained as follows:

[0070]

[0071] Among them, the phase shift duty ratio x of the next control cycle = (x1, x2) T ∈R n , the Jacobian matrix is ​​expressed as:

[0072]

[0073] The least squares function to be solved is:

[0074]

[0075] Specifically, the solution process of the optimal phase shift duty cycle of the next control cycle is as follows: Figure 5 As shown, including:

[0076] Step (1): Given the initial phase shift duty cycle value x (0) (including x1, x2), the maximum number of iterations N is 10, the iteration accuracy ε is 0.0001, and the number of iterations j = 0.

[0077] Step (2): Sample the voltages of the three ports (U1, U2, U3) at time k, combined with the phase shift duty cycle value x (j) (x (j) As x), the Jacobian matrix J(x) is calculated by formula (8) and formula (9). And the Hessian matrix H(x) and the gradient matrix g(x) are calculated, where g(x) = -J(x) T f(x), according to the first-order Taylor expansion of f(x), H(x) can be expressed as J(x) T J(x) is approximated.

[0078] Step (3): Determine whether H(x) is a non-singular matrix. If so, proceed to step (4); otherwise, end.

[0079] Step (4): Solve the incremental equation H(x)Δx of the Gauss-Newton method (j) =g(x), solve to get the incremental value of the phase shift duty cycle Δx (j) .

[0080] Step (5): x (j+1) =x (j) +Δx (j) , check whether the iteration stop condition (|x (j+1) -x (j) |<ε), ε is the first threshold, if it is satisfied, output x (j+1) , and stop the iteration; otherwise, determine whether j is equal to N. If so, the iteration fails. Otherwise, let j increase by 1 and return to step 2 to continue the iteration.

[0081] This embodiment provides a decoupling control method for a three-active bridge converter under emergency power supply, focusing on the microgrid reconstruction scenario under emergency power supply. Under the condition that the volume of mobile energy storage (emergency power generation) is limited, a high-power density TAB converter is used to reduce its occupied volume and increase the battery capacity. At the same time, multiple input ports can realize instantaneous high-power output of the converter, speeding up the recovery of emergency power supply.

[0082] This embodiment provides a decoupling control method for a three-active bridge converter under emergency power supply, which realizes port power decoupling when the TAB converter transmits instantaneous high power through a continuous set model predictive control method based on Gauss-Newton, and suppresses the transmission of port voltage fluctuations. The existing continuous set model predictive control scheme requires offline calculation and online interpolation approximate solution. When the operating conditions of voltage and current change, the optimal value needs to be recalculated, and the data occupies a large storage space.

[0083] This embodiment provides a decoupling control method for a three-active bridge converter under emergency power supply, which can realize the online port power decoupling of the TAB converter, and at the same time, the dynamic response time is extremely short. This control method can be applied to the emergency power supply scenario. When the voltage and current conditions change, the optimization process of the cost function does not need to occupy additional storage space, ensuring efficient and stable energy transmission of the converter when the mobile energy storage (emergency power generation) is connected to the microgrid, and realizing high-performance control of the converter.

[0084] Embodiment 2

[0085] This embodiment provides a three-active bridge converter decoupling control system under emergency power supply, which specifically includes:

[0086] The data acquisition module is configured to: acquire the voltage sampling value and the current sampling value of the current control cycle;

[0087] The phase shift duty cycle iteration update module is configured as follows: based on the voltage sampling value and the current sampling value, in combination with the reference voltage of each port, the phase shift duty cycle of the next control cycle is iteratively optimized using the Gauss-Newton optimization algorithm to minimize the value of the cost function;

[0088] A conversion module, configured to: convert the phase shift duty ratio of the next control cycle obtained by the iterative optimization into a switch drive signal for controlling the power switch device;

[0089] The cost function is the square of the difference between the output voltage prediction value of each port in the next control cycle and the reference voltage.

[0090] It should be noted here that each module in this embodiment corresponds to each step in Example 1 one by one, and the specific implementation process is the same, which will not be repeated here.

[0091] Embodiment 3

[0092] This embodiment provides a computer-readable storage medium having a computer program stored thereon. When the program is executed by a processor, the steps in the decoupling control method of a three-active bridge converter under emergency power supply as described in the first embodiment above are implemented.

[0093] Embodiment 4

[0094] This embodiment provides a computer device, including a computer-readable storage medium, a processor, a communication interface, and a computer program stored on the computer-readable storage medium and executable on the processor, wherein the processor, the communication interface, and the computer-readable storage medium may be connected via a bus or other means. The communication interface is used to receive and send data, and when the processor executes the program, the steps in the decoupling control method of a three-active bridge converter under emergency power supply as described in the first embodiment above are implemented.

[0095] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0096] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0097] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0098] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A decoupling control method for a three-active bridge converter under emergency power supply, characterized in that: include: Obtain the voltage sampling value and current sampling value of the current control cycle; Based on the voltage sampling value and the current sampling value, combined with the reference voltage of each port, the Gauss-Newton optimization algorithm is used to iteratively optimize the phase shift duty cycle of the next control cycle so that the value of the cost function is minimized; Converting the phase shift duty ratio of the next control cycle obtained by the iterative optimization into a switch drive signal for controlling the power switch device; The cost function is the square of the difference between the output voltage prediction value of each port in the next control cycle and the reference voltage.

2. A decoupling control method for three active bridge converters under emergency power supply as claimed in claim 1, characterized in that: The phase shift duty cycle of the next control period is converted into a switch drive signal for controlling the power switch device through pulse width modulation.

3. The decoupling control method of a three-active bridge converter under emergency power supply as claimed in claim 1, characterized in that: The stopping condition of the iterative optimization is that the absolute value of the difference between the phase-shift duty ratio of the next control cycle obtained in this iteration and the phase-shift duty ratio of the next control cycle obtained in the previous iteration is less than the first threshold.

4. The decoupling control method of a three-active bridge converter under emergency power supply as claimed in claim 1, characterized in that: The steps of the Gauss-Newton optimization algorithm include: based on the voltage sampling value and the current sampling value, combined with the reference voltage of each port, the Jacobi matrix is ​​calculated through the output voltage prediction model equation group of the three active bridge converters; based on the Jacobi matrix, the Hessian matrix and the gradient matrix are calculated; based on the Hessian matrix and the gradient matrix, the incremental value of the phase-shift duty cycle is solved through the incremental equation of the Gauss-Newton method, and after the phase-shift duty cycle of the next control cycle is updated, it is determined whether the stop condition of the iterative optimization is met. If not, it returns to recalculate the Jacobi matrix.

5. A decoupling control method for three active bridge converters under emergency power supply as claimed in claim 4, characterized in that: The incremental value of the phase shift duty cycle is the ratio of the gradient matrix to the Hessian matrix.

6. A decoupling control method for three active bridge converters under emergency power supply as claimed in claim 4, characterized in that: The updating method of the phase-shift duty ratio of the next control cycle is: taking the sum of the incremental value of the phase-shift duty ratio and the phase-shift duty ratio of the next control cycle obtained in the previous iteration as the updated phase-shift duty ratio of the next control cycle.

7. A decoupling control method for three active bridge converters under emergency power supply as claimed in claim 4, characterized in that: The output voltage prediction model equations of the three active bridge converter are: The Jacobian matrix is ​​expressed as: Among them, the phase shift duty ratio x of the next control cycle = (x1, x2) T , D 12 =x1,D 13 =x2,D 12 and D 13 are the phase shift duty ratio between the first port and the second port and the phase shift duty ratio between the first port and the third port respectively; U1(k), U2(k) and U3(k) are the voltage sampling values ​​of the current control cycle; I2(k) and I3(k) are the current sampling values ​​of the current control cycle; and is the reference voltage of each port; the winding ratio of the three H bridges in the three-active bridge converter is 1:n2:n3; T s Indicates the switching period, switching frequency f s =1 / T s ; L 12 , L 23 and L 13 are the equivalent parameters of the Δ-type equivalent circuit; C1, C2 and C3 are the supporting capacitors of the three-active bridge converter.

8. A decoupling control system for three active bridge converters under emergency power supply, characterized in that: include: The data acquisition module is configured to: acquire the voltage sampling value and the current sampling value of the current control cycle; The phase shift duty cycle iteration update module is configured as follows: based on the voltage sampling value and the current sampling value, in combination with the reference voltage of each port, the phase shift duty cycle of the next control cycle is iteratively optimized using the Gauss-Newton optimization algorithm to minimize the value of the cost function; A conversion module, configured to: convert the phase shift duty ratio of the next control cycle obtained by the iterative optimization into a switch drive signal for controlling the power switch device; The cost function is the square of the difference between the output voltage prediction value of each port in the next control cycle and the reference voltage.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of a decoupling control method for a three-active bridge converter under emergency power supply as described in any one of claims 1 to 7 are implemented.

10. A computer device comprising a computer-readable storage medium, a processor, and a computer program stored in the computer-readable storage medium and executable on the processor, characterized in that: When the processor executes the program, the steps in the decoupling control method of a three-active bridge converter under emergency power supply as described in any one of claims 1-7 are implemented.

Citation Information

Patent Citations

  • Nonlinear correction device for power switching device

    CN110995044A

  • TAB converter phase shift discrete set model prediction decoupling control method and system

    CN114726196A

  • Permanent magnet synchronous motor dead zone harmonic suppression method based on improved Gaussian Newton method

    CN116131707A

  • Power decoupling method and system of three-port direct current converter

    CN116633157A

  • Reconfigurable hardware-accelerated model predictive controller

    US20190101877A1

Cited By

  • Four-active-bridge converter and control method and control system thereof

    CN120433599A