Construction method of soft soil filling earthwork airport shielding screen

By using a frame-type road structure and layered backfilling and compaction of soft soil, the problem of the shielding screen being easily damaged under complex and severe weather conditions was solved, thus achieving the stability and safety of the shielding screen, ensuring the safe and efficient operation of the airport, and reducing construction costs.

CN118928792APending Publication Date: 2024-11-12SHANXI MECHANIZATION CONSTRUCTION GROUP CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411167154.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing runway end taxiway (EAT) shielding structures are susceptible to damage in complex and severe weather conditions, leading to FOD (Flight Overhead) and affecting aircraft operational safety and efficiency.

Method used

A frame-type road structure and a method of layered backfilling and compaction of soft soil are used to form a shielding screen, including the backfilling of the construction road and the filling of the shielding screen, to ensure the stability and safety of the shielding screen structure.

Benefits of technology

It improved the protection of the shielding screens against damage, reduced the generation of FOD (Fragmentation of Debris), ensured the safe and efficient operation of the airport runway, reduced construction costs, and improved construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118928792A_ABST
    Figure CN118928792A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of shielding screens around runway end taxiways (EAT), and particularly relates to a construction method of a shielding screen of a soft soil filling earthwork airport. The method comprises the following steps: backfilling and rolling construction roads in a construction area, and forming a frame structure by transverse and longitudinal construction roads; then soft soil is filled in a core body part of the frame structure, and the core body part is backfilled to the designed top elevation in a layered mode; finally, the top of the frame structure is filled with a shielding screen; the filling of the shielding screen is completed by adopting a frame type road structure and a soft soil layered backfilling and rolling mode, so that the sight of a pilot is shielded, accidents and delay caused by the blocked sight of the pilot are reduced, the safe and efficient operation of an airport runway is ensured, the nearby soft soil is reasonably utilized, the transportation distance is shortened, the construction efficiency is greatly improved, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of shielding screens around the end taxiway (EAT), and in particular relates to a construction method of a soft soil filling earthwork airport shielding screen. Background Art

[0002] At present, in the field of runway end taxiway (EAT) shielding, only Shanghai Hongqiao Airport, Lanzhou Zhongchuan Airport and Lhasa Gonggar International Airport have built airport visual shielding in China. The shielding structure needs to be fragile. Including all its components, the mass should be as small as possible to minimize the damage when the take-off and landing aircraft hit the shielding structure. The vertical support should be designed as a fragile connection, and the front panels of the shielding should be designed so that they will fall off the shielding structure when hit.

[0003] The defect of this construction process is that it is not suitable for airports with complex and bad weather, and FOD (Foreign Object Debris, i.e., some foreign substances, debris or objects that may damage aircraft) will be generated. Therefore, in view of the above shortcomings, it is necessary to provide a construction method for soft soil filling earthwork airport shielding screen. Summary of the invention

[0004] The present invention aims to solve the problem that complex and severe weather conditions damage the shielding screen structure, generate FOD, and thus affect the normal operation of the aircraft.

[0005] The present invention provides the following technical solution: a construction method for a soft soil filler earth and stone airport shielding screen, first backfilling and rolling the construction road in the construction area, and forming a frame structure of the horizontal and vertical construction roads; then filling the core part of the frame structure with soft soil, and backfilling the core part in layers to the designed top elevation; finally, building a shielding screen on the top of the frame structure.

[0006] Further, the following steps are included:

[0007] S1: measurement and setting out;

[0008] S2: The original ground is cleaned and rolled, and the compaction degree reaches 88%;

[0009] S3: Set up transverse and longitudinal construction roads in the construction area to form a framework structure; backfill and roll the construction roads in layers, with a backfill thickness of 0.6m and a compaction degree of 91%;

[0010] S4: The core of the frame structure is filled with soft soil, with a compaction degree of 73%. Within the top 1.5 meters of the core, 0.5 meters of stone is backfilled first, and the solid volume rate of the stone after rolling is ≥81%, and then 1 meter of planting soil is backfilled. The planting soil is backfilled and rolled in two layers, and the single layer backfill is compacted to a thickness of 0.5 meters, with a compaction degree of 85%.

[0011] S5: Build a shielding screen with a comprehensive slope of ≤10% around it and sow grass seeds on the screen for greening.

[0012] Furthermore, in step S5: when filling the shielding screens, the height difference between adjacent shielding screens is ≤ the thickness of one rolling layer, and the upper and lower adjacent layers are overlapped, and the overlap length is ≥5m.

[0013] Furthermore, in step S3: when backfilling the construction road, the moisture content of the backfill soil is the optimum moisture content ±3%, and the backfill soil is silty clay or clay.

[0014] Furthermore, in step S3: the width of the construction road is 20m, and the lateral spacing and longitudinal spacing are 60m.

[0015] Furthermore, in step S4: the soft soil of the core part of the backfill frame structure includes one of silty soil, organic soil or expansive soil.

[0016] Further, in step S4: the stone material for backfilling the core part of the frame structure has a maximum particle size of no more than 20 cm, a fine-grained soil content of less than 0.075 mm of no more than 20%, an unevenness coefficient Cu ≥ 5, a curvature coefficient Cc = 1 to 3, and a rock uniaxial saturated compressive strength fr ≥

[0017] 15MPa, mixed stone with softening coefficient KR≥0.75.

[0018] Compared with the prior art, the advantages of the present invention are:

[0019] The shielding screen is constructed by adopting a frame road structure + soft soil layered backfill and rolling method to block the pilot's line of sight, reduce accidents and delays caused by obstructed driver's line of sight, ensure the safe and efficient operation of the airport runway, and rationally utilize nearby soft soil, shorten transportation distance, greatly improve construction efficiency and reduce construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the structure of the present invention.

[0021] In the figure: 1-construction road; 2-core part. DETAILED DESCRIPTION

[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0023] like Figure 1As shown: Six horizontal and vertical construction roads are set up in the construction area. The width of the construction road is 20m, and the horizontal and vertical spacing is 60m, forming a frame structure. A 26t roller is used to backfill and roll the construction road in layers, with a layered backfill thickness of 0.6m. The backfill material is preferably on-site construction solid waste, or silty clay and clay with a moisture content close to the optimal moisture content ±3%, and the compaction degree is not less than 91%.

[0024] On-site construction solid waste refers to construction waste generated by site demolition, removal of old roads, ditch demolition, etc., mainly blocks of (broken) stones, bricks, and concrete blocks. Domestic waste should be removed cleanly.

[0025] The backfill material of the core part of the frame structure surrounded by the construction road can be soft soil, with a compaction degree of not less than 73%; soft soil includes one of silty soil, organic soil or expansive soil. Within the top 1.5 meters of the core part, first backfill 0.5m of stone, the maximum particle size of the stone is not more than 20cm, the content of fine-grained soil less than 0.075mm is not more than 20%, the unevenness coefficient Cu≥5, the curvature coefficient Cc=1~3, the rock uniaxial saturated compressive strength fr≥15MPa, the softening coefficient KR≥0.75 of the mixed stone, the solid volume rate after rolling is not less than 81%, and then backfill 1 meter thick soil suitable for planting, using two layers of backfilling and rolling, the single layer backfilling compaction thickness is 0.5m, and the compaction degree is 85%.

[0026] Build a shielding screen on the top of the frame structure. When building the shielding screen, the height difference between adjacent shielding screens shall be ≤ the thickness of one rolled layer. The upper and lower adjacent layers shall be overlapped with each other, and the overlap length shall be ≥5m. The height of the shielding screen shall be 8m, and the comprehensive slope around the shielding screen shall not be steeper than 10%. At the same time, the shielding screen shall be sown with grass seeds for greening.

[0027] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A construction method for a soft soil filling earthwork airport shielding screen, characterized in that: First, the construction roads in the construction area are backfilled and rolled to form a frame structure for the horizontal and vertical construction roads; then the core part of the frame structure is filled with soft soil, and the core part is backfilled in layers to the designed top elevation; finally, a shielding screen is built on the top of the frame structure.

2. The construction method of a soft soil filling earthwork airport shielding screen according to claim 1 is characterized in that: The following steps are involved: S1: measurement and setting out; S2: The original ground is cleaned and rolled, and the compaction degree reaches 88%; S3: Set up transverse and longitudinal construction roads in the construction area to form a framework structure; backfill and roll the construction roads in layers, with a backfill thickness of 0.6m and a compaction degree of 91%; S4: The core of the frame structure is filled with soft soil, with a compaction degree of 73%; the top layer of the core Within a 1.5-meter range, first backfill 0.5m of stone, with a solid volume ratio of ≥81% after stone rolling, and then backfill 1 meter thick planting soil. The planting soil is backfilled and rolled in two layers, with a single layer backfill thickness of 0.5m and a compaction degree of 85%; S5: Build a shielding screen with a comprehensive slope of ≤10% around it and sow grass seeds on the screen for greening.

3. The construction method of a soft soil filling earthwork airport shielding screen according to claim 2 is characterized in that: In step S5: when filling the shielding screen, the height difference between adjacent shielding screens is ≤ the thickness of one rolling layer, and the upper and lower adjacent layers are overlapped, and the overlap length is ≥5m.

4. The construction method of a soft soil filling earthwork airport shielding screen according to claim 2 is characterized by: In step S3: when backfilling the construction road, the moisture content of the backfill soil is the optimal moisture content ±3%, and the backfill soil is silty clay or clay.

5. The construction method of a soft soil filling earthwork airport shielding screen according to claim 2 is characterized by: In step S3: the width of the construction road is 20m, and the transverse spacing and longitudinal spacing are 60m.

6. The construction method of a soft soil filling earthwork airport shielding screen according to claim 2 is characterized by: In step S4: the soft soil of the core part of the backfill frame structure includes one of silty soil, organic soil or expansive soil.

7. The construction method of a soft soil filling earthwork airport shielding screen according to claim 6 is characterized by: In step S4: the stone material for backfilling the core part of the frame structure is selected to be a mixed stone with a maximum particle size not exceeding 20 cm, a fine-grained soil content less than 0.075 mm not exceeding 20%, a uniformity coefficient Cu≥5, a curvature coefficient Cc=1~3, a rock uniaxial saturated compressive strength fr≥15MPa, and a softening coefficient KR≥0.75.

Citation Information

Patent Citations

  • Rapid solidification construction method for sea mud on large-area coastal beach