Non-standard power-assisted mechanical arm for coil stock feeding in new energy industry and use method of non-standard power-assisted mechanical arm
By designing a non-standard power-assisted robot arm for the new energy industry, the servo motor and pneumatic claws are automatically clamped and placed in the expansion shaft, the problem of waiting for installation when the coil material is put online is solved, and efficiency is improved.
Patent Information
- Application Number
- CN202411360737.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When used, the existing non-standard power-assisted robot arm used for rolling materials in the new energy industry needs to wait for staff to install the coil and the expansion shaft, resulting in a large time consumption.
A non-standard power-assisted robot arm including mounting base, loading base, standby base and lower shaft base is designed. The servo motor drives the mobile screw and pneumatic claws to realize automatic clamping and placement of the expansion shaft, simplifying the rolling material Online process.
It improves the efficiency of rolling materials online, reduces the time for staff to wait for installation, and improves production efficiency.
Smart Images

Figure CN118929292A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of coil material online, and in particular to a non-standard power-assisted mechanical arm for coil material online in the new energy industry and a method of using the same. Background Art
[0002] Coil material usually refers to a roll of material of a certain width wound through a continuous production line. In the new energy industry, coil materials are mainly used to manufacture battery separators, positive and negative electrode materials, and backplane materials in photovoltaic modules. According to different uses, coil materials can be divided into battery separator coils, positive and negative electrode material coils, photovoltaic backplane coils, etc. Among them, battery separator coils are used to isolate the positive and negative electrodes inside the battery; positive and negative electrode material coils are used to prepare the positive and negative electrodes of the battery; photovoltaic backplane coils are used to protect photovoltaic modules from the influence of the external environment.
[0003] When the coil is in use, it is necessary to insert the expansion shaft into the paper tube in the middle of the coil, and then place the coil on the unwinding device through the expansion shaft, and pull the coil out to the production line through the traction device for use. Since the coil is heavy, a non-standard power-assisted robotic arm is usually used to replace manpower when the coil is put on the line.
[0004] However, the common non-standard power-assisted robotic arms used for coil material online in the new energy industry, when in use, usually put the coil material on, and after the coil material is used up, remove the expansion shaft, wait for the staff to install the coil material and the expansion shaft, and then load the new coil material. This process means that when the coil material is put online, it is necessary to wait for the staff to install the coil material and the expansion shaft, which consumes a lot of time. In view of this, the present application proposes a non-standard power-assisted robotic arm for coil material online in the new energy industry and a method of using the same. Summary of the invention
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies in the prior art, the present invention provides a non-standard power-assisted robotic arm for coiling materials online in the new energy industry and a method of using the same, which has the advantages of improving the efficiency of coiling materials online and solves the problem that the common non-standard power-assisted robotic arm for coiling materials online in the new energy industry needs to wait for the staff to install the coil and the expansion shaft when the coil is online, which consumes a lot of time.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a non-standard power-assisted mechanical arm for coiling on-line in the new energy industry, comprising a mounting base, four mounting legs are fixedly mounted on the top of the mounting base, a mounting top plate is fixedly mounted on the top of the mounting legs, two mounting side plates are fixedly mounted on the bottom of the mounting top plate, two moving guide rails are fixedly mounted between the two mounting side plates, a mechanical arm base is slidably mounted on the surface of the moving guide rail, and a loading base, a standby base and a lower shaft base are fixedly mounted on the top of the mounting base;
[0009] The tops of the loading base, the standby base and the lower shaft base are all provided with U-shaped grooves for placing the expansion shaft, and the surface of the expansion shaft is sleeved with coils.
[0010] Furthermore, the loading base includes two loading bottom plates, a loading support plate is fixed on the top of the loading bottom plate, the standby base includes two standby bottom plates, a standby support plate is fixedly installed on the top of the standby bottom plate, and the lower shaft base includes two lower shaft bottom plates, a lower shaft support plate is fixedly installed on the top of the lower shaft bottom plate.
[0011] Furthermore, a supporting base plate is fixedly installed at the bottom of the mounting leg, and a reinforcing rib plate whose one side is fixedly connected to one side of the mounting leg is fixedly installed at the top of the supporting base plate.
[0012] Furthermore, a movable base plate is fixedly installed at the bottom of the robot arm base, and a lifting cylinder with a movable end facing downward is fixedly installed at the bottom of the movable base plate.
[0013] Furthermore, a lifting horizontal plate is fixedly installed on the movable end of the lifting cylinder, two mounting rods are fixedly installed on the bottom of the lifting horizontal plate, pneumatic claws are fixedly installed on the bottom ends of the mounting rods, and the distance between the two pneumatic claws is greater than the length of the coil.
[0014] Furthermore, a movable screw is rotatably installed between the two mounting side plates, and the movable screw is threadedly connected to the robot arm base.
[0015] Furthermore, a servo motor is fixedly mounted on one side of one of the mounting side plates, and an output shaft of the servo motor is fixedly connected to one end of the moving screw.
[0016] Another technical problem to be solved by the present invention is to provide a method for using a non-standard power-assisted mechanical arm for coiling on-line in the new energy industry, comprising the following steps:
[0017] 1) For the first loading, the staff inserts the expansion shaft into the coil, and then places the coil on the lower shaft base through the expansion shaft. The servo motor drives the moving screw to rotate, drives the pneumatic claw to move to the top of the lower shaft base, clamps the expansion shaft and places it on the loading base, and connects the coil to the equipment for use;
[0018] 2) For standby loading, the staff inserts another expansion shaft into the new coil, and then places the new coil on the lower shaft base through the expansion shaft. The servo motor drives the moving screw to rotate, driving the pneumatic claw to move to the top of the lower shaft base, clamps the expansion shaft and places it on the standby base;
[0019] 3) Take the expansion shaft. After the coil is used up, the servo motor drives the moving screw to rotate, and drives the pneumatic claw to move to the top of the loading base. The pneumatic claw clamps the expansion shaft and places it on the lower shaft base. The staff removes the expansion shaft and installs a new coil;
[0020] 4) For subsequent loading, the servo motor drives the moving screw to rotate, driving the pneumatic claw to move to the top of the standby base. The pneumatic claw picks up the standby coil through the expansion shaft and places it on the loading base for use.
[0021] (III) Beneficial effects
[0022] Compared with the prior art, the present invention provides a non-standard power-assisted mechanical arm for coiling in the new energy industry and a method for using the same, which has the following beneficial effects:
[0023] 1. The non-standard power-assisted mechanical arm used for coiling materials on-line in the new energy industry and the use method thereof, by arranging three bases for placing expansion shafts, namely, a loading base, a standby base and a lower shaft base, on the installation base, and installing the mechanical arm base on a movable guide rail, so that the moving distance of the mechanical arm base covers the loading base, the standby base and the lower shaft base, the coiled material on the loading base is connected to the traction device, the standby base is used for placing the standby coiled material, and the lower shaft base is used for placing the used expansion shaft and the staff for placing new coiled material, so that when the coiled material is in use, the staff can install the coiled material and the expansion shaft, thereby improving the efficiency of coiling materials on-line, and solving the problem that the common non-standard power-assisted mechanical arm used for coiling materials on-line in the new energy industry needs to wait for the staff to install the coiled material and the expansion shaft when the coiled material is on-line, which consumes a lot of time.
[0024] 2. The non-standard power-assisted robotic arm used for coil loading in the new energy industry and its use method, by installing the robotic arm base on the surface of the movable guide rail, the robotic arm base can move left and right on the surface of the movable guide rail, and the servo motor controls the moving screw to drive the robotic arm base to move above the loading base, the standby base or the lower shaft base, so that the pneumatic claw can grab the expanding shaft. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a structural schematic diagram of a non-standard power-assisted mechanical arm for coiling in the new energy industry and a method for using the same, as proposed by the present invention;
[0026] Figure 2This is a side cross-sectional view of the structure of a non-standard power-assisted mechanical arm for coiling in the new energy industry and a method for using the same, as proposed by the present invention;
[0027] Figure 3 This is a top-view cross-sectional view of the installation top plate of a non-standard power-assisted mechanical arm for coiling on-line in the new energy industry and a method for using the same, as proposed by the present invention;
[0028] Figure 4 A three-dimensional schematic diagram of the base of a non-standard power-assisted robotic arm and a method of using the robotic arm for coiling materials on-line in the new energy industry proposed by the present invention.
[0029] In the figure: 1. Install the base; 2. Install the legs; 21. Support the bottom plate; 22. Reinforcement rib plate; 3. Install the top plate; 4. Install the side plate; 5. Move the guide rail; 6. Robot arm base; 7. Loading base; 71. Loading bottom plate; 72. Loading support plate; 8. Standby base; 81. Standby bottom plate; 82. Standby support plate; 9. Lower shaft base; 91. Lower shaft bottom plate; 92. Lower shaft support plate; 10. Expanding shaft; 11. Coiling; 12. Moving bottom plate; 13. Lifting cylinder; 14. Lifting horizontal plate; 15. Installing rod; 16. Pneumatic claw; 17. Moving screw; 18. Servo motor. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] See also Figures 1 to 4 A non-standard power-assisted robotic arm for coil loading in the new energy industry comprises a mounting base 1, four mounting legs 2 are fixedly mounted on the top of the mounting base 1, a mounting top plate 3 is fixedly mounted on the top of the mounting legs 2, two mounting side plates 4 are fixedly mounted on the bottom of the mounting top plate 3, two moving guide rails 5 are fixedly mounted between the two mounting side plates 4, a robotic arm base 6 is slidably mounted on the surface of the moving guide rail 5, a loading base 7, a standby base 8 and a lower shaft base 9 are fixedly mounted on the top of the mounting base 1.
[0032] A movable base plate 12 is fixedly installed at the bottom of the robot arm base 6 , and a lifting cylinder 13 with a movable end facing downward is fixedly installed at the bottom of the movable base plate 12 .
[0033] Secondly, a lifting horizontal plate 14 is fixedly installed at the movable end of the lifting cylinder 13, two mounting rods 15 are fixedly installed at the bottom of the lifting horizontal plate 14, and pneumatic claws 16 are fixedly installed at the bottom of the mounting rods 15. The spacing between the two pneumatic claws 16 is greater than the length of the coil 11. The robot arm base 6 moves on the surface of the moving guide rail 5, driving the pneumatic claws 16 to move above the loading base 7, the standby base 8 or the lower shaft base 9, and the lifting cylinder 13 drives the pneumatic claws 16 to move downward for clamping.
[0034] At the same time, the tops of the loading base 7, the standby base 8 and the lower shaft base 9 are all provided with U-shaped grooves for placing the expansion shaft 10, and the surface of the expansion shaft 10 is sleeved with a coil 11. By setting the loading base 7, the standby base 8 and the lower shaft base 9 to cooperate with the robot arm base 6, the pneumatic claw 16 clamps the used expansion shaft 10 to the lower shaft base 9, and the staff removes the expansion shaft 10 and installs a new coil 11. At the same time, the pneumatic claw 16 clamps the installed coil 11 on the standby base 8 and places it on the loading base 7 for use. During the use of the coil 11 on the loading base 7, the staff places the new coil 11 on the lower shaft base 9, and the pneumatic claw 16 clamps it to the standby base 8 for standby use.
[0035] Among them, the loading base 7 includes two loading bottom plates 71, and a loading support plate 72 is fixed on the top of the loading bottom plate 71; the standby base 8 includes two standby bottom plates 81, and a standby support plate 82 is fixedly installed on the top of the standby bottom plate 81; the lower shaft base 9 includes two lower shaft bottom plates 91, and a lower shaft support plate 92 is fixedly installed on the top of the lower shaft bottom plate 91.
[0036] Meanwhile, a supporting base plate 21 is fixedly mounted on the bottom of the mounting leg 2 , and a reinforcing rib plate 22 , one side of which is fixedly connected to one side of the mounting leg 2 , is fixedly mounted on the top of the supporting base plate 21 .
[0037] Among them, a moving screw 17 is rotatably installed between the two mounting side plates 4, and the moving screw 17 is threadedly connected to the robot arm base 6.
[0038] Secondly, a servo motor 18 is fixedly mounted on one side of one of the mounting side plates 4, and the output shaft of the servo motor 18 is fixedly connected to one end of the moving screw 17. The servo motor 18 drives the moving screw 17 to rotate, and controls the robot arm base 6 to accurately move to the top of the loading base 7, the standby base 8 or the lower shaft base 9.
[0039] A method for using a non-standard power-assisted robotic arm for coiling in the new energy industry comprises the following steps:
[0040] 1) For the first loading, the staff inserts the expansion shaft into the coil, and then places the coil on the lower shaft base through the expansion shaft. The servo motor drives the moving screw to rotate, drives the pneumatic claw to move to the top of the lower shaft base, clamps the expansion shaft and places it on the loading base, and connects the coil to the equipment for use;
[0041] 2) For standby loading, the staff inserts another expansion shaft into the new coil, and then places the new coil on the lower shaft base through the expansion shaft. The servo motor drives the moving screw to rotate, driving the pneumatic claw to move to the top of the lower shaft base, clamps the expansion shaft and places it on the standby base;
[0042] 3) Take the expansion shaft. After the coil is used up, the servo motor drives the moving screw to rotate, and drives the pneumatic claw to move to the top of the loading base. The pneumatic claw clamps the expansion shaft and places it on the lower shaft base. The staff removes the expansion shaft and installs a new coil;
[0043] 4) For subsequent loading, the servo motor drives the moving screw to rotate, driving the pneumatic claw to move to the top of the standby base. The pneumatic claw picks up the standby coil through the expansion shaft and places it on the loading base for use.
[0044] Working principle: The servo motor 18 drives the moving screw 17 to rotate, controlling the robot arm base 6 to accurately move on the surface of the moving guide rail 5 to the top of the loading base 7, the standby base 8 or the lower shaft base 9, and the lifting cylinder 13 drives the pneumatic claw 16 to move downward to clamp and place. After the coil 11 on the loading base 7 is used up, the pneumatic claw 16 clamps the expansion shaft 10 and places it on the lower shaft base 9, and then clamps the coil 11 on the standby base 8 and places it on the loading base 7. At the same time, the staff removes the expansion shaft 10, installs the new coil 11 on the expansion shaft 10, and then places it on the lower shaft base 9, and the pneumatic claw 16 picks it up and places it on the standby base 8.
[0045] To sum up, the non-standard power-assisted robotic arm and its use method for coiling materials online in the new energy industry are provided with three workstations, namely a loading base 7, a standby base 8 or a lower shaft base 9. During the use of the coil 11 on the loading base 7, the staff can install the new coil 11 on the expansion shaft 10 and place it on the lower shaft base 9, which is picked up by the pneumatic claw 16 and placed on the standby base 8 for standby use. After the coil 11 is used up, the new coil 11 can be quickly picked up from the standby base 8 and placed on the loading base 7 for use, thereby improving the efficiency of coiling materials 11 online.
[0046] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A non-standard power-assisted mechanical arm for coiling material on-line in the new energy industry, comprising a mounting base (1), characterized in that: Four mounting legs (2) are fixedly mounted on the top of the mounting legs (2), a mounting top plate (3) is fixedly mounted on the top of the mounting top plate (3), two mounting side plates (4) are fixedly mounted on the bottom of the mounting top plate (3), two movable guide rails (5) are fixedly mounted between the two mounting side plates (4), a mechanical arm base (6) is slidably mounted on the surface of the movable guide rail (5), and a loading base (7), a standby base (8) and a lower shaft base (9) are fixedly mounted on the top of the mounting base (1); The tops of the loading base (7), the standby base (8) and the lower shaft base (9) are all provided with U-shaped grooves for placing the expansion shaft (10), and the surface of the expansion shaft (10) is sleeved with a coil (11).
2. According to claim 1, a non-standard power-assisted mechanical arm for coiling in the new energy industry is characterized in that: The loading base (7) comprises two loading bottom plates (71), a loading support plate (72) being fixed on the top of the loading bottom plates (71); the standby base (8) comprises two standby bottom plates (81), a standby support plate (82) being fixedly mounted on the top of the standby bottom plates (81); and the lower shaft base (9) comprises two lower shaft bottom plates (91), a lower shaft support plate (92) being fixedly mounted on the top of the lower shaft bottom plates (91).
3. According to claim 1, a non-standard power-assisted mechanical arm for coiling in the new energy industry is characterized in that: A supporting base plate (21) is fixedly mounted on the bottom of the mounting leg (2), and a reinforcing rib plate (22) whose one side is fixedly connected to one side of the mounting leg (2) is fixedly mounted on the top of the supporting base plate (21).
4. According to claim 1, a non-standard power-assisted mechanical arm for coiling in the new energy industry is characterized in that: A movable base plate (12) is fixedly mounted on the bottom of the mechanical arm base (6), and a lifting cylinder (13) with a movable end facing downward is fixedly mounted on the bottom of the movable base plate (12).
5. According to claim 4, a non-standard power-assisted mechanical arm for coiling in the new energy industry is characterized in that: A lifting horizontal plate (14) is fixedly mounted on the movable end of the lifting cylinder (13), two mounting rods (15) are fixedly mounted on the bottom of the lifting horizontal plate (14), and pneumatic claws (16) are fixedly mounted on the bottom ends of the mounting rods (15), wherein the spacing between the two pneumatic claws (16) is greater than the length of the coil (11).
6. According to claim 1, a non-standard power-assisted mechanical arm for coiling in the new energy industry is characterized in that: A moving screw rod (17) is rotatably mounted between the two mounting side plates (4), and the moving screw rod (17) is threadedly connected to the mechanical arm base (6).
7. According to claim 6, a non-standard power-assisted mechanical arm for coiling in the new energy industry is characterized in that: A servo motor (18) is fixedly mounted on one side of one of the mounting side plates (4), and an output shaft of the servo motor (18) is fixedly connected to one end of a moving screw rod (17).
8. The method for using a non-standard power-assisted mechanical arm for coiling in the new energy industry according to claim 1 is characterized in that: The following steps are involved: 1) For the first loading, the staff inserts the expansion shaft into the coil, and then places the coil on the lower shaft base through the expansion shaft. The servo motor drives the moving screw to rotate, drives the pneumatic claw to move to the top of the lower shaft base, clamps the expansion shaft and places it on the loading base, and connects the coil to the equipment for use; 2) For standby loading, the staff inserts another expansion shaft into the new coil, and then places the new coil on the lower shaft base through the expansion shaft. The servo motor drives the moving screw to rotate, driving the pneumatic claw to move to the top of the lower shaft base, clamps the expansion shaft and places it on the standby base; 3) Take the expansion shaft. After the coil is used up, the servo motor drives the moving screw to rotate, and drives the pneumatic claw to move to the top of the loading base. The pneumatic claw clamps the expansion shaft and places it on the lower shaft base. The staff removes the expansion shaft and installs a new coil; 4) For subsequent loading, the servo motor drives the moving screw to rotate, driving the pneumatic claw to move to the top of the standby base. The pneumatic claw picks up the standby coil through the expansion shaft and places it on the loading base for use.