Hoisting device for structural steel column below enclosure supporting beam and construction method of hoisting device

By designing the structural steel column hoisting device and corresponding construction methods below the enclosing support beam, the problem of conflict between the steel column and the concrete support beam in underground structure construction is solved, safe and accurate lifting of the steel columns is achieved, and construction efficiency is improved and quality.

CN118929406APending Publication Date: 2024-11-12SHANGHAI CONSTRUCTION NO 7 (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411220327.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In underground structure construction, conflict between structural steel columns and concrete support beams leads to lifting difficulties, increasing construction difficulty and progress delays, and affecting project quality and safety.

Method used

Design a structural steel column hoisting device under the enclosure support beam, including lifting equipment, distribution hanging beam, main hanging rope and secondary hanging rope. The stable lifting of structural steel columns is achieved through the connecting parts of the distribution hanging beam and the steel column hoist rope. , avoid conflicts with concrete support beams, and adopt specific construction steps to ensure accurate positioning and stable installation of steel columns.

Benefits of technology

It realizes the safe and accurate lifting of structural steel columns in a limited space, avoids damage to the existing concrete support structure, improves construction efficiency and quality, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118929406A_ABST
    Figure CN118929406A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of constructional engineering construction, and provides a hoisting device for a structural steel column below an enclosure supporting beam and a construction method.The hoisting device for the structural steel column below the enclosure supporting beam comprises hoisting equipment, a distribution hoisting beam, a main hoisting rope and an auxiliary hoisting rope, and the main hoisting rope is arranged at one end of the distribution hoisting beam; the auxiliary lifting rope is arranged at the other end of the distribution lifting beam; one end of the main lifting rope is connected with lifting equipment, and one end of the auxiliary lifting rope is detachably connected with the lifting equipment; a steel column lifting rope is further arranged on one side of the distribution lifting beam, located between the main lifting rope and the auxiliary lifting rope and used for lifting the structural steel column. The construction method for hoisting the structural steel column below the enclosure supporting beam comprises the following steps: S1, lowering the structural steel column; s2, preliminary positioning; s3, re-positioning is carried out; and S4, fixed installation. The structure steel column can be smoothly hoisted in a limited space, an existing concrete supporting structure is not damaged, and it is guaranteed that the whole construction process is safely and smoothly carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building engineering construction, and in particular to a structural steel column hoisting device under an enclosure support beam and a construction method thereof. Background Art

[0002] During the construction phase of underground structures, the conflict between the main structural steel columns and the concrete support beams in the foundation pit retaining structure is a common and complex problem. This conflict usually occurs in the late stage of deep foundation pit support construction, that is, in the early stage of main structure construction. With the acceleration of urbanization and the increasing shortage of land resources, more and more construction projects have chosen to develop and utilize underground space. In order to ensure the safety and stability of underground structures, concrete support beams in the foundation pit retaining structure are widely used. They are used to maintain the stability of the foundation pit and prevent soil collapse. These support beams often need to be arranged more densely to ensure sufficient support force, which also brings considerable challenges to the subsequent main structure construction.

[0003] Especially when the position of the structural steel column to be hoisted overlaps with the position of the concrete support beam, the traditional hoisting method often fails to meet the construction requirements, resulting in the inability to normally hoist or lower the structural steel column. Because the presence of the concrete support beam limits the moving space of the hoisting equipment, it is difficult for the steel column to directly pass through the support beam to reach the predetermined position. This situation not only increases the difficulty of construction, but may also cause delays in the construction progress and even affect the quality and safety of the entire project.

[0004] Therefore, a construction device and a construction method that are both easy to operate and can ensure safety are needed to assist in hoisting the steel columns below the concrete support beams of the foundation pit retaining structure. Summary of the invention

[0005] In order to ensure that the structural steel columns can be hoisted smoothly within the limited space without damaging the existing concrete supporting structure, and to ensure the safety and smooth progress of the entire construction process.

[0006] On the one hand, the present application provides a structural steel column hoisting device under the enclosure support beam, which adopts the following technical solution: It comprises a lifting device, a distribution beam, a main lifting rope and an auxiliary lifting rope, wherein the main lifting rope is arranged at one end of the distribution beam, and the auxiliary lifting rope is arranged at the other end of the distribution beam; One end of the main lifting rope is connected to the lifting device, and one end of the auxiliary lifting rope is detachably connected to the lifting device; A steel column lifting rope is also provided on one side of the distribution lifting beam. The steel column lifting rope is located between the main lifting rope and the auxiliary lifting rope and is used for lifting the structural steel column.

[0007] By adopting the above technical solution, when in use, one end of the structural steel column is connected to the steel column lifting rope, and only the column lifting rope is connected to the distribution lifting beam. The distribution lifting beam is lifted by the lifting equipment, and the structural steel column is driven to descend along the gap on one side of the concrete support beam to the bottom of the concrete support beam; then the structural steel column is driven to move toward the direction close to the concrete support beam until the distance between the main lifting rope and the concrete support beam reaches the preset distance, and then the auxiliary lifting rope is connected to the lifting equipment, and the auxiliary lifting rope is adjusted to adjust the distribution lifting beam to a horizontal state, and the structural steel column can be lifted to the predetermined position by the lifting equipment. The structural steel column can be lifted in a limited space, while avoiding damage to the existing concrete support structure.

[0008] Optionally, the distribution hanging beam is provided with a first connecting member, a second connecting member and a third connecting member; The first connecting member is disposed close to the main lifting rope and is used to connect the main lifting rope and the distribution lifting beam; The second connecting member is disposed close to the secondary lifting rope and is used to connect the secondary lifting rope and the distribution lifting beam; The third connecting member is arranged close to the steel column hanging rope and is used to connect the steel column hanging rope and the distribution hanging beam.

[0009] By adopting the above technical solution, the main lifting rope, the auxiliary lifting rope and the steel column lifting rope are connected on the distribution lifting beam through the first connecting member, the second connecting member and the third connecting member, making the lifting device more stable and reliable.

[0010] Optionally, the third connecting member is fixed at the geometric center of the side surface of the distribution hanging beam.

[0011] By adopting the above technical solution, the third connecting member is fixed to the geometric center of the distribution hanging beam, so that the steel column lifting rope is connected to the geometric center of the distribution hanging beam, which is convenient for subsequent adjustment of the auxiliary lifting rope to adjust the distribution hanging beam to a horizontal state, and is also beneficial for maintaining the balance of the structural steel column during the subsequent lifting process to prevent safety accidents caused by unbalanced loading.

[0012] Optionally, the first connecting member, the second connecting member and the third connecting member are all configured as hanging ears.

[0013] By adopting the above technical solution, the first connecting member, the second connecting member and the third connecting member are all configured as lifting ears, making the lifting device easier to operate.

[0014] Optionally, the distribution hanging beam is made of I-beam.

[0015] By adopting the above technical solution, the distribution hanging beam is made of I-beam, so that the distribution hanging beam has sufficient bending resistance and rigidity, can withstand the load applied by the steel column of the hoisted structure, and can improve the safety of the hoisting device.

[0016] On the other hand, the present application provides a construction method for hoisting a structural steel column below a retaining support beam. The steps include: S1. Lowering the structural steel column, disconnecting the auxiliary lifting rope from the lifting equipment, connecting one end of the structural steel column to the steel column lifting rope, starting the lifting equipment to transfer the structural steel column to the top of the foundation pit at the construction area, and lowering the structural steel column along the gap on one side of the concrete support beam so that the vertical position of the structural steel column is lower than the concrete support beam; S2. Preliminary positioning: Use the lifting equipment to drive the structural steel column to move horizontally toward the direction close to the concrete support beam. When the main lifting rope is close to the concrete support beam, lower the structural steel column, temporarily place the structural steel column on the basement structural plate, and use the cable wind rope to temporarily fix the structural steel column; S3, repositioning, connecting the auxiliary lifting rope to the lifting equipment and adjusting the auxiliary lifting rope to make the distribution lifting beam in a horizontal state, then lifting the structural steel column again, and moving the structural steel column to just below the concrete support beam; S4, fixed installation, slowly drop the structural steel column to the basement structural plate again, and place the structural steel column stably in the predetermined position through fixed installation.

[0017] By adopting the above technical solution, step S1 solves the problem that the structural steel column cannot be directly lowered due to space limitations in the traditional method; step S2 ensures the accuracy of the initial position of the structural steel column and temporarily fixes it through cables and wind ropes, thereby improving the safety of construction; step S3 ensures the accuracy and stability of the structural steel column in the final installation position; step S4 ensures the installation accuracy of the structural steel column and the stability of the structure.

[0018] Optionally, in step S2, when the main hoisting rope approaches the concrete support beam, when the distance between the main hoisting rope and the concrete support beam is 90-110 mm, the structural steel column is lowered.

[0019] By adopting the above technical solution, it is ensured that there is enough space between the structural steel column and the concrete support beam for safe operation, while also avoiding positioning errors caused by premature contact with the ground.

[0020] Optionally, in step S3, a hand hoist is used to adjust the auxiliary lifting rope to keep the distribution lifting beam level.

[0021] By adopting the above technical solution, the auxiliary lifting rope is adjusted by hand chain hoist to ensure that the distribution beam remains horizontal. This adjustment ensures the balance and stability of the structural steel column during the re-lifting process, reducing the risks that may occur during the lifting process.

[0022] In summary, the present application includes at least one of the following beneficial effects: 1. The construction method for hoisting the structural steel column under the enclosure support beam provided in the present application can effectively solve the problem of the position conflict between the structural steel column and the concrete support beam, and ensure the safety and accuracy of the structural steel column during the hoisting process. This method is particularly suitable for underground structure construction projects with limited space or complex construction environment; 2. The hoisting device in the present application preferably uses components such as distribution beams and lifting ears. Since these components are reasonably designed and easy to operate, the entire hoisting process is more efficient and stable, further improving the construction efficiency and quality; 3. The hoisting device of the present application has a simple structure, is easy to operate, can be reused, and reduces construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the overall structure of the structural steel column hoisting device below the enclosure support beam of Example 1 of the present application; Figure 2 It is a schematic diagram of the distribution hanging beam structure of Example 1 of the present application; Figure 3 is an operation diagram of step S1 in Example 2 of the present application; Figure 4 is a schematic diagram of the operation structure of step S2 in Example 2 of the present application; Figure 5 is a schematic diagram of the operation structure of step S3 in Example 2 of the present application; Figure 6 is a schematic diagram of the operation structure of step S4 in Example 2 of the present application; Explanation of the accompanying drawings: 1. Hook; 2. Distribution beam; 21. First connecting piece; 22. Second connecting piece; 23. Third connecting piece; 3. Main lifting rope; 4. Auxiliary lifting rope; 5. Steel column lifting rope; 6. Steel column; 7. Concrete support beam; 8. Basement structural plate. DETAILED DESCRIPTION

[0024] The following is combined with Figure 1-6 This application is described in further detail.

[0025] Example 1 This embodiment discloses a structural steel column hoisting device under the enclosure support beam, referring to Figure 1 and Figure 2, including a lifting device, a distribution beam 2, a main lifting rope 3, an auxiliary lifting rope 4 and a steel column lifting rope 5. The lifting device can be a tower crane or a truck crane, etc., and the lifting device includes a hook 1. The distribution beam 2 is made of I-beam, has sufficient bending resistance and rigidity, and can withstand the load applied by the hoisted structural steel column 6. A first connecting member 21, a second connecting member 22 and a third connecting member 23 are arranged on the distribution beam 2; the first connecting member 21 is located at one end of the distribution beam 2, the second connecting member 22 is located at the other end of the distribution beam 2, and the third connecting member 23 is located on the bottom surface of the distribution beam 2. The first connecting member 21, the second connecting member 22 and the third connecting member 23 are all set as lifting ears, and are all welded and fixed to the distribution beam 2 to ensure the firmness and reliability of the connection. The main lifting rope 3, the auxiliary lifting rope 4 and the steel column lifting rope 5 are all made of steel wire ropes, and the diameter and strength of the main lifting steel wire rope and the auxiliary lifting steel wire rope are specifically determined according to the weight of the hoisted structural steel column 6.

[0026] Reference Figure 1 and Figure 2 , one end of the main lifting rope 3 is tied to the first connecting piece 21, and the other end is tied into a loop and then put on the hook 1. One end of the auxiliary lifting rope 4 is tied to the second connecting piece 22, and the other end is also tied into a loop and then put on the hook 1. This realizes the detachable connection between the main lifting rope 3 and the auxiliary lifting rope 4 on the hook 1. The rope segment of the steel column lifting rope 5 is hooked on the hook 1, and the steel column lifting rope 5 is used to connect the structural steel column 6; in this embodiment, reserved holes are opened on both sides of the structural steel column 6, and both ends of the steel column lifting rope 5 are tied to the structural steel column 6 through the reserved holes. In other embodiments, the connection between the steel column lifting rope 5 and the structural steel column 6 can also be achieved by welding, setting a lifting ear on the structural steel column 6, or using a rope clamp.

[0027] Among them, the third connecting member 23 is located at the geometric center of the bottom surface of the distribution hanging beam 2, which can make the force on the structural steel column 6 more uniform during the lifting process, thereby improving the safety and stability of the lifting.

[0028] The implementation principle of the structural steel column hoisting device under the enclosure support beam of this embodiment 1 is as follows: connect the main hoisting rope 3 and the auxiliary hoisting rope 4 through the hoisting equipment to perform the hoisting operation on the distribution hoisting beam 2. During the hoisting process, first disconnect the connection between the auxiliary hoisting rope 4 and the hook 1, and connect the two ends of the steel column hoisting rope 5 to the structural steel column 6; use the hoisting equipment to hoist the distribution hoisting beam 2, and drive the structural steel column 6 to descend along the gap on one side of the concrete support beam 7 until the height of the structural steel column 6 drops to below the concrete support beam 7. Then drive the structural steel column 6 to move in the direction close to the concrete support beam 7 until the distance between the main hoisting rope 3 and the concrete support beam 7 reaches a preset distance; then, put one end of the auxiliary hoisting rope 4 into a loop on the hook 1, and adjust the length or tension of the auxiliary hoisting rope 4, adjust the distribution hoisting beam 2 to a horizontal state, so that the main hoisting rope 3 and the auxiliary hoisting rope 4 evenly bear the weight of the two ends of the distribution hoisting beam 2, and ensure that the structural steel column 6 can move smoothly. Continue to use the hoisting equipment to move the structural steel column 6 and hoist the structural steel column 6 to the predetermined position. During hoisting, the positions and lengths of the main hoisting rope 3 and the auxiliary hoisting rope 4 should be reasonably allocated to ensure that the structural steel column 6 does not collide with the concrete support beam 7 during the hoisting process, thereby successfully completing the hoisting task.

[0029] Embodiment 2: This embodiment discloses a construction method for a structural steel column hoisting device below a protective support beam, comprising the following steps: S1. Lowering of structural steel columns: Figure 3 As shown, first, disconnect the auxiliary hoisting rope 4 from the lifting equipment, and connect one end of the structural steel column 6 to the steel column hoisting rope 5. Then, start the lifting equipment to transfer the structural steel column 6 to the top of the foundation pit at the construction area, and lower it along the gap on one side of the concrete support beam 7, so that the vertical position of the structural steel column 6 is lower than the concrete support beam 7. In this step, it is necessary to ensure the smooth lowering of the structural steel column 6 to avoid collision between the structural steel column 6 and the distribution beam 2 concrete support beam 7.

[0030] S2. Preliminary positioning: Figure 4 As shown, the structural steel column 6 is driven by the lifting equipment to move horizontally toward the direction close to the concrete support beam. During the movement, the distance between the main lifting rope 3 and the concrete support beam 7 should be closely observed. When the distance between the main lifting rope 3 and the concrete support beam 7 is 90-110mm, the structural steel column 6 is lowered in time. The structural steel column 6 is temporarily erected on the basement structural slab 8, and the structural steel column 6 is temporarily fixed with a cable wind rope to ensure the stability and safety of the structural steel column 6.

[0031] S3, re-positioning: Figure 5As shown, after the auxiliary lifting rope 4 is connected to the lifting equipment, the guy rope is removed, and the length and tension of the auxiliary lifting rope 4 are adjusted by a hand winch to make the distribution beam 2 in a horizontal state. The structural steel column 6 is lifted again and moved to just below the concrete support beam 7. In this step, it is necessary to ensure the horizontality of the distribution beam 2 and the accurate position of the structural steel column 6 to prepare for the subsequent fixed installation.

[0032] S4, Fixed installation: Figure 6 As shown, finally, the structural steel column 6 is slowly dropped again, so that the structural steel column 6 falls to the predetermined position on the basement structural plate 8, and the structural steel column 6 can be fixed and installed by welding or bolting. During the fixing process, the verticality and stability of the structural steel column 6 must be ensured to achieve the expected construction effect.

[0033] During the entire lifting process, it is necessary to monitor and inspect the lifting equipment, the connection between the distribution lifting beam 2 and the main lifting rope 3, the auxiliary lifting rope 4 and the steel column lifting rope 5, and the connection between the structural steel column 6 and the steel column lifting rope 5 in real time to ensure safe and smooth construction.

[0034] The structural steel column hoisting device and construction method provided by the present application have the advantages of simple operation, safety, reliability, high efficiency, etc. In actual construction, appropriate embodiments can be selected for application according to specific circumstances to meet different construction requirements.

[0035] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereby. Any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application. For example, the specific models and materials of the lifting equipment, distribution beam 2, and hanging ropes can be replaced to adapt to different construction environments and requirements. At the same time, the construction method can also be further optimized and improved to improve construction efficiency and quality.

Claims

1. A hoisting device for a structural steel column under a supporting beam, characterized in that: It comprises a lifting device, a distribution beam (2), a main lifting rope (3) and an auxiliary lifting rope (4), wherein the main lifting rope (3) is arranged at one end of the distribution beam (2), and the auxiliary lifting rope (4) is arranged at the other end of the distribution beam (2); One end of the main lifting rope (3) is connected to the lifting device, and one end of the auxiliary lifting rope (4) is detachably connected to the lifting device; A steel column hoisting rope (5) is also provided on one side of the distribution hoisting beam (2); the steel column hoisting rope (5) is located between the main hoisting rope (3) and the auxiliary hoisting rope (4) and is used for hoisting the structural steel column (6).

2. The device for hoisting the structural steel column below the enclosure support beam according to claim 1 is characterized in that: The distribution hanging beam (2) is provided with a first connecting piece (21), a second connecting piece (22) and a third connecting piece (23); The first connecting member (21) is arranged close to the main lifting rope (3) and is used to connect the main lifting rope (3) and the distribution lifting beam (2); The second connecting member (22) is arranged close to the auxiliary lifting rope (4) and is used to connect the auxiliary lifting rope (4) and the distribution lifting beam (2); The third connecting member (23) is arranged close to the steel column suspension rope (5) and is used to connect the steel column suspension rope (5) and the distribution suspension beam (2).

3. The device for hoisting the structural steel column below the enclosure support beam according to claim 2 is characterized in that: The third connecting member (23) is fixed at the geometric center of the side surface of the distribution hanging beam (2).

4. The device for hoisting the structural steel column below the enclosure support beam according to claim 2 is characterized in that: The first connecting member (21), the second connecting member (22) and the third connecting member (23) are all configured as hanging ears.

5. The device for hoisting the structural steel column below the enclosure support beam according to claim 1 is characterized in that: The distribution hanging beam (2) is made of I-beam.

6. A construction method for hoisting a structural steel column under a supporting beam, characterized in that: The method of using the structural steel column hoisting device under the enclosure support beam as described in any one of claims 1 to 4 to hoist the structural steel column comprises the following steps: S1, lowering the structural steel column, disconnecting the auxiliary lifting rope (4) from the lifting device, connecting one end of the structural steel column (6) to the steel column lifting rope (5), starting the lifting device to transfer the structural steel column (6) to the top of the foundation pit at the construction area, and lowering the structural steel column (6) along the gap on one side of the concrete support beam (7) so that the vertical position of the structural steel column (6) is lower than the concrete support beam (7); S2, preliminary positioning, driving the structural steel column (6) to move horizontally toward the direction close to the concrete support beam (7) by means of the lifting equipment, and when the main lifting rope (3) is close to the concrete support beam (7), lowering the structural steel column (6), temporarily placing the structural steel column (6) on the basement structural slab (8), and temporarily fixing the structural steel column (6) with a cable wind rope; S3, repositioning, connecting the auxiliary lifting rope (4) to the lifting device and adjusting the auxiliary lifting rope (4) to make the distribution lifting beam (2) in a horizontal state, then lifting the structural steel column (6) again, and moving the structural steel column (6) to the bottom of the concrete support beam (7); S4, fixed installation, the structural steel column (6) is slowly lowered onto the basement structural plate (8) again, and the structural steel column (6) is stably placed at a predetermined position through fixed installation.

7. The construction method of the structural steel column hoisting device under the enclosure support beam according to claim 5 is characterized in that: In the step S2, when the main suspension rope (3) approaches the concrete support beam (7), when the distance between the main suspension rope (3) and the concrete support beam (7) is 90-110 mm, the structural steel column (6) is lowered.

8. The construction method of the structural steel column hoisting device under the enclosure support beam according to claim 6 is characterized in that: In the step S3, the auxiliary lifting rope (4) is adjusted using a hand chain hoist to keep the distribution lifting beam (2) level.