Offshore wind power anchoring type pile foundation structure and construction method
Through the design of anchor pull pile foundation structure, the horizontal shear force and bending moment of the fan unit are transmitted to the seabed foundation, and the problem of steel volume increasing when facing huge horizontal shear force and bending moment is solved, and the problem of steel use of steel pipe piles is realized. Larger load bearing capacity at the same size.
Patent Information
- Application Number
- CN202411247744.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-12
AI Technical Summary
When existing steel pipe piles face huge horizontal shear force and bending moment, the pile diameter and wall thickness need to increase, resulting in an increase in steel use and transportation difficulty, limiting the development of offshore wind power.
Adopting offshore wind power anchor-pull pile foundation structure, through the combination design of anchor plate, tower, universal wheel, cable and radial spring, the fixed connection and relative horizontal movement of the tower and steel pipe pile are realized, and the fan unit is transmitted. Horizontal shear force and bending moment to the seabed foundation, reducing the horizontal shear force and bending moment of the pile body.
Without increasing the pile diameter and wall thickness, the horizontal shear force and bending moment bearing capacity of steel pipe piles will be improved, the amount of steel used will be reduced, and the difficulty of transportation will be reduced.
Smart Images

Figure CN118933061A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of offshore pile foundations, and in particular to an offshore wind power anchor-type pile foundation structure and a construction method. Background Art
[0002] As one of the key clean energy sources to promote the "dual carbon" goals and the transformation to a low-carbon energy system, offshore wind power has a cumulative installed capacity of 37.7GW in China by the end of 2023, accounting for about half of the global cumulative offshore wind power market share. With policy support, it has broad development prospects.
[0003] For offshore fixed wind power foundation types, there are mainly pile-supported, gravity-supported and suction-supported foundations. Among them, pile-supported foundations are mostly steel pipe piles. Under the horizontal thrust from the upper wind turbine unit, the pile body will bear huge horizontal shear force and bending moment. Therefore, the pile diameter and wall thickness of the steel pipe pile need to meet certain design requirements.
[0004] In recent years, with the gradual increase in the installed capacity of wind turbines, the pile diameter and wall thickness of steel pipe piles have also gradually increased. The increase in the pile diameter and wall thickness of steel pipe piles will not only lead to an increase in the amount of steel used and the production cost of steel pipe piles, but also increase the difficulty of transporting steel pipe piles, limiting the further development of offshore wind power.
[0005] Therefore, how to improve the bearing capacity of steel pipe piles against horizontal shear force and bending moment without increasing the amount of steel (without increasing the pile diameter and wall thickness) has become a technical problem that needs to be solved urgently by technical personnel in this field. Summary of the invention
[0006] In view of this, an object of the present invention is to provide an offshore wind power anchor pile foundation structure to solve the technical problem of increased steel consumption in existing steel pipe piles.
[0007] The technical solution adopted by the present invention is: an offshore wind power anchor pile foundation structure, comprising:
[0008] A steel pipe pile, the steel pipe pile comprising an upper mud section and a lower mud section that are axially fixedly connected;
[0009] An anchor plate bottom plate, the anchor plate bottom plate is sleeved on the bottom end of the upper mud section, and the anchor plate bottom plate is fixedly connected to the steel pipe pile;
[0010] Anchor plate uprights, a plurality of said anchor plate uprights are distributed circumferentially around the axis of the steel pipe pile, and the bottom ends of said anchor plate uprights are fixedly connected to the anchor plate bottom plate;
[0011] A tower, wherein the tower is coaxially arranged directly above the steel pipe pile;
[0012] Universal wheels, a plurality of which are installed between the tower and the steel pipe piles so that the tower and the steel pipe piles can move horizontally relative to each other;
[0013] Cables, a plurality of cables are distributed around the axis of the steel pipe pile, and the top ends of the cables are fixedly connected to the tower, and the bottom ends of the cables are fixedly connected to the anchor plate, so that the tower and the steel pipe pile are axially fixedly connected;
[0014] A radial spring, wherein a plurality of the radial springs are distributed circumferentially around the axis of the steel pipe pile, one end of the radial spring is fixedly connected to the tower, and the other end of the radial spring is fixedly connected to the steel pipe pile.
[0015] Preferably, a limiting clamp is fixedly installed on the upper mud section, and the limiting clamp is axially abutted against the top end of the anchor plate vertical plate.
[0016] Preferably, an arc-shaped support plate capable of fitting with the steel pipe pile is fixedly connected to one end of the anchor plate vertical plate close to the steel pipe pile, and the top end of the arc-shaped support plate is axially abutted against the limiting clamp.
[0017] Preferably, the top of the steel pipe pile is fixedly connected with a fixed flange, and the fixed flange includes a plate body part and a cylinder body part, the plate body part is fixedly connected to the top end of the upper mud section, the bottom end of the cylinder body part is fixedly connected to the plate body part, and the top end of the cylinder body part is detachably fixedly connected to the movable flange; the bottom end of the tower is coaxially arranged in the cylinder body part, and the bottom end of the tower is coaxially fixedly connected with a reinforcement plate, one end of the radial spring is fixedly connected to the reinforcement plate, and the other end of the radial spring is fixedly connected to the cylinder body part, the radial dimension of the reinforcement plate is larger than the inner diameter dimension of the movable flange, and a plurality of axial springs are evenly distributed around the circumference of the axis of the steel pipe pile between the reinforcement plate and the movable flange.
[0018] Preferably, the bottom end of the axial spring is fixedly connected to the reinforcing plate, and the top end of the axial spring is slidably connected to the movable flange along the radial direction of the steel pipe pile.
[0019] Preferably, force sensors are installed on both the axial spring and the radial spring, a tensioner matched with the cable is installed on the tower, the force sensor is electrically connected to the control module, and the control module is electrically connected to the tensioner.
[0020] Preferably, a plurality of fixed pulleys cooperating with the cables are evenly distributed on the circumference of the movable flange or the fixed flange.
[0021] Preferably, a reinforcement ring is fixedly connected to the tower, and connecting ear plates are evenly distributed on the circumference of the reinforcement ring. The top end of the cable is connected to the connecting ear plate, and the bottom end of the cable passes around the fixed pulley and is fixedly connected to the top end of the anchor plate vertical plate.
[0022] Preferably, drainage holes are formed on the plate body.
[0023] A second object of the present invention is to provide a construction method for an offshore wind power anchor pile foundation structure, the construction method comprising the following steps:
[0024] Step 1: sinking the steel pipe pile so that the lower mud section of the steel pipe pile is inserted into the seabed;
[0025] Step 2: fix the limit clamp to the upper mud section of the steel pipe pile through underwater operation, and make the top ends of the anchor plate and the arc-shaped support plate axially abut against the limit clamp, and the anchor plate bottom plate is ballasted on the seabed mud surface;
[0026] Step 3: hoist the bottom end of the tower into the fixed flange at the top of the steel pipe pile, and install multiple radial springs between the fixed flange and the reinforcement plate at the bottom end of the tower;
[0027] Step 4: Install the movable flange, and install multiple axial springs between the movable flange and the reinforcement plate;
[0028] Step 5: Install the cables between the tower reinforcement ring and the anchor plate and tighten them.
[0029] Beneficial effects of the present invention:
[0030] The present invention has a universal wheel and a radial spring installed between the top of the steel pipe pile and the bottom of the tower, an anchor plate upright plate and an anchor plate bottom plate are fixedly connected at the connection between the upper mud section and the lower mud section of the steel pipe pile, and the bottom end of the tower is fixedly connected to the anchor plate upright plate through a plurality of circumferentially distributed cables, which not only realizes the fixed connection between the tower and the steel pipe pile in the axial direction, but also enables the tower to move with a small displacement relative to the steel pipe pile in the horizontal direction, and also transmits the horizontal shear force and additional bending moment of the wind turbine unit on the top of the tower directly to the anchor plate bottom plate and the anchor plate upright plate through the tensioning force transmission of the cables, and acts on the connection between the upper mud section and the lower mud section, reduces the effect of the horizontal shear force and bending moment on the upper mud section of the steel pipe pile through the restraining resistance of the seabed foundation on the lower mud section, and indirectly improves the load bearing capacity of the steel pipe pile, so that under the same pile diameter and wall thickness, the steel pipe pile can bear a larger horizontal shear force and bending moment, thereby reducing the steel consumption of the steel pipe pile. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a three-dimensional schematic diagram of the offshore wind power anchor-pull pile foundation structure of the present invention;
[0032] Figure 2 It is a structural schematic diagram of the offshore wind power anchor-pull pile foundation structure of the present invention;
[0033] Figure 3 for Figure 2 A partial enlarged view in FIG.
[0034] Figure 4 This is a schematic diagram of the connection between the tower and the steel pipe pile;
[0035] Figure 5 It is the position relationship diagram of the reinforcing plate, radial spring and axial spring;
[0036] Figure 6 This is one of the position relationship diagrams of the steel pipe piles, the anchor plate uprights, and the anchor plate bottom plates;
[0037] Figure 7 This is the second diagram of the position relationship between the steel pipe piles, the anchor plate uprights and the anchor plate bottom plates.
[0038] Description of reference numerals in the figures:
[0039] 1. Steel pipe pile; 2. Anchor plate bottom plate; 3. Anchor plate vertical plate; 4. Tower; 5. Universal wheel; 6. Cable; 7. Radial spring; 8. Limit clamp; 9. Arc support plate; 10. Fixed flange; 11. Movable flange; 12. Reinforcement plate; 13. Axial spring; 14. Fixed pulley; 15. Reinforcement ring; 16. Connecting ear plate; 17. Drain hole; 18. Radial slider; 19. Fan unit; 20. Sea surface; 21. Seabed mud surface. DETAILED DESCRIPTION
[0040] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. These embodiments are only used to illustrate the present invention, but not to limit the present invention.
[0041] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0042] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0043] Furthermore, in the description of the present invention, unless otherwise specified, “plurality” means two or more.
[0044] Examples, such as Figure 1-Figure 7 As shown, an offshore wind power anchor-pull type pile foundation structure is used for the installation and fixation of an offshore wind turbine unit; the pile foundation structure comprises:
[0045] The steel pipe pile 1 comprises an axially arranged upper mud section and a lower mud section, wherein the bottom end of the upper mud section is fixedly connected to the top end of the lower mud section.
[0046] The anchor plate bottom plate 2 is sleeved on the bottom end of the upper mud section, and the anchor plate bottom plate 2 is horizontally arranged and fixedly connected to the steel pipe pile 1.
[0047] Anchor plate uprights 3, the number of which is multiple, and the multiple anchor plate uprights 3 are distributed circumferentially around the axis of the steel pipe pile 1, the anchor plate uprights 3 are arranged directly above the anchor plate bottom plate 2 along the radial direction of the steel pipe pile 1, the bottom end of the anchor plate uprights 3 is fixedly connected to the anchor plate bottom plate 2, and the end of the anchor plate uprights 3 close to the steel pipe pile 1 is in contact with the steel pipe pile 1, and the anchor plate uprights 3 are used to apply radial force to the steel pipe pile 1.
[0048] The tower 4 is coaxially installed just above the steel pipe pile 1 .
[0049] There are multiple universal wheels 5 , and the multiple universal wheels 5 are installed between the tower 4 and the steel pipe pile 1 , so that the tower 4 and the steel pipe pile 1 can move relative to each other in the horizontal direction.
[0050] Cable 6, the number of which is multiple, the multiple cables 6 are distributed around the axis of the steel pipe pile 1, and the top end of the cable 6 is fixedly connected to the tower 4, and the bottom end of the cable 6 is fixedly connected to the anchor plate vertical plate 3, so that the tower 4 and the steel pipe pile 1 are fixedly connected in the axial direction and horizontal shear force and bending moment are transmitted through the tightening of the cable 6.
[0051] The radial spring 7 is multiple in number and is circumferentially distributed around the axis of the steel pipe pile 1. The radial spring 7 is arranged along the radial direction of the steel pipe pile 1, and one end of the radial spring 7 is fixedly connected to the tower 4, and the other end of the radial spring 7 is fixedly connected to the steel pipe pile 1, so as to buffer the relative movement of the tower 4 and the steel pipe pile 1 in the horizontal direction through the elastic deformation of the radial spring 7.
[0052] In the present application, a universal wheel 5 and a radial spring 7 are installed between the top of the steel pipe pile 1 and the bottom of the tower 4. An anchor plate 3 and an anchor plate bottom plate 2 are fixedly connected at the connection between the mud upper section and the mud lower section of the steel pipe pile 1, and the bottom end of the tower 4 is fixedly connected to the anchor plate 3 through a plurality of circumferentially distributed cables 6, which not only realizes the fixed connection between the tower 4 and the steel pipe pile 1 in the axial direction, but also enables the tower 4 to move with a small displacement relative to the steel pipe pile 1 in the horizontal direction, and also transmits the force through the tensioning of the cables 6, so that the tower The horizontal shear force and additional bending moment of the fan unit 19 at the top of the tube 4 are directly transmitted to the anchor plate bottom plate 2 and the anchor plate vertical plate 3 and act on the connection between the upper mud section and the lower mud section. Through the restraining resistance of the seabed foundation on the lower mud section, the effect of the horizontal shear force and bending moment on the upper mud section of the steel pipe pile 1 is reduced, and the load bearing capacity of the steel pipe pile 1 is indirectly improved, so that under the same pile diameter and wall thickness, the steel pipe pile 1 can bear a larger horizontal force and bending moment, thereby reducing the steel consumption of the steel pipe pile 1.
[0053] Specific embodiment 1, as Figure 1-Figure 7 As shown, an offshore wind power anchor-pull pile foundation structure is used for the installation and fixation of an offshore wind turbine unit 19. The pile foundation structure includes: a steel pipe pile 1, an anchor plate bottom plate 2, an anchor plate vertical plate 3, a tower 4, a universal wheel 5, a cable 6 and a radial spring 7.
[0054] like Figure 1 and Figure 2 As shown, the steel pipe pile 1 includes an integrally formed upper mud section and a lower mud section, the lower mud section is vertically inserted into the seabed foundation, the upper mud section is coaxially arranged directly above the lower mud section, the bottom end of the upper mud section is fixedly connected to the top end of the lower mud section, that is, the bottom end of the upper mud section is located above the seabed mud surface 21, and the top end of the upper mud section is located above the sea surface 20.
[0055] like Figure 1 and Figure 6 As shown, the anchor plate bottom plate 2 is sleeved on the outer side of the bottom end of the upper mud section of the steel pipe pile 1, the inner diameter of the anchor plate bottom plate 2 is equal to the outer diameter of the steel pipe pile 1, the outer diameter of the anchor plate bottom plate 2 is larger than the outer diameter of the steel pipe pile 1, and the anchor plate bottom plate 2 is arranged in the horizontal direction and fixedly connected to the steel pipe pile 1, and the specific fixed connection method can adopt any known fixed connection method.
[0056] The thickness and radial dimensions of the anchor plate bottom plate 2 need to be calculated based on actual stress conditions.
[0057] like Figure 6 and Figure 7As shown, the number of the anchor plate uprights 3 is multiple, such as 4, 6 or 8, and the multiple anchor plate uprights 3 are evenly distributed around the circumference of the steel pipe pile 1; the anchor plate uprights 3 are arranged directly above the anchor plate bottom plate 2, and the bottom ends of the anchor plate uprights 3 are vertically fixedly connected to the anchor plate bottom plate 2, such as by welding; the anchor plate uprights 3 are arranged as a whole along the radial direction of the steel pipe pile 1, and one end of the anchor plate uprights 3 close to the steel pipe pile 1 abuts against the steel pipe pile 1, so that the anchor plate uprights 3 can exert radial force on the steel pipe pile 1.
[0058] The number, thickness and length of the anchor plate uprights 3 need to be calculated based on actual stress conditions.
[0059] like Figure 2 As shown, the tower 4 is coaxially arranged just above the steel pipe pile 1 , and a wind turbine unit 19 is installed on the top of the tower 4 .
[0060] like Figure 2 As shown, there are multiple universal wheels 5, and the multiple universal wheels 5 are arrayed between the tower 4 and the steel pipe pile 1. The mounting seat of the universal wheel 5 is fixedly connected to the tower 4, that is, the top end of the universal wheel 5 is detachably fixedly connected to the tower 4, and the bottom end of the universal wheel 5 is ballasted on the top end of the steel pipe pile 1 so that the tower 4 and the steel pipe pile 1 can move relative to each other in the horizontal direction.
[0061] like Figure 1 As shown, the number of the cables 6 is multiple, such as 4, 6 or 8, and the number of the cables 6 is equal to the number of the anchor plate uprights 3, and they are in a one-to-one correspondence; the multiple cables 6 are evenly distributed around the circumference of the steel pipe pile 1, the top end of the cable 6 is fixedly connected to the tower 4, and the bottom end of the cable 6 is fixedly connected to the anchor plate upright 3, so that the tower 4 and the steel pipe pile 1 are fixedly connected in the axial direction by tightening the cable 6, and the horizontal shear force and bending moment are transmitted between the tower 4 and the steel pipe pile 1 through the cable 6.
[0062] Preferably, Figure 3 As shown, a reinforcement ring 15 is integrally formed on the outer circumferential surface of the bottom end of the tower 4, and a connecting ear plate 16 is installed on the reinforcement ring 15. A plurality of connecting ear plates 16 are evenly distributed around the circumference of the tower 4, and the top end of the cable 6 is connected to the connecting ear plate 16, and the bottom end of the cable 6 is fixedly connected to the top end of the anchor plate vertical plate 3.
[0063] The number of the radial springs 7 is multiple, such as 6, 8, 10 or 12, and the multiple radial springs 7 are evenly distributed around the circumference of the steel pipe pile 1; the radial spring 7 is arranged along the radial direction of the steel pipe pile 1 as a whole, and one end of the radial spring 7 is fixedly connected to the tower 4, and the other end of the radial spring 7 is fixedly connected to the steel pipe pile 1, so as to buffer the relative movement of the tower 4 and the steel pipe pile 1 in the horizontal direction through the elastic deformation of the radial spring 7.
[0064] Preferably, Figure 3 As shown, a fixing flange 10 is installed on the top of the steel pipe pile 1, and the fixing flange can be integrally formed with the steel pipe pile 1; the fixing flange 10 includes a plate body portion and a cylinder body portion, the plate body portion is fixedly connected to the top end of the mud upper section, the bottom end of the cylinder body portion is fixedly connected to the plate body portion, and the cylinder body portion is coaxially arranged with the steel pipe pile 1; the bottom end of the tower 4 is coaxially arranged in the cylinder body portion, and the bottom end of the tower 4 is coaxially fixedly connected with a reinforcing plate 12, the reinforcing plate 12 surrounds the bottom end of the tower 4, one end of the radial spring 7 is fixedly connected to the reinforcing plate 12, and the other end of the radial spring 7 is fixedly connected to the cylinder body portion.
[0065] In another specific embodiment, Figure 1 , Figure 3 , Figure 4 and Figure 5 As shown, a fixed flange 10 is installed on the top of the steel pipe pile 1, and the fixed flange is detachably fixedly connected to the steel pipe pile 1, and a movable flange 11 is detachably fixedly connected to the top of the fixed flange 10; the bottom end of the tower 4 axially extends to the inside of the fixed flange 10, and a reinforcing plate 12 is integrally connected to the bottom end of the tower 4, the radial dimension of the reinforcing plate 12 is larger than the inner diameter dimension of the movable flange 11, and the inner diameter dimension of the movable flange 11 is smaller than the outer diameter dimension of the reinforcing plate 12, and a plurality of axial springs 13 are installed between the movable flange 11 and the reinforcing plate 12, for example, the number of the axial springs 13 is 6, 8, 10 or 12, and the plurality of axial springs 13 are evenly distributed around the circumference of the bottom end of the tower 4, and the top end of the axial spring 13 is fixedly connected to the movable flange 11, and the bottom end of the axial spring 13 is fixedly connected to the reinforcing plate 12.
[0066] Preferably, Figure 3 As shown, a plurality of radial sliders 18 are installed on the lower surface of the movable flange 11, and the radial sliders 18 are in a one-to-one correspondence with the axial springs 13. The radial sliders 18 are slidably connected to the movable flange 11 along the radial direction of the steel pipe pile 1, and the top end of the axial spring 13 is fixedly connected to the radial slider 18, so that when the tower 4 and the steel pipe pile 1 move relative to each other in the horizontal direction, the top end of the axial spring 13 can move synchronously with the tower 4, so that the axial spring 13 maintains a vertical state, thereby applying axial elastic force to the movable flange 11 and the fixed flange 10.
[0067] A force sensor (not shown in the figure) is installed on both the axial spring 13 and the radial spring 7. The force sensor can detect the elastic force of the axial spring 13 and the radial spring 7 in real time. A tensioner (not shown in the figure) matched with the cable 6 is installed on the tower 4. The force sensor is connected to the control module by electrical signals, and the control module is connected to the tensioner by electrical signals. When the tower 4 and the steel pipe pile 1 move relative to each other or have a tendency to move relative to each other, the force sensor can detect the change in the elastic force of the axial spring 13 and the radial spring 7, and the control module can control the corresponding tensioner to tighten the cable 6 according to the change in the elastic force of the axial spring 13 and the radial spring 7, so that when the tower 4 below the reinforcing ring 15 produces tensile strain locally, the tensioner will tighten the cable 6 in time until the tensile strain is zero.
[0068] In another specific embodiment, Figure 1 and Figure 6 As shown, an arc-shaped support plate 9 is fixedly connected to one end of the anchor plate upright 3 close to the steel pipe pile 1, and the arc-shaped support plate 9 is coaxial with the steel pipe pile 1, and in the circumferential direction, a spacing is set between two adjacent arc-shaped support plates 9, that is, there is a gap between two adjacent arc-shaped support plates 9, so that the side of the arc-shaped support plate 9 away from the anchor plate upright 3 can fit tightly with the steel pipe pile 1, which is used to increase the contact area between the anchor plate upright 3 and the arc-shaped support plate 9, thereby reducing the effect of the horizontal shear force acting on the mud upper section of the steel pipe pile 1 through the anchor plate upright 3 on the steel pipe pile 1, and indirectly improving the bearing capacity of the steel pipe pile 1 to horizontal loads.
[0069] Preferably, Figure 1 and Figure 6 As shown, the fixed connection between the anchor plate base plate 2 and the steel pipe pile 1 is achieved as follows: a limit hoop 8 (the structure and installation method of the limit hoop 8 are prior art) is fixedly installed on the mud upper section of the steel pipe pile 1, and the limit hoop 8 is a steel hoop, and the limit hoop 8 is located above the anchor plate base plate 2, and the top ends of the anchor plate vertical plate 3 and the arc-shaped support plate 9 are abutted against the bottom end of the limit hoop 8, so that the anchor plate base plate 2 and the steel pipe pile 1 are fixedly connected in the axial direction.
[0070] In another specific embodiment, Figure 3 As shown, at least one drainage hole 17 is formed on the plate body, and the drainage hole 17 is used to drain rainwater or seawater inside the fixed flange 10 to the outside, so as to prevent the humid environment from affecting the connection structure between the tower 4 and the steel pipe pile 1, thereby extending the service life of the pile foundation structure.
[0071] In another specific embodiment, Figure 1 and Figure 3As shown, a fixed pulley 14 is installed on the fixed flange 10 or the movable flange 11. The number of the fixed pulleys 14 is multiple, and the fixed pulleys 14 and the cables 6 are in a one-to-one correspondence. The fixed pulley 14 cooperates with the cables 6 to change the direction of the cables 6, that is, the top end of the cables 6 is fixedly connected to the connecting ear plate 16 at the bottom end of the tower 4, and the bottom end of the cables 6 is fixedly connected to the top end of the anchor plate 3 after changing direction after bypassing the fixed pulley 14.
[0072] Preferably, the upper half of each cable 6 is inclined, and the lower half of each cable 6 is vertical, so that part of the horizontal shear force transmitted downward by the cable 6 is converted into an axial force acting on the anchor plate bottom plate 2, indirectly improving the bearing capacity of the steel pipe pile 1 to horizontal loads.
[0073] Examples, such as Figure 1-Figure 3 As shown, a construction method of an offshore wind power anchor pile foundation structure comprises the following steps:
[0074] Step 1: sink the steel pipe pile 1 so that the lower mud section of the steel pipe pile 1 is inserted into the seabed, that is, the lower mud section of the steel pipe pile 1 is located below the seabed mud surface 21, and the upper mud section of the steel pipe pile 1 is located above the seabed mud surface 21.
[0075] Step 2: first, sleeve the anchor plate bottom plate 2 (the anchor plate vertical plate 3 and the anchor plate bottom plate 2 are welded and connected in advance) on the mud upper section of the steel pipe pile 1, and lower the anchor plate bottom plate 2 to the seabed mud surface 21, and during the lowering process of the anchor plate bottom plate 2, the bottom end of the cable 6 is fixedly connected to the top end of the anchor plate vertical plate 3, and the top end of the cable 6 is always located above the sea surface 20; then, fix the limit clamp 8 on the mud upper section of the steel pipe pile 1 through underwater operation, and make the top ends of the anchor plate vertical plate 3 and the arc-shaped support plate 9 axially abut against the limit clamp 8, so as to heavily load the anchor plate bottom plate 2 on the seabed mud surface 21.
[0076] Step three, first coaxially fix the fixing flange 10 to the top of the steel pipe pile 1, then hoist the tower 4 above the fixing flange 10, and insert the reinforcing plate 12 at the bottom end of the tower 4 into the fixing flange 10, and finally install multiple radial springs 7 between the fixing flange 10 and the reinforcing plate 12 at the bottom end of the tower 4.
[0077] Step 4: Install the movable flange 11 to the top of the fixed flange by connecting bolts, and install multiple axial springs 13 between the movable flange 11 and the reinforcing plate 12.
[0078] Step 5: Install and tighten the cable 6 between the reinforcement ring 15 at the bottom end of the tower 4 and the anchor plate 3, that is, connect the top end of the cable 6 to the reinforcement ring 15 at the bottom end of the tower 4, and tighten the cable 6 through the tensioner installed on the tower 4.
[0079] After the connection between the steel pipe pile 1 and the tower 4 is completed, the upper tower and the wind turbine unit 19 are installed.
[0080] Examples, such as Figure 1-Figure 3 As shown, a construction method of an offshore wind power anchor pile foundation structure comprises the following steps:
[0081] Step 1: first, sleeve the anchor plate bottom plate 2 on the steel pipe pile 1, and then sink the steel pipe pile 1 so that the lower mud section of the steel pipe pile 1 is inserted into the seabed foundation, that is, the lower mud section of the steel pipe pile 1 is located below the seabed mud surface 21, and the upper mud section of the steel pipe pile 1 is located above the seabed mud surface 21; the anchor plate bottom plate 2 is lowered to the seabed mud surface 21 along with the steel pipe pile 1, and during the pile sinking process, the bottom end of the cable 6 is fixedly connected to the top end of the anchor plate vertical plate 3, and the top end of the cable 6 is always located above the sea surface 20.
[0082] Step 2: Fix the limit clamp 8 on the upper mud section of the steel pipe pile 1 through underwater operation, and make the top ends of the anchor plate vertical plate 3 and the arc support plate 9 axially abut against the limit clamp 8 to heavily load the anchor plate bottom plate 2 on the seabed mud surface 21.
[0083] Step 3: first hoist the tower 4 to above the fixed flange 10 at the top of the steel pipe pile 1, and insert the reinforcing plate 12 at the bottom of the tower 4 into the fixed flange 10, and then install multiple radial springs 7 between the fixed flange 10 and the reinforcing plate 12 at the bottom of the tower 4.
[0084] Step 4: Install the movable flange 11 to the top of the fixed flange, and install a plurality of axial springs 13 between the movable flange 11 and the reinforcing plate 12.
[0085] Step 5: Install and tighten the cable 6 between the reinforcement ring 15 at the bottom end of the tower 4 and the anchor plate 3, that is, connect the top end of the cable 6 to the reinforcement ring 15 at the bottom end of the tower 4, and tighten the cable 6 through the tensioner installed on the tower 4.
[0086] After the connection between the steel pipe pile 1 and the tower 4 is completed, the upper tower and the wind turbine unit 19 are installed.
[0087] The working principle of the pile foundation structure of this application is as follows:
[0088] A universal wheel 5 (also called a universal pulley) is installed between the tower 4 and the steel pipe pile 1. The universal wheel 5 and the fixed flange 10 at the top of the steel pipe pile 1 only transmit axial pressure, and do not transmit horizontal force (horizontal shear force); a reinforcing ring 15 with thickened wall thickness is installed at the bottom end of the tower 4, and a connecting ear plate 16 is installed on the reinforcing ring 15. The steel cable 6 is connected to the anchor plate 3 on the seabed mud surface 21 through the connecting ear plate 16 and the fixed pulley 14, and the elastic force changes of the radial spring 7 and the axial spring 13 are detected by a force sensor. The cable is actively tensioned by the tensioner at the bottom of the tower 4 to generate horizontal resistance and anti-tilt force acting on the tower 4. Bending moment, ensuring that the tower 4 only undergoes slight displacement; the tension of the cable 6 will produce horizontal shear force and bending moment on the steel pipe pile 1 at the seabed mud surface 21 through the anchor plate upright plate 3, the lower part of the anchor plate bottom plate 2 is in contact with the mud surface, and the limit clamp 8 is in close contact with the anchor plate upright plate 3, providing a vertical reaction force to the anchor plate bottom plate 2, thereby restraining the displacement of the anchor plate bottom plate 2, thereby directly transmitting the horizontal shear force and bending moment of the wind turbine unit 19 to the pile body of the steel pipe pile 1 at the mud surface, changing the position of the horizontal shear force and bending moment on the steel pipe pile 1, reducing the effect of the horizontal shear force and bending moment on the steel pipe pile 1, thereby increasing the maximum horizontal load that the steel pipe pile 1 can bear.
[0089] Compared with the prior art, this application has at least the following beneficial technical effects:
[0090] The present application can change the stress mode of the pile body above the mud surface, thereby reducing the horizontal shear force and additional bending moment acting on the pile body above the mud surface, thereby reducing the pile diameter and wall thickness of the pile body and reducing the amount of steel used.
[0091] The present application transmits the horizontal shear force and additional bending moment of the wind turbine unit directly to the pile body at the mud surface through the tensioning force transmission of the cable. Under the action of the foundation constraint resistance, the pile body can improve the horizontal load bearing capacity of the pile body, so that under the same pile foundation geometric dimensions, the pile foundation can bear a greater horizontal shear force, thereby reducing the steel cost of the pile foundation.
[0092] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. An offshore wind power anchor pile foundation structure, characterized in that: include: A steel pipe pile (1), the steel pipe pile (1) comprising an upper mud section and a lower mud section which are axially fixedly connected; An anchor plate bottom plate (2), the anchor plate bottom plate (2) is sleeved on the bottom end of the upper mud section, and the anchor plate bottom plate (2) is fixedly connected to the steel pipe pile (1); Anchor plate uprights (3), a plurality of said anchor plate uprights (3) are distributed circumferentially around the axis of the steel pipe pile (1), and the bottom ends of said anchor plate uprights (3) are fixedly connected to the anchor plate bottom plate (2); A tower (4), wherein the tower (4) is coaxially arranged directly above the steel pipe pile (1); Universal wheels (5), a plurality of universal wheels (5) being installed between the tower (4) and the steel pipe pile (1) so as to enable the tower (4) and the steel pipe pile (1) to move horizontally relative to each other; Cables (6), wherein a plurality of the cables (6) are distributed circumferentially around the axis of the steel pipe pile (1), and the top ends of the cables (6) are fixedly connected to the tower (4), and the bottom ends of the cables (6) are fixedly connected to the anchor plate vertical plate (3), so that the tower (4) and the steel pipe pile (1) are axially fixedly connected; A radial spring (7), wherein a plurality of the radial springs (7) are distributed circumferentially around the axis of the steel pipe pile (1), one end of the radial spring (7) is fixedly connected to the tower (4), and the other end of the radial spring (7) is fixedly connected to the steel pipe pile (1).
2. An offshore wind power anchor pile foundation structure according to claim 1, characterized in that: The upper mud section is fixedly provided with a limit hoop (8), and the limit hoop (8) is axially abutted against the top end of the anchor plate vertical plate (3).
3. An offshore wind power anchor pile foundation structure according to claim 2, characterized in that: An end of the anchor plate upright (3) close to the steel pipe pile (1) is fixedly connected to an arc-shaped support plate (9) capable of fitting with the steel pipe pile (1), and the top end of the arc-shaped support plate (9) is axially abutted against the limiting clamp (8).
4. The offshore wind power anchor pile foundation structure according to claim 1, characterized in that: The top of the steel pipe pile (1) is fixedly connected to a fixed flange (10), and the fixed flange (10) includes a plate body and a barrel body, the plate body is fixedly connected to the top of the upper mud section, the bottom end of the barrel body is fixedly connected to the plate body, and the top end of the barrel body is detachably fixedly connected to a movable flange (11); the bottom end of the tower (4) is coaxially arranged in the barrel body, and the bottom end of the tower (4) is coaxially fixedly connected to a reinforcing plate (12), one end of the radial spring (7) is fixedly connected to the reinforcing plate (12), and the other end of the radial spring (7) is fixedly connected to the barrel body, the radial dimension of the reinforcing plate (12) is larger than the inner diameter of the movable flange (11), and a plurality of axial springs (13) are evenly distributed around the axis of the steel pipe pile (1) between the reinforcing plate (12) and the movable flange (11).
5. An offshore wind power anchor pile foundation structure according to claim 4, characterized in that: The bottom end of the axial spring (13) is fixedly connected to the reinforcing plate (12), and the top end of the axial spring (13) is slidably connected to the movable flange (11) along the radial direction of the steel pipe pile (1).
6. An offshore wind power anchor pile foundation structure according to claim 5, characterized in that: The axial spring (13) and the radial spring (7) are both equipped with force sensors, the tower (4) is equipped with a tensioner that matches the cable (6), the force sensor is electrically connected to a control module, and the control module is electrically connected to the tensioner.
7. An offshore wind power anchor pile foundation structure according to claim 4, characterized in that: A plurality of fixed pulleys (14) matching with the cables (6) are evenly distributed on the circumference of the movable flange (11) or the fixed flange (10).
8. An offshore wind power anchor pile foundation structure according to claim 7, characterized in that: The tower (4) is fixedly connected with a reinforcement ring (15), and the reinforcement ring (15) is evenly distributed with connecting ear plates (16) on the circumference. The top end of the cable (6) is connected to the connecting ear plate (16), and the bottom end of the cable (6) passes around the fixed pulley (14) and is fixedly connected to the top end of the anchor plate vertical plate (3).
9. An offshore wind power anchor pile foundation structure according to claim 4, characterized in that: A drainage hole (17) is formed on the plate body.
10. A construction method for an offshore wind power anchor pile foundation structure, characterized in that: The construction method comprises the following steps: Step 1: sinking the steel pipe pile (1) so that the lower mud section of the steel pipe pile (1) is inserted into the seabed; Step 2: fix the limit hoop (8) on the upper mud section of the steel pipe pile (1) through underwater operation, and make the top ends of the anchor plate upright plate (3) and the arc-shaped support plate (9) axially abut against the limit hoop (8), and the anchor plate bottom plate (2) is ballasted on the seabed mud surface (21); Step 3: hoist the bottom end of the tower (4) into the fixing flange (10) at the top of the steel pipe pile (1), and install a plurality of radial springs (7) between the fixing flange (10) and the reinforcing plate (12) at the bottom end of the tower (4); Step 4: Install the movable flange (11), and install a plurality of axial springs (13) between the movable flange (11) and the reinforcing plate (12); Step 5: Install the cable (6) between the reinforcement ring (15) of the tower (4) and the anchor plate vertical plate (3) and tighten them.