Template and support mounting structure for pipe gallery
By using supporting screws, rectangular blocks and worm gears in the pipeline gallery formwork, the rapid installation and disassembly of the pipeline gallery formwork is achieved, solving the problem of high labor consumption during construction and improving construction efficiency and accuracy.
Patent Information
- Application Number
- CN202411276615.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-11-12
AI Technical Summary
The pipe gallery formwork and brackets need to be installed and disassembled many times during the construction process, which consumes a lot of manpower and physics, and has low construction efficiency.
A formwork structure for pipe gallery is designed, using supporting screws, rectangular blocks, worm gears and drive components, and the longitudinal and transverse support plates are realized through mechanical structures such as sliding grooves, support slots, worm gear meshing and driving motors. Quick fixing and disassembly, use infrared level for precise positioning, and improve installation efficiency.
It significantly saves the installation and disassembly time of the support plate, improves construction efficiency, reduces manpower consumption, and improves installation accuracy and efficiency.
Smart Images

Figure CN118933072A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of construction equipment technology, and in particular to a template and bracket installation structure for a pipe gallery. Background Art
[0002] The template and bracket installation for the pipe gallery are commonly used in underground comprehensive pipe galleries, which are underground urban pipeline comprehensive corridors. That is, a tunnel space is built underground in the city, integrating various engineering pipelines such as electricity, communications, gas, heating, water supply and drainage, with special inspection ports, lifting ports and monitoring systems, and unified planning, design, construction and management are implemented. It is an important infrastructure and lifeline to ensure the operation of the city. The underground comprehensive pipe gallery system not only solves the problem of urban traffic congestion, but also greatly facilitates the maintenance and inspection of municipal facilities such as electricity, communications, gas, water supply and drainage. The underground comprehensive pipe gallery plays an important role in meeting the basic needs of people's livelihood and improving the comprehensive carrying capacity of the city.
[0003] The underground integrated pipe gallery is generally rectangular (cross-section) in shape and is cast by concrete. The construction process is: first excavate the pipe gallery tunnel, and then construct the pipe gallery structure in the pipe gallery tunnel. Then the prepared molds and mounting brackets are installed inside the pipe gallery for multiple times for construction. After the construction is completed, they are disassembled multiple times. During the construction process, the molds and mounting brackets need to be installed and disassembled multiple times.
[0004] It consumes a lot of manpower and physical resources, has a large construction workload and low construction efficiency.
[0005] With regard to the above-mentioned related technologies, the inventors believe that during the installation and construction of the tunnel formwork and support structure, the formwork and support need to be installed and disassembled multiple times, which consumes a lot of manpower and physical effort, has a large construction workload and low construction efficiency. Summary of the invention
[0006] In order to improve the efficiency of installation and disassembly of pipe gallery templates and mounting brackets, the present application provides a template and bracket mounting structure for a pipe gallery.
[0007] In the first aspect, a template for a pipe gallery provided in the present application adopts the following technical solution: A template for a pipe gallery, comprising a support screw and a longitudinal support plate arranged at both ends of the support screw, wherein the support screw is provided with a plurality of them, and a rectangular block is sleeved on each of the support screws, and the rectangular block is threadedly matched with the support screw, a first sliding groove for slidingly matching the rectangular block is provided on the longitudinal support plate, and a first supporting slot for plugging and matching the rectangular block is provided on the inner side wall of the first sliding groove, a first worm gear is sleeved on the end of the support screw passing through the mounting block, a worm is passed through the mounting block, and the first turbine is meshed with the worm, a connecting assembly for connecting adjacent worms is provided on the mounting plate, a fixing sleeve is provided at both lateral ends of the mounting block, a lateral support plate is provided on the side of the fixing sleeve away from the mounting block, an abutting screw is provided on the fixing sleeve, a support block is sleeved on the abutting screw, the support block is threadedly matched with the abutting screw, a second supporting slot for plugging and matching the support block is provided on the lateral support plate, and a driving assembly for driving the abutting screw to rotate is provided on the mounting block.
[0008] By adopting the above technical scheme, the operator inserts the rectangular blocks at both ends of the supporting screw into the corresponding first slide grooves respectively, the operator moves the mounting block, and the mounting block drives the rectangular block in the first slide groove to the position of the first supporting slot through the supporting screw. At this time, the support block is aligned with the second supporting slide groove, and then the operator uses the driving assembly to drive the supporting screw and the abutting screw to rotate, and the rotation of the supporting screw drives the rectangular block to be inserted into the first supporting slot, thereby realizing the fixation of the longitudinal support plate, and the rotation of the abutting screw drives the support block and the transverse support plate to be tightly pressed; the operator installs multiple mounting blocks in sequence, and the operator uses the connecting assembly to connect the worm gears in adjacent mounting plates, and the worm gear drives multiple worm gears to rotate through the connecting assembly, so as to facilitate the operator to disassemble multiple mounting plates at the same time, saving the time of supporting the longitudinal support plates and the transverse support plates for multiple times, and improving the installation efficiency of the template.
[0009] Preferably, the connecting assembly includes a connecting sleeve slidably mounted on the worm, a connecting block installed on the inner wall of the connecting sleeve, a limit block is arranged on the inner wall of the connecting sleeve, a limit groove for slidingly engaging with the limit block is opened on the worm, the limit block can slideably engage with the limit groove, the connecting sleeve can be sleeved on the adjacent worm, a connecting groove for slidingly engaging with the connecting block is opened on the end of the adjacent worm close to the connecting sleeve, and a control assembly for driving the connecting sleeve to move is arranged on the mounting block.
[0010] By adopting the above technical solution, the operator uses the control component to drive the connecting sleeve to move, the movement of the connecting sleeve drives the limit block to move in the limit slot, the movement of the connecting sleeve drives the moving block to move, and the moving block moves into the connecting slot of the adjacent worm gear, so that the worm gear drives the connecting sleeve to rotate through the limit block, and the connecting sleeve drives the adjacent worm gear to rotate through the connecting block, thereby realizing the simultaneous rotation of multiple worm gears, thereby improving the efficiency of disassembly and installation of the mounting block.
[0011] Preferably, the control assembly includes a control ring sleeved on the connecting sleeve, a control rod fixedly connected to the control ring, an annular groove for rotational cooperation of the control ring is formed on the outer wall of the connecting sleeve, and a control sliding groove for sliding cooperation of the control rod is formed on the mounting block.
[0012] By adopting the above technical solution, the operator moves the control rod, the movement of the control rod drives the control ring to move, and the movement of the control ring drives the connecting sleeve to move, so that it is convenient for the operator to connect adjacent worm gears. The setting of the annular groove makes it possible for the movement of the control rod to not affect the rotation of the movable sleeve, which is convenient for the operator to use.
[0013] Preferably, the connecting block is slidably penetrated on the inner wall of the connecting sleeve, a second sliding groove for sliding cooperation of the connecting block is opened in the connecting sleeve, a connecting spring is fixedly connected to the connecting block, one end of the connecting spring away from the connecting block is fixedly connected to the inner end surface of the second sliding groove, and both ends of the connecting block are provided with inclined surfaces.
[0014] By adopting the above technical solution, the operator moves the control rod, and the control rod drives the connecting sleeve to move by controlling the moving ring, and the movement of the connecting sleeve drives the connecting block to move. The connecting block enters the second sliding groove under the action of the inclined surface, and the operator continues to move the control rod, and the connecting sleeve continues to move to cover the adjacent worm. At this time, the connecting spring is in a compressed state, and the rotation of the worm drives the connecting sleeve to rotate, and the rotation of the connecting sleeve drives the connecting block to slide on the outer peripheral surface of the worm. When the connecting block moves to the position of the connecting groove, the connecting block is inserted into the connecting groove under the action of the connecting spring, thereby driving the adjacent worm to rotate.
[0015] Preferably, the driving assembly includes a driving motor arranged on the mounting block, a driving rod arranged in the mounting block, a second turbine fixedly mounted on the abutting screw, the worm is coaxially connected to the driving rod, and the driving rod is fixedly connected to the output shaft of the driving motor.
[0016] By adopting the above technical scheme, the operator uses the driving motor to drive the driving rod to rotate, the driving rod rotation drives the worm to rotate, the worm rotation drives the first worm gear and the second worm gear to rotate, the first turbine rotation drives the supporting screw to rotate, the supporting screw rotation drives the rectangular block to be inserted into the first supporting slot, the rectangular block presses the longitudinal support plate tightly, the second worm gear rotation drives the abutting screw to rotate, the abutting screw rotation drives the supporting block to be inserted into the second supporting slot, the supporting block presses the transverse support plate tightly, making it convenient for the operator to press and fix the longitudinal support plate and the transverse support plate at the same time.
[0017] Preferably, a limiting ring is fixedly connected to the abutting screw, and a limiting ring groove for rotational cooperation with the limiting ring is provided in the fixing sleeve.
[0018] By adopting the above technical solution, the setting of the limiting ring allows the abutment screw to rotate in the sliding sleeve without horizontal deviation, which makes it convenient for the abutment screw to push the support block to press against the transverse support plate.
[0019] Preferably, a plurality of fixing rods are provided on the outer side wall of the fixing sleeve, the fixing rods are fixedly connected to the fixing sleeve, and one end of the fixing rods away from the fixing sleeve is fixedly connected to the mounting block.
[0020] By adopting the above technical solution, the setting of the fixing rod can well stabilize the position of the fixing sleeve, so that it will not deviate during operation, which is convenient for operators to fix the support plate.
[0021] Preferably, a rubber pad is provided on the end of the support block passing through the fixed sleeve, and the rubber pad is provided with an abutment groove for sliding cooperation with the support block. An abutment spring is fixedly connected to the support block, and the end of the abutment spring away from the support block is fixedly connected to the inner end face of the abutment groove.
[0022] By adopting the above technical solution, the operator drives the worm to rotate through the driving motor, and the worm drives the abutment screw to rotate through the second turbine. The rotation of the abutment screw drives the support block to move, and the movement of the support block drives the rubber pad to be inserted into the second support slot. The rubber pad is pressed against the transverse support plate under the action of the abutment spring, thereby facilitating the operator to fix the transverse support plate.
[0023] Preferably, the outer end surface of the second supporting groove is provided with a slope.
[0024] By adopting the above technical solution, the setting of the inclined surface facilitates the insertion of the support block into the second support slot and plays a guiding role, thereby improving the accuracy of template installation.
[0025] In a second aspect, the present application also discloses a template and bracket installation structure for a pipe gallery.
[0026] A template and bracket installation structure for a pipe gallery, which is applied to the installation of pipe gallery brackets, comprises the following steps: S1. Prefabricated pipe gallery support plate: make support plates according to the size of the pipe gallery; S2. Pipe gallery bracket installation and positioning: according to the standard cross-section drawing of the pipe gallery, use an infrared level to install and position the bracket; S3. Pre-installation of pipe gallery bracket: put the installation blocks between the support plates in sequence, so that the rectangular block slides to the bottom in the first sliding groove, move the control rod to put the connecting sleeve on the adjacent worm, and then use the drive motor to drive the drive rod to rotate, the drive rod rotation drives the worm to rotate, the worm rotation drives the first turbine and the second turbine to rotate respectively, the first turbine presses the longitudinal support plate tightly through the support screw, and the second turbine presses the transverse support plate tightly through the abutment screw; S4. Pipe gallery bracket installation: install the manufactured pipe gallery bracket in the pipe gallery according to the positioning.
[0027] By adopting the above technical solution, the operator makes the support plate according to the size of the corridor, and then the operator uses an infrared level to install and position the bracket according to the standard cross-sectional view of the corridor. Then the operator puts the installation block between the support plates in turn, so that the rectangular block slides to the bottom in the first sliding groove, and then the operator moves the control rod to sleeve the connecting sleeve on the adjacent worm gear. Then the operator uses the driving motor to drive the driving rod to rotate, and the driving rod rotates to drive the worm gear to rotate, thereby driving the first turbine and the second turbine to rotate respectively. The first turbine presses the longitudinal support plate tightly through the support screw, and the second turbine presses the transverse support plate tightly through the abutment screw. Then the operator installs the pre-installed corridor bracket in the corridor.
[0028] In summary, the present application includes at least one of the following beneficial technical effects: 1. The operator inserts the rectangular blocks at both ends of the supporting screw into the corresponding first slide grooves respectively, and the operator moves the mounting block, and the mounting block drives the rectangular block in the first slide groove to the position of the first supporting slot through the supporting screw, and the supporting block is aligned with the second supporting slide groove. Then the operator uses the driving assembly to drive the supporting screw and the abutting screw to rotate, and the rotation of the supporting screw drives the rectangular block to be inserted into the first supporting slot, thereby realizing the fixation of the longitudinal support plate, and the rotation of the abutting screw drives the supporting block and the transverse support plate to be tightly abutted; the operator installs multiple mounting blocks in sequence, and the operator uses the connecting assembly to connect the worm gears in adjacent mounting plates, and the worm gear drives multiple worm gears to rotate through the connecting assembly, so that it is convenient for the operator to disassemble multiple mounting plates at the same time, saving the time of supporting the longitudinal support plate and the transverse support plate for multiple times, and improving the installation efficiency of the template; 2. The operator moves the control rod, and the control rod drives the connecting sleeve to move by controlling the moving ring. The movement of the connecting sleeve drives the connecting block to move. The connecting block enters the second sliding groove under the action of the inclined surface. The operator continues to move the control rod, and the connecting sleeve continues to move to cover the adjacent worm. At this time, the connecting spring is in a compressed state. The rotation of the worm drives the connecting sleeve to rotate. The rotation of the connecting sleeve drives the connecting block to slide on the outer circumference of the worm. When the connecting block moves to the position of the connecting slide groove, the connecting block is inserted into the connecting slide groove under the action of the connecting spring, thereby driving the adjacent worm to rotate; 3. The operator makes the support plate according to the size of the corridor, and then uses an infrared level to position the bracket installation according to the standard cross-section drawing of the corridor. Then the operator puts the installation block between the support plates in turn, so that the rectangular block slides to the bottom in the first sliding groove, and then the operator moves the control rod to put the connecting sleeve on the adjacent worm gear. Then the operator uses the drive motor to drive the drive rod to rotate, and the rotation of the drive rod drives the worm gear to rotate, thereby driving the first turbine and the second turbine to rotate respectively. The first turbine presses the longitudinal support plate tightly through the support screw, and the second turbine presses the transverse support plate tightly through the abutment screw. Then the operator installs the pre-installed corridor bracket in the corridor. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a structural schematic diagram of a template and bracket installation structure for a pipe gallery in an embodiment of the present application.
[0030] Figure 2 It is a schematic diagram of the internal structure of a template and bracket installation structure for a pipe gallery in an embodiment of the present application.
[0031] Figure 3 yes Figure 2 A magnified schematic diagram of center A.
[0032] Figure 4 It is a schematic diagram of the internal structure of the fixed sleeve of the embodiment of the application.
[0033] Figure 5 yes Figure 2 A magnified schematic diagram of point B in the middle.
[0034] Reference numerals: 1. Support screw; 11. Longitudinal support plate; 111. First sliding groove; 112. First support slot; 12. Rectangular block; 13. Mounting block; 131. First turbine; 132. Worm; 14. Fixed sleeve; 141. Transverse support plate; 142. Abutment screw; 143. Second worm gear; 144. Support block; 145. Second support slot; 146. Rubber pad; 147. Abutment slot; 148. Abutment spring; 15 , limiting ring; 151, limiting ring groove; 16, fixing rod; 2, connecting assembly; 21, connecting sleeve; 211, limiting block; 212, limiting slide groove; 213, connecting slide groove; 22, connecting block; 221, second sliding groove; 222, connecting spring; 3, control assembly; 31, control ring; 311, annular groove; 32, control rod; 321, control slide groove; 4, driving assembly; 41, driving motor; 42, driving rod. DETAILED DESCRIPTION
[0035] The following is combined with Figure 1-5 This application is described in further detail.
[0036] The present application embodiment discloses a template and bracket installation structure for a pipe gallery. Figure 1 A template and bracket installation structure for a pipe gallery includes a longitudinal support plate 11 and a transverse support plate 141. The longitudinal support plate 11 is a rectangular plate, horizontally arranged, two longitudinal support plates 11 are arranged, and the longitudinal support plates 11 are symmetrically arranged. The transverse support plate 141 is a rectangular plate, horizontally arranged, two transverse support plates 141 are arranged, and the transverse support plates 141 are symmetrically arranged.
[0037] Reference Figure 2 A mounting block 13 is arranged between the transverse support plates 141. The mounting block 13 is in the shape of a rectangular block 12. The mounting block 13 is arranged horizontally. There are multiple mounting blocks 13. The multiple mounting blocks 13 are arranged along the length direction of the longitudinal support plate 11 and abut against each other. A support screw 1 is arranged on the mounting plate. The support screw 1 is arranged vertically. The support screw 1 is passed through the mounting block 13. Both ends of the support screw 1 pass through the mounting block 13. A first turbine 131 is arranged on the support screw 1.
[0038] Reference Figure 2 , Figure 3 The first turbine 131 is placed horizontally, and the first turbine 131 is sleeved on the supporting worm 132 located on the inner end of the mounting block 13. The first turbine 131 is fixedly connected to the supporting screw 1, and the worm 132 is passed through the mounting block 13. The worm 132 is horizontally arranged, and the worm 132 is parallel to the axis of the mounting block 13, and the worm 132 is meshed with the first turbine 131.
[0039] Reference Figure 2A driving assembly 4 for driving the worm 132 to rotate is provided on the mounting block 13. The driving assembly 4 includes a driving motor 41 and a driving rod 42. The driving motor 41 is arranged at the outer end of the mounting block 13. The driving rod 42 is arranged horizontally. The driving rod 42 passes through the mounting block 13. The driving rod 42 is rotatably connected to the mounting block 13. The driving rod 42 is fixedly connected to the output shaft of the driving motor 41, and the axis of the driving rod 42 coincides with the axis of the worm 132.
[0040] Reference Figure 2 Rectangular blocks 12 are provided at both ends of the support screw 1. The rectangular blocks 12 are placed vertically. The rectangular blocks 12 are sleeved on the support screw 1. The rectangular blocks 12 are threadedly matched with the support screw 1. The rectangular blocks 12 can abut against the longitudinal support plate 11. The longitudinal support plate 11 is provided with a first sliding groove 111. The inner side wall of the first sliding groove 111 is slidingly matched with the outer side wall of the rectangular block 12. A first supporting slot 112 is provided on the inner wall of the first sliding groove 111. The first supporting slot 112 is plugged and matched with the rectangular block 12.
[0041] The operator inserts the rectangular block 12 into the first sliding groove 111, and then moves the mounting block 13. The mounting block 13 drives the rectangular block 12 to move to the position of the first supporting slot 112 through the supporting screw 1. The operator uses the mechanical structure to drive the worm 132 to rotate. The rotation of the worm 132 drives the first turbine 131 to rotate. The rotation of the first turbine 131 drives the supporting screw 1 to rotate. The rotation of the supporting screw 1 pushes the rectangular block 12 into the first supporting slot 112 to tighten the longitudinal support plate 11, thereby supporting the longitudinal support plate 11.
[0042] Reference Figure 2 , Figure 4 A fixing sleeve 14 is provided on both sides of the mounting block 13. The fixing sleeve 14 is horizontally arranged. The fixing sleeve 14 is arranged between the mounting block 13 and the transverse support plate 141. A plurality of fixing rods 16 are provided on the outer side wall of the fixing sleeve 14. One end of the fixing rod 16 is fixedly connected to the fixing sleeve 14, and the other end is fixedly connected to the mounting block 13. The arrangement of the fixing rod 16 facilitates the fixing of the fixing sleeve 14.
[0043] Reference Figure 2 , Figure 4 A support block 144 is provided at one end of the fixed sleeve 14, and the support block 144 can abut against the transverse support plate 141. A second support slot 145 is provided on the transverse support plate 141, and the second support slot 145 is plugged and matched with the support block 144. An abutment screw 142 is provided at the other end of the fixed sleeve 14, and the abutment screw 142 is horizontally arranged, and the abutment screw 142 is provided on the mounting block 13, and a second worm gear 143 is provided on the abutment screw 142.
[0044] Reference Figure 2The second worm gear 143 is placed vertically, and the second worm gear 143 is sleeved on the abutment screw 142 located on the inner end surface of the mounting block 13 . The second worm gear 143 is fixedly connected to the abutment screw 142 , and the second worm gear 143 is meshed with the worm 132 .
[0045] Reference Figure 4 A rubber pad 146 is provided on the end of the support block 144 passing through the fixed sleeve 14. The rubber pad 146 is sleeved on the support block 144. The rubber pad 146 can abut against the transverse support plate 141. An abutment groove 147 is provided on the rubber pad 146. The inner side wall of the abutment groove 147 is slidably matched with the outer side wall of the support block 144. An abutment spring 148 is provided on the support block 144. The abutment spring 148 is horizontally arranged. One end of the abutment spring 148 is fixedly connected to the support block 144, and the other end is fixedly connected to the inner wall of the abutment groove 147.
[0046] Reference Figure 2 , Figure 4 The abutting screw 142 is rotatably connected with the fixed sleeve 14, the end of the abutting screw 142 that penetrates the fixed sleeve 14 penetrates into the support block 144, the abutting screw 142 is threadedly connected with the support block 144, and a limiting ring 15 is arranged on the end of the abutting screw 142 that penetrates the fixed sleeve 14, the limiting ring 15 is arranged vertically, the limiting ring 15 is sleeved on the abutting screw 142, the limiting ring 15 is fixedly connected with the abutting screw 142, and a limiting ring groove 151 for the rotational cooperation of the limiting ring 15 is provided on the inner wall of the fixed sleeve 14. The setting of the limiting ring 15 prevents the abutting screw 142 from horizontal displacement during operation, and facilitates the abutting screw 142 to drag the support block 144 to move.
[0047] The operator inserts the rectangular block 12 into the first sliding groove 111, and the operator moves the mounting block 13. The mounting block 13 drives the fixing sleeve 14 to move through the fixing rod 16. The fixing sleeve 14 moves and drives the internal support block 144 to move to the position of the second support slot 145. The operator uses the driving motor 41 to drive the driving rod 42 to rotate. The driving rod 42 rotates and drives the worm 132 to rotate. The worm 132 rotates and drives the second worm gear 143 to rotate. The second worm gear 143 rotates and drives the abutment screw 142 to rotate. The abutment screw 142 rotates and pushes the support block 144 and the rubber pad 146 to insert into the second support slot 145, thereby achieving the tightness of the transverse support plate 141.
[0048] Reference Figure 2 , Figure 5The mounting block 13 is provided with a connecting assembly 2 for fixing the adjacent worm 132, and the connecting assembly 2 includes a connecting sleeve 21. The connecting block 22. The connecting sleeve 21 is horizontally arranged, the connecting sleeve 21 is sleeved on the worm 132, the connecting sleeve 21 is slidably penetrated on the mounting plate, the connecting sleeve 21 can penetrate into the adjacent mounting plate, and the connecting sleeve 21 can be sleeved on the adjacent worm 132.
[0049] Reference Figure 5 A limit block 211 is provided on the inner wall of the connecting sleeve 21, and the limit block 211 is fixedly connected to the inner wall of the connecting sleeve 21. A limit slot 212 is provided on the worm 132, and the inner wall of the limit slot 212 is slidably matched with the outer wall of the limit block 211. The connecting block 22 is vertically provided, and the connecting block 22 is penetrated on the inner wall of the connecting sleeve 21. An inclined surface is provided on the end of the connecting block 22 that penetrates the inner wall of the connecting sleeve 21. A second sliding slot 221 is provided on the connecting sleeve 21, and the inner wall of the second sliding slot 221 is slidably matched with the outer wall of the connecting block 22. The side wall of the connecting block 22 can be slidably matched with the inner wall of the second sliding slot 221.
[0050] Reference Figure 5 The connecting block 22 is provided with a connecting spring 222, which is vertically arranged, one end of which is fixedly connected to the connecting block 22, and the other end of which is fixedly connected to the inner end surface of the second sliding groove 221. A connecting sliding groove 213 is provided on the worm 132 in the adjacent mounting block 13, and a plurality of connecting sliding grooves 213 are provided, which are evenly arranged around the axis of the worm 132, and the inner side wall of the connecting sliding groove 213 is slidably matched with the outer side wall of the connecting block 22.
[0051] Reference Figure 5 The mounting block 13 is provided with a control assembly 3 for driving the connection sleeve 21 to move, and the control assembly 3 includes a control ring 31 and a control rod 32. The control ring 31 is vertically arranged, and the control ring 31 is sleeved on the connection sleeve 21. The connection sleeve 21 is provided with an annular groove 311, and the side wall of the control ring 31 is slidably matched with the inner side wall of the annular groove 311. The control rod 32 is vertically arranged, and the control rod 32 is penetrated on the mounting block 13. The end of the control rod 32 penetrated into the mounting block 13 is fixedly connected with the control ring 31. The mounting block 13 is provided with a control slide groove 321, and the inner side wall of the control slide groove 321 is slidably matched with the outer side wall of the mounting block 13. The setting of the annular groove 311 ensures that the movement of the control rod 32 will not affect the rotation of the connection sleeve 21.
[0052] The operator moves the control rod 32, and the control rod 32 drives the connecting sleeve 21 to move through the control ring 31. The movement of the connecting sleeve 21 drives the connecting block 22 to move. The connecting block 22 enters the second sliding groove 221 under the action of the inclined surface, and the connecting sleeve 21 continues to move to cover the adjacent worm 132. At this time, the connecting spring 222 is in a compressed state, and the connecting block 22 abuts against the outer peripheral surface of the worm 132 under the action of the connecting spring 222. Then the operator rotates the worm 132, and the rotation of the worm 132 drives the connecting sleeve 21 to rotate. The rotation of the connecting sleeve 21 drives the connecting block 22 to slide on the outer peripheral surface of the worm 132. When the connecting block 22 moves to the position of the connecting groove 213, the connecting block 22 is inserted into the connecting groove 213 under the action of the connecting spring 222, thereby driving the adjacent worm 132 to rotate; the operator moves the control rod 32 in the opposite direction, and the control rod 32 drives the connecting block 22 to enter the limiting groove 212, thereby releasing the connection state of the adjacent worm 132.
[0053] The implementation principle of the template and bracket installation structure for a pipe corridor in an embodiment of the present application is as follows: the operator first puts a plurality of mounting blocks 13 in contact with each other, and then the operator moves the control rod 32 in sequence. The control rod 32 drives the connecting sleeve 21 to move through the control ring 31 to put on the worm 132 in the adjacent mounting block 13. Then the operator drives the worm 132 to rotate by using the driving motor 41. The worm 132 drives the adjacent worm 132 to rotate through the connecting block 22, thereby realizing the connection and fixation of the plurality of mounting blocks 13.
[0054] Then the operator inserts the rectangular blocks 12 at both ends of the mounting block 13 into the first sliding groove 111, and the operator pushes the mounting block 13 to make the rectangular blocks 12 slide in the first sliding groove 111. When the rectangular blocks 12 slide to the innermost end, the innermost rectangular blocks 12 move into the innermost first support slot 112. At this time, the fixing sleeves 14 on both sides of the mounting block 13 also move to the corresponding second support slot 145. Finally, the operator drives the worm 132 to rotate by the driving motor 41, and the rotation of the worm 132 drives the first turbine 131 and the second worm wheel 143 to rotate respectively. The first turbine 131 drives the rectangular block 12 to press the longitudinal support plate 11 tightly through the support screw 1, and the second worm wheel 143 drives the abutment screw 142 to rotate through the driving rod 42. The abutment screw 142 drives the rubber pad 146 to press against the transverse support plate 141 through the support block 144, so that it is convenient for the operator to disassemble and install multiple support plates at the same time, saving the time of fixing and disassembling the fixed plates for many times, and improving the installation efficiency.
[0055] After the operation is completed, the operator removes the bracket and uses the driving motor 41 to drive the worm 132 to rotate. The worm 132 drives the adjacent worm 132 to rotate through the connecting block 22, thereby contacting the longitudinal support plate 11 and the transverse support plate 141 to be abutted. Then the operator moves out several mounting blocks 13 at the same time, and then moves the control rod 32 in turn. The control rod 32 drives the connecting sleeve 21 away from the adjacent worm 132 through the control ring 31, thereby releasing the connection between the worm 132 and the adjacent worm 132, so as to facilitate the operator to disassemble the mounting block 13 for reuse.
[0056] The embodiment of the present application also discloses a support installation structure for a pipe gallery, which is used to implement the above-mentioned template installation.
[0057] Reference Figure 1-5 , a pipe gallery bracket installation structure comprises the following steps: S1. Prefabricated pipe gallery support plate: the support plate is made according to the size of the pipe gallery; S2. Installation and positioning of pipe gallery brackets: According to the standard cross-section of the pipe gallery, use an infrared level to position the brackets; S3, pre-installation of the pipe gallery support: sequentially place the installation block 13 between the support plates, so that the rectangular block 12 slides to the bottom in the first sliding groove 111, move the control rod 32 to sleeve the connecting sleeve 21 on the adjacent worm 132, and then use the driving motor 41 to drive the driving rod 42 to rotate, the driving rod 42 rotates to drive the worm 132 to rotate, the worm 132 rotates to respectively drive the first turbine 131 and the second turbine 143 to rotate, the first turbine 131 presses the longitudinal support plate 11 tightly through the support screw 1, and the second turbine 143 presses the transverse support plate 141 tightly through the abutting screw 142; S4. Installation of pipe gallery supports: Install the prepared pipe gallery supports in the pipe gallery according to the positioning.
[0058] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A template for a pipe gallery, comprising a support screw (1) and longitudinal support plates (11) arranged at both ends of the support screw (1), characterized in that: The support screw (1) is provided with a plurality of them, each of which is sleeved with a rectangular block (12), the rectangular block (12) being threadedly matched with the support screw (1), the longitudinal support plate (11) being provided with a first sliding groove (111) for slidingly matching with the rectangular block (12), the inner side wall of the first sliding groove (111) being provided with a first supporting slot (112) for plugging and matching with the rectangular block (12), the end of the support screw (1) passing through the mounting block (13) being sleeved with a first worm gear (131), a worm (132) being passed through the mounting block (13), the first worm gear (131) being meshed with the worm gear (132), and the mounting plate being provided with a first support slot (112) for inserting and matching with the rectangular block (12). A connecting assembly (2) for connecting adjacent worm gears (132); fixed sleeves (14) are provided at both lateral ends of the mounting block (13); a lateral support plate (141) is provided on the side of the fixed sleeve (14) away from the mounting block (13); an abutment screw (142) is provided on the fixed sleeve (14); a support block (144) is sleeved on the abutment screw (142); the support block (144) is threadedly engaged with the abutment screw (142); a second support slot (145) for plugging and engaging the support block (144) is provided on the lateral support plate (141); and a driving assembly (4) for driving the abutment screw (142) to rotate is provided on the mounting block (13).
2. A template for a pipe gallery according to claim 1, characterized in that: The connecting assembly (2) comprises a connecting sleeve (21) slidably mounted on the worm (132), and a connecting block (22) mounted on the inner wall of the connecting sleeve (21); a limit block (211) is arranged on the inner wall of the connecting sleeve (21); a limit slide groove (212) for slidingly engaging with the limit block (211) is provided on the worm (132); the limit block (211) can slideably engage with the limit slide groove (212); the connecting sleeve (21) can be mounted on an adjacent worm (132); a connecting slide groove (213) for slidingly engaging with the connecting block (22) is provided on the end of the adjacent worm (132) close to the connecting sleeve (21); and a control assembly (3) for driving the connecting sleeve (21) to move is arranged on the mounting block (13).
3. A template for a pipe gallery according to claim 2, characterized in that: The control assembly (3) comprises a control ring (31) sleeved on the connecting sleeve (21), and a control rod (32) fixedly connected to the control ring (31); an annular groove (311) for rotational engagement of the control ring (31) is provided on the outer wall of the connecting sleeve (21); and a control sliding groove (321) for sliding engagement of the control rod (32) is provided on the mounting block (13).
4. A template for a pipe gallery according to claim 2, characterized in that: The connecting block (22) is slidably inserted into the inner wall of the connecting sleeve (21); a second sliding groove (221) for slidingly engaging the connecting block (22) is provided in the connecting sleeve (21); a connecting spring (222) is fixedly connected to the connecting block (22); one end of the connecting spring (222) away from the connecting block (22) is fixedly connected to the inner end surface of the second sliding groove (221); and both ends of the connecting block (22) are provided with inclined surfaces.
5. The template for a pipe gallery according to claim 1 is characterized in that: The driving assembly (4) comprises a driving motor (41) arranged on the mounting block (13), a driving rod (42) arranged in the mounting block (13), and a second turbine (143) fixedly sleeved on the abutting screw rod (142); the worm (132) is coaxially connected to the driving rod (42); and the driving rod (42) is fixedly connected to an output shaft of the driving motor (41).
6. A template for a pipe gallery according to claim 1, characterized in that: A limiting circular ring (15) is fixedly connected to the abutting screw rod (142), and a limiting circular ring groove (151) for rotationally engaging the limiting circular ring (15) is provided in the fixing sleeve (14).
7. The template for a pipe gallery according to claim 1 is characterized in that: A plurality of fixing rods (16) are provided on the outer side wall of the fixing sleeve (14), the fixing rods (16) are fixedly connected to the fixing sleeve (14), and one end of the fixing rod (16) away from the fixing sleeve (14) is fixedly connected to the mounting block (13).
8. The template for a pipe gallery according to claim 1, characterized in that: A rubber pad (146) is provided on the end of the support block (144) passing through the fixed sleeve (14), and an abutment groove (147) for sliding cooperation with the support block (144) is opened on the rubber pad (146). An abutment spring (148) is fixedly connected to the support block (144), and the end of the abutment spring (148) away from the support block (144) is fixedly connected to the inner end surface of the abutment groove (147).
9. A template for a pipe gallery according to claim 1, characterized in that: The outer end surface of the second supporting groove is provided with an inclined surface.
10. A pipe gallery template and bracket installation structure, applied to the pipe gallery bracket installation structure according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1. Prefabricated pipe gallery support plate: the support plate is made according to the size of the pipe gallery; S2. Installation and positioning of pipe gallery brackets: According to the standard cross-section of the pipe gallery, use an infrared level to install and position the brackets; S3, pre-installation of the pipe gallery support: sequentially place the installation block (13) between the support plates, so that the rectangular block (12) slides to the bottom in the first sliding groove (111), move the control rod (32) to sleeve the connecting sleeve (21) on the adjacent worm (132), then use the drive motor (41) to drive the drive rod (42) to rotate, the drive rod (42) drives the worm (132) to rotate, the worm (132) drives the first turbine (131) and the second turbine (143) to rotate respectively, the first turbine (131) presses the longitudinal support plate (11) through the support screw (1), and the second turbine (143) presses the transverse support plate (141) through the contact screw (142); S4. Installation of pipe gallery supports: Install the prepared pipe gallery supports in the pipe gallery according to the positioning.