Fabricated steel structure building system and construction method
By using fixed columns, movable columns, curved shells and connecting rods in prefabricated steel structure buildings, combined with threaded connections and motor-driven bevel gear systems, the problems of construction safety and disassembly inconvenient, achieving high efficiency, Quick installation and easy disassembly effect.
Patent Information
- Application Number
- CN202411183301.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-12
AI Technical Summary
The existing prefabricated steel structure buildings have low safety and inconvenience in operation during construction, and traditional welded connections are not convenient for later disassembly and recycling, which increases costs.
Using fixed columns, movable columns, curved shells, connecting rods and support positioning components, the bevel gear system driven by threaded connections and motors can be quickly assembled and disassembled. The ceiling structure is formed by curved shells and connecting rods, and the ceiling structure is formed through the movable shaft and The rollers realize the lifting and fixing of the structure.
It realizes efficient and rapid construction operations, improves the installation safety and reliability of prefabricated steel structures, and facilitates later disassembly and recycling, reducing construction costs.
Smart Images

Figure CN118933170A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an assembled steel structure building system, in particular to an assembled steel structure building system and a construction method. Background Art
[0002] With the rapid development of China's construction industry, the building structure is also constantly updated and improved. In recent years, with the introduction of prefabricated buildings, the construction industry has rapidly ushered in a revolution. Prefabricated buildings are endowed with many advantages and have become a hot trend in the construction industry. Among them, the prefabricated steel structure building system is a very important form.
[0003] At present, the construction of prefabricated steel structure buildings in the prior art is generally implemented in a bottom-up construction sequence. This results in the need for operators to perform construction operations at high altitudes during the later construction of prefabricated steel structure buildings, which is not only inconvenient for operators to move and has low safety, but is also not conducive to the efficient construction of prefabricated steel structure buildings; and, most of the joints of traditional prefabricated steel structure buildings are completed by welding, which is very inconvenient for some temporary prefabricated steel structure buildings to be disassembled and recycled in the later stage, increasing the cost of the building. Based on the above reasons, the present invention proposes a prefabricated steel structure building system and construction method. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a prefabricated steel structure building system and a construction method.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0006] A prefabricated steel structure building system includes a plurality of fixed columns evenly distributed, four arc-shaped shells are distributed in a ring array near the top of the fixed column, a side groove is provided on one side of the arc-shaped shell, a side plate is fixedly connected to the other side of the arc-shaped shell, the side plate is inserted into the side groove, a support and positioning assembly is provided on the lower side of the arc-shaped shell, a same first connecting rod is fixedly connected between the arc-shaped shells adjacent on the left and right, two second connecting rods are fixedly connected symmetrically in the front and back of the arc-shaped shell, the first connecting rod and the second connecting rod are perpendicular to each other, two through grooves are symmetrically provided on the bottom surface of one end of the second connecting rod away from the arc-shaped shell, and the second connecting rod is far away from the arc-shaped shell. A movable column is arranged at the lower side away from one end of the arc-shaped shell, and the side walls of the movable column are fixedly connected with an arc plate, and a circular hole is opened on the arc plate, and a fixed shell is fixedly connected to the top side wall of the movable column, and a fixed shaft is fixedly connected in the fixed shell, and two rollers are symmetrically and movably connected to the side wall of the fixed shaft, and the rollers are inserted into the through groove, and the same third connecting rod is fixedly connected between two adjacent fixed shells, and the movable column is fixedly connected with a movable shaft near the bottom end, and the movable shaft is fixedly connected with a bottom shell, and a positioning plate is inserted into the lower side of the movable column, and the bottom shell and the positioning plate are both fixedly connected to the movable column, and a base assembly is arranged on the bottom surface of the fixed column and the bottom shell.
[0007] As a preferred technical solution of the present invention, the supporting and positioning assembly includes a fixing plate, two fixing plates are symmetrically fixedly connected to the fixing column near the top, a motor is fixedly connected to the center of the top surface of the fixing plate, a rotating shaft is fixedly connected to the rotor of the motor, the rotating shaft passes through the fixing plate at one end away from the motor and is fixedly connected to the first bevel gear, four supporting plates are symmetrically and movably connected to the fixing column near the top, threaded holes are provided in the centers of the side walls of the supporting plates on the opposite sides, the same threaded rod is threadedly connected to the inner walls of two adjacent threaded holes, a second bevel gear is fixedly connected to the side walls of the threaded rod, the first bevel gear is meshed with the second bevel gear, a flat plate is movably connected to the center of the side wall of the threaded rod, and the flat plate is fixedly connected to the fixing column.
[0008] As a preferred technical solution of the present invention, the spiral directions of the threaded holes on the two adjacent support plates are opposite, the threads of the threaded rods on both sides of the plate are opposite, and the threaded rods and the threaded holes are matched and meshed with each other.
[0009] As a preferred technical solution of the present invention, the base assembly includes a bottom plate, on which a plurality of vertical rods are evenly distributed, the vertical rods are arranged in a J shape, the side walls of the plurality of vertical rods are sleeved with the same fixing frame, and the vertical rods are all threadedly connected with fixing nuts near the top ends.
[0010] As a preferred technical solution of the present invention, the fixed column, the movable column, the first connecting rod, the second connecting rod and the third connecting rod are all made of I-shaped steel.
[0011] As a preferred technical solution of the present invention, the arc-shaped shell is provided with first through holes near both sides, the first through holes respectively penetrate the arc-shaped shell, the side plate and the side groove, the first bolts are inserted into the first through holes, and the first bolts are threadedly connected with first nuts.
[0012] As a preferred technical solution of the present invention, connecting plates are provided on the upper and lower side walls of the third connecting rod close to both ends of the fixed shell, and the connecting plate is fixedly connected to the fixed shell. A plurality of second through holes are evenly distributed on the connecting plate, and the second through holes pass through the third connecting rod and the connecting plate. Second bolts are inserted into the second through holes, and second nuts are threadedly connected to the second bolts.
[0013] As a preferred technical solution of the present invention, the positioning plate is arranged in an L shape, and a third through hole is opened on the side wall of the bottom shell and the positioning plate. The third through hole passes through the movable column, and a third bolt is inserted into the third through hole. The third bolt is threadedly connected with a third nut.
[0014] A construction method for an assembled steel structure building system comprises the following steps:
[0015] S1: First, dig a foundation pit at the designated location of the construction site, place the base assembly inside the foundation pit, and then pour concrete into the foundation pit. After the concrete solidifies, the prefabricated steel structure base assembly is positioned and fixed;
[0016] S2: First, fix the bottom shell to the bottom surface of the bottom plate on both sides, and insert the movable column into the bottom shell, and complete the movable connection between the bottom shell and the movable column through the movable shaft. At this time, the other end of the movable column is set toward the center position;
[0017] S3: Then fix the fixed column to the bottom plate in the middle, and sleeve four arc-shaped shells on each fixed column, so that the side plates on the adjacent arc-shaped shells are inserted into the side grooves, and then insert the first connecting rod into the left and right sides of the assembled arc-shaped shell, insert the first bolt into the first through hole of the arc-shaped shell close to the first connecting rod, so that the first bolt passes through the arc-shaped shell, the side groove and the side plate and is threadedly connected with the first nut at the other end, thereby completing the fixed connection between the first connecting rod and the arc-shaped shell, and then insert the second connecting rod into the front and rear sides of the assembled arc-shaped shell, insert the first bolt into the remaining first through hole, and threadedly connected with the first nut as the above principle, thereby achieving the fixed connection between the second connecting rod and the arc-shaped shell, and the fixed connection between the four arc-shaped shells can be completed by the first bolt;
[0018] S4: The fixed shell is sleeved onto the second connecting rod, and the fixed shell is fixedly connected to the end of the movable column away from the bottom shell, the roller on the fixed shell is arranged at the lower side of the second connecting rod, the third connecting rod is inserted between the connecting plates on both sides of the fixed shell, the second bolt is inserted into the second through hole on the connecting plate, and the fixed installation between the fixed shell and the third connecting rod is completed by tightening the second nut;
[0019] S5: A traction rope or other structure is passed through the circular hole of the arc plate on the movable column, and the traction rope is connected to the external traction device. The traction devices on both sides pull the traction rope at the same time. At this time, the movable column is driven by the traction rope to rotate around the movable axis. The movable column drives the fixed shell to move on the second connecting rod, and the roller rotates on the bottom surface of the second connecting rod to realize the lifting of the first connecting rod and the second connecting rod. When the roller moves into the through groove on the second connecting rod, the movement of the traction device is stopped;
[0020] S6: Start the motor through an external power supply, the motor drives the rotating shaft to rotate, the rotating shaft drives the first bevel gear to mesh with the second bevel gear to rotate, the second bevel gear drives the threaded rod to rotate, the threaded rod meshes with the threaded holes on the support plates on both sides, so that the support plates on both sides extend out of the side walls of the fixed columns, and the support plates move to the lower side of the arc shell. At this time, the traction of the external traction device can be released, and the arc shell is supported by the support plate, so that the arc shell, the first connecting rod and the second connecting rod are lifted and installed, and the fixed installation of the ceiling structure of the assembled steel structure is completed;
[0021] S7: Insert the positioning plate into the bottom shell so that the bottom surface of the positioning plate is inserted into the lower side of the movable column, then insert the third bolt into the third through hole, and thread the other end of the third bolt with a third nut to achieve positioning and fixation of the bottom shell, the positioning plate and the movable column, and complete the overall fixing and installation operation of the assembled steel structure.
[0022] The embodiment of the present invention provides a prefabricated steel structure building system and a construction method, which have the following beneficial effects:
[0023] 1. The present invention is provided with a fixed column, a movable column, an arc-shaped shell, a first connecting rod, a second connecting rod, a fixed shell, a third connecting rod and a support positioning assembly. During construction, the first connecting rod and the second connecting rod can be fixedly installed through the arc-shaped shell, and the arc-shaped shell can be sleeved on the fixed column. Then, the movable column can be sleeved on the second connecting rod through the fixed shell, and the fixed shells can be fixedly connected through the third connecting rod, so that the first connecting rod, the second connecting rod, the third connecting rod and the arc-shaped shell form an assembled steel structure ceiling structure, and the ceiling structure can be lifted as a whole by pulling the movable column. The ceiling structure can be supported and fixed by the support positioning assembly, so that the construction operation of the assembled steel structure can be completed efficiently and quickly;
[0024] 2. The present invention is provided with a fixing nut, a first bolt, a second bolt, a third bolt and an arc-shaped shell. The fixing bolt can be used to achieve fixed installation between the assembled steel structure and the base assembly. The first bolt and the arc-shaped shell can be used to position and install the first connecting rod and the second connecting rod. The second bolt can be used to fix the third connecting rod. Combined with the third bolt, the movable column can be positioned. This not only can achieve secure installation and fixation of the assembled steel structure, but also can facilitate the later disassembly operation of the assembled steel structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0026] Figure 1 It is a schematic diagram of the overall front three-dimensional structure of the present invention;
[0027] Figure 2 It is a schematic diagram of the overall side three-dimensional structure of the present invention;
[0028] Figure 3 It is a schematic diagram of the three-dimensional structure of the middle part of the present invention;
[0029] Figure 4 It is a schematic diagram of the three-dimensional structure of the support and positioning assembly of the present invention;
[0030] Figure 5 It is a schematic diagram of the three-dimensional structure of the base assembly of the present invention;
[0031] Figure 6 It is a schematic diagram of the arc-shaped shell combined three-dimensional structure of the present invention;
[0032] Figure 7 It is a schematic diagram of the three-dimensional structure of the fixed shell of the present invention;
[0033] Figure 8It is a schematic diagram of the three-dimensional structure of the arc-shaped shell of the present invention;
[0034] Fig. 9 It is a three-dimensional structural schematic diagram of the positioning plate of the present invention;
[0035] Fig.10 It is a schematic diagram of the three-dimensional structure of the second connecting rod of the present invention.
[0036] In the figure: 1, fixed column; 2, arc shell; 3, side groove; 4, side plate; 5, support and positioning assembly; 6, first connecting rod; 7, second connecting rod; 8, through groove; 9, movable column; 10, arc plate; 11, round hole; 12, fixed shell; 13, fixed shaft; 14, roller; 15, third connecting rod; 16, movable shaft; 17, bottom shell; 18, positioning plate; 19, base assembly; 20, fixed plate; 21, motor; 22, rotating shaft; 23, first bevel gear; 24, support plate; 25, threaded rod; 26, second bevel gear; 27, flat plate; 28, bottom plate; 29, vertical rod; 30, fixed frame; 31, fixed nut; 32, first bolt; 33, first nut; 34, connecting plate; 35, second bolt; 36, second nut; 37, third bolt; 38, third nut. DETAILED DESCRIPTION
[0037] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0038] Example: Figure 1-10 As shown, an assembled steel structure building system includes a fixed column 1, a plurality of fixed columns 1 are evenly distributed, four arc-shaped shells 2 are distributed in a ring array near the top of the fixed column 1, a side groove 3 is opened on one side of the arc-shaped shell 2, and a side plate 4 is fixedly connected to the other side of the arc-shaped shell 2. The side plate 4 is inserted into the side groove 3 to achieve docking installation between adjacent arc-shaped shells 2, so that the arc-shaped shell 2 can be conveniently sleeved on the side wall of the fixed column 1, and the lifting, fixing and installation operation of the steel structure is convenient;
[0039] The fixed column 1 is provided with a support and positioning assembly 5 at the lower side of the arc-shaped shell 2. The support and positioning assembly 5 includes a fixed plate 20. The fixed column 1 is symmetrically fixedly connected to two fixed plates 20 near the top. The center of the top surface of the fixed plate 20 is fixedly connected to a motor 21. A rotating shaft 22 is fixedly connected to the rotor of the motor 21. The rotating shaft 22 penetrates the fixed plate 20 at one end away from the motor 21 and is fixedly connected to a first bevel gear 23. The fixed column 1 is symmetrically and movably connected to four support plates 24 near the top. The center of the side wall of the support plate 24 facing each other is provided with a threaded hole. The same threaded rod 25 is threadedly connected to the inner thread of two adjacent threaded holes. A second bevel gear 26 is fixedly connected to the side wall of the threaded rod 25. The first bevel gear 23 is meshed with the second bevel gear 26. The center of the side wall of the threaded rod 25 is movably connected to a flat plate 27. The flat plate 27 is fixedly connected to the fixed column 1, so that the support operation of the arc-shaped shell 2 can be realized, thereby realizing the support and fixing operation of the upper overall mechanism, which is convenient for the construction operation of the steel structure building.
[0040] The screw holes on the two adjacent support plates 24 are arranged in opposite directions, and the screw threads of the screw rods 25 on both sides of the flat plate 27 are arranged in opposite directions. The screw rods 25 and the screw holes are matched and meshed with each other, so that the two support plates 24 can be adjusted to realize the fixed support function of the support plates 24.
[0041] The same first connecting rod 6 is fixedly connected between the left and right adjacent arc-shaped shells 2, and two second connecting rods 7 are fixedly connected in the front and rear symmetrical manner in the arc-shaped shell 2. The first connecting rod 6 and the second connecting rod 7 are arranged perpendicular to each other, and two through grooves 8 are symmetrically provided on the bottom surface of the end of the second connecting rod 7 away from the arc-shaped shell 2. A movable column 9 is arranged at the lower side of the end of the second connecting rod 7 away from the arc-shaped shell 2, and an arc plate 10 is fixedly connected to the side wall of the movable column 9, and a circular hole 11 is opened on the arc plate 10. A fixed shell 12 is fixedly connected to the top side wall of the movable column 9, and a fixed shell 12 is fixedly connected to the fixed shell 12. A fixed shaft 13 is connected, and two rollers 14 are symmetrically and movably connected on the side wall of the fixed shaft 13. The rollers 14 are inserted into the through groove 8. A third connecting rod 15 is fixedly connected between two adjacent fixed shells 12. A movable shaft 16 is fixedly connected near the bottom end of the movable column 9. A bottom shell 17 is fixedly connected to the movable shaft 16. A positioning plate 18 is inserted into the lower side of the movable column 9. The bottom shell 17 and the positioning plate 18 are fixedly connected to the movable column 9, so that the fixed installation operation of the first connecting rod 6, the second connecting rod 7 and the third connecting rod 15 can be realized, which is convenient for the construction of the steel structure building;
[0042] The arc-shaped shell 2 is provided with first through holes near both sides, and the first through holes penetrate the arc-shaped shell 2, the side plate 4 and the side groove 3 respectively. The first bolts 32 are inserted into the first through holes, and the first nuts 33 are threadedly connected to the first bolts 32, so as to facilitate the fixed installation between the arc-shaped shell 2 and the first connecting rod 6 and the second connecting rod 7;
[0043] The third connecting rod 15 is provided with connecting plates 34 on the upper and lower side walls near both ends of the fixed shell 12. The connecting plates 34 are fixedly connected to the fixed shell 12. A plurality of second through holes are evenly distributed on the connecting plates 34. The second through holes penetrate the third connecting rod 15 and the connecting plates 34. Second bolts 35 are inserted into the second through holes. The second bolts 35 are threadedly connected with second nuts 36, so as to facilitate the fixed installation operation between the fixed shell 12 and the third connecting rod 15.
[0044] The positioning plate 18 is L-shaped, and the side walls of the bottom shell 17 and the positioning plate 18 are both provided with third through holes, the third through holes penetrate the movable column 9, and the third through holes are both inserted with third bolts 37, and the third bolts 37 are threadedly connected with third nuts 38. By fixing and locking the positioning plate 18, the movable column 9 and the bottom shell 17, the movable column 9 can be securely installed, thereby improving the installation reliability of the steel structure building;
[0045] A base assembly 19 is provided on the bottom surface of the fixed column 1 and the bottom shell 17. The base assembly 19 includes a bottom plate 28. A plurality of vertical rods 29 are evenly distributed on the bottom plate 28. The vertical rods 29 are arranged in a J shape. The side walls of the plurality of vertical rods 29 are sleeved with a same fixing frame 30. The vertical rods 29 are all threadedly connected with fixing nuts 31 near the top, which can achieve stable support for the steel structure building and improve the safety of the steel structure building.
[0046] The fixed column 1, the movable column 9, the first connecting rod 6, the second connecting rod 7 and the third connecting rod 15 are all arranged by I-shaped steel, which is convenient for the construction of the assembled steel structure building.
[0047] A construction method for an assembled steel structure building system comprises the following steps:
[0048] S1: First, a foundation pit is dug at a designated location of the construction site, and the base assembly 19 is placed inside the foundation pit, and then concrete is poured into the foundation pit. After the concrete solidifies, the assembled steel structure base assembly 19 is positioned and fixed;
[0049] S2: First, the bottom shell 17 is fixedly connected to the bottom surface of the bottom plate 28 on both sides, and the movable column 9 is inserted into the bottom shell 17, and the movable connection between the bottom shell 17 and the movable column 9 is completed through the movable shaft 16, and the other end of the movable column 9 is set toward the center position;
[0050] S3: Then fix the fixed column 1 to the bottom plate 28 in the middle, and sleeve four arc-shaped shells 2 on each fixed column 1, so that the side plates 4 on the adjacent arc-shaped shells 2 are inserted into the side grooves 3, and then insert the first connecting rod 6 into the left and right sides of the assembled arc-shaped shell 2, insert the first bolt 32 into the first through hole of the arc-shaped shell 2 close to the first connecting rod 6, so that the first bolt 32 passes through the arc-shaped shell 2, the side grooves 3 and the side plates 4 and is threadedly connected with the first nut 33 at the other end, so as to complete the fixed connection between the first connecting rod 6 and the arc-shaped shell 2, and then insert the second connecting rod 7 into the front and rear sides of the assembled arc-shaped shell 2, insert the first bolt 32 into the remaining first through hole, and be threadedly connected with the first nut 33 as described above, so as to realize the fixed connection between the second connecting rod 7 and the arc-shaped shell 2, and the fixed connection between the four arc-shaped shells 2 can be completed by the first bolt 32;
[0051] S4: The fixed shell 12 is sleeved onto the second connecting rod 7, and the fixed shell 12 is fixedly connected to the end of the movable column 9 away from the bottom shell 17. The roller 14 on the fixed shell 12 is arranged at the lower side of the second connecting rod 7. The third connecting rod 15 is inserted between the connecting plates 34 on both sides of the fixed shell 12, and the second bolt 35 is inserted into the second through hole on the connecting plate 34. The fixed installation between the fixed shell 12 and the third connecting rod 15 is completed by tightening the second nut 36.
[0052] S5: A traction rope or other structure is passed through the circular hole 11 of the arc plate 10 on the movable column 9, and the traction rope is connected to the external traction equipment. The traction equipment on both sides pulls the traction rope at the same time. At this time, the movable column 9 is driven by the traction rope to rotate around the movable shaft 16, and the movable column 9 drives the fixed shell 12 to move on the second connecting rod 7, and the roller 14 is rotated on the bottom surface of the second connecting rod 7 to realize the lifting of the first connecting rod 6 and the second connecting rod 7. When the roller 14 moves into the through groove 8 on the second connecting rod 7, the movement of the traction equipment is stopped;
[0053] S6: Start the motor 21 through an external power supply, the motor 21 drives the rotating shaft 22 to rotate, the rotating shaft 22 drives the first bevel gear 23 to mesh with the second bevel gear 26 to rotate, the second bevel gear 26 drives the threaded rod 25 to rotate, the threaded rod 25 meshes with the threaded holes on the support plates 24 on both sides, so that the support plates 24 on both sides extend out of the side walls of the fixed column 1, and the support plates 24 move to the lower side of the arc shell 2. At this time, the traction of the external traction device can be released, and the arc shell 2 is supported by the support plate 24, so that the arc shell 2, the first connecting rod 6 and the second connecting rod 7 are lifted and installed, and the fixed installation of the ceiling structure of the assembled steel structure is completed;
[0054] S7: Insert the positioning plate 18 into the bottom shell 17 so that the bottom surface of the positioning plate 18 is inserted into the lower side of the movable column 9, and then insert the third bolt 37 into the third through hole, and thread the third nut 38 on the other end of the third bolt 37 to achieve the positioning and fixation of the bottom shell 17, the positioning plate 18 and the movable column 9, and complete the overall fixing and installation operation of the assembled steel structure.
[0055] Finally, it should be noted that in the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention.
[0056] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0057] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An assembled steel structure building system, comprising a fixed column (1), characterized in that: A plurality of fixed columns (1) are evenly distributed, and four arc-shaped shells (2) are distributed in a ring array near the top of the fixed column (1). A side groove (3) is provided on one side of the arc-shaped shell (2), and a side plate (4) is fixedly connected to the other side of the arc-shaped shell (2). The side plate (4) is inserted into the side groove (3). A support positioning component (5) is provided on the lower side of the fixed column (1) located on the lower side of the arc-shaped shell (2). The same first connecting rod (6) is fixedly connected between the arc-shaped shells (2) adjacent to each other on the left and right. Two second connecting rods (7) are fixedly connected in a front-to-back symmetrical manner in the arc-shaped shell (2). The first connecting rod (6) and the second connecting rod (7) are perpendicular to each other. Two through grooves (8) are symmetrically provided on the lower side of the second connecting rod (7) away from the arc-shaped shell (2). A movable column (9) is provided on the lower side of the second connecting rod (7) away from the end of the arc-shaped shell (2). The side walls of the columns (9) are fixedly connected with arc plates (10), the arc plates (10) are provided with round holes (11), the top side walls of the movable columns (9) are fixedly connected with fixed shells (12), the fixed shells (12) are fixedly connected with fixed shafts (13), the side walls of the fixed shafts (13) are symmetrically and movably connected with two rollers (14), the rollers (14) are inserted into the through grooves (8), and two adjacent fixed shells (12) are fixedly connected with the fixed shafts (13). A third connecting rod (15) is fixedly connected between the movable column (9), a movable shaft (16) is fixedly connected to the movable column (9) near the bottom end, a bottom shell (17) is fixedly connected to the movable shaft (16), a positioning plate (18) is inserted into the lower side of the movable column (9), the bottom shell (17) and the positioning plate (18) are both fixedly connected to the movable column (9), and a base assembly (19) is provided on the bottom surface of the fixed column (1) and the bottom shell (17).
2. The assembled steel structure building system according to claim 1, characterized in that: The support and positioning assembly (5) comprises a fixing plate (20), two fixing plates (20) are fixedly connected to the fixing column (1) near the top in a symmetrical manner, a motor (21) is fixedly connected to the center of the top surface of the fixing plate (20), a rotating shaft (22) is fixedly connected to the rotor of the motor (21), an end of the rotating shaft (22) away from the motor (21) passes through the fixing plate (20) and is fixedly connected to a first bevel gear (23), and the fixing column (1) is movable symmetrically in front and back near the top. Four support plates (24) are connected, and threaded holes are provided at the centers of the side walls of the support plates (24) facing each other. The same threaded rod (25) is threadedly connected to two adjacent threaded holes, and a second bevel gear (26) is fixedly connected to the side wall of the threaded rod (25). The first bevel gear (23) is meshed with the second bevel gear (26). A flat plate (27) is movably connected to the center of the side wall of the threaded rod (25), and the flat plate (27) is fixedly connected to the fixed column (1).
3. The assembled steel structure building system according to claim 2, characterized in that: The threaded holes on two adjacent support plates (24) are arranged in opposite directions, the threaded rods (25) on both sides of the flat plate (27) are arranged in opposite directions, and the threaded rods (25) and the threaded holes are matched and meshed with each other.
4. The assembled steel structure building system according to claim 1, characterized in that: The base assembly (19) comprises a bottom plate (28), on which a plurality of vertical rods (29) are evenly distributed, the vertical rods (29) being arranged in a J-shape, a same fixing frame (30) being sleeved on the side walls of the plurality of vertical rods (29), and a fixing nut (31) being threadedly connected near the top of each vertical rod (29).
5. The assembled steel structure building system according to claim 1, characterized in that: The fixed column (1), the movable column (9), the first connecting rod (6), the second connecting rod (7) and the third connecting rod (15) are all made of I-shaped steel.
6. The assembled steel structure building system according to claim 1, characterized in that: The arc-shaped shell (2) is provided with first through holes near both sides, and the first through holes penetrate the arc-shaped shell (2), the side plate (4) and the side groove (3) respectively. A first bolt (32) is inserted into each of the first through holes, and a first nut (33) is threadedly connected to the first bolt (32).
7. The assembled steel structure building system according to claim 1, characterized in that: The third connecting rod (15) is provided with connecting plates (34) on the upper and lower side walls near the two ends of the fixed shell (12); the connecting plate (34) is fixedly connected to the fixed shell (12); a plurality of second through holes are evenly distributed on the connecting plate (34); the second through holes penetrate the third connecting rod (15) and the connecting plate (34); second bolts (35) are inserted into the second through holes; and second nuts (36) are threadedly connected to the second bolts (35).
8. The assembled steel structure building system according to claim 1, characterized in that: The positioning plate (18) is arranged in an L shape, and a third through hole is opened on the side wall of the bottom shell (17) and the positioning plate (18), and the third through hole passes through the movable column (9). A third bolt (37) is inserted into the third through hole, and a third nut (38) is threadedly connected to the third bolt (37).
9. A construction method for an assembled steel structure building system according to any one of claims 1 to 8, characterized in that: The following steps are involved: S1: First, a foundation pit is dug at a designated location of the construction site, and the base assembly (19) is placed inside the foundation pit, and then concrete is poured into the foundation pit. After the concrete solidifies, the assembled steel structure base assembly (19) is positioned and fixed; S2: First, the bottom shell (17) is fixedly connected to the bottom surface of the bottom plate (28) on both sides, and the movable column (9) is inserted into the bottom shell (17), and the movable connection between the bottom shell (17) and the movable column (9) is completed through the movable shaft (16), and the other end of the movable column (9) is set toward the center position; S3: The fixed column (1) is then fixedly mounted on the bottom plate (28) at the middle, and four arc-shaped shells (2) are sleeved on each fixed column (1), so that the side plates (4) on the adjacent arc-shaped shells (2) are inserted into the side grooves (3), and then the first connecting rods (6) are inserted into the left and right sides of the assembled arc-shaped shells (2), and the first bolts (32) are inserted into the first through holes of the arc-shaped shells (2) near the first connecting rods (6), so that the first bolts (32) penetrate the arc-shaped shells (2), the side grooves (3) and the side plates (4). ) and a first nut (33) is threadedly connected at the other end to complete the fixed connection between the first connecting rod (6) and the arc-shaped shell (2), and then the second connecting rod (7) is inserted into the front and rear sides of the assembled arc-shaped shell (2), and the first bolt (32) is inserted into the remaining first through hole, and the first nut (33) is threadedly connected as in the above principle to achieve the fixed connection between the second connecting rod (7) and the arc-shaped shell (2), and the first bolt (32) can be used to complete the fixed connection between the four arc-shaped shells (2); S4: The fixed shell (12) is sleeved onto the second connecting rod (7), and the fixed shell (12) is fixedly connected to the end of the movable column (9) away from the bottom shell (17), the roller (14) on the fixed shell (12) is arranged at the lower side of the second connecting rod (7), the third connecting rod (15) is inserted between the connecting plates (34) on both sides of the fixed shell (12), the second bolt (35) is inserted into the second through hole on the connecting plate (34), and the fixed installation between the fixed shell (12) and the third connecting rod (15) is completed by tightening the second nut (36); S5: A traction rope or other structure is passed through the circular hole (11) of the arc plate (10) on the movable column (9), and the traction rope is connected to the external traction equipment. The traction equipment on both sides pulls the traction rope at the same time. At this time, the movable column (9) is driven by the traction rope to rotate around the movable shaft (16). The movable column (9) drives the fixed shell (12) to move on the second connecting rod (7), and the roller (14) rotates on the bottom surface of the second connecting rod (7) to realize the lifting of the first connecting rod (6) and the second connecting rod (7). When the roller (14) moves into the through groove (8) on the second connecting rod (7), the movement of the traction equipment is stopped; S6: The motor (21) is started by an external power supply, the motor (21) drives the rotating shaft (22) to rotate, the rotating shaft (22) drives the first bevel gear (23) to engage with the second bevel gear (26) to rotate, the second bevel gear (26) drives the threaded rod (25) to rotate, the threaded rod (25) engages with the threaded holes on the support plates (24) on both sides, so that the support plates (24) on both sides extend out of the side walls of the fixed column (1), and the support plates (24) move to the lower side of the arc shell (2). At this time, the traction of the external traction device can be released, and the arc shell (2) is supported by the support plate (24), so that the arc shell (2), the first connecting rod (6) and the second connecting rod (7) are lifted and installed, and the fixed installation of the ceiling structure of the assembled steel structure is completed; S7: Insert the positioning plate (18) into the bottom shell (17) so that the bottom surface of the positioning plate (18) is inserted into the lower side of the movable column (9), and then insert the third bolt (37) into the third through hole, and thread the other end of the third bolt (37) with a third nut (38), so as to achieve the positioning and fixation of the bottom shell (17), the positioning plate (18) and the movable column (9), and complete the overall fixing and installation operation of the assembled steel structure.