Concrete formwork load-bearing primary and secondary arris component and connecting method
By designing the primary and secondary corrugated components of the special-shaped welded pipe and the U-shaped spring wire card connector, the problem of underutilizing the load bearing capacity of the vertical rod of the coil-type steel pipe frame is solved, and efficient and economical formwork support system installation is achieved, and construction efficiency is improved and security.
Patent Information
- Application Number
- CN202411263623.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-09-10
AI Technical Summary
In civil engineering projects, the pole bearing capacity of the coiled steel pipe scaffolding has not been fully utilized, resulting in large usage of the formwork support system and low erection efficiency. The existing bearing capacity of primary and secondary products is insufficient and the degree of processing automation is difficult to meet. Green construction demand.
A special-shaped welded pipe primary and secondary corrugated members and connection methods are designed for the top of the vertical pole of the concrete formwork support frame. The special-shaped welded pipe pressed by galvanized aluminum-magnesium thin plates is combined with the U-shaped spring wire card connection to achieve high cross-section bending resistance. Stiffness and lightweight and durable primary and secondary corrugated components, supporting large spacing arrangement and efficient installation.
It improves the load-bearing capacity and layout efficiency of formwork brackets, reduces material usage and processing costs, improves construction safety and operation convenience, and meets efficient and economical construction needs.
Smart Images

Figure CN118933333A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a load-bearing primary and secondary rib components at the top of a concrete formwork support frame upright and a connection method, and belongs to the field of cast-in-place concrete construction formwork support system for structural components in civil engineering. Background Art
[0002] In civil engineering, the formwork support frame for concrete pouring of floor beam and slab structures usually uses a fastener-type steel pipe scaffolding as the formwork support frame. The horizontal steel pipe is fastened to the vertical pole with a right-angle fastener at the top of the vertical pole to form the main rib bearing system of the floor slab formwork. A 40×90mm wooden square is laid on the single or double horizontal steel pipe main rib as the secondary rib bearing system of the floor slab formwork. The plywood formwork is laid on the wooden square and fixed with carpentry nails. The new generation of formwork support frame uses a disc-type steel pipe scaffolding with Q355 steel vertical poles. The bearing capacity of the vertical poles is greatly improved, but the load-bearing primary and secondary ribs installed in the adjustable support at the top of the vertical pole still use traditional fastener steel pipes and wooden squares with small cross-sectional bending stiffness, which directly leads to the fact that the vertical poles of the disc-type steel pipe support cannot be arranged at large spacing, and the large bearing capacity of the vertical pole cannot be fully utilized, resulting in a large amount of disc-type steel pipe supports, low erection efficiency, and poor economic indicators, which has become a pain point of the current domestic construction site formwork support system. It is known that the top of the foreign tool-type formwork support system has matching load-bearing primary and secondary rib products, the main products are wooden I-beams and aluminum beams with large cross-sectional bending rigidity, which can solve the problem of efficient use of large-spacing layout of formwork support poles. However, lightweight wooden I-beams are easy to be sawed, and I-section aluminum beams are expensive and easy to be assembled, disassembled, collided and deformed. They are not suitable for promotion and application in Chinese engineering construction sites. Summary of the invention
[0003] Technical problem: The purpose of the present invention is to provide a durable, lightweight, low-processing-cost, and high-section bending stiffness concrete formwork support frame upright top load-bearing primary and secondary rib products that match the large-spacing arrangement of high-load-bearing poles of the disc-type steel pipe scaffolding at the top of the support frame in the civil engineering construction formwork support system. The primary and secondary ribs and connecting parts of the formwork support system are more durable and less prone to deformation than the known tool-type wooden I-beams and aluminum primary and secondary beams, and the processing and forming are highly automated, with light deadweight per linear meter and good comprehensive economic indicators. It can solve the current construction site The use of fastener steel pipes and wooden squares as primary and secondary ribs brings about a large amount of temporary turnover materials, dense pole arrangement spacing, low assembly and disassembly efficiency, and is not conducive to green construction.
[0004] Technical solution: The main and secondary rib components used for bearing the top concrete formwork of the present invention include formwork supporting main ribs, formwork supporting secondary ribs, connecting pieces, formwork support uprights, and adjustable supports; wherein, an adjustable support is provided at the top end of the upper portion of the formwork support upright, a groove on the adjustable support is embedded in the horizontally arranged formwork supporting main rib, the horizontally arranged formwork supporting secondary rib is arranged above the horizontally arranged formwork supporting main rib, the formwork supporting main rib and the formwork supporting secondary rib are cross-arranged and connected by connecting pieces.
[0005] The template supporting the main rib is a special-shaped welded pipe, and its two side webs are respectively provided with longitudinal stiffening rib grooves, a row of large circular holes are arranged at the midline position of the side, and a row of circular buckle holes are respectively arranged on the upper and lower sides of the large circular holes. A groove is arranged on the top surface of the template supporting the main rib, and a plywood strip is arranged in the groove.
[0006] The main ribs supported by the template are pressed with 2-2.2mm thin plates of galvanized aluminum-magnesium steel with a strength not lower than Q355 or pressed with ordinary thin plates and hot-dip galvanized to form special-shaped welded pipes with large cross-section and high bending stiffness EI value; the top surface of the main ribs supported by the template is provided with pressed grooves, and plywood strips with a width of 30mm and a thickness of 12-15mm are provided in the grooves and fixed with self-tapping screws.
[0007] The self-weight of the main ribs supported by the template is controlled within 7kg per linear meter, and the cross-sectional bending stiffness EI value is 400kNm 2 The above can meet the expected technical parameters of 1200-1800mm large spacing arrangement under the allowable bearing capacity of the formwork support uprights. By comparison, the cross-sectional width of the special-shaped welded pipe is 60mm, the height is 140mm, and the wall thickness is 2-2.2mm.
[0008] Two upper and lower longitudinal stiffening rib grooves with a width of 10-15mm and a recess of 2-4mm are symmetrically pressed on the webs of both side surfaces of the main ribs supported by the template 20mm away from the top and bottom surfaces; large circular holes with a diameter of 50-60mm and evenly distributed at a spacing of 150mm are symmetrically punched in the middle of the webs of both side surfaces for the convenience of inserting scaffolding steel pipes with a diameter of 48mm; circular buckle holes with a diameter of about 18mm and evenly distributed at a spacing of 150mm are punched in the upper and lower parts, and the circular buckle holes are staggered with the large circular holes.
[0009] The template supporting secondary rib is a special-shaped welded pipe, and long holes are arranged on both sides along the length direction, and a groove is arranged on the top surface, and a plywood strip is arranged in the groove.
[0010] The template supports secondary ribs with a deadweight of 4kg per meter and a cross-sectional bending stiffness EI value of 90kNm 2 The above can meet the technical parameters of the large spacing arrangement of the formwork support secondary ribs with a span of 1200-1800mm under the allowable bearing capacity of the formwork support uprights and the formwork panel with an interval of 200-400mm.
[0011] The cross-sectional width of the special-shaped welded pipe selected from the template supporting secondary ribs is 50mm, the height is 80mm, and the wall thickness is 2-2.2mm; long strip holes with a width of 16-18mm and a length of 60mm are symmetrically punched in the middle of the web with a height of 80mm on both sides of the template supporting secondary ribs, which are used to insert the connecting parts connecting the main and secondary ribs into the holes and to insert the tension screws when used as the back rib of the wall template.
[0012] The connecting piece is a U-shaped hook spring wire clip, which is made of spring steel wire with a diameter of 2.5 to 3.5 mm and bent into a U-shaped hook shape. When in use, the connecting piece is passed through the long strip hole in the middle of the secondary rib of the template support, and the two legs of the connecting piece are made to straddle the circular buckle holes evenly distributed on the main rib of the template support in an "eight" shape.
[0013] The method for connecting primary and secondary rib members for bearing the load of top concrete formwork of the present invention comprises the following steps:
[0014] Step 1: Plan the plane and elevation layout of the disc-type steel pipe scaffolding formwork support poles according to the concrete beam-slab structure layer height and plane dimensions of the construction object, and according to the floor thickness and beam section dimensions;
[0015] Step 2: According to the thickness of the floor slab poured with concrete in the construction area, a 15mm thick plywood formwork panel and a formwork supporting secondary rib are selected, and the spacing L1 of the formwork supporting secondary ribs under the specified deflection control value is calculated according to the cross-sectional bending stiffness value of the formwork panel; the span value L2 of the formwork supporting secondary ribs under the specified deflection control value is calculated according to the cross-sectional bending stiffness value of the formwork supporting secondary ribs;
[0016] Step 3, according to the load value of the floor formwork in the span area of the secondary ribs supported by the formwork, the cross-sectional bending stiffness value of the main ribs supported by the formwork is calculated to obtain the span value L3 of the main ribs supported by the formwork under the specified deflection value, and the modulus value of the horizontal rod of the support is also regularized to determine the arrangement spacing of the vertical rods of the formwork support in the span direction of the main ribs supported by the formwork;
[0017] Step 4, complete the installation of the formwork supporting main ribs and formwork supporting secondary ribs on the top of the formwork support uprights, and connect the formwork supporting main ribs and formwork supporting secondary ribs with U-shaped spring wire clamp connectors; finally, lay the plywood formwork panel on the top surface of the formwork supporting secondary ribs, and use carpentry nails to fix the formwork panel directly to the plywood strips embedded in the top of the formwork supporting secondary ribs to complete the installation of the entire floor formwork project.
[0018] Beneficial effect: According to the reasonable standard load bearing capacity of the Q355 steel standard 48×3.2 pipe uprights of the disc-type steel pipe bracket, which is about 40kN, reverse thinking is used to calculate the cross-sectional bending stiffness value required for the primary and secondary ribs under the top template panel of the bracket that matches the high bearing capacity of the uprights, and considering the work intensity and work safety of workers laying the primary and secondary ribs, the reasonable cross-sectional dimensions of the primary and secondary ribs of the special-shaped steel pipes are calculated. The effective effect obtained solves the problem of fixing the plywood template panel and the primary and secondary ribs of the special-shaped welded pipes with carpentry nails, and at the same time solves the assembly line processing of the special-shaped welded pipes, the light weight of the line, the safety of the installation and disassembly of the primary and secondary ribs, and uses galvanized aluminum-magnesium thin plates for direct high-frequency welding to solve the problem of harsh and easy rust in the construction site environment, achieving the beneficial effect of economical and efficient processing. The primary and secondary ribs and connecting parts of this formwork support system are more durable and less prone to deformation than the known tool-type wooden I-beams and aluminum primary and secondary beams. They also have a high degree of automation in processing and forming, light weight per linear meter, and good comprehensive economic indicators. They can solve the pain points of the current engineering construction sites that use fastener steel pipes and wooden squares as primary and secondary ribs, resulting in a large amount of temporary turnover materials, dense spacing between vertical poles, low assembly and disassembly efficiency, and are not conducive to green construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 ; Overall schematic diagram of the assembly of the lower unit frame of the disc-type steel pipe formwork support frame, the primary and secondary ribs at the top of the vertical pole, and the formwork panel;
[0020] Figure 2 ; Schematic diagram of the main rib structure supported by the template;
[0021] Figure 3 ; Schematic diagram of the secondary rib structure supported by the template;
[0022] Figure 4 ; Schematic diagram of fixing the main and secondary ribs with U-shaped spring wire clamp connectors.
[0023] In the figure there are: formwork supporting main rib 1, formwork supporting secondary rib 2, connecting piece 3, formwork support upright 4, adjustable support 5, groove 6, plywood strip 7, upper surface of plywood strip 8, self-tapping screw 9, longitudinal stiffening rib groove 10, large circular hole 11, circular buckle hole 12, long strip hole 13, formwork panel 14. DETAILED DESCRIPTION
[0024] The invention discloses a load-bearing primary and secondary rib members and a connection method for the top of a concrete formwork support frame upright pole. A galvanized aluminum-magnesium thin plate with a strength greater than Q355 and a thickness of 2 to 2.2 mm is pressed and high-frequency welded on an automated forming line to form a special-shaped welded pipe with a required cross-sectional bending stiffness value, and the formed welded pipe does not need to be hot-dip galvanized. A thin plate with a strength greater than Q355 and a thickness of 2 to 2.2 mm can also be pressed and high-frequency welded on an automated forming line to form a special-shaped welded pipe with a required cross-sectional bending stiffness value, and then hot-dip galvanized.
[0025] The main and secondary rib components for bearing the top concrete formwork load of the present invention include a formwork supporting main rib 1, a formwork supporting secondary rib 2, a connecting piece 3, a formwork support upright 4, and an adjustable support 5; wherein, an adjustable support 5 is provided at the top end of the upper portion of the formwork support upright 4, a groove on the adjustable support 5 is embedded in the horizontally arranged formwork supporting main rib 1, the horizontally arranged formwork supporting secondary rib 2 is arranged above the horizontally arranged formwork supporting main rib 1, the formwork supporting main rib 1 and the formwork supporting secondary rib 2 are cross-arranged and connected by the connecting piece 3.
[0026] For the formwork supporting main rib 1, combined with the use conditions of concrete pouring and forming for the formwork support, after calculation and analysis, in order to efficiently utilize the bearing capacity of the disc-type steel pipe frame uprights, for the standard pipe diameter 48mm uprights, pouring the conventional 400 thick basement top plate, the plywood secondary rib spacing is 300-400mm, the secondary rib span is 1800mm, the main rib is also 1800mm, and the controlled deflection value of the main beam is still calculated according to the load standard value 1 / 400, and the required main beam section bending stiffness EI value is calculated inversely, requiring EI>325kNm 2 The main cross section of the special-shaped welded pipe of the present invention is 60mm wide and 140mm high. Under the condition of 2mm steel pipe wall thickness, the design bending stiffness value EI of the cross section reaches 400kNm. 2 Above, can meet more than 325kNm 2 requirements, and the line weight is about 6.5kg.
[0027] The template supporting main rib 1 is a special-shaped welded pipe, and its two side webs are respectively provided with longitudinal stiffening rib grooves 10, a row of large circular holes 11 are arranged at the midline position of the side, and a row of circular buckle holes 12 are respectively arranged on the upper and lower sides of the large circular holes 11, and a groove 6 is arranged on the top surface of the template supporting main rib 1, and a plywood strip 7 is arranged in the groove 6.
[0028] The template supporting the main rib 1 is pressed with a 2-2.2mm thin plate of galvanized aluminum-magnesium steel with a strength not lower than Q355 or pressed with an ordinary thin plate and hot-dip galvanized to form a large-section special-shaped welded pipe with a high bending stiffness EI value; the top surface of the template supporting the main rib 1 is provided with a pressed groove 6, and a plywood strip 7 with a width of 30mm and a thickness of 12-15mm is provided in the groove and fixed with self-tapping screws 9.
[0029] The self-weight of the main rib 1 supported by the template is controlled within 7kg per linear meter, and the cross-sectional bending stiffness EI value is 400kNm 2 The above can meet the expected technical parameters of large spacing arrangement of 1200-1800mm under the allowable bearing capacity of the formwork support uprights 4, and the preferred cross-sectional width of the special-shaped welded pipe is 60mm, the height is 140mm, and the wall thickness is 2-2.2mm.
[0030] On the two side webs of the template supporting the main rib 1, 20mm away from the top and bottom surfaces, two upper and lower longitudinal stiffening rib grooves 10 with a width of 10-15mm and an inward depression of 2-4mm are symmetrically pressed; large circular holes 11 with a diameter of 50-60mm and evenly distributed at a spacing of 150mm are symmetrically punched in the middle of the two side webs for easy insertion of scaffolding steel pipes with a diameter of 48mm. Circular buckle holes 12 with a diameter of about 18mm and evenly distributed at a spacing of 150mm are punched in the upper and lower parts, and the circular buckle holes 12 are staggered with the large circular holes 11.
[0031] For the formwork-supported secondary rib 2, cast the conventional 400-thick basement top slab, the spacing between the plywood lower beams is 300-400mm, the secondary rib span is 1800mm, and the controlled deflection value of the secondary rib is calculated as 1 / 400 according to the load standard value. The required secondary rib stiffness EI value is calculated inversely, and EI>65kNm is required 2 The secondary cross section of the special-shaped welded pipe of the present invention is 50mm wide and 80mm high. Under the condition of 2mm steel pipe wall thickness, the cross-sectional bending rigidity value EI of the cross section reaches 93kNm. 2 , can meet more than 65kNm 2 requirements, and the line weight is only about 4kg.
[0032] The template supporting secondary rib 2 is a special-shaped welded pipe, and long holes 13 are arranged on both sides along the length direction. A groove 6 is arranged on the top surface, and a plywood strip 7 is arranged in the groove 6.
[0033] The template supports the secondary ribs 2 with a deadweight of 4 kg per meter and a cross-sectional bending stiffness EI value of 90 kNm. 2 The above can meet the technical parameters of the large spacing arrangement of the formwork support secondary ribs 2 with a span of 1200-1800mm arranged at intervals of 200-400mm under the formwork panel 14 under the allowable bearing capacity of the formwork support uprights 4.
[0034] The cross-sectional width of the special-shaped welded pipe selected from the template supporting secondary rib 2 is 50mm, the height is 80mm, and the wall thickness is 2-2.2mm; on the two side faces of the template supporting secondary rib 2, the height is 80mm, and the middle of the web is symmetrically punched with long strip holes 13 with a width of 16-18mm and a length of 60mm, which are used to insert the connecting parts 3 connecting the main and secondary ribs into the holes and to insert the tension screws when used as the back rib of the wall template.
[0035] The top surfaces of the primary and secondary rectangular welded pipes are pressed with grooves with a width of 30mm and a depth of 12-15mm. The grooves are embedded with 12mm or 15mm plywood template strips, which are fixed by drilling countersunk screws with a spacing of 300-600mm through the groove pipe wall on the top surface of the steel pipe. When the plywood template panel is laid on the construction site, it can be directly fixed to the plywood strips with carpentry nails.
[0036] The connecting piece 3 is a U-shaped hook spring wire clip, which is made of a spring steel wire with a diameter of 2.5 to 3.5 mm and bent into a U-shaped hook. When in use, the connecting piece 3 is passed through the long strip hole 13 in the middle of the template supporting secondary rib 2, and the two legs of the connecting piece 3 are arranged in an "eight" shape to respectively hook the circular buckle holes 12 evenly distributed on the template supporting main rib 1.
[0037] The method for connecting primary and secondary rib members for bearing the top concrete formwork of the present invention comprises the following steps:
[0038] Step 1, planning the plane and elevation layout of the disc-type steel pipe scaffolding formwork support uprights 4 according to the concrete beam-slab structure layer height and plane size of the construction object, and according to the floor thickness and beam cross-section size;
[0039] Step 2, according to the thickness of the floor slab poured with concrete in the construction area, select a 15mm thick plywood formwork panel 14 and a formwork supporting secondary rib 2, and calculate the spacing L1 of the formwork supporting secondary rib 2 under the specified deflection control value according to the cross-sectional bending stiffness value of the formwork panel 14; calculate the span value L2 of the formwork supporting secondary rib 2 under the specified deflection control value according to the cross-sectional bending stiffness value of the formwork supporting secondary rib 2;
[0040] Step 3, according to the load value of the floor slab formwork in the span area of the formwork supporting the secondary rib 2, the span value L3 of the formwork supporting the main rib 1 under the specified deflection value is calculated according to the cross-sectional bending stiffness value of the formwork supporting the main rib 1, and the modulus value of the horizontal rod of the support is also regularized to determine the arrangement spacing of the formwork support vertical rods 4 in the span direction of the formwork supporting the main rib 1;
[0041] Step 4, complete the installation of the formwork supporting main rib 1 and the formwork supporting secondary rib 2 on the top of the formwork support upright 4, and connect the formwork supporting main rib 1 and the formwork supporting secondary rib 2 with a U-shaped spring wire clamp connector 3; finally, lay the plywood formwork panel 14 on the top surface of the formwork supporting secondary rib 2, and use carpentry nails to fix the formwork panel 14 directly to the plywood strip 7 embedded in the top of the formwork supporting secondary rib 2 to complete the installation of the entire floor formwork project.
[0042] Furthermore, based on the conventional 15 mm thickness of the plywood formwork 14 at the construction site, the formwork supporting secondary ribs 2 are used as the supporting points of the formwork panel, and the spacing L1 of the secondary ribs 2 under load conditions is calculated according to the cross-sectional stiffness EI value of the formwork panel.
[0043] Furthermore, based on the EI value of the cross-sectional stiffness of the steel pipe 50×80×2 secondary ribs with the designed and processed special-shaped welded top surface embedded with plywood strips 7, and according to the laying spacing L1 of the secondary ribs 2 supported by the template, the span L2 of the secondary ribs under load conditions (i.e. the spacing of the main ribs 1 supported by the template) is calculated.
[0044] Furthermore, according to the EI value of the cross-sectional stiffness of the main rib supported by the designed and processed special-shaped welded steel pipe 60×140×2 formwork with embedded plywood strips 7 on the top, and the calculated span L2 of the secondary rib supported by the formwork, the span L3 of the main rib under load conditions is calculated.
[0045] Furthermore, the template supporting secondary rib 2 is placed orthogonally on the top surface of the template supporting main rib 1, and at the intersection of the template supporting secondary rib 2 and the main rib 1, one leg of the stamped U-shaped spring steel wire clamp connector 3 is passed through the long strip hole 13 in the middle of the secondary rib side wall, and the two legs of the U-shaped spring steel wire clamp 3 are symmetrically straddled on both sides of the template supporting secondary rib 2, and the hooks at the ends of the legs are respectively inserted into the evenly distributed circular buckle holes 12 on the upper part of one side wall of the main rib to achieve fixation between the primary and secondary ribs.
Claims
1. A primary and secondary rib member used for bearing the top concrete formwork. Features The primary and secondary rib components comprise a template supporting primary rib (1), a template supporting secondary rib (2), a connecting piece (3), a template support upright (4), and an adjustable support (5); wherein the upper top of the template support upright (4) is provided with an adjustable support (5), a groove on the adjustable support (5) is embedded with a horizontally arranged template supporting primary rib (1), a horizontally arranged template supporting secondary rib (2) is arranged above the horizontally arranged template supporting primary rib (1), and the template supporting primary rib (1) and the template supporting secondary rib (2) are cross-arranged and connected by a connecting piece (3).
2. The primary and secondary rib members for bearing the top concrete formwork according to claim 1, Features The template supporting main rib (1) is a special-shaped welded pipe, and the webs on both sides thereof are respectively provided with longitudinal stiffening rib grooves (10), a row of large circular holes (11) are arranged at the midline position of the side, and a row of circular buckle holes (12) are respectively arranged on the upper and lower sides of the large circular holes (11), and a groove (6) is arranged on the top surface of the template supporting main rib (1), and a plywood strip (7) is arranged in the groove (6).
3. The primary and secondary rib members for bearing the top concrete formwork according to claim 2, Features The template supporting main rib (1) is pressed from a 2-2.2mm thin plate of galvanized aluminum-magnesium steel with a strength not less than Q355 or pressed from an ordinary thin plate and hot-dip galvanized to form a large-section special-shaped welded pipe with a high bending stiffness EI value; a pressed groove (6) is provided on the top surface of the template supporting main rib (1), and a plywood strip (7) with a width of 30mm and a thickness of 12-15mm is provided in the groove and fixed with self-tapping screws (9).
4. The primary and secondary rib members for bearing the top concrete formwork according to claim 3, Features The self-weight of the main rib (1) supported by the template is controlled within 7kg per linear meter, and the cross-sectional bending stiffness EI value is 400kNm 2 The above can meet the desired technical parameters of large spacing arrangement of 1200-1800mm under the allowable bearing capacity of the template support uprights (4), and the cross-sectional width of the special-shaped welded pipe is 60mm, the height is 140mm, and the wall thickness is 2-2.2mm.
5. The primary and secondary rib members for bearing the top concrete formwork according to claim 4, Features Two longitudinal stiffening rib grooves (10) with a width of 10 to 15 mm and an inward depression of 2 to 4 mm are symmetrically pressed on the webs of the two side surfaces of the template supporting the main rib (1) at a position 20 mm away from the top and bottom surfaces; large circular holes (11) with a diameter of 50 to 60 mm and evenly arranged at a spacing of 150 mm are symmetrically punched in the middle of the webs of the two side surfaces for easy insertion of scaffolding steel pipes with a diameter of 48 mm; circular buckle holes (12) with a diameter of about 18 mm and evenly arranged at a spacing of 150 mm are punched in the upper and lower parts, and the circular buckle holes (12) are staggered with the large circular holes (11).
6. The primary and secondary rib members for bearing the top concrete formwork according to claim 1, Features The template supporting secondary rib (2) is a special-shaped welded pipe, with long holes (13) on both sides along the length direction, a groove (6) on the top surface, and a plywood strip (7) in the groove (6).
7. The primary and secondary rib members for bearing the top concrete formwork according to claim 6, Features The template supporting secondary rib (2) has a deadweight of 4 kg per linear meter and a cross-sectional bending stiffness EI value of 90 kNm. 2 The above can meet the technical parameters of the large spacing arrangement of the template support secondary ribs (2) with a span of 1200-1800mm arranged at intervals of 200-400mm under the template panel (14) under the allowable bearing capacity of the template support uprights (4).
8. The primary and secondary rib members for bearing the top concrete formwork according to claim 7, Features The cross-sectional width of the special-shaped welded pipe selected for the template supporting secondary rib (2) is 50mm, the height is 80mm, and the wall thickness is 2-2.2mm; long strip holes (13) with a width of 16-18mm and a length of 60mm are symmetrically punched in the middle of the web with a height of 80mm on both sides of the template supporting secondary rib (2), which are used to insert the connecting piece (3) connecting the main and secondary ribs into the hole and to insert the tension screw when it is used as the back rib of the wall template.
9. The primary and secondary rib members for bearing the top concrete formwork according to claim 8, Features The connecting piece (3) is a U-shaped hook spring wire clip. The connecting piece (3) is made of a spring steel wire with a diameter of 2.5 to 3.5 mm and bent into a U-shaped hook. When in use, the connecting piece (3) is passed through the long strip hole (13) in the middle of the template support secondary rib (2), and the two legs of the connecting piece (3) are arranged in an "eight" shape to respectively hook the circular buckle holes (12) evenly distributed on the template support main rib (1).
10. A method for connecting primary and secondary rib members for bearing the top concrete formwork as claimed in claim 1, Features The steps include: Step 1, planning the plane and elevation layout of the disc-type steel pipe scaffolding formwork support upright pole (4) according to the floor height and plane size of the concrete beam-slab structure of the construction object, and according to the floor thickness and beam cross-section size; Step 2, according to the thickness of the floor slab cast in concrete in the construction area, select a 15 mm thick plywood formwork panel (14) and a formwork supporting secondary rib (2), and calculate the spacing L1 of the formwork supporting secondary rib (2) under the specified deflection control value according to the cross-sectional bending stiffness value of the formwork panel (14); calculate the span value L2 of the formwork supporting secondary rib (2) under the specified deflection control value according to the cross-sectional bending stiffness value of the formwork supporting secondary rib (2); Step 3, according to the load value of the floor slab formwork in the span area of the formwork supporting the secondary rib (2), according to the cross-sectional bending stiffness value of the formwork supporting the main rib (1), the span value L3 of the formwork supporting the main rib (1) under the specified deflection value is calculated, and the modulus value of the horizontal rod of the support is also regularized to determine the arrangement spacing of the formwork support vertical rods (4) in the span direction of the formwork supporting the main rib (1); Step 4, complete the installation of the formwork supporting main rib (1) and the formwork supporting secondary rib (2) on the top of the formwork support upright (4), and connect the formwork supporting main rib (1) and the formwork supporting secondary rib (2) with a U-shaped spring wire clamp connector (3); finally, lay the plywood formwork panel (14) on the top surface of the formwork supporting secondary rib (2), and use carpentry nails to directly fix the formwork panel (14) to the plywood strip (7) embedded in the top of the formwork supporting secondary rib (2), thereby completing the installation of the entire floor formwork project.
Citation Information
Patent Citations
Strip quick-release supporting system for beam
CN107989364A
Monitoring system for monitoring axial force of disc buckle type high formwork vertical rod
CN219284535U
Adjustable tool type wood formwork fastening device
CN221277269U
Formwork system
RU2020114966A
