Concrete frame column film wrapping maintenance device and construction method
By designing the concrete frame column wrapping device of the ring track and the reel frame, the problem of low maintenance efficiency of concrete frame columns in the traditional method is solved, and a single-person efficient wrapping construction is achieved, reducing labor consumption and cost.
Patent Information
- Application Number
- CN202411220838.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-12
AI Technical Summary
The maintenance of concrete frame columns is difficult, the traditional wrapping method is inefficient, requires multiple people to cooperate, and resources are wasted and costly.
A concrete frame column wrapping maintenance device including an annular track, an embedded hook, a moving piece and a reel frame is designed. The aligned track is suspended by an embedded hook, and the height and inclination of the curing film coil are adjusted using wire ropes and support. , realizes efficient film wrap construction with single operation.
It greatly reduces manual consumption, improves construction efficiency, simplifies operation, and expands the convenience of use and application range of the device.
Smart Images

Figure CN118933383A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete column maintenance construction, and in particular to a concrete frame column wrapping maintenance device and a construction method. Background Art
[0002] Concrete frame structures are widely used in modern buildings due to the stability and durability of their materials. The combination of concrete and steel bars makes the structure safer and more reliable. After the concrete is cast, maintenance further guarantees its strength and integrity. Compared with the maintenance of plane components in frame structures, the maintenance of concrete columns is more difficult. Rapid evaporation of water and imperfect water conservation measures prevent them from being fully maintained. As an important supporting component in the frame structure, the maintenance method and quality of concrete columns are important control points for structural safety. The traditional method requires multiple people to cooperate with the film wrapping, and for components with larger structural dimensions, the film wrapping efficiency is low, or water spraying is used for maintenance, but the spraying of the curing liquid needs to be carried out continuously for many times. The above methods all take up a lot of labor, waste resources, and are costly. Summary of the invention
[0003] The object of the present invention is to provide a concrete frame column wrapping maintenance device and a construction method to solve the problems in the above background.
[0004] The first object of the present invention is to provide: a concrete frame column wrapping and curing device, characterized in that it comprises:
[0005] Circular track;
[0006] A pre-embedded hook, wherein the pre-embedded hook is used to suspend the annular track;
[0007] A moving member, wherein the moving member is movably arranged in the annular track;
[0008] The reel frame is connected to the moving member and can move along with the moving member in the circumferential direction around the annular track.
[0009] Preferably, the annular track comprises a plurality of track lobes, the outer walls of the long ends of the track lobes are provided with connecting ears, and the connecting ears on adjacent track lobes are connected by high-strength bolts.
[0010] Preferably, at least one pre-embedded hook is arranged above each track flap, which is connected to the pre-embedded hook via a lifting chain.
[0011] Preferably, the inner ring of the annular track is provided with a plurality of telescopic abutting members, and the telescopic abutting members can be telescoped along the radial direction of the annular track.
[0012] Preferably, the telescopic tightening member includes a top screw, a top screw knob and a sleeve, the sleeve is fixedly connected to the annular track, and the top screw knob abuts against the other end of the sleeve; one end of the top screw is slidably inserted into the sleeve, and the other end passes through and is threadedly connected to the top screw knob.
[0013] Preferably, the moving member is a ball or a slider that matches the shape of the annular track.
[0014] Preferably, the reel frame includes a steel wire rope and a support, at least one group of the steel wire rope is respectively arranged at the top and bottom ends of the support, the steel wire rope located at the top is wound on a pulley, and the pulley is connected to the moving part through a second suspension chain.
[0015] Preferably, a mounting rod is provided on the top of the support, and the cross-sectional size of the support>the inner diameter of the curing film roll to be installed>the cross-sectional size of the mounting rod.
[0016] Preferably, a first lifting ring is provided at the top of the mounting rod, and a second lifting ring is provided at the bottom of the support, and the first lifting ring and the second lifting ring are used for installing the steel wire rope.
[0017] Another object of the present invention is to provide a method for construction using the concrete frame column wrapping curing device as described above, which comprises the steps of:
[0018] During pouring, the embedded hook is embedded around the circumference of the concrete frame column to the top thereof, the annular track is sleeved on the outside of the concrete frame column, the annular track is suspended by the embedded hook, and the film wrapping curing device is installed completely;
[0019] The steel wire rope is pulled to drive the curing film to move circumferentially around the concrete frame column to complete the coating, including: loosening or tightening the steel wire rope at the top of the support to change the height of the curing film roll; changing the distance between the bottom of the reel frame and the concrete frame column to change the inclination of the curing film roll.
[0020] The beneficial effect of the present invention is that when the above-mentioned device is used for film wrapping construction, after the device is installed, one person can complete the film wrapping construction of the concrete frame column, which greatly reduces labor consumption and improves construction efficiency; in addition, the height and inclination of the curing film roll can be controlled by adjusting the wire rope, which is simple to operate and greatly expands the convenience of use and application range of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 is an overall structural diagram of an embodiment of the present invention;
[0022] Figure 2 is a top view of the annular track and the telescopic abutment member in an embodiment of the present invention;
[0023] Figure 3is a cross-sectional view of a circular track in an embodiment of the present invention;
[0024] Figure 4 1 is a structural diagram of a reel stand in an embodiment of the present invention.
[0025] 10. Annular track; 11. Track flap; 12. Connecting ear; 13. T-slot;
[0026] 20. Pre-buried hooks;
[0027] 30. Moving parts;
[0028] 40. Reel frame; 41. Steel wire rope; 42. Support; 43. Mounting rod; 44. Lifting ring 1; 45. Lifting ring 2;
[0029] 50. Hanging chain 1;
[0030] 60, hanging chain 2;
[0031] 70. Curing film roll;
[0032] 80. telescopic fastening member; 81. top screw; 82. top screw knob; 83. sleeve;
[0033] 90. Pulley. DETAILED DESCRIPTION
[0034] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solution of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0036] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0037] Reference Figure 1-4 The embodiment of the present invention provides a concrete frame column wrapping maintenance device and a method for wrapping construction using the same. The maintenance device includes: a circular track 10, an embedded hook 20, a moving part 30, a reel frame 40, a lifting chain 50 and a lifting chain 60. The embedded hook 20 is located above the circular track 10 and is used to suspend the circular track 10. The circular track 10 is connected to the embedded hook 20 through the lifting chain 50; the moving part 30 is movably arranged in the circular track 10, and the reel frame 40 is located outside the circular track 10 and is connected to the moving part 30 through the lifting chain 60, and can move around the circumference of the circular track 10 with the moving part 30.
[0038] Before the film wrapping construction, when pouring the concrete frame column, the embedded hook 20 is embedded around the circumference of the concrete frame column to its top; during the film wrapping construction, the annular track 10 is sleeved on the outside of the concrete frame column, and the annular track 10 is suspended on the embedded hook 20 by a lifting chain 50; the reel frame 40 with the curing film roll is pulled to move around the circumference of the annular track 10, that is, around the outer circumference of the concrete frame column, and then attached to the side wall of the concrete frame column to play a role in water retention. When the above device is used for film wrapping construction, after the device is installed, one person can complete the film wrapping construction of the concrete frame column, which greatly reduces labor consumption and improves construction efficiency.
[0039] Since the size of the concrete frame column is relatively large, in order to facilitate the annular track 10 to be mounted on the outside of the concrete frame column, the annular track 10 in this embodiment is configured to include a plurality of track petals 11, and connecting ears 12 are provided on the outer walls of the long ends of the track petals 11. The plurality of track petals 11 are arranged in a ring shape, and the connecting ears 12 on the connected track petals 11 are pressed tightly and fastened with high-strength bolts.
[0040] The shape of the track portion of the annular track 10 can be configured according to specific usage requirements. For example, it can be a T-slot 13 with an opening facing downward. The moving part 30 or the hanging chain 50 is connected by passing through the opening of the T-slot 13. The moving part 30 is configured as a ball or slider that is adapted to the shape of the track portion of the annular track 10.
[0041] During implementation, in order to ensure the stable lifting of the annular track 10, if the number of track petals 11 is greater than or equal to 3, at least one pre-embedded hook 20 is constructed above each track petal 11; if the number of track petals 11 is 2, at least two pre-embedded hooks 20 are constructed above each track petal 11.
[0042] In order to prevent the external environment from disturbing the lifting chain 50 and causing the problem of the circular track 10 being skewed, the present embodiment provides a plurality of telescopic abutting members 80 on the inner ring of the circular track 10. The telescopic abutting members 80 can be extended and retracted along the radial direction of the circular track 10. By changing the length of the telescopic abutting members 80, the up and down movement of the circular track 10 is not affected when the circular track 10 is lifted or disassembled. During the wrapping construction, the telescopic abutting members 80 are pressed against the outer wall of the concrete frame column to prevent the lifting chain 50 and the circular track 10 from being skewed and unstable due to wind or other external annular disturbances.
[0043] The structure of the telescopic abutment 80 can be configured according to actual needs. In this embodiment, it is configured to include a top screw 81, a top screw 81 knob and a sleeve 83. The sleeve 83 is fixedly connected to the annular track 10, and the top screw 81 knob abuts against the other end of the sleeve 83; one end of the top screw 81 is slidably inserted into the sleeve 83, and the other end passes through and is threadedly connected to the top screw 81 knob. By rotating the top screw 81 knob, the position of the top screw 81 knob on the top screw 81 is changed, and then the length of the top screw 81 that can be inserted into the sleeve 83 is changed to adjust the total length of the telescopic abutment 80, so as to fix or loosen the annular track 10.
[0044] In this embodiment, the reel frame 40 for installing the curing film roll 70 includes a steel wire rope 41 and a support 42. At least one set of steel wire ropes 41 is respectively arranged at the top and bottom ends of the support 42. The steel wire rope 41 at the top is wound on a pulley 90. The pulley 90 is connected to the moving part 30 through a suspension chain 60. The curing film roll 70 can be directly put on the steel wire rope 41 at the top of the support 42, and the steel wire rope 41 is wound on the pulley 90. The free ends of the two sets of steel wire ropes 41 are both drooped to facilitate the workers to pull. Of course, a mounting rod 43 can also be set on the top of the support 42 for installing the curing film roll 70, but it should meet the following conditions: the cross-sectional size of the support 42> the inner diameter of the curing film roll 70 to be installed> the cross-sectional size of the mounting rod 43, so that the curing film roll 70 can be installed smoothly and blocked by the support 42 and cannot fall. During implementation, a lifting ring 1 44 is provided at the top of the mounting rod 43 , a lifting ring 2 45 is provided at the bottom of the support 42 , and the steel wire rope 41 is installed on the lifting ring 1 44 and the lifting ring 2 45 .
[0045] The method for construction using the above device comprises the steps of:
[0046] During pouring, the embedded hook 20 is embedded around the circumference of the concrete frame column to the top thereof;
[0047] A plurality of track petals 11 are placed at the outer bottom of the concrete frame column to facilitate workers to connect and equip the device; first, the track petals 11 are connected to form a circular track 10 using high-strength bolts, and then the curing film roll 70 is installed on the reel frame 40, the reel frame 40 is connected to the pulley 90, and the pulley 90 is connected to the moving part 30 installed in the circular track 10 through the suspension chain 60 to complete the assembly operation on the ground;
[0048] The circular track 10 is lifted by a crane, and the workers work at high altitude to suspend the circular track 10 on the embedded hook 20 through a lifting chain 50, thus completing the high-altitude assembly operation;
[0049] Workers pull the steel wire rope 41 on the bottom surface foundation to drive the curing film roll 70 to move circumferentially around the concrete frame column to complete the coating. During this process: loosening or tightening the steel wire rope 41 on the top of the support 42 can change the height of the support 42, and then change the height of the curing film roll 70, to achieve coating and curing construction at different heights; change the distance between the bottom of the reel frame 40 and the concrete frame column, that is, the worker approaches or moves away from the concrete frame column. Since the position of the annular track 10 connected to the top of the reel frame 40 is unchanged, the inclination of the straight line where the lifting chain 260, the reel frame 40, and the curing film roll 70 on the reel frame 40 are located can be changed to achieve coating and curing construction at different angles.
[0050] Compared with the prior art, the beneficial effects of the present invention are: when the above-mentioned device is used for film wrapping construction, after the device is installed, one person can complete the film wrapping construction of the concrete frame column, which greatly reduces labor consumption and improves construction efficiency; in addition, the height and inclination of the curing film roll 70 can be controlled by adjusting the wire rope 41, which is simple to operate and greatly expands the convenience of use and application range of the device.
[0051] The above are preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.
Claims
1. A concrete frame column wrapping curing device, characterized in that: include: Circular track; A pre-embedded hook, wherein the pre-embedded hook is used to suspend the annular track; A moving member, wherein the moving member is movably arranged in the annular track; The reel frame is connected to the moving member and can move along with the moving member in the circumferential direction around the annular track.
2. The concrete frame column film wrapping and curing device according to claim 1 is characterized in that: The annular track comprises a plurality of track lobes, and the outer walls of the long ends of the track lobes are provided with connecting ears, and the connecting ears on adjacent track lobes are connected by high-strength bolts.
3. The concrete frame column wrapping curing device according to claim 2 is characterized in that: At least one pre-embedded hook is arranged above each track flap, and is connected to the pre-embedded hook via a lifting chain.
4. The concrete frame column wrapping curing device according to claim 2 or 3, characterized in that: The inner ring of the annular track is provided with a plurality of telescopic abutting members, and the telescopic abutting members can be telescoped along the radial direction of the annular track.
5. The concrete frame column film wrapping and curing device according to claim 4 is characterized in that: The telescopic tightening member includes a top screw, a top screw knob and a sleeve, the sleeve is fixedly connected to the annular track, and the top screw knob abuts against the other end of the sleeve; one end of the top screw is slidably inserted into the sleeve, and the other end passes through and is threadedly connected to the top screw knob.
6. The film wrapping and curing device for concrete frame columns according to any one of claims 2-3 and 5, characterized in that: The moving part is a ball or a slider that matches the shape of the annular track.
7. The concrete frame column wrapping and curing device according to claim 6 is characterized in that: The reel frame includes a steel wire rope and a support, at least one group of the steel wire rope is respectively arranged at the top and bottom ends of the support, the steel wire rope located at the top is wound on a pulley, and the pulley is connected to the moving part through a second suspension chain.
8. The concrete frame column film wrapping and curing device according to claim 7, characterized in that: A mounting rod is provided on the top of the support, and the cross-sectional size of the support>the inner diameter of the curing film roll to be installed>the cross-sectional size of the mounting rod.
9. The concrete frame column film wrapping and curing device according to claim 8, characterized in that: A first lifting ring is provided at the top of the installation rod, and a second lifting ring is provided at the bottom of the support. The first lifting ring and the second lifting ring are used for installing the steel wire rope.
10. A construction method using the concrete frame column film wrapping and curing device according to any one of claims 7 to 9, characterized in that: Includes steps: During pouring, the embedded hook is embedded around the circumference of the concrete frame column to the top thereof, the annular track is sleeved on the outside of the concrete frame column, the annular track is suspended by the embedded hook, and the film wrapping curing device is installed completely; The steel wire rope is pulled to drive the curing film to move circumferentially around the concrete frame column to complete the coating, including: loosening or tightening the steel wire rope at the top of the support to change the height of the curing film roll; changing the distance between the bottom of the reel frame and the concrete frame column to change the inclination of the curing film roll.
Citation Information
Patent Citations
Pier column maintenance device and film covering construction method
CN113756182A
Automatic film wrapping machine for concrete stand column films
CN210685415U
Pier column maintenance film winding device
CN219992218U