Construction process for settlement damage treatment of concrete lining plate
By demarcating the repair area on the concrete lining plate, filling high-performance mortar and polyurethane weathering adhesive, and directly repairing the settlement and cracking parts in the existing technology by directly using the construction process of spraying or batch scraping mortar and sealing coating, the overall excavation in the existing technology is solved In addition to major repair problems, economical and efficient repair results have been achieved.
Patent Information
- Application Number
- CN202411173269.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-12
AI Technical Summary
The prior art cannot effectively solve the problem of concrete lining panel repair after settlement and cracking, resulting in overall excavation and major repair, with high economic costs and long cycles.
The construction process of dividing fixed points along the perimeter, chiseling and filling high-performance mortar and polyurethane weathering glue, combined with spraying or batch scraping mortar and sealing coating, directly repairing the settlement and cracking parts to avoid overall excavation.
The economical restoration of lining plates is achieved, the repair cycle is shortened, the anti-settlement and cracking properties are improved, the service life is extended, and labor and material costs are reduced.
Smart Images

Figure CN118933391A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete lining slabs, in particular to a construction process for treating settlement damage of concrete lining slabs. Background Art
[0002] Concrete lining panels refer to a type of plate-like material used in concrete structures, usually used to protect concrete structures from erosion, wear or other damage. These panels are usually made of a special concrete or other material to enhance the durability and reliability of the structure. Concrete lining panels are widely used in the fields of engineering construction and infrastructure, such as to prevent cement water pipes from erosion, or to support rock and soil in geotechnical engineering.
[0003] After searching the prior art, the construction process of the tunnel secondary lining drainage system with the publication number of CN 113374509 A includes the following steps: S1, construction preparation: check the clearance and the surface conditions of the initial support, and deal with the uneven parts of the initial support surface; S2, steel mesh installation: tie the steel mesh at a position close to the initial support surface, and weld it, leaving a distance between the steel mesh and the initial support surface; S3, capillary drainage board installation: insert the capillary drainage board into the annular gap between the initial support surface and the steel mesh; S4, secondary lining pouring: away from the steel mesh, build a template, and pour concrete between the capillary drainage board and the template to form a secondary lining, so that the steel mesh is pre-buried in the secondary lining. This application has the effect of avoiding damage to the drainage material during the welding process of the steel mesh, and improves the construction quality of the drainage system, simplifies the construction process, and improves the construction efficiency.
[0004] Although the above technical solution improves the quality of the lining plate through secondary lining, the drainage channel is subject to water all year round, and settlement and cracking occur repeatedly when the temperature drops below zero in winter, which still causes bulging and cracking of the lining plate. This technical solution cannot solve the settlement and cracking problems of the lining plate, and cannot repair the settled and cracked lining plate. In addition, the existing technology can only repair the lining plate by excavating it as a whole, which results in high economic expenditure and a long repair cycle. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a construction process for treating settlement damage of concrete lining slabs, which has the advantages of directly repairing the settled and cracked parts of the lining slabs without having to remove the entire lining slabs during repair, low economic expenditure for repairing the settled and cracked lining slabs, and shorter repair period, thereby solving the problems of the above-mentioned technologies.
[0006] To achieve the above object, the present invention provides the following technical solution: a construction process for treating settlement damage of a concrete lining slab, comprising the following steps: Step 1: Draw a line 50 cm around the settlement and cracking of the concrete lining slab to mark the fixed points; Step 2: After chiseling out the settlement and cracks and cleaning them, use high-performance mortar and gravel in a 1:1 ratio to mix and pour the cushion layer to the designed elevation; Step 3: For the crack area, expand it by 3cm on each side, cut it wide and deep, chisel it out and fill it with R70 mortar for repair; then make a seam cut (3-5mm) and pour polyurethane weather-resistant glue; Step 4: After the repair is completed, spray or scrape R70 mortar on the surface; Step 5: Use an electric sprayer to spray D200 sealing coating; Step 6. Carry out watering maintenance three times every 12 hours, and cover the repaired area with geotextile during the maintenance.
[0007] Preferably, if the crack area in step three is a shrinkage crack, glue can be directly injected without cutting.
[0008] Preferably, the D200 closed coating in step 4 is greater than 1 cm thick.
[0009] Preferably, the dividing of the fixed points in step 1 further comprises the following steps: S1.1. Prepare the necessary tools and materials, including elastic lines and marker poles; S1.2. Use measuring tools to measure the location of settlement and cracks of the concrete lining slab and determine the range of expansion of 50 cm; S1.3. Select a suitable location within 50 cm and insert a marker pole into the ground to mark the location; S1.4, select two fixed points, fix the elastic line at one end, and tighten and release the other end to form a uniform straight line; S1.5. Place the lines perpendicular to the ground and ensure that they are aligned with the marked fixed points; S1.6. Gently pull and release the elastic line to create a clear marking line.
[0010] Preferably, the step of chiseling out the ice in step 2 further includes the following steps: S2.1. Prepare the necessary tools and materials, such as hammer, impact drill and broom; S2.2. Use a hammer and impact drill to remove the damaged parts of the settlement and cracks, and ensure that the surrounding area is smooth and flat; S2.3. Use a broom to clean the chiseled area and ensure that the surface is free of any debris and dust.
[0011] Preferably, the cushion layer pouring in step 2 further comprises the following steps: S3.4. According to the ratio requirements of high-performance mortar, add appropriate amount of high-performance mortar and gravel in a ratio of 1:1 into a container and stir thoroughly until a uniform mixture is obtained; S3.5. Pour the mixed high-performance mortar and gravel mixture into the prepared mold or construction area, level the surface with tools, and pour it to the predetermined elevation according to the design requirements. Tools such as a lead ruler can be used to ensure the flatness and elevation of the cushion layer; S3.6. After the cushion layer is poured, it shall be cured and dried according to the requirements of high-performance mortar.
[0012] Preferably, the high-performance mortar in S3.3 is R70 mortar, the drying time of the high-performance mortar is 24h-36h, and the high-performance mortar is sprayed with clean water every 12h for curing, and the spraying amount is 50ml / m2.
[0013] Preferably, the step three also includes the following detailed steps: S4.1. Expand the crack area by 3 cm on each side, and use a cutting machine or other tool to cut the crack wider and deeper to ensure that both sides of the crack are even; S4.2. Chisel away the loose and damaged concrete in the enlarged crack area until the surface is clean and ensure that the surface is flat after chiseling; S4.3, Fill with R70 mortar: Mix the R70 mortar evenly according to the ratio requirements and fill it into the crack area after chiseling. Use tools to fill and smooth the mortar to ensure that it is completely filled and flush with the surrounding surface; S4.4, cutting and pouring polyurethane weather-resistant glue: After the R70 mortar is cured, cut the repair area with a width of 3-5mm, and then use polyurethane weather-resistant glue to pour to ensure that the cracks are completely filled.
[0014] Preferably, the R70 mortar operation method in step 4 includes the following detailed steps: S5.1. Use spraying equipment to evenly spray R70 mortar on the surface of the repair area, keeping the spraying thickness uniform; S5.2. If you choose to scrape in batches, use a scraper to evenly scrape the R70 mortar on the surface of the repair area, ensuring that it is scraped flat and has a uniform thickness; S5.3, Smoothing treatment: Use a scraper or trowel to further smooth and shape the surface after spraying or scraping as needed to ensure the smoothness and appearance of the repaired surface; S5.4. Cover with a damp cloth and avoid direct sunlight to ensure that the R70 mortar is cured on the surface.
[0015] Preferably, after the D200 coating is applied, it is protected from direct sunlight and covered with a protective layer.
[0016] Compared with the prior art, the present invention provides a construction process for treating settlement damage of concrete lining slabs, which has the following beneficial effects: 1. The present invention avoids the process of overall excavation through a repair method for shrinkage cracks. After cutting the width and depth, R70 mortar is directly filled and polyurethane weather-resistant glue is poured, thereby saving a lot of time and labor costs. After the settlement and cracking areas are repaired, R70 mortar is sprayed or scraped and D200 sealing coating is applied to effectively improve the durability of the lining board, enhance its anti-settlement and cracking performance, and extend its service life. Through detailed construction operation steps such as S1.1 to S1.6, S2.1 to S2.3 and S3.4 to S3.6, the standardization and refinement of the repair process are ensured, so that the lining board can be effectively maintained and repaired, achieving the beneficial effect of directly repairing the settlement and cracking parts of the lining board without overall excavation during repair.
[0017] 2. The present invention adopts a direct glue injection method to repair shrinkage cracks, thereby avoiding the excavation and reconstruction of the entire area, saving a lot of labor and material costs. High-performance mortar, polyurethane weather-resistant glue and D200 sealing coating are used in the repair process. These materials have excellent anti-settling, cracking performance and durability, extend the service life of the lining board, reduce future maintenance and replacement costs, and achieve the beneficial effect of low economic expenditure in repairing lining boards damaged by settlement and cracking.
[0018] 3. The present invention adopts a direct glue injection repair method for settlement and cracking damage such as shrinkage cracks, avoiding the excavation and reconstruction of the entire area, which can greatly shorten the repair period. Compared with the traditional excavation and overall reconstruction method, the direct repair process is more efficient. The construction steps adopt a refined method, which is easy and efficient to operate. The spraying or scraping of R70 mortar and the application of D200 sealing coating ensure that the construction period is short and the drying time is relatively short, thereby shortening the entire repair period and achieving the beneficial effect of a shorter repair period. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the process of the present invention; DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] See also Figure 1A construction process for treating settlement damage of a concrete lining slab comprises the following steps: Step 1: Draw a line 50 cm around the settlement and cracking of the concrete lining slab to mark the fixed points; Step 2: After chiseling out the settlement and cracks and cleaning them, use high-performance mortar and gravel in a 1:1 ratio to mix and pour the cushion layer to the designed elevation; Step 3: For the crack area, expand it by 3cm on each side, cut it wide and deep, chisel it out and fill it with R70 mortar for repair; then make a seam cut (3-5mm) and pour polyurethane weather-resistant glue; Step 4: After the repair is completed, spray or scrape R70 mortar on the surface; Step 5: Use an electric sprayer to spray D200 sealing coating; Step 6. Carry out watering maintenance three times every 12 hours, and cover the repaired area with geotextile during the maintenance.
[0022] Preferably, if the crack area in step three is a shrinkage crack, glue can be directly injected without cutting.
[0023] Preferably, the D200 closed coating in step 4 is greater than 1 cm thick.
[0024] Preferably, the dividing of the fixed points in step 1 further comprises the following steps: S1.1. Prepare the necessary tools and materials, including elastic lines and marker poles; S1.2. Use measuring tools to measure the location of settlement and cracks of the concrete lining slab and determine the range of expansion of 50 cm; S1.3. Select a suitable location within 50 cm and insert a marker pole into the ground to mark the location; S1.4, select two fixed points, fix the elastic line at one end, and tighten and release the other end to form a uniform straight line; S1.5. Place the lines perpendicular to the ground and ensure that they are aligned with the marked fixed points; S1.6. Gently pull and release the elastic line to create a clear marking line.
[0025] Preferably, the step of chiseling out the ice in step 2 further includes the following steps: S2.1. Prepare the necessary tools and materials, such as hammer, impact drill and broom; S2.2. Use a hammer and impact drill to remove the damaged parts of the settlement and cracks, and ensure that the surrounding area is smooth and flat; S2.3. Use a broom to clean the chiseled area and ensure that the surface is free of any debris and dust.
[0026] Preferably, the cushion layer pouring in step 2 further comprises the following steps: S3.4. According to the ratio requirements of high-performance mortar, add appropriate amount of high-performance mortar and gravel in a ratio of 1:1 into a container and stir thoroughly until a uniform mixture is obtained; S3.5. Pour the mixed high-performance mortar and gravel mixture into the prepared mold or construction area, level the surface with tools, and pour it to the predetermined elevation according to the design requirements. Tools such as a lead ruler can be used to ensure the flatness and elevation of the cushion layer; S3.6. After the cushion layer is poured, it shall be cured and dried according to the requirements of high-performance mortar.
[0027] Preferably, the high-performance mortar in S3.3 is R70 mortar, the drying time of the high-performance mortar is 24h-36h, and the high-performance mortar is sprayed with clean water every 12h for curing, and the spraying amount is 50ml / m2.
[0028] Preferably, the step three also includes the following detailed steps: S4.1. Expand the crack area by 3 cm on each side, and use a cutting machine or other tool to cut the crack wider and deeper to ensure that both sides of the crack are even; S4.2. Chisel away the loose and damaged concrete in the enlarged crack area until the surface is clean and ensure that the surface is flat after chiseling; S4.3, Fill with R70 mortar: Mix the R70 mortar evenly according to the ratio requirements and fill it into the crack area after chiseling. Use tools to fill and smooth the mortar to ensure that it is completely filled and flush with the surrounding surface; S4.4, cutting and pouring polyurethane weather-resistant glue: After the R70 mortar is cured, cut the repair area with a width of 3-5mm, and then use polyurethane weather-resistant glue to pour to ensure that the cracks are completely filled.
[0029] By using direct glue injection to repair shrinkage cracks, the excavation and reconstruction of the entire area is avoided, saving a lot of labor and material costs. For shrinkage cracks and other settlement and cracking damage, direct glue injection is used to repair them, avoiding the excavation and reconstruction of the entire area. This can greatly shorten the repair period. Compared with the traditional excavation and overall reconstruction method, the direct repair process is more efficient. The construction steps use refined methods, which are easy and efficient to operate. The spraying or scraping of R70 mortar and the application of D200 sealing coating ensure a short construction period and a relatively short drying time.
[0030] Preferably, the R70 mortar operation method in step 4 includes the following detailed steps: S5.1. Use spraying equipment to evenly spray R70 mortar on the surface of the repair area, keeping the spraying thickness uniform; S5.2. If you choose to scrape in batches, use a scraper to evenly scrape the R70 mortar on the surface of the repair area, ensuring that it is scraped flat and has a uniform thickness; S5.3, Smoothing treatment: Use a scraper or trowel to further smooth and shape the surface after spraying or scraping as needed to ensure the smoothness and appearance of the repaired surface; S5.4. Cover with a damp cloth and avoid direct sunlight to ensure that the R70 mortar is cured on the surface.
[0031] The overall excavation process was avoided by repairing shrinkage cracks. The cracks were directly filled with R70 mortar and injected with polyurethane weather-resistant glue after cutting the width and depth, thus saving a lot of time and labor costs.
[0032] Preferably, after the D200 coating is applied, it is protected from direct sunlight and covered with a protective layer.
[0033] After repairing the settlement and cracking areas, spraying or scraping R70 mortar and applying D200 sealing coating can effectively improve the durability of the lining board, enhance its anti-settlement and cracking performance, and extend its service life.
[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations may be made to the embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A construction process for treating settlement damage of a concrete lining slab, characterized in that: The following steps are involved: Step 1: Draw a line 50 cm around the settlement and cracking of the concrete lining slab to mark the fixed points; Step 2: After chiseling out the settlement and cracks and cleaning them, use high-performance mortar and gravel in a 1:1 ratio to mix and pour the cushion layer to the designed elevation; Step 3: For the crack area, expand it by 3cm on each side, cut it wide and deep, chisel it out and fill it with R70 mortar for repair; then make a seam cut (3-5mm) and pour polyurethane weather-resistant glue; Step 4: After the repair is completed, spray or scrape R70 mortar on the surface; Step 5: Use an electric sprayer to spray D200 sealing coating; Step 6. Carry out watering maintenance three times every 12 hours, and cover the repaired area with geotextile during the maintenance.
2. A construction process for treating settlement damage of a concrete lining slab according to claim 1, characterized in that: If the crack area in step 3 is a shrinkage crack, there is no need to cut the crack and directly inject glue.
3. A construction process for treating settlement damage of a concrete lining slab according to claim 1, characterized in that: In step 4, the D200 closed coating is greater than 1 cm thick.
4. A construction process for treating settlement damage of a concrete lining slab according to claim 2, characterized in that: The step 1 of dividing the fixed points also includes the following steps: S1.
1. Prepare the necessary tools and materials, including elastic lines and marker poles; S1.
2. Use measuring tools to measure the location of settlement and cracks of the concrete lining slab and determine the range of expansion of 50 cm; S1.
3. Select a suitable location within 50 cm and insert a marker pole into the ground to mark the location; S1.4, select two fixed points, fix the elastic line at one end, and tighten and release the other end to form a uniform straight line; S1.
5. Place the lines perpendicular to the ground and ensure that they are aligned with the marked fixed points; S1.
6. Gently pull and release the elastic line to create a clear marking line.
5. A construction process for treating settlement damage of a concrete lining slab according to claim 4, characterized in that: The step 2 of removing ice and melting also includes the following steps: S2.
1. Prepare the necessary tools and materials, such as hammer, impact drill and broom; S2.
2. Use a hammer and impact drill to remove the damaged parts of the settlement and cracks, and ensure that the surrounding area is smooth and flat; S2.
3. Use a broom to clean the chiseled area and ensure that the surface is free of any debris and dust.
6. A construction process for treating settlement damage of a concrete lining slab according to claim 4, characterized in that: The cushion layer pouring in step 2 also includes the following steps: S3.
4. According to the ratio requirements of high-performance mortar, add appropriate amount of high-performance mortar and gravel in a ratio of 1:1 into a container and stir thoroughly until a uniform mixture is obtained; S3.
5. Pour the mixed high-performance mortar and gravel mixture into the prepared mold or construction area, level the surface with tools, and pour it to the predetermined elevation according to the design requirements. Tools such as a lead ruler can be used to ensure the flatness and elevation of the cushion layer; S3.
6. After the cushion layer is poured, it shall be cured and dried according to the requirements of high-performance mortar.
7. The construction process for treating settlement damage of a concrete lining slab according to claim 1, characterized in that: The high-performance mortar in S3.3 is R70 mortar. The drying time of the high-performance mortar is 24h-36h. The high-performance mortar is sprayed with clean water every 12h for curing, and the spraying amount is 50ml / m 2 .
8. The construction process for treating settlement damage of a concrete lining slab according to claim 1, characterized in that: The step three also includes the following detailed steps: S4.
1. Expand the crack area by 3 cm on each side, and use a cutting machine or other tool to cut the crack wider and deeper to ensure that both sides of the crack are even; S4.
2. Chisel away the loose and damaged concrete in the enlarged crack area until the surface is clean and ensure that the surface is flat after chiseling; S4.3, Fill with R70 mortar: Mix the R70 mortar evenly according to the ratio requirements and fill it into the crack area after chiseling. Use tools to fill and smooth the mortar to ensure that it is completely filled and flush with the surrounding surface; S4.4, cutting and pouring polyurethane weather-resistant glue: After the R70 mortar is cured, cut the repair area with a width of 3-5mm, and then use polyurethane weather-resistant glue to pour to ensure that the cracks are completely filled.
9. A construction process for treating settlement damage of a concrete lining slab according to claim 1, characterized in that: The step 4 R70 mortar operation method includes the following detailed steps: S5.
1. Use spraying equipment to evenly spray R70 mortar on the surface of the repair area, keeping the spraying thickness uniform; S5.
2. If you choose to scrape in batches, use a scraper to evenly scrape the R70 mortar on the surface of the repair area, ensuring that it is scraped flat and has a uniform thickness; S5.3, Smoothing treatment: Use a scraper or trowel to further smooth and shape the surface after spraying or scraping as needed to ensure the smoothness and appearance of the repaired surface; S5.
4. Cover with a damp cloth and avoid direct sunlight to ensure that the R70 mortar is cured on the surface.
10. A construction process for treating settlement damage of a concrete lining slab according to claim 1, characterized in that: After the D200 coating is applied, avoid direct sunlight and cover with a protective layer.
Citation Information
Patent Citations
Process method for repairing lining by adopting high-ductility cement-based composite material
CN116084993A
Freeze-thaw damage treatment construction process for concrete lining plate
CN117888507A
Omitted
KR1020130113568A