A steel pipe column pile combined support system and construction method thereof

By using the combination of steel pipe column piles to support the support system during the combination of steel pipe columns and PHC pipe piles, the column partial inclined problem is solved, and high -efficiency and accurate column installation and structural stability are available. It is suitable for different terrain and building needs.

CN118933405BActive Publication Date: 2025-01-24SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411432076.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2025-01-24
Estimated Expiration
2044-10-14

AI Technical Summary

Technical Problem

During the combined installation of steel pipe columns and PHC pipe piles, it is easy to deflect the upper steel pipe concrete column, which affects the pile foundation fixing effect.

Method used

A composite support system of steel pipe columns and piles is adopted, including concrete base plates, concrete horizontal support beams, prefabricated concrete-filled steel pipe columns, positioning piles, prefabricated PHC pipe piles and positioning cavities. Real-time support of the columns is achieved through arc-shaped bases, clamping components and support systems. Support and adjustment.

Benefits of technology

It improves construction efficiency and accuracy, enhances structural stability, is convenient for regulating and reuse, improves construction safety, and meets different terrain and building needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933405B_ABST
    Figure CN118933405B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of building construction technology, and in particular to a steel tube column pile combined support system and a construction method thereof, wherein a concrete horizontal support beam is located above a concrete base plate, and a group of support components for supporting the concrete horizontal support beam is arranged between the concrete base plate and the concrete horizontal support beam; a plurality of prefabricated holes are opened inside two arc-shaped bases of the concrete base plate, and a plurality of embedded bolts engaged with the prefabricated holes are fixedly connected to the top of the concrete base plate, and a mounting component for mounting the arc-shaped base on the top of the concrete base plate is arranged at the bottom of the two arc-shaped bases; a clamping component for clamping a prefabricated steel tube concrete column is arranged on one side of the arc-shaped base; a control component for releasing the braking state of the arc-shaped base is arranged on one side of the arc-shaped base; the problem that the upper steel tube concrete column is easily deflected during the combined installation process of the existing steel tube column combined piles, and the verticality of the steel tube column piles after the combination is not enough, which affects the fixing effect of the pile foundation is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and relates to a steel pipe column pile combined support system and a construction method thereof. Background Art

[0002] In the large-span roof lattice shell structure, many buildings use partial steel tube column structure, that is, the upper part of the structure uses steel tube concrete columns as the load-bearing components of the large-span roof to increase the plastic deformation capacity of the upper structure, and the lower part uses prestressed high-strength concrete pipe piles (PHC pipe piles) to reduce the amount of steel used and save economy. The steel tube concrete columns and PHC pipe piles are connected at the connection to form a combined column pile structure.

[0003] However, during the installation of the upper steel tube concrete column and the lower PHC pile, the upper steel tube concrete column needs to be supported and adjusted vertically in real time to keep the combined column pile in a vertical state at all times, to prevent the combined column pile from being skewed and affecting the fixation effect of the pile foundation. Summary of the invention

[0004] In view of this, in order to solve the problem that during the installation of the existing steel tube column combined piles, the upper steel tube concrete column is prone to deflection, and the verticality of the steel tube column pile is insufficient after the combination, which affects the fixing effect of the pile foundation, the present invention provides a steel tube column pile combination support system and a construction method thereof, which requires supporting the upper steel tube concrete column and performing real-time support vertical adjustment.

[0005] In order to achieve the above object, the present invention provides the following technical solutions:

[0006] A steel tube column pile combined support system, comprising a concrete base plate and a concrete horizontal support beam used in combination, the concrete horizontal support beam is located above the concrete base plate, a prefabricated steel tube concrete column is arranged inside the concrete horizontal support beam, a positioning pile is arranged at the bottom of the prefabricated steel tube concrete column, a prefabricated PHC pipe pile is arranged inside the concrete base plate, a positioning cavity is opened at the top of the prefabricated PHC pipe pile, the positioning cavity is clamped with the positioning pile, and a group of support components for supporting the concrete horizontal support beam are arranged between the concrete base plate and the concrete horizontal support beam;

[0007] Two symmetrically arranged arc-shaped bases are arranged on the top of the concrete base plate, a plurality of prefabricated holes are opened inside the arc-shaped bases, a plurality of embedded bolts are fixedly connected to the top of the concrete base plate, the embedded bolts are clamped with the prefabricated holes, and a mounting assembly for mounting the arc-shaped bases on the top of the concrete base plate is arranged at the bottom of the two arc-shaped bases;

[0008] A clamping assembly for clamping a prefabricated steel tube concrete column is provided on one side of the arc-shaped base;

[0009] A control component for releasing the braking state of the arc-shaped base is arranged on one side of the arc-shaped base.

[0010] Furthermore, the support assembly includes two symmetrically arranged support base plates, both sides of the top of the support base plates are fixedly connected with outer sleeves, an inner rod slides through the inner part of the outer sleeve, the tops of the two inner rods are fixedly connected to the same support top plate, and a No. 2 push rod is fixedly connected to the top of the support base plate, and the piston rod of the No. 2 push rod is fixedly connected to the bottom of the support top plate.

[0011] Furthermore, a rotating strip plate is rotatably connected between the two supporting top plates, a U-shaped frame is fixedly connected to the bottom of the rotating strip plate, a fixed rod is fixedly connected to the inside of the U-shaped frame, an arc sleeve is rotatably provided on the outer wall of the fixed rod, a pointer is fixedly connected to the middle position of the bottom of the U-shaped frame, and a plurality of scale lines are provided on one side of the arc sleeve, and the scale lines are used in conjunction with the pointer.

[0012] Furthermore, the installation component includes two symmetrically arranged insertion holes opened on the top of the concrete base plate, two symmetrically arranged limit cavities are opened inside the concrete base plate, the limit cavities are located at the bottom of the insertion holes and are connected to the insertion holes, a No. 1 rectangular hole is opened at the bottom of the arc base, two symmetrically arranged vertical plates are slidably penetrated inside the No. 1 rectangular hole, a protrusion is fixedly connected to the bottom of one side of the vertical plate, the protrusion is used in conjunction with the limit cavity, the same No. 2 spring is fixedly connected between the two vertical plates, and a yield groove is opened at the top of one side of the vertical plate.

[0013] Furthermore, the clamping assembly includes two first round rods symmetrically arranged and sliding through the interior of the arc-shaped base, one end of the two first round rods is fixedly connected to the same lower clamping plate, the other end of the two first round rods is fixedly connected to the same push plate, one side of the arc-shaped base is fixedly connected to a push rod No. 1, and the piston rod of the push rod No. 1 is fixedly connected to one side of the push plate.

[0014] Furthermore, the control component includes a first circular groove formed on the inner wall of one side of the arc-shaped base, a second circular rod slidingly penetrates the interior of the first circular groove, one end of the second circular rod is fixedly connected to an arc-shaped plate, one end of the second circular rod is fixedly connected to the same No. 3 spring between the inner wall of one side of the first circular groove, a convex plate is fixedly connected to one side of the arc-shaped plate, a No. 2 rectangular hole is formed on the inner wall of one side of the arc-shaped base, one end of the convex plate extends to the interior of the No. 2 rectangular hole, a connected rectangular groove is formed on the inner wall of one side of the No. 1 rectangular hole, the rectangular groove is connected to the No. 2 rectangular hole, a connecting plate is slidably connected to the inner wall of the rectangular groove, two symmetrically arranged arc-shaped blocks are fixedly connected to one side of the connecting plate, the arc-shaped block is used in conjunction with the give way groove, and the connecting plate is used in conjunction with the convex plate.

[0015] Furthermore, two symmetrically arranged positioning grooves are opened on one side of the arc plate, and a positioning rod slides through the interior of the positioning groove. One end of the two positioning rods is fixedly connected to the same resistance plate, and the same No. 1 spring is fixedly connected between one side of the resistance plate and one side of the arc plate.

[0016] Furthermore, two symmetrically arranged sliding blocks are slidably connected to the inner wall of one side of the arc-shaped base. The sliding blocks are used in conjunction with the arc-shaped plate, and the lower clamping plate is used in conjunction with the sliding blocks.

[0017] Furthermore, the top of the lower clamping plate is fixedly connected to two symmetrically arranged support rods, and the tops of the two support rods are fixedly connected to the same upper clamping plate.

[0018] A construction method of a steel pipe column pile combined support system specifically comprises the following steps:

[0019] S1. Foundation construction: The prefabricated PHC piles are sunk into the ground as the foundation by hammering or static pressure, and then the concrete base plate is poured on the ground, and multiple embedded bolts are embedded on the top;

[0020] S2. Install the arc base: Place the two arc bases on the top of the concrete base plate, connect them with the prefabricated holes through the embedded bolts to ensure accurate installation, and use the elastic mechanism of the bumps and the second spring to fix the arc base on the concrete base plate;

[0021] S3. Column hoisting and positioning: hoist the prefabricated steel tube concrete columns and positioning piles from top to bottom into the concrete bottom plate, perform preliminary positioning through the positioning cavity, and use the No. 1 spring and the contact plate to position the columns sideways to ensure their vertical state;

[0022] S4, column straightening: Start the No. 1 push rod, clamp and straighten the column through the push plate and the clamping plate to ensure the verticality of the column;

[0023] S5. Installation and adjustment of the support system: Install the support base plate on the top of the concrete base plate, and adjust the height of the support top plate through the outer sleeve and the inner rod. Use the rotating strip plate and the U-shaped frame to adjust the inclination angle of the column, and monitor the adjustment accuracy through the pointer and scale line;

[0024] S6. Fixing and completion of columns: After the adjustment is completed, fix the prefabricated steel tube concrete columns on the supporting top plate and the rotating strip plate. After the columns are formed, retract the support system for subsequent reuse;

[0025] S7. Finishing and cleaning: After completing all installation work, clean up the construction site and check whether the connections between each component are firm to ensure construction quality.

[0026] The steel pipe column pile combined support system disclosed in the present invention has the following beneficial effects:

[0027] 1. Improve construction efficiency and accuracy: The use of prefabricated PHC piles and prefabricated steel tube concrete columns, combined with precise positioning and clamping devices, significantly improves construction efficiency and installation accuracy, and reduces on-site operation time and labor costs.

[0028] 2. Enhanced structural stability: The close connection between the arc base and the concrete base plate, as well as the fixing mechanism through the bumps and limit cavities, ensure the stability of the column installation and improve the bearing capacity and seismic performance of the overall structure.

[0029] 3. Easy to adjust and reuse: The design has an adjustable support system and clamping device, which makes the column easy to operate during straightening and installation, and the equipment can be easily disassembled and reused after completing the task, reducing construction costs.

[0030] 4. Improve construction safety: Through the mechanized lifting and clamping process, the risk of manual operation is reduced and the safety of the construction site is improved.

[0031] 5. Flexibility and adaptability: The adjustability of the support system and the flexibility of the rotating strip plates enable this construction method to adapt to different terrains and building requirements, improving the versatility and adaptability of the construction solution.

[0032] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:

[0034] Figure 1 It is a three-dimensional structural schematic diagram of a steel pipe column pile combined support system of the present invention;

[0035] Figure 2 An exploded view of a steel pipe column pile combined support system of the present invention;

[0036] Figure 3 A three-dimensional cross-sectional view of a concrete bottom plate in a steel pipe column pile combined support system of the present invention;

[0037] Figure 4 It is a schematic diagram of the three-dimensional structure of two arc-shaped bases spliced ​​together in a steel pipe column pile combined support system of the present invention;

[0038] Figure 5An exploded view of an arc-shaped base in a steel pipe column pile combined support system of the present invention;

[0039] Figure 6 It is a schematic diagram of the three-dimensional structure of an arc-shaped base in a steel pipe column pile combined support system of the present invention;

[0040] Figure 7 It is a three-dimensional structural schematic diagram of a lower clamping plate and a sliding block in a steel pipe column pile combined support system of the present invention;

[0041] Figure 8 A three-dimensional cross-sectional view of an arc-shaped base in a steel pipe column pile combined support system of the present invention;

[0042] Fig. 9 An exploded view of an arc-shaped base and an arc-shaped plate in a steel pipe column pile combined support system of the present invention;

[0043] Fig.10 It is a schematic diagram of the three-dimensional structure of two supporting bottom plates in a steel pipe column pile combined supporting system of the present invention;

[0044] Fig.11 It is a three-dimensional structural schematic diagram of a U-shaped frame and an arc-shaped sleeve in a steel pipe column pile combined support system of the present invention;

[0045] Fig.12 for Figure 8 Enlarged view of part A.

[0046] In the figure: 1. Prefabricated PHC pile; 2. Concrete base plate; 3. Concrete horizontal support beam; 4. Prefabricated steel tube concrete column; 5. Support rod; 6. Arc base; 7. Embedded bolts; 8. Positioning pile; 9. Insertion hole; 10. Limiting cavity; 11. Upper clamping plate; 12. Push plate; 13. Prefabricated hole; 14. Protrusion; 15. Lower clamping plate; 16. First round rod; 17. No. 1 push rod; 18. Sliding block; 19. Contact plate; 20. Protrusion plate; 21. Second round rod; 22. Arc plate; 23. First round groove ; 24. Arc block; 25. Spring No. 1; 26. Positioning rod; 27. Positioning slot; 28. Connecting plate; 29. ​​Vertical plate; 30. Spring No. 2; 31. Give way slot; 32. Rectangular slot; 33. Rectangular hole No. 1; 34. Spring No. 3; 36. Rectangular hole No. 2; 37. Positioning cavity; 38. Support bottom plate; 39. Outer sleeve; 40. Inner rod; 41. Support top plate; 42. Push rod No. 2; 43. U-shaped frame; 44. Rotating strip plate; 45. Scale line; 46. Arc sleeve; 47. Fixed rod; 48. Pointer. DETAILED DESCRIPTION

[0047] The following describes the embodiments of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0048] Reference Figure 1-11 A steel tube column pile combination support system, a concrete base plate 2 and a concrete horizontal support beam 3 are used together to support the steel tube column combination piles, the concrete base plate 2 and the concrete horizontal support beam 3 are arranged in parallel, the concrete horizontal support beam 3 is located above the concrete base plate 2, and a prefabricated steel tube concrete column 4 is arranged inside the concrete horizontal support beam 3, and a positioning pile 8 is arranged at the bottom of the prefabricated steel tube concrete column 4. A prefabricated PHC pipe pile 1 is arranged inside the concrete base plate 2, and a positioning cavity 37 is opened at the top of the prefabricated PHC pipe pile 1, and the positioning cavity 37 is clamped with the positioning pile 8. A group of support components for supporting the concrete horizontal support beam 3 is arranged between the concrete base plate 2 and the concrete horizontal support beam 3, and the support component includes two symmetrically arranged support base plates 38, a support The top sides of the support bottom plate 38 are fixedly connected with outer sleeves 39, and the inner rod 40 is slidably penetrated inside the outer sleeve 39. The tops of the two inner rods 40 are fixedly connected with the same support top plate 41. The top of the support bottom plate 38 is fixedly connected with a No. 2 push rod 42, and the piston rod of the No. 2 push rod 42 is fixedly connected to the bottom of the support top plate 41. The same rotating strip plate 44 is rotatably connected between the two support top plates 41. The bottom of the rotating strip plate 44 is fixedly connected with a U-shaped frame 43, and the inside of the U-shaped frame 43 is fixedly connected with a fixed rod 47. The outer wall of the fixed rod 47 is rotatably provided with an arc sleeve 46, and a pointer 48 is fixedly connected to the middle position of the bottom of the U-shaped frame 43. A plurality of scale marks 45 are provided on one side of the arc sleeve 46, and the scale marks 45 are used in conjunction with the pointer 48.

[0049] The top of the concrete bottom plate 2 is provided with two symmetrically arranged arc bases 6, and a plurality of prefabricated holes 13 are opened inside the arc base 6. A plurality of embedded bolts 7 are fixedly connected to the top of the concrete bottom plate 2, and the embedded bolts 7 are clamped with the prefabricated holes 13. The bottom of the two arc bases 6 is provided with a mounting assembly for mounting the arc base 6 on the top of the concrete bottom plate 2. The mounting assembly includes two symmetrically arranged insertion holes 9 opened on the top of the concrete bottom plate 2, and two symmetrically arranged limiting cavities 10 are opened inside the concrete bottom plate 2. The limiting cavity 10 is located at the bottom of the insertion hole 9 and is connected to the insertion hole 9. A No. 1 rectangular hole 33 is opened at the bottom of the arc base 6, and two symmetrically arranged vertical plates 29 are slidably penetrated inside the No. 1 rectangular hole 33. A protrusion 14 is fixedly connected to the bottom of one side of the vertical plate 29, and the protrusion 14 is used in conjunction with the limiting cavity 10. The same No. 2 spring 30 is fixedly connected between the two vertical plates 29, and a clearance groove 31 is opened at the top of one side of the vertical plate 29.

[0050] A clamping assembly for clamping the prefabricated steel tube concrete column 4 is provided on one side of the arc-shaped base 6, and the clamping assembly includes two symmetrically arranged first round rods 16 that slide through the interior of the arc-shaped base 6, one end of the two first round rods 16 is fixedly connected to the same lower clamping plate 15, and the other end of the two first round rods 16 is fixedly connected to the same push plate 12, and a No. 1 push push rod 17 is fixedly connected to one side of the arc-shaped base 6, and the piston rod of the No. 1 push push rod 17 is fixedly connected to one side of the push plate 12, and two symmetrically arranged sliding blocks 18 are slidably connected to the inner wall of one side of the arc-shaped base 6, and the sliding blocks 18 are used in conjunction with the arc plate 22, and the lower clamping plate 15 is used in conjunction with the sliding blocks 18, and the top of the lower clamping plate 15 is fixedly connected to two symmetrically arranged support rods 5, and the tops of the two support rods 5 are fixedly connected to the same upper clamping plate 11;

[0051] A control component for releasing the braking state of the arc base 6 is provided on one side of the arc base 6, and the control component includes a first circular groove 23 opened on the inner wall of one side of the arc base 6, and a second circular rod 21 is slidably penetrated inside the first circular groove 23, and an arc plate 22 is fixedly connected to one end of the second circular rod 21, and a No. 3 spring 34 is fixedly connected between one end of the second circular rod 21 and an inner wall of one side of the first circular groove 23, and a convex plate 20 is fixedly connected to one side of the arc plate 22, and a No. 2 rectangular hole 36 is opened on the inner wall of one side of the arc base 6, and one end of the convex plate 20 extends to the inside of the No. 2 rectangular hole 36, and an inner wall of one side of the No. 1 rectangular hole 33 A connected rectangular groove 32 is provided, and the rectangular groove 32 is connected to the No. 2 rectangular hole 36. A connecting plate 28 is slidably connected to the inner wall of the rectangular groove 32. Two symmetrically arranged arc blocks 24 are fixedly connected to one side of the connecting plate 28. The arc blocks 24 are used in conjunction with the yielding groove 31. The connecting plate 28 is used in conjunction with the convex plate 20. Two symmetrically arranged positioning grooves 27 are provided on one side of the arc plate 22. A positioning rod 26 slides through the interior of the positioning groove 27. One end of the two positioning rods 26 is fixedly connected to the same contact plate 19. The same No. 1 spring 25 is fixedly connected between one side of the contact plate 19 and one side of the arc plate 22.

[0052] A construction method of a steel pipe column pile combined support system specifically comprises the following steps:

[0053] S1. Foundation construction: sink the prefabricated PHC pile 1 into the ground as the foundation by hammering or static pressure, then pour the concrete base plate 2 on the ground, and embed a plurality of pre-embedded bolts 7 on the top;

[0054] S2, install the arc base 6: place the two arc bases 6 on the top of the concrete base plate 2, connect them with the prefabricated holes 13 through the embedded bolts 7 to ensure accurate installation, and use the elastic force mechanism of the protrusion 14 and the second spring 30 to fix the arc base 6 on the concrete base plate 2;

[0055] S3, column hoisting and positioning: hoist the prefabricated steel tube concrete column 4 and the positioning pile 8 from top to bottom into the concrete bottom plate 2, perform preliminary positioning through the positioning cavity 37, and use the No. 1 spring 25 and the contact plate 19 to position the column laterally to ensure its vertical state;

[0056] S4, column straightening: start the No. 1 push rod 17, clamp and straighten the column through the push plate 12 and the clamping plate to ensure the verticality of the column;

[0057] S5. Installation and adjustment of the support system: Install the support bottom plate 38 on the top of the concrete bottom plate 2, and adjust the height of the support top plate 41 through the outer sleeve 39 and the inner rod 40, adjust the inclination angle of the column by rotating the strip plate 44 and the U-shaped frame 43, and monitor the adjustment accuracy through the pointer 48 and the scale line 45;

[0058] S6, column fixing and completion: After the adjustment is completed, the prefabricated steel tube concrete column 4 is fixed on the supporting top plate 41 and the rotating strip plate 44. After the column is formed, the supporting system is retracted for subsequent reuse;

[0059] S7. Finishing and cleaning: After completing all installation work, clean up the construction site and check whether the connections between each component are firm to ensure construction quality.

[0060] When the steel pipe column pile combined support system is used, the prefabricated PHC pipe pile 1 is sunk into the ground by hammering or static pressure as the foundation of the building, and a concrete base plate 2 is poured on the ground. At this time, a plurality of embedded bolts 7 are embedded on the top of the concrete base plate 2, and two arc-shaped bases 6 are placed on the top of the concrete base plate 2. At this time, the prefabricated holes 13 and the embedded bolts 7 are butted to ensure the installation accuracy of the arc-shaped base 6;

[0061] At this time, the plurality of protrusions 14 first approach and squeeze the second spring 30 and then enter the interior of the insertion hole 9, and then the elastic force of the second spring 30 drives the two vertical plates 29 away, and the vertical plates 29 drive the protrusions 14 to enter the interior of the limiting cavity 10, and the two arc-shaped bases 6 are fixed to ensure the stability of the arc-shaped base 6. At this time, the positioning piles 8 and the prefabricated steel tube concrete column 4 can be hoisted from top to bottom;

[0062] At this time, after the prefabricated steel tube concrete column 4 and the positioning pile 8 enter the interior of the concrete bottom plate 2, they are initially positioned through the positioning cavity 37. At this time, the contact plate 19 moves laterally under the elastic force of the No. 1 spring 25, and the positioning rod 26 moves out from the interior of the positioning groove 27. At this time, multiple contact plates 19 will position the prefabricated steel tube concrete column 4 from the side to ensure that the prefabricated steel tube concrete column 4 is in a vertical state;

[0063] At this time, the No. 1 push rod 17 can be started, the piston rod of the No. 1 push rod 17 is retracted, the piston rod of the No. 1 push rod 17 drives the push plate 12 to be retracted, the push plate 12 drives the first round rod 16 to move laterally, the first round rod 16 drives the lower clamping plate 15 to move laterally, the lower clamping plate 15 clamps the prefabricated steel tube concrete column 4, at this time it can help the prefabricated steel tube concrete column 4 to perform the straightening process, at the same time the lower clamping plate 15 drives the upper clamping plate 11 to move laterally through the support rod 5, the upper clamping plate 11 helps clamp the upper half of the prefabricated steel tube concrete column 4;

[0064] When the straightening is completed and the equipment needs to be retracted, the piston rod of the No. 1 push rod 17 can be extended, and then the lower clamping plate 15 can no longer resist the sliding block 18. At this time, one end of the sliding block 18 moves out from the gap between the arc plate 22 and the arc base 6, and the second round rod 21 is quickly retracted under the tension of the No. 3 spring 34. The second round rod 21 drives the arc plate 22 to retract. At this time, the contact plate 19 and the lower clamping plate 15 no longer clamp the prefabricated steel tube concrete column 4, which can facilitate the removal of the arc base 6;

[0065] like Fig.12 As shown, the arc plate 22 drives the convex plate 20 to move horizontally, and the convex plate 20 enters the interior of the second rectangular hole 36 and uses the inclined surface to conflict with the connecting plate 28. At this time, the convex plate 20 can push the connecting plate 28 to move horizontally, and the connecting plate 28 moves toward the direction of the vertical plate 29. Since the connecting plate 28 and the clearance groove 31 are located on the same horizontal plane, the connecting plate 28 drives the two arc blocks 24 to move horizontally. The arc blocks 24 enter the interior of the clearance groove 31 and drive the two vertical plates 29 to approach each other. At this time, the vertical plate 29 drives the two protrusions 14 to approach each other, and the protrusions 14 can be moved out of the interior of the limiting cavity 10. At this time, the two arc bases 6 can be moved vertically upward and taken out separately from both sides of the prefabricated steel tube concrete column 4, which reduces the difficulty of operation and is convenient for reuse;

[0066] A support bottom plate 38 is installed on both sides of the top of the concrete bottom plate 2, and the support top plate 41 is supported by the outer sleeve 39 and the inner rod 40. By starting the No. 2 push rod 42, the piston rod of the No. 2 push rod 42 is extended, and the height of the support top plate 41 can be adjusted. The same rotating strip plate 44 is rotatably connected between the two support top plates 41. At this time, the angle of the rotating strip plate 44 can drive the U-shaped frame 43 to be adjusted. Since the arc sleeve 46 is rotatably connected to the fixed rod 47, the current inclination degree of the rotating strip plate 44 can be understood through the pointer 48 and the scale line 45. After the adjustment is completed, the same prefabricated steel tube concrete column 4 is set on the top of the rotating strip plate 44 and the support top plate 41. After the prefabricated steel tube concrete column 4 is formed, the piston rod of the No. 2 push rod 42 is retracted. At this time, the shelf can be retracted from one side for easy reuse.

[0067] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.

Claims

1. A steel pipe column pile combined support system, characterized in that: The invention comprises a concrete base plate (2) and a concrete horizontal support beam (3) used in combination, wherein the concrete horizontal support beam (3) is located above the concrete base plate (2), a prefabricated steel tube concrete column (4) is arranged inside the concrete horizontal support beam (3), a positioning pile (8) is arranged at the bottom of the prefabricated steel tube concrete column (4), a prefabricated PHC pipe pile (1) is arranged inside the concrete base plate (2), a positioning cavity (37) is opened at the top of the prefabricated PHC pipe pile (1), and the positioning cavity (37) is clamped with the positioning pile (8), and a group of support components for supporting the concrete horizontal support beam (3) are arranged between the concrete base plate (2) and the concrete horizontal support beam (3); The support assembly comprises two symmetrically arranged support base plates (38), both sides of the top of the support base plates (38) are fixedly connected to outer sleeves (39), an inner rod (40) is slidably penetrated inside the outer sleeve (39), the tops of the two inner rods (40) are fixedly connected to the same support top plate (41), the top of the support base plates (38) is fixedly connected to a second push rod (42), and the piston rod of the second push rod (42) is fixedly connected to the bottom of the support top plate (41); A rotating strip plate (44) is rotatably connected between the two supporting top plates (41); a U-shaped frame (43) is fixedly connected to the bottom of the rotating strip plate (44); a fixing rod (47) is fixedly connected to the inside of the U-shaped frame (43); an arc-shaped sleeve (46) is rotatably provided on the outer wall of the fixing rod (47); a pointer (48) is fixedly connected to the middle position of the bottom of the U-shaped frame (43); a plurality of scale lines (45) are provided on one side of the arc-shaped sleeve (46); the scale lines (45) are used in conjunction with the pointer (48); The top of the concrete base plate (2) is provided with two symmetrically arranged arc-shaped bases (6), a plurality of prefabricated holes (13) are provided inside the arc-shaped bases (6), a plurality of embedded bolts (7) are fixedly connected to the top of the concrete base plate (2), the embedded bolts (7) are engaged with the prefabricated holes (13), and a mounting assembly for mounting the arc-shaped bases (6) on the top of the concrete base plate (2) is provided at the bottom of the two arc-shaped bases (6); The mounting assembly comprises two symmetrically arranged insertion holes (9) opened on the top of the concrete bottom plate (2), two symmetrically arranged limiting cavities (10) are opened inside the concrete bottom plate (2), the limiting cavities (10) are located at the bottom of the insertion holes (9) and are connected to the insertion holes (9), a No. 1 rectangular hole (33) is opened at the bottom of the arc-shaped base (6), two symmetrically arranged vertical plates (29) are slidably penetrated inside the No. 1 rectangular hole (33), a protrusion (14) is fixedly connected to the bottom of one side of the vertical plate (29), the protrusion (14) is used in conjunction with the limiting cavity (10), the same No. 2 spring (30) is fixedly connected between the two vertical plates (29), and a clearance groove (31) is opened at the top of one side of the vertical plate (29); A clamping assembly for clamping the prefabricated steel tube concrete column (4) is provided on one side of the arc-shaped base (6); the clamping assembly comprises two first round rods (16) symmetrically arranged and slidingly passing through the interior of the arc-shaped base (6); one end of the two first round rods (16) is fixedly connected to the same lower clamping plate (15); the other end of the two first round rods (16) is fixedly connected to the same push plate (12); one side of the arc-shaped base (6) is fixedly connected to a first push rod (17); the piston rod of the first push rod (17) is fixedly connected to one side of the push plate (12); A control component for releasing the braking state of the arc-shaped base (6) is provided on one side of the arc-shaped base (6); the control component comprises a first circular groove (23) provided on the inner wall of one side of the arc-shaped base (6); a second circular rod (21) is slidably penetrated inside the first circular groove (23); an arc-shaped plate (22) is fixedly connected to one end of the second circular rod (21); a third spring (34) is fixedly connected between one end of the second circular rod (21) and the inner wall of one side of the first circular groove (23); a convex plate (20) is fixedly connected to one side of the arc-shaped plate (22); a second rectangular hole (36) is provided on the inner wall of one side of the arc-shaped base (6); one end of the convex plate (20) extends to the second rectangular hole (36). 6), a connected rectangular groove (32) is formed on the inner wall of one side of the first rectangular hole (33), the rectangular groove (32) is connected to the second rectangular hole (36), a connecting plate (28) is slidably connected to the inner wall of the rectangular groove (32), two symmetrically arranged arc blocks (24) are fixedly connected to one side of the connecting plate (28), the arc blocks (24) are used in conjunction with the clearance groove (31), and the connecting plate (28) is used in conjunction with the convex plate (20); two symmetrically arranged sliding blocks (18) are slidably connected to the inner wall of one side of the arc base (6), the sliding blocks (18) are used in conjunction with the arc plate (22), and the lower clamping plate (15) is used in conjunction with the sliding blocks (18).

2. A steel pipe column pile combined support system according to claim 1, characterized in that: One side of the arc-shaped plate (22) is provided with two symmetrically arranged positioning grooves (27), a positioning rod (26) is slidably penetrated inside the positioning groove (27), one end of the two positioning rods (26) is fixedly connected to the same abutment plate (19), and one side of the abutment plate (19) and one side of the arc-shaped plate (22) are fixedly connected to the same No. 1 spring (25).

3. The steel pipe column pile combined support system according to claim 1, characterized in that: Two symmetrically arranged support rods (5) are fixedly connected to the top of the lower clamping plate (15), and the tops of the two support rods (5) are fixedly connected to the same upper clamping plate (11).

4. The construction method of a steel pipe column pile combined support system according to claim 2, characterized in that: The specific steps include: S1. Foundation construction: sinking prefabricated PHC piles (1) into the ground as a foundation by hammering or static pressure, then pouring a concrete base plate (2) on the ground and pre-embedding a plurality of pre-embedded bolts (7) on the top; S2. Install the arc base (6): Place the two arc bases (6) on the top of the concrete base plate (2), connect them with the prefabricated holes (13) through the embedded bolts (7), ensure accurate installation, and use the elastic force mechanism of the protrusion (14) and the second spring (30) to fix the arc base (6) on the concrete base plate (2); S3, column hoisting and positioning: hoist the prefabricated steel tube concrete column (4) and the positioning pile (8) from top to bottom into the interior of the concrete base plate (2), perform preliminary positioning through the positioning cavity (37), and use the No. 1 spring (25) and the contact plate (19) to position the column laterally to ensure its vertical state; S4, column straightening: start the No. 1 push rod (17), clamp and straighten the column through the push plate (12) and the clamping plate to ensure the verticality of the column; S5. Installation and adjustment of the support system: Install the support bottom plate (38) on the top of the concrete bottom plate (2), and adjust the height of the support top plate (41) by means of the outer sleeve (39) and the inner rod (40), adjust the inclination angle of the column by means of the rotating strip plate (44) and the U-shaped frame (43), and monitor the adjustment accuracy by means of the pointer (48) and the scale line (45); S6, column fixing and completion: after the adjustment is completed, the prefabricated steel tube concrete column (4) is fixed on the supporting top plate (41) and the rotating strip plate (44), and after the column is formed, the supporting system is retracted for subsequent reuse; S7. Finishing and cleaning: After completing all installation work, clean up the construction site and check whether the connections between each component are firm to ensure construction quality.

Citation Information

Patent Citations

  • Prefabricated assembly type combined supporting structure

    CN211006696U

  • Supporting and reinforcing device of reinforced concrete building structure

    CN216429135U