Hydrate unblocking system and method suitable for tie-back pipeline of deepwater gas field
By using hydrate deblocking devices in the deep-water gas field return pipeline, the location of the greatest risk of hydrate generation is determined, and pressure relief and inhibitor injection technology is used to solve the production problems caused by hydrate blockage, achieving rapid and effective deblocking , avoid production accidents and economic losses.
Patent Information
- Application Number
- CN202411083963.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-12
AI Technical Summary
The back-connection pipeline of deep-water gas field causes throttling of the production system and blockage of pipelines due to hydrate blockage. The existing technology is difficult to effectively resolve the blockage, resulting in production accidents and economic losses.
Using hydrate deblocking devices, including underwater production facilities, isolation valves, pressure relief valves and hydrate inhibitor injection valves, to ensure that the risk of hydrate generation is determined by determining the maximum risk of hydrate generation, and to use pressure relief and inhibitor injection to ensure that in any Relieve the blockage under working conditions.
It realizes rapid and accurate judgment and removal of hydrate blockage, avoids the inability to unblock due to the hydrostatic column, and avoids production accidents and economic losses.
Smart Images

Figure CN118933630A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a hydrate blocking removal system and method suitable for a deepwater gas field tie-back pipeline, belonging to the technical field of marine gas field engineering. Background Art
[0002] One of the common development modes of deepwater gas fields is to connect shallow-water platforms with long-distance pipelines. The natural environment of low temperature, high pressure and strong heat exchange on the seabed poses severe challenges to the gathering and transportation system. Due to insufficient injection of hydrate inhibitors during the production process, the water carried by the natural gas produced from the formation first forms hydrates at the location with the greatest risk of hydrate formation under the high-pressure conditions of the production system, resulting in a reduction in the flow area in the pipe, thereby producing a throttling effect that affects normal transportation. Hydrates continue to aggregate at the throttling position, eventually leading to pipeline blockage.
[0003] Hydrate unblocking in submarine pipelines is complex and difficult to operate. Pressure reduction is a commonly used method for pipeline hydrate unblocking. However, the pressure difference on both sides of the blockage point is too large, which will cause kinetic energy for hydrate movement. The solid hydrate moves too fast and easily damages the pipeline and underwater production system, so double-side pressure reduction is used.
[0004] When hydrate blockage occurs and the deepwater gas field is shut down, under existing technologies, the accumulated liquid in the pipeline accumulates in low-lying areas due to gravity. The accumulated liquid in the pipeline is prone to form a static liquid column in the continental slope area. Pressure reduction is implemented on the central manifold and both sides of the platform. The pressure downstream of the hydrate blockage is difficult to reduce to the dissolution pressure due to the existence of the static liquid column, and the blockage cannot be unblocked, resulting in the abandonment of the pipeline, causing serious production accidents and economic losses. Summary of the invention
[0005] In view of the above technical problems, the present invention provides a hydrate unblocking system and method suitable for deepwater gas field tie-back pipelines. The method can quickly determine the location of the blocked pipeline and use an unblocking device to unblock it.
[0006] To achieve the above object, the present invention adopts the following technical solutions: A hydrate blocking removal system suitable for deepwater gas field tie-back pipeline, comprising: A hydrate unblocking device, comprising an underwater production facility and an isolation valve, a pressure relief valve and a hydrate inhibitor injection valve integrated on the underwater production facility; A first vessel is provided with a first flare and an inhibitor injection skid, the pressure relief valve is connected to the first flare through a vent pipe, and the hydrate inhibitor injection valve is connected to the inhibitor injection skid through an inhibitor injection pipeline.
[0007] A second aspect of the present invention provides a method for removing blockages in the above-mentioned hydrate removal system, comprising the following steps: After hydrate blockage, shut down the underwater production system and close the landing platform shut-off valve; Hydrate blockage occurs in the sea pipeline. Since the concentration of the hydrate inhibitor that causes hydrate formation and blockage in the production system is unclear, the first pressure relief port of the underwater manifold and the second pressure relief port of the shallow water platform are used to relieve the pressure of the sea pipeline. When no gas is released, the valve at the second pressure relief port is closed. A mixed fluid of nitrogen and methanol is injected through the coiled tubing on the second vessel, and the pressure rise rate at the first pressure relief port is noted. If it is related to the pipe capacity from the underwater manifold to the position with the greatest risk of hydrate formation, it indicates that the hydrate blockage has not been resolved; otherwise, it indicates that the hydrate blockage has been resolved; When the hydrate blockage has not been relieved, the first pressure relief port and the pressure relief valve are used to remove the blockage; first, the isolation valve is closed by using an ROV, and two continuous oil pipes are connected from the first vessel to the pressure relief valve and the hydrate inhibitor injection valve; The first pressure relief port and the pressure relief valve are used for pressure relief, and the pressure at the pressure relief valve is P3. After continuous pressure relief for a period of time, the pressure at P3 is observed. When the pressure at the position with the greatest risk of hydrate formation drops to P1, the hydrate can be completely unblocked, and the pressure relief valve is closed; A mixed fluid of nitrogen and methanol is injected through a coiled tubing on the second vessel, and when the pressures on both sides of the isolation valve are substantially the same, the injection is stopped, and the isolation valve is opened again. The isolation valve can be opened only after the pressures on both sides are balanced, and at the same time, the fluid downstream of the isolation valve can be prevented from flowing back to a lower temperature to generate hydrates again; Close the valve at the first pressure relief port and remove the connection of the coiled tubing to resume production.
[0008] In the blocking removal method, preferably, the position with the greatest hydrate formation risk is determined by: 1) Maximum shut-in pressure and minimum ambient temperature; 2) The lowest flow temperature along the pipeline and the flow pressure at the corresponding position.
[0009] The unblocking method preferably analyzes the maximum static liquid column height after pressure relief downstream of the location with the greatest hydrate formation risk, determines the maximum pressure that may occur at the hydrate, and determines whether a hydrate unblocking device needs to be added, as follows: The amount of liquid accumulated in the sea pipeline in each year is calculated, and the year with the maximum amount of liquid accumulated in the pipeline is used for analysis. It is assumed that hydrate blockage occurs at the location with the greatest hydrate formation risk. The first pressure relief port and the second pressure relief port implement bilateral pressure relief. By controlling the pressure relief speed, the pressure relief and unblocking reach a stable state. The accumulated liquid downstream of the hydrate will form a static liquid column in the steep slope section due to gravity. The pressure at the hydrate blockage point is equal to the gravity of the static liquid column. When the actual hydrate inhibitor concentration c1 in the pipeline is less than the hydrate formation inhibition concentration c2 under this pressure and the ambient temperature conditions at the hydrate location, the hydrate will not be unblocked, and a hydrate unblocking device needs to be installed on the tie-back pipeline.
[0010] The blocking removal method described above preferably includes determining the installation position of the hydrate blocking removal device as follows: In order to ensure that the generated hydrate blockage can be solved by reducing the pressure under any working conditions, it is assumed that no inhibitor is injected during the production process, and hydrate blockage occurs in the pure water section without inhibitor in the pipe. Based on the lowest ambient temperature at the location with the greatest risk of hydrate formation, the pressure of hydrate dissolution is inferred to be P1 by theoretical calculation; Based on the stable state achieved by the annual manifold with the maximum amount of liquid accumulated in the pipe and the pressure relief on both sides of the shallow water platform, attempts were made to install the hydrate unblocking device at a certain distance downstream from the location with the maximum risk of hydrate formation. It was finally determined that pressure relief would be implemented after installation at D, which could reduce the pressure at the location with the maximum risk of hydrate formation to the hydrate dissolution pressure P1.
[0011] The present invention adopts the above technical solution, which has the following advantages: The unblocking device of the present invention can be used to accurately determine the position with the greatest risk of hydrate blockage. At the same time, the unblocking device of the present invention can be used to unblock hydrate blockages under any working conditions, avoiding the abandonment of the pipeline due to the inability to unblock due to the presence of a static liquid column in the pipeline, thereby causing serious production accidents and economic losses. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 A schematic diagram of a hydrate deblocking system applicable to a deepwater gas field tie-back pipeline provided by an embodiment of the present invention; The reference numerals in the figures are as follows: A-the location with the greatest risk of hydrate formation; B-underwater manifold; C-shallow water platform; D-hydrate deblocking device; 1-Isolation valve; 2-Hydrate inhibitor injection valve; 3-Pressure relief valve; 4-Inhibitor injection skid; 5-First flare; 6-First vessel; 7-Second flare; 8-Second vessel; 9-First pressure relief port; 10-Second pressure relief port. DETAILED DESCRIPTION
[0013] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention is described clearly and completely below. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work are within the scope of protection of the present invention.
[0014] Unless otherwise defined, the technical or scientific terms used in the present invention shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second", "third", "fourth" and similar terms used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Words such as "include" or "comprise" and the like mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Words such as "connect" or "connected" and the like are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect.
[0015] For ease of description, spatially relative terms may be used herein to describe the relationship of one element or feature relative to another element or feature as shown in the figures, such as "inside", "outside", "inner side", "outer side", "below", "above", etc. Such spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation depicted in the figures.
[0016] Hydrate unblocking in submarine pipelines is complex and difficult to operate. Pressure reduction is a common method for pipeline hydrate unblocking, but the pressure difference on both sides of the blockage point is too large, which will cause hydrate movement kinetic energy. The solid hydrate moves too fast and easily damages the pipeline and underwater production system, so double-side pressure reduction is used. When hydrate blockage occurs and the deepwater gas field is shut down, under the existing technology, the accumulated liquid in the pipeline accumulates in low-lying areas due to gravity. The accumulated liquid in the pipeline is prone to form a static liquid column in the continental slope area. The central manifold and both sides of the platform are used to reduce the pressure. Due to the existence of the static liquid column, the downstream pressure of the hydrate blockage is difficult to reduce to the dissolution pressure, and the blockage cannot be unblocked, resulting in the abandonment of the pipeline, causing serious production accidents and economic losses.
[0017] Based on the above problems, the present invention provides a hydrate unblocking system and method suitable for deepwater gas field tie-back pipelines. The unblocking device of the present invention can quickly unblock the blocked position of the underwater manifold, and the unblocking position analysis method of the present invention can accurately determine the blockage position.
[0018] like Figure 1 As shown, the hydrate blocking removal system of the present invention includes the following components: A hydrate deblocking device D, comprising an underwater production facility and an isolation valve 1, a pressure relief valve 3 and a hydrate inhibitor injection valve 2 integrated on the underwater production facility; The first vessel 6 is provided with a first flare 5 and an inhibitor injection skid 4, the pressure relief valve 3 is connected to the first flare 5 through a vent pipe, and the hydrate inhibitor injection valve 2 is connected to the inhibitor injection skid 4 through an inhibitor injection pipeline.
[0019] In order to reduce the pressure relief process, the isolation valve 1 can reduce the production fluid downstream of the hydrate deblocking device D entering the deblocking and pressure relief section, especially the liquid, which increases the difficulty of pressure relief. At the same time, it can reduce the discharge volume and shorten the discharge time.
[0020] The pressure relief valve 3 is connected to the first vessel 6 with the relief function of the first flare 5 through a continuous oil pipe to relieve the pressure accumulated in the pressure relief section.
[0021] The hydrate inhibitor injection valve 2 injects methanol through the coiled tubing during the discharge process to prevent hydrates from forming in the coiled tubing and blocking the discharge pipeline due to pressure reduction and temperature reduction during the discharge process.
[0022] Before determining the placement location of the hydrate deblocking device D, it is necessary to first determine the location with the greatest risk of hydrate formation, as follows: 1. Determination of the location with the greatest risk of hydrate formation The location A with the greatest risk of hydrate formation in the offshore pipeline is determined by the most stringent of the following two conditions: (1) the maximum shut-in pressure and the minimum ambient temperature; (2) the minimum flow temperature along the pipeline and the flow pressure at the corresponding location.
[0023] (ii) Analyze the maximum static liquid column height after pressure relief downstream of the location A with the greatest risk of hydrate formation, determine the maximum pressure that may occur at the hydrate site, and judge whether a hydrate deblocking device is needed.
[0024] Specifically, the amount of liquid accumulated in the submarine pipeline in each year was calculated using the flow safety pipeline numerical simulation software, and the year with the largest amount of liquid accumulated in the pipeline was used for analysis. It was assumed that hydrate blockage occurred at position A with the greatest risk of hydrate formation, and double-sided pressure relief was implemented at the underwater manifold B pressure relief port 1 and the shallow water platform C pressure relief port 2. By controlling the pressure relief speed, the pressure relief and unblocking reached a stable state. The accumulated liquid downstream of the hydrate will form a static liquid column in the steep slope section due to gravity, and the pressure at the hydrate blockage point is equal to the gravity of the static liquid column. When the actual hydrate inhibitor concentration c1 in the pipe is less than the hydrate formation inhibition concentration c2 under this pressure and the ambient temperature conditions at the hydrate location, the hydrate will not be able to be unblocked, and a hydrate unblocking device needs to be installed on the return pipeline.
[0025] (III) Determine the installation location of hydrate deblocking device D In order to ensure that the generated hydrate blockage can be released by reducing the pressure under any working conditions, it is assumed that no inhibitor is injected during the production process, and hydrate blockage occurs in the pure water section without inhibitor in the pipe. Based on the lowest ambient temperature at position A where the risk of hydrate formation is the greatest, theoretical calculation is used to infer that the pressure of hydrate dissolution is P1.
[0026] Based on the stable state achieved by the annual pressure relief on both sides of the manifold and shallow water platform in the above (II) with the maximum amount of liquid accumulated in the pipe, an attempt was made to install underwater unblocking and pressure relief devices at a node of 100m downstream from the location with the greatest risk of hydrate formation. It was finally determined that after the installation at D, pressure relief would be implemented, which could reduce the pressure at position A to the hydrate dissolution pressure P1.
[0027] (IV) The unblocking process using hydrate unblocking device D is as follows 1) After hydrate blockage, shut down the underwater production system and close the landing platform shut-off valve.
[0028] 2) Hydrate blockage occurs in the sea pipeline. Since the concentration of the hydrate inhibitor that causes hydrate formation and blockage in the production system is unclear, the first pressure relief port 9 of the underwater manifold B and the second pressure relief port 10 of the shallow water platform C are used to relieve the pressure of the sea pipeline. After a period of continuous release, when no gas is released, the valve at the second pressure relief port 10 is closed.
[0029] 3) A mixed fluid of nitrogen and methanol is injected into the second vessel 8 through the coiled tubing, and the pressure rise rate at the first pressure relief port 9 is noted. If it is related to the pipe capacity from the manifold to the blockage point A, it indicates that the hydrate blockage has not been relieved; otherwise, it indicates that the hydrate blockage has been relieved.
[0030] 4) If the hydrate blockage has not been relieved, the first pressure relief port 9 of the underwater manifold B and the pressure relief valve 3 of the hydrate unblocking device D are used to remove the blockage. First, the isolation valve 1 is closed by ROV, and two coiled tubings are connected from the first vessel to the pressure relief valve 3 and the hydrate inhibitor injection valve 2.
[0031] 5) The first pressure relief port 9 of the underwater manifold B and the pressure relief valve 3 of the hydrate unblocking device D are pressure-relieved. The pressure at the pressure relief valve 3 is P3. After continuous discharge for a period of time, the pressure at P3 is observed to ensure that the pressure at the blockage point position A drops to P1. In this case, the hydrate can be completely unblocked and the valve at the pressure relief valve 3 is closed.
[0032] 6) A mixed fluid of nitrogen and methanol is injected through the continuous oil pipe on the first vessel 6. When the pressures on both sides of the isolation valve 1 are basically the same, the injection is stopped and the isolation valve 1 is opened again. The isolation valve 1 can be opened conveniently due to the pressure balance and the backflow of the fluid downstream of the isolation valve 1 to a lower temperature to generate hydrates again can be avoided.
[0033] 7) Close the valve at the first pressure relief port 9 and remove the connection of the coiled tubing to resume production.
[0034] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A hydrate blocking removal system suitable for deepwater gas field tie-back pipeline, characterized in that: include: A hydrate deblocking device (D), comprising an underwater production facility and an isolation valve (1), a pressure relief valve (3) and a hydrate inhibitor injection valve (2) integrated on the underwater production facility; A first vessel (6), wherein a first flare (5) and an inhibitor injection skid (4) are arranged on the first vessel (6), the pressure relief valve (3) is connected to the first flare (5) via a vent pipe, and the hydrate inhibitor injection valve (2) is connected to the inhibitor injection skid (4) via an inhibitor injection pipeline.
2. A method for removing blockages in a hydrate removal system according to claim 1, characterized in that: The steps include: After hydrate blockage, shut down the underwater production system and close the landing platform shut-off valve; Hydrate blockage occurs in the sea pipeline. Since the concentration of the hydrate inhibitor that causes hydrate formation and blockage in the production system is unclear, the sea pipeline is first depressurized using the first pressure relief port (9) of the underwater manifold (B) and the second pressure relief port (10) of the shallow water platform (C). When no more gas is released, the valve at the second pressure relief port (10) is closed. A mixed fluid of nitrogen and methanol is injected through the coiled tubing on the second vessel (8), and the pressure rise rate at the first pressure relief port (9) is noted. If the pressure rise rate is related to the pipe volume from the underwater manifold (B) to the position (A) with the greatest risk of hydrate formation, it indicates that the hydrate blockage has not been resolved. Otherwise, it indicates that the hydrate blockage has been resolved. When the hydrate blockage has not been cleared, the first pressure relief port (9) and the pressure relief valve (3) are used to remove the blockage; first, the isolation valve (1) is closed by using an ROV, and two continuous oil pipes are connected from the first vessel (6) to the pressure relief valve (3) and the hydrate inhibitor injection valve (2); The first pressure relief port (9) and the pressure relief valve (3) are used to release pressure, the pressure at the pressure relief valve (3) being P3. After continuous release for a period of time, the pressure at P3 is observed. When the pressure at the position (A) with the greatest risk of hydrate formation drops to P1, the hydrate can be completely unblocked, and the pressure relief valve (3) is closed. A mixed fluid of nitrogen and methanol is injected through a coiled tubing on the second vessel (8), and when the pressures on both sides of the isolation valve (1) are substantially the same, the injection is stopped, and the isolation valve (1) is opened again. The isolation valve (1) can be opened only after the pressures are balanced, and at the same time, the fluid downstream of the isolation valve (1) can be prevented from flowing back to a lower temperature to generate hydrates again; The valve at the first pressure relief port (9) is closed and the connection of the coiled tubing is removed to resume production.
3. The blocking removal method according to claim 2, characterized in that: The location (A) with the greatest risk of hydrate formation is determined by: The position A with the greatest risk of hydrate formation in the sea pipeline is determined by the most stringent of the following two conditions: 1) Maximum shut-in pressure and minimum ambient temperature; 2) The lowest flow temperature along the pipeline and the flow pressure at the corresponding position.
4. The blocking removal method according to claim 3, characterized in that: Analyze the maximum static liquid column height after pressure relief downstream of the location with the greatest risk of hydrate formation (A), determine the maximum pressure that may occur at the hydrate location, and judge whether a hydrate unblocking device is needed, as follows: The amount of liquid accumulated in the sea pipeline in each year is calculated, and the year with the largest amount of liquid accumulated in the pipeline is used for analysis. It is assumed that hydrate blockage occurs at the position (A) with the greatest risk of hydrate formation. The first pressure relief port (9) and the second pressure relief port (10) implement double-sided pressure relief. By controlling the pressure relief speed, the pressure relief and unblocking reach a stable state. The accumulated liquid downstream of the hydrate will form a static liquid column in the steep slope section due to the influence of gravity. The pressure at the hydrate blockage point is equal to the gravity of the static liquid column. When the actual hydrate inhibitor concentration c1 in the pipeline is less than the hydrate formation inhibition concentration c2 under the conditions of this pressure and the ambient temperature at the hydrate position, the hydrate will not be unblocked, and a hydrate unblocking device needs to be installed on the tie-back pipeline.
5. The blocking removal method according to claim 4, characterized in that: The installation position of the hydrate deblocking device (D) is determined as follows: In order to ensure that the generated hydrate blockage can be solved by reducing the pressure under any working conditions, it is assumed that no inhibitor is injected during the production process, and hydrate blockage occurs in the pure water section without inhibitor in the pipe. Based on the lowest ambient temperature at the position (A) with the greatest risk of hydrate formation, the pressure of hydrate dissolution is inferred to be P1 by theoretical calculation; Based on the stable state achieved by the annual manifold with the maximum amount of liquid accumulated in the pipe and the pressure relief on both sides of the shallow water platform (C) in claim 4, the hydrate deblocking device (D) is attempted to be installed at a certain distance downstream from the position with the maximum risk of hydrate formation (A). It is finally determined that after the pressure relief is implemented after the installation at D, the pressure at the position with the maximum risk of hydrate formation (A) can be reduced to the hydrate dissolution pressure P1.