Large-scale three-dimensional physical simulation method for SAGD (Steam Assisted Gravity Drainage) double-horizontal
Through the large-scale three-dimensional physical simulation method of SAGD dual horizontal well expansion technology, the problem of insufficient research on the hydraulic expansion process is solved, a micro-fracture network is formed, the connectivity and thermal conduction efficiency of the expansion area are improved, and the heavy oil recovery rate is improved. The application of SAGD technology in complex geological conditions provides a solid foundation.
Patent Information
- Application Number
- CN202411283231.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-12
AI Technical Summary
The existing technology lacks research on the capacity expansion mechanism, thermal conduction, and multiphase fluid seepage involved in hydraulic capacity expansion at the theoretical research level, resulting in insufficient understanding of the capacity expansion process, which limits the optimization of SAGD technology and the complex geological conditions. Promotion and application under.
Large-scale three-dimensional physical simulation method using SAGD dual horizontal well expansion technology includes establishing a simulation target formation, loading ground stress using a true three-axis loading system, performing hydraulic expansion and steam circulation simulation, forming a micro-fracture network, and optimizing pore structure and thermal conduction efficiency .
By simulating hydraulic capacity expansion before production, a micro-crack network is formed, which improves the connectivity and thermal conduction efficiency of the expansion area, improves the steam-assisted mining effect, enhances the physical structure transformation of the oil sand reservoir, improves the heavy oil recovery rate, and makes up for it. In the prior art, the simulation and verification of the actual effect of the capacity expansion process are insufficient.
Smart Images

Figure CN118933729A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of simulation of heavy oil production methods, and in particular to a large-scale three-dimensional physical simulation method of a SAGD double horizontal well expansion technology. Background Art
[0002] China is one of the countries with the richest heavy oil resources in the world. There are a large number of heavy oil resources distributed and mined in major oil fields such as Xinjiang, Liaohe, Shengli, Tarim and Bohai. However, the ultra-heavy oil sand reservoir has extremely high viscosity and poor fluidity, making it difficult for traditional oil and gas extraction technology to effectively develop such reservoirs. In order to improve the efficiency of heavy oil extraction, heating the oil sand reservoir to reduce the viscosity of heavy oil and increase its fluidity has become a widely used feasible solution. However, the traditional steam huff-and-puff method is not efficient in treating such high-viscosity reservoirs and cannot meet modern mining needs.
[0003] The introduction of steam-assisted gravity drainage (SAGD) technology has brought revolutionary changes to heavy oil production. SAGD technology arranges a pair of parallel horizontal wells in the heavy oil reservoir - the upper one is a steam injection well and the lower one is a production well, and uses high-temperature steam to inject into the heated reservoir to form a steam chamber, thereby establishing an effective oil drainage channel. Although SAGD technology has achieved certain production results in some oil fields in China, such as Xinjiang, Liaohe, and Shengli, most of China's heavy oil reservoirs have river sedimentation characteristics, strong heterogeneity, and low permeability and low heat conductivity interlayers. These complex geological conditions make conventional SAGD technology still face many challenges in practical applications.
[0004] In response to the above challenges, academia and industry have proposed a variety of improved technologies, such as SAGD rapid preheating startup technology, which generates high porosity and high permeability expansion zones between SAGD well groups through high-pressure fluid injection in a short period of time, thereby significantly shortening the steam cycle time, reducing steam usage, and improving initial recovery. However, most of the existing technologies focus on the summary and analysis of field construction experience. Although this provides valuable practical experience for the application of expansion technology, at the theoretical research level, especially for the mechanistic and systematic research on complex physical and chemical processes involved in the hydraulic expansion process, such as expansion mechanism, heat conduction, and multiphase fluid seepage, there is still a lack of research. This lack of research has led to an insufficient understanding of the expansion process, and it is impossible to fully reveal the physical changes and mechanisms in the expansion zone, which limits the further optimization of the technology and its promotion and application under more complex geological conditions.
[0005] Therefore, a new large-scale three-dimensional physical simulation method for SAGD dual-horizontal well expansion technology is urgently needed to solve the above technical problems. Summary of the invention
[0006] The present invention aims to solve the above technical problems, that is, to solve the problem that the existing theoretical research on the mechanistic and systematic research of complex physical and chemical processes involved in the hydraulic expansion process, such as expansion mechanism, heat conduction, multiphase fluid seepage, etc., is still insufficient. This lack of research has led to an insufficient understanding of the expansion process and an inability to fully reveal the physical changes and mechanisms in the expansion area, which has limited the further optimization of the technology and its promotion and application under more complex geological conditions.
[0007] To this end, the present invention provides a large-scale three-dimensional physical simulation method for SAGD dual horizontal well expansion technology, comprising the following steps: Establish a target formation required for simulation, the target formation includes a bottom layer, an oil sand reservoir and a cap layer arranged in order from bottom to top, two screen pipes are buried in the oil sand reservoir to respectively simulate the steam injection well and the production well in the SAGD technology, each screen pipe is provided with a long pipe and a short pipe, a plurality of temperature sensors are buried in the oil sand reservoir to detect the temperature of different parts, and the wellheads of the steam injection well and the production well are both equipped with pressure sensors and flow meters; Applying ground stress to the target stratum using a true triaxial loading system; Under the condition of loading ground stress, hydraulic expansion operation is performed on the oil sand reservoir to form a micro-fracture network inside the oil sand reservoir; After the hydraulic expansion operation is completed, a steam circulation simulation operation is performed on the target formation; When the target formation reaches the production conversion standard, a heavy oil extraction simulation process is performed.
[0008] In a specific implementation of the large-scale three-dimensional physical simulation method of the above-mentioned SAGD dual horizontal well expansion technology, the hydraulic expansion operation includes: sequentially performing well washing operations, ground stress transformation operations, preliminary hydraulic expansion operations, expansion of the hydraulic expansion area operations and horizontal thermal connectivity inspection operations on the oil sand reservoir.
[0009] In the specific implementation of the large-scale three-dimensional physical simulation method of the above-mentioned SAGD dual horizontal well expansion technology, the well washing operation specifically includes: Injecting cleaning fluid into the oil sand reservoir for cleaning, and judging whether the cleaning is completed according to the cleanliness of the liquid discharged from the short pipe; If the cleanliness reaches a predetermined cleanliness standard, cleaning is considered complete.
[0010] In the specific implementation of the large-scale three-dimensional physical simulation method of the SAGD dual horizontal well expansion technology, the step of "injecting cleaning fluid into the oil sand reservoir" specifically includes: injecting a cleaning fluid into the oil sand reservoir at an initial low flow rate; After the initial low flow rate reaches stability, the flow rate of the cleaning fluid injected into the oil sand reservoir is gradually increased according to the set ratio and the set interval time; Real-time monitoring of the cleanliness of the liquid discharged from the short pipe and the pressure change between two adjacent flow rates in the oil sand reservoir; If the liquid cleanliness does not change or the pressure change value is greater than the preset pressure difference value, stop increasing the flow rate until the liquid cleanliness changes and the pressure change value is less than the preset pressure difference value, then continue to increase the flow rate; After the liquid cleanliness reaches a predetermined cleanliness standard, the injection of cleaning liquid into the oil sand reservoir is stopped.
[0011] In the specific implementation of the large-scale three-dimensional physical simulation method of the SAGD dual horizontal well expansion technology, the geostress transformation operation specifically includes: injecting clean water into the oil sand reservoir and controlling the drainage flow rate to perform geostress transformation; Acquire pressure values in real time, and acquire pore pressure values and effective stress values in the oil sand reservoir according to the pressure values; Determining the magnitude of the pore pressure value and the effective stress value; If the pore pressure value and the effective stress value both reach the corresponding preset required values, it is determined that the ground stress transformation is completed.
[0012] In the specific implementation of the large-scale three-dimensional physical simulation method of the above-mentioned SAGD dual horizontal well expansion technology, the initial hydraulic expansion operation specifically includes: Injecting expansion liquid into the oil sand reservoir according to a preset injection pressure, and during the injection process, the valve on the short pipe is in a closed state; After the injection is completed, the pressure is held down for a first set time to form a preliminary hydraulic expansion zone; Among them, the preset injection pressure method is: starting from the set minimum injection pressure value, controlling the injection pressure value to gradually increase to the set maximum injection pressure value in a step-by-step manner, the minimum injection pressure value is greater than the minimum resistive stress value of the oil sand reservoir, and the maximum injection pressure value is less than the fracture pressure value of the oil sand reservoir.
[0013] In the specific implementation of the large-scale three-dimensional physical simulation method of the SAGD dual horizontal well expansion technology, the operation of expanding the hydraulic expansion area specifically includes: Injecting expansion liquid into the oil sand reservoir according to a second injection pressure value and a second set time, and the valve on the short pipe is in a closed state during the injection process; when the second set time is reached, the valve on the short pipe is controlled to open to drain water to form a hydraulic shock operation; The hydraulic oscillation operation is repeated until the current permeability obtained by inverting the real-time pressure value reaches the set permeability, so as to evenly expand the hydraulic expansion area and form a micro-fracture network inside the oil sand reservoir.
[0014] In a specific implementation of the large-scale three-dimensional physical simulation method for the above-mentioned SAGD dual horizontal well expansion technology, the horizontal thermal connectivity inspection operation specifically includes: Injecting a set amount of hot water at a set temperature into the oil sand reservoir through the steam injection well, and during the injection process, the valve on the short pipe is in a closed state; Acquire the temperature value of each position in the oil sand reservoir in real time and calculate the temperature difference between the temperature value of each position and the set temperature value after a third set time; Determine the size of each temperature difference value and the corresponding preset temperature difference value; If the temperature difference is less than or equal to the corresponding preset temperature difference, it is determined that the horizontal thermal connectivity of the oil sand reservoir is qualified.
[0015] In a specific implementation of the large-scale three-dimensional physical simulation method for the above-mentioned SAGD dual horizontal well expansion technology, the horizontal thermal connectivity inspection operation specifically further includes: If the temperature difference is greater than the corresponding preset temperature difference, the hydraulic oscillation operation in the hydraulic expansion area expansion operation is repeated, and the horizontal thermal connectivity inspection operation is performed once every fourth set time until the horizontal thermal connectivity of the oil sand reservoir is determined to be qualified.
[0016] In the specific implementation of the large-scale three-dimensional physical simulation method of the SAGD dual horizontal well expansion technology, the steam cycle simulation operation specifically includes: Injecting high-temperature steam into the steam injection well and the production well to carry out the steam circulation process according to the steam injection flow rate and circulation time determined by the field steam circulation method and similar criteria; Acquire temperature data in the oil sand reservoir in real time, and determine whether the oil sand reservoir meets the conversion standard according to the temperature data; If the changeover criteria are not met, the steam cycle process continues.
[0017] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention simulates the hydraulic expansion operation before simulating production. After the hydraulic expansion operation, a micro-fracture network is formed inside the oil sand reservoir instead of a single fracture, thereby achieving a fundamental improvement in the internal structure of the reservoir, changing the pore structure and permeability of the oil sand reservoir, greatly improving the connectivity and heat conduction efficiency of the expansion zone, and further improving the effect of steam-assisted production. Therefore, the present invention successfully reproduces the actual oil sand reservoir expansion process under laboratory conditions, so that the physical structure of the oil sand reservoir is fundamentally improved. This method of directly transforming the reservoir not only enhances the formation and expansion of the steam cavity, but also accelerates the heating rate of the oil reservoir and improves the recovery rate of the heavy oil. This breakthrough makes up for the lack of simulation and verification of the actual effect of the expansion process in the prior art, and lays a solid foundation for the widespread application of SAGD technology under different geological conditions.
[0018] 2. The present invention introduces hydraulic oscillation technology in the process of simulating hydraulic expansion operations. By periodically increasing and decreasing the fluid pressure in the wellbore, the further expansion and connection of the fractures are promoted. At the same time, the interlayers in the heterogeneous oil sand reservoir can be broken up to achieve uniform expansion of the expansion area. The heterogeneity of the oil sand reservoir is fully considered. The hydraulic expansion technology effectively improves the heterogeneity of the reservoir, optimizes the steam migration path, and expands the development area of the steam chamber, thereby maximizing the recovery rate of the oil reservoir.
[0019] 3. The present invention injects hot water into the steam injection well, monitors the temperature changes of the oil sand reservoir, and analyzes the propagation of the heat source in the oil sand reservoir to evaluate the horizontal thermal connectivity of the expansion area, thereby ensuring the effectiveness of the expansion area and the continuity of production, thereby achieving an effective evaluation of the hydraulic expansion construction effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings, in which: Figure 1 It is a flow chart of the main steps of the large-scale three-dimensional physical simulation method of the SAGD dual horizontal well expansion technology provided by the present invention; Figure 2 It is a schematic diagram of the structure of the screen tube, temperature sensor, oil sand reservoir, bottom layer and cover layer distributed in the test box; Figure 3 It is a schematic diagram of the internal structure of the sieve tube; Figure 4 It is a three-dimensional schematic diagram of the distribution of temperature sensors and screen tubes; Figure 5 yes Figure 4 Side view of the temperature sensor and screen tube distribution; Figure 6 yes Figure 4 Front view of the temperature sensor and screen tube distribution; Figure 7 It is a schematic diagram of true triaxial three-dimensional principal stress loading; Figure 8 It is a flow chart of the steps of hydraulic expansion operation; Fig. 9 This is the temperature distribution diagram corresponding to different cross sections after the steam cycle process is carried out directly without expansion; Fig.10 It is a temperature distribution diagram corresponding to different cross sections after the steam circulation process after the expansion operation according to the present invention.
[0021] Description of reference numerals: 1. Screen tube; 2. Temperature sensor; 3. Test chamber; 4. Cover layer; 5. Notch; 6. Short tube; 7. Long tube; 8. Bottom layer; 9. Oil sand reservoir. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0023] In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the system or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are used to define components, only for the convenience of distinguishing the above components, and unless otherwise stated, the above terms have no special meanings and cannot be understood as indicating or implying relative importance.
[0024] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "setting", and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0025] The present invention relates to the technical field of simulation of heavy oil production methods, and in particular to a large-scale three-dimensional physical simulation method for SAGD dual horizontal well expansion technology. The purpose is to solve the problem that the existing theoretical research on the mechanistic and systematic research of complex physical and chemical processes involved in the hydraulic expansion process, such as expansion mechanism, heat conduction, multiphase fluid seepage, etc., is still insufficient. This lack of research has led to an insufficient understanding of the expansion process, and it is impossible to fully reveal the physical changes and mechanisms in the expansion area, which limits the further optimization of the technology and the promotion and application under more complex geological conditions. To this end, the present invention provides a large-scale three-dimensional physical simulation method for the SAGD dual horizontal well expansion technology, comprising the following steps: establishing a target formation required for simulation, the target formation comprising a bottom layer, an oil sand reservoir and a cap layer arranged in sequence from bottom to top, two screen pipes buried in the oil sand reservoir for respectively simulating a steam injection well and a production well in the SAGD technology, each screen pipe being provided with a long pipe and a short pipe, a plurality of temperature sensors buried in the oil sand reservoir to detect the temperature of different parts, and a pressure sensor and a flow meter being installed at the wellhead of the steam injection well and the wellhead of the production well; applying ground stress to the target formation by using a true triaxial loading system; under the condition of applying ground stress, hydraulically expanding the oil sand reservoir to form a micro-crack network inside the oil sand reservoir; after the horizontal thermal connectivity test is up to standard, performing a steam cycle simulation operation on the target formation; and executing a heavy oil extraction process when the target formation reaches the conversion standard. The invention provided by the present invention successfully reproduces the actual oil sand reservoir expansion process under laboratory conditions, so that the physical structure of the oil sand reservoir is fundamentally improved. This method of directly transforming the reservoir not only enhances the formation and expansion of the steam cavity, but also accelerates the heating rate of the oil reservoir and improves the recovery rate of the heavy oil. This breakthrough makes up for the lack of simulation and verification of the actual effect of the expansion process in the prior art, improves the understanding of the expansion process, and lays a solid foundation for the widespread application of SAGD technology under different geological conditions.
[0026] The large-scale three-dimensional physical simulation method of the SAGD dual-horizontal well expansion technology provided by the embodiment of the present invention is described in detail below with reference to the accompanying drawings.
[0027] See also Figure 1-3 The present invention provides a large-scale three-dimensional physical simulation method for SAGD dual horizontal well expansion technology, comprising the following steps: S1, establish the target stratum required for simulation, the target stratum includes the bottom layer 8, the oil sand reservoir 9 and the cap layer 4 arranged in order from bottom to top, two screens 1 are buried in the oil sand reservoir 9 to respectively simulate the steam injection well and the production well in the SAGD technology, and the steam injection well and the production well are horizontally distributed up and down, such as Figure 2As shown, a long tube 7 and a short tube 6 are arranged in each screen tube 1, and a plurality of evenly distributed notches 5 are arranged on the screen tube 1 to connect the inside of the screen tube 1 with the inside of the oil sand reservoir 9. A plurality of temperature sensors 2 are buried in the oil sand reservoir 9 to detect the temperature of different parts, and the wellheads of the steam injection well and the production well are both equipped with pressure sensors and flow meters; S2, using a true triaxial loading system to load in-situ stress on the target stratum; S3, under the condition of loading ground stress, hydraulic expansion operation is performed on the oil sand reservoir 9 to form a micro-fracture network inside the oil sand reservoir 9; S4, after the hydraulic expansion operation is completed, a steam circulation simulation operation is performed on the target formation; S5, when the target formation reaches the production conversion standard, the heavy oil extraction simulation process is executed.
[0028] Specifically, Figure 2 As shown, in step S1, the target formation also includes a test box 3, and the bottom layer 8, the oil sand reservoir 9 and the cap layer 4 are placed in the test box 3 from bottom to top. The preparation of the target formation is as follows: When preparing the target formation simulating the oil sand reservoir 9, core samples of the oil sand reservoir 9, the bottom layer 8 and the cap layer 4 are first obtained from the actual drilling process. These core samples are used to test their physical and mechanical properties in the laboratory, including but not limited to the following parameters: Uniaxial compressive strength (UCS): The compressive strength of rock in the absence of lateral stress is measured by conducting uniaxial compression tests on core samples.
[0029] Triaxial compressive strength: Use a triaxial compression testing machine to simulate the compressive strength under underground multiaxial stress conditions to obtain the failure characteristics of the rock.
[0030] Tensile Strength: The tensile strength of the core is measured by splitting tests to assess its tendency to break under tensile stress.
[0031] Elastic modulus and Poisson's ratio: The elastic modulus and Poisson's ratio of rock are calculated through stress-strain curve to understand the elastic deformation characteristics of rock.
[0032] Based on these test results, the staff selected materials that are closest to the physical and mechanical properties of the original formation to simulate the oil sand reservoir9. The simulation materials include the following: Heavy oil-saturated quartz sand: Mainly used to simulate the skeleton structure of the reservoir, its particle size and viscosity of saturated heavy oil are consistent with the actual reservoir.
[0033] Clay: Used to simulate the fine-grained components in the reservoir and provide the necessary plastic deformation capacity.
[0034] Feldspar and carbonates: These minerals are used to adjust the chemical composition of the simulated material to more closely resemble the composition of actual oil sands reservoirs9.
[0035] To ensure that the simulated target formation is consistent with the actual oil sand reservoir in terms of porosity and permeability, the following steps were taken: Particle crushing and screening: The collected oil sand samples are crushed into fine particles of 200-400 microns and screened to obtain a uniform particle size distribution. This particle size is consistent with the particle size in the actual reservoir, ensuring the similarity of the pore structure.
[0036] Molding and compaction: The crushed oil sand particles are placed in a molding mold and compacted by a 5000 KN manually controlled press. The molding process is carried out in multiple steps. After each layer of oil sand particles is compacted, the next layer of material is added until the target height is reached. The compaction pressure of each layer is 9 MPa and the compaction time is 1 hour.
[0037] Porosity and permeability adjustment: By controlling the pressure and time during the compaction process, the porosity and permeability of the target formation are adjusted to match the physical properties of the actual oil sand reservoir 9. The specific parameters are repeatedly adjusted and optimized through porosity and permeability tests of the compacted samples until the characteristics of the simulated samples are basically consistent with those of the actual oil sand reservoir 9.
[0038] Temperature sensors 2 and horizontal well arrangement: During the compaction process, 75 temperature sensors 2 were buried in the target formation. These sensors were distributed on 5 cross sections, with 15 temperature sensors 2 in each cross section. Two horizontal wells (steam injection well and production well) were also arranged in the bottom area of the simulated target formation during this process. In order to avoid damage to the sensors and well pipes during the subsequent compaction process, grooves were pre-cut in the mold during the experiment.
[0039] After the above steps, the composition, porosity and permeability of the target formation reached a level highly consistent with the actual reservoir, ensuring the accuracy and reliability of the experimental results.
[0040] In the present application, the temperature sensors 2 are mainly distributed in the area near the upper part of the steam injection well (I well) in order to monitor the development of the steam chamber. For example, the test box 3 has a size of 1100mm×500mm×500mm, and the temperature sensors 2 are distributed on five cross sections of the oil sand reservoir 9, such as Figure 4-6As shown, the five cross sections are a, b, c, d, and e, respectively. There are fifteen temperature sensors 2 on each cross section. The lowest row of temperature sensors 2 on each cross section is located between the steam injection well and the production well. The spacing between the temperature sensors 2 of this layer and the temperature sensors 2 of the previous layer (along the Z-axis direction) is designed to be 60 mm. The spacing between two adjacent layers of temperature sensors 2 along the Z-axis direction on each other cross section is 40 mm. The spacing between two adjacent temperature sensors 2 at the same height along the X-axis direction on each cross section is 80 mm. The spacing between the steam injection well and the production well is 50 mm, and the distance between the production well and the bottom wall of the test box 3 is 50 mm. The spacing between two adjacent cross sections along the X-axis direction is 100 mm. It should be noted that the present application does not make specific restrictions on the size of the test box 3 and the specific installation position and distribution of the temperature sensors 2. Without deviating from the basic principles of the present invention, it is set according to actual conditions and experimental requirements.
[0041] These temperature sensors 2 are used to detect temperature changes inside the oil sand reservoir 9. The temperature data measured by these sensors at different locations allow researchers to draw profiles of temperature distribution, which show the evolution of the temperature cavity during the experiment. These profiles show the temperature distribution along the horizontal wellbore from the toe to the heel of the wellbore, helping to analyze the formation and expansion process of the steam cavity.
[0042] Step S2 specifically includes accurately determining the three-dimensional principal stress distribution of the target formation based on the geostress data of the target block or through a small-scale fracturing geostress test conducted on site. On this basis, a true triaxial loading system is used to apply a predetermined three-dimensional principal stress to the core sample in the entire test box 3 (the bottom layer 8, oil sand reservoir 9 and cap layer 4 are the entire core sample), such as Figure 7 As shown, the actual ground stress environment underground is realistically reproduced. The applied load value is precisely set to the triaxial effective stress value under the field formation conditions. Ground stress loading runs through the entire experimental process to ensure that the core sample in the test box 3 is always in a stress state consistent with the underground environment.
[0043] Specifically, these stress loadings are not only applied to the oil sand reservoir 9, but also accurately applied to the overburden 4 and the bottom layer 8. By controlling the distribution of stress in all directions, it is ensured that the stress state in the simulation experiment is highly consistent with the stress field characteristics in the actual underground environment, and the stress transfer and mutual influence between layers are fully considered, making the experimental results more practical and guiding.
[0044] After the triaxial stress reaches and stabilizes at a predetermined value, a hydraulic expansion operation is performed. Figure 8The hydraulic expansion operation includes: sequentially performing a well washing operation S31, a ground stress transformation operation S32, a preliminary hydraulic expansion operation S33, an expansion hydraulic expansion area operation S34 and a horizontal thermal connectivity inspection operation S35 on the oil sand reservoir 9.
[0045] In one embodiment, the well washing operation S31 specifically includes: Inject cleaning liquid into the oil sand reservoir 9 for cleaning, and judge whether the cleaning is completed according to the cleanliness of the liquid discharged from the short pipe 6; in this step, the cleaning liquid is injected into the oil sand reservoir 9 through the long pipe 7, and the sewage after cleaning is discharged through the short pipe 6; If the cleanliness reaches the predetermined cleaning standard, the cleaning is considered to be completed; the cleanliness detection can be carried out by testing the discharged sewage through a cleanliness detector, and if the test data reaches the predetermined cleaning standard, the cleaning is considered to be completed; Specifically, the step of "injecting cleaning fluid into the oil sand reservoir 9" specifically includes: Injecting cleaning fluid into the oil sand reservoir 9 at an initial low flow rate; Liquid injection is performed at a lower flow rate at the beginning to ensure that the fluid can enter the wellbore smoothly without causing sudden formation damage or fluid breakthrough; After the initial low flow rate reaches stability, the flow rate of the cleaning fluid injected into the oil sand reservoir 9 is gradually increased according to the set ratio and the set interval time; Real-time monitoring of the cleanliness of the liquid discharged from the short pipe 6 and the pressure change value between two adjacent flow rates in the oil sand reservoir 9; If the liquid cleanliness does not change or the pressure change value is greater than the preset pressure difference, stop increasing the flow rate until the liquid cleanliness changes and the pressure change value is less than the preset pressure difference, then continue to increase the flow rate to ensure the safety and effectiveness of the cleaning process; After the liquid cleanliness reaches a predetermined cleanliness standard, the injection of cleaning liquid into the oil sand reservoir 9 is stopped.
[0046] The above steps can effectively improve the efficiency of well washing, ensure that the sediment is completely removed, and prevent formation damage or other problems caused by a sudden increase in flow.
[0047] In one embodiment, the geostress transformation operation S32 specifically includes: Injecting clean water into the oil sand reservoir 9 and controlling the drainage flow rate to perform geostress transformation; Obtaining pressure values in real time, and obtaining pore pressure values and effective stress values in the oil sand reservoir 9 according to the pressure values; Determining the magnitude of the pore pressure value and the effective stress value; If the pore pressure value and the effective stress value both reach the corresponding preset required values, it is determined that the ground stress transformation is completed.
[0048] In the geostress transformation step, clean water is injected into the oil sand reservoir 9 through the long pipe 7 according to the first injection pressure value, and the valve opening and closing degree on the short pipe 6 is adjusted to increase the pore pressure around the well and reduce the effective stress, thereby changing the original geostress state and achieving the purpose of geostress transformation. The reduction of effective stress can reduce the strength of the rock of the oil sand reservoir 9, thereby promoting the generation and extension of cracks. Geostress transformation can induce and expand complex fracture networks, thereby improving the permeability and connectivity of the reservoir.
[0049] It should be noted that the present application does not impose any specific restrictions on the specific numerical values of the set ratio, the set interval time, and the preset pressure difference, and they can be flexibly set according to actual conditions without deviating from the basic principles of the present invention.
[0050] In one embodiment, a preliminary hydraulic capacity expansion operation is performed after the ground stress transformation is completed. The preliminary hydraulic capacity expansion operation S33 specifically includes: Injecting expansion liquid into the oil sand reservoir 9 according to a preset injection pressure, and during the injection process, the valve on the short pipe 6 is in a closed state; After the injection is completed, the pressure is held down for a first set time to form a preliminary hydraulic expansion zone; Among them, the preset injection pressure method is: starting from the set minimum injection pressure value, controlling the injection pressure value to gradually increase to the set maximum injection pressure value in a step-by-step manner, the minimum injection pressure value is greater than the minimum resistive stress value of the oil sand reservoir 9, and the maximum injection pressure value is less than the fracture pressure value of the oil sand reservoir 9.
[0051] Specifically, starting from the lowest injection pressure value, the pressure is gradually increased step by step according to the interval of the first set time and the set pressure increase value. For example, if the first set time is 20 minutes and the set pressure increase value is 3MPa, then the expansion liquid is injected according to the lowest injection pressure value. When the injection time reaches the first set time (i.e. 20 minutes), the sum of the lowest injection pressure value and the set pressure increase value is used as the new injection pressure for injection, and so on, until the highest injection pressure value is reached.
[0052] In the above embodiment, the pressure value of the injected expansion liquid is gradually increased in a step-by-step manner rather than directly increased at the beginning. This gradual manner is conducive to forming a micro-crack hydraulic expansion zone, which is convenient for forming a micro-crack network rather than a single crack. The pressure value detected by the pressure sensor can be used to obtain the permeability in the oil sand reservoir 9, and the size of the expansion zone can be obtained through the permeability, so that the effect of the initial hydraulic expansion can be evaluated.
[0053] In the present application, the specific values of the minimum injection pressure value, the maximum injection pressure value, the first set time and the set pressure increase value are not specifically limited, and they can be flexibly set according to actual conditions without deviating from the basic principles of the present invention.
[0054] In one embodiment, the hydraulic expansion area expansion operation S34 specifically includes: Injecting expansion liquid into the oil sand reservoir 9 according to the second injection pressure value and the second set time, and the valve on the short pipe 6 is in a closed state during the injection process; when the second set time is reached, the valve on the short pipe 6 is controlled to open to drain water to form a hydraulic shock operation; The above hydraulic oscillation operation is repeated until the current permeability obtained by inverting the real-time pressure value reaches the set permeability, so as to evenly expand the hydraulic expansion area and form a micro-fracture network inside the oil sand reservoir 9.
[0055] In the above embodiment, after the wellhead pressure is quickly increased by a high-pressure water pump, the pump is suddenly stopped and the valve of the short pipe 6 is opened to drain water. By repeating this process, hydraulic shock is achieved to break up the interlayers in the heterogeneous oil sand reservoir 9 and evenly expand the expansion area. The hydraulic expansion technology effectively improves the heterogeneity of the reservoir, optimizes the steam migration path, and expands the development area of the steam chamber, thereby maximizing the recovery rate of the oil reservoir.
[0056] In one embodiment, the horizontal thermal connectivity verification operation S35 specifically includes: Inject a set amount of hot water at a set temperature into the oil sand reservoir 9 through the steam injection well, and during the injection process, the valve on the short pipe 6 is in a closed state; Acquire the temperature value of each position in the oil sand reservoir 9 in real time and calculate the temperature difference between the temperature value of each position and the set temperature value after a third set time; Determine the size of each temperature difference value and the corresponding preset temperature difference value; If the temperature difference is less than or equal to the corresponding preset temperature difference, it is determined that the horizontal thermal connectivity of the oil sand reservoir 9 is qualified.
[0057] In addition, the horizontal thermal connectivity verification operation specifically includes: If the temperature difference is greater than the corresponding preset temperature difference, the hydraulic oscillation operation in the hydraulic expansion zone expansion operation is repeated, and the horizontal thermal connectivity test operation is performed once every fourth set time until the horizontal thermal connectivity of the oil sand reservoir 9 is determined to be qualified.
[0058] In the above embodiment, hot water is injected into the steam injection well, and the temperature change is monitored. The propagation of the heat source in the sample is analyzed to evaluate the horizontal thermal connectivity of the expansion area, thereby ensuring the effectiveness of the expansion area and the continuity of production, and effectively evaluating the construction effect of the hydraulic expansion.
[0059] The present invention simulates the hydraulic expansion operation before simulating production. After the hydraulic expansion operation, a micro-crack network is formed inside the oil sand reservoir 9 instead of a single crack, thereby achieving a fundamental improvement in the internal structure of the reservoir, changing the pore structure and permeability of the oil sand reservoir 9, greatly improving the connectivity and heat conduction efficiency of the expansion zone, and further enhancing the effect of steam-assisted mining.
[0060] During the hydraulic expansion operation, the true triaxial loading system is always in a loading state, so as to fully simulate the actual situation of the double well expansion and connection process. These steps not only cover the entire process from basic preparation to effect evaluation, but also provide scientific basis and practical data for actual engineering applications.
[0061] In the present application, the injection of expansion fluid, cleaning fluid and clean water is completed through a pump system, and this pump system achieves the operation requirements of different stages by controlling the injection pressure and flow rate of the fluid.
[0062] In this application, the steam cycle simulation operation specifically includes: Injecting high-temperature steam into the steam injection well and the production well to carry out the steam circulation process according to the steam injection flow rate and circulation time determined by the field steam circulation method and similar criteria; Acquire temperature data in the oil sand reservoir 9 in real time, and determine whether the oil sand reservoir 9 has reached the conversion standard based on the temperature data; If the conversion criteria are not met, the steam cycle process continues; If the conversion criteria are met, the heavy oil extraction simulation process is executed.
[0063] Specifically, first ensure that a stable connection is established between the steam generator and the simulated steam injection well and production well to ensure that high-temperature steam can be effectively transmitted from the steam generator to the wellbore and then to the oil sand reservoir 9. The temperature data detected by the temperature sensor 2 is used to monitor how the steam propagates and distributes in the oil sand reservoir 9. In the process of steam being injected into the oil sand reservoir 9 through the steam injection well and forming a steam chamber, the heat of the steam is transferred to the oil sand in the reservoir, thereby reducing the viscosity of the oil sand and increasing its fluidity. This process enables the oil sand in the reservoir to be extracted in the production well.
[0064] In the present application, after the steam cycle process, a steam chamber can be obtained, and the size, shape and temperature distribution diagram of the steam chamber are usually generated by detailed analysis of the data collected by the temperature sensor 2. The specific steps are as follows: Data collection: Temperature sensors 2 arranged at different depths and locations continuously record the temperature within the oil sand reservoir 9. In order to generate an accurate temperature distribution map, multiple sets of sensor data are usually required, which will form a multi-dimensional matrix.
[0065] Data processing and interpolation: These temperature data are input into the dedicated fluid-solid thermal coupling analysis software for processing. The software uses the interpolation algorithm to convert the discrete temperature point data into a continuous temperature field distribution.
[0066] Generate images: The processed data generates a 3D temperature distribution map in the software. The size, shape and temperature distribution of the steam chamber can be intuitively displayed in the form of color changes or isotherms. This process requires the support of the thermal simulation module of the software, which can accurately capture and display the dynamic changes of the steam chamber expansion.
[0067] We use our own fluid-solid thermal coupling analysis software and the data from the temperature sensor 2 to construct the temperature field of the steam chamber and generate a 3D visualization image. In this way, we can accurately understand the expansion of the steam chamber, such as Fig. 9 and Fig.10 As shown, it provides a basis for subsequent production decisions.
[0068] Regarding judging whether the oil sand reservoir 9 has reached the conditions for conversion: In the SAGD (steam-assisted gravity drive) development process, the criteria for judging whether the oil sand reservoir 9 has reached the conditions for conversion to production are as follows: The steam chamber expands to the target area: by analyzing the temperature field data collected by the temperature sensor 2, if the steam chamber has fully expanded and covered the target oil layer area, and the temperature field is evenly distributed, it means that the oil sand layer has been effectively heated.
[0069] Temperature uniformity: Judging the uniformity of the temperature field is the key. If the temperature field inside the reservoir is relatively uniform at all locations and the temperature has reached the design temperature, it means that the steam chamber has stabilized and the oil sand layer has been fully heated.
[0070] Fig. 9 It shows the temperature distribution diagram of different cross sections after the steam cycle process is carried out in the conventional way. Fig.10 The temperature distribution diagrams corresponding to different cross sections after the steam cycle process is performed after the expansion is performed in this application. These diagrams are generated based on the temperature data collected in the experiment and are used to show the formation and expansion process of the steam chamber.
[0071] a, b, c, d, and e represent five different cross sections along the X direction of the target formation, such as Figure 4 As shown. Temperature sensors 2 are installed on these sections to monitor the propagation of steam in the oil sand reservoir 9. By analyzing the temperature data at different positions on these sections, the formation, expansion and temperature change of the steam cavity can be observed. It reflects the expansion and heat conduction effect of the steam cavity at different positions, and can more comprehensively understand the propagation of steam in the reservoir, thereby verifying the effectiveness of the expansion step.
[0072] pass Fig. 9 and Fig.10 The comparison proves that the expansion step described in the present invention can form a better steam chamber. By comparing the temperature distribution diagrams before and after the expansion, it can be seen that after adopting the expansion technology, the steam propagates more evenly in the reservoir and the expansion of the steam chamber is more effective. This shows that the technology not only improves the porosity and permeability of the reservoir, but also significantly improves the efficiency of steam chamber formation.
[0073] The heavy oil extraction simulation process in step S5 is specifically to connect the negative pressure extraction system to the production well, and use the negative pressure principle to extract the heavy oil with enhanced fluidity after heating, so as to realize the heavy oil extraction simulation process. By installing a metering device at the end of the extraction system, the oil and water production extracted from the production well can be monitored and recorded in real time.
[0074] The present invention systematically studies the key processes in the SAGD dual horizontal well expansion technology by constructing a large-scale three-dimensional physical simulation method. The method uses a true triaxial loading system to simulate the actual stress environment of the formation, and combines a multi-physics field coupling model to deeply analyze the physical changes of the oil sand reservoir during the hydraulic expansion process. Experimental verification shows that the simulation method of the present invention can accurately reproduce the formation process of the micro-fracture network inside the oil sand reservoir, thereby significantly improving the porosity and permeability of the expansion zone and optimizing the physical structure of the reservoir.
[0075] On this basis, the present invention proposes a liquid injection strategy based on pressure control to address the multiphase fluid seepage problem that may occur during the expansion process, ensuring the uniformity and stability of the seepage process in the expansion area. This strategy effectively improves the heat conduction efficiency, promotes the formation and expansion of the steam cavity, thereby accelerating the heating process of the oil reservoir and improving the recovery rate of heavy oil.
[0076] Through the simulation method described in the above embodiment, the present invention successfully reproduced the actual oil sand reservoir expansion process under laboratory conditions, so that the physical structure of the oil sand reservoir was fundamentally improved. This direct reservoir transformation method not only enhances the formation and expansion of the steam chamber, but also accelerates the heating rate of the oil reservoir and improves the recovery rate of heavy oil. This breakthrough makes up for the lack of simulation and verification of the actual effect of the expansion process in the prior art, improves the understanding of the expansion process, and lays a solid foundation for the widespread application of SAGD technology under different geological conditions.
[0077] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the protection scope of the technical solutions of the embodiments of the present invention.
Claims
1. A large-scale three-dimensional physical simulation method for SAGD dual horizontal well expansion technology, characterized in that: The following steps are involved: Establish a target formation required for simulation, the target formation includes a bottom layer, an oil sand reservoir and a cap layer arranged in order from bottom to top, two screen pipes are buried in the oil sand reservoir to respectively simulate the steam injection well and the production well in the SAGD technology, each screen pipe is provided with a long pipe and a short pipe, a plurality of temperature sensors are buried in the oil sand reservoir to detect the temperature of different parts, and the wellheads of the steam injection well and the production well are both equipped with pressure sensors and flow meters; Applying ground stress to the target stratum using a true triaxial loading system; Under the condition of loading ground stress, hydraulic expansion operation is performed on the oil sand reservoir to form a micro-fracture network inside the oil sand reservoir; After the hydraulic expansion operation is completed, a steam circulation simulation operation is performed on the target formation; When the target formation reaches the production conversion standard, a heavy oil extraction simulation process is performed.
2. The large-scale three-dimensional physical simulation method of the SAGD dual horizontal well expansion technology according to claim 1 is characterized in that: The hydraulic expansion operation includes: sequentially performing a well washing operation, a ground stress transformation operation, a preliminary hydraulic expansion operation, an expansion hydraulic expansion area operation and a horizontal thermal connectivity inspection operation on the oil sand reservoir.
3. The large-scale three-dimensional physical simulation method for the SAGD dual horizontal well expansion technology according to claim 2 is characterized in that: The well washing operation specifically includes: Injecting cleaning fluid into the oil sand reservoir for cleaning, and judging whether the cleaning is completed according to the cleanliness of the liquid discharged from the short pipe; If the cleanliness reaches a predetermined cleanliness standard, cleaning is considered complete.
4. The large-scale three-dimensional physical simulation method for the SAGD dual horizontal well expansion technology according to claim 3 is characterized in that: The step of "injecting cleaning fluid into the oil sand reservoir" specifically includes: injecting a cleaning fluid into the oil sand reservoir at an initial low flow rate; After the initial low flow rate reaches stability, the flow rate of the cleaning fluid injected into the oil sand reservoir is gradually increased according to the set ratio and the set interval time; Real-time monitoring of the cleanliness of the liquid discharged from the short pipe and the pressure change between two adjacent flow rates in the oil sand reservoir; If the liquid cleanliness does not change or the pressure change value is greater than the preset pressure difference value, stop increasing the flow rate until the liquid cleanliness changes and the pressure change value is less than the preset pressure difference value, then continue to increase the flow rate; After the liquid cleanliness reaches a predetermined cleanliness standard, the injection of cleaning liquid into the oil sand reservoir is stopped.
5. The large-scale three-dimensional physical simulation method for the SAGD dual horizontal well expansion technology according to claim 3 is characterized in that: The geostress transformation operation specifically includes: injecting clean water into the oil sand reservoir and controlling the drainage flow; Acquire pressure values in real time, and acquire pore pressure values and effective stress values in the oil sand reservoir according to the pressure values; Determining the magnitude of the pore pressure value and the effective stress value; If the pore pressure value and the effective stress value both reach the corresponding preset required values, it is determined that the ground stress transformation is completed.
6. The large-scale three-dimensional physical simulation method for the SAGD dual horizontal well expansion technology according to claim 2, characterized in that: The preliminary hydraulic capacity expansion operation specifically includes: Injecting expansion liquid into the oil sand reservoir according to a preset injection pressure, and during the injection process, the valve on the short pipe is in a closed state; After the injection is completed, the pressure is held down for a first set time to form a preliminary hydraulic expansion zone; Among them, the preset injection pressure method is: starting from the set minimum injection pressure value, controlling the injection pressure value to gradually increase to the set maximum injection pressure value in a step-by-step manner, the minimum injection pressure value is greater than the minimum resistive stress value of the oil sand reservoir, and the maximum injection pressure value is less than the fracture pressure value of the oil sand reservoir.
7. The large-scale three-dimensional physical simulation method for the SAGD dual horizontal well expansion technology according to claim 2, characterized in that: The operation of expanding the hydraulic capacity expansion area specifically includes: Injecting expansion liquid into the oil sand reservoir according to a second injection pressure value and a second set time, and the valve on the short pipe is in a closed state during the injection process; when the second set time is reached, the valve on the short pipe is controlled to open to drain water to form a hydraulic shock operation; The hydraulic oscillation operation is repeated until the current permeability obtained by inverting the real-time pressure value reaches the set permeability, so as to evenly expand the hydraulic expansion area and form a micro-fracture network inside the oil sand reservoir.
8. The large-scale three-dimensional physical simulation method for the SAGD dual horizontal well expansion technology according to claim 7, characterized in that: The horizontal thermal connectivity verification operation specifically includes: Injecting a set amount of hot water at a set temperature into the oil sand reservoir through the steam injection well, and during the injection process, the valve on the short pipe is in a closed state; Acquire the temperature value of each position in the oil sand reservoir in real time and calculate the temperature difference between the temperature value of each position and the set temperature value after a third set time; Determine the size of each temperature difference value and the corresponding preset temperature difference value; If the temperature difference is less than or equal to the corresponding preset temperature difference, it is determined that the horizontal thermal connectivity of the oil sand reservoir is qualified.
9. The large-scale three-dimensional physical simulation method for the SAGD dual horizontal well expansion technology according to claim 8, characterized in that: The horizontal thermal connectivity verification operation specifically includes: If the temperature difference is greater than the corresponding preset temperature difference, the hydraulic oscillation operation in the hydraulic expansion area expansion operation is repeated, and the horizontal thermal connectivity inspection operation is performed once every fourth set time until the horizontal thermal connectivity of the oil sand reservoir is determined to be qualified.
10. The large-scale three-dimensional physical simulation method for the SAGD dual horizontal well expansion technology according to claim 1, characterized in that: The steam cycle simulation operation specifically includes: Injecting high-temperature steam into the steam injection well and the production well to carry out the steam circulation process according to the steam injection flow rate and circulation time determined by the field steam circulation method and similar criteria; Acquire temperature data in the oil sand reservoir in real time, and determine whether the oil sand reservoir meets the conversion standard according to the temperature data; If the changeover criteria are not met, the steam cycle process continues.